Major References in Oil & Gas Industry

This document lists major oil and gas industry projects from 2005-2019 that Postkey Real Estate has worked on. It includes 88 projects for clients such as Gazprom Neft, NIS, Transnafte, Lukoil, and Petrohemija involving equipment procurement, installation, automation, and calibration services. The projects range from 2019 to 2005 and cover areas like metering systems, cooling systems, tank management, and compressor unit installation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
239 views12 pages

Major References in Oil & Gas Industry

This document lists major oil and gas industry projects from 2005-2019 that Postkey Real Estate has worked on. It includes 88 projects for clients such as Gazprom Neft, NIS, Transnafte, Lukoil, and Petrohemija involving equipment procurement, installation, automation, and calibration services. The projects range from 2019 to 2005 and cover areas like metering systems, cooling systems, tank management, and compressor unit installation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

MAJOR REFERENCES IN OIL & GAS INDUSTRY

2005 - 2019
Belgrade, 12.12.2019.

No. Client Project Year


GAZPROM NEFT
NIS - Production block Procurement of equipement and materials, execution
Refinery Pančevo of works on the Project
89 "COOLING OF JET FUEL SYSTEM WITH 2019
Dragan Mišić STANDARD EI / JIG 1530"
Project Manager
tel: +381 63 888 4215
POSTKEY REAL ESTATE
Dilivery of metering systems, automatisation and
88 Belilo br. 37, Sremski Karlovci, Serbia 2019
SCADA aplications
Ivan Maric, Technical Manager
JP TRANSNAFTA, Pančevo
87 Milan Anušjak ESD System 2019
Tel: +381 64 888 60 25
POSTKEY REAL ESTATE
2018
86 Belilo br. 37, Sremski Karlovci, Serbia VRU SYSTEM
2019
Ivan Maric, Technical Manager
Basic design, Environmental study, Detail Design with
GAZPROM NEFT
Tender documentation for procurement of
NIS - Production block
equipement and materials, Execution of works on the
Refinery Pančevo
85 Project 2018
Dragan Mišić "COOLING OF JET FUEL SYSTEM WITH
Project Manager STANDARD EI / JIG 1530"
tel: +381 63 888 4215
NIS GAZPROM NEFT
Procurement Department
Goran Šarić Replacement of local pneumatic control circuits at 2018
84
Expert Coordinator / Function for Gas Processing Courts – NIS Facility North Banat
MTSSCC
Мob. +381 64 888 2343
JUGOPETROLAD
UI. Stanka Dragojevica bb
“Tank Menagment System”
83 81000 Podgorica, Crna Gora 2018
on Avio Service Tivat i Instalation in Bar, Montenegro
Danijela Matić
Tel: +382 20 401 844
LUKOIL Macedonia
Skopje, FYROM
82 VRU SYSTEM 2018
Janko Mitrov
Manager, Oil base, Stip
tel: + 389 32 223 470
HIP –Petrohemija a.d. Pančevo
INSTALLATION OF MEASURING DEVICE AND
Pančevo
81 BALANCING THE STEAM FLOW IN THE MIDDLE 2018
Veselka Mitić
PRESSURE
tel: +381 13 343029
NIS a.d. Novi Sad
Funkcija za MTSP i KI v.d. Installation of Gas Separators and Compressor Units
80 Direkcije za nabavku DDC at Production Facilities in the Block Research 2018
Dimitrije Miljković and Production - SGS Palic, Serbia
теl: +381 64 888-2662
GAZPROM NEFT
NIS – Department for Metrology
Marijana Tobdžić Calibration services of density (densitometer) type 2017
79
Quality Assurance and Document L-DENS 417T Ex, 2018
Management Sector
Tel. +381 21 481 2584
GAZPROM NEFT
NIS – Procurement Department
Function for Material, Technical and
Mass master measuring system with SS steel,
Service Support 2017
78 in accordance with technical offer no.
Ivan Ragaji 2018
170720.B1D06-MASTER of 11/24/2017.
Expert Coordinator for procurement of
Equipment
tel: +381 21 481 3317
LUKOIL Macedonia
Skopje, FYROM PETROL TERMINAL ŠTIP
„Replacement of obsolete equipment in oil base Stip“,
77 2017
Janko Mitrov equipment installation according to MID 2014/32/EU
Manager, Oil base, Stip MI-005, "turnkey project"
tel: + 389 32 223 470
G-Petrol d.o.o. Sarajevo
POPOVI TERMINAL
Procurement and installation of equipment for
76 Jusuf Korajčević 2017
additivation in consortium with TEHNOMONT Brčko,
Coordinator for Capital Construction
"turnkey project"
+387 33 944927
JP TRANSNAFTA, Pančevo
Procurement and installation of level metering
2016
75 equipment on underground reservoirs in SKpG
Milan Anušjak 2017
Ledinci
Tel: +381 64 888 60 25
JP SRBIJAGAS, Novi Sad
Procurement and delivery of 66 rotary gas 2016
74
Veljko Ostojić displacement meters 2017
Tel: +381 21 487 28 18
HIP –Petrohemija a.d. Pančevo Production of technical documentation, procurement
FSK Elemir of equipment and works including commissioning and
2016
73 Dragan Ludoški performances proving for turnkey project
2017
Project manager „Replacement of measuring and regulation equipment
tel: +381 64 8566 193 as produced by MTBE’’

