1. EHS & TOOLS PREPARATION
www.huawei.com
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
1.1 Personal Protection Equipment / Alat Perrlindungan Diri Preparation
PPE/ APD :
• Ground & Climb Helmet
• Safety Shoes
• Full Body Harness (Working at Height)
• Working Lanyard
• Double Lanyard with Absorber
• Safety Gloves
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
1.2 Safety Kit Prepaaration
First aid kit
Safety sign & Barricade line
emergency phone
number
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
1.3 Tool’s List
No Tools Quantity
1 Toolbox complete 1 set
2 Pulley/ Katrol 1 pcs
3 Rope/ Tali 2 pcs
4 Shackles 1 pcs
5 Transceivers 1 set
6 WD-40/ Pembersih karat 1 pcs
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Wrenches Pulley/ Katrol Rope/ Tali
First aid kit
Transceiver/ HT Shackles Pembersih karat/ WD-40
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
1.4 Competency Certification Check
Electricity
Huawei Pass ID
Every Worker Work at the tower
should have certification WAH,
Basic First Aid
WAH
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Security Level:
2. Methode of Procedure
V-Pole Mounting Dismantle
www.huawei.com
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
2.1 Preparation Team & Tool’s Dismantle Actvity
Here are a few steps before working on the dismantle process
Check Point / a few step’s before start Dismantle Process
1. Use PPE according to the composition of each work
2. Conduct toolbox meetings with team
3. Prepare all the equipment for dismantle such as rope, pulley, HT, etc. in accordance with MOP
dismantle
4. Install pulleys / pulleys to the strongest structures in the tower
Team List for dismantle Activity :
A. Work on tower : 4 orang (WAH Certified Licence)
B. Traction sling : 2 person
C. Lifting sling : 2 person
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 9
2.2 Overview V-Pole Mounting
1. Vertical Mounting
2. Horizontal Mounting
3. Arm Bracket
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 10
Overview V-Pole Mounting
Horizontal mounting : 5 Meter Vertical mounting : 3 Meter
3
1. Vertical Mounting : 6 pcs (8 pcs U-Bolt for each vertical mounting)
2. Horizontal Mounting : 6 pcs (2 pcs U-Bolt for each Horizontal mounting)
3. Arm Bracket : 12 pcs
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 11
2.3 Dismantle Process
V-Pole Mounting dismantle Process
Dismantle Vertical Mounting Process :
1. Install pulleys / pulleys to the strongest
structures in the tower.
2. Determine the mounting to be dismantled first,
find the Horizontal Mounting position at the
bottom & Loosen U-Bolt from Arm Bracket to
Horizontal Mounting (4 U-Bolt).
3. Slide Horizontal Mounting together (4 people
in the U-Bolt position that has been loosened)
so that the vertical mounting
position.approaches the Leg Tower.
4. Ikat vertical mounting (simpul Icicle Clove
Hitch) dengan tali yang sudah terhubung ke
katrol dan tali kendali.
5. Release one by one U-Bolt on vertical
mountings.
6. After all U-Bolt on the vertical mounting
release, move the vertical mounting load on
the pulley slowly.
7. Lower the vertical mounting slowly, control the
vertical mounting so that it does not collide
with the existing device or to the tower by 1. Vertical Mounting
using a control rope (lifting sling). 2. Horizontal Mounting
8. Repeat Step 2 to Dismantle next Vertical 3. Arm Bracket
mounting side
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 12
Dismantle Process
Dismantle Horizontal Mounting Process :
1. Determine the Horizontal Mounting to be
dismantled, find the lowest position first and
the Vertical Mounting has been lowered.
2. Tie the horizontal position at the bottom
(Icicle Clove Hitch knot) with a rope that is
connected to the pulley and the control
rope.
3. Release one by one U-Bolt on the arm
bracket.
4. After all the U-Bolt on the Arm Bracket is
open, slowly move the Horizontal Mounting
load on the pulley.
5. Lower it the Horizontal Mounting slowly,
control the Horizontal Mounting so as not to
hit the existing device or to the tower by
using a control rope (lifting Sling).
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 13
Dismantle Process
Dismantle Arm Bracket :
1. Lower it the arm bracket one by one,
after all Vertical Mounting and Horizontal
Mounting have been lowered.
2. Tie the Arm Bracket with a rope that has
been connected to the pulley and control
rope.
3. Release one by one U-Bolt on from the
leg tower.
4. After all the U-Bolt in the tower leg is
open, slowly move the Arm Bracket load
on the pulley.
5. Lower the Arm Bracket slowly, control
the Arm Bracket so it does not collide
with the existing device or to the tower
by using a control rope (lifting Sling).
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 14
Tali ke arah Katrol
Tali Kendali
Knot Icicle Clove Hitch to tie Mounting
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 15
Mounting Vertical/
Horizontal
Lifting sling/ Tali
Kendali
Traction sling/
Mounting to be lowered Lifting Sling Position (2 person)
vertically
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 16
Shackles
Traction Sling Position (2 people)
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 17
Mounting after being lowered
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 18
2.3 Perkiraan Estimasi Waktu
Duration
No Work Description Quantity
(hour)
1 Preparation Tool’s & Team @Day 1
2 Dismantle Vertical Mounting 6 pcs 6
3 Dismantle Horizontal Mounting 6 pcs 6
4 Dismantle Arm bracket 12 pcs 6
Total 19
Duration Dismantle Process
1. Persiapan Team dan peralatan dismantle : 1 hour / day
2. Dismantle Vertical Mounting : 1 hour / mounting unit
3. Dismantle Horizontal Mounting : 1 hour / mounting unit
4. Dismantle Arm bracket : 0.5 hour / arm unit
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 19
Security Level:
3. Clearance of Site
www.huawei.com
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
3. Clearance of Site
Before Leave site, please check :
1. Check All Tool’s
2. Clean the site area from the remnants of material and rubbish
3. Report to HS to leave site & Close Gate Site