TC6015A-10F
QTZ125 (TC6015A-10F) SHARES HL
QTZ125 (TC6015A-10F) Tower Crane
4% FA BLA
Operating Instructions
Z PREAROAROA
ZOOMLION HEAVY INDUSTRY SCIENCE AND TECHNOLOGY CO., LTD.BAR CUSTOMERS:
RGAE AAS a ANA EH!
‘Thanks for your purchase and being one of the users of Zoomlion Tower Crane!
AT BEE MEA SAR BILE, PRAIA TALE
KE, FABRE, USBiA.
Go through the instructions for correct operation and maintenance, and always keep at
hand for consultation.
APARMBHREA HER: " HRA. PRA LHRS,
itm.
Pay attention to the sentences marked with “Warning, Notice or Precautions in this
A
publication, which involves safety of construction.
ABS EBLE Pa PASI Te BE SS a DC Fea eA BM AS Fil SB
BY, ROR TMI. WARE, SARA ABR.
‘Zoomlion has been devoting every effort to the perfect of her products. Therefore they
are changed without notice. If you have any questions, please don't hesitate to contact
Zoomlion for further consultation.
AAA TOTNES, WE
ORS: FIPS APER, BELCRR HOR.
Manufacturer's No. TERS SNS ae Sey
a ———— A, UR AOR
a AM: fis an
Shipped Date
Sail Editor:
ext Proofreader:
HK Ratifier:
EA) Date: 2013-1F3& Contents
1% 38 Preface. 1
Fi ik SEU al
B-B WE 1
1
1
1.1 31 Foreword
1.2 SZHEHERAL Cautions of erecting tower
1.3 HELI) B47 General layout of tower crane 5
1.3 SSALA 8 4 General layout of tower crane 5
1.4 Het HARTER ES Foundation & Counterweight.
1.5 373 Erecting...
1.6 RADU RA ABE
17 BBBR RR
1.8 APH RRA Fall-change system
1.9 WiFi Jacking operation for adding sections
1.10 S8#LEN MIA Tower anchored onto the building .
1.11 SABRI TE Preparations before operation 61
Bae TE. 1
2.1 $RVER SUA: Precautions for tower crane dismantle
2.2 SRSA ELABEF Procedures of Tower dismantling
2.3 SPL EUR VER FG Attention after
Sie PROUD SAP cee
Ba PULSE.
1.1 WMSRET. Operator...
1.2 BUREBA} RIE Mechanical part and others
1.3 4224438 HUME Routine check of wire rope. 5
SEAR AE oes eeese ce enseesensteansneantee 1
2.1 HiA(3238-5 489 Electrical mounting and operation. 1
2.2 HEHLS-HLH Working mechanisms of tower crane..... 4
G2 LER RE 1
3.1 SDH ALSALAE Multiple-purpose limiter 1
4
0
.
tower crane
3.2 Fy$ BREA 3.2-1) Moment limiter(Fig. 2.3-2)
3.3 RSM HA (MLA 33-1) Hoisting weight limiter (Refer t
Fig.3.3-1)
3.4 BiH BEAL 3.4-1), 9
PUR RF GHEE 1
4.1 HLHURZF Tower crane maintenance 1
4.2 SEK HERE Main troubles and troubleshooting 2
Pitre: 1
TC6015A-10FTC6O1SA-10F $8272 Sf] Tower Crane HA Preface
#38 Preface
‘TCOOLSA-1OF S208 BLA? HEE IR 2S i Sec BH HEE IG! 5037-93 SS
HEA) ERT MEHL.
TCOO1SA-10F tower crane is designed and manufactured by Zoomlion Heavy
Industry Science and Technology Co., Ltd. according to the Chinese standard of
JG/T3037-93 “Classification of Tower Crane”.
TC6O15A-LOF SL Ak FES, MEI, LETS ARAL. CLA
A:
‘The TC6O1SA-10F tower crane is a self-climbing multi-purpose machine with a
horizontal jib, a trolleying mechanism and an upper slewing mechanism. Its characteristies
are:
1. RSM REO ASE, BIER CAH, RK LAPWBAE 60m, FR
KBAR HE 207m~
‘The performance parameters and technical indicator of the crane are at a leading
level in China, The Maximum working radius is 60m and the maximum hoisting.
height is 207m.
2. BI AMG RTH, IRI, BEAN ee.
‘The outline of the crane is international fashion model and very perfect, enjoyed
by the intemal and oversea users
3. CLARKS, ANE. BOAR. RR. See LIE
KA, ASMA MMS.
‘The crane has many working mode, it is used in different condition. Such as:
outrigger stationary, anchored to the building and mobile, so that it is applied in
different construction projects.
4. CARRERE, TE ARTEREAE, “ERIE
STARA AR, LAPEER aE.
It has high working speed and good regulated speed performance, The technique
of the stepless speed regulated and frequency altering is used in the trolleying
mechanism and the slewing mechanism, so the crane works more smoothly and
reliably,
S. LASSE Ha RGR Se BS FS [3 CER EP TOE, AK,
Wi>, HEIST, LIAISE.
‘The main electric elements are used world-renowned products, which service life
is long with less failure, simple maintenance and reliable working.
6. SHEERS He, AAP RAL Ah RT BBA LA,
SRR OL (PATS.
All equipped safety devices are mechanical or mechanical-electrieal integrated
TFL POHLA RS 4 sb aE
‘TOBOL5A-10F olTC6O1SA-10F $#x(i2 Bffl Tower Crane HA Preface
products, and adapt to all badly conditions to ensure the crane working reliably.
7 PREVA LUE RMR, REM AE.
8, MERE IRWCR AL EP Sh PA RL Se BY SEAR, SEAL ACE, RARER
MIURA:
‘The design of the crane is based on the actual situations in China and on the
safe-reliable operation principles. Greatly absorb and adopt the well-established and
reliable advanced technology to enhance its overall technical level at the same time in
the world, Well-established advanced technology adopted as following:
1) SakeeeS SHAE TE Aa] ARAL Oe BBC
Electrics manufactured with the technology from TE, France.
2) S/R CEASE PLT BYPASS, SPREE. REPS.
AEBRALES Pate ae. (ELE, 5 NPB Hila 28 ae eae
Weight limier, height limiter, radius limiter, slewing limiter, slewing brake,
traction brake and similar safety guards are China-made based on the imported
technology.
3) AA Di Re (BT AE) AUB AS Bs
Carriage rope break-proof device (carriage slip-proof) and axle break-proof
device,
4) HF} BLESHES AE; Rope pay-off system for hoisting mechanism:
5) #5|@9K'RAB, Traction rope-tensioning system;
6) MERE AEAM ERE, RES, BH, With, MA,
CEM, KEALPE, HED L BE:
Large-radius hoisting jib suspended by double rigid tie rods, featuring good jib
rigidity, light jib weight, small jib cross-section, small wind resistance and nice-looking
appearance and several jib lengths, it is satisfied different construction needs.
8) BUMS GRICSh SE, PREP, PU BRSIL AR, SR OR aE OH BRE ER,
‘Out-hung operator cabin, featuring excellent field of view, spacious interior and
satisfactory working environment
9) RAPER, WET RUS ee Pia
Adopt rotating limiter to make the driver pass through the tower crane
conveniently.
10) RAHA S RASH, FED, AUB TA.
Advanced inter-active control console, the operator handles the mechanisms easy
and services simply.
9. RUS AAMT BA RSE.
Design in complete conformity or superior to the relevant national standards.
HPBMAAU LSA, AMAR SRR ARAB. PRA.
‘TOB0154-10F 0-2,TCOO1SA-10F S832 BML Tower Crane #8 Preface
KGET BURR ELAR SEK ERA LEH
The crane is suitable for use in such large-sized construction projects as high-rise or
super high-rise buildings, bridge and water conservancy projects, large-span industrial
buildings, large gymnasiums, and high chimneys and silos constructed with slip form.
