0% found this document useful (0 votes)
25 views67 pages

Ee - Kantor Lurah Lapangan

The document lists hourly and daily wage rates for various construction jobs in Indonesia. Workers are paid between Rp. 13,750 and Rp. 20,000 per hour or Rp. 125,000 to Rp. 175,000 per day depending on their role. Equipment rental rates are also provided ranging from Rp. 45,800 to Rp. 7,598,358.55 per hour of use. Finally, material costs are listed with prices such as Rp. 950 for a red brick or Rp. 1,333.47 per kg for cement.

Uploaded by

Nolvy Mela
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views67 pages

Ee - Kantor Lurah Lapangan

The document lists hourly and daily wage rates for various construction jobs in Indonesia. Workers are paid between Rp. 13,750 and Rp. 20,000 per hour or Rp. 125,000 to Rp. 175,000 per day depending on their role. Equipment rental rates are also provided ranging from Rp. 45,800 to Rp. 7,598,358.55 per hour of use. Finally, material costs are listed with prices such as Rp. 950 for a red brick or Rp. 1,333.47 per kg for cement.

Uploaded by

Nolvy Mela
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 67

DAFTAR HARGA SATUAN UPAH

HARGA PER JAM HARGA PER HARI


NO. JENIS UPAH
SATUAN (RP) SATUAN (RP)

1 Pekerja Jam/Org 13,750.00 Jam/Org 125,000.00

2 Mandor Jam/Org 16,250.00 Jam/Org 145,000.00

3 Tukang Batu Jam/Org 16,875.00 Jam/Org 150,000.00

4 Tukang Besi Jam/Org 16,875.00 Jam/Org 150,000.00

5 Tukang Cat Jam/Org 16,875.00 Jam/Org 150,000.00

6 Tukang Las Jam/Org 16,875.00 Jam/Org 150,000.00

7 Tukang Kayu Jam/Org 16,875.00 Jam/Org 150,000.00

7 Tukang Listrik Jam/Org 16,875.00 Jam/Org 150,000.00

8 Kepala Tukang Jam/Org 20,000.00 Jam/Org 175,000.00

9 Instalatur Jam/Org 20,000.00 Jam/Org 160,000.00

10 Mekanik/Sopir Jam/Org 20,000.00 Jam/Org 160,000.00


DAFTAR HARGA SATUAN ALAT

NO. JENIS UPAH SATUAN JUMLAH HARGA

1 Aggregat (Chip) Spreader Jam Kerja 566,180.42


2 Aspahlt Tanker Jam Kerja 551,596.13
3 Asphalt Distributor Jam Kerja 408,726.01
4 Asphalt Finisher Jam Kerja 931,569.21
5 Asphalt Liquid Mixer Jam Kerja 56,480.50
6 Asphalt Mixing Plant Jam Kerja 6,149,018.02
7 Asphalt Sprayer Jam Kerja 77,860.75
8 Blending Equipment Jam Kerja 241,895.99
9 Bore Pile Machine Jam Kerja 816,706.69
10 Bulldozer 100-150 HP Jam Kerja 783,566.30
11 Cement Tanker Jam Kerja 518,288.03
12 Chainsaw Jam Kerja 125,000.00
13 Cold Milling Jam Kerja 1,702,261.76
14 Cold Recycler Jam Kerja 6,319,381.62
15 Compressor 4000-6500 L\M Jam Kerja 184,520.38
16 Concrete Breaker Jam Kerja 851,305.53
17 Concrete Mixer 0.3-0.6 M3 Jam Kerja 183,909.53
18 Concrete Pan Mixer Jam Kerja 679,851.66
19 Concrete Pump Jam Kerja 260,785.80
20 Concrete Vibrator Jam Kerja 58,176.10
21 Condrete Mixer (350) Jam Kerja 94,798.40
22 Crane 10-15 Ton Jam Kerja 653,155.83
23 Crane On Track 35 Ton Jam Kerja 467,598.78
24 Crane On Track 75-100 Ton Jam Kerja 637,689.55
25 Dump Truck 10 Ton Jam Kerja 526,134.66
26 Dump Truck 3.5 Ton Jam Kerja 305,765.93
27 Excavator 80-140 Hp Jam Kerja 589,634.32
28 Flat Bed Truck 3-4 M3 Jam Kerja 487,137.77
29 Fulvi Mixer Jam Kerja 1,342,381.99
30 Generator Set Jam Kerja 439,240.91
31 Hot Recycler Jam Kerja 7,598,358.55
32 Jack Hammer Jam Kerja 51,052.45
33 Motor Grader >100 HP Jam Kerja 688,371.82
34 Pedestrian Roller Jam Kerja 104,120.61
35 Pile Driver + Hammer Jam Kerja 293,063.20
36 Rock Drill Breaker Jam Kerja 340,963.55
37 Slip Form Paver Jam Kerja 572,845.16
38 Stone Crusher Jam Kerja 721,669.02
39 Tamper Jam Kerja 63,217.82
40 Tandem Roller 6-8 T. Jam Kerja 477,287.11
41 Three Wheel Roller 6-8 T Jam Kerja 230,153.27
42 Tire Roller 8-10 T. Jam Kerja 445,020.94
43 Track Loader 75-100 Hp Jam Kerja 303,450.57
44 Trailer 20 Ton Jam Kerja 510,720.99
45 Tronton Jam Kerja 564,126.22
46 Truk Mixer (Agitator) Jam Kerja 687,940.82
47 Vibrating Rammer Jam Kerja 63,632.69
48 Vibratory Roller 5-8 T. Jam Kerja 423,487.77
49 Water Pump 70-100 mm Jam Kerja 56,073.75
50 Water Tanker 3000-4500 L. Jam Kerja 260,822.71
51 Welding Set Jam Kerja 124,473.80
52 Wheel Loader 1.0-1.6 M3 Jam Kerja 556,386.34
53 Pick UP Jam Kerja 213,122.51
54 Excavator Mini PC 50 Jam Kerja 322,290.83
49 Pompa Lumpur Diesel 2.5KW,3" Jam Kerja 50,466.38
49 Travo Jam Kerja 45,800.00
55 Alat Bantu Jam Kerja 500.00
DAFTAR HARGA SATUAN BAHAN

HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)

1 Air Ltr 275.00


2 Alang-alang Ikat 32,500.00
3 Aspal Kg 12,720.00
4 Bata merah Bh 950.00
5 Batu Alam 10 x 20 M² 146,100.00
6 Batu apung Kg 7,800.00
7 Batu Belah Uk. 15 - 20 M³ 296,200.00
8 Batu Andesit 20 x 40 M² 206,618.00
9 Bensin / Premium (HET) Ltr 7,900.00
10 Kerikil Beton M³ 461,000.00
11 Kerikil Koral Uk. 1 - 3 cm M³ 463,500.00
12 Koral Sikat 2 - 3 cm Kg 12,800.00
13 Koral Sikat Panca Warna Kg 9,600.00
14 Minyak Bekisting Ltr 13,500.00
15 Minyak Pelumas / Oli (Pertamina) Ltr 34,080.00
16 Pasir Kasar/ Urug M³ 156,294.44
17 Pasir Pasang / Beton M³ 240,600.00
18 Pasir Pasang (Sedang) M³ 150,000.00
19 Paving Stone t=6 cm M² 151,062.50
20 S o l a r (HET) Ltr 10,013.00
21 Semen PC Kg 1,333.47
22 Semen Putih Kg 5,000.00
23 Semen Warna Kg 15,000.00
24 Tanah Pilihan M³ 77,300.00
25 Tanah Subur M³ 107,500.00
26 Taso C 75.75 Ujung 78,000.00
27 Reng Ujung 40,200.00
28 Besi Hollow 2 x 4 cm Ujung 95,000.00
29 Besi Hollow 4 x 4 cm Ujung 105,000.00
30 Besi Siku 4 x 4 x 4 M¹ 95,000.00
31 Besi Siku 5 x 5 x 5 M¹ 155,000.00
32 Besi strip Kg 97,020.00
33 Jaring Kawat baja Kg 18,000.00
34 Kawat Beton / Bendrat Kg 31,800.00
35 Kawat Las Kg 35,000.00
36 Paku Beton Kg 27,000.00
37 Paku Kayu 2" s/d 6" Kg 19,080.00
38 Paku Reng Kg 60,000.00
39 Paku Sekrup Kg 60,000.00
40 Paku Seng Kg 26,000.00
41 Paku Ramset Kg 23,000.00
42 Sekrup fixer Bh 235.00
43 Sekrup Galvani Bh 750.00
44 Dynabolt Bh 1,250.00
HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
45 Mur bout Bh 1,250.00
46 Besi Beton Ulir Kg 13,455.75
47 Ampelas Lbr 5,000.00
48 Cat Dasar /Alkali (Dulux/ Setara) Kg 50,000.00
49 Cat Kayu/Besi Mengkilap (Glotex/ Seiv/ Setara) Kg 65,000.00
50 Cat Menie Kayu/Besi/Seng (Glotex Setara) Kg 55,000.00
51 Cat Tembok (Dulux/ICI setara) Kg 68,386.67
52 Cat Tembok (Metrolite/ Catylac/ Setara) Kg 26,000.00
53 Waterproofing Coating System Ex. FOSROC Kg 80,000.00
54 Chipping Kg 1,700.00
55 Compound Gypsum Kg 10,000.00
56 Dempul Besi Kg 50,000.00
57 Dempul Kayu/Wood Filler (Impra Setara) Kg 40,000.00
58 Kuas Bh 12,000.00
59 Lem Eha-Bond Ltr 40,000.00
60 Minyak Cat / Thiner Ltr 25,000.00
61 Paper Tape M¹ 4,200.00
62 Plamir Kg 55,600.00
63 Plamur Tembok (Danapaint Setara) Kg 44,300.00
64 Soda api Kg 51,500.00
65 Teak oil Ltr 46,000.00
66 Sabun Kg 18,606.00
67 Vernis Kg 30,000.00
68 Kalkarium Kg 65,000.00
69 Kayu Kelas I (Kayu Besi, dll.) M³ 9,180,000.00
70 Kayu Kelas I (Kayu Linggua,dll.) M³ 12,240,000.00
71 Kayu Kelas II (Kayu Cempaka, dll.) M³ 6,732,000.00
72 Kayu Kelas III (Kayu Nantu, dll.) M³ 4,635,000.00
73 Kayu Kelas IV (Kayu Telon, dll.) M³ 2,060,000.00
74 Listplank GRC Ex Kalsiplank 300 x 3000 x 8 mm Lbr 120,000.00
75 Atap Onduline Gelombang 0.95 * 1.95 M M² 165,000.00
76 Atap Spandek M1 65,000.00
77 Seng Gelombang BJLS 20 Lbr 46,643.75
78 Seng Gelombang BJLS 30 (uk. 180 x 90 x 0,3 cm) Lbr 65,700.00
79 Seng Plat BJLS 20 Lbr 46,400.00
80 Tegel Abu-Abu uk. 30x30 cm Bh 5,600.00
81 Tegel Abu-Abu uk. 40x40 cm Bh 10,300.00
82 Tegel Berwarna uk. 20x20 cm Bh 2,700.00
83 Tegel Berwarna uk. 30x30 cm Bh 7,900.00
84 Tegel Berwarna uk. 40x40 cm Bh 12,200.00
85 Tegel Berwarna uk. 60x60 cm Bh 46,250.00
86 Tegel Keramik uk. 40x40 cm anti slip Bh 14,000.00
87 Tegel Plint pc warna uk. 10x40 cm Bh 2,182.95
88 Bak Cuci Stainless Steel (1 Lobang) Bh 257,300.00
89 Kloset Duduk Keramik Standar Bh 2,304,800.00
90 Kloset Jongkok Keramik Standar Bh 350,000.00
91 Mata Kran Standar 1/2" Bh 56,200.00
HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
92 Pipa PVC dia. 1" AW M¹ 10,500.00
93 Pipa PVC dia. 1,5" AW M¹ 18,750.00
94 Pipa PVC dia. 2" AW M¹ 23,800.00
95 Pipa PVC (S-12,5) dia. 1/2" AW M¹ 5,900.00
96 Pipa PVC (S-12,5) dia. 3/4" AW M¹ 7,300.00
97 Pipa PVC dia. 1 1/4" AW M¹ 16,250.00
98 Pipa PVC dia. 1/2" AW M¹ 6,300.00
99 Pipa PVC dia. 3" AW M¹ 41,600.00
100 Pipa PVC dia. 3/4" AW M¹ 7,800.00
101 Pipa PVC dia. 4" AW M¹ 67,200.00
102 Pompa Air Listrik; Suction 9 m; Head 40 m; kap. 35 l/min Unit 630,000.00
103 Pompa Centrifugal; Head 100 m; kap. 11 l/dt Unit 13,740,500.00
104 Pompa Tangan Dragon Unit 351,400.00
105 Profil Tank Fiberglass orange kap. 1100 ltr. Bh 1,500,000.00
106 Profil Tank Fiberglass orange kap. 650 ltr. Bh 997,500.00
107 Stop Kran 1" Bh 131,900.00
108 Stop Kran 1/2" Bh 35,000.00
109 Stop Kran 2" Bh 155,150.00
110 Stop Kran 3/4" Bh 87,600.00
111 Floordrain Bh 45,000.00
112 Submersible Deep Well Pump; Head 100 m; kap.1 HP Unit 6,366,937.50
113 Submersible Deep Well Pump; Head 70 m; kap.2 HP Unit 4,851,000.00
114 Urinoir Keramik Standar Bh 1,712,600.00
115 Wastafel Gantung Keramik Bh 552,480.00
116 Sealtape Bh 15,000.00
117 Box MCB Unit 35,000.00
118 Saklar Ganda Bh 28,900.00
119 Saklar Tunggal Bh 22,700.00
120 Stop Kontak Bh 34,000.00
121 Tee Dos Bh 2,100.00
122 L. Bow Bh 2,500.00
123 Close Bh 3,500.00
124 Isolasi Listrik Ex. 3M Bh 10,000.00
125 Pipa Listrik Clipsal 5/8" Btg 12,000.00
126 Kontaktor 18 A Bh 375,000.00
127 Box Panel Bh 350,000.00
128 Miniature Circuit Breaker Bh 65,000.00
129 Lampu Indikator Bh 45,000.00
130 Down Light Warna 3" Setara Phillips Bh 55,000.00
131 Lampu Downlight 4' Bh 43,000.00
132 Lampu LED Scene Switch 9.5 watt (Cool & Warm) Bh 135,000.00
133 Lampu TL (Neon) 18 Watt (komplet) Setara Phillips Bh 100,000.00
134 Kaca Polos 3 mm M² 123,000.00
135 Kaca Polos 5 mm M² 175,100.00
136 Stiker Sandblast M² 85,000.00
137 Engsel (setara solid) 3" Bh 30,900.00
138 Engsel (setara solid) 4" Bh 43,300.00
HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
139 Kunci Pintu Master (setara solid) Bh 185,000.00
140 Kunci Tanam 2 Slag Bh 180,000.00
141 Kunci Tanam Biasa Bh 40,000.00
142 Kunci Tanam Ex. Belleza Set 500,000.00
143 Sealent Kg 35,000.00
144 Karet Hitam Roll 56,500.00
145 Tarikan Pintu (setara solid) 15" Psg 265,000.00
146 Kunci Silinder Psg 50,000.00
147 Bambu / Dolken Btg 15,508.50
148 Gypsum 9 mm Lbr 80,000.00
149 List Profil Gypsum Ujg 131,250.00
150 Metal Furing (Rangka Plafond) Ujg 70,000.00
151 Multipleks 9 mm Lbr 140,000.00
152 Plywood 4 mm Lbr 68,250.00
153 Stop Kran 1" PVC Bh 33,000.00
154 Stop Kran 1/2" Besi Bh 78,000.00
155 Stop Kran 2" PVC Bh 45,000.00
156 Stop Kran 3/4" Besi Bh 105,000.00
157 Rangka Aluminium 3" Silver Ujg 151,593.75
158 Rangka Aluminium 4" Silver Ujg 179,844.00
159 Kusen Allumunium 3" (Coklat) Bh 175,848.00
160 Kusen Allumunium 4" (Coklat) Bh 236,486.00
161 Profil Alumunium Swing Door 6 M Tiang Polos Bh 241,500.00
162 Profil Alumunium Swing Door 6 M Tiang Moher Bh 252,000.00
163 Profil Alumunium Swing Door Ambang Atas Bh 220,500.00
164 Profil Alumunium Swing Door Ambang Bawah Bh 330,750.00
165 Profil Alumunium Casement (Frame) Bh 159,000.00
166 Profil Alumunium Casement (Skoneng) Bh 58,800.00
167 Hollow 1/2 X 3/4 Bh 26,000.00
168 Allumunium Composite Panel M2 772,500.00
ANALISA HARGA SATUAN

HARGA SATUAN PEKERJAAN PERSIAPAN

1 M1 Pek. Pagar Sementara Dari Seng Gelombang Tinggi 2 Meter


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Dolken Kayu Ø 8 - 10/400 cm 1.2500 Btg 15,509 19,386
- Semen Potland 2.5000 Kg 1,333 3,334
- Pasir Beton 0.0050 M³ 240,600 1,203
- Koral Beton 0.0090 M³ 463,500 4,172
- Balok Kayu Kelas III 0.0720 M³ 2,060,000 148,320
- Paku Biasa 2" - 5" 0.0600 Kg 19,080 1,145
- Meni Besi 0.4500 Kg 55,000 24,750
- Seng Gelombang BJLS 20 1.2000 Lbr 46,644 55,973
- Pekerja 0.2000 Org / Hari 125,000 25,000
- Tukang Kayu 0.3000 Org / Hari 150,000 45,000
- Kepala Tukang 0.0200 Org / Hari 175,000 3,500
- Mandor 0.0200 Org / Hari 145,000 2,900
Jumlah (Belum Termasuk PPN) 76,400 258,281 334,681
Overhead & Profit (10%) 33,468
Jumlah Harga 368,149
Pembulatan Jumlah Harga 368,149

1 M1 Pek. Pengukuran Dan Pemasangan Bouwplank


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Balok Kayu Kelas III 0.0120 M³ 2,060,000 24,720
- Papan Kayu Kelas III 0.0070 M³ 2,060,000 14,420
- Paku Biasa 2" - 5" 0.0200 Kg 19,080 382
- Pekerja 0.1000 Org / Hari 125,000 12,500
- Tukang Kayu 0.1000 Err:509 150,000 15,000
- Kepala Tukang 0.0100 Org / Hari 175,000 1,750
- Mandor 0.0050 Org / Hari 145,000 725
Jumlah (Belum Termasuk PPN) 29,975 39,522 69,497
Overhead & Profit (10%) 6,950
Jumlah Harga 76,446
Pembulatan Jumlah Harga 76,446

1 M² Pek. Pembuatan Kantor Sementara, Dengan Lantai Plesteran


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Dolken Kayu Ø 8 - 10/400 cm 1.2500 Btg 15,509 19,386
- Balok Kayu Kelas III 0.1800 M³ 2,060,000 370,800
- Besi Strip 1.1000 Kg 97,020 106,722
- Semen Potland 35.0000 Kg 1,333 46,671
- Pasir Pasang 0.1500 M³ 240,600 36,090
- Pasir Beton 0.1000 M³ 240,600 24,060
- Koral Beton 0.1500 M³ 463,500 69,525
- Bata Merah 30.0000 Bh 950 28,500
- Seng Plat 0.2500 Lbr 46,400 11,600
- Kaca Polos 3 mm 0.0800 M² 123,000 9,840
- Kunci Tanam Biasa 0.1500 Bh 40,000 6,000
- Plywood 4 mm 0.0600 Lbr 68,250 4,095
- Pekerja 2.0000 Org / Hari 125,000 250,000
- Tukang Kayu 2.0000 Org / Hari 150,000 300,000
- Tukang Batu 1.0000 Org / Hari 150,000 150,000
- Kepala Tukang 0.3000 Org / Hari 175,000 52,500
- Mandor 0.0500 Org / Hari 145,000 7,250
Jumlah (Belum Termasuk PPN) 759,750 733,289 1,493,039
Overhead & Profit (10%) 149,304
Jumlah Harga 1,642,343
Pembulatan Jumlah Harga 1,642,342
1 M² Pek. Pembuatan Gudang Semen Dan Alat - Alat
J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Dolken Kayu Ø 8 - 10/400 cm 1.7000 Btg 15,509 26,364
- Kayu Kelas III 0.2000 M³ 2,060,000 412,000
- Paku Biasa 0.3000 Kg 19,080 5,724
- Semen Potland 10.5000 Kg 1,333 14,001
- Pasir Beton 0.0300 M³ 240,600 7,218
- Koral Beton 0.0500 M³ 463,500 23,175
- Seng Gelombang BJLS 30 1.5000 Lbr 65,700 98,550
- Pekerja 1.0000 Org / Hari 125,000 125,000
- Tukang Kayu 1.5000 Org / Hari 150,000 225,000
- Kepala Tukang 0.2000 Org / Hari 175,000 35,000
- Mandor 0.0500 Org / Hari 145,000 7,250
Jumlah (Belum Termasuk PPN) 392,250 587,033 979,283
Overhead & Profit (10%) 97,928
Jumlah Harga 1,077,211
Pembulatan Jumlah Harga 1,077,211

1 M² Pek. Pembuatan Bedeng Buruh


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Dolken Kayu Ø 8 - 10/400 cm 1.2500 Btg 15,509 19,386
- Kayu Kelas III 0.2000 M³ 2,060,000 412,000
- Paku Biasa 0.3000 Kg 19,080 5,724
- Semen Potland 18.0000 Kg 1,333 24,002
- Pasir Beton 0.0300 M³ 240,600 7,218
- Koral Beton 0.0500 M³ 463,500 23,175
- Seng Gelombang BJLS 30 1.5000 Lbr 65,700 98,550
- Plywood 4 mm 1.3500 Lbr 68,250 92,138
- Pekerja 1.0000 Org / Hari 125,000 125,000
- Tukang Kayu 2.0000 Org / Hari 150,000 300,000
- Kepala Tukang 0.2000 Org / Hari 175,000 35,000
- Mandor 0.0500 Org / Hari 145,000 7,250
Jumlah (Belum Termasuk PPN) 467,250 682,193 1,149,443
Overhead & Profit (10%) 114,944
Jumlah Harga 1,264,387
Pembulatan Jumlah Harga 1,264,386

1 M² Pek. Pembersihkan Lapangan Dan Perataan


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pekerja 0.1000 Org / Hari 125,000 12,500
- Mandor 0.0500 Org / Hari 145,000 7,250
Jumlah (Belum Termasuk PPN) 19,750 - 19,750
Overhead & Profit (10%) 1,975
Jumlah Harga 21,725
Pembulatan Jumlah Harga 21,725

1 M³ Pek. Bongkaran Beton Bertulang


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pekerja 7.0000 Org / Hari 125,000 875,000
- Mandor 0.3500 Org / Hari 145,000 50,750
Jumlah (Belum Termasuk PPN) 925,750 - 925,750
Overhead & Profit (10%) 92,575
Jumlah Harga 1,018,325
Pembulatan Jumlah Harga 1,018,325

1 M³ Pek. Bongkaran Dinding Tembok Bata Merah


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pekerja 5.0000 Org / Hari 125,000 625,000
- Mandor 0.2500 Org / Hari 145,000 36,250
Jumlah (Belum Termasuk PPN) 661,250 - 661,250
Overhead & Profit (10%) 66,125
Jumlah Harga 727,375
Pembulatan Jumlah Harga 727,375

1 M2 Pek. Bongkaran Rangka dan Penutup Atap


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pekerja 0.2500 Org / Hari 125,000 31,250
- Mandor 0.0500 Org / Hari 145,000 7,250
Jumlah (Belum Termasuk PPN) 38,500 - 38,500
Overhead & Profit (10%) 3,850
Jumlah Harga 42,350
Pembulatan Jumlah Harga 42,350

