0% found this document useful (0 votes)
104 views38 pages

Mas Soleh 02. SPMK PD Hit Daya 4.330-6.330 Kva+Kabel Power

1. The document lists various materials and their unit prices used for electricity metering and distribution, including meters, circuit breakers, current transformers, and potential transformers of different voltage ratings and specifications. 2. Items are organized into two sections - section A lists meters and protective devices while section B lists prefabricated metering cabinets of different capacities. 3. Prices are given per unit for each item listed according to type, voltage rating, and other technical specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
104 views38 pages

Mas Soleh 02. SPMK PD Hit Daya 4.330-6.330 Kva+Kabel Power

1. The document lists various materials and their unit prices used for electricity metering and distribution, including meters, circuit breakers, current transformers, and potential transformers of different voltage ratings and specifications. 2. Items are organized into two sections - section A lists meters and protective devices while section B lists prefabricated metering cabinets of different capacities. 3. Prices are given per unit for each item listed according to type, voltage rating, and other technical specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 38

HARGA SATUAN

NO. MATERIAL + SIZE GOL SAT

A ALAT PENGUKUR DAN PEMBATAS


1 kWh MPB 1P;230V;5(60)A;1;2W MDU-KD Bh
2 kWh E; 1P; 2W; 230 V; 5(40) A; kls 1 (combo); register drum HDW Bh
3 kWh E; 1P; 2W; 230 V; 5(100) A; kls 1 termasuk modem 3G/4G MDU-KD Bh
4 kWh E; 1P; 3W; 230 V; kls 1 termasuk modem GPRS u/ MTD MDU-KD Bh
5 kWh MPB; 3P; 4W; 230/400 V; 5(80) A; kls 1 HDW Bh
6 kWh E; 3P; 4W; 57,7-100V/220-400V; 5 A; kls 0,2 (meter pembanding) MDU-KD Bh
7 kWh E; 3P; 4W; 220/380V; 5(80) A; kls 1 (langsung) MDU-KD Bh
8 kWh E; 3P; 4W; 57,7-100V/220-400V; 5(10) A; kls 0,5 (tidak langsung) MDU-KD Bh
9 kWh E; 3P; 4W; 220/380V; 5(10); kls 1 (tidak langsung) MDU-KD Bh
10 KWH Elektronik; 3P; 4W; 57,7/100 - 230/400 V; 5(10) A; Class 0.2s MDU-KD Bh
11 Metering Out Fit 3 Ph, 20 KV HDW Unit
12 Metering Out Fit 1 Ph, 20 KV HDW Unit
13 GSM Modem HDW Unit
14 MCB 1 Fasa 2 A MDU-KD Bh
15 MCB 1 Fasa 4 A MDU-KD Bh
16 MCB 1 Fasa 6 A MDU-KD Bh
17 MCB 1 Fasa 10 A MDU-KD Bh
18 MCB 1 Fasa 16 A MDU-KD Bh
19 MCB 1 Fasa 20 A MDU-KD Bh
20 MCB 1 Fasa 25 A MDU-KD Bh
21 MCB 1 Fasa 35 A MDU-KD Bh
22 MCB 1 Fasa 50 A MDU-KD Bh
23 MCB 3 Fasa 10 A MDU-KD Bh
24 MCB 3 Fasa 16 A MDU-KD Bh
25 MCB 3 Fasa 20 A MDU-KD Bh
26 MCB 3 Fasa 25 A MDU-KD Bh
27 MCB 3 Fasa 35 A MDU-KD Bh
28 MCCB 1 Fasa 40 A HDW Bh
29 MCCB 1 Fasa 63 A HDW Bh
30 MCCB 1 Fasa 80 A HDW Bh
31 MCCB 1 Fasa 100 A HDW Bh
32 CT TR ; Burden 5 VA; 50/5 A - 300/5 A Class 0.5s HDW Bh
33 CT TR ; Burden 5 VA; 100/5 A Class 0.5s HDW Bh
34 CT TM Indoor Tipe Blok 10/5-5A Class 0.2s MDU-KD Bh
35 CT TM Indoor Tipe Blok 15/5-5A Class 0.2s MDU-KD Bh
36 CT TM Indoor Tipe Blok 20/5-5A Class 0.2s MDU-KD Bh
37 CT TM Indoor Tipe Blok 30/5-5A Class 0.2s MDU-KD Bh
38 CT TM Indoor Tipe Blok 40/5-5A Class 0.2s MDU-KD Bh
39 CT TM Indoor Tipe Blok 50/5-5A Class 0.2s MDU-KD Bh
40 CT TM Indoor Tipe Blok 60/5-5A Class 0.2s MDU-KD Bh
41 CT TM Indoor Tipe Blok 75/5-5A Class 0.2s MDU-KD Bh
42 CT TM Indoor Tipe Blok 80/5-5A Class 0.2s MDU-KD Bh
43 CT TM Indoor Tipe Blok 100/5-5A Class 0.2s MDU-KD Bh
44 CT TM Indoor Tipe Blok 150/5-5A Class 0.2s MDU-KD Bh
45 CT TM Indoor Tipe Blok 200/5-5A Class 0.2s MDU-KD Bh
46 CT TM Indoor Tipe Blok 250/5-5A Class 0.2s MDU-KD Bh
47 CT TM Indoor Tipe Blok 300/5-5A Class 0.2s MDU-KD Bh
48 CT TM Indoor Tipe Blok 400/5-5A Class 0.2s MDU-KD Bh
49 CT TM Indoor Tipe Blok 500/5-5A Class 0.2s MDU-KD Bh
50 CT TM Indoor Tipe Blok 600/5-5A Class 0.2s MDU-KD Bh
51 CT TM Indoor Tipe Blok 750/5-5A Class 0.2s MDU-KD Bh
52 CT TM Indoor Tipe Blok 800/5-5A Class 0.2s MDU-KD Bh
53 CT TM Indoor Tipe Blok 1000/5-5A Class 0.2s MDU-KD Bh
54 CT TM Indoor Tipe Ring 50/5-5A Class 0.2s MDU-KD Bh
55 CT TM Indoor Tipe Ring 100/5-5A Class 0.2s MDU-KD Bh
56 CT TM Outdoor (Burden 30 VA) 10/5 Class 0.2s MDU-KD Bh
57 CT TM Outdoor (Burden 30 VA) 15/5 Class 0.2s MDU-KD Bh
58 CT TM Outdoor (Burden 30 VA) 20/5 Class 0.2s MDU-KD Bh
59 CT TM Outdoor (Burden 30 VA) 25/5 Class 0.2s MDU-KD Bh
60 CT TM Outdoor (Burden 30 VA) 30/5 Class 0.2s MDU-KD Bh
61 CT TM Outdoor (Burden 30 VA) 40/5 Class 0.2s MDU-KD Bh
62 CT TM Outdoor (Burden 30 VA) 50/5 Class 0.2s MDU-KD Bh
63 CT TM Outdoor (Burden 30 VA) 60/5 Class 0.2s MDU-KD Bh
64 CT TM Outdoor (Burden 30 VA) 75/5 Class 0.2s MDU-KD Bh
65 CT TM Outdoor (Burden 30 VA) 80/5 Class 0.2s MDU-KD Bh
66 CT TM Outdoor (Burden 30 VA) 100/5 Class 0.2s MDU-KD Bh
67 CT TM Outdoor (Burden 30 VA) 150/5 Class 0.2s MDU-KD Bh
68 CT TM Outdoor (Burden 30 VA) 200/5 Class 0.2s MDU-KD Bh
69 CT TM Outdoor (Burden 30 VA) 250/5 Class 0.2s MDU-KD Bh
70 CT TM Outdoor (Burden 30 VA) 300/5 Class 0.2s MDU-KD Bh
71 CT TM Outdoor (Burden 30 VA) 400/5 Class 0.2s MDU-KD Bh
72 CT TM Outdoor (Burden 30 VA) 500/5 MDU-KD Bh