‘TOBOL5A-10F 0-3TC6O1SA-10F t83(i2 Bifl Tower Crane
#_i8 Preface
0. MHLEATERE Technic performance parameter of tower crane
OA MEER iS HE HA Radius and Load Capacity
30m fle StEGe FEE 30m Jib’s Radius and Load Capacity
EE Radius(m) 25 ~14.79 15, 16 |
7] O18
20 | 2 | 24
26 | 2712
EE
Hoisting
weigh 10 os | 9.13 | 8,
ee
fall
5.00
Aes
a-fall
s | 795
703 | 628 | 5.65
513 | 4.372
WE Radius(m) | 28 [30
wee
Hoisting
weigh(t)
Ae
ast | 443
2-fall
es
aos | 43
fall
al
35m #9 té HHL AEHHE 35m Jib’s Radius and Load Capacity
) 3m RRR eR HHS,
| ‘P 30m Abs Hosting Charaterisi Curve
alt
3m HERE,
35 Jibs Hestng Characlers
lic Curve
4-fall
2-fall
43
Ka
\ ar Rin
22
1255 1 ¥ a0
1471
WEEE Radusim) [25 ~1477 [ 15 [ 16 [ 17
18
2 | 2 | 4
26 | 271
kee
Hoisting
RS
fall
5.00
weigh
lo 9.82 | 911 | 8.49
794
702 | 627 | 5.64
a2 | 487
THEE Ra
idiusim) | 28 [ 30 | 32 | 35
eae
Hoisting,
es
4st | 442 | 408 | 3.66
2-fall
weigh ()
pes
468 | 429 | 396
fall
‘TOBOL5A-10F
o4TC6O1SA-10F $8272 Sf] Tower Crane HA Preface
40m (8 fe Bt AEE 40m Jib’s Radius and Load Capacity
$858 Radius(m) 25 ~14.77 15 16 17 18 20, 22 24 26 27.09
Hee
it 5.00
ae 2-fall
Hoising AEE
weieh® PO 10 982] o11 | 849 | 704] 701 | 626 | 504 | 512 | 487
WEEE Radiusim) | 28 | 30 | 32 | 35 | 38 | 40
wma [UF] as | an | 407 | sos | ss | 300
2-fal
Hoisting L-—
weigh @) | | 467 | 420 | 396 | 353 | 3.17 | 296
4 fall
| A in tieeeetee, isn RSH,
aut) l ‘40m Jibs Hoisting Characlerislic Curve alr) ‘ ‘45m Jibs Hoisting Characlerisic Curve
9 a
e 8
1 im
6 6
5 5
4 4
3 3
q ia
1 1
ims ww bo By Sw Cs oS we BW He WD :
wat \_ ts Rim} 476 = \_nae Rin
45m 83H ALTE 45m Jib’s Radius and Load Capacity
BEE Radius(m) 25 ~14.76 15, 16 17 18 20 22 4 26, 2708
Tine
’ 5.00
ae 2-fall
[oisting
1, | ee
weigh @) 10 osz|ou| sao] 794] ror | 626] soa | saz | as7
4-fall
HE Rdwim |] 9 |= ls | sl) ] 2 |S
eae like 48 | 442 | 408 | 366 | 33 | 309] 29 | 265
Hoisting
weigh (t) fu 467| 429 | 395 | 353 | 317 | 296 | 277 | 252
‘TOBOL5A-10F 0-5TC6O1SA-10F $#x(i2 Bffl Tower Crane HA Preface
50m te Ste Atte 50m Jib’s Radius and Load Capacity
85% Radius(m) 2.5 ~14.76 15 16 17 18 20 22 eas 26 2707
Hee
i 5.00
aay 2-fall
Hoisting |e
weigh (©) ai 10 982} 911} s4o | 794] 701 | 626 | so | 512] 497
§BEE Radius(m) 28 30, 32 35 38 40 42 45 48 50,
nee bie 476 | 438 | 409 | 366 | 330 | 309 | 29 | 265 | 243 | 23
fa
Hoisting
ee
weight) | | 463 | 42s | 395 | 353 | 3.17 | 296 | 2.77 | 252 | 23 | 247
fall
4 con Hie MRM Sn bs Hoisting Chara Curve th ssn eseAAA sn ie Hoisting Characlisic Cue
q a
sft Tall 4 TY fal
iy ‘
iw Dal 1
i ae 4
gy J
3 BL ce
aH | Kon 1
iC 1 | = io 1 [
15 Ww eB aS sw SW Ba bw GD
xm \_nut Rn) Lan a
Ssm te PERENTE 55m Jib*s Radius and Load Capacity
WEEE Radivsimy | 7° ~ | as | a6 | a7 | as | 20 | 22 | 24 2
1419
exe | O* 5.00 478
sled 2-fall
oistin
° hes : =
weigh (t) 10 938] 87 | 81 1757] 669 | 597] 537] 487] 4.65
fall
BE kdwm |=] |2ys) =) so] 2) Ss ] se] 0 | 2
Wee | 437 | 421] 389 | 347] 313 | 253] 278 | 2s | 23 | 217 | 206
Hoist 2-fall
ip Hm =| 444 | 408 [3.76 | 334 | 3.00 | 280 238 [217] 204 | 193
: 4-fall
#8 Radius(m) 54 | 55
Biee | 195/190
ax
bas 2-fall
can(y | OR [182 [077
weigh
ee | aefall
‘TOB0154-10F 0-6TC6O1SA-10F $8272 Sf] Tower Crane HA Preface
aut 60m RRERMERNES, 60m Jibs Hoisting Characlerslic Curve
10 —
9 4-fall
; 2-fall
: pai
5
4]
3
1
15 8 \ wo ew 8 oS
\_ B25, UB Rim)
60m Bie Hf AEE 60m Jib’s Radius and Load Capacity
WE Radiusim) [25 ~1325] 15 | 16 | 17] 18 | 20 | 22 | 24 [2923] 27
ce
5.00 439
ae fall i:
ist
",, | oes : ;
weigh | IE 10 | ses | 802] 747] 698 | o1s | sas} aos] 487 | 426
WE Radiusimy | 28 | 30] 32] 35 [38] 4] 2] 4 | 48 | so | 2
wma [SBP] a2 | ass [ss |sis] 26] 207 | 25 | 228] 208] 197 | 186
fl
Hoisting
weigh (t) aes 4.07 | 3.73 | 3.43 | 3.05 | 2.73 | 2.54 | 2.37] 2.15 | 1.95] 1.84 | 1.73
4-fall
BE Radium) [34 [55 [58 [ 0
PSE
wae [OT | 16 [om [se | 130
Hoisting
rae
weigh 163 | 158 | 14s | 1.37
eNO Tatu
‘TOBOL5A-10F o7TC6O1SA-10F t#30i2 Biffl Tower Crane
#_i® Preface
0.2 HAHEGER Technical parameters table of the tower crane
# 0-1 Table 0-1
HALAS Hoisting wa
$144L {FH Mechanism Group [L814 Slewing MS
EG AUF) Trolleying Me
WEEN Rated hoisting moment _kNm 12
#25 1 (PEE Working Radius m Sv) Minimum: 4K Maximum60
BER TER WER
BAT AEE Max hoisting height m Stationary Mobile Anchored
45 46 207
HERES Max hoisting capacity 1 10
5 Model QP1080
46% Fall a
atin (REBSE
hoisting | Max. Load/ Speed t/ m/min fer ec eee |e ee
mechenism [2 SERRA PREREE mvmin ie
Min stable lowering speed at 2 fall
BE Power kW SIRT
3 Speed _mimin O556
i oe a5
2% BE Speed m/min 0-09
ee
_E Speed_mimin 048
aasteuiy [GE Power kW 75
“Lf 4) Working Pressure MPa 315
RAL Max
Fee working radius m - ae He a ot fae
SH weight (t) 765 9.6] 11.55] 13.2 | 1485] 16.8 | 18.75
31 Total power i 53.5+2%5.2 (E76 Ft HUY Excluding
Erecting Mechanism)
TF Operation Temperate 20-140
‘TOB0154-10FTC6O1SA-10F t#30i2 Biffl Tower Crane
0.3 AMEGE Technical parameters of the tower crane
ik
Preface
02 Tableo2
JHE Item AE Unit BH Parameter
We Model 108
REID N 30000
Maximum traction of the rope
HA 35. 7-16-1770/
ante ec ; '
Beedle Specifications 6229F1IWR-16-1770
Bee ERASE) mmm 160
mechanism } Wire rope
Maximum —finear
speed
BE Thain TOE
ef Speed
Wire Rope Drum | 4 m S4OGRRIER 6 TE)
Rope eapadlty ayers <6)
TS Model YZPB(RSOMEE
1 Mow — [HE Power Ww 37
EE speed Tian OT
WOEELALS Model of Reducer J781C-20.43,
BE Model TW, 31580-1000
won Brake RIE Sm Too
Braking moment
SRE Item 4 Unit SR Parameter
EfLE!S Model BPSSB
=
BABSIA N 12100
Maxitmur traction of the rope
6X 19-9.3-1700- I] Ai
HK Specifications i x
(right-twist)
BABE m/min 55
Maximum linear speed. A
23) 14 30m FF 30m ib ™ e 4
Toles aS 35m Pasa] m 8 o
mechanism | Wire rope aawaa eS a] #248E,
kK I I
45m $F 45m Jib m 98 59
Length Wire Wire
50m § 50m Jib m 108 ae
rope 1 ropell
55m Ff 35m Jib m 118 69
60m fF 60m Jib m 128 m4
STEM Wire Rope Drum Speed Tain 0327
Hah $l | 2S Model YEJI32S-4B5
Motor TA% Power kw SS
‘TOB0154-10FTC6O1SA-10F t#30i2 Biffl Tower Crane
#_i® Preface
YE Speed Timin 1440
Wa 3% HL 3 EL Reducer Ratio 4B
#1 3) #8 Braking moment Nm 7s
ERULS Model HPWSSFI.130A,
IS Model YTRVFW132M1-4F1
& #1 Motor Th Power kW SS
$55 Speed min 0~1440
#3 Model ‘XX5-130.195CLA-12/16,
EPO Teste fe
sieving Reduction rate
mechanism | M841 Reducer [3H #15 Ouput| Nm
13000
rotation moment
Bue Timin aoe
Output drum speed
#2 Modulus 12
gamma | 7
Parameter of gear Number of teeth
stoutputend [2 & OR He
Position-changing 40s
factor
ERLE: Ratio 1596.56
SARE Speed 00.5
B Taw
‘abAL Motor [2% Power 78
FRE Speed iin O70
itt Ee A 3E | Bick Flow min o7
‘Hydraulic THeBA MPa 318
TA BL | pump Working pressure
Jacking fil / HEE mm 160/110
mechanism Cylinder /rod diameter
TH He A t a
Jacking
BOSE | Maximum jacking forse
7 THGPRRBE Jacking speed | minin ry
BAB: BEAR HERE FE PK BES SICAL eS Ay SOHZ HT SET
TC6015A-10F
o-10TC6O1SA-10F $8272 Sf] Tower Crane HA Preface
0.4 ¥BLSPALR Overall dimensions of the crane
0.4.1 MOLALLA T Overall dimensions of the free standing crane
Z|
val 43m
eK
fet BRA xMHRR REREBRS
Mobile Stationary Outrigger Stationary Bolts Stationary
(Heh feson Hes
(eam
fra!
FEO. TCOOLSA-1OF Sst EUINER ST
Fig 0-1 Overall dimensions of the TC6015.-10F tower crane
0.4.2 [AR RAEPLSNE RY Overall dimensions of the crane anchored to the building
0.2 TC6O1SA-10F AMER HL Cw se
WPRSUNE RT RE RRS Ee
Fig 0-2 Dimensions of Stationary Crane with Founclation Anchor
‘TC6O15A-10F onTC6O1SA-10F $8272 Sf] Tower Crane HA Preface
Pa
ama
pat ol
0-3 TC6OLSA-LOF Haha ELS ENS tS
Root SS EB RE
Fig 0-3 Dimensions of Stationary Crane with Foundation Undercarriage and Mobile
‘TC6O15A-10F O12TCOO1SA-1OF {#708 Ht Tower Crane a 3% Erecting
A PPL
Part Installation of Tower Crane
BALES
ChapterI Erecting
1.1 317 Foreword
ALP RRA TL, CME IEP BOREAL. CEB A L AD
SEG RHE 1.2-1 AG SEH
‘The user should go through the chapter in detail for proper and prompt erection of the
tower crane. Select a proper mobile crane and slings in accordance with items shown in
Table 1.2+1,
1.2 SCHEAER GA Cautions of erecting tower
a SRL ARE TL PE EL RAAF Lams HYSEAT
‘The maximum wind speed atop should be less than 14m/s during erane erecting,
b. Ai RAE FF.
Strictly follow the procedures of crane erecting
BAGH, MERA KEES, RETNA SHR
c
12-1).
6. SULA A RR, PSST ME, EHO SAIS, Al
PAGER.
The dismountable pins, connecting bolts and nuts for the slewing rings and tower
sections of the tower erane are special-made, which shall not be replaced freely.
° DARI MK. Fa. PESRE PRE.
Stairs, platform and protecting fence should be installed for safe operation.
£ CHRERER SK, LAWEREAR MAKE), CRRKEB ZA,
HEL aS LEEKS HANTS, SIRE.
