4-T-Tij H - . - : Design Guide 10: Bolted Moment End Plate Beam Splice Connection. First Edition

Bolt clearances are an important consideration for connections that require tightening bolts with wrenches or impact wrenches. Section 7.7 of Design Guide 1 provides dimensions for wrenches used to install bolts. For M24 bolts, the clearance required is a maximum of 65 mm to accommodate all wrench options, and for M20 bolts the maximum clearance needed is 55 mm.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views1 page

4-T-Tij H - . - : Design Guide 10: Bolted Moment End Plate Beam Splice Connection. First Edition

Bolt clearances are an important consideration for connections that require tightening bolts with wrenches or impact wrenches. Section 7.7 of Design Guide 1 provides dimensions for wrenches used to install bolts. For M24 bolts, the clearance required is a maximum of 65 mm to accommodate all wrench options, and for M20 bolts the maximum clearance needed is 55 mm.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

9 Bolt clearances are a major detailing issue with this connection because of the need to

get either a hand wrench and socket or impact wrench into the connection in order to
tension the bolls for 8.8/TB category.
Section 7.7 of DESIGN GUIDE 1 (Ref. 12) provides the relevant dimensions of wrenches
for installing bolts. The worst case scenario is that impact wrenches are to be used in
which case the clearance required is a maximum. In general, dimension A in Figure 6
should be 65 mm to accommodate all wrench options for M24 bolls, 55 mm for M20 bolts
(Ref. 12).'

4-t-tiJ»H_._._---_. . {}-

----------------------===fA

----------------------===f-
(a) Beam splice

A
A

...
A
A

(b) Apex connection

50 to 75

r_~:-}t20 5 to

Universal joint

(c) Milred knee connection

FIGURE 6 CLEARANCE REQUIRED FOR TENSIONING BOLTS

design gUide 10:


bolted moment end plate beam splice connection. first edition
[[17