*) Harga KHS 2005 1


73 CT TM Outdoor (Burden 30 VA) 600/5 MDU-KD Bh
74 CT TM Outdoor (Burden 30 VA) 800/5 MDU-KD Bh
75 CT TM Outdoor (Burden 30 VA) 1000/5 MDU-KD Bh
76 CT TM Outdoor Double Core 10/5A MDU-KD Bh
77 CT TM Outdoor Double Core 15/5A MDU-KD Bh
78 CT TM Outdoor Double Core 20/5A MDU-KD Bh
79 CT TM Outdoor Double Core 30/5A MDU-KD Bh
80 CT TM Outdoor Double Core 40/5A MDU-KD Bh
81 PT in door (ratio 20.000/v3 : 100/v3) Class 0.2s MDU-KD Bh
82 PT out door (ratio 20.000/v3 : 100/v3) Class 0.2s MDU-KD Bh

B KOTAK APP
1 Smart Box Langsung SPLN 03.015-1:2010 Daya 3.9 kVA MCCB 6A HDW Unit
2 Smart Box Langsung SPLN 03.015-1:2010 Daya 6.6 kVA MCCB l0A HDW Unit
3 Smart Box Langsung SPLN 03.015-1:2010 Daya 10.5 kVA MCCB 16A HDW Unit
4 Smart Box Langsung SPLN 03.015-1:2010 Daya 13.2 kVA MCCB 20A HDW Unit
5 Smart Box Langsung SPLN 03.015-1:2010 Daya 16.5 kVA MCCB 25A HDW Unit
6 Smart Box Langsung SPLN 03.015-1:2010 Daya 23 kVA MCCB 35A HDW Unit
7 Smart Box Langsung SPLN 03.015-1:2010 Daya 33 kVA MCCB 50A HDW Unit
8 Smart Box Langsung SPLN 03.015-1:2010 Daya 41.5 kVA MCCB 63A HDW Unit
9 Smart Box Tidak Langsung SPLN 03.015-2:2012 Daya 53 kVA MCCB 80A HDW Unit
10 Smart Box Tidak Langsung SPLN 03.015-2:2012 Daya 66 kVA MCCB l00A HDW Unit
11 Smart Box Tidak Langsung SPLN 03.015-2:2012 Daya 82.5 kVA MCCB 125A HDW Unit
12 Smart Box Tidak Langsung SPLN 03.015-2:2012 Daya 105 kVA MCCB 160A HDW Unit
13 Smart Box Tidak Langsung SPLN 03.015-2:2012 Daya 131 kVA MCCB 200A HDW Unit
14 Smart Box Tidak Langsung SPLN 03.015-2:2012 Daya 147 kVA MCCB 225A HDW Unit
15 Smart Box Tidak Langsung SPLN 03.015-2:2012 Daya 164 kVA MCCB 250A HDW Unit
16 Smart Box Tidak Langsung SPLN 03.015-2:2012 Daya 197 kVA MCCB 300A HDW Unit
17 Smart Box Tidak Langsung SPLN D3.015-3:2013 TM HDW Unit
17 Smart Box Tidak Langsung Daya TM HDW Unit
18 Kotak APP 1 Fasa OA KAS I HDW Set
19 Kotak APP 3 Fasa OA KAS III HDW Set
20 Kotak APP Type I Lipat,lengkap HDW Bh
21 Kotak APP Type III Lipat,lengkap HDW Bh
22 Kotak APP TR Type IV Tanpa Topi,lengkap HDW Bh
23 Kotak APP TR Type I A Single Tarif, lengkap HDW Bh
24 Kotak APP TR Double Tarif, lengkap HDW Bh
25 Kotak APP TM , lengkap HDW Bh

C KUBIKEL PELANGGAN
1 Air Insulated LBS Manual;24KV;630A;Min-16KA MDU-KD Cell
2 Air Insulated LBS Motorized;24KV;630A;Min-16KA MDU-KD Cell
3 Air Insulated CBOG Motorized+Metering;20KV;630A;Min-16KA MDU-KD Cell
4 Fully Gas Insulated LBS Motorized;24KV;630A;Min-16KA MDU-KD Cell
5 Fully Gas Insulated CBOG Motorized+Metering;20KV;630A;Min-16KA MDU-KD Cell
6 Fully Gas Insulated LBS Manual24KV;630A;Min-16KA MDU-KD Cell
Air Insulated ACO Switchgear, Double incoming, ATS, LBS Motorized 24 KV; 630 A;16
7 MDU-KD Cell
KVA

D KUBIKEL GARDU INDUK


1 Metaclad;Outgoing;20kV;630A;25kA - GI MDU-KD Cell
2 Metaclad;Couple;20kV;2000A;25kA - GI MDU-KD Cell

E TRAFO DISTRIBUSI
1 Trafo 1 Fasa CSP 50 kVA MDU-KD Bh
2 Trafo 3 Fasa 50 kVA MDU-KD Bh
3 Trafo 3 Fasa 100 kVA MDU-KD Bh
4 Trafo 3 Fasa 160 kVA MDU-KD Bh
5 Trafo 3 Fasa 200 kVA MDU-KD Bh
6 Trafo 3 Fasa 250 KVA HDW Bh
7 Trafo 3 Fasa 315 KVA HDW Bh
8 Trafo 3 Fasa 400 KVA HDW Bh
9 Trafo 3 Fasa KVA HDW Bh
10 PHBTR 2 Jurusan 250 A MCCB MDU-KD Bh
11 PHBTR 2 Jurusan 250 A LBS MDU-KD Bh
12 PHBTR 2 Jurusan 400 A LBS MDU-KD Bh
13 PHBTR 4 Jurusan 400 A LBS MDU-KD Bh

F PEMBATAS
1 FCO Polymer MDU-KD Bh
2 Fuse Link 2 A MDU-KD Bh
3 Fuse Link 3 A MDU-KD Bh
4 Fuse Link 4 A MDU-KD Bh
5 Fuse Link 6 A MDU-KD Bh
6 Fuse Link 8 A MDU-KD Bh
7 Fuse Link 10 A MDU-KD Bh
8 Fuse Link 12A MDU-KD Bh
C 9 Fuse Link 15 A MDU-KD Bh
C 9 Fuse Link 16 A MDU-KD Bh
10 Fuse Link 20 A MDU-KD Bh
11 Fuse Link 25 A MDU-KD Bh
12 Fuse Link 30 A MDU-KD Bh
13 Fuse Link 50 A MDU-KD Bh
14 Fuse Link 60 A MDU-KD Bh

*) Harga KHS 2005 2


15 Fuse Link 65A MDU-KD Bh
16 Fuse Link 80 A MDU-KD Bh
17 Fuse Link 100 A MDU-KD Bh
18 NT Fuse 63 - 100 A Size 00, 25 - 160 A HDW Bh
19 NT Fuse 63 - 100 A Size 0, 50 - 160 A HDW Bh
20 NT Fuse 63 A Size 0 HDW Bh
21 NT Fuse 80 A Size 0 HDW Bh
22 NT Fuse 100 A Size 0 HDW Bh
23 NT Fuse 63 - 100 A Size 1, 63 - 250 A HDW Bh
24 NT Fuse 63 - 100 A Size 2, 250 - 400 A HDW Bh
25 NT Fuse 63 - 100 A Size 3, 425 - 630 A HDW Bh
26 NT Fuse 63 - 100 A Size 4, 800 - 1250 A HDW Bh
27 NH Fuse Holder Size 00, 25 - 160 A HDW Bh
28 NH Fuse Holder Size 0, 50 - 160 A HDW Bh
29 NH Fuse Holder Size 1, 63 - 250 A HDW Bh
30 NH Fuse Holder Size 2, 250 - 400 A HDW Bh
31 NH Fuse Holder Size 3, 425 - 630 A HDW Bh
32 NH Fuse Holder Size 4, 800 - 1250 A HDW Bh
33 NH Fuse Puller Size 00-4 HDW Bh

G ALAT PEMISAH SWITCH


1 ABSW 20 KV HDW Set
2 Load Break Switch MDU-KD Set
3 Load Break Switch - 3 Way HDW Set
4 Recloser Lengkap Dengan PT MDU-KD Set
5 Disconnecting Switch 20 KV - 630 A HDW Set