The quantity of counterweight blocks shall be pro
length (refer to relevant chapter). Jib must be installed after placing one 3t counter-weight
on the counter.jib. It is prohibited 10 place two pieces or more counter-weight on the
led in accordance with the jib
counter-jib before installing jib.
g XEREG, PHRLARCMEM THEW. PREG TR.
After jib installation, it is prohibited to hoist any load before placing specified
counter-weight on the counter-jib.
bh, ETH RRDAGERAR Ai, BMT DT.
It is necessary to keep the direction of every tower section in accordance, otherwise it
cannot add or reduce tower sections.
‘TOBO15A-10F 1-1TCOO1SA-1OF {#708 Ht Tower Crane at 3% Erecting
i WHET 1-H HVAMELER TH Lacc20, Afi Las.
JEM LIANE, LAS ORK NERS RTE
BERRA AT Som, EBLE RTA SHE Ry Be
At the erection position of the tower crane, it must be no less than 1.5m distance
between the widest slewing part of the crane and around buildings, and the safe distance
between any parts of the crane and overhead power lines shall comply with the stipulations
as shown in Table 1.2-1.
KERB AER. tA. REL. ALIN
Auxiliary hoist equipment, sleepers, cables, rope clips and other ordinary tools should
be provided before hand.
LHL SR 29 RTL 12-1).
Reference size for tower crane erecting site is shown as Fig. 1.2-1.
| EMER ERR
The safe distance for tower crane from electric transmission line
gy allan
i
eae
Vertical distance
HFK :
tariznilistrce | 1 -O 1.8 | 22 4.0 6.0
AYA AVA 7
/ |
am / i 61300 S|
ify secant
Lug for tower section _/ | ni Neateabe Foundation support for anchored frame
w i ;
7 7 oe 077777
sa-k07a1 Direction along the building lenth
mo. FH, SLE ER, REBAR MERIT.
Je FA Fe tila BAS NL eR
Drive the trolley to the balance position before jacking, Slew the jib to the right front
of the in-let beam and thenlock the slewing of tower erane by slewing brake.
n WES EE, RE He eR AE 2A RT AIF
‘TOBO15A-10F 1-2‘TC6O1SA-1OF Sati HL Tower Crane
at 3% Erecting
It is prohibited to slewing the jib, move the trolley or make the hoist hook up and
down movement during jacking operation.
0. FREWAEAT (BUR FET), WAR TT aR ES.
p. SVAN ie
ER RG RE ME CH 12-1)
Weight specifications of erane parts and component(show in Table1.2-1)
R121 RE Ie
“Table 1.2-1 Component weight and height
‘TOBO15A-10F
Sea
3
Fran 42% Designation HE Weight (kg) | Outiazer
Stationary
Hom)
ae eee ae 3500 80
2 ee 1200 no
Tower section LA6A1
3 _| TSA Climbing Frame 4600 19
4 itt sso 130
Slewing Assembly
3 GIRLS! Operatar Cab 300 18
@__| FIRSE4 Stewing frame 1380 73
7 TEI Tower Head 1350 22
8 eee 8400 152
Counter Iib assembly
> a Rien 3000 183
The first Counterweight
1 @
= 30 KEES a
30m Jib assembly
10 eee 5839 183
35m Jib assembly
oe DRERNE A 63s 183
40m Ji assembly
lod SPEER A 6639 183
445m Iib assembly
30 KRENE
oe eae 7035 183
Som ib assembly
EWE
tor SS RRM EH 7308 183
5m Jib assembly
10g ot T1038 183
601 Ti assembly
Ma skeen am 23000+1650 202
Counterweight f 30m Jib
Tie 35 RRR 2-30007195071650 202TC6O1SA-1OF Sati HL Tower Crane
at 3% Erecting
‘TC6O15A-10F
Countenweight of 35m Jib
40 KE ‘4
le WEERTHE | 2000129501650 | 202
Countenweight of 40m Jib
BREED RE |2-3000-21950-251650
ta 20.2
Countenwveight of 45% Jib
i SO RRER TRS [P3000DIOS-STED]
* | counterweight of SOm Jib ane
Te | SS Rae Pa [Es0OES DSO TSR
Counterweight of 55m Tib EEE
OK 4 DSOODFAN19SOTS* 1650
lig OO KREG Ye E 20.2
Countenveight of 60m Jib
HE: D 2lay by cy
die. f. ERR RP HEE PHP OE
+ Dlay by cy dy ex fy gare the remaining counterweights after mounting a counterweight.TC6O1SA-1OF Sati HL Tower Crane it
1.3 SEHLAE4645 BE General layout of tower crane
1.3.1 Busha BEA HAIL 13-1)
Assembly relation of main components for stationary crane (Fig. 1.3-1)
SCAR EAU RAR ENT I 45m, RA Ae a A
RBA, REG TAS hy BER H, TS FURR) S AEA 383 1 Ai
AR BKSA ESE. TSWET EEL, RAE, STRESS.
ETMMREP GE 6, FRM ETL, Be aes HL
5], UE KGa), SE FAME SiS EE.
The TC6015A—10F tower
independent hoisting height is 45m. 2-fall or 4-fall wire ropes may be used for hoisting
purpose. The tower sections are integral construction of square shaped steel tube structure,
ane, with embedded anchors or with an undercarriage,
The base section of tower body or the undercarriage is connected to the foundation. Mast
sections are connected to slewing ring support and slewing tower body throught the upper
support and slewing ring. The operator cab is set at the side of the upper support with the
{ib in front and counter-jib behind, The hoisting mechanism is located at the rear of the
counter-jib and the slewing mechanism is symmetrically located on both sides of the upper
support. The trolley is pulled by trolleying mechanism to make to-and-fro movements
along the jib. The jib and counter-jib are connected to the tower head by the rigid tie rods.
GE PE PANE H AR, PBL AE RSG DU al, SALA TBE TF ALA Tt
185 Dea, SEE. FRSA
‘The lower end of the slewing ring support is the climbing frame, which surrounds the
tower body, To meet construction needs, jacking mechanism can jack the upper structure
of the tower body to let in mast sections for inereasing tower crane height.
1, GEER 2. FAST SrEERT ARR 5. FUE 6. BAKE
ee eee
12, 9M (0-D.c.0.0. fg #RRARUMEE ) 13, FNM (0-b.c. die. fg Smee
14, MME 15. 56 ERD)
‘.toundotion 2.tower bose seclion S.tower entionce or most section .cimmbing frome
5. slewing ring support 6,slewing ring 7.upper supporler B.operation cab Gplewing lover setin
10, tower head 1 1.counter-p> 12. jo(o- 1. figure the different lang of 7b)
13.counler3o 14,undercorrioge 15. foundotion
B13] EBACE
ig. 1.3-1 Assembly relation of main components for stationary erane
‘TC6O15A-10F 1-5TCOO1SA-10P {#702 El Tower Crane at 3% Erecting
1.3.2 HFA(SRA 3. B 4) Anchored State (Fig.3 Fig.4)
ALENT RRA RAE 45m. HRT AE AL 45m, AT
PAE Sa BT. OL RAH ATI 220m. ETRE S
110m FY, AK AS Sa fs RAS ET, CHE L10m AY, ARERR
SUNS. Wb MTR Sor CAR, Ae SRE, FS
MITE L461. HREM REE MIE. CAMS RARE T
BTRMPRA, Lew 220m Hh, HE SRNR. A, BA
FREI Om, WSR TRA. HSRARRA RARE. 1.3.2.1 40
1.3.2, 2 7 MEH HT BERS, PASI OSE SE TAS
RZ IAT RA PRA. 1.3.2.3. 1.3.2.4( 3, A BER
2— AHH TSR. MRT AUER HTS. ASHLEY (EA MAR.
‘The maximum hoisting height can reach 45m when crane is stationary with
embedded anchors. Ifthe hoisting height must be over 46m, it must be fastened with tie-in
ng
height can reach 220m when the erane is fastened with tie-in
onto the building. When the height is <110m, hoisting can
be done with 2-fall or 4-fall, but if the height is >110m, only
2-fall can do the job. The tower crane anchored-to-building
onto the building and mast tie frame, The maximum hoii
has the same structural layout as stationary type, only with
the exception of tower section B added to the tower body for
higher hoisting, To enhance tower crane stability and tower
body rigidity, several anchors are provided along the whole
height of the tower body. If the maximum hoisting height is
220m, the crane must be equipped with 9 anchors. Standard
attachment, the tower body center has to be kept Sm away q
from the building. In ease of the actual distance of the project
not in compliance with this requirement, just
‘TC6O15A-10F 1-6TC6O1SA-1OF Sati HL Tower Crane
x
i Erecting
contact our company for further information, Items 1.3.2.1
and 1.3.2.2 give consideration to project construction
requirements and the stress of the tower body and
anchored frames. They specify the distance between
anchored frame and foundation plane, distance between
anchored frames and suspension height limit, Fig3-3above
anchored frame. Item 1.3.2.3 and1.3.2.4 (Fig3. Fig4) ean
satisfy both ordinary construction needs and facilitate
prefabrication of anchored frames most economically for
lower operation cost of the tower erane.
HERE: 45m FRAT AE OLB) ER
ESET SRS OE HA 2 BE BE aE
Note: when the wind strength is over 11 grades, it is
necessary to reduce one tower section.
‘TC6O15A-10F
medB xe nO
2B xm
Fig 4
1-7TCOO1SA-10P {#702 El Tower Crane at 3% Erecting
1.3.2.1 JHA With one anchored attachment (Shown as Fig. 1. 3-2)
CL) TEAL FOES Eh EHR
false at SCAR SEY L46620 FRE
ie PEE L46Al RE, REE Ba):
2] 4 ‘The hy is the distance from first anchor point
aq to the foundation surface.
A @
25(m)
200m HY, no<10
When hook height h is >100m, namely:
n0<10
1.3. 2. 3 SIE PA Bs RB CO I a KS LB 3)
SKS, ERD DISA Bh 33m, UALR oom, BE
fil F 19 SEAT LA6A1, 1 4 HES BRIA SE AY L46G20;
After Ist anchoring operation, tower height above the anchored frame is less than
33m; maximum working height reaches 67m, from down to up, 1 Base Tower Section
146G20 and 19 tower sections L46A1.
IS. TAPED EH 33m, HALA TI 90m, BE
Tid F 27 ba LAGAL, 1 HUBS BRIAR AEA L46G20;
After 2nd anchoring operation, tower height above the anchored frame is less than
33m; maximum working height reaches 91m, from down to up, 1 Base Tower Section
146G20 and 27 tower sections L46A1.