1 M2 Pek. Bongkaran Rangka dan Penutup Plafond


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pekerja 0.2000 Org / Hari 125,000 25,000
- Mandor 0.0400 Org / Hari 145,000 5,800
Jumlah (Belum Termasuk PPN) 30,800 - 30,800
Overhead & Profit (10%) 3,080
Jumlah Harga 33,880
Pembulatan Jumlah Harga 33,880

1 M2 Buangan Puing Hasil Bongkaran


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Dump Truck 3.5 Ton 0.1200 Org / Hari 305,766 36,692
- Pekerja 0.7000 Org / Hari 125,000 87,500
- Mandor 0.1400 Org / Hari 145,000 20,300
Jumlah (Belum Termasuk PPN) 107,800 36,692 144,492
Overhead & Profit (10%) 14,449
Jumlah Harga 158,941
Pembulatan Jumlah Harga 158,941

HARGA SATUAN PEKERJAAN TANAH

1 M³ Pek. Galian Tanah Biasa Sedalam < 1 M


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pekerja 0.5630 Org / Hari 125,000 70,375
- Mandor 0.0563 Org / Hari 145,000 8,164
Jumlah (Belum Termasuk PPN) 78,539 - 78,539
Overhead & Profit (10%) 7,854
Jumlah Harga 86,392
Pembulatan Jumlah Harga 86,392

1 M³ Pek. Galian Tanah Keras Sedalam > 1 M s/d 2 M (Semi Mekanis)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Bensin 1.2500 Ltr 7,900 9,875
- Sewa Jack Hammer 0.1250 Jam Kerja 408,420 51,052
- Pekerja 0.4200 Org / Hari 125,000 52,500
- Mandor 0.0420 Org / Hari 145,000 6,090
Jumlah (Belum Termasuk PPN) 58,590 60,927 119,517
Overhead & Profit (10%) 11,952
Jumlah Harga 131,469
Pembulatan Jumlah Harga 131,469

1 M³ Pek. Timbunan/Urugan Tanah


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pekerja 0.3300 Org / Hari 125,000 41,250
- Mandor 0.0330 Org / Hari 145,000 4,785
Jumlah (Belum Termasuk PPN) 46,035 - 46,035
Overhead & Profit (10%) 4,604
Jumlah Harga 50,639
Pembulatan Jumlah Harga 50,638

1 M³ Pek. Timbunan/Urugan Tanah (Tanah Pilihan)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Tanah Pilihan 1.1000 M³ 77,300 85,030
- Pekerja 0.3300 Org / Hari 125,000 41,250
- Mandor 0.0330 Org / Hari 145,000 4,785
Jumlah (Belum Termasuk PPN) 46,035 85,030 131,065
Overhead & Profit (10%) 13,107
Jumlah Harga 144,172
Pembulatan Jumlah Harga 144,171

1 M³ Pek. Urugan Tanah Subur


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Tanah Subur 1.1000 M³ 107,500 118,250
- Pekerja 0.3300 Org / Hari 125,000 41,250
- Mandor 0.0330 Org / Hari 145,000 4,785
Jumlah (Belum Termasuk PPN) 46,035 118,250 164,285
Overhead & Profit (10%) 16,429
Jumlah Harga 180,714
Pembulatan Jumlah Harga 180,713

1 M³ Pek. Pemadatan Tanah Tiap 20 Cm


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pekerja 0.5000 Org / Hari 125,000 62,500
- Mandor 0.0500 Org / Hari 145,000 7,250
Jumlah (Belum Termasuk PPN) 69,750 - 69,750
Overhead & Profit (10%) 6,975
Jumlah Harga 76,725
Pembulatan Jumlah Harga 76,725

1 M³ Pek. Urugan Pasir


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pasir Urug/Pasang 1.1000 M³ 240,600 264,660
- Pekerja 0.3000 Org / Hari 125,000 37,500
- Mandor 0.0100 Org / Hari 145,000 1,450
Jumlah (Belum Termasuk PPN) 38,950 264,660 303,610
Overhead & Profit (10%) 30,361
Jumlah Harga 333,971
Pembulatan Jumlah Harga 333,971

HARGA SATUAN PEKERJAAN PONDASI

1 M³ Pas. Pondasi Batu Kali, 1 Pc : 4 Ps


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Batu Belah 15/20 cm 1.2000 M³ 296,200 355,440
- Semen Portland 163.0000 Kg 1,333 217,356
- Pasir Pasang 0.5200 M³ 240,600 125,112
- Pekerja 1.5000 Org / Hari 125,000 187,500
- Tukang Batu 0.7500 Org / Hari 150,000 112,500
- Kepala Tukang 0.0750 Org / Hari 175,000 13,125
- Mandor 0.0750 Org / Hari 145,000 10,875
Jumlah (Belum Termasuk PPN) 324,000 697,908 1,021,908
Overhead & Profit (10%) 102,191
Jumlah Harga 1,124,098
Pembulatan Jumlah Harga 1,124,098

1 M³ Pas. Batu Kosong (anstamping)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Batu Belah 15/20 cm 1.2000 M³ 296,200 355,440
- Pasir Urug 0.4320 M³ 156,294 67,519
- Pekerja 0.7800 Org / Hari 125,000 97,500
- Tukang Batu 0.3900 Org / Hari 150,000 58,500
- Kepala Tukang 0.0390 Org / Hari 175,000 6,825
- Mandor 0.0390 Org / Hari 145,000 5,655
Jumlah (Belum Termasuk PPN) 168,480 422,959 591,439
Overhead & Profit (10%) 59,144
Jumlah Harga 650,583
Pembulatan Jumlah Harga 650,583

HARGA SATUAN PEKERJAAN BETON

1 M³ Cor Beton Mutu F'c = 7.4 Mpa (K-100)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Semen Portland 247.0000 Kg 1,333 329,367
- Pasir Beton (1400 kg/m3) 869.0000 Kg 172 149,344
- Koral Beton 999.0000 Kg 343 342,990
- Air 215.0000 Ltr 275 59,125
- Pekerja 1.6500 Org / Hari 125,000 206,250
- Tukang Batu 0.2750 Org / Hari 150,000 41,250
- Kepala Tukang 0.0280 Org / Hari 175,000 4,900
- Mandor 0.0830 Org / Hari 145,000 12,035
Jumlah (Belum Termasuk PPN) 264,435 880,826 1,145,261
Overhead & Profit (10%) 114,526
Jumlah Harga 1,259,787
Pembulatan Jumlah Harga 1,259,787

1 M³ Cor Beton Mutu F'c = 16.9 Mpa (K-200)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Semen Portland 352.0000 Kg 1,333 469,381
- Pasir Beton (1400 kg/m3) 731.0000 Kg 172 125,628
- Koral Beton 1,031.0000 Kg 343 353,977
- Air 215.0000 Ltr 275 59,125
- Pekerja 1.6500 Org / Hari 125,000 206,250
- Tukang Batu 0.2750 Org / Hari 150,000 41,250
- Kepala Tukang 0.0280 Org / Hari 175,000 4,900
- Mandor 0.0830 Org / Hari 145,000 12,035
Jumlah (Belum Termasuk PPN) 264,435 1,008,111 1,272,546
Overhead & Profit (10%) 127,255
Jumlah Harga 1,399,800
Pembulatan Jumlah Harga 1,399,800

1 M³ Cor Beton Mutu F'c = 21.7 Mpa (K-250)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Semen Portland 384.0000 Kg 1,333 512,052
- Pasir Beton (1400 kg/m3) 692.0000 Kg 172 118,925
- Koral Beton 1,039.0000 Kg 343 356,723
- Air 215.0000 Ltr 275 59,125
- Pekerja 1.6500 Org / Hari 125,000 206,250
- Tukang Batu 0.2750 Org / Hari 150,000 41,250
- Kepala Tukang 0.0280 Org / Hari 175,000 4,900
- Mandor 0.0830 Org / Hari 145,000 12,035
Jumlah (Belum Termasuk PPN) 264,435 1,046,826 1,311,261
Overhead & Profit (10%) 131,126
Jumlah Harga 1,442,387
Pembulatan Jumlah Harga 1,442,387

1 M³ Pek. Pengecoran dengan Concrete Pump


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Sewa Concrete Pump 0.1200 Sewa-Hari 6,258,859 751,063
- Pekerja 0.2000 Org / Hari 125,000 25,000
- Mandor 0.0200 Org / Hari 145,000 2,900
Jumlah (Belum Termasuk PPN) 27,900 751,063 778,963
Overhead & Profit (10%) 77,896
Jumlah Harga 856,859
Pembulatan Jumlah Harga 856,859

1 M³ Pek. Pemadatan Beton (Vibrator)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Vibrator 0.1000 Sewa-Hari 1,396,226 139,623
- Pekerja 0.2500 Org / Hari 125,000 31,250
- Mandor 0.0250 Org / Hari 145,000 3,625
Jumlah (Belum Termasuk PPN) 34,875 139,623 174,498
Overhead & Profit (10%) 17,450
Jumlah Harga 191,947
Pembulatan Jumlah Harga 191,947

1 Kg Pek. Pembesian Dengan Besi Polos Atau Besi Ulir


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Besi Beton ( Polos Ulir ) 1.0500 Kg 13,456 14,129
- Kawat Beton 0.0150 Kg 31,800 477
- Pekerja 0.0070 Org / Hari 125,000 875
- Tukang Besi 0.0070 Org / Hari 150,000 1,050
- Kepala Tukang 0.0007 Org / Hari 175,000 123
- Mandor 0.0004 Org / Hari 145,000 51
Jumlah (Belum Termasuk PPN) 2,098 14,606 16,704
Overhead & Profit (10%) 1,670
Jumlah Harga 18,374
Pembulatan Jumlah Harga 18,374

1 M² Pas. Bekisting Untuk Pondasi


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kayu Terentang 0.0400 M³ 4,635,000 185,400
- Paku Biasa 2" - 5" 0.3000 Kg 19,080 5,724
- Minyak Bekisting 0.1000 Ltr 13,500 1,350
- Pekerja 0.5200 Org / Hari 125,000 65,000
- Tukang Kayu 0.2600 Org / Hari 150,000 39,000
- Kepala Tukang 0.0260 Org / Hari 175,000 4,550
- Mandor 0.0260 Org / Hari 145,000 3,770
Jumlah (Belum Termasuk PPN) 112,320 192,474 304,794
Overhead & Profit (10%) 30,479
Jumlah Harga 335,273
Pembulatan Jumlah Harga 335,273

1 M² Pas. Bekisting Untuk Sloof


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kayu Terentang 0.0450 M³ 4,635,000 208,575
- Paku Biasa 2" - 5" 0.3000 Kg 19,080 5,724
- Minyak Bekisting 0.1000 Ltr 13,500 1,350
- Pekerja 0.5200 Org / Hari 125,000 65,000
- Tukang Kayu 0.2600 Org / Hari 150,000 39,000
- Kepala Tukang 0.0260 Org / Hari 175,000 4,550
- Mandor 0.0260 Org / Hari 145,000 3,770
Jumlah (Belum Termasuk PPN) 112,320 215,649 327,969
Overhead & Profit (10%) 32,797
Jumlah Harga 360,766
Pembulatan Jumlah Harga 360,765

1 M² Pas. Bekisting Untuk Sloof (Material dari bongkaran awal)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pekerja 0.5200 Org / Hari 125,000 65,000
- Tukang Kayu 0.2600 Org / Hari 150,000 39,000
- Kepala Tukang 0.0260 Org / Hari 175,000 4,550
- Mandor 0.0260 Org / Hari 145,000 3,770
Jumlah (Belum Termasuk PPN) 112,320 - 112,320
Overhead & Profit (10%) 11,232
Jumlah Harga 123,552
Pembulatan Jumlah Harga 123,552

1 M² Pas. Bekisting Untuk Kolom


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kayu Terentang 0.0400 M³ 4,635,000 185,400
- Paku Biasa 2" - 5" 0.4000 Kg 19,080 7,632
- Minyak Bekisting 0.2000 Ltr 13,500 2,700
- Balok Kayo Borneo 0.0150 M³ 2,060,000 30,900
- Plywood Tebal 9 mm 0.3500 Lbr 140,000 49,000
- Dolken Kayu Galam Ø -8-10/4 m 2.0000 Btg 15,509 31,017
- Pekerja 0.6600 Org / Hari 125,000 82,500
- Tukang Kayu 0.3300 Org / Hari 150,000 49,500
- Kepala Tukang 0.0330 Org / Hari 175,000 5,775
- Mandor 0.0330 Org / Hari 145,000 4,785
Jumlah (Belum Termasuk PPN) 142,560 306,649 449,209
Overhead & Profit (10%) 44,921
Jumlah Harga 494,130
Pembulatan Jumlah Harga 494,129

1 M² Pas. Bekisting Untuk Kolom (Material dari bongkaran awal)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pekerja 0.6600 Org / Hari 125,000 82,500
- Tukang Kayu 0.3300 Org / Hari 150,000 49,500
- Kepala Tukang 0.0330 Org / Hari 175,000 5,775
- Mandor 0.0330 Org / Hari 145,000 4,785
Jumlah (Belum Termasuk PPN) 142,560 - 142,560
Overhead & Profit (10%) 14,256
Jumlah Harga 156,816
Pembulatan Jumlah Harga 156,816

1 M² Pas. Bekisting Untuk Balok


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kayu Terentang 0.0400 M³ 4,635,000 185,400
- Paku Biasa 2" - 5" 0.4000 Kg 19,080 7,632
- Minyak Bekisting 0.2000 Ltr 13,500 2,700
- Balok Kayo Borneo 0.0180 M³ 2,060,000 37,080
- Plywood Tebal 9 mm 0.3500 Lbr 140,000 49,000
- Dolken Kayu Galam Ø -8-10/4 m 2.0000 Btg 15,509 31,017
- Pekerja 0.6600 Org / Hari 125,000 82,500
- Tukang Kayu 0.3300 Org / Hari 150,000 49,500
- Kepala Tukang 0.0330 Org / Hari 175,000 5,775
- Mandor 0.0330 Org / Hari 145,000 4,785
Jumlah (Belum Termasuk PPN) 142,560 312,829 455,389
Overhead & Profit (10%) 45,539
Jumlah Harga 500,928
Pembulatan Jumlah Harga 500,927

1 M² Pas. Bekisting Untuk Balok (Material dari bongkaran awal)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pekerja 0.6600 Org / Hari 125,000 82,500
- Tukang Kayu 0.3300 Org / Hari 150,000 49,500
- Kepala Tukang 0.0330 Org / Hari 175,000 5,775
- Mandor 0.0330 Org / Hari 145,000 4,785
Jumlah (Belum Termasuk PPN) 142,560 - 142,560
Overhead & Profit (10%) 14,256
Jumlah Harga 156,816
Pembulatan Jumlah Harga 156,816

1 M² Pas. Bekisting Untuk Lantai


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kayu Terentang 0.0400 M³ 4,635,000 185,400
- Paku Biasa 2" - 5" 0.4000 Kg 19,080 7,632
- Minyak Bekisting 0.2000 Ltr 13,500 2,700
- Balok Kayo Borneo 0.0150 M³ 2,060,000 30,900
- Plywood Tebal 9 mm 0.3500 Lbr 140,000 49,000
- Dolken Kayu Galam Ø -8-10/4 m 6.0000 Btg 15,509 93,051
- Pekerja 0.6600 Org / Hari 125,000 82,500
- Tukang Kayu 0.3300 Org / Hari 150,000 49,500
- Kepala Tukang 0.0330 Org / Hari 175,000 5,775
- Mandor 0.0330 Org / Hari 145,000 4,785
Jumlah (Belum Termasuk PPN) 142,560 368,683 511,243
Overhead & Profit (10%) 51,124
Jumlah Harga 562,367
Pembulatan Jumlah Harga 562,367

1 M² Pas. Bekisting Untuk Lantai (Material dari bongkaran awal)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pekerja 0.6600 Org / Hari 125,000 82,500
- Tukang Kayu 0.3300 Org / Hari 150,000 49,500
- Kepala Tukang 0.0330 Org / Hari 175,000 5,775
- Mandor 0.0330 Org / Hari 145,000 4,785
Jumlah (Belum Termasuk PPN) 142,560 - 142,560
Overhead & Profit (10%) 14,256
Jumlah Harga 156,816
Pembulatan Jumlah Harga 156,816
1 M² Pas. Bekisting Untuk Tangga
J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kayu Terentang 0.0300 M³ 4,635,000 139,050
- Paku Biasa 2" - 5" 0.4000 Kg 19,080 7,632
- Minyak Bekisting 0.1500 Ltr 13,500 2,025
- Balok Kayu Borneo 0.0150 M³ 2,060,000 30,900
- Plywood Tebal 9 mm 0.3500 Lbr 140,000 49,000
- Dolken Kayu Galam Ø -8-10/4 m 2.0000 Btg 15,509 31,017
- Pekerja 0.6600 Org / Hari 125,000 82,500
- Tukang Kayu 0.3300 Org / Hari 150,000 49,500
- Kepala Tukang 0.0330 Org / Hari 175,000 5,775
- Mandor 0.0330 Org / Hari 145,000 4,785
Jumlah (Belum Termasuk PPN) 142,560 259,624 402,184
Overhead & Profit (10%) 40,218
Jumlah Harga 442,402
Pembulatan Jumlah Harga 442,402

1 M² Pas. Bekisting Untuk Tangga (Material dari bongkaran awal)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pekerja 0.6600 Org / Hari 125,000 82,500
- Tukang Kayu 0.3300 Org / Hari 150,000 49,500
- Kepala Tukang 0.0330 Org / Hari 175,000 5,775
- Mandor 0.0330 Org / Hari 145,000 4,785
Jumlah (Belum Termasuk PPN) 142,560 - 142,560
Overhead & Profit (10%) 14,256
Jumlah Harga 156,816
Pembulatan Jumlah Harga 156,816

1 M² Pek. Bongkar Bekisting (Pemanfaatan Kembali)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pekerja 0.0800 Org / Hari 125,000 10,000
- Tukang Kayu 0.0080 Org / Hari 150,000 1,200
Jumlah (Belum Termasuk PPN) 11,200 - 11,200
Overhead & Profit (10%) 1,120
Jumlah Harga 12,320
Pembulatan Jumlah Harga 12,320

1 M³ Pek. Pondasi Beton Bertulang ( 150 Kg Besi + Bekesting )


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kayu Terentang 0.2000 M³ 4,635,000 927,000
- Paku Biasa 2" - 5" 1.5000 Kg 19,080 28,620
- Minyak Bekisting 0.4000 Ltr 13,500 5,400
- Besi Beton Polos/Ulir 150.0000 Kg 13,456 2,018,363
- Kawat Beton 2.2500 Kg 31,800 71,550
- Semen Portland 336.0000 Kg 1,333 448,046
- Pasir Beton 0.5400 M³ 240,600 129,924
- Koral Beton 0.8100 M³ 463,500 375,435
- Pekerja 5.3000 Org / Hari 125,000 662,500
- Tukang Batu 0.2750 Org / Hari 150,000 41,250
- Tukang Kayu 1.3000 Org / Hari 150,000 195,000
- Tukang Besi 1.0500 Org / Hari 150,000 157,500
- Kepala Tukang 0.2620 Org / Hari 175,000 45,850
- Mandor 0.2650 Org / Hari 145,000 38,425
Jumlah (Belum Termasuk PPN) 1,140,525 4,004,337 5,144,862
Overhead & Profit (10%) 514,486
Jumlah Harga 5,659,349
Pembulatan Jumlah Harga 5,659,348

1 M³ Pek. Pelat Beton Bertulang ( 200 Kg Besi + Bekesting )


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kayu Terentang 0.3200 M³ 4,635,000 1,483,200
- Paku Biasa 2" - 5" 3.2000 Kg 19,080 61,056
- Minyak Bekisting 1.6000 Ltr 13,500 21,600
- Besi Beton Polos/Ulir 200.0000 Kg 13,456 2,691,150
- Kawat Beton 2.2500 Kg 31,800 71,550
- Semen Portland 413.0000 Kg 1,333 550,723
- Pasir Beton 0.4864 M³ 240,600 117,035
- Koral Beton 0.7563 M³ 463,500 350,543
- Kayu Borneo Balok 0.1200 M³ 2,060,000 247,200
- Plywood 9 mm 3.1000 Lbr 140,000 434,000
- Dolken Ø -8-10/4 m 32.0000 Btg 15,509 496,272
- Pekerja 5.3000 Org / Hari 125,000 662,500
- Tukang Batu 0.2750 Org / Hari 150,000 41,250
- Tukang Kayu 1.3000 Org / Hari 150,000 195,000
- Tukang Besi 1.0500 Org / Hari 150,000 157,500
- Kepala Tukang 0.2650 Org / Hari 175,000 46,375
- Mandor 0.2650 Org / Hari 145,000 38,425
Jumlah (Belum Termasuk PPN) 1,141,050 6,524,329 7,665,379
Overhead & Profit (10%) 766,538
Jumlah Harga 8,431,917
Pembulatan Jumlah Harga 8,431,917

1 M1 Pek. Kolom Praktis Uk. 110/110 Mm (Besi 3 Kg)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kayu Terentang 0.0020 M³ 4,635,000 9,270
- Paku Biasa 2" - 5" 0.0100 Kg 19,080 191
- Besi Beton Polos/Ulir 3.0000 Kg 13,456 40,367
- Kawat Beton 0.0450 Kg 31,800 1,431
- Semen Portland 4.0000 Kg 1,333 5,334
- Pasir Beton 0.0060 M³ 240,600 1,444
- Koral Beton 0.0090 M³ 463,500 4,172
- Pekerja 0.1800 Org / Hari 125,000 22,500
- Tukang Batu 0.0200 Org / Hari 150,000 3,000
- Tukang Kayu 0.0200 Org / Hari 150,000 3,000
- Tukang Besi 0.0200 Org / Hari 150,000 3,000
- Kepala Tukang 0.0060 Org / Hari 175,000 1,050
- Mandor 0.0090 Org / Hari 145,000 1,305
Jumlah (Belum Termasuk PPN) 33,855 62,208 96,063
Overhead & Profit (10%) 9,606
Jumlah Harga 105,669
Pembulatan Jumlah Harga 105,669
1 M1 Pek. Ring Balok Beton Bertulang Uk. 100/150 Mm (Besi 3 Kg)
J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kayu Terentang 0.0030 M³ 4,635,000 13,905
- Paku Biasa 2" - 5" 0.0200 Kg 19,080 382
- Besi Beton Polos/Ulir 3.6000 Kg 13,456 48,441
- Kawat Beton 0.0500 Kg 31,800 1,590
- Semen Portland 5.5000 Kg 1,333 7,334
- Pasir Beton 0.0090 M³ 240,600 2,165
- Koral Beton 0.0150 M³ 463,500 6,953
- Pekerja 0.2970 Org / Hari 125,000 37,125
- Tukang Batu 0.3300 Org / Hari 150,000 49,500
- Tukang Kayu 0.3300 Org / Hari 150,000 49,500
- Tukang Besi 0.3300 Org / Hari 150,000 49,500
- Kepala Tukang 0.0100 Org / Hari 175,000 1,750
- Mandor 0.0150 Org / Hari 145,000 2,175
Jumlah (Belum Termasuk PPN) 189,550 80,769 270,319
Overhead & Profit (10%) 27,032
Jumlah Harga 297,351
Pembulatan Jumlah Harga 297,351

HARGA SATUAN PEKERJAAN DINDING

1 M² Pas. Bata Merah Tebal 1 Bata, 1 Pc : 4 Ps


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Bata Merah 5 x 11 x 22 cm 140.0000 Bh 950 133,000
- Semen Portland 26.5500 Kg 1,333 35,404
- Pasir Pasang 0.0930 M³ 240,600 22,376
- Pekerja 0.6500 Org / Hari 125,000 81,250
- Tukang Batu 0.2000 Org / Hari 150,000 30,000
- Kepala Tukang 0.0200 Org / Hari 175,000 3,500
- Mandor 0.0300 Org / Hari 145,000 4,350
Jumlah (Belum Termasuk PPN) 119,100 190,779 309,879
Overhead & Profit (10%) 30,988
Jumlah Harga 340,867
Pembulatan Jumlah Harga 340,867