GAZPROM NEFT
NIS – Research and Production
72 Delivery of 28 chemicals dosing systems 2016
Marija Pavlović
Project manager
tel: +381 64 888 1090
JP TRANSNAFTA, Pančevo Procurement and installation of metering group for
2016
71 Milan Anušjak fuel dispensing in SKpG Ledinci Jetty with production
2017
of technical documentation
Tel: +381 64 888 60 25
GAZPROM NEFT
NIS – Department for Metrology
Delivery of Master meter with external density meter,
70 Voja Mirkov 2016
full operator’s training
Department Manager
tel: +381 11 205 8664
HELLENIC PETROLEUM
Refinery OKTA AD, Skopje
TLGS system upgrade with tank metering equipment
69 2016
Ioannis Geroulanos and integration into existing system
Executive Director
tel: +389 2 2532 217
JUGOPETROL AD
Podgorica, Montenegro Aircraft service – Tivat airport
68 Delivery of equipment, installation, calibration and 2016
Ice Rikaloski commissioning - Tank Inventory System upgrade
e-mail: [email protected]
Mob.: +382 67 170 133
HIP –Petrohemija a.d. Pančevo
FSK Elemir Replacement of dosing system of volumetric meters
67 Dragan Ludoški for SBR polymerization unit FSK Elemir – “turnkey” 2016
Project Manager project
tel: +381 64 8566 193
GAZPROM NEFT
NIS - Production block FB-25304 Reservoir alteration and installation of
Refinery Pančevo on/OFF valves for 12 interconnected measuring
66 2016
systems on LCS Jetty -’’turnkey’’
Aleksandar Marjanović
Consortium Feromont Beograd and WIG Beograd
Project Manager
tel: +381 13 32 4216
OPTIMA GRUPA
Refinery Brod a.d. 24-K-1B compressor for nitrogen and hydrogen
65 Andrej Jakovlevič Getinger mixing in Brod refinery 2016
General Manager Delivery and set up of compressor cabinets
tel: +387 53 612 151
GAZPROM NEFT
NIS - Research & Production GAZPROM NEFT / NIS
Research & Production 2015
64
Milan Vasiljev 2016
Kać pigging station full recovery
tel: +381 64 888 1449
GAZPROM NEFT
NIS - Research & Production PROJEKAT ASUTP FAZA VI, LOT 1
Production of design and technical documentation, 2015
63 Aleksandar Stašuk
delivery of equipment, installation, set up and start up 2016
Project Manager
– “turnkey” measuring bridges project
tel: +381 21 481 3409
LUKOIL Macedonia
Skopje PETROL TERMINAL ŠTIP 2014
62 Andrei Mihailovic Kuku Development and replacement of the application for 2015
Managing Director oil base in Štip refinery „Lukoil Macedonia“ DOOEL
tel: +389 2 3293 026
GAZPROM NEFT
NIS – Technical services GAZPROM NEFT / NIS
Technical services
61 Dušan Salamić, 2015
Procurement and installation of temperature meters at
Project Manager reservoir park – B reservoirs
tel: +381 64 888 4431
GAZPROM NEFT
NIS – Technical services GAZPROM NEFT / NIS
Technical services
60 2015
Dušan Salamić, Full reservoir park recovery – B reservoirs – “turnkey”
Project Manager project
tel: +381 64 888 4431
GAZPROM NEFT GAZPROM NEFT / NIS
NIS - Production block NIS – Refinery Pančevo 2014
59 Marko Jerkan Procurement of mobile pump sets for 2015
Technical Coordinator
NIS "Production"
tel: +381 64 888 4512
SIEMENS Beograd, NIS - Refinery Pančevo
Oml. brigada 21, 11070 Novi Beograd BIODIESEL BLENDING 2014
58
Jelena Milin Production, delivery, commissioning, metrology 2015
Commercial Coordinator PD OM checkup and approval for MS-100