RSS, PRO DIGS RE G3m, HEPA LIP MRE Liam, BE
fii F 35 SbEAY LA6A1, 1 4 HES BRIA SE AY L46G20;
After 3rd anchoring operation, tower height above the anchored frame is less than
33m; maximum working height reaches 115m, from down to up, 1 Base Tower Section
146G20 and 35 tower sections L46A1.
SOK, HAR LS A ER<33m, HOLA LE 138m, BE
UDF 43 RE L46AL, 1 WHUPS BUI EE L46G20;
After 4th anchoring operation, tower height above the anchored frame is less than
33m; maximum working height reaches 139m, from down to up, 1 Base Tower Section
146G20 and 43 tower sections LA6A1.
SAKA, WRC SB B33m, BALA LIER lem, BE
ti) F 51 WbnHE LAGAL, 1 HUES BRIE EW L46G20;
After Sth anchoring operation, tower height above the anchored frame is less than
33m: maximum working height reaches163m, from down to up, 1 Base Tower Section
146G20 and 51 tower sections L46A1
BAIS APSR CISS Bh E<33m, BBL LAP AGRE 186m, 8
TF 59 FS pRHETT L46A1, 1 TUES BEI A L46G20;
Afier 6th anchoring operation, tower height above the anchored frame is less than
33m; maximum working height reaches187m, from down to up, 1 Base Tower Section
146G20 and 59 tower sections LA6A1.
SOK, HURL CS A Et30m, BPURALIP RGAE 207m, BE
til F 66 SHE L4OA11 9 TUES RIEL 52 ETT 146620;
After 7th anchoring operation, tower height above the anchored frame is less than
33m; maximum working height reaches 208m, from down to up, 1 Base Tower Section
‘TC6O15A-10F 1-9TC6O1SA-1OF Sati HL Tower Crane it
146G20 and 66 tower sections L46A1
1.3.2. 4 RAR ELE ARR AC BAR A RSL 4)
ils, VHRR CIS SR Bt<33m, SALA LIP 67m, BE
TTF 19 VRE L46A1, 1 WES BRIE BEG 146620;
After Ist anchoring operation, tower height above the anchored frame is less than
33m; maximum working height reaches 67m, from down to up, for the tower crane with
undercarriage.1 undercarrige chassis L46G20 and 19 tower sections LA6AL
RIKI, WARD) Ce Bab Bt<33m, LALA 91m, BE
GE 27 RHETT L4OAL, 1 TUES BEI L46G20;
After 2nd anchoring operation, tower height above the anchored frame is less than
33m
underearriage,1 underearrige chassis L46G20 and 27 tower sections LGA
FSS, PRU LISS REL 33m, BL ACL AP RAE 115m, BE
TTF 35 PRE L46A1, 1 WEE BRIE AE 146620;
After 3rd anchoring operation, tower height above the anchored frame is less than
maximum working height reaches 91m, from down to up, for the tower crane with
33m; maximum working height reaches 115m, from down to up, for the tower erane with
undercarriage, undercarrige chassis L46G20 and 35 tower sections LA6A1
SUKI. APEC DIS 33m, PLA 139m, BE
Ti] F 43 SRE L4OAL, 1 WUE BRIE AL L46G20;
After 4th anchoring operation, tower height above the anchored frame is less than
33m; maximum working height reaches 139m, from down to up, for the tower crane with
underearriage.1 underearrige chassis L46G20 and 43 tower sections L46A 1.
TRS, HERD LISS BIKER <33m, BEL ACL AP RAE 163m, BE
Wi) F 51 REA L46A1, 1 HUES BELLE AE Lo4620;
After Sth anchoring operation, tower height above the anchored frame is less than
33m; maximum working height reaches163m, from down to up, for the tower crane with
undercarriage,1 undercarrige chassis L46G20 and 51 tower sections LA6A1
SKS, WEIRD CASS Bh E<33m, BLAIR AGRE 187m, BE
Ti F 59 SRE L4OAL, 1 WHUPR BRIE AL L46G20;
After 6th anchoring operation, tower height above the anchored frame is less than
33m; maximum working height reaches187m, from down to up, for the tower erane with
underearriage.1 underearrige chassis L46G20 and 59 tower sections L46A 1.
Ska, RRL CIES BE<30m, BELA LAP RE 208m, BE
Til F 66 HRHE L4GA1, 1 WHUPSE BEL SE FEW L46G20;
After 7th anchoring operation, tower height above the anchored frame is less than
33m; maximum working height reaches 208m, from down to up, for the tower crane with
undercarriage,1 undercarrige chassis L46G20 and 66 tower sections LA6A1
TC6O15A-10F 1-10TC6O1SA-1OF Sati HL Tower Crane it
\. MH RFI Foundation & Counterweight
141 SOBRE SE HIROMI AE CLI 14-1, 2 14-1)
Loads on Foundation with embedded anchors (shown as Table1.4-1, Fig.1.4-1)
BAL TCOOLSA-1OF CALSCBERE 45m) SERRE tS
Table 14-1 Load schematie diagram onthe foundation why
Kae 1
\ tow | | EM ae |
TH cK) | aay) biatie of torsion |
oro cKNm | Teen
THER | p60 2570 385 Bl41 Fight]
Operation
SELL
om af | 956 | 680 | 2660 | 00
operation
WE: RAH Ry Fy RSE M ARR KROL, HUE My WS
LRAT.
Note: Fh, Fv and bending moment M in Table 1.4-1 refer to the load at max bending
moment of foundation. Torque Mn refers to the load at max tor
foundati
jon moment of
142 SERRA EMEA ILE 14-2. # 14-2)
Foundation with embedded anchors (shown as Table1.4-2, Fig, 14-2)
GE UH BE BB AE REL ES OE, BT
AS St EE PH EAT RL BAH REL a tl, ME SE AE
Tr
Reinforced concrete foundations must be adopted, Basic requirements for the
foundation with embedded anchors as following:
1) ARP EMSS Se, RL, PRA ANA AL) 14-2. 48 14-2,
2) REL EES BAF 035, SI AN FEN 14-2 BF 14-4 HAE.
‘The concrete strength grade must not be lower than C35. The ground base must be
hard ground and the earth endurance must not be less than the specifications as shown in
the table L4—2 . Fig.1.4-2
TEL ES REM 1400 mm.
‘The depth of the conerete foundation should be more than 14000mm:
TC6O15A-10F 1-11TC6O1SA-1OF Sati HL Tower Crane it
3) GRRL BE TT se SB Ee BA
FRE RAEAF 1/1000.
Adjust the level of the anchors upper surface to ensure that the planeness tolerance is
1/1000.
fei reinforcement bar/ — \BEM Lower steel at
jeg eee EEE Ere reer eee
Hi42 kee tities
Fig 4-2 Embedded Anchors Foundation
#142 TCOOISA-1OF (ANSE REBE 45m) AER
Table 1.42 Load schematic diagram on the foundation
LER TER
foci orcs ft | oy ra
‘aro ing = bar — ing a a i was | oe RH
of upper layer _| bar of lower layer | (Mpa Vertical
L
aie DRE zanh | (| OO | seintoring ea
Concrete | Weight
Lengthwise and Lengthwise and endurance bar
5700 31-0 22 02 45.5 109 14X1640
6000 31-9 22 0.16, 50.4 121 14X1640
6500 31-9 22 0.12 59 142 14X1640
TC6O15A-10FTCOO1SA-10P {#702 El Tower Crane at 3% Erecting
1.4.3 FALE XBE AE Install the embedded Anchors
AERRNRET HEE, WARE PRP:
The installation of the embedded anchors is very important, please install them as
following:
1.43.1 49 4 NEES HEE 2 AA — i.
Fasten 4 anchors and the base section together with 12 high+tensile bolts
1.4.3.2 ARABELLA, RRC ES
HAA 146620 BAG
According to the construction convenience and the progress of binding rebar, hoist
the whole piece of anchors assembled with the base section into rebar net.
WR: LE RACE ir AEM
5, HERR RER NS AMZ
RE fis
Be sure that the climbing lug on the base section is placed perpendicularly to the
building in order to conveniently installing and dismantling the whole tower crane.
1.4.3.3, FEL 5 SB) EBL 6 A AS I> AL.
Be sure that the number of rebars around anchors must not be reduce or cut off.
143.4 EG MARES, RIEMBIL.
If it is difficult to pass through the anchor,the main reinforcing rod can be tumed
aside,
1.4.3.5 Fie RSC 4 [El ee BAS ESE BL SE EY L46G20 98 BEER
Le ERA ETA Oe EER, GRE ES iP ee SACP
AVE FE<1.5/1000.
Gently hoist the whole piece of anchors assembled with the base section so that it is
RA AA TMS. AME
in a vertical position before placing concrete. Hang plumb lines along the centerline in 2
directions of the base section to ensure that the perpendicularity of the embedded base
section centerline and horizontal plane is less than1.5/1000.
1.4.3.6 FALE CBE) BREE Fe IA 95°01 Lb.
Conerete filling rate around the embedded anchors must be over 95%.
‘T060154-10F 1-13TCOO1SA-1OF {#708 Ht Tower Crane a 3% Erecting
143.7 RRB A(R 14-3 A 14-4)
Installation diagram is shown as Fig.1.4-3
160032 Beat
Base tower section 964 Plumb-lne
a +
eH eeietey on 4 # Vertical
j 3 Embedded anchors
& | #
143 GRRE
Fig 14-3 the embedded anchors
1 BERRAREA— RK, TEMS H RAE.
It is allowed that the anchors are used one time, and it is forbidden to dig
them out and use again,
2 PERRASNRESVSAMEZ—, Ailsa RMARBADAI
ERK. SU-MRRALR.
The embedded anchors bear all loads of the crane, so they should be
purchased from our company. Otherwise if the users supply the embedded anchors,
you are responsible for the damage caused by anchors.
fe
‘T060154-L0F 1-14TC60154-10F 257.428 Tower Crane Set Erecting
1.4.4 BAP Lightning Protection
TRAERHMERP HO 144 ROD
i
RIERA inn A
BABU nn 3.51 ROBE
Eating red hich rust be chien
atleast 15m ito tte ground or
ovornZz¢ sid stip Snme3.Somn
‘ae RUTIN
Eating to with must be die
ak ot lost 14m io the ground,
Fli44 SSR
BRALAME ERP A145 CREA)
Fig 1.4-4 Gound protection figure of outrigger stationary tower crane
BREET on ARERR
#3 Inn 3.5m AEE
Enrthing rod which must he driven
ct least 4.5m into the ground or
Gohronnized steel strip Sdmmt3.Smm
HES Pa BEC FS
Esrthing rad which must be de
at least 1m into the ground.
