0% found this document useful (0 votes)
628 views37 pages

Nitoproof 10

The document provides technical information about Nitoproof 10, a bitumen emulsion protective coating produced by Fosam Company Limited. It can be used as a damp-proof membrane, vapour seal, and protective coating for concrete and masonry. Nitoproof 10 is easy to apply, economical, and resists chemicals while serving as both a protective coating and curing membrane. It is applied in one or two coats at a rate of 2 square meters per liter.

Uploaded by

Gavriel Ng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
628 views37 pages

Nitoproof 10

The document provides technical information about Nitoproof 10, a bitumen emulsion protective coating produced by Fosam Company Limited. It can be used as a damp-proof membrane, vapour seal, and protective coating for concrete and masonry. Nitoproof 10 is easy to apply, economical, and resists chemicals while serving as both a protective coating and curing membrane. It is applied in one or two coats at a rate of 2 square meters per liter.

Uploaded by

Gavriel Ng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 37

constructive solutions

Technical Submittal

NITOPROOF 10
(Bitumen emulsion protective coating)

Fosam Company Limited


Head Office
telephone: fax: email:
PO Box 11081
Jeddah – 21453 +966 (12) 637 5345 +966 (12) 637 5891 [email protected]
Saudi Arabia
C.R. No. 31273
Paid up Capital: SR3,000,000
www.fosroc.com Registered Office: Industrial Area, Phase 4, Road No. 102, Street No. 82
constructive solutions

Technical Datasheet
Nitoproof 10 constructive solutions

Bitumen emulsion protective coating

Uses Properties

To act as a damp-proof membrane and vapour seal for The essential properties of Nitoproof 10 are:
concrete and masonry. It can also be used as a protective
coating for concrete below ground. Bitumen content: 60%
 Time between coats: Minimum 2 hours
 Foundation protective coating
Chemical resistance
 Curing membrane (Test results with some common chemicals)
Potable water: Excellent
Sea water: Excellent
Advantages 10% Sodium Hydroxide: Satisfactory
5% Sodium sulphate: Satisfactory
 Nitoproof 10 has a number of significant advantages as Wet heat (700C + 80% R.H.): Satisfactory
follows:
Instructions for Use
 Easy to apply
Surface preparation
 Economical in use
Surfaces to be coated must be sound, clean and free of oil
 Multipurpose, serves both as a protective coating and or grease. Any oil or grease contamination should be
curing membrane removed with a proprietary chemical degreaser. If the
surface is dusty, it should be primed with a coat of Nitoproof
 Contains no solvent, no health hazard 10, diluted with an equal quantity of cool, clean water and
allowed to dry.
 Resists attack by chloride and sulphate ions present in
the ground water Application

Nitoproof 10 may be applied by brush, broom or squeegee.


 Adhere to wide range of materials including concrete, It is recommended that one or two coats should be applied
steel, cork and wood depending on the degree of protection required. Allow a
minimum of 2 hours between coats.
Description
Where the Nitoproof 10 is to take a screed, the second coat
Nitoproof 10 is a brown/black liquid blend of selected should be blinded with clean, dry sharp sand as soon as
bitumens emulsified with water to give an easily applied applied. The excess sand should be brushed off when the
protective coating. coating has dried.

Cleaning
Standards compliance
Nitoproof 10 should be removed from tools and equipment
Nitoproof 10 complies with concrete curing requirements of with water when it is wet. On drying Nitoproof 10 may be
ASTM C309-93 when applied at a rate of 2m² per litre and to removed with Fosroc Solvent 102.
BS6949:1991 requirements for bituminous coating.

Technical support
Specification
Fosroc offers a full technical support package to specifiers,
Concrete surfaces shall be waterproofed with Nitoproof 10, a end users and contractors, as well as on-site assistance in
bitumen emulsion protective coating. It shall be applied at a locations all over the world.
rate of 2 m² per litre, and thus act as a combined
waterproofing and curing agent in accordance with ASTM
C309.

Page 1
Nitoproof 10
Estimating Additional Information

Supply Fosroc manufactures a wide range of complementary


products which include:
Nitoproof 10: 20 & 200 litre drums
Fosroc Solvent 102: 4 litre containers  Waterproofing membranes & waterstops

Coverage  Joint sealants & filler boards

The coverage will vary upon the level of protection required:  Cementitious & epoxy grouts

Nitoproof 10  Specialised flooring materials


Normal Conditions: 7.0 to 9.0 m²/litre (at 60 – 75
microns dft Fosroc additionally offers a comprehensive package of
Severe conditions: 2
2.4 m /litre (at 250 microns dft) products specifically designed for the repair and
refurbishment of damaged concrete. Fosroc’s ‘Systematic
(The above coverage rates depend on substrate porosity, Approach’ to concrete repair features the following:
roughness, shape, and conditions)
 Hand-placed repair mortars
Storage
 Spray grade repair mortars
Shelf life
 Fluid micro-concretes
Nitoproof 10 has a shelf life of 12 months if stored in shade
below 45°C under normal warehouse conditions.  Chemically resistant epoxy mortars

 Anti-carbonation/anti-chloride protective coatings


Precautions
 Chemical and abrasion resistant coatings
Health and safety
For further information on any of the above, please consult
Nitoproof 10 contains bituminous material. Possible risk of your local Fosroc office - as below.
irreversible effects in contact with skin. Wear suitable
protective clothing, gloves and eye/face protection. Barrier
creams provide additional skin protection. Should accidental
skin contact occur, remove immediately with plenty of clean
water and seek medical advice. If swallowed, seek medical
attention immediately - do not induce vomiting.