1 M² Pas. Bata Merah Tebal ½ Bata, 1 Pc : 4 Ps


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Bata Merah 5 x 11 x 22 cm 70.0000 Bh 950 66,500
- Semen Portland 11.5000 Kg 1,333 15,335
- Pasir Pasang 0.0430 M³ 240,600 10,346
- Pekerja 0.3000 Org / Hari 125,000 37,500
- Tukang Batu 0.1000 Org / Hari 150,000 15,000
- Kepala Tukang 0.0100 Org / Hari 175,000 1,750
- Mandor 0.0150 Org / Hari 145,000 2,175
Jumlah (Belum Termasuk PPN) 56,425 92,181 148,606
Overhead & Profit (10%) 14,861
Jumlah Harga 163,466
Pembulatan Jumlah Harga 163,466
HARGA SATUAN PEKERJAAN PLESTERAN

1 M² Pek. Plesteran 1 Pc : 4 Ps, Tebal 15 mm


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Semen Portland 5.2000 Kg 1,333 6,934
- Pasir Pasang 0.0200 M³ 240,600 4,812
- Pekerja 0.2000 Org / Hari 125,000 25,000
- Tukang Batu 0.1500 Org / Hari 150,000 22,500
- Kepala Tukang 0.0150 Org / Hari 175,000 2,625
- Mandor 0.0100 Org / Hari 145,000 1,450
Jumlah (Belum Termasuk PPN) 51,575 11,746 63,321
Overhead & Profit (10%) 6,332
Jumlah Harga 69,653
Pembulatan Jumlah Harga 69,653

1 M² Pek. Plesteran 1 Pc : 4 Ps, Tebal 20 mm


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Semen Porland 8.6800 Kg 1,333 11,575
- Pasir Pasang 0.0280 M³ 240,600 6,737
- Pekerja 0.2500 Org / Hari 125,000 31,250
- Tukang Batu 0.2000 Org / Hari 150,000 30,000
- Kepala Tukang 0.0200 Org / Hari 175,000 3,500
- Mandor 0.0125 Org / Hari 145,000 1,813
Jumlah (Belum Termasuk PPN) 66,563 18,311 84,874
Overhead & Profit (10%) 8,487
Jumlah Harga 93,361
Pembulatan Jumlah Harga 93,361

1 M² Pek. Acian Dinding


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Semen Portland 3.2500 Kg 1,250 4,063
- Pekerja 0.2000 Org / Hari 125,000 25,000
- Tukang Batu 0.1000 Org / Hari 150,000 15,000
- Kepala Tukang 0.0100 Org / Hari 175,000 1,750
- Mandor 0.0100 Org / Hari 145,000 1,450
Jumlah (Belum Termasuk PPN) 43,200 4,063 47,263
Overhead & Profit (10%) 4,726
Jumlah Harga 51,989
Pembulatan Jumlah Harga 51,988

1 M² Pek. Plesteran dan acian Kolom Struktur


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Semen Portland 8.4500 Kg 1,250 10,563
- Pasir Pasang 0.0200 M³ 240,600 4,812
- Pekerja 0.4000 Org / Hari 125,000 50,000
- Tukang Batu 0.3500 Org / Hari 150,000 52,500
- Kepala Tukang 0.0350 Org / Hari 175,000 6,125
- Mandor 0.0300 Org / Hari 145,000 4,350
Jumlah (Belum Termasuk PPN) 112,975 15,375 128,350
Overhead & Profit (10%) 12,835
Jumlah Harga 141,184
Pembulatan Jumlah Harga 141,184

HARGA SATUAN PEKERJAAN PLESTERAN

1 M² Pas. Lantai Ubin Warna Uk 40 x 40 cm


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Ubin Warna 40 x 40 cm 6.2500 Bh 12,200 76,250
- Semen Portland 9.8000 Kg 1,250 12,250
- Semen Warna 0.6000 Kg 15,000 9,000
- Pasir Pasang 0.0450 M³ 240,600 10,827
- Pekerja 0.2500 Org / Hari 125,000 31,250
- Tukang 0.1250 Org / Hari 150,000 18,750
- Kepala Tukang 0.0130 Org / Hari 175,000 2,275
- Mandor 0.0130 Org / Hari 145,000 1,885
Jumlah (Belum Termasuk PPN) 54,160 108,327 162,487
Overhead & Profit (10%) 16,249
Jumlah Harga 178,736
Pembulatan Jumlah Harga 178,735

1 M² Pas. Lantai Ubin Warna Uk 40 x 40 cm (Antislip)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Ubin Warna 40 x 40 cm 6.2500 Bh 14,000 87,500
- Semen Portland 9.8000 Kg 1,250 12,250
- Semen Warna 0.6000 Kg 15,000 9,000
- Pasir Pasang 0.0450 M³ 240,600 10,827
- Pekerja 0.2500 Org / Hari 125,000 31,250
- Tukang 0.1250 Org / Hari 150,000 18,750
- Kepala Tukang 0.0130 Org / Hari 175,000 2,275
- Mandor 0.0130 Org / Hari 145,000 1,885
Jumlah (Belum Termasuk PPN) 54,160 119,577 173,737
Overhead & Profit (10%) 17,374
Jumlah Harga 191,111
Pembulatan Jumlah Harga 191,110

1 M² Pas. Lantai Keramik Uk 60 x 60 cm


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Keramik 60 x 60 cm 2.8000 Bh 46,250 129,500
- Semen Portland 9.8000 Kg 1,250 12,250
- Semen Warna 0.6000 Kg 15,000 9,000
- Pasir Pasang 0.0450 M³ 240,600 10,827
- Pekerja 0.2500 Org / Hari 125,000 31,250
- Tukang 0.1250 Org / Hari 150,000 18,750
- Kepala Tukang 0.0130 Org / Hari 175,000 2,275
- Mandor 0.0130 Org / Hari 145,000 1,885
Jumlah (Belum Termasuk PPN) 54,160 161,577 215,737
Overhead & Profit (10%) 21,574
Jumlah Harga 237,311
Pembulatan Jumlah Harga 237,310

1 M² Pas. Lantai Batu Alam Andesit 20 x 40 cm


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Batu Alam Andesit 20 x 40 cm 1.0600 M2 206,618 219,015
- Semen Portland 11.7500 Kg 1,333 15,668
- Pasir Pasang 0.0350 M³ 240,600 8,421
- Pekerja 0.2500 Org / Hari 125,000 31,250
- Tukang 0.1250 Org / Hari 150,000 18,750
- Kepala Tukang 0.0130 Org / Hari 175,000 2,275
- Mandor 0.0130 Org / Hari 145,000 1,885
Jumlah (Belum Termasuk PPN) 54,160 243,104 297,264
Overhead & Profit (10%) 29,726
Jumlah Harga 326,991
Pembulatan Jumlah Harga 326,990

1 M² Pas. Plint Ubin Warna Uk 10 x 40 cm


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Tegel Plint pc warna uk. 10x40 cm 2.6500 Bh 2,183 5,785
- Semen Portland 1.1400 Kg 1,250 1,425
- Semen Warna 0.1000 Kg 15,000 1,500
- Pasir Pasang 0.0030 M³ 240,600 722
- Pekerja 0.0900 Org / Hari 125,000 11,250
- Tukang 0.0900 Org / Hari 150,000 13,500
- Kepala Tukang 0.0090 Org / Hari 175,000 1,575
- Mandor 0.0050 Org / Hari 145,000 725
Jumlah (Belum Termasuk PPN) 27,050 9,432 36,482
Overhead & Profit (10%) 3,648
Jumlah Harga 40,130
Pembulatan Jumlah Harga 40,129

1 M² Pas. Plint Ubin Warna Uk 10 x 60 cm


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Tegel Plint pc warna uk. 10x60 cm 0.3300 Bh 46,250 15,263
- Semen Portland 1.1400 Kg 1,250 1,425
- Semen Warna 0.1000 Kg 15,000 1,500
- Pasir Pasang 0.0030 M³ 240,600 722
- Pekerja 0.0900 Org / Hari 125,000 11,250
- Tukang 0.0900 Org / Hari 150,000 13,500
- Kepala Tukang 0.0090 Org / Hari 175,000 1,575
- Mandor 0.0050 Org / Hari 145,000 725
Jumlah (Belum Termasuk PPN) 27,050 18,909 45,959
Overhead & Profit (10%) 4,596
Jumlah Harga 50,555
Pembulatan Jumlah Harga 50,555

1 M² Pas. Porselen Dinding Uk 40 cm x 40 cm


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Porselen 6.2500 Bh 12,200 76,250
- Semen Portland 9.3000 Kg 1,333 12,401
- Pasir Pasang 0.0180 M³ 240,600 4,331
- Semen Warna 2.7500 Kg 15,000 41,250
- Pekerja 0.9000 Org / Hari 125,000 112,500
- Tukang 0.4500 Org / Hari 150,000 67,500
- Kepala Tukang 0.0450 Org / Hari 175,000 7,875
- Mandor 0.0450 Org / Hari 145,000 6,525
Jumlah (Belum Termasuk PPN) 194,400 134,232 328,632
Overhead & Profit (10%) 32,863
Jumlah Harga 361,495
Pembulatan Jumlah Harga 361,495

1 M² Pas. Dinding Batu Alam/Candi Uk 10 x 20 cm


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Batu Tempel 1.0600 M2 206,618 219,015
- Semen Portland 11.7500 Kg 1,333 15,668
- Pasir Pasang 0.0350 M³ 240,600 8,421
- Pekerja 0.7000 Org / Hari 125,000 87,500
- Tukang 0.3500 Org / Hari 150,000 52,500
- Kepala Tukang 0.0350 Org / Hari 175,000 6,125
- Mandor 0.0350 Org / Hari 145,000 5,075
Jumlah (Belum Termasuk PPN) 151,200 243,104 394,304
Overhead & Profit (10%) 39,430
Jumlah Harga 433,735
Pembulatan Jumlah Harga 433,734

1 M² Pas. Paving Block Tbl 6 cm


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Paving Block 6 cm 1.0100 M2 151,063 152,573
- Pasir Pasang 0.0500 M³ 240,600 12,030
- Peralatan 0.1000 % 164,603 16,460
- Pekerja 0.2500 Org / Hari 125,000 31,250
- Tukang 0.2500 Org / Hari 150,000 37,500
- Kepala Tukang 0.0250 Org / Hari 175,000 4,375
- Mandor 0.0025 Org / Hari 145,000 363
Jumlah (Belum Termasuk PPN) 73,488 181,063 254,551
Overhead & Profit (10%) 25,455
Jumlah Harga 280,006
Pembulatan Jumlah Harga 280,006

HARGA SATUAN PEKERJAAN PARTISI & PLAFOND

1 M² Pas. Dinding Partisi Gypsum 9 mm (Double)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Gypsum 9 mm 0.7200 Lbr 80,000 57,600
- Metal furing 2 x 4 2.0000 Btg 15,833 31,667
- Metal furing 4 x 4 6.0000 Btg 17,500 105,000
- Paku peluru ramset 0.7800 Kg 23,000 17,940
- Paku beton 0.0200 Kg 27,000 540
- Sekrup 6x 1-1.5 28.0000 Bh 235 6,580
- Sekrup gypsum 0.0300 Kg 60,000 1,800
- Textile tape 2.4000 M1 4,200 10,080
- Compound gypsum 0.0400 Zak 10,000 400
- Amplas 0.2000 Lbr 5,000 1,000
- Pekerja 0.5250 Org / Hari 125,000 65,625
- Tukang allumunium 0.2625 Org / Hari 150,000 39,375
- Tukang gypsum 0.2625 Org / Hari 150,000 39,375
- Kepala tukang 0.1050 Org / Hari 175,000 18,375
- Mandor 0.0525 Org / Hari 145,000 7,613
Jumlah (Belum Termasuk PPN) 170,363 232,607 402,969
Overhead & Profit (10%) 40,297
Jumlah Harga 443,266
Pembulatan Jumlah Harga 443,266

1 M² Pas. Plafond Gypsum 9 mm (Rangka Metal Furring)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Gypsum 9 mm 0.3600 Lbr 80,000 28,800
- Metal furing 2 x 4 2.2000 Btg 15,833 34,833
- Metal furing 4 x 4 2.4000 Btg 17,500 42,000
- Paku peluru ramset 0.3900 Kg 23,000 8,970
- Paku beton 0.0100 Kg 27,000 270
- Sekrup 6x 1-1.5 14.0000 Bh 235 3,290
- Sekrup gypsum 0.0150 Kg 60,000 900
- Textile tape 1.2000 M1 4,200 5,040
- Compound gypsum 0.0200 Zak 10,000 200
- Amplas 0.1000 Lbr 5,000 500
- Pekerja 0.3500 Org / Hari 125,000 43,750
- Tukang allumunium 0.1750 Org / Hari 150,000 26,250
- Tukang gypsum 0.1750 Org / Hari 150,000 26,250
- Kepala tukang 0.0700 Org / Hari 175,000 12,250
- Mandor 0.0350 Org / Hari 145,000 5,075
Jumlah (Belum Termasuk PPN) 113,575 124,803 238,378
Overhead & Profit (10%) 23,838
Jumlah Harga 262,216
Pembulatan Jumlah Harga 262,216

1 M² Pas. List Profil Gypsum


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- List Profil Gypsum 1.0500 M1 32,813 34,453
- Paku 0.0100 Kg 60,000 600
- Pekerja 0.0500 Org / Hari 125,000 6,250
- Tukang 0.0500 Org / Hari 150,000 7,500
- Kepala Tukang 0.0050 Org / Hari 175,000 875
- Mandor 0.0025 Org / Hari 145,000 363
Jumlah (Belum Termasuk PPN) 14,988 35,053 50,041
Overhead & Profit (10%) 5,004
Jumlah Harga 55,045
Pembulatan Jumlah Harga 55,044
HARGA SATUAN PEKERJAAN ATAP

1 M² Pas. Atap Spandek Tbl 0.45 mm


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Atap Spandek 1.1000 M2 65,000 71,500
- Sekrup Galvani 11.0000 Bh 750 8,250
- Pekerja 0.1500 Org / Hari 125,000 18,750
- Tukang Kayu 0.0750 Org / Hari 150,000 11,250
- Kepala Tukang 0.0300 Org / Hari 175,000 5,250
- Mandor 0.0150 Org / Hari 145,000 2,175
Jumlah (Belum Termasuk PPN) 37,425 79,750 117,175
Overhead & Profit (10%) 11,718
Jumlah Harga 128,893
Pembulatan Jumlah Harga 128,892

HARGA SATUAN PEKERJAAN BESI DAN ALLUMUNIUM

1 M² Pas. Cladding Wall (Aluminium Composite Panel) Rangka Sincalnium


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Cladding (Aluminium Composite Pan 0.3600 Lbr 772,500 278,100
- Besi Hollow 2 x 4 cm 4.2000 M1 15,833 66,500
- Besi Hollow 4 x 4 cm 4.2000 M1 17,500 73,500
- Besi Siku Uk. 4 x 4 x 4 cm 2.1000 M1 15,833 33,250
- Sealant 0.1200 Kg 35,000 4,200
- Paku Sekrup 0.3200 Kg 60,000 19,200
- Alat Bantu 1.0000 Ls 15,000 15,000
- Pekerja 1.5000 Org / Hari 125,000 187,500
- Tukang Besi 0.7500 Org / Hari 150,000 112,500
- Kepala tukang 0.3000 Org / Hari 175,000 52,500
- Mandor 0.1500 Org / Hari 145,000 21,750
Jumlah (Belum Termasuk PPN) 374,250 489,750 864,000
Overhead & Profit (10%) 86,400
Jumlah Harga 950,400
Pembulatan Jumlah Harga 950,400

1 M² Pas. Rangka Atap Baja Ringan


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
Taso C 75.75 0.8 mm 3.7200 m1 13,000 48,360
Reng 5.4000 m1 6,700 36,180
Bout (Screw driver) 28.0000 Bh 750 21,000
Dynabolt 1.6000 Bh 1,250 2,000
Peralatan 0.1000 Bh 10,754
Pekerja 0.2000 Org / Hari 125,000 25,000
Tukang Besi 0.4500 Org / Hari 150,000 67,500
Kepala Tukang 0.0100 Org / Hari 175,000 1,750
Mandor 0.0500 Org / Hari 145,000 7,250
Jumlah (Belum Termasuk PPN) 101,500 118,294 219,794
Overhead & Profit (10%) 21,979
Jumlah Harga 241,773
Pembulatan Jumlah Harga 241,773

1 M1 Pas. Profil Kusen Allumunium 4" (Brown)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Open Back 4" (Coklat) 1.1000 M1 39,414 43,356
- Skrup fixer 6.0000 Bh 235 1,410
- Sealent 0.0600 Tube 35,000 2,100
- Karet Hitam 615 0.0250 Roll 56,500 1,413
- Pekerja 0.150 Org / Hari 125,000 18,750
- Tukang allumunium 0.150 Org / Hari 150,000 22,500
- Kepala tukang 0.015 Org / Hari 175,000 2,625
- Mandor 0.015 Org / Hari 145,000 2,175
Jumlah (Belum Termasuk PPN) 46,050 48,278 94,328
Overhead & Profit (10%) 9,433
Jumlah Harga 103,761
Pembulatan Jumlah Harga 103,761

1 M2 Pas. Panel Pintu Allumunium (Brown)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Tiang Swing Polos 600 cm 1.2000 M1 40,250 48,300
- Tiang Swing Moher 600 cm 1.2000 M1 42,000 50,400
- Ambang Datar Atas 0.6000 M1 36,750 22,050
- Ambang Datar Bawah 0.6000 M1 55,125 33,075
- Hollow 1/2" x 3/4" 3.0000 M1 4,333 13,000
- Karet Hitam 615 0.1100 Roll 56,500 6,215
- Skrup fixer 12.0000 Bh 235 2,820
- Sealent 0.0600 Tube 35,000 2,100
- Pekerja 1.100 Org / Hari 125,000 137,500
- Tukang allumunium 1.100 Org / Hari 150,000 165,000
- Kepala tukang 0.550 Org / Hari 175,000 96,250
- Mandor 0.220 Org / Hari 145,000 31,900
Jumlah (Belum Termasuk PPN) 430,650 177,960 608,610
Overhead & Profit (10%) 60,861
Jumlah Harga 669,471
Pembulatan Jumlah Harga 669,471

1 M2 Pas. Bingkai Jendela Allumunium (Brown)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kesmen 5301 Bingkai Coklat 4.4000 M1 26,500 116,600
- Kesmen 5302 Skoneng Coklat 4.4000 M1 9,800 43,120
- Karet Hitam 615 0.1100 Roll 56,500 6,215
- Skrup fixer 8.0000 Bh 235 1,880
- Sealent 0.0600 Tube 35,000 2,100
- Pekerja 0.950 Org / Hari 125,000 118,750
- Tukang allumunium 0.950 Org / Hari 150,000 142,500
- Kepala tukang 0.475 Org / Hari 175,000 83,125
- Mandor 0.190 Org / Hari 145,000 27,550
Jumlah (Belum Termasuk PPN) 371,925 169,915 541,840
Overhead & Profit (10%) 54,184
Jumlah Harga 596,024
Pembulatan Jumlah Harga 596,024

1 M1 Pek. Railing Tangga, Besi Hollow.


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Besi Hollow 40 x 40 mm 5.2000 M1 17,500 91,000
- Besi Hollow 20 x 40 mm 4.6000 M1 15,833 72,833
- Dynabolt 8.0000 Bh 1,250 10,000
- Kawat Las Listrik 1.4080 Kg 35,000 49,280
- Solar 1.0560 Ltr 7,500 7,920
- Minyak Pelumas 0.1408 Ltr 55,000 7,744
- Peralatan 0.1000 % 238,777 23,878
- Pekerja 0.800 Org / Hari 125,000 100,000
- Tukang allumunium 0.800 Org / Hari 150,000 120,000
- Kepala tukang 0.400 Org / Hari 175,000 70,000
- Mandor 0.160 Org / Hari 145,000 23,200
Jumlah (Belum Termasuk PPN) 313,200 262,655 575,855
Overhead & Profit (10%) 57,586
Jumlah Harga 633,441
Pembulatan Jumlah Harga 633,440

1 M1 Pek. Pintu Pagar, Besi Hollow.


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Besi Hollow 40 x 40 mm 8.8800 M1 17,500 155,400
- Besi Hollow 20 x 40 mm 15.8900 M1 15,833 251,592
- Besi Siku 5 x 5 x 5 9.6000 M1 25,833 248,000
- Dynabolt 8.0000 Bh 1,250 10,000
- Kawat Las Listrik 4.4800 Kg 35,000 156,800
- Solar 3.3600 Ltr 7,500 25,200
- Minyak Pelumas 0.4480 Ltr 55,000 24,640
- Peralatan dan Assesoris 0.1000 % 871,632 87,163
- Pekerja 0.900 Org / Hari 125,000 112,500
- Tukang allumunium 0.900 Org / Hari 150,000 135,000
- Kepala tukang 0.450 Org / Hari 175,000 78,750
- Mandor 0.180 Org / Hari 145,000 26,100
Jumlah (Belum Termasuk PPN) 352,350 958,795 1,311,145
Overhead & Profit (10%) 131,114
Jumlah Harga 1,442,259
Pembulatan Jumlah Harga 1,442,259

1 M1 Pek. Pagar, Besi Hollow.


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Besi Hollow 40 x 40 mm 10.5000 M1 17,500 183,750
- Dynabolt 20.0000 Bh 1,250 25,000
- Kawat Las Listrik 0.4480 Kg 35,000 15,680
- Solar 0.3360 Ltr 7,500 2,520
- Minyak Pelumas 0.0448 Ltr 55,000 2,464
- Peralatan dan Assesoris 0.1000 % 229,414 22,941
- Pekerja 0.800 Org / Hari 125,000 100,000
- Tukang allumunium 0.800 Org / Hari 150,000 120,000
- Kepala tukang 0.400 Org / Hari 175,000 70,000
- Mandor 0.160 Org / Hari 145,000 23,200
Jumlah (Belum Termasuk PPN) 313,200 252,355 565,555
Overhead & Profit (10%) 56,556
Jumlah Harga 622,111
Pembulatan Jumlah Harga 622,110

1 M1 Pek. Fasade Besi Hollow


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Besi Hollow 40 x 40 mm 13.1250 M1 17,500 229,688
- Dynabolt 14.0000 Bh 1,250 17,500
- Kawat Las Listrik 0.4480 Kg 35,000 15,680
- Solar 0.3360 Ltr 7,500 2,520
- Minyak Pelumas 0.0448 Ltr 55,000 2,464
- Peralatan dan Assesoris 0.1000 % 267,852 26,785
- Pekerja 0.800 Org / Hari 125,000 100,000
- Tukang allumunium 0.800 Org / Hari 150,000 120,000
- Kepala tukang 0.400 Org / Hari 175,000 70,000
- Mandor 0.160 Org / Hari 145,000 23,200
Jumlah (Belum Termasuk PPN) 313,200 294,637 607,837
Overhead & Profit (10%) 60,784
Jumlah Harga 668,620
Pembulatan Jumlah Harga 668,620

1 Cm Pek. Huruf Stainless


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Plat Stainless Steel 0.0180 cm 720,000 12,960
- Skrup fixer 2.0000 Bh 235 470
- Perlengkapan (10%) 1.0000 Ls 1,500 1,500
- Pekerja 0.035 Org / Hari 125,000 4,375
- Tukang allumunium 0.035 Org / Hari 150,000 5,250
- Mandor 0.007 Org / Hari 145,000 1,015
Jumlah (Belum Termasuk PPN) 10,640 14,930 25,570
Overhead & Profit (10%) 2,557
Jumlah Harga 28,127
Pembulatan Jumlah Harga 28,127