JUGOPETROL AD LUKA BAR


Podgorica, Montenegro Oil derivate warehouse
Production of design and technical documentation, 2014
57
Ice Rikaloski dismantling of equipment in Skopje Refinery, delivery 2015
e-mail: [email protected] of new equipment, installation, calibration and
Mob.: +382 67 170 133 Tank Inventory System commissioning
GAZPROM NEFT
NIS - Energy block PROJEKAT
56 Zoran Pećanac “Reservoir base recovery for acids and caustics in 2015
Project Manager Novi Sad refinery - “turnkey” project
tel: +381 64 888 4404
GAZPROM NEFT / NIS - Production block
FOSTER WHEELER IBERIA
Base Oil Project
Gabriel Garcia Marquez 2
28232 Las Rozas - Madrid, Spain Production of design and technical documentation in 2014
55 Serbian language for Base oil complex for production
Carmen Valverde Rujas 2015
of base oils from “Velebit” type crude and
Project Director
hydrocracking residue at »MHC« unit in Novi Sad
tel: +34 91 336 2629
Refinery

GAZPROM NEFT
NIS - Research & Production BRINE MOBILE UNIT
54 Strahinja Ilin Production of complete documentation, procurement 2014
Project Manager of equipment and components, production of mobile
tel: +381 64 888 4180 unit, FAT and set up, delivery, installation and start up

PITING
GAZPROM NEFT Unit for preparation and dispatch of crude and gas in
NIS - Research & Production Elemir station
53 Strahinja Ilin Production of design and technical documentation, 2014
Project Manager de-installation of existing, procurement and
tel: +381 64 888 4180 installation of new heat exchangers and equipment –
“turnkey”

MERA Zrenjanin / GOAL Zrenjanin


NGP VELEBIT
Tibor Pragai 2013
52 Reconstruction of NGP gas part for Velebit stage I
MREA Project Manager 2014
Installation of AJAX compressor
tel: +381 63 622 030

GAZPROM NEFT / NIS


NS KONCEPT
Research & Production / SGS Janošik
21000 Novi Sad, Pavleka Miškina 35
51 Delivery and installation of equipment for gas 2013
Željko Drobnjak
preparation in SOS VGj station and interconnecting
Manager
pipelines from other pipelines and main MG–01 gas
tel: +381 63 561 614
pipeline

GAZPROM NEFT
NIS - Research & Production NP ELEMIR
50 Dimitrije Miljković Reconstruction of management-monitoring measuring 2013
Project Manager and regulation system
tel: +381 64 888 2662
ENERGOTEHNIKA
JUŽNA BAČKA Novi Sad SS1 VELEBIT - MG07 PIPELINE
49 Mr Davor Krmpot Fiscal measuring station including two ultrasonic gas 2013
Deputy Manager flowmeters Altosonic V12
tel: +381 21 4877 227

GAZPROM NEFT
NIS - Research & Production Measuring and Control Systems za leaking detection
48 Aleksandar Stašuk on pipelines OUS Adorjan - Novi Sad Oil Refinery and 2013
Project Manager OS KP - US Tisa, "Turn-key" contract
tel: +381 21 481 3409

GAZPROM NEFT
NIS – Sales Block PRAHOVO WAREHOUSE UNIT
47 Srboljub Blagojević Fiscal measuring for diesel unloading in Prahovo 2013
Technical Department Manager warehouse
tel: +381 11 311 63 71

GAZPROM NEFT
NIS - Research & Production Measuring and Control Systems for technical losses
and internal gas consumption in production facility
46 Veljko Stanišić 2013
Bačka, Severni Banat and Srednji Banat, "Turn-key"
Technical Project Manager contract “
tel: +381 21 481 3845

HELLENIC PETROLEUM
JKP BAR INSTALLATION
Jugopetrol Kotor
45 Technical solution, equipment delivery, installation 2013
Ioannis Geroulanos
and commissioning of additives dosing system –
Executive Director
separately for EKO and LUKOIL delivery lines
tel: +382 32 301 346