Fire

Nitoproof 10 is not flammable. Fosroc Solvent 102 is


flammable. Ensure adequate ventilation. Do not use near a
naked flame and do not smoke during use.

Flash point

Fosroc Solvent 102: 33°C

For further information, please consult the Material Safety


Data Sheet for the respective products.

Important note:
Fosroc products are guaranteed against defective materials and manufacture and are sold subject to its standard Conditions
for the Supply of Goods and Services, copies of which may be obtained on request. Whilst Fosroc endeavours to ensure that
any advice, recommendation, specification of information it may give is accurate and correct, it cannot, because it has no direct
or continuous control over where or how its products are applied, accept any liability either directly or indirectly arising from the
use of its products, whether or not in accordance with any advice, specification, recommendation of information given by it.

Fosam Company Limited


Telephone: +966 2 637 5345 Fax: +966 2 637 5891 email: [email protected]
Head Office
Post Box 11081 Regional Offices
Jeddah Sales Office Tel: (02) 608 0999 Fax: (02) 638 0693 Yanbu Tel: (04) 322 4280 Fax: (04) 391 2980
Jeddah – 21453
Jeddah Showroom Tel: (02) 665 0187 Fax: (02) 667 4844 Makkah Tel: (02) 542 0869 Fax: (02) 542 0869
Saudi Arabia Riyadh Tel: (01) 482 9303 Fax: (01) 482 7562 Medinah Tel: (04) 845 1767 Fax: (04) 846 3195
Dammam Tel: (03) 814 1282 Fax: (03) 814 1581 Jubail Tel: (03) 362 3904 Fax: (03) 362 3875

www.fosroc.com Khamis Mushayt Tel: (07) 250 0469 Fax: (07) 250 0469 CSD Tel: (02) 608 0999 Fax: (02) 638 0693

Registered Office: Industrial Area, Phase 4, Road No. 414, Street No. 407
Page 2 FO SA/NITOPROOF 10/25/05/11/B
constructive solutions

Material Safety
Datasheet
Revision date: 15/11/2015 Revision: 01

SAFETY DATA SHEET


NITOPROOF 10

SECTION 1: Identification of the substance/mixture and of the company/undertaking

1.1. Product identifier


Product name NITOPROOF 10

Product number 1960005

Synonyms; trade names NITOBOND AR

Container size 1 Ltr,4 Ltr,5 Ltr,25 Litre Pail,210 Litre Drum

1.2. Relevant identified uses of the substance or mixture and uses advised against
Identified uses Acrylic Primer

1.3. Details of the supplier of the safety data sheet


Supplier FOSAM COMPANY LTD
Phase 4,Road 414 , Street 82
Post Box 11081 Jeddah 21453
K.S.A
+966126375345
+966126080999
+966126375891

1.4. Emergency telephone number


Emergency telephone +966 126375345 , +966216080999

SECTION 2: Hazards identification

2.1. Classification of the substance or mixture


Classification
Physical hazards Not Classified

Health hazards Skin Sens. 1 - H317

Environmental hazards Not Classified

2.2. Label elements

Pictogram

Signal word Warning

Hazard statements H317 May cause an allergic skin reaction.

1/6
Revision date: 15/11/2015 Revision: 01

NITOPROOF 10

Precautionary statements P261 Avoid breathing vapour/spray.


P272 Contaminated work clothing should not be allowed out of the workplace.
P280 Wear protective gloves/protective clothing/eye protection/face protection.
P302+P352 IF ON SKIN: Wash with plenty of water.
P362+P364 Take off contaminated clothing and wash it before reuse.
P501 Dispose of contents/container in accordance with national regulations.

Supplementary precautionary P321 Specific treatment (see medical advice on this label).
statements P333+P313 If skin irritation or rash occurs: Get medical advice/attention.

2.3. Other hazards


SECTION 3: Composition/information on ingredients

3.2. Mixtures
Composition comments ASPHALT EMULSION, BITUMEN

SECTION 4: First aid measures

4.1. Description of first aid measures


General information Eyes: Irrigate immediately with copious quantities of water for several minutes. Obtain medical
attention if
irritation persists.
Skin: Wash thoroughly with soap and water or suitable skin cleanser as soon as possible.
Inhalation: Remove from exposure - unlikely to occur.
Ingestion: Wash out mouth with water. Obtain medical attention.

Inhalation Ensure supply of fresh air.

Ingestion DO NOT induce the patient to vomit, medical advice is required.

Skin contact In case of skin contact wash affected areas thoroughly with soap and
plenty of water. Consult a doctor in the event of a skin reaction.

Eye contact Flush eyes with clean water for at least 15 minutes keeping eyelids open. If discomfort
persists, consult a physicain.

4.2. Most important symptoms and effects, both acute and delayed
General information Irritant effects.

4.3. Indication of any immediate medical attention and special treatment needed
SECTION 5: Firefighting measures

5.1. Extinguishing media


Suitable extinguishing media Suitable Extinguishing Media: Carbon dioxide, powder, foam or water fog - Do not use water
jets.
Special Exposure Hazards: Material can splatter above 100°C. Polymer film can burn. Irritant
fumes.
Special Protective Equipment: Self-contained breathing apparatus.