Blas RRB ete
Fig. 14-5 Gound protection figure of undercarriage stationary tower crane
ER: FESRAMEAHSREEBR.
Do not connect ground lead with steel reinforcement of building foundations?
‘TeEOLDA-1OF LeisTCOO1SA-10P {#702 El Tower Crane at 3% Erecting
1.4.5 F651 Counterweight
l) FRB A SOM, WRANGLER, AERTS
(A146) ©
‘The counter-weight has two specifications; both are cast with reinforced
concrete. For specific dimensions, refer to Fig. 14-5 . Basic requirements are as
following:
3.0 RET 3.01 Counterveight
| way
Ui a
+ §l
'T
gl
2
3 3
ql
20 he] J
no/
199 HSER 1.95¢ Counterweight
y g|
ee Sal tat pchadestatel
‘T060154-10F 1-16‘TC6O1SA-1OF Sati HL Tower Crane it
165 EF GEH TEE 1.65 Counterweight
raz
2
‘0
ny
108
ls
1220 {soa} 9)
See 10
Biase eae
Fig] 4-6 Counterweight
2) MP HE NSAB Kon:
a) FRYE Be mR Te » BEN, MMSTIKF cls.
Weigh the counter-weight cast with reinforced conerete. Permitted weight
deviation is 2%, concrete grade no less than C18.
b) FHEMRERRERKENARTEL. MRI43) PE.
Counterweight should be equipped according to the length change of jib
(shown as Table 1.43).
#143 Table 14-3
30m #4(30m Jib) 35m #4K5m Jib) 40m EK 40m Jib) 45m #6(45m Jib)
2308 230 Dan 230
seere [pao] aie [2 Ba PADS
Counter [ 1-165] Counter [1-1.65t__| counter [DA Counter [201 65
weight [Gar ] 76% | weight [Gar] 96 | woieht Far weiaht [FHF ] 1320
3m BEGOm fib) | 55m BEGSm iby tim BFE (Om Tipp
Tao Dao Da
aca [29s | rare [sos | eae [aos
Counter 3*1.65t Counter 3*1.65t Counter *1.65t
weight [FHF ] 1485] weight [FEF [16a | weight TES
Total | Total
1.4.6 JAR ce RE BC M
Loads on Foundation with Chassis Stationary a
Fy Fh M
(KN) (KN) (kNm)
TC6O15A-10F 1-17TC6O1SA-1OF Sati HL Tower Crane it
147 RRB el
Fig. 14-7 Load schematic diagram on the Chassis Stationary
1.4.7 (SRA ERE 1.48) Foundation for Undercarriage ( Fig.1.4-8)
CFA TIS TS EBL Ah ET REIS LAS EAM ER, BR
LAA AS TS J TSP AIR AT. SRF DS Sh, EE
ASR OT
‘The ground foundation is the precondition to ensure safe operation of the crane. This
foundation must closely comply with the regulations for different geological conditions.It
is built of 4-blocks as base ballast, made of reinforeed conerete, Basie requirements as
follows:
14.7.1 REE SRNR 035, SR FAIRE Se, HiT A >
¥ 0.15Mpa.
The concrete strength grade shall be no less than C35.The soil below foundations shall be
tamped solid. The earth-bearing load shall be no less than 0.1SMPa.
1.4.7.2 (ERLE EA F 1000mm.
The depth of conerete foundation shall be more than 1000mm.
1.4.7.3 HERR LES RAR BRACE, TERE AF 1/7506
‘The contact surface between concrete foundation and frame girder shall be calibrated for
horizontality
1.4.7.4 DOA SRE ill HL EE LZ, 1200mm*1200mm 2% 800mm FI, FHF
EPIRA.
Dig a pit (1200mm = 1200mm * 800mm) with water drains in the middle part of 4-block
foundation for the installing the frame gird
1.4.7.5 DUEEL Sh BAUR HE ADT fit BE Ds A ETA A PTE IIR ES SARE 0
The relative positions of 4-group foundation bolts shall be accurate to ensure proper
installation
Its planeness deviation shall be within 1/750.
TC6O15A-10F 1-18TCOOLSA-10F {sti bl Tower Crane at 3% Erecting
BRR
West
TT
aka
iE]
east Banks» LUMPIAE, BAIL neRSH, WE, ERA, ARIA
‘ORR Ub, ROAR FALE, RS, AERA
{1ARYEG Ion, AMURRERAANSAEDE MMAR, SEABEALA
Cc
‘won Bae
se Bk ea
ost
e oo a ae
Hi4s RRBeEteiree
Figl.4-8 foundation of underunder stationary
‘T060154-L0F 1-19TCOO1SA-1OF {#708 Ht Tower Crane at 3% Erecting
LS SH Erecting
RR
SEBL HE.
‘The erection of tower crane shall be conducted only after the concrete strength of
BLE AL EAE BT ELS ETA BUR THA TOLL Kit EAT
foundation reaches the designed value of 70%.
CRE KBE BURA EAH 146620 fae, RRL ARE 1. 5-1
itt.
Erecting sequence shall be conducted in according to Fig. 1.5-1
1, 5-1 Kb EAL RRM
Fig. 1.5-1 Installation sequence of stationary crane with embedded anchor
CL) Se RETF Lasc20 F0.1 THRET Lasal
Install a base section 146620 and a tower section L46A1;,
(2) ABIES Install climbing frame;
(3) 22 IPEK AKA Install slewing ring assembly;
(4) 22Z1PSS-A VA Install slewing tower section assembly,
(5) 2284217 Install the tower head;
(6) 32870 AAR Install the counter-jib assembly;
(7) 32857 eH SAF Install the counter-jib tie bars ;
(8) BA—H 3. 0 Wh? 4H Install the first counter weight block(3.0t);
<9) 2225)412 Install the operator cab;
10) RAE Install the jib assembly 5
C11) S88 A AACEF Install the jib te bars,
12) REEF @EE CARA Install the rest counter ballast
1.5.1 FRASIER 146620 F— REA LAGAL
Install a base section L46G20 and a tower section LAGAL
1.5.1.1 4i#4 (2 Structure skeetch
FR ERE 146620 Ay RAREST, RAE L4GAL 2 yh ak it TTT Ae
‘T060154-L0F 1-20TCOOISAA10P_VEatALSEbL Tower Crane “it Breeting
CEA RY. SBMA DB ELA 1 ESE L46G20, 12 pT LAGAL
FEA 46620 F PHS A DU EAL, Heep Loe
(1.5. 1-1)
EW L40Al ASAE RAR EPA MSS TA, OL
1.6.1-2)
PV MEVLALA, SHE AIRAHAL FAR, FAB RELY
FG. SS eT, WA SS ER, A ES
D. A SAist ILE 1.5.1-3) , BAER EE, URL THE
RELSLE FMB RE AN. MALL A AUB D RUE
iH, PPAR ee At SS OWL, RES eH
‘T060154-L0F 1-21TCOOLSA-10F {sti bl Tower Crane
3 3% Erecting
Dy A BUS My ACMI A Ae He 1. 5-1) AREA AAT.
7500
ME Step
143449
1600
3000
1600
el
\#eBolts
Nb aStep
8
‘T060154-L0F
Fi
151-1 UME BR IEA L46G20
1 Base tower section L46G20
LAGAIES ASU: L180x18
L&GAT main chord specification: L180x18
FE15.1-2 RET L4sa1
Fig 5.1-2 Tower section L46A1TCOOISAA10P_VEatALSEbL Tower Crane “it Breeting
channels E channels D channels A
151-3 JESHHH A. DE
Fig].$.1-3 channels for tower section
‘T060154-L0F 1-23‘TC6O1SA-1OF Sati HL Tower Crane it
#1, 5-1 WASH Tablel.s-1 combination of channels
Till
110-1
14941
1841
LTH E
14641
15+
1441 E
143+] E
TT E |D]D
=[ of =| of =] of =
> ol=[e]e[ ele] ol =
SSeEcCeEcecee
=} of =| of =] ol =] of =|] =
el of =| of =| of =| of >] ole] =
elo] =| of =] ol =] of =|o} =] o] =
se} of =| of =| of =] of =] co} =] of =] =
el} of =| of =| of =] of =] o} =| of =] o] =
D
14241 E Jala
D
A
el ol e[of=
or [ETAlala
LAN
ofif2|sfa]s]e
2
9} 10} 41] 12] 13} 14} 14] 16
M
mit: LRT, NRT, MRP
1.5.1. 2 FRR MRED LAGAL
a SSR aE LOR ACHID) . ASSiita, eae BIT Meee
ELSE A w_L OE Se BREE SEE Lh. FS PARE AEE (hn 1.5. 1-4), Brae
Ben ihe Sa a ME — FS SL ee
BF HOSE AE Be EW 146620 AEH LAGAL CLAM 1.5.1-2) «
Hoist the installed tower sections by hook(forbidden horizontal ventro-rod), install
them on the Base section which is equipped with embedded anchors on the foundation,
connect them intensionally by 8 Shafts(shown as fig 1.5.1-4), Be sure that the climbing
lugs on each section are placed on the same plane under counter-jib in order to
conveniently installing and dismantling the whole tower crane, At this time there are 1
base tower section L46G20 and one tower sections LAGA on the foundation, shown as
Figl.5 .1-2.
D. ABGXRAiRBRREERE, ERO MT HRREREMRAT
1. 5/1000.
TC6O15A-10F 1-24TCOO1SA-10P {#702 El Tower Crane at 3% Erecting
Inspect verticality by theodolite or plumb line. Verticality deviations of 4 sides of
main chord rod must not be greater than 1.5/1000.
BL 5.1-4
1.5.2. FAAMEF}AE Install climbing frame
1.5.2.1 #9 ak UREA 1.5.2-1) Structure sketch (Fig. 1.5.2-1)
MCA RER CH RAY, FS. RRMA A SAM, ISLE
BEBE GAT AE em
‘The climbing frame consists of climbing frame structure, platform, climbing stairs,
hydraulic jack system and let-in device for mast section. Jacking of the tower crane is
done mainly by this component.
TAF} HL See AE MET AR a URL ENE FASE). RR IHERB
FAL (UAE GL, RRA 16 NER, RAR TRS ESPON, iB
PR ARER
‘The jacking cylinder (or called climbing jack) is provided on the beam at the rear side
of climbing frame (i.e. one side of pre-assembled counter-jib). The hydraulic pump station
is placed on the platform on the side of hydraulic cylinder. Climbing frames have 16
rollers on the inner side. These rollers are supported on the outer side of the main chord
rod of the tower crane, acting as guide and bearing,
ATETPGARRNRE BE, CMRARP BORE RRP ES, ROR
BS, TERIAT} 3 Aba ALE eB EAE.