H LIGHTNING ARESTER
1 Lightning Arester (Ceramic) 24 KV, 5 KA HDW Bh
2 Lightning Arester (Ceramic) 24 KV, 10 KA HDW Bh
3 Lightning Arester (Ceramic) 18 KV, 5 KA HDW Bh
4 Lightning Arester (Polymer) 18 KV, 10 KA MDU-KD Bh
5 Lightning Arester (Polymer) 21 KV, 10 KA MDU-KD Bh
6 Lightning Arester (Polymer) 24 KV, 10 KA MDU-KD Bh
7 Disconnector Lightning Arester 5 KA HDW Bh
8 Disconnector Lightning Arester 10 KA HDW Bh
9 Multi Chamber Arrester HDW Bh

I KAPASITOR
1 Capasitor 3 x 300 KVAR komplit dengan kontrol HDW Set
2 Micro Capasitor Controller HDW Bh
3 Current Sensor HDW Bh

J TIANG BETON
1 Tiang Beton 9M-100 daN+E MDU Btg
2 Tiang Beton 9M-200 daN+E MDU Btg
3 Tiang Beton 9M-350 daN+E MDU Btg
4 Tiang Beton 11M-200 daN+E MDU Btg
5 Tiang Beton 12M-200 daN+E MDU Btg
6 Tiang Beton 12M-350 daN+E MDU Btg
7 Tiang Beton 13M-350 daN+E MDU Btg
8 Tiang Beton 13M-500 daN+E MDU Btg
9 Tiang Beton 14M-350 daN+E MDU Btg
10 Penomoran Tiang HDW Btg
11 Penghalang Panjat dan Papan Peringatan HDW Set

K ISOLATOR
1 Isolator Pinpost Porcelain MDU-KD Bh
2 Isolator Pinpost Polimer MDU-KD Bh
3 Isolator Tumpu ( Line Post ) 20 KV Polymer MDU-KD Bh
4 Isolator Tarik ( Porcelain ) 20 KV + Primary Dead End Clamp 70-150 mm² MDU-KD Set
5 Isolator Tarik ( Porcelain ) 20 KV + Primary Dead End Clamp 150-240 mm² MDU-KD Set
6 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End Clamp 70-150 mm² MDU-KD Set
7 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End Clamp 150-240 mm² MDU-KD Set

L PENGHANTAR KAWAT
1 AAAC 25 mm² HDW Mtr
2 AAAC 35 mm² HDW Mtr
3 AAAC 50 mm² MDU-KD Mtr
4 AAAC 70 mm² MDU-KD Mtr
5 AAAC 150 mm² MDU-KD Mtr
6 AAAC 240 mm² MDU-KD Mtr
7 AAAC/S 70 mm² MDU-KD Mtr
8 AAAC/S 150 mm² MDU-KD Mtr
9 AAAC/S 240 mm² MDU-KD Mtr
10 ACSR 70 mm² HDW Mtr
11 ACSR 150 mm² HDW Mtr
12 ACSR 240 mm² HDW Mtr

M PENGHANTAR KABEL
1 NFA2X-T 2 x 35 + N 50 mm² HDW Mtr
2 NFA2X-T 2 x 70 + N 50 mm² MDU-KD Mtr
3 NFA2X-T 3 x 35 + N 35 mm² MDU-KD Mtr

*) Harga KHS 2005 3


4 NFA2X-T 3 x 70 + N 50 mm² MDU-KD Mtr
5 NFA2X 2 x 10 mm² MDU-KD Mtr
6 NFA2X 2 x 16 mm² MDU-KD Mtr
7 NFA2X 2 x 25 mm² HDW Mtr
8 NFA2X 4 x 10 mm² HDW Mtr
9 NFA2X 4 x 16 mm² MDU-KD Mtr
10 NFA2X 4 x 25 mm² HDW Mtr
11 NFA2X 4 x 70 mm² MDU-KD Mtr
12 Kabel NYFGBY 4 x 4 mm² HDW Mtr
13 Kabel NYFGBY 4 x 6 mm² HDW Mtr
14 Kabel NYFGBY 4 x 16 mm² HDW Mtr
15 Kabel NYFGBY 4 x 50 mm² HDW Mtr
16 Kabel NYFGBY 4 x 70 mm² HDW Mtr
17 Kabel NYFGBY 4 x 95 mm² HDW Mtr
18 Kabel NYFGBY 4 x 150 mm² HDW Mtr
19 Kabel NYY 1 x 70 mm² MDU-KD Mtr
20 Kabel NYY 1 x 95 mm² MDU-KD Mtr
21 Kabel NYY 1 x 150 mm² MDU-KD Mtr
22 Kabel NYY 1 x 240 mm² MDU-KD Mtr
23 Kabel NYY 4 x 25 mm² HDW Mtr
24 Kabel NYY 4 x 35 mm² HDW Mtr
25 Kabel NYY 4 x 70 mm² MDU-KD Mtr
26 Kabel NYY 4 x 95 mm² HDW Mtr
27 Kabel NA2XSY 20 KV, 1 x 70 mm² HDW Mtr
28 Kabel NA2XSY 20 KV, 1 x 95 mm² HDW Mtr
29 Kabel NA2XSY 20 KV, 1 x 150 mm² HDW Mtr
30 Kabel NA2XSY 20 KV, 1 x 240 mm² HDW Mtr
31 Kabel NA2XSY 20 KV, 1 x 300 mm² HDW Mtr
32 Kabel NA2XS2Y 20 KV, 1 x 70 mm² HDW Mtr
33 Kabel NA2XS2Y 20 KV, 1 x 120 mm² HDW Mtr
34 Kabel NA2XS2Y 20 KV, 1 x 150 mm² HDW Mtr
35 Kabel NA2XS2Y 20 KV, 1 x 240 mm² HDW Mtr
36 Kabel NA2XS2Y 20 KV, 1 x 300 mm² HDW Mtr
37 Kabel NA2XSEFGbY 20 KV, 3 x 150 mm² HDW Mtr
38 Kabel NA2XSEYBY 20 KV, 3 x 150 mm² MDU-KD Mtr
39 Kabel NA2XSEYBY 20 KV, 3 x 240 mm² MDU-KD Mtr
40 Kabel NA2XSEYBY 20 KV, 3 x 300 mm² MDU-KD Mtr
41 Kabel NA2XCEYBY 20 KV, 3 x 240 mm² HDW Mtr
42 Kabel NA2XCEYBY 20 KV, 3 x 300 mm² HDW Mtr
43 Kabel NYA Fleksibel 2.5 mm² HDW Mtr
44 Kabel NYA Fleksibel 4 mm² HDW Mtr
45 Kabel NYA Fleksibel 6 mm² HDW Mtr
46 Kabel NYA Fleksibel 10 mm² HDW Mtr
47 Kabel NYA Fleksibel 16 mm² HDW Mtr
48 Kabel NYM 2 x 2.5 mm² HDW Mtr
49 Kabel NYM 3 x 2.5 mm² HDW Mtr
50 Kabel NYM 2 x 4 mm² HDW Mtr
51 Kabel NYM 3 x 4 mm² HDW Mtr
52 MVTIC 3 x 150 + N 95 mm² MDU-KD Mtr
53 MVTIC 3 x 240 + N 95 mm² MDU-KD Mtr