HARGA SATUAN PEKERJAAN KAYU

1 M³ Pas. Kusen Pintu dan Jendela Kayu Kelas I


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Balok Kayu Kelas I 1.1000 M³ 9,180,000 10,098,000
- Paku Kayu 1.2500 Kg 19,080 23,850
- Lem Kayu 1.0000 Kg 40,000 40,000
- Pekerja 7.0000 Org / Hari 125,000 875,000
- Tukang Kayu 21.0000 Org / Hari 150,000 3,150,000
- Kepala Tukang 2.1000 Org / Hari 175,000 367,500
- Mandor 0.3500 Org / Hari 145,000 50,750
Jumlah (Belum Termasuk PPN) 4,443,250 10,161,850 14,605,100
Overhead & Profit (10%) 1,460,510
Jumlah Harga 16,065,610
Pembulatan Jumlah Harga 16,065,610
1 M³ Pas. Kusen Pintu dan Jendela Kayu Kelas II
J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Balok Kayu Kelas II 1.1000 M³ 6,732,000 7,405,200
- Pekerja 6.0000 Org / Hari 125,000 750,000
- Tukang Kayu 20.0000 Org / Hari 150,000 3,000,000
- Kepala Tukang 2.0000 Org / Hari 175,000 350,000
- Mandor 0.3000 Org / Hari 145,000 43,500
Jumlah (Belum Termasuk PPN) 4,143,500 7,405,200 11,548,700
Overhead & Profit (10%) 1,154,870
Jumlah Harga 12,703,570
Pembulatan Jumlah Harga 12,703,570

1 M² Pas. Pintu Panel Kayu Kelas II


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Papan Kayu Kelas II 0.0400 M³ 6,732,000 269,280
- Lem Kayu 0.5000 Ltr 40,000 20,000
- Pekerja 1.0000 Org / Hari 125,000 125,000
- Tukang Kayu 3.0000 Org / Hari 150,000 450,000
- Kepala Tukang 0.3000 Org / Hari 175,000 52,500
- Mandor 0.0500 Org / Hari 145,000 7,250
Jumlah (Belum Termasuk PPN) 634,750 289,280 924,030
Overhead & Profit (10%) 92,403
Jumlah Harga 1,016,433
Pembulatan Jumlah Harga 1,016,433

1 M1 Pas. Lisplang GRC Uk 300 x 3000 x 8 mm


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Listplank GRC Ex Kalsiplank 300 x 1.0500 M1 40,000 42,000
- Sekrup Fixer 8.0000 Bh 235 1,880
- Pekerja 0.1500 Org / Hari 125,000 18,750
- Tukang Kayu 0.2500 Org / Hari 150,000 37,500
- Kepala Tukang 0.0250 Org / Hari 175,000 4,375
- Mandor 0.0750 Org / Hari 145,000 10,875
Jumlah (Belum Termasuk PPN) 71,500 43,880 115,380
Overhead & Profit (10%) 11,538
Jumlah Harga 126,918
Pembulatan Jumlah Harga 126,918

HARGA SATUAN PEKERJAAN PENGECETAN

1 M² Pek. Mendempul Dan Menggosok Kayu


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Dempul Jadi 0.0800 Kg 40,000 3,200
- Teakoil 0.0200 Kg 46,000 920
- Batu Apung 0.0100 Kg 7,800 78
- Pekerja 0.0400 Org / Hari 125,000 5,000
- Tukang Cat 0.0400 Org / Hari 150,000 6,000
- Kepala Tukang 0.0040 Org / Hari 175,000 700
- Mandor 0.0025 Org / Hari 145,000 363
Jumlah (Belum Termasuk PPN) 12,063 4,198 16,261
Overhead & Profit (10%) 1,626
Jumlah Harga 17,887
Pembulatan Jumlah Harga 17,886

1 M² Pek. Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Cat Meni 0.2000 Kg 55,000 11,000
- Plamir 0.1500 Kg 55,600 8,340
- Cat dasar 0.1700 Kg 50,000 8,500
- Cat Penutup 2 Kali 0.2600 Kg 55,000 14,300
- Pekerja 0.0700 Org / Hari 125,000 8,750
- Tukang Cat 0.0090 Org / Hari 150,000 1,350
- Kepala Tukang 0.0060 Org / Hari 175,000 1,050
- Mandor 0.0025 Org / Hari 145,000 363
Jumlah (Belum Termasuk PPN) 11,513 42,140 53,653
Overhead & Profit (10%) 5,365
Jumlah Harga 59,018
Pembulatan Jumlah Harga 59,017

1 M² Pek. Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Cat Meni 0.2000 Kg 55,000 11,000
- Plamir 0.1500 Kg 55,600 8,340
- Cat dasar 0.1700 Kg 50,000 8,500
- Cat Penutup 3 Kali 0.3500 Kg 55,000 19,250
- Pekerja 0.0700 Org / Hari 125,000 8,750
- Tukang Cat 0.1050 Org / Hari 150,000 15,750
- Kepala Tukang 0.0040 Org / Hari 175,000 700
- Mandor 0.0025 Org / Hari 145,000 363
Jumlah (Belum Termasuk PPN) 25,563 47,090 72,653
Overhead & Profit (10%) 7,265
Jumlah Harga 79,918
Pembulatan Jumlah Harga 79,917

1 M² Pek. Cat Dinding Dalam (Metrolite/Catylac/Setara)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Cat Penutup (Metrolite/Catylac/Seta 0.3750 Kg 26,000 9,750
- Amplas 0.1000 Lbr 5,000 500
- Kuas 0.0500 Lbr 12,000 600
- Pekerja 0.0800 Org / Hari 125,000 10,000
- Tukang Cat 0.1200 Org / Hari 150,000 18,000
- Kepala Tukang 0.0120 Org / Hari 175,000 2,100
- Mandor 0.0120 Org / Hari 145,000 1,740
Jumlah (Belum Termasuk PPN) 31,840 10,850 42,690
Overhead & Profit (10%) 4,269
Jumlah Harga 46,959
Pembulatan Jumlah Harga 46,959
1 M² Pek. Cat Dinding Luar (Metrolite/Catylac/Setara)
J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Cat Dasar 0.1500 Kg 50,000 7,500
- Cat Penutup (Metrolite/Catylac/Seta 0.3750 Kg 26,000 9,750
- Amplas 0.1000 Lbr 5,000 500
- Kuas 0.0500 Lbr 12,000 600
- Pekerja 0.0800 Org / Hari 125,000 10,000
- Tukang Cat 0.1200 Org / Hari 150,000 18,000
- Kepala Tukang 0.0120 Org / Hari 175,000 2,100
- Mandor 0.0120 Org / Hari 145,000 1,740
Jumlah (Belum Termasuk PPN) 31,840 18,350 50,190
Overhead & Profit (10%) 5,019
Jumlah Harga 55,209
Pembulatan Jumlah Harga 55,209

1 M² Pek. Pengecatan Permukaan Baja Dengan Meni Besi


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Meni Besi 0.1000 Kg 55,000 5,500
- Kuas 0.0100 Bh 12,000 120
- Pekerja 0.0200 Org / Hari 125,000 2,500
- Tukang Cat 0.2000 Org / Hari 150,000 30,000
- Kepala Tukang 0.0200 Org / Hari 175,000 3,500
- Mandor 0.0100 Org / Hari 145,000 1,450
Jumlah (Belum Termasuk PPN) 37,450 5,620 43,070
Overhead & Profit (10%) 4,307
Jumlah Harga 47,377
Pembulatan Jumlah Harga 47,377

1 M² Pek. Waterproofing Coating System Ex. FOSROC


J. HARGA
URAIAN TENAGA, BAHAN, ALAT INDEX SATUAN H.SATUAN TOTAL
TENAGA MATERIAL
- Waterproofing Coating System Ex 0.3000 Ltr 80,000 24,000
- Kuas 0.0500 Bh 40,000 2,000
- Pekerja 0.0200 Org / Hari 125,000 2,500
- Tukang 0.2000 Org / Hari 150,000 30,000
- Kepala tukang 0.0200 Org / Hari 175,000 3,500
- Mandor 0.0100 Org / Hari 145,000 1,450
Jumlah (Belum Termasuk PPN) 37,450 26,000 63,450
Jasa 10% 6,345
Jumlah Harga 69,795
Pembulatan Jumlah Harga 69,795

HARGA SATUAN PEKERJAAN ASESORIS & KACA

1 Bh Pas. Kunci Tanam Ex Belleza


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kunci Tanam 1.0000 Set 500,000 500,000
- Pekerja 0.0600 Org / Hari 125,000 7,500
- Tukang Kayu 0.6000 Org / Hari 150,000 90,000
- Kepala Tukang 0.0600 Org / Hari 175,000 10,500
- Mandor 0.0030 Org / Hari 145,000 435
Jumlah (Belum Termasuk PPN) 108,435 500,000 608,435
Overhead & Profit (10%) 60,844
Jumlah Harga 669,279
Pembulatan Jumlah Harga 669,278

1 Bh Pas. Kunci Tanam Biasa


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kunci Pintu Master (setara solid) 1.0000 Set 185,000 185,000
- Pekerja 0.0600 Org / Hari 125,000 7,500
- Tukang Kayu 0.6000 Org / Hari 150,000 90,000
- Kepala Tukang 0.0600 Org / Hari 175,000 10,500
- Mandor 0.0030 Org / Hari 145,000 435
Jumlah (Belum Termasuk PPN) 108,435 185,000 293,435
Overhead & Profit (10%) 29,344
Jumlah Harga 322,779
Pembulatan Jumlah Harga 322,778

1 Bh Kunci Tanam 2 Slag


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kunci Tanam 1.0000 Set 180,000 180,000
- Pekerja 0.0600 Org / Hari 125,000 7,500
- Tukang Kayu 0.6000 Org / Hari 150,000 90,000
- Kepala Tukang 0.0600 Org / Hari 175,000 10,500
- Mandor 0.0030 Org / Hari 145,000 435
Jumlah (Belum Termasuk PPN) 108,435 180,000 288,435
Overhead & Profit (10%) 28,844
Jumlah Harga 317,279
Pembulatan Jumlah Harga 317,278

1 Bh Pas. Tarikan Pintu


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Tarikan Pintu (setara solid) 15" 1.0000 Set 265,000 265,000
- Pekerja 0.0600 Org / Hari 125,000 7,500
- Tukang Kayu 0.6000 Org / Hari 150,000 90,000
- Kepala Tukang 0.0600 Org / Hari 175,000 10,500
- Mandor 0.0030 Org / Hari 145,000 435
Jumlah (Belum Termasuk PPN) 108,435 265,000 373,435
Overhead & Profit (10%) 37,344
Jumlah Harga 410,779
Pembulatan Jumlah Harga 410,778

1 Bh Pas. Kunci Silinder


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kunci Silinder 1.0000 Bh 50,000 50,000
- Pekerja 0.0050 Org / Hari 125,000 625
- Tukang Kayu 0.5000 Org / Hari 150,000 75,000
- Kepala Tukang 0.0050 Org / Hari 175,000 875
- Mandor 0.0025 Org / Hari 145,000 363
Jumlah (Belum Termasuk PPN) 76,863 50,000 126,863
Overhead & Profit (10%) 12,686
Jumlah Harga 139,549
Pembulatan Jumlah Harga 139,548

1 Bh Pas. Engsel Pintu


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Engsel 4" 1.0000 Bh 43,300 43,300
- Pekerja 0.0150 Org / Hari 125,000 1,875
- Tukang Kayu 0.1500 Org / Hari 150,000 22,500
- Kepala Tukang 0.0150 Org / Hari 175,000 2,625
- Mandor 0.0008 Org / Hari 145,000 109
Jumlah (Belum Termasuk PPN) 27,109 43,300 70,409
Overhead & Profit (10%) 7,041
Jumlah Harga 77,450
Pembulatan Jumlah Harga 77,449

1 Bh Pas. Engsel Casement 20"


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Engsel Casement 2 Profil 20" 1.0000 Bh 82,500 82,500
- Pekerja 0.0150 Org / Hari 125,000 1,875
- Tukang Kayu 0.1500 Org / Hari 150,000 22,500
- Kepala Tukang 0.0150 Org / Hari 175,000 2,625
- Mandor 0.0008 Org / Hari 145,000 109
Jumlah (Belum Termasuk PPN) 27,109 82,500 109,609
Overhead & Profit (10%) 10,961
Jumlah Harga 120,570
Pembulatan Jumlah Harga 120,569

1 Bh Pas. Rambuncis
J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Rambuncis Ex. Dekson 1.0000 Bh 22,500 22,500
- Pekerja 0.0150 Org / Hari 125,000 1,875
- Tukang Kayu 0.1500 Org / Hari 150,000 22,500
- Kepala Tukang 0.0150 Org / Hari 175,000 2,625
- Mandor 0.0008 Org / Hari 145,000 109
Jumlah (Belum Termasuk PPN) 27,109 22,500 49,609
Overhead & Profit (10%) 4,961
Jumlah Harga 54,570
Pembulatan Jumlah Harga 54,569

1 Bh Pas. Door Closer


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Door Closer Ex. Hampton 1.0000 Bh 245,000 245,000
- Pekerja 0.0500 Org / Hari 125,000 6,250
- Tukang Kayu 0.5000 Org / Hari 150,000 75,000
- Kepala Tukang 0.0500 Org / Hari 175,000 8,750
- Mandor 0.0025 Org / Hari 145,000 363
Jumlah (Belum Termasuk PPN) 90,363 245,000 335,363
Overhead & Profit (10%) 33,536
Jumlah Harga 368,899
Pembulatan Jumlah Harga 368,898

1 M² Pas. Kaca Polos, Tebal 5 mm


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kaca 1.1000 M² 175,100 192,610
- Pekerja 0.0150 Org / Hari 125,000 1,875
- Tukang Kaca 0.1500 Org / Hari 150,000 22,500
- Kepala Tukang 0.0150 Org / Hari 175,000 2,625
- Mandor 0.0008 Org / Hari 145,000 109
Jumlah (Belum Termasuk PPN) 27,109 192,610 219,719
Overhead & Profit (10%) 21,972
Jumlah Harga 241,691
Pembulatan Jumlah Harga 241,690

1 M² Pas. Stiker Sandblast


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Sandblast 1.1000 M² 85,000 93,500
- Pekerja 0.2000 Org / Hari 125,000 25,000
- Tukang Kaca 0.1000 Org / Hari 150,000 15,000
- Mandor 0.0400 Org / Hari 145,000 5,800
Jumlah (Belum Termasuk PPN) 45,800 93,500 139,300
Overhead & Profit (10%) 13,930
Jumlah Harga 153,230
Pembulatan Jumlah Harga 153,230

HARGA SATUAN PEKERJAAN PLUMBING

1 Bh Pas. Kloset Duduk/Monoblok


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kloset duduk/monoblok 1.0000 Bh 2,304,800 2,304,800
- Perlengkapan 0.1000 % 2,304,800 230,480
- Pekerja 3.3000 Org / Hari 125,000 412,500
- Tukang Batu 1.1000 Org / Hari 150,000 165,000
- Kepala Tukang 0.0010 Org / Hari 175,000 175
- Mandor 0.1600 Org / Hari 145,000 23,200
Jumlah (Belum Termasuk PPN) 600,875 2,535,280 3,136,155
Overhead & Profit (10%) 313,616
Jumlah Harga 3,449,771
Pembulatan Jumlah Harga 3,449,770

1 Bh Pas. Kloset Jongkok Porselen


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kloset Jongkok Porselen 1.0000 Bh 500,000 500,000
- Semen Portland 6.0000 Kg 1,333 8,001
- Pasir Pasang 0.0100 M³ 240,600 2,406
- Pekerja 1.0000 Org / Hari 125,000 125,000
- Tukang Batu 1.5000 Org / Hari 150,000 225,000
- Kepala Tukang 1.5000 Org / Hari 175,000 262,500
- Mandor 0.1600 Org / Hari 145,000 23,200
Jumlah (Belum Termasuk PPN) 635,700 510,407 1,146,107
Overhead & Profit (10%) 114,611
Jumlah Harga 1,260,718
Pembulatan Jumlah Harga 1,260,717

1 Bh Pas. Wastafel
J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Wastafel 1.0000 Bh 552,480 552,480
- Perlengkapan 0.1000 % 552,480 55,248
- Semen Abu - Abu 6.0000 Kg 1,333 8,001
- Pasir Pasang 0.0100 M³ 150,000 1,500
- Pekerja 1.2000 Org / Hari 125,000 150,000
- Tukang Batu 1.4500 Org / Hari 150,000 217,500
- Kepala Tukang 0.1500 Org / Hari 175,000 26,250
- Mandor 0.1000 Org / Hari 145,000 14,500
Jumlah (Belum Termasuk PPN) 408,250 617,229 1,025,479
Overhead & Profit (10%) 102,548
Jumlah Harga 1,128,027
Pembulatan Jumlah Harga 1,128,026

1 M1 Pas. Pipa PVC Tipe AW Diameter ½"


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pipa PVC 1.2000 M1 6,300 7,560
- Perlengkapan 0.3500 Hrg Pipa 7,560 2,646
- Pekerja 0.0360 Org / Hari 125,000 4,500
- Tukang Batu 0.0600 Org / Hari 150,000 9,000
- Kepala Tukang 0.0060 Org / Hari 175,000 1,050
- Mandor 0.0018 Org / Hari 145,000 261
Jumlah (Belum Termasuk PPN) 14,811 10,206 25,017
Overhead & Profit (10%) 2,502
Jumlah Harga 27,519
Pembulatan Jumlah Harga 27,518

1 M1 Pas. Pipa PVC Tipe AW Diameter 1"


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pipa PVC 1.2000 M1 10,500 12,600
- Perlengkapan 0.3500 Hrg Pipa 12,600 4,410
- Pekerja 0.0360 Org / Hari 125,000 4,500
- Tukang Batu 0.0600 Org / Hari 150,000 9,000
- Kepala Tukang 0.0060 Org / Hari 175,000 1,050
- Mandor 0.0018 Org / Hari 145,000 261
Jumlah (Belum Termasuk PPN) 14,811 17,010 31,821
Overhead & Profit (10%) 3,182
Jumlah Harga 35,003
Pembulatan Jumlah Harga 35,003

1 M1 Pas. Pipa PVC Tipe AW Diameter 2"


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pipa PVC 1.2000 M1 14,000 16,800
- Perlengkapan 0.3500 Hrg Pipa 14,000 4,900
- Pekerja 0.0540 Org / Hari 125,000 6,750
- Tukang Batu 0.0900 Org / Hari 150,000 13,500
- Kepala Tukang 0.0090 Org / Hari 175,000 1,575
- Mandor 0.0027 Org / Hari 145,000 392
Jumlah (Belum Termasuk PPN) 22,217 21,700 43,917
Overhead & Profit (10%) 4,392
Jumlah Harga 48,308
Pembulatan Jumlah Harga 48,308

1 M1 Pas. Pipa PVC Tipe AW Diameter 2½"


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pipa PVC 1.2000 M1 9,500 11,400
- Perlengkapan 0.3500 Hrg Pipa 9,500 3,325
- Pekerja 0.0360 Org / Hari 125,000 4,500
- Tukang Batu 0.0600 Org / Hari 150,000 9,000
- Kepala Tukang 0.0060 Org / Hari 175,000 1,050
- Mandor 0.0018 Org / Hari 145,000 261
Jumlah (Belum Termasuk PPN) 14,811 14,725 29,536
Overhead & Profit (10%) 2,954
Jumlah Harga 32,490
Pembulatan Jumlah Harga 32,489

1 M1 Pas. Pipa PVC Tipe AW Diameter 3"


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pipa PVC 1.2000 M1 40,000 48,000
- Perlengkapan 0.3500 Hrg Pipa 40,000 14,000
- Pekerja 0.0810 Org / Hari 125,000 10,125
- Tukang Batu 0.1350 Org / Hari 150,000 20,250
- Kepala Tukang 0.0135 Org / Hari 175,000 2,363
- Mandor 0.0041 Org / Hari 145,000 595
Jumlah (Belum Termasuk PPN) 33,332 62,000 95,332
Overhead & Profit (10%) 9,533
Jumlah Harga 104,865
Pembulatan Jumlah Harga 104,865

1 M1 Pas. Pipa PVC Tipe AW Diameter 4"


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pipa PVC 1.2000 M1 64,000 76,800
- Perlengkapan 0.3500 Hrg Pipa 64,000 22,400
- Pekerja 0.0810 Org / Hari 125,000 10,125
- Tukang Batu 0.1350 Org / Hari 150,000 20,250
- Kepala Tukang 0.0135 Org / Hari 175,000 2,363
- Mandor 0.0041 Org / Hari 145,000 595
Jumlah (Belum Termasuk PPN) 33,332 99,200 132,532
Overhead & Profit (10%) 13,253
Jumlah Harga 145,785
Pembulatan Jumlah Harga 145,785
1 Bh Pas. Bak Cuci Piring Stainles Steel (1 Lubang)
J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Bak Cuci Stainless Steel 1.0000 Bh 257,300 257,300
- Water Drain + Asesories 1.0000 Set 192,975 192,975
- Pekerja 0.7500 Org / Hari 125,000 93,750
- Tukang Batu 0.3750 Org / Hari 150,000 56,250
- Kepala Tukang 0.1500 Org / Hari 175,000 26,250
- Mandor 0.0750 Org / Hari 145,000 10,875
Jumlah (Belum Termasuk PPN) 187,125 450,275 637,400
Overhead & Profit (10%) 63,740
Jumlah Harga 701,140
Pembulatan Jumlah Harga 701,140

1 Bh Pas. Mata Kran Diameter 1/2"


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kran Air 1.0000 Bh 56,500 56,500
- Seal Tape 0.0250 Bh 15,000 375
- Pekerja 0.0100 Org / Hari 125,000 1,250
- Tukang Batu 0.1000 Org / Hari 150,000 15,000
- Kepala Tukang 0.0100 Org / Hari 175,000 1,750
- Mandor 0.0050 Org / Hari 145,000 725
Jumlah (Belum Termasuk PPN) 18,725 56,875 75,600
Overhead & Profit (10%) 7,560
Jumlah Harga 83,160
Pembulatan Jumlah Harga 83,160

1 Bh Pas. Mata Kran Diameter 3/4"


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Kran Air 1.0000 Bh 94,000 94,000
- Seal Tape 0.0250 Bh 15,000 375
- Pekerja 0.0100 Org / Hari 125,000 1,250
- Tukang Batu 0.1000 Org / Hari 150,000 15,000
- Kepala Tukang 0.0100 Org / Hari 175,000 1,750
- Mandor 0.0050 Org / Hari 145,000 725
Jumlah (Belum Termasuk PPN) 18,725 94,375 113,100
Overhead & Profit (10%) 11,310
Jumlah Harga 124,410
Pembulatan Jumlah Harga 124,410

1 Bh Pas. Floor Drain


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Floor Drain 1.0000 Bh 45,000 45,000
- Pekerja 0.0100 Org / Hari 125,000 1,250
- Tukang Batu 0.1000 Org / Hari 150,000 15,000
- Kepala Tukang 0.0100 Org / Hari 175,000 1,750
- Mandor 0.0050 Org / Hari 145,000 725
Jumlah (Belum Termasuk PPN) 18,725 45,000 63,725
Overhead & Profit (10%) 6,373
Jumlah Harga 70,098
Pembulatan Jumlah Harga 70,097

1 Bh Pas. Septictank Biofill


- Septictank Biofill Kap. 3000 L 1.000 Bh 15,000,000 15,000,000
- Perlengkapan (15%) 0.150 Hrg Septic 2,250,000 337,500
- Pekerja 2.200 Org / Hari 125,000 275,000
- Tukang Batu 1.100 Org / Hari 150,000 165,000
- Kepala Tukang 0.440 Org / Hari 175,000 77,000
- Mandor 0.440 Org / Hari 145,000 63,800
Jumlah (Belum Termasuk PPN) 580,800 15,337,500 15,918,300
Overhead & Profit (10%) 1,591,830
Jumlah Harga 17,510,130
Pembulatan Jumlah Harga 17,510,130

