Hira RCC Cement Mill

This risk assessment form summarizes potential hazards, consequences, current controls, and additional controls needed for pouring cement foundations at a project site. Key steps include: 1) Reinforcement work with hazards like cuts, injuries, and electric shock requiring PPE and safe handling. 2) Formwork with hitting, slipping, tripping, and falling hazards controlled by training, PPE, and caution signs. 3) Pouring RCC using a boom presser machine and pump after inspecting shuttering and reinforcement and only allowing trained operators. 4) Material lifting and shifting controlled by using validated flagmen, riggers, tag lines, and supervision to prevent injuries from lifting tools or manual handling.

Uploaded by

Raju
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
591 views2 pages

Hira RCC Cement Mill

This risk assessment form summarizes potential hazards, consequences, current controls, and additional controls needed for pouring cement foundations at a project site. Key steps include: 1) Reinforcement work with hazards like cuts, injuries, and electric shock requiring PPE and safe handling. 2) Formwork with hitting, slipping, tripping, and falling hazards controlled by training, PPE, and caution signs. 3) Pouring RCC using a boom presser machine and pump after inspecting shuttering and reinforcement and only allowing trained operators. 4) Material lifting and shifting controlled by using validated flagmen, riggers, tag lines, and supervision to prevent injuries from lifting tools or manual handling.

Uploaded by

Raju
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Risk Assessment/Management Form

For RCC Pouring of Cement mill Foundation 1400 Cu.m


Dept: Sindri Project SOP NO: 001

Probab

Probab
Severit

Severit

Residu
al risk
Sl Initial Additional control

ility
ility
Basic Job Steps Potential Hazard Consequence/Risk Current control measure

y
No. Risk measure

• Pinch Point
• Cut injury
• person Injury due to • Use Mandatory PPE’s & Appropriate Hand gloves.( Safety Shoes, Helmet,
improper handling of Safety Goggles, Reflective Jackle, Cut Resistance Hand Gloves etc.
Reinforcement • Injury to workmen • . Shoulder pad should be used while shifting of Rebar. Ensure daily Tool box
1 Reinforcement work 3 2 6 2 1 2
• Injury of shoulder. • property damage . Proper communication and co ordination with co workers talk(TBT)
• . Ensure good housekeeping in work area
Electric shock .
• Fall the person.

• Hitting hazard by Ensure daily Tool Box


• Only trained person involbe in job
hammer talk.Continuious
  • Injury to workmen • TBT must be conduct after start the job
2 Form work • slip & trip hazard 3 3 9 supervision to be 2 1 2
• property damage• • provied mandatry ppes with harnes
• pinch point maintained during the
• Necessary caution board to be placed
• falling hazard activity

• Use Mandatory PPE’s & Appropriate Hand gloves.( Safety Shoes, Helmet,
• Eye injury ·         • Injury to Safety Goggles, Reflective Jackle, Cut Resistance Hand Gloves etc.
• slip & trip hazard workmen • Work location should be housekeeped
given tbt before start
3 RCC Pouring • Pinch Point • property damage • pouring of concrete by using Boom presser machine & concrete pump 2 1 2
the job
• falling hazard • fall of person • inspection of shuttering and support, check reinforcement as per BBS
• Hand injury •
• Only trained person involbe in job

• Physical injury
during Lifting /
  • Ensure application of mandatory as well as job specific PPEs by the
shifting / stacking /
team and by the others.
manual handling of
• Ensure trade validated Fflagmen and Riggers are deployed for the job. tbt and work permit
material and
• Ensure tag lines with appropriate length provided with the load and no must be insure before
machinery ·          • Personal Injury.
4 Material Lifting & shifting person to be allowed to move near or under a suspended load 3 2 6 start the job and only 2 1 2
• Failure of Lifting • property damage
• Work shall be done under strict supervision. trande person involbe in
Tool – Tackles
• . SWL, load radius & boom length shall be checked before lifting. job
• slip & trip hazard
• Crane/Fraena or jcb operator should have valid TPI
• pinch point
.
• falling hazard

• Working location should be housekeeped


• Personal injury.
• Use mandatory ppe
5 ·         slip & trip hazard
• Property Damage
• Provide proper landing pleat farm with guardrail system
Curing
6 ·         pinch point
7 ·         falling hazard
8

Reference:
Reviewed By concern Reviewed By Project
Prepared By Approved By
Dept. Safety

Hapbco Sinoma ACC ACC


Note:
Date- Date- Date- Date-

Enclosure:
1. Any Drgs
Probab

Probab
Severit

Severit

Residu
al risk
Sl Initial Additional control

ility
ility
Basic Job Steps Potential Hazard Consequence/Risk Current control measure

y
No. Risk measure
2..Method statement.