5.2. Special hazards arising from the substance or mixture


5.3. Advice for firefighters
SECTION 6: Accidental release measures

6.1. Personal precautions, protective equipment and emergency procedures


Personal precautions Wear suitable protective equipment, including gloves, goggles/face shield, respirator, boots,
clothing or apron, as appropriate.

6.2. Environmental precautions

2/6
Revision date: 15/11/2015 Revision: 01

NITOPROOF 10

Environmental precautions Prevent entry into drains, sewers and water courses.

6.3. Methods and material for containment and cleaning up


Methods for cleaning up Soak up with inert absorbent or contain and remove by best available means. Gather into
containers.

6.4. Reference to other sections


SECTION 7: Handling and storage

7.1. Precautions for safe handling


Usage precautions avoid skin and eyes contact

7.2. Conditions for safe storage, including any incompatibilities


Storage precautions Store in cool, dry area.

7.3. Specific end use(s)


SECTION 8: Exposure Controls/personal protection

8.1. Control parameters

Ingredient comments No exposure limits known for ingredient(s).

8.2. Exposure controls

Protective equipment

Appropriate engineering No specific ventilation requirement noted.


controls

SECTION 9: Physical and Chemical Properties

9.1. Information on basic physical and chemical properties


Appearance Liquid.

Colour Milky. Brown to black

Odour Slight / faint.

pH pH (concentrated solution): 4.5 - 5.5

Melting point Not applicable.

Flash point Not applicable.

Upper/lower flammability or Not applicable.


explosive limits

Relative density 1.08 @ °C

Oxidising properties Not applicable.

9.2. Other information

SECTION 10: Stability and reactivity

10.1. Reactivity
10.2. Chemical stability
Stability Stable.

3/6
Revision date: 15/11/2015 Revision: 01

NITOPROOF 10

10.3. Possibility of hazardous reactions


10.4. Conditions to avoid
Conditions to avoid Temperatures below 2°C.

10.5. Incompatible materials


Materials to avoid None known.

10.6. Hazardous decomposition products


Hazardous decomposition Carbon oxides.
products

SECTION 11: Toxicological information

11.1. Information on toxicological effects


Toxicological effects not available.

General information The following toxicological assessment is based on a knowledge of the toxicity of the
product's components.
Oral LD50, rat >5000 mg/kg.
Dermal LD50, rat/rabbit >5000 mg/kg.
Health Effects
On Eyes: May cause transient irritation.
On Skin: Unlikely to irritate on brief or occasional exposure.
By Inhalation: Low volatility makes inhalation unlikely at ambient temperatures.
By Ingestion: Low order of acute toxicity. May cause irritation of mouth, throat and digestive
tract.

SECTION 12: Ecological Information

12.1. Toxicity
Toxicity Not available.

12.2. Persistence and degradability


Persistence and degradability Inherently biodegradable.

12.3. Bioaccumulative potential


Bioaccumulative potential Not expected to be bioaccumulative.

12.4. Mobility in soil


Mobility Mobile liquid.

12.5. Results of PBT and vPvB assessment


12.6. Other adverse effects
SECTION 13: Disposal considerations

13.1. Waste treatment methods


Disposal methods Disposal must be in accordance with local and national legislation.
Unused Product: Dispose of in an approved manner. Do not empty into drains, sewers or
water
courses.
Used/Contaminated Product: As for Unused product.
Packaging: May be steam cleaned and recycled.

SECTION 14: Transport information

4/6
Revision date: 15/11/2015 Revision: 01

NITOPROOF 10

14.1. UN number
14.2. UN proper shipping name
14.3. Transport hazard class(es)
This Product is not classified as dangerous for transport

14.4. Packing group


14.5. Environmental hazards
14.6. Special precautions for user
14.7. Transport in bulk according to Annex II of MARPOL73/78 and the IBC Code
SECTION 15: Regulatory information

15.1. Safety, health and environmental regulations/legislation specific for the substance or mixture
Guidance Hazard Label Data:-
This product is NOT classified as dangerous for supply
Safety Phrases: Avoid contact with skin and eyes.
In case of contact with eyes, rinse immediately with plenty of water and seek medical
advice.
EC Directives: Dangerous Substances Directive, 67/548/EEC and adaptations.
Dangerous Preparations Directive, 88/379/EEC.
Safety Data Sheets Directive, 91/155/EEC.
Statutory Instruments: Chemicals (Hazard Information and Packaging for Supply)
(Amendment) Regs. 1996 (SI
1092).
Control of Substances Hazardous to Health Regs. 1994 (SI 3246).
Environmental Protection (Duty of Care) Regs. 1991 (SI 2839).
Codes of Practice: Waste Management. The Duty of Care.
The above publications are available from HMSO

15.2. Chemical safety assessment


SECTION 16: Other information

General information The data and advice given apply when the product is used for the stated application or
applications. The product is not sold as suitable for any other application. Use of the product
for applications other than as stated in this sheet may give rise to risks not mentioned in this
sheet. The product should not be used other than for the stated application or applications
without seeking advice from Fosam Company ( Fosroc).
If this product has been purchased for supply to a third party for use at work, it is the
purchaser's duty to take all necessary steps to secure that any person handling or using the
product is provided with the information in this sheet.
It is the responsibility and duty of the employer to inform employees and others who may be
affected of any hazards described in this sheet and of any precautions which should be taken.
This sheet does not constitute or substitute for the users own assessment of workplace risk,
as required by other health and safety legislation.
Further copies of this Safety Data Sheet may be obtained from Fosroc Fosam Compamy.