GAZPROM NEFT
RECONSTRUCTION OF FLARE SYSTEM
NIS - Production block
44 Production of Feasibility Study and Conceptual 2013
Aleksandar K. Petrović
design for Pančevo refinery, in cooperation with “BJ
Project Manager
Procesno projektiranje Zagreb and TEI Beograd”
tel: +381 13 324 646

EKO-DUNAV
PETROL TERMINAL BARIČ
Beograd, Kostolačka 21 2012
43 Delivery of equipment, installation and commissioning
Milan Tadić, Project Manager 2013
of batch loading system during truck loading
tel: +381 11 24 63 103

LUKOIL Macedonia
Skopje PETROL TERMINAL ŠTIP
2012
42 Andrei Mihailovic Kuku Design, delivery and installation of bottom loading 2013
Managing Director system for trucks
tel: +389 2 3293 026
GAZPROM NEFT ASUTP STAGE III LOT 1
NIS - Research & Production
Design and technical documentation production, 2012
41 Aleksandar Stašuk delivery of equipment, installation, set up and start up 2013
Project Manager - „turnkey“ system for leak detection on US Tisa -
tel: +381 21 481 3409 Terminal pipeline for Transnafta - Novi Sad

GAZPROM NEFT
NIS - Research & Production SNGS ITEBEJ
2012
40 Rade Mikašinović Measuring and Control System for reconstruction of 2013
Construction Manager SNGS Itebej
tel: +381 21 481 3097

GAZPROM NEFT
SGS KIKINDA GORNJA
NIS - Research & Production
Measuring and Control System for installation of 2012
39 Rade Mikašinović
AJAX compressor and gas field exploitation 2013
Construction Manager
optimization in Mokrin
tel: +381 21 481 3097

GAZPROM NEFT
NIS - Production block WATER INTAKE
Refinery Novi Sad Design, delivery and works on reconstruction of the 2012
38
Aleksandar Čeman water intake facility, in cooperation with Controlpoint 2013
Project Manager Užice
tel: +381 21 528 455

GAZPROM NEFT
NIS - Production block JETTY
Refinery Pančevo 2012
37 Design and delivery of Custody Transfer measuring
Aleksandar Marjanović and control system MS-16 and relocation of control 2013
Project Manager system (LCS)
tel: +381 13 32 4216

SRBIJAGAS
Novi Sad, Narodnog fronta 12 GAS TECHNICS - LABORATORY
36 2012
Veljko Ostojić, Manager Re-hauling the test installation for industrial gas
tel: +381 21 4872 818 meters

GAZPROM NEFT MHC / DHT


NIS - Production block
Refinery Pančevo Production of design and technical documentation,
35 equipment delivery, installation, set up and start up; 2012
Renata Ristić Abci „turnkey“ project for additives dosing system for
Project Manager viscosity and conductivity of diesel and anti-oxidants
tel: +381 64 888 5908 for jet fuel
LUKOIL Macedonia
PETROL TERMINAL ŠTIP
Skopje
34 Andrei Mihailovic Kuku Set up of Terminal Management system and 2012
Managing Director connection to main accounting system with operation
tel: +389 2 3293 026 synchronization

GAZPROM NEFT
NIS - Production block
Refinery Pančevo JETTY
33 2012
Tomica Ružičić Maintenance of measuring systems at the Jetty and
Manager MT&SO product lines in Refinery Pančevo during 2012.
tel: +381 13 324 500

ASUTP PROJECT STAGE II LOT 1


GAZPROM NEFT
Production of design and technical documentation,
NIS - Research & Production
delivery of equipment, installation, set up and start up 2011
32 Aleksandar Stašuk „turnkey“ of the automated system for measuring and 2013
Project Manager dispatch of crude oil and natural gas from collection,
tel: +381 21 481 3409 loading and compressor stations in Bačka an Srednji
Banat region

GAZPROM NEFT
NIS - Production block
LPG LOADING/UNLOADING FACILITY
Refinery Pančevo 2011
31 Design, delivery, installation, commissioning for truck
Aleksandar Marjanović 2012
and rail LPG loading/unloading facility, "turnkey"
Project Manager
tel: +381 13 32 4216

LUKOIL Macedonia
PETROL TERMINAL ŠTIP
Skopje
30 Andrei Mihailovic Kuku Project design, delivery of equipment, 2011
Managing Director installation and commissioning for marking the extra
tel: +389 2 3293 026 light fuel