To facilitate erection of the jacking system and satisfaction of safety needs, Platform
and protection fence are provided at the upper and middle portions of climbing frames.
‘The platform is provided also on the introduction beam. During jacking operation,
operator stands on the platform, operating the hydraulic system, to let in mast sections and
insert connection pins.
‘T060154-10F 1-25‘TC6O1SA-1OF Sati HL Tower Crane
152-1 (42 Figl,5.2-1 Climbing frame
HE 15.2.2 PROT
Fig].5.2-2 Hoist and install climbing frame
1.5.2.2 FRARICFPAE Install climbing frame
a. RUF AE BEERS M1522 a. RARE E, TR
FR AT) Gh Bee TF As I aU
After pre-assembling the climbing frame (shown as 1.5.2-2), hoist the frame. It should
be noted that climbing jack is mounted at the same side of the climbing lugs on section.
b, HEMET IRIS FERS CEH Sh
Enclose the climbing frame on the outer side of the mast section slowly.
co. RCT ARE ETE SA LA. eT aS
RHETT EY APR ARR y 2~Smm) -
Place the frame over two tower sections and lowerit until the pawl is supported by the
upper climbing lugs of the second tower section (count down up). Adjust the clearance
between climbing guide rollers and tower sections (clearance is 2~3mm)
4. RDG, HERR G— i, BE, EMEA
SERGE, CARTES RH LU he dS TEA SB, RE EA AR 5
ATER. WE LER.
Fix the jacking cylinder and hoist the hydraulic pump station to one comer of the
platform, connect oil tubes, and check the hydraulic system for normal operation, Be sure
of the rotation of fan blades of the oil pump motor in the same direction as arrow
indication on its casing. This will help avoid oil pump burn-down, In case of any errors,
motors shall be rewired.
1.5.3 28 EZRA. Install the assembly of slewing
‘T060154-L0F 1-26TCOO1SA-1OF {#708 Ht Tower Crane at 3% Erecting
1.5.3.1 iff Structure sketeh,
FIR SRE MAI PSE. BSCR, EC, FBSA, LE 1.5.3-10
‘The assembly of slewing ring consists of the slewing ring support.slewing ring, upper
support and slewingmechanism. Shown as Figl.5.3-L.
am TZ VE
es
2600
el
Sa
te
153-1 (HEAR Figls3-1 slewing assembly
LReARAH, RAHA ARRAS. bMS
ALES, SH LIPF SMA, SAREE, BRAKE
MAREE SC MEAN eae SSR. LOC LP ae 4 MA SARS, OF
285 Fer PS BBY LP a AE
‘The upper support is a form of plate-shell structure, The flanges are welded on its
both sides for the installation of slewing mechanism. On the three sides of the upper
support is provided with an operating platform, On the front of the right side of working
platform is welded with a support lug for connection of the operator cab, On the rear is
provided a support for the installation of slewing limiter and a support plate for mounting
electrical whistle. The lower portion of the upper support is connected to the inner ring of
the slewing ring by high-strength bolt. Its upper portion is connected to the slewing tower
by 4 pieces of pins.
FSC EE ARETE, OS ELF EY PP Oi RR TE
SLA AR TS OR, ALP TF ES LE, FR Pe SE
4H LAGAL ALB RAE.
‘The lower support is an integrated box structure. Its upper portion is connected to the
‘T060154-L0F 1-27TC6O1SA-1OF Sati HL Tower Crane it
“ecting
outer ring of the slewing ring by high-strength bolt. There are 2 detachable in-let beams in
the middle, The lower support is connected to the tower section and connected to the
climbing frame.
1.5.5.2 FAR E52 ARE Hoist and install the assembly of slewing rings
HATER PE, FSR, ESTA AY 80 FF 8.8 2 M24 RR, RH
STAB HE PAA Bl) GAON + my CRLF RAR EET SD ASE. ELAR Bb ARE ES
KASAM AT 640N, m,
Inspect M24 high-strength bolts (80 pieces, strength rating 8.8) connecting the
slewing rings, slewing ring support, and upper support to make sure that their
pr joned torsion moment are up to 640Nm, and the torque of loose-proof nuts (the
upper nut) should be a little more than or equal to 640N « m.
a. MB15.3-2 Fm, HARE LRN REBET, SE HOR aA
ie;
Hang the hook in the four pin-holes of the upper slewing surpport main chord
rods, hoist the assembly of slewing rings
bh, A LG AR wR BRA EHS TULA 5 IF SC
(ERA, PRES EAGER, ROPE A eybrias
Put the assembly of slewing rings slowly to the top of tow
5 BE BY
body. Remember to keep
the position of beams of the slewing ring support in conformity to the position of
Strengthened section’s climbing stairs on the tower body. In connecting the slewing ring
support to the sleeve frame, their marks on four comers must correspond to one another.
co. FA @ 50 FAME Fes S PRE L46A1 EBL, FB
Connect with 8 pins to Strengthened sections and slewing ring support, keep their
large fastness with the pins .
A BRP) AE, HARES MHEL C8 END PEMA ASME TAR TAT ey Pe
ER AGRA, AHSCT RS PER.
Operate the jacking system to extrude the hydraulic cylinder to the second pair of
climbing lug from up to down Jack the climbing frame to contact the connecting ear-plate
of the ring support. Connect the climbing frame to the ring support with pins.
i
TC6O15A-10F 1-28TCOO1SA-1OF {#708 Ht Tower Crane at 3% Erecting
3
E
Bi153-2 AYER AR
Figl 5.3.2 Installing slewing assembly
1.5.4 332(5] 6149 Install the slewing tower section
1.5.4.1 [UGS 2-42 AGI Slewing tower assembly Structure sketch
FLPeSE SS LTR EPS A RS CL 1.5.41). ES SHE
Ri, LHEPWANTRERESAT OSHA, 1 Se
1. CAME RMERLERS REE He. ALR ARES.
‘The slewing tower assembly consists of the slewing tower and hoisting weight limiter
(Fig. 1.5.41). The slewing tower body is an integrated frame structure. Its upper end
surface has the ear-plates for mounting the jib and counter -. These plates
are connected to the tower head by 4 pins. The hoisting weight limiter is provided on the
respectivel
beam of the slewing tower to control the maximum hoisting weight at different gears.
‘T060154-L0F 1-29TCOO1SA-1OF {#708 Ht Tower Crane at 3% Erecting
Seas EERE seein
P1541 Hes
Figl 5.41 slewing tower
1.5.4.2 FAS ELPA 4 Hoist and install the slewing tower body
FRETS
FFig]_5.4-2 Installing the slewing tower body
MO 1.5.42 Fim, RARE RES RET. eR.
Shown as Fig. 1.5.4-2, placethe hoisting wires at the four mainchords, and then
tighten the hoisting wires.
a. FRAKES (AEE ARPA RERRAATA), CRE
SURI SA Le A be EE
Hoist the slewing tower body(Pay attention to the direction of the ear-plates for mounting
{jib and counter-jib). Keep the car-plates close to the side of the hook weight limiter and
the jib on the upper support in the same direction.
b. FA 4 Pee Pet 5 Se EH RIEL, SIP FO
Connect the slewing tower body and the upper support together with 4 pins, Put through
and keep open up the cotter pins.
1.5.5 ASST Install the tower head
5.1 SHgf@ ie CH 1.5.5-1) Structure sketch (Figl.5.5-1)
‘T060154-L0F 1-30TCOO1SA-1OF {#708 Ht Tower Crane a 3% Erecting
BOWAU RECA, THARRRAKERER, BAO WSRER
VORA, ATREAE, BULMRALETS, LRP Sm
RAR. SULMEAREA AAS Re RAAT A, TE
KRPORAAERAS, PRATER, BORAT, BR
HSS ER
‘The tower head is a quadrangular cone-shaped structure. On its top, there is provided
with the tie plate frame and jib tie plate, which are connected respectively to the
counter-jib and the jib through pins. ‘The upper portion of the tower head is provided with
a working platform. The platform is bolted to the tower head. The upper portion of the
tower head is provided with guide pulleys for hoisting wire rope and pulleys for mounting
the jib tie rods, ‘The lower portion of the main rear chord of the tower head is provided
with a moment limiter, and ladders with protection rings. ‘The tower head has 4 ear-plates
on its lower end, which are connected to the slewing tower body through 4 pins.
1.5.5.2 fA&24TH Hoist and Install the Tower Head
a. FART TEA CIES EAP. ER. PR ARRAS, ea
TREAE, ERM SAE idee bP tT.
Before hoisting, assemble the platform, rails, ladders and moment limiter on the
ground, On each side at the back of the tower head, mount one counter-jib tie rod for the
convenient installation of the counter-jb.
b. WF 1.5.5-2 Ve AIRES b, MERA
ROE Le
Hoist the tower head onto the slewing tower body. Pay attention to align the
verticalside of the tower head to the jib direction of thetower head upper
supportifigl 5.5-2)
co. FA 4 PSSST S ee ER. APSE IE KE
Connect the tower head to the slewing tower body by 4 pieces of pins. Put through
and open up cotter pins.
‘T060154-L0F 1-31TCOO1SA-1OF {#708 Ht Tower Crane at 3% Erecting
HEGRE RENTER
8660
2 55-2 BET
-1 Tower head Figl.5.5-2 Hoist and Install Tower Head
1.5.6 32425¢- G78 3K Installation of counter-
1.5.6.1 Fit (HAA 1.5.6-1) Structure sketch
FHS ARS, A, ER. FOR LRAT
EH, QRETLEVS, RSH HAAR SARES BE, AA
ARASH AMER. RAR AP OH. RAM, BANMAS AER
SEHRAR, ARRAS L. MAUS RR SS
PLL. PHEMESRE KMRL. WR 12-1.
‘The counter-jib has 2 sections, which are connected by pins. ‘The counter-jib is
provided with railings, walkway and working platform. One end of the counter-jib is
connected to the tower body by two pins and another end connected to the tower head by
Wo rigidly-combined tie rods. Its tail section is equipped with the counter-weight and
hoist mechanism. ‘The resistance box and the electric control box are arranged at the root.
The hoist mechanism and its own base frame are fixed on the counter-jib by six bolts. The
weight of counter-weight varies with the jib length, referred to table 1.2-1.
assembly
‘T060154-L0F 1-32TCOO1SA-10P {#702 El Tower Crane at 3% Erecting
*eBisecrc resistance cnbine!