Revision date 15/11/2015

Revision 01

SDS number 23511

Risk phrases in full NC Not classified.

Hazard statements in full H317 May cause an allergic skin reaction.

5/6
Revision date: 15/11/2015 Revision: 01

NITOPROOF 10

The information on this data sheet represents our current data and is reliable provided that the product is used under the
prescribed conditions and in accordance with the application specified on the packaging and/or in the technical guidance
literature. Any other use of the product which involves using the product in combination with any other product or any other
process is the responsibility of the user.

6/6
constructive solutions

Method Statement
method statement constructive solutions

Nitoproof10
Section A : General Comments
l Comments
High temperature working

It is suggested that, for temperatures above 350C, the following guidelines are adopted as good
working practice:

(i) Store unmixed materials in a cool (preferably temperature controlled) environment, avoiding
exposure to direct sunlight.
(ii) Keep equipment cool, arranging shade protection if necessary. It is especially important to
keep cool those surfaces of the equipment which will come into direct contact with the material
itself.
(iii) Try to avoid application during the hottest times of the day, arrange temporary shading as
necessary.
(iv) Make sufficient material, plant and labour available to ensure that application is a continuous
process.

Equipment

It is suggested that the following list of equipment is adopted as a minimum requirement.


Protective clothing : Protective overalls
: Good quality gloves, goggles and face mask
Preparation equipment : Stiff wire brush
: Soft brush
: Air compressor
Application equipment : Brush / Roller / Spray equipment

Application - points of note

Fosroc operates a policy to encourage the use, where possible, of approved or licensed applicators.
This ensures that repairs are completed satisfactorily so that the long term performance of the
materials is assured. For contractors who wish to apply the materials themselves Fosroc is also able
to offer technical assistance and training, either on-site or at its Training Centre in Jeddah.

Fosam Company Limited


Head Office
telephone: fax: email:
PO Box 11081
Jeddah – 21453 +966 (2) 637 5345 +966 (2) 637 5891 [email protected]
Saudi Arabia
Registered Office: Industrial Area, Phase 4, Road No. 414, Street No. 407 Certificate number IND93024

www.fosroc.com
constructive solutions

Section B : Application Method

1.0 Preparation

1.1 Clean the surface free of oil, grease and all loosely adhering particles, by stiff wire brushing.

1.2 Follow step 1 by soft brushing and blowing of dry, oil-free compressed air.

1.3 Ensure that the surface is free of surface water or bleeding. Conduct a test patch when
there is a doubt of the substrate condition.

2.0 Application

2.1 Stir the contents of the drum thoroughly.

2.2 Apply a full coat of Nitoproof 10, using a brush, roller or spray equipment. Confirm coverage
rates from the relevant technical data sheet and apply accordingly.

2.3 Apply the second coat at right angle to the first, after the first coat has dried fully.

2.4 Clean grit of 2mm size should be broadcast into the wet second coat to provide the
mechanical key, when it is necessary to cover the membrane with a screed or render.

2.5 Remove all loose grit prior to placing the screed/render.

2.6 Damaged areas of Nitoproof 10 can be readily over coated to restore the continuity of the
membrane.

3.0 Cleaning

3.1 Clean all tools and equipment with Fosroc Solvent 102.

Section C : Approval and variations

This method statement is offered by Fosroc as a ‘standard proposal’ for the application of Nitoproof
10. It remains the responsibility of the Engineer to determine the correct method for any given
application.

Where alternative methods are to be used, these must be submitted to Fosroc for approval, in
writing, prior to commencement of any work. Fosroc will not accept responsibility or liability for
variations to the above method statement under any other condition.

Page 2 of 2
constructive solutions

Test Reports
constructive solutions

Job References
Job References for Nitoproof 10 (Saudi Arabia Projects)
Sorted by ascending Project Category and ascending Project Date