N SEPATU KABEL
1 Sepatu Kabel AL/CU Ring-35 mm² HDW Bh
2 Sepatu Kabel AL/CU Ring-50 mm² HDW Bh
3 Sepatu Kabel AL/CU Ring-70 mm² HDW Bh
4 Sepatu Kabel AL/CU Ring-95 mm² HDW Bh
5 Sepatu Kabel AL/CU Ring-120 mm² HDW Bh
6 Sepatu Kabel AL/CU Ring-150 mm² HDW Bh
7 Sepatu Kabel AL/CU Ring-185 mm² HDW Bh
8 Sepatu Kabel AL/CU Ring-240 mm² HDW Bh
9 Sepatu Kabel AL/CU Ring-300 mm² HDW Bh
10 Sepatu Kabel AL/CU Kepala-35 mm² HDW Bh
11 Sepatu Kabel AL/CU Kepala-50 mm² HDW Bh
12 Sepatu Kabel AL/CU Kepala-70 mm² HDW Bh
13 Sepatu Kabel AL/CU Kepala-95 mm² HDW Bh
14 Sepatu Kabel AL/CU Kepala-120 mm² HDW Bh
15 Sepatu Kabel AL/CU Kepala-150 mm² HDW Bh
16 Sepatu Kabel AL/CU Kepala-185 mm² HDW Bh
17 Sepatu Kabel AL/CU Kepala-240 mm² HDW Bh
18 Sepatu Kabel AL/CU 2 Lubang 150 mm² HDW Bh
19 Sepatu Kabel AL/CU 2 Lubang 240 mm² HDW Bh
20 Sepatu Kabel AL/AL-25 mm² HDW Bh
21 Sepatu Kabel AL/AL-50 mm² HDW Bh
22 Sepatu Kabel AL/AL-70 mm² HDW Bh
23 Sepatu Kabel AL/AL-95 mm² HDW Bh
24 Sepatu Kabel AL/AL-120 mm² HDW Bh
25 Sepatu Kabel AL/AL-150 mm² HDW Bh
26 Sepatu Kabel AL/AL-240 mm² HDW Bh
27 Sepatu Kabel CU/CU-25 mm² HDW Bh
28 Sepatu Kabel CU/CU-35 mm² HDW Bh
29 Sepatu Kabel CU/CU-50 mm² HDW Bh
30 Sepatu Kabel CU/CU-70 mm² HDW Bh
31 Sepatu Kabel CU/CU-95 mm² HDW Bh

*) Harga KHS 2005 4


32 Sepatu Kabel CU/CU-150 mm² HDW Bh
33 Sepatu Kabel CU/CU-240 mm² HDW Bh
34 Sepatu Kabel AL/CU 2 Lubang 240-300 mm² HDW Bh

O AKSESORIES APP
1 Kawat Segel HDW Roll
2 Timah Segel HDW Kg
3 Segel Plastik Tekan HDW Bh
4 Service Wedge Clamp 1 fasa 6,10,16 mm2 HDW Set
5 Service Wedge Clamp 6-25 mm² HDW Set
6 Service Wedge Clamp 6, 10, 16, 25 mm² HDW Set
7 Strain Hook Clamp 1 ½" HDW Set
8 Strain Hook Ekor Babi HDW Set
9 Loden Manset 0.8 Kg HDW Bh
10 Protective Cup 1 ½" HDW Set
11 Protective Cup Plastik 1 ½" HDW Set
12 Tap Connector Kedap Air ( 6-25 / 6-25 ) mm² HDW Set
13 Tap Connector Kedap Air ( 35-70 / 35-70 ) mm² HDW Set
14 Tap Connector Kedap Air ( 6-25 / 35-70 ) mm² HDW Set
15 Tap Connector Berbadan Logam ( 6-25 / 6-25 ) mm² HDW Set
16 Tap Connector Berbadan Logam ( 35-70 / 35-70 ) mm² HDW Set
17 Tap Connector Berbadan Logam ( 6-25 / 35-70 ) mm² HDW Set
18 Connector Bimetal 16-6 mm² HDW Set
19 Connector Bimetal 16-10 mm² HDW Set
20 Connector Bimetal 16-16 mm² HDW Set
21 Connector Bimetal 50-50 mm² HDW Set
22 Connector Bimetal 70-35 mm² HDW Set
23 Connector Bimetal 50-70 mm² HDW Set
24 Connector Bimetal 70-70 mm² HDW Set
25 Connector Bimetal 95-70 mm² HDW Set
26 Connector Bimetal 70-50 mm² HDW Set
27 Connector Bimetal 70-95 mm² HDW Set
28 Connector Bimetal 120-70 mm² HDW Set
29 Connector Bimetal 70-120 mm² HDW Set
30 Connector Bimetal 120-120 mm² HDW Set
31 Pole Bracket Three Way 3"-4" HDW Set
32 Pole Bracket Three Way 8"-9" HDW Set
33 Pole Bracket Two Way 6"-7" HDW Set
34 Pole Bracket Two Way 8"-9" HDW Set
35 Pole Attachment Fitting / L bracket HDW Set
36 Fixing Collar HDW Set
37 Bimetalic Connector AL/AL 70-70 mm² HDW Set
38 Klem Bugel untuk tiang atap 1 ½" HDW Set
39 Gas Pipe 1 ½" x 6 Meter HDW Btg
40 Gas Pipe 1 ½" x 1.5 Meter HDW Btg

P AKSESORIES TM
1 Armour Rod # for 35 mm² HDW Set
2 Armour Rod # for 50 mm² HDW Set
3 Armour Rod # for 70 mm² HDW Set
4 Armour Rod # for 150 mm² HDW Set
5 Armour Rod # for 240 mm² HDW Set
6 Armour Tape ¼" wide HDW Mtr
7 Bimetalic Connector 35 - 240 mm² HDW Bh
8 Ball Clevis Socket Eyes HDW Bh
9 Bolt Double Arming ⅝ " x 16 - 24" HDW Bh
10 Bolt Double Arming ⅝" x 10" HDW Bh
11 Bolt Double Arming ⅝" x 12" HDW Bh
12 Bolt Double Arming ⅝" x 14" HDW Bh
13 Bolt Double Up Side ⅝" x (14 - 22") HDW Bh
14 Bolt Double Up Side ⅝" x 10" HDW Bh
15 Bolt Double Up Side ⅝" x 12" HDW Bh
16 Bolt Double Up Side ⅝" x 9" HDW Bh
17 Bolt Double Up Side ⅝" x 8" HDW Bh
18 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh
19 Bolt Machine ⅝" x (14 - 22") HDW Bh
20 Bolt Machine ⅝" x 10" HDW Bh
21 Bolt Machine ⅝" x 12" HDW Bh
22 Bolt Machine ⅝" x 8" HDW Bh
23 Bolt Machine ⅝" x 9" HDW Bh
24 Bolt Single Up Side ⅝" x 10" HDW Bh
25 Bolt Single Up Side ⅝" x 12" HDW Bh
26 Bolt Single Up Side ⅝" x 8" HDW Bh
27 Bolt Single Up Side ⅝" x 9" HDW Bh
28 Brace Steel 550 mm HDW Bh
29 Brace Steel 770 mm HDW Bh
30 Brace Steel 1.262 mm HDW Bh
31 Bracket Extension for cut out HDW Bh
32 Bracket Secondary / Bracket insulated HDW Bh
33 Bracket band segment,vertikal plat ( Hot dip galvanis ) HDW Bh
34 Bracket Transformer cluster and adapter HDW Bh
35 Center Bracket 6 KN HDW Bh
36 Center Bracket 12.5 KN HDW Bh