ZARUBEZNEFT AUXILIARY HEATING SYSTEM


Refinery »BROD«
Full supervision, as-built project and delivery of steam
29 Sergei G. Krascuk traps for reconstruction and system modernization of 2011
Manager auxiliary heating system for units 31, 32 and 35
tel: +387 53 612 151 In cooperation with Delta Energo Proces design team

HELLENIC PETROLEUM TANK MANAGEMENT SYSTEM


Refinery »OKTA«
Production of design and technical documentation,
Skopje 2011
28 delivery of equipment, installation and commissioning
Tome Pavlovski „turnkey“ of the fiscal measuring system and central 2012
Refinery Director monitoring system for a reservoir park of 50
tel: +389 2 2532 217 reservoirs – semi products, products and LPG
GAZPROM NEFT
NIS - Production block WASTEWATER NEUTRALIZATION
Refinery Pančevo 2010
27 Technical solution, delivery of wastewater
Branko Živanović 2011
neutralization unit from HPV-a, set up and
Project Manager commissionig
tel: +381 13 32 4077

LOCAL IT NETWORK
ZARUBEZNEFT
Refinery »BROD« Production of main projects for local industrial
network for information gathering and transfer – 2010
26 Yuriy V. Fedorov
information networks for monitoring and management 2011
Security Deputy Manager
of complete technological process in real time (PLS)
tel: +387 53 612 151
and information network for admin purposes (ZLS)

ZARUBEZNEFT
Refinery »BROD« PRESSURE REDUCING AND COOLING STATIONS
2010
25
Аleksei V. Sidorov Main project design (technical, mechanical, electrical 2011
Manager and instrumentation)
tel: +387 53 610 773
GAZPROM NEFT
NIS - Production block
CUSTODY TRANSFER 2009
Refinery Novi Sad
24 MEASURING-MANAGEMENT SYSTEMS 2011
Goran Klaparević In stages
Final installation, FAT and metrological verification
Deputy Manager
tel: +381 21 420 663

INTEC
Novi Sad, Rumenačka 110 PSG BANATSKI DVOR
2010
23 Danilo Bjelica Delivery, integration and commissioning 2011
General Manager of control-management system for new bore drills
tel: +381 21 442 033

PETROPROCESS
Novi Sad, Bulevar Cara Lazara 40 PSG BANATSKI DVOR
2010
22 Dejan Petrović Delivery, integration and commissioning 2011
General Manager of mass flow meters for new bore drills
tel: +381 21 475 1740
GAZPROM NEFT
NIS - Production block PRODUCTLINE RNP-PHK
Refinery Pančevo 2010
21 Adaptation of installations and installation, set up and
Aleksandar Marjanović metrology verification of three fiscal management 2011
Project Manager systems, "turnkey" project
tel: +381 13 32 4216
ZARUBEZNEFT AUXILIARY HEATING SYSTEM
Refinery »BROD«
Full supervision, as-built project and delivery of steam 2010
20 Sergei G. Krascuk traps for reconstruction and system modernization of 2011
Manager auxiliary heating system for units 31, 32 and 35
tel: +387 53 612 151 In cooperation with Delta Energo Proces design team

ZARUBEZNEFT AUXILIARY HEATING SYSTEM


Refinery »BROD« Full supervision, as-built project and delivery of steam
2010
19 Sergei G. Krascuk traps for reconstruction and system modernization of
2011
Manager auxiliary heating system for units 02, 03, 04, 05, 06,
tel: +387 53 612 151 08, 09, 36, 37 i 38 in cooperation with Delta Energo
Proces design team - "turnkey"
HEAT Wärmetechnische Anlagen PSG BANATSKI DVOR
Wien, Schonbrunner Strase 179
Production and delivery of 2009
18 Peter Neuhauser SMAR 302 Foundation Fieldbus 2010
Deputy Managing Director For control and management system for natural gas
tel: +43 2236 73 130 332 production line
GAZPROM NEFT
JETTY
NIS - Production block
Refinery Pančevo Production of project and technical documentation, 2009
17 delivery of equipment, installation, set up and
Aleksandar Marjanović 2010
commissioning – “turnkey” for nine (9) fiscal control-
Project Manager
management systems
tel: +381 13 32 4216

LUKOIL Macedonia PETROL TERMINAL ŠTIP


Skopje
Production of main modernization projects and
16 Andrei Mihailovic Kuku 2010
reconstruction of warehouse for oil derivate products,
Managing Director
loading/unloading truck and rail terminals for LPG and
tel: +389 2 3293 026
fuels
LUKOIL Macedonia
PETROL TERMINAL ŠTIP
Skopje
15 Andrei Mihailovic Kuku Design, equipment delivery, construction works, 2010
Managing Director commissioning and training for automatic diesel
tel: +389 2 3293 026 additivation and 95/98 gasoline - "turnkey"