Market Market Main


Project Title Sector Segment Contractor Country Quantity Units
King Abdullah Road Transport Road Al-Fahd Company Saudi Arabia 3200 Litres
RABIGH II INDEPNDENT WATER,STEAM
Utilities Power Oil, Gas, Coal G S Contracting Saudi Arabia 20 Drums
AND POWER PROJECT ( IWSPP)
RABIGH II INDEPNDENT WATER,STEAM
Utilities Power Hydro & Wave G S Contracting Saudi Arabia 10 Drums
AND POWER PROJECT ( IWSPP)
Al Andaluse Mall Buildings Commerical Mubark Al-Guthmi Saudi Arabia 50 200 L Drum
Al Anoud tower 2 Buildings Commerical Al Redwan Saudi Arabia 12 Drums
AL S uwalim Tower Buildings Commerical Tarouk Saudi Arabia 2 Drums
ARAFAT-MINA(AL MASHAER) RAIL WAY Transport Rail CHINA RAIL WAY CO. Saudi Arabia 227000 Litre(s)
Building of Ministry of Commerce Buildings Public & Institutional Buildings Al Dar AL Zahbia Saudi Arabia 4000 Litre(s)
correction facility Buildings Public & Institutional Buildings SBG-ABCD Saudi Arabia 20 drum
correction facility Buildings Residential SBG-ABCD Saudi Arabia 100 Drums
Dammam Cement Factory (E.P.C.C.) Industrial Cement & Concrete Gama Industry Saudi Arabia 5400 Litre(s)
Emigrants housing Buildings Residential RTCC Saudi Arabia 36000 Litre(s)
EPCC Industrial Oil & Gas Gama Industry Saudi Arabia 5400 Litre(s)
Faculty Of science - Tibah University Buildings Public & Institutional Buildings Al Khodarie Co Saudi Arabia 8000 Kilogram(s)
Hail Madinah Road Transport Road RIO Co Saudi Arabia 12000 Litre(s)
Haramain High Speed Rail Way Transport Rail MASCO Saudi Arabia 2000 Litre(s)
Haramain High Speed Rail Way Transport Rail MASCO Saudi Arabia 400 Litre(s)
Haramain High Speed Rail Way Transport Rail MASCO Saudi Arabia 4000 Litre(s)
Haramain Railway madinh Transport Rail Al Rajhi Saudi Arabia 6000 Litre(s)
Haramain Railway madinh Transport Rail AL Rajhi - Al arrab JV Co Saudi Arabia 2400 Litre(s)
Haramain Railway madinh Transport Rail AL Rajhi - Al arrab JV Co Saudi Arabia 13860 Litre(s)
HHSR Transport Rail MASCO Saudi Arabia 8000 Litre(s)
HHSR Transport Rail Al Arrab Saudi Arabia 10000 Litre(s)
HHSR Transport Rail Al Arrab Saudi Arabia 13000 Litre(s)
HHSR Transport Rail Al Arrab Saudi Arabia 16200 Litre(s)
HHSR Transport Rail Al Arrab Saudi Arabia 500 Litre(s)
Housing Buildings Residential RTCC Saudi Arabia 32000 Litre(s)
Huyandai Showroom Buildings Commerical Tareg Al Jafari Cont. Saudi Arabia 1000 Litre(s)
Improvement of Al-Jamarat Bridge and
Transport Road Saudi Binladen Group Saudi Arabia 8600 Litre(s)
Surrounding Area
JESCO Industrial Chemical & Process Azmeel Saudi Arabia 10 Drums
KFU - Female Computer Scince Collage -
Buildings Public & Institutional Buildings Abdullah Al Khodari Saudi Arabia 2600 Litre(s)
B01
KFU - Girls College of Sceince B 02 Buildings Public & Institutional Buildings Abdullah Al Khudari Saudi Arabia 2200 Litre(s)
KFU - Girls Computer Sceince College B
Buildings Public & Institutional Buildings Abdullah Al Khudari Saudi Arabia 600 Litre(s)
01
KFU - Girls Educational Collage - B32 Buildings Public & Institutional Buildings Abdullah Al Khodari Saudi Arabia 4600 Litre(s)
Al Arrab Contraction
KFU - Infar Structure # 2 Buildings Public & Institutional Buildings Saudi Arabia 200 Litre(s)
Company
KFU - Infar Structure # 3,4 Buildings Public & Institutional Buildings FEMCO Saudi Arabia 2000 Litre(s)
KFU - Infar Structure # 3,4 Buildings Public & Institutional Buildings FEMCO Saudi Arabia 2000 Litre(s)
KFU - Infra Structure Ph 3,4 Buildings Public & Institutional Buildings FEMCO Saudi Arabia 800 Litre(s)
KFU - Infra Structure Ph 3,4 Buildings Public & Institutional Buildings FEMCO Saudi Arabia 3000 Litre(s)
KFU - Infra Stucture Ph 3,4 Buildings Public & Institutional Buildings FEMCO Saudi Arabia 1000 Litre(s)
KFU - Infra sturcture - Phase# 2 Buildings Public & Institutional Buildings Al Arrab( KFU-PH#2) Saudi Arabia 400 Litre(s)
KFU- Engineering College Buildings Public & Institutional Buildings AL KHODARI Saudi Arabia 50 drun
KFU- Infra Structure Project Ph#3 & 4 Buildings Public & Institutional Buildings FEMCO Saudi Arabia 1600 Litre(s)
Al Arrab Contracting
KFU- Infra Structure project Phase# 2 Buildings Public & Institutional Buildings Saudi Arabia 400 Litre(s)
Company
KFU ph # 3 & 4 Buildings Public & Institutional Buildings FEMCO Saudi Arabia 2000 Litre(s)
KFU ph # 3 & 4 Buildings Public & Institutional Buildings FEMCO Saudi Arabia 600 Litre(s)
KFU-Computer college B01 Buildings Public & Institutional Buildings Abdullah Al Khodari Saudi Arabia 600 Litre(s)
KFU-Infrastructure Phase#2 Buildings Public & Institutional Buildings Al Arrab Saudi Arabia 200 Litre(s)
KFU-Infrastructure Phase#2 Buildings Public & Institutional Buildings Al Arrab Saudi Arabia 200 Litre(s)
King Abduallah Foundation Centre Buildings Public & Institutional Buildings Saudi Binladin Group Saudi Arabia 20 Drums
King Abdullah Road Transport Road Al-Fahd Saudi Arabia 24 Drums
King Abdullah Road Transport Road Al-Fahd Saudi Arabia 10 Drums
King Faisal University Buildings Public & Institutional Buildings FEMCO Saudi Arabia 2000 Litre(s)
King Saud Medical University Buildings Public & Institutional Buildings Saudi Bin Laden Saudi Arabia 200 Litre(s)
King Saud Medical University Buildings Public & Institutional Buildings Saudi Bin Laden Saudi Arabia 1200 Litre(s)
King Saud University - Girl Buildings Public & Institutional Buildings Abdullah Al Khoradi Saudi Arabia 600 Litre(s)
King Saud University - Girls Buildings Public & Institutional Buildings SBG - PBAD Saudi Arabia 30 Drums
King Saud University - Girls Buildings Public & Institutional Buildings SBG - PBAD Saudi Arabia 48 Drums
King Saud University - Girls Buildings Public & Institutional Buildings SBG - PBAD Saudi Arabia 40 Drums
King Saud University - Girls Buildings Public & Institutional Buildings SBG - PBAD Saudi Arabia 37 drum
King Saud University - Girls Buildings Public & Institutional Buildings SBG - PBAD Saudi Arabia 82 Drums
KSU Buildings Public & Institutional Buildings Saudi Bin Laden ABCD Saudi Arabia 1600 Litre(s)
KSU Project Buildings Public & Institutional Buildings Saudi Binladin ABCD Saudi Arabia 400 Litre(s)
Artec Company (Arabian
Mina Retaining Wall / Makkah Buildings Public & Institutional Buildings Technical Contracting Saudi Arabia 12000 Litre(s)
Co. )
Ministry of Interior - Dammam Jail Buildings Public & Institutional Buildings Saudi Binladen Group Saudi Arabia 2 drum
National Guard Housing Units Project Buildings Residential SGB Saudi Arabia 10000 Litre(s)
National Guard Housing Units Project Buildings Residential SGB Saudi Arabia 10000 Kilogram(s)
National Guard Housing Units Project Buildings Residential SGB Saudi Arabia 600 Litre(s)
National Guard Housing Units Project Buildings Residential SGB Saudi Arabia 800 Litre(s)
National Guard Housing Units Project Buildings Residential SGB Saudi Arabia 20000 Litre(s)
Saudi Binladin Group -
National Guard Villa - madinah Buildings Residential Saudi Arabia 2000 Litre(s)
RPD
North Ring Road Storm Water Line Transport Road Al Ayuni Saudi Arabia 15000 Litre(s)
Princess Noura University Buildings Public & Institutional Buildings SBG Saudi Arabia 40 Drums
Princess Noura University Buildings Public & Institutional Buildings SBG Saudi Arabia 15 drum
Private Villas ( Royal Palace ) l Buildings Residential Axal Saudi Arabia Saudi Arabia 10 Drums
Qurayyah Combined Cycle Power Plant Utilities Power Oil, Gas, Coal Arabian Bemco Saudi Arabia 47 drum
Qurayyah Combined Cycle Power Plant Utilities Power Oil, Gas, Coal Arabian Bemco Saudi Arabia 25 Packs
Qurayyah Combined Cycle Power Plant Industrial Oil & Gas Arabian Bemco Saudi Arabia 43 Drums
Qurayyah Combined Cycle Power Plant Utilities Power Oil, Gas, Coal Arabian Bemco Saudi Arabia 20 Litre(s)
Rafal Buildings Commerical DCC Saudi Arabia 24 drum
Rain Flowage Utilities Water Jubar Int. Co. Saudi Arabia 2 Drums
Mastoor Al-Saad
Road Projects (Khamis Mushayt) Transport Road Saudi Arabia 5000 Litre(s)
Company
SABIC III - Housing Project Buildings Residential PROJECT BUILD CO. Saudi Arabia 1600 Litre(s)
SANG Buildings Residential Arabtec Saudi Arabia 320 Drums
SANG AL Hassa Buildings Residential Arabtec Saudi Arabia 250 Drums
SANG AL Hassa Buildings Residential Arabtec Saudi Arabia 250 Drums
SANG AL Hassa Buildings Residential Arabtec Saudi Arabia 10000 Litre(s)
SARI & PRINCE SULTAN STREET
Transport Road Freyssinet Saudi Arabia Saudi Arabia 3600 Litre(s)
INTESECTION BRIDGE
Saudi Paper Mill Industrial Chemical & Process Asharq Al-Baeid Saudi Arabia 4 drum
Saudi Railways Transport Rail Al Ayuni Co Saudi Arabia 50 Drums
Saudi Railways Transport Rail Al Ayuni Co Saudi Arabia 60 drum
Sewage treatment Plant – Phase 1 - Control System
Utilities Water Saudi Arabia 24000 Litre(s)
Madinah Technology Co - Systech
Strategic Project Buildings Commerical Axal Saudi Arabia Saudi Arabia 10 Drums
Tasnee Expansion Industrial Oil & Gas Samsung Saudi Arabia 1600 Litre(s)
Unicoil Expansion Industrial Chemical & Process Dyweidag S.A. Saudi Arabia 1680 Litre(s)
Water conection Utilities Water Haif Saudi Arabia 10 Drums
Water conection Utilities Water Haif Saudi Arabia 24 drum
Job References for Nitoproof 10 (International Projects)
Sorted by ascending Project Category and ascending Project Date