*) Harga KHS 2005 5


37 Clevis Swinging Secondary HDW Bh
38 Compresion Conector H type 150 mm² / 240 mm² HDW Bh
39 Compresion Conector H type 240 mm² / 240 mm² HDW Bh
40 Compresion Conector H type 50 mm² / 70 mm² HDW Bh
41 Compresion Conector H type 70 mm² / 150 mm² HDW Bh
42 Compresion Conector H type 70 mm² / 70 mm² HDW Bh
43 Compresion Terminal Lug 35 mm² HDW Bh
44 Compresion Terminal Lug 50 mm² HDW Bh
45 Compresion Terminal Lug 70 mm² HDW Bh
46 Compresion Terminal Lug 150 mm² HDW Bh
47 Compresion Terminal Lug 240 mm² HDW Bh
48 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis HDW Bh
49 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh
50 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis HDW Bh
51 Cross Arm Clevis HDW Bh
52 Dead End Assembly HDW Bh
53 Expanding Anchor 8.000 lbs HDW Bh
54 Expanding Anchor 10.000 lbs HDW Bh
55 Fixed Dead Assembly 25-35 mm² HDW Bh
56 Fixed Dead Assembly 50-70 mm² HDW Bh
57 Adjustable Dead End Assembly 25-35 mm² HDW Bh
58 Adjustable Dead End Assembly 50-70 mm² HDW Bh
59 Blundle protection Set 35-70 mm² HDW Bh
60 Compression Joint LVTC+ Heat Shrink 35 HDW Bh
61 Compression Joint LVTC+ Heat Shrink 50 HDW Bh
62 Compression Joint LVTC+ Heat Shrink 70 HDW Bh
63 Compression Joint LVTC+ Heat Shrink 150 HDW Bh
64 Compression Joint LVTC+ Heat Shrink 240 HDW Bh
65 Frefomed guy wire 22 mm² HDW Mtr
66 Frefomed guy wire 35 mm² HDW Mtr
67 Frefomed guy wire 70 mm² HDW Mtr
68 Ground rod & Washer HDW Bh
69 Ground rod ⅝" x 8" Copper Weld HDW Bh
70 Ground rod ⅝" x 8" Galvanis HDW Bh
71 Ground wire Cu 16 mm² HDW Mtr
72 Ground wire Cu 25 mm² HDW Mtr
73 Ground wire Cu 50 mm² HDW Mtr
74 Clamp Ground Rod ⅝" HDW Bh
75 Grounding Iron Plate Form Plat / Eart safety mats HDW Bh
76 Guy Attachment / Guy hok HDW Bh
77 Guy Wire 22 mm² HDW Mtr
78 Guy Wire 35 mm² HDW Mtr
79 Guy Wire 70 mm² HDW Mtr
80 Hot Line Clamp ( 35mm² s/d 70 mm² ) HDW Bh
81 Hot Line Clamp ( 150mm² s/d 240 mm² ) HDW Bh
82 Insulating Tape HDW Bh
83 Joint sleeve 35 mm² HDW Bh
84 Joint sleeve 50 mm² HDW Bh
85 Joint sleeve 70 mm² HDW Bh
86 Joint sleeve 150 mm² HDW Bh
87 Joint sleeve 240 mm² HDW Bh
88 Kawat Bendrad 6 mm² HDW Mtr
89 Kawat Las HDW Bh
90 Kousen HDW Bh
91 Large Angle Assembly 25-35 mm² HDW Bh
92 Large Angle Assembly 50-70 mm² HDW Bh
93 Lock Nut ⅝" HDW Bh
94 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² HDW Bh
95 Live Line Connector 240 mm² HDW Bh
96 Live Line Connector 150 mm² HDW Bh
97 Live Line Connector 70 mm² HDW Bh
98 Nut Timble eye ⅝" HDW Bh
99 Oval Eye Bolt ⅝" x 8" HDW Bh
100 Oval Eye Bolt ⅝" x 9" HDW Bh
101 Oval Eye Bolt ⅝" x ( 14" s/d 22" ) HDW Bh
102 Oval Eye Bolt ⅝" x 10" HDW Bh
103 Oval Eye Bolt ⅝" x 12" HDW Bh
104 Oval Eye Nut ⅝" HDW Bh
105 Parallel group clamp AL/AL 25-70 mm² HDW Bh
106 Parallel group clamp AL/AL 70-150 mm² HDW Bh
107 Parallel group clamp AL/AL 150-240 mm² HDW Bh
108 Pin adapter Insulator HDW Bh
109 Pipa Pralon 2 ½" HDW Bh
110 Pipa Pralon 3" HDW Bh
111 Knee Pipe 2 ½" HDW Bh
112 Knee Pipe 3" HDW Bh
113 Spiral Pralon 2 ½" HDW Bh
114 Spiral Pralon 3" HDW Bh
115 Pipe Cap Galvanis 2 ½" HDW Bh
116 Pipe Galvanis 2" 6' HDW Bh
117 Plastic Strap for Clamping HDW Bh
118 Plat Besi 4 mm x 4 cm x 8 cm HDW Bh
119 Pole Band Double Rack 3" atau 3 ½" HDW Bh

*) Harga KHS 2005 6


120 Pole Band Double Rack 4" atau 4 ½" HDW Bh
121 Pole Band Double Rack 5" atau 5 ½" HDW Bh
122 Pole Band Double Rack 6" atau 6 ½" HDW Bh
123 Pole Band Double Rack 7" atau 7 ½" HDW Bh
124 Pole Band Double Rack 8" atau 8 ½" HDW Bh
125 Pole Band Double Rack 9" atau 12" HDW Bh
126 Pole Band Double Up Side 3" atau 3 ½" HDW Bh
127 Pole Band Double Up Side 4" atau 4 ½" HDW Bh
128 Pole Band Double Up Side 5" atau 5 ½" HDW Bh
129 Pole Band Double Up Side 6" atau 6 ½" HDW Bh
130 Pole Band Double Up Side 7" atau 7 ½" HDW Bh
131 Pole Band Double Up Side 8" atau 8 ½" HDW Bh
132 Pole Band Double Up Side 9" atau 12" HDW Bh
133 Pole Band Single Rack 3" atau 3 ½" HDW Bh
134 Pole Band Single Rack 4" atau 4 ½" HDW Bh
135 Pole Band Single Rack 5" atau 5 ½" HDW Bh
136 Pole Band Single Rack 6" atau 6 ½" HDW Bh
137 Pole Band Single Rack 7" atau 7 ½" HDW Bh
138 Pole Band Single Rack 8" atau 8 ½" HDW Bh
139 Pole Band Single Rack 9" atau 12" HDW Bh
140 Pole Band Single Up Side 3" atau 3 ½" HDW Bh
141 Pole Band Single Up Side 4" atau 4 ½" HDW Bh
142 Pole Band Single Up Side 5" atau 5 ½" HDW Bh
143 Pole Band Single Up Side 6" atau 6 ½" HDW Bh
144 Pole Band Single Up Side 7" atau 7 ½" HDW Bh
145 Pole Band Single Up Side 8" atau 8 ½" HDW Bh
146 Pole Band Single Up Side 9" atau 12" HDW Bh
147 Primary Angle Clamp ( 35 s/d 70 ) mm² HDW Bh
148 Primary Angle Clamp ( 150 s/d 240 ) mm² HDW Bh
149 Primary Dead End Clamp ( 35 s/d 70 ) mm² HDW Bh
150 Primary Dead End Clamp ( 70 s/d 150 ) mm² HDW Bh
151 Primary Dead End Clamp ( 150 s/d 240 ) mm² HDW Bh
152 Rod Anchor ¾" x 8' HDW Bh
153 Rod Anchor ⅝" x 7' HDW Bh
154 Schackle Anchor ⅝" HDW Bh
155 Side Bracket HDW Bh
156 Split Plastic Sleve ( Tutup Kabel ) HDW Bh
157 Spool Insulator ANSI 53 - 2 HDW Bh
158 Spool Insulator ANSI 53 - 4 HDW Bh
159 Stainless Steel Strap 20 x 0.7 mm HDW Mtr
160 Steel L 70 x 70 x 7 x 780 mm galvanis HDW Bh
161 Steel L 70 x 70 x 7 x 1.000 mm galvanis HDW Bh
162 Steel L 70 x 70 x 7 x 1.250 mm galvanis HDW Bh
163 Steel L 70 x 70 x 7 x 1.682 mm galvanis HDW Bh
164 Steel L 70 x 70 x 7 x 3.000 mm galvanis HDW Bh
165 Steel Channel C NP 8 x 1.750 HDW Bh
166 Steel Channel C NP 8 x 1.250 HDW Bh
167 Steel Channel C NP 8 x 1.390 HDW Bh
168 Stopping Buckle / Yokes HDW Bh
169 Strain Clamp A3C, ACSR 25-70 mm² HDW Bh
170 Strain Clamp A3C, ACSR 70-150 mm² HDW Bh
171 Strain Clamp A3C, ACSR 150-240 mm² HDW Bh
172 Strain Clamp A3C, ACSR 240-400 mm² HDW Bh
173 Suspension / Small Angle Assembly HDW Bh
174 Suspension Clamp AL HDW Bh
175 Suspension Clamp Plastic HDW Bh
176 Suspension Clamp Bracket / Pole Bracket HDW Bh
177 Strain Clamp Wedge 25-70 mm² HDW Bh
178 Strain Clamp Wedge 70-150 mm² HDW Bh
179 Tap connector ( 35 s/d 70 ) mm² HDW Bh
180 Tap connector ( 35 s/d 150 ) mm² HDW Bh
181 Tap connector ( 70 s/d 150 ) mm² HDW Bh
182 Tap connector ( 70 s/d 240 ) mm² HDW Bh
183 Tension Bracket HDW Bh
184 Link HDW Bh
185 Plastic Strap / Cable Ties HDW Bh
186 Three Bolt Clamp HDW Bh
187 Tie Wire # 4 / Alluminium bonding wire # 20 HDW Mtr
188 U Bolt Connector HDW Bh
189 Washer Round ⅜" HDW Bh
190 Washer Square 2 ¼" HDW Bh