HARGA SATUAN PEKERJAAN MECHANICAL ELECTRICAL

1 Ttk Pas. Instalasi lampu dan kotak kontak


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Tee Dos 1.0000 Bh 2,100 2,100
- L Bow 1.0000 Bh 2,500 2,500
- Close 1.0000 Bh 3,500 3,500
- Isolasi Listrik Ex. 3M 0.2000 Bh 10,000 2,000
- Pekerja 0.4800 Org / Hari 125,000 60,000
- Tukang listrik 0.0480 Org / Hari 150,000 7,200
- Kepala tukang listrik 0.0480 Org / Hari 175,000 8,400
Jumlah (Belum Termasuk PPN) 75,600 10,100 85,700
Overhead & Profit (10%) 8,570
Jumlah Harga 94,270
Pembulatan Jumlah Harga 94,270

1 m' Pek. Kabel NYY 4 x 10 mm


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- MYM 4 X 10 mm 1.1000 M' 70,500 77,550
- Pekerja 0.060 Org / Hari 125,000 7,500
- Tukang listrik 0.030 Org / Hari 150,000 4,500
- Kepala tukang listrik 0.006 Org / Hari 175,000 1,050
Jumlah (Belum Termasuk PPN) 13,050 77,550 90,600
Overhead & Profit (10%) 9,060
Jumlah Harga 99,660
Pembulatan Jumlah Harga 99,660

1 m' Pek. Kabel NYM 2 x 2.5 mm


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- NYM 2 X 2.5 mm 1.1000 M' 11,000 12,100
- Pipa Listrik Clipsal 5/8" 1.1000 M' 3,000 3,300
- Pekerja 0.05 Org / Hari 125,000 6,250
- Tukang listrik 0.03 Org / Hari 150,000 3,750
- Kepala tukang listrik 0.01 Org / Hari 175,000 875
Jumlah (Belum Termasuk PPN) 10,875 15,400 26,275
Overhead & Profit (10%) 2,628
Jumlah Harga 28,903
Pembulatan Jumlah Harga 28,902

1 m' Pek. Bongkaran Dinding (Jalur Kabel)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Pekerja 0.10 Org / Hari 125,000 12,500
- Kepala tukang listrik 0.02 Org / Hari 175,000 3,500
Jumlah (Belum Termasuk PPN) 16,000 - 16,000
Overhead & Profit (10%) 1,600
Jumlah Harga 17,600
Pembulatan Jumlah Harga 17,600

1 Ttk Pas. Stop kontak


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Stop kontak 1.0000 Bh 34,000 34,000
- Pekerja 0.2000 Org / Hari 125,000 25,000
- Tukang listrik 0.0200 Org / Hari 150,000 3,000
- Kepala tukang listrik 0.0200 Org / Hari 175,000 3,500
Jumlah (Belum Termasuk PPN) 31,500 34,000 65,500
Overhead & Profit (10%) 6,550
Jumlah Harga 72,050
Pembulatan Jumlah Harga 72,050

1 Ttk Pas. Saklar tunggal


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Saklar tunggal 1.0000 Bh 20,000 20,000
- Pekerja 0.4000 Org / Hari 125,000 50,000
- Tukang listrik 0.0400 Org / Hari 150,000 6,000
- Kepala tukang listrik 0.0400 Org / Hari 175,000 7,000
Jumlah (Belum Termasuk PPN) 63,000 20,000 83,000
Overhead & Profit (10%) 8,300
Jumlah Harga 91,300
Pembulatan Jumlah Harga 91,300

1 Ttk Pas. Saklar ganda


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Saklar ganda 1.0000 Bh 30,000 30,000
- Pekerja 0.4000 Org / Hari 125,000 50,000
- Tukang listrik 0.0400 Org / Hari 150,000 6,000
- Kepala tukang listrik 0.0400 Org / Hari 175,000 7,000
Jumlah (Belum Termasuk PPN) 63,000 30,000 93,000
Overhead & Profit (10%) 9,300
Jumlah Harga 102,300
Pembulatan Jumlah Harga 102,300

1 Ttk Pas. Lampu LED Scene Switch 9.5 watt (Cool & Warm)
J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Lampu LED Scene Switch 9.5 watt 1.0000 Bh 135,000 135,000
- Rumah Lampu Downlight 1.0000 Bh 55,000 55,000
- Pekerja 0.4000 Org / Hari 125,000 50,000
- Tukang listrik 0.0200 Org / Hari 150,000 3,000
- Kepala tukang listrik 0.0200 Org / Hari 175,000 3,500
Jumlah (Belum Termasuk PPN) 56,500 190,000 246,500
Overhead & Profit (10%) 24,650
Jumlah Harga 271,150
Pembulatan Jumlah Harga 271,150

1 Ttk Pas. Lampu Downlight TL 18 watt


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Lampu neon TL 18 watt Ex. Philips 1.0000 Bh 100,000 100,000
- Rumah Lampu Downlight 1.0000 Bh 43,000 43,000
- Pekerja 0.4000 Org / Hari 125,000 50,000
- Tukang listrik 0.0200 Org / Hari 150,000 3,000
- Kepala tukang listrik 0.0200 Org / Hari 175,000 3,500
Jumlah (Belum Termasuk PPN) 56,500 143,000 199,500
Overhead & Profit (10%) 19,950
Jumlah Harga 219,450
Pembulatan Jumlah Harga 219,450

1 Ttk Pas. Lampu TL (2 x 16 watt)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Lampu Neon RM 2 x 16 watt 1.0000 Bh 500,000 500,000
- Pekerja 0.4000 Org / Hari 125,000 50,000
- Tukang listrik 0.2000 Org / Hari 150,000 30,000
- Kepala tukang listrik 0.0800 Org / Hari 175,000 14,000
Jumlah (Belum Termasuk PPN) 94,000 500,000 594,000
Overhead & Profit (10%) 59,400
Jumlah Harga 653,400
Pembulatan Jumlah Harga 653,400

1 Bh Pek. Perakitan dan Instalasi Sub Distribution Panel


J. HARGA
URAIAN TENAGA, BAHAN, ALAT INDEX SATUAN H.SATUAN TOTAL
TENAGA MATERIAL
- Kontaktor 18 A 1.0000 Bh 375,000 375,000
- Box Panel 1.0000 Bh 350,000 350,000
- Miniature Circuit Breaker 3.0000 Bh 65,000 195,000
- Lampu Indikator 3.0000 Bh 45,000 135,000
- Alat bantu 1.0000 Ls 50,000 50,000
- Pekerja 3.200 Org / Hari 125,000 400,000
- Tukang Listrik 3.200 Org / Hari 150,000 480,000
- Kepala tukang listrik 2.133 Org / Hari 175,000 373,333
Jumlah (Belum Termasuk PPN) 1,253,333 1,105,000 2,358,333
Overhead & Profit (10%) 235,833
Jumlah Harga 2,594,167
Pembulatan Jumlah Harga 2,594,166
Galian Struktur Kedalaman 2 -4 Meter (Alat Berat)

NO URAIAN PEKERJAAN KODE KOEFISIEN SATUAN KETERANGAN

I. Asumsi
1 Pekerjaan dilakukan secara mekanis
2 Lokasi Pekerjaan : Sekitar Jembatan
3 Kondisi Jalan : Baik
4 Jam Kerja Efektif per hari tk 7 Jam
5 Faktor pengembangan bahan Fk 1.2
6 Pengurugan kembali (Backfill) untuk struktur Uk 50 %/M3
7 Faktor Pembayaran Fp 2 1.5-2

II. METODE PELAKSANAAN


1 Tanah yang dipotong berada disekitar jembatan
2 Penggalian dilakukan dengan menggunakan Excavator
3 L 0.1 Km
Bulldozer mengangkut/Menggusur hasil galian ke tempat pembuangan disekitar lokasi
4 Bahan Pengaman tebing galian (Bahan Kayu)

III. PEMAKAIAN BAHAN, ALAT, DAN TENAGA

1 BAHAN
- Urugan Pilihan (Untuk Backfill) 1 M3
- Bahan pengaman tebing galian 0.3 M3

2 ALAT
2.a EXCAVATOR
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1
Faktor Efisiensi alat Fa 0.83
Faktor konversi (Kedalaman 40 - 75%) Fv 1
Berat isi material Bim 0.85
Waktu siklus
- Menggali/memuat, lain - lain, standart T1 0.32 Menit

Waktu Siklus (=T1 x Fv) Ts1 0.32 Menit

Kap. Prod/jam V x Fb x Fa x 60 x Fk Q1 173.6775 M3/Jam


Ts1

Koefisien Alat/M3 ( = 1 : Q1) 0.005757798218 Jam

2.b BULLDOZER
Faktor pisau (blade) Fb 1
Faktor efisiensi kerja Fa 0.83
Kecepatan mengupas Vf 3 Km/jam
Kecepatan mundur Vr 5 Km/jam
Kapasitas pisau q 5.4 M3 panduan = datar
Faktor kemiringan (grade) Fm 1

Waktu Siklus Ts 3.25


- Waktu Gusur T1 2 Menit
- Waktu Kembali T2 1.2 Menit
- Waktu lain - lain T3 0.05 Menit

Kap. Prod/jam q x Fb x Fm x Fa x 60/Ts Q2 68.95384615385 M3


Tk

Koefisien Alat/M3 ( = 1 : Q1) 0.014502454261 Jam

Timbunan Tanah dari sumber galian

NO URAIAN PEKERJAAN KODE KOEFISIEN SATUAN KETERANGAN

I. Asumsi
1 Pekerjaan dilakukan secara mekanis
2 Lokasi Pekerjaan : Sekitar Jembatan
3 Kondisi Jalan : Baik
4 Jam Kerja Efektif per hari tk 7 Jam
5 Faktor pengembangan bahan (padat ke asli) Fk 1.11
6 Tebal hamparan padat t 0.15 M
7 Berat Volume bahan (lepas) D 1.6 Ton/M3 1.5-2
8 Faktor Kehilangan Fh 1.03 1.5-2

II. URUTAN KERJA


1 Excavator menggali dan memuat ke dalam Dump Truck
2
Dump Truck mengangkut ke lapangan dengan jarak dari sumber galian ke lapangan L 10 Km
3 Material diratakan menggunakan Motor Grader
4 Material dipadatkan dengan Vibratory Roller
5 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan level permukaan
menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT, DAN TENAGA

1 BAHAN
1.a Bahan Timbunan 1 x Fk x Fh 1.1433 M3

2 ALAT
2.a EXCAVATOR
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1
Faktor Efisiensi alat Fa 0.83
Faktor konversi (Kedalaman 40 - 75%) Fv1 0.9
Waktu siklus
- Menggali/memuat, lain - lain, standart T1 0.32 Menit
- Lain lain T2 0.1 Menit
Waktu Siklus (=T1 x Fv) Ts1 0.42 Menit

Kap. Prod/jam V x Fb x Fa x 60 x Fv1 Q1 99.24428571429 M3/Jam


Ts1

Koefisien Alat/M3 ( = 1 : Q1) 0.010076146881 Jam

2.b DUMP TRUCK


Kapasitas Bak V 3.5 Ton
Faktor efisiensi kerja Fa 0.83
Faktor Konversi asli ke lepas Fv2 1.25
Kecepatan (Bermuatan) v1 20 Km/jam
Kecepatan (Kosong) v2 30 Km/jam

Waktu Siklus Ts2 53.19


- Waktu muat (V x 60)/(Dx Fk x Q1) T1 1.19 Menit
- Waktu tempuh isi (L/v1) x 60 T2 30 Menit
- Waktu tempuh kosong (L/v2) x 60 T3 20 Menit
- Waktu lain - lain T4 2 Menit

Kap. Prod/jam V x Fa x 60 Q2 1.638465877045 M3


D x Fv2 x Ts2

Koefisien Alat/M3 ( = 1 : Q2) 0.610327022375 Jam

2.c WATER TANK TRUCK


Volume tangki air V 5 M3
Kebutuhan air/M3 material padat Wc 0.07 M3
Kapasitas pompa air pa 200 liter/menit
Faktor efisiensi alat Fa 0.83
Kap. Prod/jam pa x Fa x 60 Q3 142.2857142857 M3
1000 x Wc

Koefisien Alat/M3 ( = 1 : Q3) 0.00702811245 Jam

3 TENAGA
a Produksi menentukan : EXCAVATOR Q1 99.24428571429 M3/Jam
b Produksi Timbunan / hari Tk x Q1 Qt 694.71 M3
c Kebutuhan tenaga
Pekerja P 4 Orang
Mandor M 1 Orang
Koefisien Tenaga/M3 Pekerja (Tk x P)/Qt 0.040304587526 Jam
Mandor (Tk x M)/Qt 0.010076146881 Jam

Lapis Pondasi Agregat Kelas A

NO URAIAN PEKERJAAN KODE KOEFISIEN SATUAN KETERANGAN

I. Asumsi
1 Menggunakan alat berat
2 Lokasi Pekerjaan : Sepanjang jalan
3 Kondisi existing jalan : Baik
4 Jarak rata-rata Bace Camp ke lokasi pekerjaan L 8.73 km
5 Tebal lapis agregat padat t 0.15 m
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per hari Tk 7 Jam 1.5-2
8 Proporsi Campuran
- Agregat Pecah mesin 20 - 30 mm 20-30 28 % Gradasi harus
- Agregat Pecah mesin 5 - 10 & 10 - 20 20-30 42 % memenuhi spek
- Fraksi lolos Scalping Screen 0 - 5 mm PU 30 % memenuhi spek
9 Berat isi Agregat (Lepas) Bil 1.51 Ton/M3
10 Faktor Kehilangan Fh1 1.05

II. URUTAN KERJA


1 Wheel loader memuat Agregat campuran ke dalam Dump Truck di Bace Camp
2 Dump Truck mengangkut Agregat kelas A ke lokasi pekerjaan dan dihampar dengan Motor
Grader L 10 Km
3 Hamparan Agregat dibasahi dengan Water Tank Truck sebelum dipadatkan dengan Tandem Roller
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan level permukaan
menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT, DAN TENAGA

1 BAHAN
1.a Agregat A 1 M3 x (Bip/Bil) x Fh 1.258609271523 M3

2 ALAT
2.a WHEEL LOADER
Kapasitas Bucket V 1.5 M3
Faktor Bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu siklus
- Menggali/memuat, lain - lain, standart Ts1 0.45 Menit

Kap. Prod/jam V x Fb x Fa x 60 Q1 117.7132596685 M3/Jam


Ts1 x Bip/Bil

Koefisien Alat/M3 ( = 1 : Q1) 0.008495219679 Jam

2.b DUMP TRUCK


Kapasitas Bak V 3.5 Ton
Faktor efisiensi alat Fa 0.8
Kecepatan (Bermuatan) v1 20 Km/jam
Kecepatan (Kosong) v2 30 Km/jam

Waktu Siklus Ts2 46.83145439243


- Waktu muat (V x 60)/(Q1 x Bil) T1 1.181454392426 Menit
- Waktu tempuh isi (L/v1) x 60 T2 26.19 Menit
- Waktu tempuh kosong (L/v2) x 60 T3 17.46 Menit
- Waktu lain - lain T4 2 Menit

Kap. Prod/jam V x Fa x 60 Q2 1.981951676756 M3


Ts2 x Bip

Koefisien Alat/M3 ( = 1 : Q2) 0.504553169347 Jam

2.c MOTOR GRADER


Panjang Hamparan Lh 50 M1
Lebar efektif kerja blade b 2.4 M1
Faktor Efisiensi alat Fa 0.83
Kecepatan rata-rata alat v 4 km/jam
Jumlah lintasan n 6 lintasan 1 x pp
Lajur lintasan N 3
Lebar Overlap bo 0.3 M1
Waktu Siklus
- Perataan 1 lintasan T1 0.75 menit
- Waktu tempuh isi T2 1 menit
Ts3 1.75
Kap. Prod/jam Lh x (N(b-bo)+bo) x t x Fa x 60 Q3 234.7714285714 M3/Jam
n x Ts3

Koefisien Alat/M3 ( = 1 : Q1) 0.004259462091 Jam

2.d TANDEM ROLLER


Lebar efektif pemadatan b 1.2 M1
Faktor Efisiensi alat Fa 0.83
Kecepatan rata-rata alat v 1.5 km/jam
Jumlah lintasan n 6 lintasan 1 x pp
Lajur lintasan N 3
Lebar Overlap bo 0.3 M1
Kap. Prod/jam (v x 1000) x (N(b-bo)+bo) x t x Fa Q4 93.375 M3/Jam
n

Koefisien Alat/M3 ( = 1 : Q1) 0.010709504685 Jam

2.e WATER TANK TRUCK


Volume tangki air V 4 M3
Kebutuhan air/M3 material padat Wc 0.07 M3
Kapasitas pompa air pa 100 liter/menit
Faktor efisiensi alat Fa 0.83
Kap. Prod/jam pa x Fa x 60 Q3 71.14285714286 M3
1000 x Wc

Koefisien Alat/M3 ( = 1 : Q3) 0.0140562249 Jam


2.f ALAT BANTU
- Kereta Dorong 2 Buah Lumpsum
- Sekop 3 Buah
- Garpu 2 Buah

3 TENAGA
a Produksi menentukan : WHEEL LOADER Q1 117.7132596685 M3/Jam
b Produksi agregat / hari Tk x Q1 Qt 823.9928176796 M3
c Kebutuhan tenaga
Pekerja P 7 Orang
Mandor M 1 Orang

Koefisien Tenaga/M3 Pekerja (Tk x P)/Qt 0.059466537752 Jam


Mandor (Tk x M)/Qt 0.008495219679 Jam

Lapis Resap Pengilkat - Aspal Cair

NO URAIAN PEKERJAAN KODE KOEFISIEN SATUAN KETERANGAN

I. Asumsi
1 Menggunakan alat berat
2 Lokasi Pekerjaan : Sepanjang jalan
3 Kondisi existing jalan : Baik
4 Jarak rata-rata Bace Camp ke lokasi pekerjaan L 8.73 km
5 Tebal lapis agregat padat t 0.15 m
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per hari Tk 7 Jam 1.5-2
8 Proporsi Campuran
- Aspal Pen 60 atau Pen 80 As 64 % Terhadap Volume
- Kerosene K 36 % Terhadap Volume
9 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1 1.03 Kg/liter
- Kerosene D2 0.8 Kg/liter
10 Faktor Kehilangan Fh1 1.03
II. URUTAN KERJA
1
Aspal dan Minyak Flux dicampur dan dipanaskan sehingga menjadi campuran aspal cair
2
Permukaan yang akan dilapisi dibersihkan dari debu dan kotoran dengan Air Compressor
3 Selama pemadatan sekelompok pekerja akan merapikan tepi Campuran aspal cair
disemprotkan dengan Asphalt Distributor ke atas permukaan yang akan dilapisi

III. PEMAKAIAN BAHAN, ALAT, DAN TENAGA

1 BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat diperlukan :
(1 liter x Fh) PC 1.03 liter
1.a Aspal (As x PC x D1) 0.678976 Kg
1.b Kerosene (K x PC) 0.3708 Liter
2 ALAT
2.a ASPHALT DISTRIBUTOR
Lebar Penyemprotan b 3 M
Asumsi panduan
Kecepatan penyemprotan V 30 m/menit
sedang
Kapasitas pompa aspal pas 100 liter/menit
Faktor efisiensi kerja Fa 0.8

Kap. Prod/jam pas x Fa x 60 Q1 4800 M3/Jam

Koefisien Alat/M3 ( = 1 : Q1) 0.000208333333 Jam

2.b AIR COMPRESSOR


Kap. Prod/jam = Asphalt Distributor Q2 4800 M3

Koefisien Alat/M3 ( = 1 : Q2) 0.000208333333 Jam

3 TENAGA
a Produksi menentukan : ASPHALT DISTRIBUTOR Q3 4800 M3/Jam
b Produksi Lapis Resap Pengikat/hari Tk x Q4 Qt 33600 M3
c Kebutuhan tenaga
Pekerja P 10 Orang
Mandor M 2 Orang

Koefisien Tenaga/M3 Pekerja (Tk x P)/Qt 0.002083333333 Jam


Mandor (Tk x M)/Qt 0.000416666667 Jam

Laston Lapis aus (AC-WC)

NO URAIAN PEKERJAAN KODE KOEFISIEN SATUAN KETERANGAN

I. Asumsi
1 Menggunakan alat berat
2 Lokasi Pekerjaan : Sepanjang jalan
3 Kondisi existing jalan : Baik
4 Jarak rata-rata Bace Camp ke lokasi pekerjaan L 8.73 km
5 Tebal lapis (AC-WC) padat t 0.04 m
6 Berat isi Agregat (padat) Bip 1.6 Ton/M3
Berat isi Agregat (lepas) Bil 1.51 Ton/M3
7 Jam kerja efektif per hari Tk 7 Jam 1.5-2
8 Komposisi campuran AC-WC
- Agregat Pecah mesin 5 - 10 & 10 -15 mm 5-10&10-15 40.28 % Gradasi harus
- Agregat Pecah mesin 0 - 5 mm 0-5 52.68 % memenuhi spek
- Semen FF 0.94 % memenuhi spek
- Asphalt As 6.1 %
- Anti Stripping Agent Asa 0.3 %As
9 Berat isi bahan
- AC-WC D1 2.32 Ton/M3
- Agregat Pecah mesin 5 - 10 & 10 -15 mm D2 1.42 Ton/M3
- Agregat Pecah mesin 0 - 5 mm D3 1.57 Ton/M3
10 Jarak Stock pile ke cold bin I 0.05 km
11 Faktor Kehilangan Agregat Fh1 1.05
Aspal Fh2 1.03

II. URUTAN KERJA


1 Wheel loader memuat Agregat ke dalam Cold Bin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat langsung kedalam
Dump Truck dan diangkut ke lokasi pekerjaan L 10 Km
3 Campuranpanas AC dihampar dengan Finisher dan dipadatkan dengan Tandem & Pneumatic
Tire Roller
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan level permukaan
menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT, DAN TENAGA

1 BAHAN
1.a Agr 5-10 & 10-15 0.297845070423 M3
1.b Agr 0-5 0.352318471338 M3
1.c Semen 9.87 Kg
1.d Aspal 62.83 Kg
Anti Stripping Agregat 0.0183 Kg

2 ALAT
2.a WHEEL LOADER
Kapasitas Bucket V 1.5 M3
Faktor Bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu siklus
- Kecepatan maju rata -rata Vf 15 km/jam
- Kecepatan kembali rata -rata Vr 20 km/jam
- Muat ke Bin (l x 60)/Vf T1 0.2 menit
- Kembali ke Stock pile (l x 60)/Vr T2 0.15 menit
- Lain - lain T3 0.75 menit
Ts1 1.1 menit

Kap. Prod/jam V x Fb x Fa x 60 x Bip Q1 92.35636363636 M3/Jam


Ts1

Koefisien Alat/M3 ( = 1 : Q1) 0.010827624222 Jam

2.b ASPHALT MIXING PLANT (AMP)


Kapasitas produksi V 60 Ton/jam
Faktor efisiensi alat Fa 0.83
Kap. Prod/jam V x Fa Q2 49.8 M3

Koefisien Alat/M3 (1 : Q2) 0.020080321285 Jam

2.c GENERATORSET (GENSET)


Kap. Prod/jam Sama dengan AMP Q3 49.8
Koefisien Alat/ton (1 : Q3) 0.020080321285 M3/Jam

2.d DUMP TRUCK


Kapasitas bak V 3.5 Ton
Faktor Efisiensi alat Fa 0.8
Kecepatan rata-rata bermuatan v1 20 km/jam
Kecepatan rata-rata kosong v2 30 km/jam 1 x pp
Kapasitas AMP / batch Q2b 1 Ton
Waktu menyiapkan 1 batch AC - BC Tb 1 menit
Waktu Siklus
- Mengisi Bak (V : Q2b) x Tb T1 3.5 menit
- Angkut (L : v1) x 60 menit T2 26.19 menit
- Tunggu + dump + putar T3 15 menit
- Kembali (L : v2) x 60 menit T4 17.46 menit
Ts2 62.15

Kap. Prod/jam V x Fa x 60 Q4 2.703137570394 M3/Jam


Ts2

Koefisien Alat/ton (1 : Q4) 0.36994047619 Jam

2.e ASPHALT FINISHER


Kecepatan menghampar V 5 m/menit
Faktor efisiensi alat Fa 0.83
Lebar hamparan b 3.15 meter
Kap.Prod / jam V x b x 60 x Fa x t x D1 Q5 72.78768 Ton
Koefisien Alat/ton (1 : Q5) 0.013738588728 Jam