Project Title Market Sector Market Segment Main Contractor Country Quantity Units
Al Hamed Developments And
Al Ain Mall Buildings Commerical Construction UAE 10 Litre(s)
Al Jaber- LTA Engineering &
UAE
Al Jaber Tower at Media City Buildings Commerical Contracting (A.L.E.C) L.LC 10 200 Ltr
Al Khor Housing Buildings Residential Qatar Design Consortium UAE 20000 SQM
Al Salt Water Treatment Plant Utilities Water Morganti Group Inc. Jordan 800 Litre(s)
Al- Samah Tunnel Transport Road Samarah & Yousef Co. Jordan 800 Litre(s)
Public & Institutional
Alexandria Bibliotheca Buildings Buildings Arab Contractors Egypt 0 Litre(s)
Al-Mushatta Industrial city Buildings Commerical Taamer Jordan 3 200 Ltr
Al-Mushatta Industrial city Buildings Commerical Advanced Building systems Jordan 3 200 Ltr
Al-Mushatta Industrial city Utilities Power Oil, Gas, Coal Taamer Jordan 1 200 Ltr
Al-Mushatta Industrial city Utilities Power Oil, Gas, Coal Taamer Jordan 6 18 Ltr
BAPCO REFINERY - LSDP
UAE
PRODUCTION Industrial Oil & Gas JGC Japan 12000 Litre(s)
Cluster Buildings, ASAB Buildings Residential Al Geemi & Ptnrs UAE 4400 Litre(s)
Conference Palace Hotel BP01 Buildings Mixed Development Arabtec UAE 1000 Litre(s)
Construction of New Airfield for Al
UAE
Yasat Safli Island Transport Airports Al Geemi & Ptnrs 10800 Litre(s)
Public & Institutional Al Habtoor Marry & Robert Joint
UAE
Dubai Internet City Buildings Buildings Venture 8000 Litre(s)
Dubai Sports City Cricket Stadium Public & Institutional
UAE
S3 Buildings Buildings Alpine 4000 Litre(s)
200 L
UAE
Emirates Float Glass Project Industrial Chemical & Process Inavo 15 Drum
Greater Amman Water Supply
System Utilities Water Morganti Group Inc. Jordan 400 Litre(s)
Public & Institutional Al Ghanim International General
UAE
Health Sciences Centre Buildings Buildings Trading & Contracting Co. 3000 Litre(s)
Hilton Hotel & Resort, Fontas Buildings Commerical Ahmadiah Contracting & Trading UAE 10000 Litre(s)
Hilton Mangaf Resort Project / 200 L
UAE
Phase 2 Buildings Commerical Ahmadiah Contracting & Trading 30 Drum
200 L
UAE
Manama_R.A.K Road. Transport Road Emirates Road Contracting 5 Drum
Meganaghat Power Station Utilities Power Oil, Gas, Coal Hyundai Engineering & Const Co China 800 Litre(s)
Mr. JUMAA AL MAJED COMPLEX Buildings Commerical Intermass Eng. &Contr. Co UAE 30000 Ltr
Public & Institutional
Mwaqar Prison Buildings Buildings Nemer al-Lozi Jordan 1000 Litre(s)
Consolidated Contractors
UAE
Presidential Palace -Abudhabi Utilities Water International Company (CCC) 760 Drums
Ras Laffan Power Plant B Utilities Power Oil, Gas, Coal Seimens / Doosan UAE 10000 Litre(s)
Ras Laffan Power Plant B Utilities Power Oil, Gas, Coal Seimens/Doosan UAE 10000 Litre(s)
18&200 ltr
Tala Bay Buildings Commerical UCG Jordan 40 drums
The Cultural Village ( Al- Hussien Public & Institutional
Gardens) Buildings Buildings Samarah & Yousef Co. Jordan 1400 Litre(s)
UpGrading to Assamra Waste
Water Treatment Plant Utilities Water Morganti Group Inc. Jordan 472 Litre(s)
Wadi Mousa Water Supply &
Waste Water Project (A) Utilities Water Morganti Group Inc. Jordan 12600 Litre(s)
constructive solutions