Q AKSESORIES KABEL TANAH


1 Terminating kabel 1 x 70 mm² OD HDW Set
2 Terminating kabel 1 x 95 mm² ID HDW Set
3 Terminating kabel 1 x 95 mm² OD HDW Set
4 Terminating kabel 1 x 240 mm² ID HDW Set
5 Terminating kabel 1 x 240 mm² OD HDW Set
6 Terminating kabel 1 x 300 mm² ID HDW Set
7 Terminating kabel 1 x 300 mm² OD HDW Set
8 Terminating kabel 3 x 70 mm² ID HDW Set
9 Terminating kabel 3 x 70 mm² OD HDW Set
10 Terminating kabel 3 x 95 mm² ID HDW Set

*) Harga KHS 2005 7


11 Terminating kabel 3 x 95 mm² OD HDW Set
12 Terminating kabel 3 x 150 mm² ID HDW Set
13 Terminating kabel 3 x 150 mm² OD HDW Set
14 Terminating kabel 3 x 240 mm² ID HDW Set
15 Terminating kabel 3 x 240 mm² OD HDW Set
16 Terminating kabel 3 x 300 mm² ID HDW Set
17 Terminating kabel 3 x 300 mm² OD HDW Set
18 Jointing Raychem 24 KV 3 x 300 mm² (Armoured) OD HDW Set
19 Jointing Raychem 24 kV 3 x 300 mm² (Unarmoured) ID HDW Set
20 Jointing Raychem 24 kV 3 x 240 mm² (Armoured) OD HDW Set
21 Jointing Raychem 24 kV 3 x 240 mm² (Unarmoured) ID HDW Set
22 Jointing Raychem 24 kV 3 x 95 mm² (Armoured) OD HDW Set
23 Jointing Raychem 24 kV 3 x 95 mm² (Unarmoured) ID HDW Set
24 Suplement kit XLPE-PILC 3 x 150-240 mm² HDW Set
25 Suplement kit XLPE-PILC 3 x 300-400 mm² HDW Set
26 Suplement kit XLPE-PILC 3 x 150-240 mm² (IJKA) HDW Set
27 Klem beugel bevesteging 8 x 6" HDW Bh
28 Klem beugel ⅞" HDW Bh
29 Pipa PVC ½" HDW Bh
30 Pipa PVC ¾" panjang 4 meter HDW Bh
31 Pipa PVC 3" panjang 4 meter HDW Bh
32 Pipa PVC 6" panjang 4 meter HDW Bh
33 Pipa Besi Galvanis 3" Tebal 4 mm Panjang 6 Meter HDW Bh
34 Pipa shock PVC HDW Bh
35 Tanda urutan Fasa untuk kabel HDW Bh
36 Stainless steel strap HDW Bh
37 Tanda Kabel TM HDW Bh

R MATERIAL SCADA DAN TELEKOMUNIKASI


1 Antena 9 dBi HDW Bh
2 Auxiliary Relay 220 VAC 2CO & Socket HDW Bh
3 Auxiliary Relay 24 VDC 2CO & Socket HDW Bh
4 Battery 12 V/120 Ah HDW Bh
5 Concentrator Moxa 16 Port HDW Bh
6 Concentrator Moxa 8 Port HDW Unit
7 Handy Talkie Dual Band UHF/VHF Wide Range Freq HDW Bh
8 IO Interface 1218R HDW Bh
9 Kabel komunikasi RS485 HDW Meter
10 Modem Concentrator 3G HDW Bh
11 Modem GPRS (Intek J65I-X with DI/DO) HDW Bh
12 Modem GPRS (Intek J65I-X) HDW Bh
13 Modul Automatic Transfer Switch Control Module HDW Bh
14 Module Sepam 1000 (converter) HDW Unit
15 Moxa A53 HDW Bh
16 UPORT HDW Bh
17 Modem 3G/4G HDW Bh

S UPAH PASANG
- KONSTRUKSI JTR
1 Upah Pasang Konst. JTR J2 JASA Unit
2 Upah Pasang Konst. JTR J3 JASA Unit
3 Upah Pasang Konst. JTR J4 JASA Unit
4 Upah Pasang Konst. JTR J4-A JASA Unit
5 Upah Pasang Konst. JTR J5 JASA Unit
6 Upah Pasang Konst. JTR J6 JASA Unit
7 Upah Pasang Konst. JTR J6-X JASA Unit
8 Upah Pasang Konst. JTR J7 JASA Unit
9 Upah Pasang Konst. JTR J8 JASA Unit
10 Upah Pasang Konst. JTR J10 JASA Unit
11 Upah Pasang Konst. JTR J5-T JASA Unit
12 Upah Pasang Konst. JTR J6-T JASA Unit
13 Upah Pasang Konst. JTR J7-T JASA Unit
14 Upah Pasang Konst. JTR MJ6-T JASA Unit
15 Upah Pasang Konst. JTR B13-B JASA Unit
16 Upah Pasang Konst. JTR B13-D JASA Unit
17 Upah Pasang Konst. JTR B15-B JASA Unit
18 Upah Pasang Konst. JTR B15-D JASA Unit
19 Upah Pasang Konst. JTR B16-B JASA Unit
20 Upah Pasang Konst. JTR B16-D JASA Unit
21 Upah Pasang Konst. JTR B71-B JASA Unit

- KONSTRUKSI JTM 1 FASA


1 Upah Pasang Konst. JTM 1 Fasa A1 JASA Unit
2 Upah Pasang Konst. JTM 1 Fasa A1-N JASA Unit
3 Upah Pasang Konst. JTM 1 Fasa A1-PN JASA Unit
4 Upah Pasang Konst. JTM 1 Fasa A1-P JASA Unit
5 Upah Pasang Konst. JTM 1 Fasa A1' JASA Unit
6 Upah Pasang Konst. JTM 1 Fasa A1-P' JASA Unit
7 Upah Pasang Konst. JTM 1 Fasa A2 JASA Unit
8 Upah Pasang Konst. JTM 1 Fasa A2-N JASA Unit
9 Upah Pasang Konst. JTM 1 Fasa A2' JASA Unit
10 Upah Pasang Konst. JTM 1 Fasa A3 JASA Unit

*) Harga KHS 2005 8


11 Upah Pasang Konst. JTM 1 Fasa A3-N JASA Unit
12 Upah Pasang Konst. JTM 1 Fasa A3' JASA Unit
13 Upah Pasang Konst. JTM 1 Fasa A4 JASA Unit
14 Upah Pasang Konst. JTM 1 Fasa A4-N JASA Unit
15 Upah Pasang Konst. JTM 1 Fasa A4' JASA Unit
16 Upah Pasang Konst. JTM 1 Fasa A5 JASA Unit
17 Upah Pasang Konst. JTM 1 Fasa A5-N JASA Unit
18 Upah Pasang Konst. JTM 1 Fasa A5-1 JASA Unit
19 Upah Pasang Konst. JTM 1 Fasa A5-2 JASA Unit
20 Upah Pasang Konst. JTM 1 Fasa A5-3 JASA Unit
21 Upah Pasang Konst. JTM 1 Fasa A5-4 JASA Unit
22 Upah Pasang Konst. JTM 1 Fasa A5' JASA Unit
23 Upah Pasang Konst. JTM 1 Fasa A5-1' JASA Unit
24 Upah Pasang Konst. JTM 1 Fasa A5-2' JASA Unit
25 Upah Pasang Konst. JTM 1 Fasa A5-3' JASA Unit
26 Upah Pasang Konst. JTM 1 Fasa A5-4' JASA Unit
27 Upah Pasang Konst. JTM 1 Fasa A6 JASA Unit
28 Upah Pasang Konst. JTM 1 Fasa A6-N JASA Unit
29 Upah Pasang Konst. JTM 1 Fasa A6' JASA Unit
30 Upah Pasang Konst. JTM 1 Fasa A7 JASA Unit
31 Upah Pasang Konst. JTM 1 Fasa A7-A JASA Unit
32 Upah Pasang Konst. JTM 1 Fasa A8 JASA Unit
33 Upah Pasang Konst. JTM 1 Fasa A8-A JASA Unit
34 Upah Pasang Konst. JTM 1 Fasa A9 JASA Unit
35 Upah Pasang Konst. JTM 1 Fasa A9-N JASA Unit