2.f TANDEM ROLLER


Lebar efektif pemadatan b 1.48 M1
Faktor Efisiensi alat Fa 0.83
Kecepatan rata-rata alat v 1.5 km/jam
Jumlah lintasan n 6 lintasan 1 x pp
Lajur lintasan N 3
Lebar Overlap bo 0.3 M1
Kap. Prod/jam (v x 1000) x (N(b-bo)+bo) x t x Fa 119.52 M /Jam
3

(v x 1000) x b x t x Fa x D1 Q6 28.49888
n

Koefisien Alat/ton (1 : Q6) 0.035089098238 Jam

2.f PNEUMATIC TIRE ROLLER


Kecepatan rata-rata v 2.5 km/jam
Lebar efektif pemadatan b 1.99 M1
Jumlah lintasan n 6 lintasan
Lajur lintasan N 3
Lebar Overlap bo 0.3 M1
Faktor Efisiensi alat Fa 0.83
Kap. Prod/jam (v x 1000) x (N(b-bo)+bo) x t x Fa x D1 Q7 172.3412 ton
n

Koefisien Alat/ton (1 : Q7) 0.005802443061 Jam

2.g ALAT BANTU


- Rambu 2 Buah Lumpsum
- Kereta Dorong 2 Buah Lumpsum
- Sekop 3 Buah
- Garpu 2 Buah
- Tongkat kontrol ketebalan hamparan

3 TENAGA
a Produksi menentukan : AMP Q2 49.8 M3/Jam
b Produksi AC-WC / hari Tk x Q2 Qt 348.6 M3
c Kebutuhan tenaga
Pekerja P 10 Orang
Mandor M 1 Orang

Koefisien Tenaga/M3 Pekerja (Tk x P)/Qt 0.200803212851 Jam


Mandor (Tk x M)/Qt 0.020080321285 Jam
HARGA SATUAN PEKERJAAN PERSIAPAN

1 M3 Galian Struktur Kedalaman 2 -4 Meter (Alat Berat)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Urugan Pilihan 1.0000 M³ 77,300 77,300

- Excavator 0.0058 Jam 589,634 3,395


- Bulldozer 0.0145 Jam 783,566 11,364
- Alat Bantu 1.0000 Ls 500 500

- Pekerja 0.0576 Org / Hari 125,000 7,200


- Mandor 0.0058 Org / Hari 145,000 841
Jumlah (Belum Termasuk PPN) 8,041 92,559 100,600
Overhead & Profit (10%) 10,060
Jumlah Harga 110,660
Pembulatan Jumlah Harga 110,659

1 M3 Timbunan Tanah dari sumber galian


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Urugan Pilihan 1.1433 M³ 77,300 88,377

- Excavator 0.0101 Jam 589,634 5,941


- Dump Truck 0.6103 Jam 305,766 186,617
- Watertank truck 0.0070 Jam 260,823 1,833
- Alat Bantu 1.0000 Ls 500 500

- Pekerja 0.0403 Org / Hari 125,000 5,038


- Mandor 0.0101 Org / Hari 145,000 1,461
Jumlah (Belum Termasuk PPN) 6,499 283,269 289,768
Overhead & Profit (10%) 28,977
Jumlah Harga 318,745
Pembulatan Jumlah Harga 318,744

1 M3 Lapis Pondasi Agregat Kelas A


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Agregat A 1.2586 M³ 77,300 97,290

- Wheel loader 0.0085 Jam 556,386 4,727


- Dump Truck 0.5046 Jam 305,766 154,275
- Motor grader 0.0043 Jam 688,372 2,932
- Tandem roller 0.0107 Jam 477,287 5,112
- Watertank truck 0.0141 Jam 260,823 3,666
- Alat bantu 1.0000 Ls 500 500

- Pekerja 0.0595 Org / Hari 125,000 7,433


- Mandor 0.0085 Org / Hari 145,000 1,232
Jumlah (Belum Termasuk PPN) 8,665 268,502 277,167
Overhead & Profit (10%) 27,717
Jumlah Harga 304,884
Pembulatan Jumlah Harga 304,883

1 M3 Lapis Resap Pengilkat - Aspal Cair


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Aspal 0.6790 Kg 77,300 52,485
- Kerosene 0.3708 Liter 77,300 28,663

- Aspal Distributor 0.0002 Jam 408,726 85


- Compressor 0.0002 Jam 184,520 38

- Pekerja 0.0021 Org / Hari 125,000 260


- Mandor 0.0004 Org / Hari 145,000 60
Jumlah (Belum Termasuk PPN) 321 81,271 81,592
Overhead & Profit (10%) 8,159
Jumlah Harga 89,751
Pembulatan Jumlah Harga 89,751

1 M3 Laston Lapis aus (AC-WC)


J. HARGA
URAIAN TENAGA, BAHAN, ALAT KOEF. SATUAN H. SATUAN TOTAL
TENAGA MATERIAL
- Agr 5-10 & 10-15 0.2978 M³ Err:509 Err:509
- Agr 0-5 0.3523 M³ Err:509 Err:509
- Semen 9.8700 Kg 1,333 13,161
- Aspal 62.8300 Kg 12,720 799,198
- Anti Stripping Agregat 0.0183 Kg Err:509 Err:509

- WHEEL LOADER 0.0108 Jam 556,386 6,024


- ASPHALT MIXING PLANT (AMP) 0.0201 Jam 6,149,018 123,474
- GENERATORSET (GENSET) 0.0201 Jam 439,241 8,820
- DUMP TRUCK 0.3699 Jam 305,766 113,115
- ASPHALT FINISHER 0.0137 Jam 931,569 12,798
- TANDEM ROLLER 0.0351 Jam 477,287 16,748
- PNEUMATIC TIRE ROLLER 0.0058 Jam 445,021 2,582
- ALAT BANTU 1.0000 Ls 15,000 15,000

- Pekerja 0.2008 Org / Hari 125,000 25,100


- Mandor 0.0201 Org / Hari 145,000 2,912
Jumlah (Belum Termasuk PPN) 28,012 Err:509 Err:509
Overhead & Profit (10%) Err:509
Jumlah Harga Err:509
Pembulatan Jumlah Harga Err:509
HARGA SATUAN JADI

HARGA SATUAN JUMLAH


NO URAIAN PEKERJAAN SATUAN OVERHEAD & DIBULATKAN
HARGA
UPAH MATERIAL PROFIT
A. HARGA SATUAN PEKERJAAN PERSIAPAN
1 Pek. Pagar Sementara Dari Seng Gelombang Tinggi 2 Meter M1 76,400.00 258,281.10 33,468.11 368,149.21 368,149.00

2 Pek. Pengukuran Dan Pemasangan Bouwplank M1 29,975.00 39,521.60 6,949.66 76,446.26 76,446.00

3 Pek. Pembuatan Kantor Sementara, Dengan Lantai Plesteran M2 759,750.00 733,289.08 149,303.91 1,642,342.98 1,642,342.00

4 Pek. Pembuatan Gudang Semen Dan Alat - Alat M2 392,250.00 587,032.89 97,928.29 1,077,211.17 1,077,211.00

5 Pek. Pembuatan Bedeng Buruh M2 467,250.00 682,192.59 114,944.26 1,264,386.84 1,264,386.00

6 Pek. Pembersihkan Lapangan Dan Perataan M2 19,750.00 - 1,975.00 21,725.00 21,725.00

7 Pek. Bongkaran Beton Bertulang M3 925,750.00 - 92,575.00 1,018,325.00 1,018,325.00

8 Pek. Bongkaran Dinding Tembok Bata Merah M3 661,250.00 - 66,125.00 727,375.00 727,375.00

9 Pek. Bongkaran Rangka dan Penutup Atap M2 38,500.00 - 3,850.00 42,350.00 42,350.00

10 Pek. Bongkaran Rangka dan Penutup Plafond M2 30,800.00 - 3,080.00 33,880.00 33,880.00

11 Buangan Puing Hasil Bongkaran M3 107,800.00 36,691.91 14,449.19 158,941.10 158,941.00

HARGA SATUAN PEKERJAAN TANAH


1 Pek. Galian Tanah Biasa Sedalam < 1 M M3 78,538.50 - 7,853.85 86,392.35 86,392.00

2 Pek. Galian Tanah Keras Sedalam > 1 M s/d 2 M (Semi Mekanis) M3 58,590.00 60,927.45 11,951.74 131,469.19 131,469.00

3 Pek. Timbunan/Urugan Tanah M3 46,035.00 - 4,603.50 50,638.50 50,638.00

4 Pek. Timbunan/Urugan Tanah (Tanah Pilihan) M3 46,035.00 85,030.00 13,106.50 144,171.50 144,171.00

5 Pek. Urugan Tanah Subur M3 46,035.00 118,250.00 16,428.50 180,713.50 180,713.00

6 Pek. Pemadatan Tanah Tiap 20 Cm M3 69,750.00 - 6,975.00 76,725.00 76,725.00

7 Pek. Urugan Pasir M3 38,950.00 264,660.00 30,361.00 333,971.00 333,971.00

HARGA SATUAN PEKERJAAN PONDASI


1 Pas. Pondasi Batu Kali, 1 Pc : 4 Ps M3 324,000.00 697,907.61 102,190.76 1,124,098.37 1,124,098.00

2 Pas. Batu Kosong (anstamping) M3 168,480.00 422,959.20 59,143.92 650,583.12 650,583.00

HARGA SATUAN PEKERJAAN BETON


1 Cor Beton Mutu F'c = 7.4 Mpa (K-100) M3 264,435.00 880,825.95 114,526.09 1,259,787.04 1,259,787.00

2 Cor Beton Mutu F'c = 16.9 Mpa (K-200) M3 264,435.00 1,008,110.68 127,254.57 1,399,800.25 1,399,800.00

3 Cor Beton Mutu F'c = 21.7 Mpa (K-250) M3 264,435.00 1,046,825.96 131,126.10 1,442,387.05 1,442,387.00

4 Pek. Pengecoran dengan Concrete Pump M3 27,900.00 751,063.11 77,896.31 856,859.42 856,859.00

5 Pek. Pemadatan Beton (Vibrator) M3 34,875.00 139,622.65 17,449.76 191,947.41 191,947.00

6 Pek. Pembesian Dengan Besi Polos Atau Besi Ulir Kg 2,098.25 14,605.54 1,670.38 18,374.17 18,374.00

7 Pas. Bekisting Untuk Pondasi M2 112,320.00 192,474.00 30,479.40 335,273.40 335,273.00

8 Pas. Bekisting Untuk Sloof M2 112,320.00 215,649.00 32,796.90 360,765.90 360,765.00

8 Pas. Bekisting Untuk Sloof (Material dari bongkaran awal) M2 112,320.00 - 11,232.00 123,552.00 123,552.00

9 Pas. Bekisting Untuk Kolom M2 142,560.00 306,649.00 44,920.90 494,129.90 494,129.00

10 Pas. Bekisting Untuk Kolom (Material dari bongkaran awal) M2 142,560.00 - 14,256.00 156,816.00 156,816.00

11 Pas. Bekisting Untuk Balok M2 142,560.00 312,829.00 45,538.90 500,927.90 500,927.00

12 Pas. Bekisting Untuk Balok (Material dari bongkaran awal) M2 142,560.00 - 14,256.00 156,816.00 156,816.00

13 Pas. Bekisting Untuk Lantai M2 142,560.00 368,683.00 51,124.30 562,367.30 562,367.00

14 Pas. Bekisting Untuk Lantai (Material dari bongkaran awal) M2 142,560.00 - 14,256.00 156,816.00 156,816.00

15 Pas. Bekisting Untuk Tangga M2 142,560.00 259,624.00 40,218.40 442,402.40 442,402.00

16 Pas. Bekisting Untuk Tangga (Material dari bongkaran awal) M2 142,560.00 - 14,256.00 156,816.00 156,816.00

17 Pek. Bongkar Bekisting (Pemanfaatan Kembali) M2 11,200.00 - 1,120.00 12,320.00 12,320.00

18 Pek. Pondasi Beton Bertulang ( 150 Kg Besi + Bekesting ) M3 1,140,525.00 4,004,337.42 514,486.24 5,659,348.66 5,659,348.00

19 Pek. Pelat Beton Bertulang ( 200 Kg Besi + Bekesting ) M3 1,141,050.00 6,524,329.16 766,537.92 8,431,917.07 8,431,917.00

20 Pek. Kolom Praktis Uk. 110/110 Mm (Besi 3 Kg) M1 33,855.00 62,208.03 9,606.30 105,669.33 105,669.00

21 Pek. Ring Balok Beton Bertulang Uk. 100/150 Mm (Besi 3 Kg) M1 189,550.00 80,769.29 27,031.93 297,351.21 297,351.00

HARGA SATUAN PEKERJAAN DINDING


1 Pas. Bata Merah Tebal 1 Bata, 1 Pc : 4 Ps M2 119,100.00 190,779.43 30,987.94 340,867.37 340,867.00

2 Pas. Bata Merah Tebal ½ Bata, 1 Pc : 4 Ps M2 56,425.00 92,180.71 14,860.57 163,466.28 163,466.00

HARGA SATUAN PEKERJAAN PLESTERAN


1 Pek. Plesteran 1 Pc : 4 Ps, Tebal 15 mm M2 51,575.00 11,746.04 6,332.10 69,653.15 69,653.00

2 Pek. Plesteran 1 Pc : 4 Ps, Tebal 20 mm M2 66,562.50 18,311.32 8,487.38 93,361.20 93,361.00

3 Pek. Acian Dinding M2 43,200.00 4,062.50 4,726.25 51,988.75 51,988.00


HARGA SATUAN JUMLAH
NO URAIAN PEKERJAAN SATUAN OVERHEAD & DIBULATKAN
HARGA
UPAH MATERIAL PROFIT
4 Pek. Plesteran dan acian Kolom Struktur M2 112,975.00 15,374.50 12,834.95 141,184.45 141,184.00

HARGA SATUAN PEKERJAAN LANTAI


1 Pas. Lantai Ubin Warna Uk 40 x 40 cm M2 54,160.00 108,327.00 16,248.70 178,735.70 178,735.00

2 Pas. Lantai Ubin Warna Uk 40 x 40 cm (Antislip) M2 54,160.00 119,577.00 17,373.70 191,110.70 191,110.00

3 Pas. Lantai Keramik Uk 60 x 60 cm M2 54,160.00 161,577.00 21,573.70 237,310.70 237,310.00

3 Pas. Lantai Batu Alam Andesit 20 x 40 cm M2 54,160.00 243,104.35 29,726.44 326,990.79 326,990.00

4 Pas. Plint Ubin Warna Uk 10 x 40 cm M1 27,050.00 9,431.62 3,648.16 40,129.78 40,129.00

5 Pas. Plint Ubin Warna Uk 10 x 60 cm M1 27,050.00 18,909.30 4,595.93 50,555.23 50,555.00

6 Pas. Porselen Dinding Uk 40 cm x 40 cm M2 194,400.00 134,232.07 32,863.21 361,495.28 361,495.00

7 Pas. Dinding Batu Alam/Candi Uk 10 x 20 cm M2 151,200.00 243,104.35 39,430.44 433,734.79 433,734.00

8 Pas. Paving Block Tbl 6 cm M2 73,487.50 181,063.44 25,455.09 280,006.03 280,006.00

HARGA SATUAN PEKERJAAN PARTISI & PLAFOND


1 Pas. Dinding Partisi Gypsum 9 mm (Double) M2 170,362.50 232,606.67 40,296.92 443,266.08 443,266.00

2 Pas. Plafond Gypsum 9 mm (Rangka Metal Furring) M2 113,575.00 124,803.33 23,837.83 262,216.17 262,216.00

3 Pas. List Profil Gypsum M1 14,987.50 35,053.13 5,004.06 55,044.69 55,044.00

HARGA SATUAN PEKERJAAN ATAP


1 Pas. Atap Spandek Tbl 0.45 mm M2 37,425.00 79,750.00 11,717.50 128,892.50 128,892.00

HARGA SATUAN PEKERJAAN BESI DAN ALLUMUNIUM


1 Pas. Cladding Wall (Aluminium Composite Panel) Rangka Sincalnium M2 374,250.00 489,750.00 86,400.00 950,400.00 950,400.00

2 Pas. Rangka Atap Baja Ringan M2 101,500.00 118,294.00 21,979.40 241,773.40 241,773.00

3 Pas. Profil Kusen Allumunium 4" (Brown) M1 46,050.00 48,278.27 9,432.83 103,761.09 103,761.00

4 Pas. Panel Pintu Allumunium (Brown) M2 430,650.00 177,960.00 60,861.00 669,471.00 669,471.00

5 Pas. Bingkai Jendela Allumunium (Brown) M2 371,925.00 169,915.00 54,184.00 596,024.00 596,024.00

6 Pek. Railing Tangga, Besi Hollow. M1 313,200.00 262,655.07 57,585.51 633,440.57 633,440.00

7 Pek. Pintu Pagar, Besi Hollow. M1 352,350.00 958,794.83 131,114.48 1,442,259.32 1,442,259.00

8 Pek. Pagar, Besi Hollow. M1 313,200.00 252,355.40 56,555.54 622,110.94 622,110.00

8 Pek. Fasade Besi Hollow M2 313,200.00 294,636.65 60,783.67 668,620.32 668,620.00

9 Pek. Huruf Stainless Cm 10,640.00 14,930.00 2,557.00 28,127.00 28,127.00

HARGA SATUAN PEKERJAAN KAYU


1 Pas. Kusen Pintu dan Jendela Kayu Kelas I M3 4,443,250.00 10,161,850.00 1,460,510.00 16,065,610.00 16,065,610.00

2 Pas. Pintu Panel Kayu Kelas II M2 634,750.00 289,280.00 92,403.00 1,016,433.00 1,016,433.00

3 Pas. Lisplang GRC Uk 300 x 3000 x 8 mm M1 71,500.00 43,880.00 11,538.00 126,918.00 126,918.00

HARGA SATUAN PEKERJAAN PENGECETAN


1 Pek. Mendempul Dan Menggosok Kayu M2 12,062.50 4,198.00 1,626.05 17,886.55 17,886.00

2 Pek. Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup M2 11,512.50 42,140.00 5,365.25 59,017.75 59,017.00

3 Pek. Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup M2 25,562.50 47,090.00 7,265.25 79,917.75 79,917.00

4 Pek. Cat Dinding Dalam (Metrolite/Catylac/Setara) M2 31,840.00 10,850.00 4,269.00 46,959.00 46,959.00

4 Pek. Cat Dinding Luar (Metrolite/Catylac/Setara) M2 31,840.00 18,350.00 5,019.00 55,209.00 55,209.00

5 Pek. Pengecatan Permukaan Baja Dengan Meni Besi M2 37,450.00 5,620.00 4,307.00 47,377.00 47,377.00

5 Pek. Waterproofing Coating System Ex. FOSROC M2 37,450.00 26,000.00 6,345.00 69,795.00 69,795.00

HARGA SATUAN PEKERJAAN ASESORIS & KACA


1 Pas. Kunci Tanam Ex Belleza Bh 108,435.00 500,000.00 60,843.50 669,278.50 669,278.00

2 Pas. Kunci Tanam Biasa Bh 108,435.00 185,000.00 29,343.50 322,778.50 322,778.00

3 Kunci Tanam 2 Slag Bh 108,435.00 180,000.00 28,843.50 317,278.50 317,278.00

4 Pas. Tarikan Pintu Bh 108,435.00 265,000.00 37,343.50 410,778.50 410,778.00

5 Pas. Kunci Silinder Bh 76,862.50 50,000.00 12,686.25 139,548.75 139,548.00

6 Pas. Engsel Pintu Bh 27,108.75 43,300.00 7,040.88 77,449.63 77,449.00

7 Pas. Engsel Casement 20" Bh 27,108.75 82,500.00 10,960.88 120,569.63 120,569.00

8 Pas. Rambuncis Bh 27,108.75 22,500.00 4,960.88 54,569.63 54,569.00

9 Pas. Door Closer Bh 90,362.50 245,000.00 33,536.25 368,898.75 368,898.00

10 Pas. Kaca Polos, Tebal 5 mm M2 27,108.75 192,610.00 21,971.88 241,690.63 241,690.00

10 Pas. Stiker Sandblast M2 45,800.00 93,500.00 13,930.00 153,230.00 153,230.00

HARGA SATUAN PEKERJAAN PLUMBING


1 Pas. Kloset Duduk/Monoblok Bh 600,875.00 2,535,280.00 313,615.50 3,449,770.50 3,449,770.00

2 Pas. Kloset Jongkok Porselen Bh 635,700.00 510,406.82 114,610.68 1,260,717.50 1,260,717.00


HARGA SATUAN JUMLAH
NO URAIAN PEKERJAAN SATUAN OVERHEAD & DIBULATKAN
HARGA
UPAH MATERIAL PROFIT

3 Pas. Wastafel Bh 408,250.00 617,228.82 102,547.88 1,128,026.70 1,128,026.00

4 Pas. Pipa PVC Tipe AW Diameter ½" M1 14,811.00 10,206.00 2,501.70 27,518.70 27,518.00

5 Pas. Pipa PVC Tipe AW Diameter 1" M1 14,811.00 17,010.00 3,182.10 35,003.10 35,003.00

6 Pas. Pipa PVC Tipe AW Diameter 2" M1 22,216.50 21,700.00 4,391.65 48,308.15 48,308.00

7 Pas. Pipa PVC Tipe AW Diameter 2½" M1 14,811.00 14,725.00 2,953.60 32,489.60 32,489.00

8 Pas. Pipa PVC Tipe AW Diameter 3" M1 33,332.00 62,000.00 9,533.20 104,865.20 104,865.00

9 Pas. Pipa PVC Tipe AW Diameter 4" M1 33,332.00 99,200.00 13,253.20 145,785.20 145,785.00

10 Pas. Bak Cuci Piring Stainles Steel (1 Lubang) Bh 187,125.00 450,275.00 63,740.00 701,140.00 701,140.00

11 Pas. Mata Kran Diameter 1/2" Bh 18,725.00 56,875.00 7,560.00 83,160.00 83,160.00

12 Pas. Mata Kran Diameter 3/4" Bh 18,725.00 94,375.00 11,310.00 124,410.00 124,410.00

13 Pas. Floor Drain Bh 18,725.00 45,000.00 6,372.50 70,097.50 70,097.00

14 Pas. Septictank Biofill Bh 580,800.00 15,337,500.00 1,591,830.00 17,510,130.00 17,510,130.00

HARGA SATUAN PEKERJAAN MECHANICAL ELECTRICAL


1 Pas. Instalasi lampu dan kotak kontak Ttk 75,600.00 10,100.00 8,570.00 94,270.00 94,270.00

2 Pek. Kabel NYY 4 x 10 mm M1 13,050.00 77,550.00 9,060.00 99,660.00 99,660.00

3 Pek. Kabel NYM 2 x 2.5 mm M1 10,875.00 15,400.00 2,627.50 28,902.50 28,902.00

4 Pek. Bongkaran Dinding (Jalur Kabel) M1 16,000.00 - 1,600.00 17,600.00 17,600.00

5 Pas. Stop kontak Ttk 31,500.00 34,000.00 6,550.00 72,050.00 72,050.00

6 Pas. Saklar tunggal Ttk 63,000.00 20,000.00 8,300.00 91,300.00 91,300.00

7 Pas. Saklar ganda Ttk 63,000.00 30,000.00 9,300.00 102,300.00 102,300.00

8 Pas. Lampu LED Scene Switch 9.5 watt (Cool & Warm) Ttk 56,500.00 190,000.00 24,650.00 271,150.00 271,150.00

9 Pas. Lampu Downlight TL 18 watt Ttk 56,500.00 143,000.00 19,950.00 219,450.00 219,450.00

10 Pas. Lampu TL (2 x 16 watt) Ttk 94,000.00 500,000.00 59,400.00 653,400.00 653,400.00

11 Pek. Perakitan dan Instalasi Sub Distribution Panel Bh 1,253,333.33 1,105,000.00 235,833.33 2,594,166.67 2,594,166.00
PEMERINTAH KOTA MANADO
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan Raya Ringroad Kel. Tingkulu Link V Kec. Wanea
M A N A D O - 95119

