PAVEMENT QUANTITY
S.No. Description Unit Total Qty Section-1 Section-2
SITE CLEARING & EARTHWORK
1 Subgrade Cum 1,702,543 813,119.00 889,423.53
2 Earthen shoulder Cum 212,885 100,139.34 112,746.09
3 Median Fill Cum 300,943 137,439.84 163,503.11
SUB-BASE, BASE AND PAVEMENT - - -
4 GSB Drainage Layer Cum 635,274 305,345.65 329,928.20
5 WMM Cum 513,224 250,412.00 262,812.13
6 Profile corrective course (……..) Cum - - -
7 BM Cum - - -
8 DBM-VG30 Cum 100,450 27,913.99 61,585.38
9 BC-VG30 Cum 85,829 26,257.04 59,572.36
10 Prime coat Sq.m 1,900,623 930,630.62 969,992.38
11 Tack coat Sq.m 5,064,882 2,288,967.73 2,556,909.98
12 SDBC in service road Cum 3,577 1,137.13 2,440.21
DRAINAGE, APPURTENANCES AND TRAFFIC SAFETY - - -
13 Construction of new kerb-I type Lin.m 308,560 142,544.72 166,015.58
14 Road marking Sq.m 108,689 50,577.18 58,112.00
Double face single beam Metal beam crash barrier (in
15 Lin.m 34,242 17,785.77 16,456.49
Median)
16 Pedestrian Guard rail Lin.m - - -
17 Open Lined Drain Lin.m 5,695 2,308.00 3,386.97
18 Open Lined Drain adjacent to RE Wall Lin.m 18,893 9,651.20 9,242.00
19 Open unlined drain Lin.m 234,534 107,345.75 127,188.03
20 Lined covered Drain Lin.m 73,553 33,449.31 40,103.57
21 Kerb 750x300 in RE wall portions adjcnt c way Lin.m - - -
22 Footpath over lined drain Sq.m 84,581 38,857.06 45,723.90
23 Parapet wall Lin.m - - -
24 Lateral drain, 350mm dia, in the service road portion @ 100m inter - - -
25 Separator Sq.m - - -
26 CTB Cum - - -
Single face single beam Metal beam crash barrier (b/w
27 Lin.m 8,329 - 8,329.18
MCW & S/R)
8 DBM-VG40 Cum 31,895 31,894.72
9 BC-VG40 Cum 26,257 26,257.04