- KONSTRUKSI JTM 1 FASA MENJADI 3 FASA


1 Upah Pasang Konst. JTM 1-3 Fasa B1 JASA Unit
2 Upah Pasang Konst. JTM 1-3 Fasa B1-A JASA Unit
3 Upah Pasang Konst. JTM 1-3 Fasa B2 JASA Unit
4 Upah Pasang Konst. JTM 1-3 Fasa B3 JASA Unit
5 Upah Pasang Konst. JTM 1-3 Fasa B4 JASA Unit
6 Upah Pasang Konst. JTM 1-3 Fasa B5 JASA Unit
7 DB 06 JASA Unit
8 DB 08 (SKUTM ke SUTM) JASA Unit
9 DB 09 (Jointing SKUTM) JASA Unit

- KONSTRUKSI JTM 3 FASA


1 Upah Pasang Konst. JTM 3 Fasa C1 JASA Unit
2 Upah Pasang Konst. JTM 3 Fasa C1-N JASA Unit
3 Upah Pasang Konst. JTM 3 Fasa C1-1 JASA Unit
4 Upah Pasang Konst. JTM 3 Fasa C1-1N JASA Unit
5 Upah Pasang Konst. JTM 3 Fasa C1-A JASA Unit
6 Upah Pasang Konst. JTM 3 Fasa C1' JASA Unit
7 Upah Pasang Konst. JTM 3 Fasa C1-1' JASA Unit
8 Upah Pasang Konst. JTM 3 Fasa C1-A' JASA Unit
9 Upah Pasang Konst. JTM 3 Fasa C2 JASA Unit
10 Upah Pasang Konst. JTM 3 Fasa C2-1 JASA Unit
11 Upah Pasang Konst. JTM 3 Fasa C2-A JASA Unit
12 Upah Pasang Konst. JTM 3 Fasa C2-N JASA Unit
13 Upah Pasang Konst. JTM 3 Fasa C2' JASA Unit
14 Upah Pasang Konst. JTM 3 Fasa C2-1' JASA Unit
15 Upah Pasang Konst. JTM 3 Fasa C2-A' JASA Unit
16 Upah Pasang Konst. JTM 3 Fasa C3 JASA Unit
17 Upah Pasang Konst. JTM 3 Fasa C3-VN JASA Unit
18 Upah Pasang Konst. JTM 3 Fasa C3' JASA Unit
19 Upah Pasang Konst. JTM 3 Fasa C4-1 JASA Unit
20 Upah Pasang Konst. JTM 3 Fasa C5-1 JASA Unit
21 Upah Pasang Konst. JTM 3 Fasa C7 JASA Unit
22 Upah Pasang Konst. JTM 3 Fasa C7-1 JASA Unit
23 Upah Pasang Konst. JTM 3 Fasa C7-N JASA Unit
24 Upah Pasang Konst. JTM 3 Fasa C7' JASA Unit
25 Upah Pasang Konst. JTM 3 Fasa C7-1' JASA Unit
30 Upah Pasang Konst. JTM 3 Fasa C7-A' JASA Unit
26 Upah Pasang Konst. JTM 3 Fasa C8 JASA Unit
27 Upah Pasang Konst. JTM 3 Fasa C8-A JASA Unit
28 Upah Pasang Konst. JTM 3 Fasa C8-AN JASA Unit
29 Upah Pasang Konst. JTM 3 Fasa C8' JASA Unit
30 Upah Pasang Konst. JTM 3 Fasa C8-A' JASA Unit
31 Upah Pasang Konst. JTM 3 Fasa C8-N JASA Unit
32 Upah Pasang Konst. JTM 3 Fasa C9 JASA Unit
33 Upah Pasang Konst. JTM 3 Fasa C9-N JASA Unit
34 Upah Pasang Konst. JTM 3 Fasa C9' JASA Unit
35 Upah Pasang Konst. JTM 3 Fasa C10 JASA Unit
36 Upah Pasang Konst. JTM 3 Fasa C10-N JASA Unit
37 Upah Pasang Konst. JTM 3 Fasa C10' JASA Unit
38 Upah Pasang Konst. JTM 3 Fasa C11 JASA Unit
39 Upah Pasang Konst. JTM 3 Fasa C11-N JASA Unit
40 Upah Pasang Konst. JTM 3 Fasa C11' JASA Unit

- KONSTRUKSI JTM DOUBLE CIRCUIT


1 Upah Pasang Konst. JTM Double Circuit DC-C1V JASA Unit
2 Upah Pasang Konst. JTM Double Circuit DC-C1-1V JASA Unit

*) Harga KHS 2005 9


3 Upah Pasang Konst. JTM Double Circuit DC-C1-1H JASA Unit
4 Upah Pasang Konst. JTM Double Circuit DC-C1-AHN JASA Unit
5 Upah Pasang Konst. JTM Double Circuit DC-C2-1V JASA Unit
6 Upah Pasang Konst. JTM Double Circuit DC-C2-AH JASA Unit
7 Upah Pasang Konst. JTM Double Circuit DC-C2-AHN JASA Unit
8 Upah Pasang Konst. JTM Double Circuit DC-C2-ABN JASA Unit
9 Upah Pasang Konst. JTM Double Circuit DC-C4-N JASA Unit
10 Upah Pasang Konst. JTM Double Circuit DC-C7-N JASA Unit
11 Upah Pasang Konst. JTM Double Circuit DC-C8 JASA Unit
12 Upah Pasang Konst. JTM Double Circuit DC-C8-N JASA Unit

- AKSESORIES JARINGAN
1 Upah Pasang Acc.Jar M2-11 JASA Unit
2 Upah Pasang Acc.Jar M2-11M JASA Unit
3 Upah Pasang Acc.Jar M2-12 JASA Unit
4 Upah Pasang Acc.Jar M2-12A JASA Unit
5 Upah Pasang Acc.Jar M2-15 JASA Unit
6 Upah Pasang SM / CM 3 - 16 (ABSW) JASA Unit
7 Upah Pasang Acc.Jar M5-2 JASA Unit
8 Upah Pasang Acc.Jar M5-3 JASA Unit
9 Upah Pasang Acc.Jar M5-4 JASA Unit
10 Upah Pasang Acc.Jar M5-5 JASA Unit
11 Upah Pasang Acc.Jar M5-6 JASA Unit
12 Upah Pasang Acc.Jar M5-8 JASA Unit
13 Upah Pasang Acc.Jar M5-9 JASA Unit
14 Upah Pasang Acc.Jar M5-10 JASA Unit
15 Upah Pasang Acc.Jar M5-12 JASA Unit
16 Upah Pasang Acc.Jar M5-13 JASA Unit
17 Upah Pasang Acc.Jar M5-16 JASA Unit
18 Upah Pasang Acc.Jar M5-20 JASA Unit
19 Upah Pasang Acc.Jar M5-24 (Recloser 3 fasa 20 KV, 560 A) JASA Unit
20 Upah Pasang Acc.Jar P12C-1 JASA Unit
21 Upah Pasang Acc.Jar P12C-2 JASA Unit
22 Upah Pasang Acc.Jar P12S-1 JASA Unit
23 Upah Pasang Acc.Jar P12S-2 JASA Unit
24 Upah Pasang Acc.Jar E1-1 JASA Unit
25 Upah Pasang Acc.Jar E1-2 JASA Unit
26 Upah Pasang Acc.Jar E1-3 JASA Unit
27 Upah Pasang Acc.Jar E2-1 JASA Unit
28 Upah Pasang Acc.Jar E2-2 JASA Unit
29 Upah Pasang Acc.Jar E2-3 JASA Unit
30 Upah Pasang Acc.Jar E5-1 JASA Unit
31 Upah Pasang Acc.Jar E5-2 JASA Unit
32 Upah Pasang Acc.Jar E6-1 JASA Unit
33 Upah Pasang Acc.Jar F1-2 JASA Unit
34 Upah Pasang Acc.Jar F1-3 JASA Unit
35 Upah Pasang Acc.Jar FDG (Drag Schoor) JASA Unit
36 Upah Pasang Acc.Jar M45 Penghalang Panjat JASA Unit
37 Upah Pasang Acc.Jar LVCB 2 Jurusan JASA Unit
38 Upah Pasang Acc.Jar Sectionalizer 3 Fasa JASA Unit
39 Upah Pasang Acc.Jar LVCB 4 Jurusan JASA Unit
40 Upah Pasang Acc.Jar Disconecting Switch JASA Unit
41 Upah Pasang Acc.Jar Konstruksi Vangnet JASA Unit
42 Upah Pembuatan & Pasang Acc.Jar Jaring Vangnet JASA Per 1 m