ENGINEERING ESTIMATE

Kegiatan : Perencanaan DED - Pembangunan Gedung Kantor Kelurahan

Pekerjaan : Perencanaan DED - Gedung Kantor Kelurahan Lapangan

NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN JUMLAH HARGA

A. PEKERJAAN PERSIAPAN 39,928,312.34


1 Papan Nama Proyek 1.00 Ls 225,000.00 225,000.00
2 Pek. Pagar Sementara Dari Seng Gelombang Tinggi 2 Meter 8.00 M1 368,149.00 2,945,192.00
3 Pek. Pengukuran Dan Pemasangan Bouwplank 78.55 M1 76,446.00 6,004,833.30
4 Pek. Pembuatan Gudang Semen Dan Alat - Alat 6.00 M2 1,077,211.00 6,463,266.00
5 Pek. Bongkaran Beton Bertulang 3.37 M3 1,018,325.00 3,432,264.41
6 Pek. Bongkaran Dinding Tembok Bata Merah 17.57 M3 727,375.00 12,778,524.00
7 Pek. Bongkaran Rangka dan Penutup Atap 112.19 M2 42,350.00 4,751,246.50
8 Buangan Puing (Hasil Bongkaran) 20.94 M3 158,941.00 3,327,986.13

B. PEKERJAAN TANAH DAN PONDASI 22,341,019.28


1 Pek. Galian Tanah Keras Sedalam > 1 M s/d 2 M (Semi Mekanis)
1.1 Galian Tanah Pondasi Menerus 12.51 M3 131,469.00 1,644,200.61
1.2 Galian Tanah Biasa Pondasi Telapak PT-1 19.44 M3 131,469.00 2,555,757.36
1.3 Galian Tanah Biasa Pondasi Telapak PT-2 0.35 M3 131,469.00 46,277.09
1.4 Galian Tanah Biasa Pondasi Telapak Tangga PTT-1 1.20 M3 131,469.00 157,762.80
2 Pek. Timbunan/Urugan Tanah 18.87 M3 50,638.00 955,569.13
3 Pek. Timbunan/Urugan Tanah (Tanah Pilihan) 9.16 M3 144,171.00 1,321,041.58
4 Pek. Pemadatan Tanah (Menggunakan Tamper) 28.03 M3 76,725.00 2,150,878.92
5 Pek. Urugan Pasir
5.1 Di bawah Pondasi Batu CP 1 : 4 1.00 M3 333,971.00 333,929.25
5.2 Urugan Pasir dibawah Pondasi Pondasi Telapak PT-1 0.65 M3 333,971.00 216,413.21
5.3 Urugan Pasir dibawah Pondasi Pondasi Telapak PT-2 0.03 M3 333,971.00 10,687.07
5.4 Urugan Pasir dibawah Pondasi Telapak Tangga PTT-1 0.04 M3 333,971.00 13,358.84
5.5 Urugan Pasir dibawah Lantai 9.27 M3 333,971.00 3,096,245.14
6 Pas. Pondasi Batu Kali, 1 Pc : 4 Ps 7.25 M3 1,124,098.00 8,152,099.21
7 Pas. Batu Kosong (anstamping) 2.59 M3 650,583.00 1,686,799.07

C. PEKERJAAN BETON 342,858,859.64


I. PEKERJAAN LANTAI KERJA 7,705,751.74
1 Pek. Cor Beton Tumbuk
1.1 Lantai Kerja Pondasi Telapak PT-1, 1 Pc : 3 Ps : 5 Kr 0.65 M3 1,259,787.00 816,341.98
1.2 Lantai Kerja Pondasi Telapak PT-2, 1 Pc : 3 Ps : 5 Kr 0.03 M3 1,259,787.00 40,313.18
1.3 Di bawah Lantai 1, Pc : 3 Ps : 5 Kr 4.64 M3 1,259,787.00 5,839,742.64
1.4 Pertebalan Kolom ty. 1, 1 Pc : 3 Ps : 5 Kr 0.50 M3 1,259,787.00 625,144.10
1.5 Pertebalan Kolom ty. 2, 1 Pc : 3 Ps : 5 Kr 0.30 M3 1,259,787.00 384,209.84
II. PEKERJAAN PONDAASI BETON BERTULANG 21,665,845.76
1 Pondasi Telapak PT-1 Beton K-250 (Besi 150 kg)
1.1 Perakitan Bekisting 9.72 M2 335,273.00 3,258,853.56
1.2 Pembesian Tulangan Struktur 583.20 Kg 18,374.00 10,715,716.80
1.3 Pengecoran Beton Mutu K-250 3.89 M3 1,442,387.00 5,608,000.66
2 Pondasi Telapak PT-2 Beton K-250 (Besi 150 kg)
1.1 Perakitan Bekisting 0.60 M2 335,273.00 201,163.80
1.2 Pembesian Tulangan Struktur 20.80 Kg 18,374.00 382,179.20
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN JUMLAH HARGA

1.3 Pengecoran Beton Mutu K-250 0.16 M3 1,442,387.00 230,781.92


3 Pondasi Telapak Tangga PTT-1 Beton K-250 (Besi 150 kg)
2.1 Perakitan Bekisting 0.78 M2 335,273.00 261,512.94
2.2 Pembesian Tulangan Struktur 36.00 Kg 18,374.00 661,464.00
2.3 Pengecoran Beton Mutu K-250 0.24 M3 1,442,387.00 346,172.88
III. PEKERJAAN SLOOF BETON BERTULANG 33,481,274.33
1 Sloof SL-1 Beton K-250 (Besi 200 kg)
1.1 Perakitan Bekisting 26.82 M2 360,765.00 9,675,717.30
1.2 Pembesian Tulangan Struktur 536.40 Kg 18,374.00 9,855,813.60
1.3 Pengecoran Beton Mutu K-250 2.68 M3 1,442,387.00 3,868,481.93
2 Sloof SL-2 Beton K-250 (Besi 200 kg)
2.1 Perakitan Bekisting 13.54 M2 360,765.00 4,884,758.10
2.2 Pembesian Tulangan Struktur 203.10 Kg 18,374.00 3,731,759.40
2.3 Pengecoran Beton Mutu K-250 1.02 M3 1,442,387.00 1,464,744.00
IV. PEKERJAAN KOLOM BETON BERTULANG 98,959,447.21
1 Kolom Praktis K-250 (Besi 250 kg)
1.1 Lantai 1 74.80 M1 105,669.00 7,904,041.20
1.2 Lantai 2 35.10 M1 105,669.00 3,708,981.90
1.3 Dinding Ekspos 19.35 M1 105,669.00 2,044,695.15
2 Kolom K1 Beton K-250 (Besi 250 kg)
2.1 Perakitan Bekisting 56.70 M2 494,129.00 28,017,114.30
2.2 Perakitan Bekisting (Material dari bongkaran awal) 37.80 M2 156,816.00 5,927,644.80
2.3 Pembesian Tulangan Struktur 1,974.38 Kg 18,374.00 36,277,166.25
2.4 Pengecoran Beton Mutu K-250 7.90 M3 1,442,387.00 11,391,251.33
3 Kolom K2 Beton K-250 (Besi 250 kg)
2.1 Perakitan Bekisting 4.80 M2 494,129.00 2,371,819.20
2.2 Pembesian Tulangan Struktur 54.00 Kg 18,374.00 992,196.00
2.3 Pengecoran Beton Mutu K-250 0.23 M3 1,442,387.00 324,537.08

V. PEKERJAAN BALOK BETON BERTULANG 97,338,655.87


1 Balok Praktis K-250 (Besi 250 kg)
1.1 Lantai 1 17.85 M1 297,351.00 5,307,715.35
1.2 Lantai 2 8.62 M1 297,351.00 2,563,165.62
1.3 Dinding Ekspos 13.20 M1 297,351.00 3,925,033.20
2 Ring Balok Beton K-250 (Besi 200 kg) 51.50 M1 297,351.00 15,313,576.50
3 Balok B1-1 Beton K-250 (Besi 200 kg)
3.1 Perakitan Bekisting 45.82 M2 500,927.00 22,949,970.51
3.2 Pembesian Tulangan Struktur 943.25 Kg 18,374.00 17,331,275.50
3.3 Pengecoran Beton Mutu K-250 4.72 M3 1,442,387.00 6,802,657.69
4 Balok B1-2 Beton K-250 (Besi 200 kg)
4.1 Perakitan Bekisting 2.98 M2 500,927.00 1,490,257.83
4.2 Pembesian Tulangan Struktur 61.25 Kg 18,374.00 1,125,407.50
4.3 Pengecoran Beton Mutu K-250 0.31 M3 1,442,387.00 441,731.02
5 Balok B1K Beton K-250 (Besi 200 kg)
5.1 Perakitan Bekisting 8.67 M2 500,927.00 4,343,037.09
5.2 Pembesian Tulangan Struktur 178.50 Kg 18,374.00 3,279,759.00
5.3 Pengecoran Beton Mutu K-250 0.89 M3 1,442,387.00 1,287,330.40
6 Balok Tangga BT Beton K-250 (Besi 200 kg)
6.1 Perakitan Bekisting (Material dari bongkaran awal) 2.63 M2 156,816.00 411,642.00
6.2 Pembesian Tulangan Struktur 39.38 Kg 18,374.00 723,476.25
6.3 Pengecoran Beton Mutu K-250 0.16 M3 1,442,387.00 227,175.95
7 Balok Kanopi BK Beton K-250 (Besi 200 kg)
7.1 Perakitan Bekisting (Material dari bongkaran awal) 16.13 M2 156,816.00 2,528,658.00
7.2 Pembesian Tulangan Struktur 193.50 Kg 18,374.00 3,555,369.00
7.3 Pengecoran Beton Mutu K-250 0.97 M3 1,442,387.00 1,395,509.42
8 Balok Teras B3 Beton K-250 (Besi 200 kg)
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN JUMLAH HARGA

7.1 Perakitan Bekisting (Material dari bongkaran awal) 5.17 M2 156,816.00 810,346.68
7.2 Pembesian Tulangan Struktur 59.63 Kg 18,374.00 1,095,549.75
7.3 Pengecoran Beton Mutu K-250 0.30 M3 1,442,387.00 430,011.62
VI. PEKERJAAN PELAT BETON BERTULANG 65,656,604.85
1 Pelat S1 Beton K-250 (Besi 150 kg)
1.1 Perakitan Bekisting 43.98 M2 562,367.00 24,732,900.66
1.2 Pembesian Tulangan Struktur 791.64 Kg 18,374.00 14,545,593.36
1.3 Pengecoran Beton Mutu K-250 5.28 M3 1,442,387.00 7,612,341.63
2 Pelat S2 Beton K-250 (Besi 110 kg)
2.1 Perakitan Bekisting (Material dari bongkaran awal) 14.98 M2 156,816.00 2,349,574.13
2.2 Pembesian Tulangan Struktur 164.81 Kg 18,374.00 3,028,274.06
2.3 Pengecoran Beton Mutu K-250 1.50 M3 1,442,387.00 2,161,128.44
3 Pelat Kanopi Beton K-250 (Besi 120 kg)
3.1 Perakitan Bekisting (Material dari bongkaran awal) 17.05 M2 156,816.00 2,672,928.72
3.2 Pembesian Tulangan Struktur 143.18 Kg 18,374.00 2,630,752.57
3.3 Pengecoran Beton Mutu K-250 1.19 M3 1,442,387.00 1,720,984.05
4 List Pelat Beton K-250 (Besi 120 kg)
4.1 Perakitan Bekisting (Material dari bongkaran awal) 15.40 M2 156,816.00 2,414,966.40
4.2 Pembesian Tulangan Struktur 58.80 Kg 18,374.00 1,080,391.20
4.3 Pengecoran Beton Mutu K-250 0.49 M3 1,442,387.00 706,769.63
VII. PEKERJAAN TANGGA BETON BERTULANG 18,051,279.88
1 Tangga Beton K-250 (Besi 200 kg)
1.1 Perakitan Bekisting 11.04 M2 442,402.00 4,884,118.08
1.2 Pembesian Tulangan Struktur 514.63 Kg 18,374.00 9,455,719.75
1.3 Pengecoran Beton Mutu 26.40 Mpa 2.57 M3 1,442,387.00 3,711,442.05

D. PEKERJAAN LANTAI & DINDING 231,366,549.78


1 Pas. Lantai Batu Alam& Keramik (Lantai 1)
1.1 Lantai Batu Alam, Uk 40 x 40 cm 5.07 M2 326,990.00 1,657,839.30
1.2 Keramik Lantai, Uk 60 x 60 cm 43.80 M2 237,310.00 10,394,178.00
1.3 Keramik Lantai, Uk 40 x 40 cm 17.51 M2 178,735.00 3,129,649.85
1.4 Keramik Lantai, Uk 40 x 40 cm (Antislip) 1.95 M2 191,110.00 372,664.50
1.5 Keramik Dinding, Uk 40 x 40 cm 8.17 M2 361,495.00 2,953,414.15
1.6 Plint Lantai Uk 10 x 40 cm 27.29 M1 40,129.00 1,095,120.41
1.7 Plint Lantai Uk 10 x 60 cm 32.52 M1 50,555.00 1,644,048.60
2 Pas. Lantai Keramik (Lantai 2)
2.1 Keramik Lantai, Uk 60 x 60 cm 41.56 M2 237,310.00 9,862,603.60
2.2 Keramik Lantai, Uk 40 x 40 cm (Antislip) 1.94 M2 178,735.00 346,745.90
2.3 Keramik Dinding, Uk 40 x 40 cm 8.19 M2 361,495.00 2,960,644.05
2.4 Plint Lantai Uk 10 x 60 cm 41.50 M1 50,555.00 2,098,032.50
3 Pas. Lantai Keramik Tangga, Uk. 60 x 60 cm 14.50 M2 237,310.00 3,440,995.00
4 Pas. Dinding1/2 Bata Merah SP. 1:4
4.1 Lantai 1 144.90 M2 163,466.00 23,686,223.40
4.2 Lantai 2 113.40 M2 163,466.00 18,537,044.40
4.3 Dinding ekspos 34.24 M2 163,466.00 5,597,075.84
5 Pek. Plesteran Dinding
5.1 Lantai 1, 1 Pc : 4 Ps, Tbl 20 mm 281.63 M2 93,361.00 26,293,258.43
5.2 Lantai 2, 1 Pc : 4 Ps, Tbl 20 mm 218.61 M2 93,361.00 20,409,648.21
5.3 Kolom Eksterior (Teras), 1 Pc : 4 Ps, Tbl 15 mm 20.48 M2 93,361.00 1,911,566.48
5.4 Kanopi Beton, 1 Pc : 4 Ps, Tbl 15 mm 33.18 M2 93,361.00 3,097,717.98
6 Pek. Acian Dinding
6.1 Lantai 1 281.63 M2 51,988.00 14,641,380.44
6.2 Lantai 2 218.61 M2 51,988.00 11,365,096.68
6.3 Kolom Eksterior (Teras) 20.48 M2 51,988.00 1,064,454.30
6.4 Kanopi Beton 33.18 M2 51,988.00 1,724,961.84
7 Pek. Plester dan Acian Kolom Expose 64.35 M2 141,184.00 9,085,825.73
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN JUMLAH HARGA

8 Pas. Allumunium Composite Panel 33.74 M2 950,400.00 32,066,496.00


9 Pek. Fasade Besi Hollow 12.91 M2 668,620.00 8,631,884.20
10 Pas. Dinding Partisi Gypsum 9 mm (Double) 30.00 M2 443,266.00 13,297,980.00

E. PEKERJAAN PLAFOND,RAILING, & ATAP 90,239,151.85


1 Pas. Plafond Gypsum Tbl 9 mm, Rangka Metal Furing
1.1 Lantai 1 69.55 M2 262,216.00 18,237,122.80
1.2 Lantai 2 60.11 M2 262,216.00 15,760,623.79
2 List Profil Gypsum
2.1 Lantai 1 90.60 M1 55,044.00 4,986,986.40
2.2 Lantai 2 59.60 M1 55,044.00 3,280,622.40
3 Pas. Railing Tangga 6.78 M1 633,440.00 4,294,723.20
4 Pas. Rangka Atap Baja Ringan 105.51 M2 241,773.00 25,509,154.93
5 Pas. Penutup Atap Spandek Tbl 0.45 mm 110.20 M2 128,892.00 14,203,730.84
6 Pas. Listplank GRC 31.25 M1 126,918.00 3,966,187.50

F. PEKERJAAN PINTU, VENTILASI, DAN JENDELA 63,669,180.11


1 Pek Kusen
1.1 Kusen Pintu Kayu Kelas I 0.06 M3 16,065,610.00 979,359.59
1.2 Kusen Pintu Allumunium 4" 29.41 M1 103,761.00 3,051,611.01
1.3 Kusen Jendela & Ventilasi 4" 180.22 M1 103,761.00 18,699,807.42
2 Pek Panel dan Bingkai
2.1 Panel Pintu Kayu Kelas II 3.32 M2 1,016,433.00 3,375,573.99
2.2 Panel Pintu Allumunium 9.42 M2 669,471.00 6,304,743.14
2.3 Jendela 20.75 M2 596,024.00 12,368,034.42
3 Pas. Kaca Polos, Tebal 5 mm
3.1 Pintu 5.58 M2 241,690.00 1,348,944.40
3.2 Jendela (Bingkai) 19.21 M2 241,690.00 4,644,049.18
3.3 Jendela (Kaca mati) 12.86 M2 241,690.00 3,109,100.16
4 Pas. Assesoris
4.1 Pas. Kunci Tanam + Handle 2.00 Set 322,778.00 645,556.00
4.2 Pas. Kunci Tanam 2 Slag 3.00 Bh 317,278.00 951,834.00
4.3 Pas. Tarikan Pintu 4.00 Set 410,778.00 1,643,112.00
4.4 Pas. Kunci Silinder 2.00 Set 139,548.00 279,096.00
4.5 Pas. Engsel Pintu 24.00 Bh 77,449.00 1,858,776.00
4.6 Pas. Engsel Casement 20" 28.00 Bh 120,569.00 3,375,932.00
4.7 Pas. Rambuncis 14.00 Bh 54,569.00 763,966.00
5 Pasang Stiker Sandblast 1.76 M2 153,230.00 269,684.80

G. PEKERJAAN PENGECETAN 39,830,754.50


1 Pek. Pengecatan Dinding Lantai 1
1.1 Dinding Interior 180.42 M2 46,959.00 8,472,413.22
1.2 Dinding Eksterior 94.50 M 2
55,209.00 5,217,250.50
2 Pek. Pengecatan Dinding Lantai 2
2.1 Dinding Interior 107.95 M2 46,959.00 5,069,247.53
2.2 Dinding Eksterior 68.82 M2 55,209.00 3,799,317.75
3 Pek. Pengecatan Kanopi Beton
3.1 Lantai 1 (Dark Grey) 15.23 M2 55,209.00 840,557.03
3.2 Lantai 1 (Grey) 5.25 M2 55,209.00 289,847.25
3.3 Lantai 2 (Blue) 33.18 M2 55,209.00 1,831,834.62
4 Pek. Pengecatan Plafond
4.1 Lantai 1 69.55 M2 46,959.00 3,265,998.45
4.2 Lantai 2 60.11 M2 46,959.00 2,822,494.17
5 Pek. Pengecatan Meni Besi
5.1 Pas. Railing Tangga 9.38 M2 47,377.00 444,563.03
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN JUMLAH HARGA

5.2 Pek. Fasade Besi Hollow 27.11 M2 47,377.00 1,284,437.85


6 Pek. Pengecatan Dinding Partisi 60.00 M2 46,959.00 2,817,540.00
7 Pek. Mendempul Dan Menggosok Kayu 17.14 M2 17,886.00 306,651.89
8 Pek. Pengecatan Bidang Kayu Baru 17.14 M2 79,917.00 1,370,160.98
9 Pek. Waterproofing Coating System Ex. FOSROC 28.63 M2 69,795.00 1,998,440.24

H. PEKERJAAN MECHANICAL ELECTRICAL 32,885,222.00


1 Pas. Instalasi lampu dan kotak kontak 71.00 Titik 94,270.00 6,693,170.00
2 Pek. Kabel NYM 2 x 2.5 mm 426.00 M1 28,902.00 12,312,252.00
3 Pas. Stop kontak 19.00 Bh 72,050.00 1,368,950.00
4 Pas. Saklar tunggal 4.00 Bh 91,300.00 365,200.00
5 Pas. Saklar ganda 9.00 Bh 102,300.00 920,700.00
6 Pas. Lampu Downlight TL 12 watt 18.00 Bh 271,150.00 4,880,700.00
7 Pas. Lampu Downlight TL 18 watt 17.00 Bh 219,450.00 3,730,650.00
8 Pas. Lampu TL (2 x 16 watt) 4.00 Set 653,400.00 2,613,600.00

I. PEKERJAAN PLUMBING 37,968,520.50


1 Pas. Kloset Duduk/Monoblok 1.00 Set 3,449,770.00 3,449,770.00
2 Pas. Kloset Jongkok Porselen 1.00 Set 1,260,717.00 1,260,717.00
3 Pas. Wastafel 1.00 Bh 1,128,026.00 1,128,026.00
4 Pas. Pipa PVC Tipe AW Diameter ½" 48.00 M1 27,518.00 1,320,864.00
5 Pas. Pipa PVC Tipe AW Diameter 1" 48.00 M1 35,003.00 1,680,144.00
6 Pas. Pipa PVC Tipe AW Diameter 3" 32.00 M1 104,865.00 3,355,680.00
7 Pas. Pipa PVC Tipe AW Diameter 4" 24.10 M1 145,785.00 3,513,418.50
8 Pas. Bak Cuci Piring Stainles Steel (1 Lubang) 6.00 Bh 701,140.00 4,206,840.00
9 Pas. Mata Kran Diameter 1/2" 4.00 Bh 83,160.00 332,640.00
10 Pas. Floor Drain 3.00 Bh 70,097.00 210,291.00
11 Pas. Septictank Biofill 1.00 Unit 17,510,130.00 17,510,130.00

K. PEKERJAAN AKHIR 8,000,000.00


1 Pembersihan Akhir 1.00 Ls 5,000,000.00 5,000,000.00
2 Laporan, Pengujian Beton, dan Dokumentasi Akhir 1.00 Ls 3,000,000.00 3,000,000.00

Dibuat oleh, Pejabat Pembuat Komitmen

Septian K. Rantung, ST Arca G. N. Pamikiran,ST.


Konsultan Individu NIP. 19891122 201503 1 001

Pejabat Pelaksana Teknis Kegiatan

Marcos Kairupan, ST
NIP. 19830417 201001 1 013
PEMERINTAH KOTA MANADO
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan Raya Ringroad Kel. Tingkulu Link V Kec. Wanea
M A N A D O - 95119

Kegiatan : Perencanaan DED - Pembangunan Gedung Kantor Kelurahan

Pekerjaan : Perencanaan DED - Gedung Kantor Kelurahan Lapangan

REKAPITULASI

NO. URAIAN PEKERJAAN JUMLAH HARGA

A. PEKERJAAN PERSIAPAN 39,928,312.34


B. PEKERJAAN TANAH DAN PONDASI 22,341,019.28
C. PEKERJAAN BETON 342,858,859.64
D. PEKERJAAN LANTAI & DINDING 231,366,549.78
E. PEKERJAAN PLAFOND,RAILING, & ATAP 90,239,151.85
F. PEKERJAAN PINTU, VENTILASI, DAN JENDELA 63,669,180.11
0 PEKERJAAN PENGECETAN 39,830,754.50
H. PEKERJAAN MECHANICAL ELECTRICAL 32,885,222.00
I. PEKERJAAN PLUMBING 37,968,520.50
K. PEKERJAAN AKHIR 8,000,000.00
JUMLAH HARGA 909,087,570.02
PAJAK (10%) 90,908,757.00
TOTAL 999,996,327.02
DIBULATKAN 1,000,000,000.00
Terbilang : Satu Milyar Rupiah

Dibuat oleh, Pejabat Pembuat Komitmen

Septian K. Rantung, ST Arca G. N. Pamikiran,ST.