AAA Hoisting necharisn E498 counter ballet 1900 RM ecicl control canbe!
a
345
A: Hest, FAIND
‘Tok et about excling counter bls
‘ihe
é
f
AN
28855
A
DOD
ft
F161 Pari
Fig 5.6-1 structure of eounter-jib
1.56.2 (TSE BR Hoist and Install Counter-jib Assembly
aN LACE A, HERR, A. ALE, SP RE
BL, ARE. BV Lie, HERD LM ERE
PATE BITTE.
Assemble the two sections of the counter-jib with banisters, passage and operating
platform on the ground. And fix the hoisting mechanism, the electric control cabinet, the
resistance box and counter-jib con-robs onto the counter-jib. Connect the slewing
mechanism to the temporary power supply, and slew the portion above slewing ring to a
position for convenient mount of the counter-jb.
bE 156.2 a. AEA CRM LA 4 Pe).
Shown as Fig.1.5-11, hoist the counter-weight (Four mounting ears are equipped on it.)
cc. FER EP Oo 5 ELS ee.
‘Comneet the front end of counter-jib to the slewing tower body with pins
a. PRRRAT RAD 15.63 fim, KE 164 TOR BH eS ESO e,
ET PGB SIS LPS TEMAS. TETRA. SRP
Of.
Shown as 1.5.6-3 for the counter-jib pull rods schematic diagram, lift up the counter-jib
slowly to a proper position for smooth connection of the counter-jib pull rods to those on
the tower head. Connect the pull rods by pins, insert and open up cotter pins. (Shown as
Fig. 1.5.6.4).
‘T060154-10F 1-33TCOO1SA-10P {#702 El Tower Crane at 3% Erecting
ec. RMF MAT. RR 3.0 AE BRAT OR A
BL, 9H 1565 fin.
Lay down the counter
slowly. Hoist two pieces of 3.0t counter-weight at the
furthest position of the counter-jib, shown as Fig! 5 6-5.
aged ant os
(ax, mK oa what TOK
21562 Ber
Figl_5.6-2 Hoist and install Counter-jib Assembly
Fide on ihe comter-jb
AL ‘Fde on the tower head
Scceeeee rcsetPnPicccrtnt or
| . [7 meet fe tower ead
or ="
\
68 akg 26H)
H1s63 Pair
Fig 5.63 Counterzjib pull rods
‘T060154-10F 1-34TCOO1SA-1OF {#708 Ht Tower Crane at 3% Erecting
1564 See a RT
Figl.5.6-4 Installing counter.jib pull rods
‘T060154-L0F 1-35TCOISAALOF $$xtA2SEHL Tower Crane ik ___ 3 Erecting
‘PER 1 FRMERRASEST ERR
2 RMRERAMELTAT LES TORR EARR
ial Malice: 1Be sure of mounting Ihe bale of the
- (aleve px mali ole. 154m 2m
‘1Be sare of nownling the end fare of the
eee
B1s6s BEE
Fig]_5.6-5 Hoist and install the first counter weight
1.5.7 32487] LX Install operator cab
1.5.7.1 Sa fGRULH 1.5.7-1) Structure sketch
WWAAERAM, MEPFLRR EMF a, AAR
ALEGRE, WUE. a/R MOM, TOMAR. PLATA
Ee
The cab is a sheet structure, offset at thefront on the upper support right side platform.
‘Thereare large big glass windows on the four sides of the cab.The upper window in front
can beopened to obtain a wide field of view.The cab is nice-looking and comfortable,
equipped with inter-active control console.
TC6O15A-10F 1-36TCOO1SA-1OF {#708 Ht Tower Crane at 3% Erecting
BABA Hook lugs
\ Aas LAER
Cant wn apr ye ys
/
Ud
560g
stl ALE
Fig1.5.7-1_ Operator cab
1.5.7.2 1385] 8L% Hoist and install the operator cab
AMEN MEARE RRS
a WB1572 Hm, Bas.
DAME RA LER AN, EB LIL. Rie AS
HIE PE FEO. (ETE A AL SS SEL PESO EE HE a
fh, Ute FA).
After the electric equipment in the cab is mounted, Hoist the cab to the front nearright
platform of the upper support (Fig. 1 5.7-2).Hoist the cab to the front near right platform of
the upper support. Align it with thehole-position of ear-plate and conneetthem with three
we
pins and put in cotter pins.( Alternatively assemble on the groundthe cab and slewing ring
assembly and hoistthe whole piece once for all.)
157-2 BRAS
Figl.5.7-2 Hoist and install the operator cab
‘T060154-L0F 1-37TCOO1SA-10P {#702 El Tower Crane at 3% Erecting
1.5.8 42 1A RK Install jib assembly
RERAKSRRES, RESHAT. REEARBAN, RES
RES LYM L.
“The jib assembly consists of the jib, jib pull rods, trolley, and trolleying mechanism.
‘The pull rods are placed on the rod-fixing frame on the upper chord rod of the jib.
1.5.8.1 S7MgfARULA 1.5.8-1) Structure sketch
RESLTLARLAA TATE RNS, BSRERAS ARM,
DAH. PSUZAAMWER, HETE. ATRAREER. BERBERA
Ef, RERRAMAS. RRHSAMRAN. ERERSo APRA SIH,
REEVES MPRA STA, CEES, REA
REE -MUSHBEAE, ETHERS A.
‘The upper and lower chord rods on the jib are square tubes welded with two pieces
of angle steel. The whole jib is a varied cross-section triangle spatial structure, consisting
of ten sections. Section-to-section is connected by pins for the purpose of convenient
installing and dismantling. In order to improve hoisting performance and reduce jib weight,
the senond and eighth jib is structured of a double hook lugs and varied cross-section
spatial truss. In the second section, the traveling mechanism is provided. The trolley
moves along the jib lower chord as its track. It is pulled by the traveling mechanism to
move to and fro along the jib. On one side of the trolley, a maintenance cage is provided
for tower crane installation and maintenance.
HESS TRASH S AMER. HTRERERAP, CBI.
VELSHRA TAA, HRW AAR IT STE
‘The root of the first jib section is connected to the slewing tower body by pins. In
order to maintain the jib at a horizontal position, the third and seventh sections are
provided with two hook lugs, through which jib pull rods are connected to the tower head.
ator nit sea pe toy shdok oNeary
foes x“ !
158-1 @EAAR Figl 58-1 tb assembly
REBARN, LA RRRS TE LMP SAR, Tie
Se. HAE LER ATG REBAR 6Om, SSm, 50m, 45m, 40m, 35m, 30m
EK, BRC ae eR 1.5.8.2 PR.
Jib sections should be assembled strictly according to the series number marked on
each section, and the jib may be assembled with various jib lengths of 60m, 55m,
45m 40m and 35m and 30m according to the construction requirements. shown as Fig.
1582,
Dislocation and free assembling are forbidden.
‘T060154-10F 1-38TCOO1SA-1OF {#708 Ht Tower Crane at 3% Erecting
Or Or or sk oy OF OF OF OF
ARRAN
rox 1000 000 10000 00 sono wor lf ao
or @r OF snk OF Or Ot Or
ATRIA AD
0
roooo | segoo soon | sono coon soto
OF @F OF snk OF
AIRIITIAITAA
veooo | tcaon son | sonoo saan
DF @F OF sngk OI OFF
ART
[wooo | town son | sosoo soon | on
Or Or ODF snhkO? OF
ADRIANA a
[wooo [soso soon f_onco ff sso
DF OF OF 3inkk OF
SN
1000 10209 ‘a0 so
1532 RE
Fig1.5.8-2 Jib assembly
1.5.8.2 2¢424% AUK Install windproof boards
1, SREB 50 GK, ASKER MNOR A, FERRAE BAA
KPA: SRR On KA, ARES UA, tee
BOSSA CARA AMR.
‘There should have one windproof boards installed on the tip of the jib when the
length of the jib arrangement was35m, There should have two windproof boards
installed on the tip of the jib when the length of the jib arrangement was 30m
2, SRR GAD GT HE, RUA AZ MER RAL U MRE CF
BRS tt U MR M16 it, Pe RP M16 BRE) , AR
A, ARBRE ILS REE. AP CMR RRR
SER K, (i PETS UC EES A LE
‘The windproof boards should be manufactured by the users. We advise that the
connection between the windproof boards and the jibs used the U type bolt ( each suit
includes a U type bolt M16, a washer, one elastic washer and a nut M16). Otherwise, the
method of the connection can be designed for other kinds based on the surroundings.
2, AARRRERE SEE AM, 0H 1.5.8-3 Pia. HR L U MR ILE
BC. LARA ES AR MOT See
The windproof boards installed on the tip of the jib,as shown in Fig1.5.8-3.
‘T060154-L0F 1-39TC6O1SA-1OF Sati HL Tower Crane
1. FFUAR Windproof boards 2, MI6 fff U BRE: Uaype bolt 3. 44% backing board
15.8.3 FRG ASH
Fig .5.8-3 Installing the windproof boards
3. PERU ELD 1.5.8-4, eRe OY U a RE LSS Se
RET SHR. HARESRE STRAIT ER, BLL. F
RRR wEL,
‘The followed showed manufacturing method of the windproof board. Before drill the
hole of U-type bolt on windproof boards.the windproof boards should be assembled
with the Jib. The windproof boards must be connected to every ventro-rod,and the hole
should be drilled on upper and below abnormal tub.
\ve ZL Cin
‘T060154-10F 1-40TCOO1SA-10P {#702 El Tower Crane at 3% Erecting
eS cag ant Evtce ii
No. | Designation } specification — | Quantity | Material
RABA
1 7 (40x 20 2,5-1000 2 Q235A,
Abnormal tub A,
JE B
2 dined (40 20 2.5-4866 2 Q235A,
Abnormal tub B
BA
3 16.920 3 235A
steel rod A. A 7
wa
4 16-1220 4 235A
steel rod B 7 7
3 Plate 2-1000%5000 7 3A
6 ‘H/{% Plate B-20X40 4 Q235A,
Biss4 BREE
Fig.5.8-4 Manufacturing method of the windproof boards
4s U aR He ARH HE ILD 1.5.8.5;
‘The fig 1.5.8-5 followed showed manufacturing method of theU-type bolt and
backing board,
1
i
516
al a
al a oY 298
Eb a
¢ -— At as
\ 038 \
FA 158-5 U BUsR ee eb HY Hel
Fig1.5.8-5 Manufacturing method of the U-type bolt and backing board
1.5.8.3 AIA BR Hoist and install jib assembly
a SUE OAR, 29 0.6m) (8158-8), HRRER. RTI
ARSKNRES, HMARE)PRERER TAN PAL.