Approvals
constructive solutions

Case Histories
Case History
HHSR Project-Alhajj Bridge
constructive solutions

• Project : Haramain High Speed Railway


(HHSR-AlHajj Bridge)

• Client : Saudi Railways Organisation

• Consultant : Dar Al-handasah

• Contractor : Al Rajhi Alliance

• Location : Alhajj bridge-Ring Road-Jeddah

• Products : Nitoproof 10
Renderoc FC
Renderoc HSXtra
Concure A
Dekguard Filler
Dekguard E2000

• Execution : March 2009 Background


Date
The Haramain High Speed Rail project also known as
the "Western Railway", IMAGE
is a 444 kilometers high speed
inter-city Rail transport system under
image of structure after construction in
completion
Saudi Arabia. It will link the Muslim holy cities of Medina
and Mecca via King Abdullah Economic City, Rabigh,
Jeddah and King Abdul-Aziz International Airport. It will
connect with the national network at Jeddah.

The rail line is planned to provide a safe and comfortable


transport in 320 kilometers per hour electric trains.
Construction started in March 2009. The railway is
expected to carry three million passengers a year,
including many Hajj and Umrah pilgrims, helping to
relieve traffic congestion on the roads.

Project Task
From the day one Fosam has been requested to join this
project to introduce the effective solutions for all inquiries
Which related to our field as the alliance trust this name.
From that day, still we spend hard efforts to give
solutions to the Alliance when they asked for.