Konsultan Individu NIP. 19891122 201503 1 001

Pejabat Pelaksana Teknis Kegiatan

Marcos Kairupan, ST
NIP. 19830417 201001 1 013
Panjang Lebar Tinggi Keliling Luas Jumlah
NO. URAIAN PEKERJAAN SATUAN TOTAL
(a) (b) (c) (d) (e) (f)
A. PEKERJAAN LANTAI
1 PEKERJAAN LANTAI KERAMIK/GRANIT
LANTAI 1
1 TERAS M2 2.60 1.95 5.07 5.07
2 RG. TUNGGU M2 5.63 5.63
3 RG. KERJA STAFF M 2
30.18 30.18
4 RG. ARSIP M 2
7.99 7.99
5 PENTRY M2 4.43 4.43
6 GUDANG LOGISTIK M 2
6.49 6.49
7 GUDANG PERALATAN M 2
6.59 6.59
8 TOILET LT-1 LANTAI M2 1.95 1.95
DINDING M2 8.17 8.17

LANTAI 2
9 TOILET LT-2 LANTAI M2 1.94 1.94
DINDING M2 8.19 8.19
10 RG. SEKERTARIS LURAH M2 8.10 8.10
11 RG. LURAH M2 11.67 11.67
12 RG. SERBAGUNAH M2 21.79 21.79

2 PEKERJAAN PLINT LANTAI


LANTAI 1
TERAS M1 - -
RG. TUNGGU M1 7.02 7.02
RG. KERJA STAFF M1 25.50 25.50
RG. ARSIP M1 11.37 11.37
PENTRY M1 7.70 7.70
GUDANG LOGISTIK M1 8.78 8.78
GUDANG PERALATAN M1 10.81 10.81
TOILET LT-1 M1 5.11 5.11

LANTAI 2
TOILET LT-2 M1 5.12 5.12
RG. SEKERTARIS LURAH M1 10.80 10.80
RG. LURAH M 1
12.70 12.70
RG. SERBAGUNAH M1 18.00 18.00

B. PEKERJAAN PLAFOND
1 PEKERJAAN PLAFOND
LANTAI 1
1 TERAS M2 3.40 1.85 6.29 6.29
2 RG. TUNGGU M2 5.63 5.63
3 RG. KERJA STAFF M 2
30.18 30.18
4 RG. ARSIP M 2
7.99 7.99
5 PENTRY M2 4.43 4.43
6 GUDANG LOGISTIK M 2
6.49 6.49
7 GUDANG PERALATAN M 2
6.59 6.59
8 TOILET LT-1 LANTAI M 2
1.95 1.95
69.55
LANTAI 2
9 TOILET LT-2 LANTAI M2 1.94 1.94
10 RG. SEKERTARIS LURAH M2 8.02 8.02
11 RG. LURAH M2 11.53 11.53
12 RG. SERBAGUNAH M2 30.58 30.58
13 Kanopi Beton 8.04
60.11

2 PEKERJAAN LIST PROFIL


LANTAI 1
TERAS M1 5.27 5.27
RG. TUNGGU M1 8.62 8.62
RG. KERJA STAFF M1 29.08 29.08
RG. ARSIP M1 12.30 12.30
PENTRY M1 8.50 8.50
GUDANG LOGISTIK M1 9.51 9.51
GUDANG PERALATAN M1 11.51 11.51
TOILET LT-1 M1 5.81 5.81
90.60
LANTAI 2
TOILET LT-2 M1 5.80 5.80
RG. SEKERTARIS LURAH M1 11.45 11.45
RG. LURAH M1 13.60 13.60
RG. SERBAGUNAH M1 28.75 28.75
59.60
C. PEKERJAAN PINTU, JENDELA, & VENTILASI
1 PEKERJAAN KUSEN
KUSEN PINTU 29.41
1.1 P1 M1 6.41 1.00 6.41
1.2 P2 M 1
6.60 2.00 13.20
1.4 P4 M 1
4.90 2.00 9.80

KUSEN JENDELA 180.22


1.1 J1 M1 9.32 1.00 9.32
1.2 JV1 M 1
23.73 4.00 94.92
1.3 JV2 M 1
15.82 4.00 63.28
1.4 V1 M1 3.10 3.00 9.30
1.5 V2 M1 1.70 2.00 3.40

KUSEN DAN PANEL KAYU


P3 (KAYU) M1 5.08 0.04 0.15 2.00 0.06
P3 (KAYU) M2 0.81 2.05 2.00 3.32

Pengecetan 0.20 2.00 0.81


0.76 2.00 3.05
2.00 13.28
17.14

2 BINGKAI PINTU 9.42


P1 M2 0.77 2.35 1.00 3.60
P2 M2 0.81 2.05 2.00 3.32
P4 M2 0.61 2.05 2.00 2.50

3 BINGKAI JENDELA 20.75


J1 M2 1.31 1.65 1.00 2.16
JV1 M2 1.92 1.80 4.00 13.82
JV2 M2 0.71 1.60 4.00 4.54
V1 M2 - - 3.00 -
V2 M2 0.41 0.27 2.00 0.22

4 KACA (Pintu) 5.58


P1 M2 0.64 2.19 1.00 2.78
P2 M 2
0.70 2.00 2.00 2.80

5 KACA (Jendela Bingkai) 19.21


J1 M2 1.31 1.65 1.00 2.16
JV1 M 2
1.92 1.60 4.00 12.29
JV2 M 2
0.71 1.60 4.00 4.54
V1 M2 - - 3.00 -
V2 M 2
0.41 0.27 2.00 0.22

6 KACA (mati) 12.86


J1 M2 - - 1.00 -
JV1 M 2
0.45 1.60 4.00 5.76
JV2 M 2
0.56 1.60 4.00 7.10
V1 M2 - - 3.00 -
V2 M2 - - 2.00 -

7 ENGSEL PINTU 4" Bh (Jumlah bingkai pintu dikalikan 3) 24.00


8 ENGSEL CASEMENT 20" Bh (Jumlah bingkai jendela dikalikan 2) 28.00
9 RAMBUNCIS Bh (Jumlah bingkai jendela dikalikan 1) 14.00
7 HANDEL PINTU Bh 24.00
1 Tipe A 4.00
kunci 3.00
2 Tipe B (Kamar mandi) 2.00
3 Kunci Tanam 2.00

D. PEKERJAAN MECHANICAL ELECTRICAL


1 PEKERJAAN KABEL
LANTAI 1
TERAS M1
RG. TUNGGU M1
RG. KERJA STAFF M1
RG. ARSIP M1
PENTRY M1
GUDANG LOGISTIK M1
GUDANG PERALATAN M1
TOILET LT-1 M1

LANTAI 2
TOILET LT-2 M1
RG. SEKERTARIS LURAH M1
RG. LURAH M1
RG. SERBAGUNAH M1

2 PEKERJAAN LAMPU
LANTAI 1
Lampu DL 12 watt Bh 13.00 13.00
Lampu Neon Bh 4.00 4.00
LANTAI 2
Lampu DL 12 watt Bh 5.00 5.00
Lampu DL 18 watt Bh 17.00 17.00

3 PEKERJAAN STOP KONTAK


3.1 Lantai 1 Bh 10.00 10.00
3.2 Lantai 2 Bh 9.00 9.00
4 PEKERJAAN SAKLAR TUNGGAL
4.1 Lantai 1 Bh 1.00 1.00
4.2 Lantai 2 Bh 3.00 3.00
5 PEKERJAAN GANDA
5.1 Lantai 1 Bh 5.00 5.00
5.2 Lantai 2 Bh 4.00 4.00
E. PEKERJAAN PLUMBING
1 PEKERJAAN PIPA
LANTAI 1
1.1 Pipa Distribusi Air Bersih 1" M1
1.2 Pipa Buangan Air Kotor 3" M1
1.3 Pipa Buangan Septictank 4" M1
LANTAI 2
1.1 Pipa Distribusi Air Bersih 1" M1
1.2 Pipa Buangan Air Kotor 3" M1
1.3 Pipa Buangan Septictank 4" M1
2 KLOSET DUDUK Bh 1.00
3 KLOSET JONGKOK Bh 1.00
4 STOPKRAN Bh 2.00
5 WASTAFEL Bh 2.00
6 FLOORDRAIN Bh 2.00

F. PEKERJAAN PENGECETAN

1 Dinding Lantai 1
1.1 Pas Bata M2 144.90
1.2 Plester 281.63 281.63
1.3 Acian 281.63
1.4 Pengecetan Dinding Dalam 180.42
Pengecetan Dinding Luar 94.50
Pengecetan Kanopi Depan 15.23
5.25
2 Dinding Lantai 2
2.1 Pas Bata M2 113.40
2.2 Plester 218.61 218.61
2.3 Acian 218.61
2.4 Pengecetan Dinding Dalam 107.95
Pengecetan Dinding Luar 68.82
Pengecetan Kanopi Depan 15.12
18.06
3 Pengecetan Waterproofing 7.77
5.88
4 Pek. Plester dan Acian Kolom 7.10 0.90 6.00 40.26
8.50 0.90 3.00 24.10

5 Pengecetan Pagar
5.1 Pas. Railing Tangga 6.78 9.38
Besi Hollow 40x40 5.20 0.1600 0.83 5.64
Besi Hollow 20 x 40 4.60 0.1200 0.55 3.74
5.2 Pek. Fasade Besi Hollow 12.91 27.11
Besi Hollow 40x40 13.13 0.1600 2.10 27.11
5.3 Err:509 Err:509 Err:509
Besi Hollow 40x40 8.88 0.1600 1.42 Err:509
Besi Hollow 20 x 40 15.89 0.1200 1.91 Err:509
5.4 Err:509 Err:509 Err:509
Besi Hollow 40x40 10.50 0.1600 1.68 Err:509

F. PEKERJAAN RUANG LUAR


PAGAR PEMBATAS
1 Pas. Sloof Beton Bertulang
Bekisting 0.15 0.20 13.69
Besi 150.00 176.00
Cor Beton 39.11 0.15 0.2 1.1733

2 Pas. Dinding 39.11 1.4 54.754


3 Pek. Plester 1.75 1.00 68.44

MAIN ENTERANCE

1 Galian Tanah 0.40 0.50 0.60 2.00 0.24


2 Pek. Pondasi Beton Bertulang ( 150 Kg Besi + Bekesting ) 0.24
3 Pek. Kolom Praktis Uk. 110/110 Mm (Besi 3 Kg) 2.15 4.00 8.60
4 Cor Beton Mutu K-100 (Pertebalan Dinding) 0.20 0.05 1.80 2.00 0.03
5 Pas. Bata Merah Tebal ½ Bata, 1 Pc : 4 Ps 0.20 1.80 2.00 0.72
6 Pintu Pagar Tipe - 1 (Modern Minimalis) 4.80
7 Pagar Railing Tipe - 2 (Modern Minimalis) 3.81 3.81

BACKDROP TULISAN

1 ### 4.16 0.15 0.62


2 ### 4.16 0.22 0.92
3 ### 1.80 2.00 3.60
4 ### 3.58
5 ### 4.08
6 ### 5.01 2.00 10.024

10.02
DRAINASE

1 ### 15.10 0.08 1.13


2 ### 0.05 0.76
3 ### 0.25 3.78
4 ### 0.55 8.31

BAK TANAMAN

1 ### 10.74 0.30 3.22


2 ### 0.30 3.22
3 ### 10.74 0.30 3.22
4 ### 0.20 3.22 1.56
0.51
0.41
NO URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH LUAS KELILING VOLUME SATUAN

A B C D E F G H I J

PEKERJAAN TANAH DAN PONDASI


Galian Tanah Pondasi Menerus = 12.51 M³
- Bagian 1 : 22.55 x 0.70 x 0.70 = 11.05 M³
- Bagian 2 : 3.00 x 0.50 x 0.70 = 1.05 M³
- Bagian 3 : 7.75 x 0.35 x 0.15 = 0.41 M³

Galian Tanah Biasa Pondasi Telapak PT-1 : 1.20 x 1.20 x 1.50 x 9.00 = 19.44 M³
Galian Tanah Biasa Pondasi Telapak PT-2 : 0.80 x 0.80 x 0.55 x 1.00 = 0.35 M³
Galian Tanah Biasa Pondasi Telapak Tangga PTT-1 : 1.00 x 0.80 x 1.50 x 1.00 = 1.20 M³

Urugan Kembali Tanah Biasa Pondasi Menerus : 1/4 Volume Galian Tanah Pondasi Menerus = 3.13 M³
Urugan Kembali Tanah Biasa Pondasi Telapak PT-1 : 3/4 Volume Galian Tanah Pondasi Telapak = 14.58 M³
Urugan Kembali Tanah Biasa Pondasi Telapak PT-2 : 3/4 Volume Galian Tanah Pondasi Telapak = 0.26 M³
Urugan Kembali Tanah Biasa Pondasi Telapak Tangga PTT-1 : 3/4 Volume Galian Tanah Pondasi Telapak = 0.90 M³

Urugan Tanah Biasa dibawah Lantai (bahan didatangkan) : 0.28 x 83.71 - sisa galian = 9.16 M³

Urugan Pasir dibawah Pondasi Menerus : = 1.00 M³


- Bagian 1 : 22.55 x 0.70 x 0.05 = 0.79 M³
- Bagian 2 : 3.00 x 0.50 x 0.05 = 0.08 M³
- Bagian 3 : 7.75 x 0.35 x 0.05 = 0.14 M³

Urugan Pasir dibawah Pondasi Pondasi Telapak PT-1 : 1.20 x 1.20 x 0.05 x 9.00 = 0.65 M³
Urugan Pasir dibawah Pondasi Telapak Tangga PTT-1 : 1.00 x 0.80 x 0.05 x 1.00 = 0.04 M³
Urugan Pasir dibawah Lantai : 0.10 x 92.71 = 9.27 M³

Pasangan Batu Pondasi Menerus 1 Pc : 4 Ps = 7.25 M³


- Bagian 1 : 22.55 x 0.26 = 5.75 M³
- Bagian 2 : 3.00 x 0.21 = 0.63 M³
- Bagian 2 : 7.75 x 0.11 = 0.87 M³

Anstamping Batu Kosong = 2.59 M³


- Bagian 1 : 22.55 x 0.11 = 2.37 M³
- Bagian 2 : 3.00 x 0.08 = 0.23 M³

PEKERJAAN BETON BERTULANG :


Lantai Kerja Pondasi Telapak PT-1 Beton Tumbuk 1 Pc : 3 Ps : 5 Kr : 1.20 x 1.20 x 0.05 x 9.00 = 0.65 M³

Lantai Kerja Pondasi Telapak PT-1 Beton Tumbuk 1 Pc : 3 Ps : 5 Kr : 0.80 x 0.80 x 0.05 x 1.00 = 0.03 M³

Cor Beton Tumbuk dibawah Lantai 1 Pc : 3 Ps : 5 Kr : 0.05 x 92.71 = 4.64 M³

Cor Beton Tumbuk (Pertebalan Kolom ty. 1) 1 Pc : 3 Ps : 5 Kr : 2.55 x 0.19 = 0.50 M³

Cor Beton Tumbuk (Pertebalan Kolom ty. 2) 1 Pc : 3 Ps : 5 Kr : 2.55 x 0.12 = 0.30 M³

Pondasi Telapak PT-1 Beton K-250 (Besi 150 kg)


- Perakitan Bekisting : 3.60 0.30 x 9.00 = 9.72 M²
- Pembesian Tulangan Struktur : 150.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 583.20 Kg
- Pengecoran Beton Mutu K-250 : 1.20 x 1.20 x 0.30 x 9.00 = 3.89 M³

Pondasi Telapak P2-1 Beton K-250 (Besi 150 kg)


- Perakitan Bekisting : 2.40 0.25 x 1.00 = 0.60 M²
- Pembesian Tulangan Struktur : 130.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 20.80 Kg
- Pengecoran Beton Mutu K-250 : 0.80 X 0.80 X 0.25 x 1.00 = 0.16 M³

Pondasi Telapak Tangga PTT-1 Beton K-250 (Besi 150 kg)


- Perakitan Bekisting : 2.60 0.30 x 1.00 = 0.78 M²
- Pembesian Tulangan Struktur : 150.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 36.00 Kg
- Pengecoran Beton Mutu K-250 : 1.00 x 0.80 x 0.30 x 1.00 = 0.24 M³

Sloof SL-1 Beton K-250 (Besi 200 kg)


- Perakitan Bekisting : 44.70 x 0.30 x 2.00 = 26.82 M²
- Pembesian Tulangan Struktur : 200.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 536.40 Kg
- Pengecoran Beton Mutu K-250 : 44.70 x 0.20 x 0.30 = 2.68 M³

Sloof SL-2 Beton K-250 (Besi 200 kg)


- Perakitan Bekisting : 33.85 x 0.20 x 2.00 = 13.54 M²
- Pembesian Tulangan Struktur : 200.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 203.10 Kg
- Pengecoran Beton Mutu K-250 : 33.85 x 0.15 x 0.20 = 1.02 M³

Kolom K1 Beton K-250 (Besi 250 kg)


- Perakitan Bekisting : 9.75 x 9.00 x 1.20 = 105.30 M²
LANTAI 1
5.25 x 9.00 x 1.20 = 56.70 M²
LANTAI 2
3.00 x 6.00 x 1.20 = 21.60 M²
4.50 x 3.00 x 1.20 = 16.20 M²
- Pembesian Tulangan Struktur : 250.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 1974.38 Kg
- Pengecoran Beton Mutu K-250 : 9.75 x 0.30 x 0.30 x 9.00 = 7.90 M³
Kolom K2 Beton K-250 (Besi 250 kg)
- Perakitan Bekisting : 3.00 x 2.00 x 0.80 = 4.80 M²
- Pembesian Tulangan Struktur : 240.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 54.00 Kg
- Pengecoran Beton Mutu K-250 : 3.00 x 0.15 x 0.25 x 2.00 = 0.23 M³

Balok B1-1 Beton K-250 (Besi 200 kg)


- Perakitan Bekisting : 53.90 x 0.85 = 45.82 M²
- Pembesian Tulangan Struktur : 200.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 943.25 Kg
- Pengecoran Beton Mutu K-250 : 53.90 x 0.25 x 0.35 = 4.72 M³

Balok B1-2 Beton K-250 (Besi 200 kg)


- Perakitan Bekisting : 3.50 x 0.85 = 2.98 M²
- Pembesian Tulangan Struktur : 200.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 61.25 Kg
- Pengecoran Beton Mutu K-250 : 3.50 x 0.25 x 0.35 = 0.31 M³

Balok B1K Beton K-250 (Besi 200 kg)


- Perakitan Bekisting : 10.20 x 0.85 = 8.67 M²
- Pembesian Tulangan Struktur : 200.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 178.50 Kg
- Pengecoran Beton Mutu K-250 : 10.20 x 0.25 x 0.35 = 0.89 M³

Balok Tangga BT Beton K-250 (Besi 200 kg)


- Perakitan Bekisting : 3.50 x 0.75 = 2.63 M²
- Pembesian Tulangan Struktur : 250.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 39.38 Kg
- Pengecoran Beton Mutu K-250 : 3.50 x 0.15 x 0.30 = 0.16 M³

Balok Kanopi BK Beton K-250 (Besi 200 kg)


- Perakitan Bekisting : 21.50 x 0.75 = 16.13 M²
- Pembesian Tulangan Struktur : 200.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 193.50 Kg
- Pengecoran Beton Mutu K-250 : 21.50 x 0.15 x 0.30 = 0.97 M³
Pelat S1 Beton K-250 (Besi 150 kg)
- Perakitan Bekisting : 43.98 = 43.98 M²
- Pembesian Tulangan Struktur : 150.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 791.64 Kg
- Pengecoran Beton Mutu K-250 : 0.12 x 43.98 = 5.28 M³

Pelat S2 Beton K-250 (Besi 110 kg)


- Perakitan Bekisting : 14.98 = 14.98 M²
- Pembesian Tulangan Struktur : 110.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 164.81 Kg
- Pengecoran Beton Mutu K-250 : 0.10 x 14.98 = 1.50 M³

Pelat Kanopi Beton K-250 (Besi 120 kg)


- Perakitan Bekisting : 17.05 = 17.05 M²
- Pembesian Tulangan Struktur : 120.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 143.18 Kg
- Pengecoran Beton Mutu K-250 : 0.70 X 0.07 x 24.35 = 1.19 M³

List Pelat Beton K-250 (Besi 120 kg)


- Perakitan Bekisting : 15.40 = 15.40 M²
- Pembesian Tulangan Struktur : 120.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 58.80 Kg
- Pengecoran Beton Mutu K-250 : 10.00 0.07 X 0.35 x 2.00 = 0.49 M³

Tangga Beton K-250 (Besi 200 kg)


- Perakitan Bekisting : 9.60 x 1.15 x 1.00 = 11.04 M²
- Pembesian Tulangan Struktur : 200.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 514.63 Kg
- Pengecoran Beton Mutu 26.40 Mpa = 2.57 M³
- Pelat Tangga : 9.60 x 1.15 x 0.12 x 1.00 = 1.32 M³
- Pijakan Tangga : 1.15 x 21.00 x 0.03 = 0.62 M³
- Pondasi Tangga : 1.15 x 1.00 x 0.55 = 0.63 M³

Kolom Praktis K-250 (Besi 250 kg)


- Lantai 1 : 3.40 x x 22.00 74.80
- Lantai 2 : 2.70 x x 13.00 35.10
- Perakitan Bekisting : 109.90 x 0.00 x 0.60 = 0.00 M²
- Pembesian Tulangan Struktur : 250.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 618.19 Kg
- Pengecoran Beton Mutu K-251 : 109.90 x 0.15 x 0.15 x = 2.47 M³

Balok Praktis K-250 (Besi 250 kg)


- Lantai 1 : 17.85 x
- Lantai 2 : 8.62 x
- Perakitan Bekisting : 26.47 x 0.15 x 2.00 = 7.94 M²
- Pembesian Tulangan Struktur : 250.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 148.89 Kg
- Pengecoran Beton Mutu K-251 : 26.47 x 0.15 x 0.15 = 0.60 M³

Ring Balok Beton K-250 (Besi 200 kg)


- Perakitan Bekisting : 51.50 x 0.55 = 28.33 M²
- Pembesian Tulangan Struktur : 200.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 309.00 Kg
- Pengecoran Beton Mutu K-250 : 51.50 x 0.15 x 0.20 = 1.55 M³

Ring Balok Beton K-250 (Besi 200 kg)


- Perakitan Bekisting : 7.95 x 0.65 = 5.17 M²
- Pembesian Tulangan Struktur : 200.00 Berat Besi / m3 Dikalikan dengan Volume Beton = 59.63 Kg
- Pengecoran Beton Mutu K-250 : 7.95 x 0.15 x 0.25 = 0.30 M³
Penutup Atap Onduline : = 105.51 M²
- Atap 1 : 1.61 x 4.42 x 1.00 = 7.12 M²
- Atap 1 : 8.16 x 9.25 x 1.00 = 75.48 M²
- Atap 2 : 7.05 x 3.25 x 1.00 = 22.91 M²
Listplank GRC : 31.25 = 31.25 M1
Pas. Dinding1/2 Bata Merah SP. 1:4 : = 278.28 M²
- Lantai 1 : 51.70 x 3.40 - 16.05 = 159.73 M²
- Lantai 2 : 44.00 x 2.70 - 34.00 = 84.80 M²
- Lantai Atap : = 33.75 M²
- Dinding ekspos : = 34.24 M²

Plesteran Dinding SP. 1:4 : = 647.36 M²

Acian Dinding : = 647.36 M²

Rangka Sunscreen Besi Hollow : = 12.91 M²

Alluminium Comp. Panel : = 41.78 M²


- Kanopi : 24.35 x 0.33 x 1.00 = 8.04 M²
- Dinding lt.2 : = 33.74 M²