0% found this document useful (0 votes)
63 views10 pages

Bar Bending Schedule - RCC Slab New

This document contains a bar bending schedule for reinforcing steel in an RCC slab. It lists two bar sizes - 6 mm and 8 mm diameter bars of varying lengths and quantities. It shows the cut length of each bar, diameter, number of bars, total bar length, and weight calculations. The total weight of reinforcing steel required for the slab is calculated to be 42.215 kg.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views10 pages

Bar Bending Schedule - RCC Slab New

This document contains a bar bending schedule for reinforcing steel in an RCC slab. It lists two bar sizes - 6 mm and 8 mm diameter bars of varying lengths and quantities. It shows the cut length of each bar, diameter, number of bars, total bar length, and weight calculations. The total weight of reinforcing steel required for the slab is calculated to be 42.215 kg.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Bar Bending Schedule - RCC Slab

mm
230
6 Dia @ 180 mm C/C

300
mm 8 Dia @ 170 mm C/C

mm
230
Designed By: #BOSS PLAN For More
About Surveying & Civil Engineering Join Us @ www.fb.com/LandSurveyors

4000

230 100
mm mm

230 2000 230 Ends Cover =


Note: All Input data Cells mm mm
are in Red Color Top Cover =
Bottom Cover =

Cut Length of Bar Dia No Length (m) Total Length (m) Weight in Kg/m
100 - 2 x 13 2410 + 18 x 8 Pi 8 2
- 8= 66 + 0.414 x 66 2.5813 x 27 4 x 1000 x 7860
8 4410
170 + 1 = 2581.32
= 2.58132 m 69.696 0.39489 Kg/m
2000 + 2 x 230 - 2 x 25
= 2410 mm 27 No Additional Length for each
crank = 0.414d

2410 + 1 Pi 6 2
4.41 x 15 4 x 1000 x 7860
4000 + 2 x 230 - 2 x 25 6 180 4.41 m
= 4410 mm 15 No 66.150 0.22212 Kg/m
Total Weight =

Bar Bending Schedule of RCC SLAB (Practice Sheet)


Cut Length of Bar Dia No's Length of Bar (m) Total Length (m) Weight in Kg/m
Span + 2BW - 2CC Total Length x No Pi/4 x (d/1000)2 x 7860
[(Span - + 18d + 0.414h
EC)/(Spacing
C-C)]+1
[(Span -
EC)/(Spacing
C-C)]+1

Bentup Bars

Straight Bars

Total Weight =
300
mm

For More

100
mm

230
mm

Ends Cover = 25 mm
Top Cover = 13 mm
Bottom Cover = 13 mm
ht in Kg/m Total Weight in Kg

0.3949 x 69.696
7860
27.522 Kg

0.2221 x 66.150
7860
14.693 Kg

Weight = 42.215 Kg

Sheet)
ht in Kg/m Total Weight in Kg
2
/1000) x 7860 Weight Kg/m x Length
Weight = Kg
Downloaded from http://CivilEngineeringBible.com
Downloaded from http://CivilEngineeringBible.com

Downloaded from http://CivilEngineeringBible.com

Downloaded from http://CivilEngineeringBible.com


Downloaded from http://CivilEngineeringBible.com
Downloaded from http://CivilEngineeringBible.com

You might also like