Constructive Solutions
Exposed concrete will affected by severe conditions and
carbons produced by vehicles.
IMAGE Fosam Inquired to give solution to protect the concrete
image of structure after completion from the surrounding circumstances and to add
Aesthetic appearance to concrete.
Our Anti-Carbonation System Dekguard E2000
suggested to Protect the exposed concrete and
Nitoproof 10 to protect the backfilled one.
6000 Ltr N/Proof 10
30000 kg Renderoc FC
8000 kg Renderoc HSxtra
13000 Ltr Dekguard E2000
6600 Ltr Concure A
3060 Ltr Dekguard Filler
Project Photos : For Retaining Wall

• Prepare the surface in order to start repairing • Repairing Stage begin

g within/on the structure)

• Applying Nitoproof 10 • Final stage to paint Dekguard E2000 @ 2 coats

• Casting concrete for the next stage of retaining wall • Final Appearance

Fosam Co. Ltd. Tel: +966 2 60 80 999 Fax: +966 2 66 75 891 E-mail: [email protected]
(Saudi Fosroc)
Regional Offices
Head Office Jeddah Sales Office Tel: (02) 6080999 Fax: (02) 635 3330 Yanbu Tel: (04) 322 4280 Fax: (04) 391 2980
Post Box 11081 Jeddah Showroom Tel: (02) 665 0787 Fax: (02) 667 4884 Makkah Tel: (02) 542 0869 Fax: (02) 542 0869
Riyadh Tel: (01) 482 9303 Fax: (01) 482 9303 Medinah Tel: (04) 845 1767 Fax: (04) 846 3195
Jeddah – 21453 Dammam Tel: (03) 847 2929 Fax: (03) 847 1582 Jubail Tel: (03) 362 3904 Fax: (03) 362 3875
www.Fosroc.com Saudi Arabia Khamis Mushayt Tel: (07) 250 0469 Fax: (07) 250 0469
Project Photos : For Bridge

• Repairing stage, using Dekguard Filler • Applying 1st Coat of dekguard E2000 over Concure A

• 1st coat has been finished • Preparation and applying 2nd coat of Dekguard E2000

• Mission complete • Ready to be used by End Users

Fosam Co. Ltd. Tel: +966 2 60 80 999 Fax: +966 2 66 75 891 E-mail: [email protected]
(Saudi Fosroc)
Regional Offices
Head Office Jeddah Sales Office Tel: (02) 6080999 Fax: (02) 635 3330 Yanbu Tel: (04) 322 4280 Fax: (04) 391 2980
Post Box 11081 Jeddah Showroom Tel: (02) 665 0787 Fax: (02) 667 4884 Makkah Tel: (02) 542 0869 Fax: (02) 542 0869
Riyadh Tel: (01) 482 9303 Fax: (01) 482 9303 Medinah Tel: (04) 845 1767 Fax: (04) 846 3195
Jeddah – 21453 Dammam Tel: (03) 847 2929 Fax: (03) 847 1582 Jubail Tel: (03) 362 3904 Fax: (03) 362 3875
www.Fosroc.com Saudi Arabia Khamis Mushayt Tel: (07) 250 0469 Fax: (07) 250 0469
CASE STUDY

Constructive solutions
King Khaled road
intersection with King
Sultan & King Faisal roads
Assir - KSA
CUSTOMER
Municipality of Khamis Mushayt
Sinopec International Co.

SECTOR
Roads structures

DATE
2015

PRODUCTS
CONPLAST SP440M
NITOPROOF 10
CONBEXTRA TS
CEBEX CABLE GROUT PLUS

THE PROJECT
Municipality of Khamis Mushayt decided to remove all traffic lights from most of the city
intersections to save citizens’ time and make smoother traffic flow, Khamis Mushayt is a city in
south-west Saudi Arabia, located east of Abha, the provincial seat of the Asir province, 884
kilometers (549 mi) from the national capital of Riyadh.
One of the biggest projects in this area is King Khaled road intersection with King Sultan and King
Faisal roads, the project consists of two crossing bridges with a total length of 2,626 meters and
heights ranging between 8 and 17 meters. Each bridge is 24 meters wide with 3 lanes in both
directions. Project was awarded to Sinopec International Co. with a budget of USD 35 million.
Side view of the intersection
THE SOLUTION
FOSROC was involved in early stages through supplies of concrete super plasticizer Conplast
SP440M, Nitoproof 10 also was approved from the client and was used for waterproofing
purpose of bridges foundations.
FOSROC went into extensive trails with the contractor on the biggest scope in this project, the
fabrication of the bridges girders, FOSROC managed to meet stringent pre-stressed concrete
specifications with supplies of more than 85 tons of Cebex Cable grout Plus and Conbextra TS.
Besides regular and controlled supplies, project site proved to help contractor to adjust
concrete mix design based on the weather changes to ensure consistent performance.
Fixing girders crane

THE BENEFITS
The client achieved more than required specifications in concrete admixtures using the right
admixture, moreover the client benefitted from being able to contract with a single party for
the various types of construction solutions including concrete additive, the whole offering was
feasible in terms of cost and ease of application.

Bridge girders workshop

T: +966 126080999 F: +966 12 6380693 E: [email protected]


Address: Jeddah Industrial Area Phase 4, Road 414, Street 407. Jeddah – Saudi Arabia www.fosroc.com