TREI
Moscow, Russia REFINERY »BROD«
14 As-built project for measuring, regulation and 2009
Edmund Dekk
President management of HDS unit
tel: +7 495 254 8221
HIP PETROHEMIJA TEMPERATURE ACQUISITION SYSTEM
Elemir, Industrial zone Design, software production, delivery, installation and
2009
13 Milan Katić commissioning of
2010
Chief Engineer SMAR 302 Foundation Fieldbus System
tel: +381 23 737 610 "turnkey" project
ISOIL Impianti REFINERY PANČEVO
Albano, Via Madonna d. Rose 74
Design and delivery of Custody Transfer measuring
12 Marco Blumer and management lines (15) for reception and crude 2008
President dispatch and other derivate for Jetty facility on
tel: + 39 35 4239 011 Danube river - "turnkey"

TRANSNAFTA
Pančevo, Zmaj Jovina 1 OIL TERMINAL NOVI SAD
2007
11 Željko Krivačević Reconstruction and upgrade of control and 2008
Technical Manager management system - "turnkey"
tel: +381 11 2445 951

UNDERGROUND GAS STORAGE


SRBIJAGAS
Novi Sad, Narodnog fronta 12 BANATSKI DVOR
10 Jovica Budimir Upgrade and commissioning of 2007
Investment Executive Manager Central Process Control Systems,
tel: +381 21 481 2600 Connection, configuration of field instrumentation and
stand-alone controllers
NIS PETROL CUSTODY TRANSFER
Refinery Novi Sad MEASURING-CONTROL SYSTEMS
2007
9 Rajko Trebovac Design and delivery of Custody Transfer metering 2008
Technical Manager systems for reception and crude dispatch on two ship
tel: +381 21 522 157 loading/unloading pontoons - "turnkey"

FITORJA
Ferizaj/Uroševac, Kosovo FITORJA PETROL TERMINAL
2007
8 Tahir Maloku Custody Transfer Metering & Control System 2008
General Manager
tel: +381 290 320 542

NIS PETROL
C5/C6 ISOMMERISATION
Refinery Novi Sad
SMAR 302 Foundation Fieldbus 2007
7 Milan Balać Under the license of Axens Paris and in cooperation 2008
Commercial Manager with Petrolinvest Sarajevo, Technip Paris and Foster
tel: +381 21 420 663 Wheeler France

MEHRABAD Industrial Co IOOC - IRAN OFFSHORE OIL Co


Tehran, Iran
Kharg Island Petrol Terminal 2006
6 Bahman Tehrani Flowserve control valves for oil facilities in 2007
Managing Director Aboozar, Foroozan and Dorood
tel: + 98 21 6662 7152 In cooperation with Petrolinvest Sarajevo
HIB PETROL
Ferizaj/Uroševac, Kosovo
HIB PETROL TERMINAL
5 Ibrahim Bucaliu 2006
Transfer Metering & Control System
General Manager
tel: +381 290 22 126

SRBIJAGAS
Novi Sad, Narodnog fronta 12 FISCAL GAS METERING
4 Vanja Vukoje Control Microsystems Flow Computers 2006
Procurement Manager
tel: +381 21 481 2496

SRBIJAGAS
Novi Sad, Narodnog fronta 12 PSG BANATSKI DVOR
2006
3 Vanja Vukoje SMAR 302 Foundation Fieldbus
2007
Procurement Manager For gas insertion line
tel: +381 21 481 2496

NIS NAFTAGAS
Novi Sad, Narodnog fronta 12 Mesuring and control equipment and systems for
stations SS Bečej, KS Itebej, RG Elemir, KS Elemir, 2005
2 Rade Mikašinović wastewater treatment, SOS Mokrin Jug, 2008
Project Coordinator US Tisa, RG Palić, SOS Turija
tel: +381 21 481 3409

LUKOIL Macedonia
PETROL TERMINAL ŠTIP
Skopje 2005
Tank Management, Custody Transfer Flow Metering
1 Andrei Mihailovic Kuku 2010
and Terminal Automation Management
Managing Director In stages
tel: +389 2 3293 026

Direktor

Snežana Gavrilović-Pirec