Assemble the jib on the flat sleepers (or supports) near the tower crane, No matter how
many the jib length is, the trolley must at first be mounted on the guide rail on the jib
lower chords.
b. BABAR RAEREDE |, HERE) ERBRE ERE.
Mount the maintenance cage to the trolley and move the trolley as close to the minimum
radius point of jib root as possible.
o RRFRE GRAMS Ie, SAN, RRS
BRAETRE DS aM, ARES Fl SM, Be TRE
Ena, WH 1586 ian. ERE EMAAR 3 MER, BRE
Dik, AF ERE Oe KE Ae ee 6~9 fh. MEM SR
SHEN ARR S, RES Ae Ao, TREKS ERO ADIGE 2 A
KR. EMERRMLA HEE MAAKERE, CAS Ae
‘T060154-10F 1-41TCOO1SA-10P {#702 El Tower Crane at 3% Erecting
SSB, WFLA BR SK
Mount the traveling mechanism at the jib root section,let two wire ropes from the
wire drum and let one of them pass over the guide pulley at the jib root.and then fix it at
the back of the trolley.Let the other rope pass over the guide pulley at the middle of jib and
head portions and then fix it at the front of the trolley.as shown in Fig, 1.5-19.At the rear of
the trolley is provided with three rope clips.And rope clip compression plates must be on
the side of ropes with force applied. The rope clip interval is 6~9 times of the wire rope
diameter. At the front end of the trolley is provided with tensioning devices. If the traction
rope has become loosened, adjust tensioning devices to tension the rope. The jib root
section is provided with another set of rope tensioning devices. Any loosened rope during,
its operation can be tensioned by this tensioning set.
sas kamen = RENAE
Wire Drum Central Pulley Guiding Pulley At jib Tip
petal Pulley Guiding Pulley
Rae
Tralley
\ Guiding Pulley At Jib Foo! \ Eouipped With A Rope Tension Device And Anti-Broken Device
RES HA FREE
Biss.o ms MH TEE
Fig. 1.5.8-6 Trolley Wire Rope Layout Plan
d SE SHHES 1537 ae PS RES LAMA ee. FeO
WH, MERE Lok OEIC.
After assembling jib pull rods shown as Fig 1.5.8-7, connect it to the jib hook lugs on
the upper chord of jib with pins, insert cotter pins, then place jib pull rods on the bracket
of upper chord on the jib.
2 RARER LE ee. CAEL OLE Gilt ISS L ane BLS
EP REE BTM.
Check and perfect the circuit connection on the jib. Switch on the temporary power
supply of the slewing mechanism to slew the tower crane superstructure to a position for
convenient installation of the jib.
‘T060154-10F 1-42TCOO1SA-10P {#702 El Tower Crane at 3% Erecting
(60m. 550.0 SSmPsty Long jb pul rads «for On. Ein. SO. 5 jt»
‘sil 90502
44180
edie 40m. Joma Long jib pull rods ¢for 45m. 35m jb
sax 210 4305 1305
49180
dtr SOmated Long jib pull rods «for 30m jo»
13700
H1s87 SES MTART EE
Fig! _5.8-7 Jib pull rod Diagram
£ RA skh, RRA TA, SUTMSBHER ER, RARER
BRA. WH 153.9 Pima HAs ES RES RMREEE.
Hang up ropes shown as Fig.1.5.8-5. Try the ropes for balance. In case of improper
balance, move properly the rope-hanging position. Lift the jib assembly to the mount
height. Use the axle-positioning frame and pins to connect the slewing tower body to the
root section of jib and then fasten the connection shown as Figl.5.8-8,
EE: URIRRERA NRE, UNE.
Attention: record the jib lifting point for reference during tower dismantling.
‘S0fLHL Center of gravity
AE Trolley”
an 09 FL SCRE SE TT
RRA AA CEB). FRR AR, RB, HIER EL
L204} TH 10~5 0mm SEI, REEF MOAR Ee aL A PO. BET
SRA, WIE a, OETA, WMA aE EP
Ro A — a FB A. LTT, SPERM, HEME FARA IS TH
PPSRCE THB SR AT UL eB — A a5 A i eT a SE OT
AT, SSS, RTE, SRT RE be
SAVBILA, FUEL, HPL LAA te ER tt
SBS LOTTE AE BIE), MAS LER ERE | I
TEL, FAGSS ELL, RSL NE WS ES ME, OTE, aR,
FS ESAS LP EEE Se.
Start hydraulic jack system; extrude the piston of the cylinder place the pins of both
ends of the jack beam into the cradle of the climbing lugs on tower section nearest to the
beam (It should be checked by a specially- designed watchdog). Erect the climbing frame
and the upper part until it reaches the height of 10 ~ 50mm. Check if there are any strange
sounds, deformation, any self-retreat of piston rod ete, after confirmation, go on to erect
until it reaches the height of half the tower section, the support latches on the climbing
frame pass through a pair of climbing lugs and resets automatically, then retreat the jack to
let the support latches stay at the upper climbing lugs, confirm that the two support latches
‘T060154-L0F 1-56TCOOISA-10F PEstH2SEHL Tower Crane na vecting
press the top of climbing lugs and bear the weight of climbing frame and the upper part
without any strange sound and deformation, retreat the piston completely, lift jack beam so
as to support the cradle of climbing lugs. Erect the upper part of tower crane to a height of
alittle more than half the tower section so that the space is fit for a tower section, drag the
tower section on the inlet platform of climbing frame into upper part of tower, retreat the
jack slightly so that the new tower section alight at the top of tower and conduct proper
alignment, remove the inlet wheels, fasten the upper and lower sections with four pieces of
pins
FR CRSA aT. HE FSC ES SA LE, FE RTIE. AS PEAS Pe
SEER, Rise A ETI Lie, BEML TE, UATE
Dh EAP BREE LYK BN AT 6 AAR SC NIA I A TES, EEA, fe
SALW Z AT, Ade PSC EEUU fa ATL MLE Pai Oa EA AD) St,
GENEL, He PSR
Retreat the jack once more to let the lower of slewing ring support alight at the top
of new mast and conduct proper alignment, then fasten ring support to tower section
with eight pieces of pins.Then a tower section is mounted. If several sections are to be
mounted, just repeat procedures mentioned above. As for proper alignment of slewing
ring support with connecting pin holes, insert four guiding rods into four pin holes at the
comers of slewing ring support before retreat the jack.
WARINTER4H General Notices of Jacking Operation:
1. HELA EAL UEAF ldm/s BY, ATTAIN
Jacking operation is prohibited when the wind speed at the highest top exceeding
14mis.
2. RAH BAER ERS S| GRE Be, SEN BLES tl)
HERES MAE, RB)ED EMA PE
Keep the jib in the same direction as the in-let tower section during jacking
operation. Stop the jib with the slewing mechanism brake be sure of the trolley stopping at
the jack-balanced position.
3. FRESMS Lie, MARA
BG SEGA A PEDAL 8 “MAIER:
If several tower sections are to be mounted, after mounting a section, all the chords
of the section must be fastened with 8 pins,
4. SURE Lee, aS BREAST IE;
Keep the climbing lugs on the newly added tower section in alignment with those on
We, Fete Fee,
the existed sections.
5. EPR ESI AA O 50 HE ZAP $e. FEN A AR EL
Its prohibited to slew, change work-radius and hoist load without connection of the
slewing ring support to the tower body by 8 pieces of pins.
TC6O15A-10F 1-57TCOO1SA-10P {#702 El Tower Crane at 3% Erecting
6 EDA, FMEA RAMARS. SCENT, WaT.
AG PRESS AS, IFAM 8 fh O 50 THR PRESSE RES I, ER
RASH.
If the jacking hydraulic system has become abnormal in the course of jacking, stop
immediately the jacking operation, retract the oil cylinder, lower the slewing ring support
onto the top of tower body and use & pins to connect the slewing ring support to the tower
body before removing troubles from the hydraulic system.
1.10 S#4LASENAF Tower anchored onto the building
L.10, 1 RUF Pare AE ee EA EH HT BA
When the working height of the tower crane has to be exceeded to its stand-alone height,
the tower body shall be anchored.
1.10, 2 Pera BR BEA
HENARE A SIMERAARASAR, PRIMER GR, SRA OF
PE) Ait, oS AMAL AER, PPAR ha A SZ ee, AR
PEP ERA ES EAE, DUR EEE APA PTE
MEATS EE AS BRS ES. (SILA 110-1)
The anchoring devices consist of four sets of mast-tie-frames and four inner ties. The 4
tie-frames are fastened into anchoring frames by 24 sets of M20 bolts, nuts and washers (bolt
pre-tensioned moment 370Nm).Anchoring frames are articulated with dtie-rods on 4top
points. The 4brace rods shall be kept at the same horizontal level. Adjusting bolts can be used
to push inner tie rods tightly against the 4 chord rods on the tower body (shown as 1.9-3).
4300
1 BAFAStutA 2. SAF BStutB 3. FHF Inclined strut
4 ER Bock beam 5. FH BLatchB 6, (RE Side beam
7. FIBA Latch A 8 BEE Forward beam 9. #54R4F Regulating bolts
Bl 110-1 SRE
Fig.1.10-1 Schematic Diagram of Tie Frame
‘T060154-10F 1-58TCOOISA-10F PEstH2SEHL Tower Crane na vecting
1. 10.3 [ff#7RHV4RAT Load on anchoring points
Fe 1. 10-1 SH THEPLTE A 1. 10-2 Pate eR AT AT BR A PE,
UNG A OLE REE STE EAL) AVRO. ALP RH RR ADA. UE RE
SU LA RAR ARR Be Me RE SR,
ABEREE SRA MITER EAM MAK
tallation organizations are required to
Before tower crane erection, customers or ii
ates of the load-bearing capability at 1g. anchoring points (for
make necessary es
the of connection foundation-fixing spots), as well as the construction period of the
reinforced conerete structure affecting the anchoring point strength and similar factors. In
the table 1.10-1, it gives the anchoring forces imposed at the anchoring points of the
building at working and non-working conditions when the tower erane has its anchoring
strut rods layout and location as shown in Fig. 1.10-2. The building’s anchoring point shall
not have its load-bearing capability smaller than the values shown in the table.
4300
FAl.10-2 RR
Fig 1.10-2 Force imposed at anchoring point
R101 A EE
Table 1.10-1 Force imposed at anchoring point
FL (kN) £178
F2 (kN)
F3 (KN)
FA (KN)
VER: HEE RAL SE LAER RAT A BERS
St. ARRPREIR AE BK PSE TT AMEE. , RLY, On
SLL, RATER ARGS 110-1 BARRA. AR i.
TC6O15A-10F 1-59