- PENGHANTAR TM
1 Upah Pasang Penghantar TM A3C 3x240 + 1x150mm² JASA Per 50 m
2 Upah Pasang Penghantar TM A3C 3x240 + 1x120mm² JASA Per 50 m
5 Upah Pasang Penghantar TM A3C 3x150 + 1x150mm² JASA Per 50 m
6 Upah Pasang Penghantar TM A3C 3x150 + 1x70mm² JASA Per 50 m
9 Upah Pasang Penghantar TM A3C 3x70 + 1x70mm² JASA Per 50 m
10 Upah Pasang Penghantar TM A3C 3x70 + 1x50mm² JASA Per 50 m
11 Upah Pasang Penghantar TM A3C 3x70 + 1x35mm² JASA Per 50 m
12 Upah Pasang Penghantar TM A3C 3x35 + 1x35mm² JASA Per 50 m
13 Upah Pasang Penghantar TM A3C 1x150 + 1x70mm² JASA Per 50 m
14 Upah Pasang Penghantar TM A3C 1x120 + 1x70mm² JASA Per 50 m
15 Upah Pasang Penghantar TM A3C 1x70 + 1x70mm² JASA Per 50 m
16 Upah Pasang Penghantar TM A3C 1x70 + 1x50mm² JASA Per 50 m
17 Upah Pasang Penghantar TM A3C 1x70 + 1x35mm² JASA Per 50 m
18 Upah Pasang Penghantar TM A3C 1x35 + 1x35mm² JASA Per 50 m
19 Upah Pasang Penghantar TM A3C 3x240mm² JASA Per 50 m
20 Upah Pasang Penghantar TM A3C 3x150mm² JASA Per 50 m
21 Upah Pasang Penghantar TM A3C 3x70mm² JASA Per 50 m
22 Upah Pasang Penghantar TM A3C 3x35mm² JASA Per 50 m
23 Upah Pasang Penghantar TM A3C 2x240mm² JASA Per 50 m
24 Upah Pasang Penghantar TM A3C 2x150mm² JASA Per 50 m
25 Upah Pasang Penghantar TM A3C 2x70mm² JASA Per 50 m
26 Upah Pasang Penghantar TM A3C 2x35mm² JASA Per 50 m
27 Upah Pasang Penghantar TM A3C 1x240mm² JASA Per 50 m
28 Upah Pasang Penghantar TM A3C 1x150mm² JASA Per 50 m
29 Upah Pasang Penghantar TM A3C 1x70mm² JASA Per 50 m
30 Upah Pasang Penghantar TM A3C 1x50mm² JASA Per 50 m
31 Upah Pasang Penghantar TM A3C 1x35mm² JASA Per 50 m

*) Harga KHS 2005 10


32 Upah Pasang Penghantar TM A3CS 3x240 + 1x150mm² JASA Per 50 m
33 Upah Pasang Penghantar TM A3CS 3x240 + 1x120mm² JASA Per 50 m
34 Upah Pasang Penghantar TM A3CS 3x150 + 1x150mm² JASA Per 50 m
35 Upah Pasang Penghantar TM A3CS 3x150 + 1x70mm² JASA Per 50 m
36 Upah Pasang Penghantar TM A3CS 3x70 + 1x70mm² JASA Per 50 m
37 Upah Pasang Penghantar TM A3CS 3x70 + 1x50mm² JASA Per 50 m
38 Upah Pasang Penghantar TM A3CS 3x70 + 1x35mm² JASA Per 50 m
39 Upah Pasang Penghantar TM A3CS 3x35 + 1x35mm² JASA Per 50 m
40 Upah Pasang Penghantar TM A3CS 1x150 + 1x70mm² JASA Per 50 m
41 Upah Pasang Penghantar TM A3CS 1x120 + 1x70mm² JASA Per 50 m
42 Upah Pasang Penghantar TM A3CS 1x70 + 1x70mm² JASA Per 50 m
43 Upah Pasang Penghantar TM A3CS 1x70 + 1x50mm² JASA Per 50 m
44 Upah Pasang Penghantar TM A3CS 1x70 + 1x35mm² JASA Per 50 m
45 Upah Pasang Penghantar TM A3CS 1x35 + 1x35mm² JASA Per 50 m
46 Upah Pasang Penghantar TM A3CS 3x240mm² JASA Per 50 m
47 Upah Pasang Penghantar TM A3CS 3x150mm² JASA Per 50 m
48 Upah Pasang Penghantar TM A3CS 3x70mm² JASA Per 50 m
49 Upah Pasang Penghantar TM A3CS 3x35mm² JASA Per 50 m
50 Upah Pasang Penghantar TM A3CS 2x240mm² JASA Per 50 m
51 Upah Pasang Penghantar TM A3CS 2x150mm² JASA Per 50 m
52 Upah Pasang Penghantar TM A3CS 2x70mm² JASA Per 50 m
53 Upah Pasang Penghantar TM A3CS 2x35mm² JASA Per 50 m
54 Upah Pasang Penghantar TM A3CS 1x240mm² JASA Per 50 m
55 Upah Pasang Penghantar TM A3CS 1x150mm² JASA Per 50 m
56 Upah Pasang Penghantar TM A3CS 1x70mm² JASA Per 50 m
57 Upah Pasang Penghantar TM A3CS 1x50mm² JASA Per 50 m
58 Upah Pasang Penghantar TM A3CS 1x35mm² JASA Per 50 m
59 Upah Pasang Kabel MVTIC 3 x 240 + N 95 mm² JASA Per 50 m

- PENGHANTAR TR
1 Upah Pasang Penghantar TR A3C 3x70 + 1x35mm² JASA Per 50 m
2 Upah Pasang Penghantar TR A3C 2x70 + 1x70mm² JASA Per 50 m
3 Upah Pasang Penghantar TR A3C 2x70 + 1x35mm² JASA Per 50 m
4 Upah Pasang Penghantar TR A3C 2x70mm² JASA Per 50 m
5 Upah Pasang Penghantar TR A3C 2x55 + 1x35mm² JASA Per 50 m
6 Upah Pasang Penghantar TR A3C 2x55mm² JASA Per 50 m
7 Upah Pasang Penghantar TR A3C 2x35mm² JASA Per 50 m
8 Upah Pasang Penghantar TR TX # 6 ,4 , 2 JASA Per 50 m
9 Upah Pasang Penghantar TR TX # 1 / 0 & # 4/ 0 JASA Per 50 m
10 Upah Pasang Penghantar TR QX # 6, 4, 2 JASA Per 50 m
11 Upah Pasang Penghantar TR QX # 2 / 0 & 4 / 0 JASA Per 50 m
12 Upah Pasang Penghantar TR LVTC 3x70 + 1x50mm² JASA Per 50 m
13 Upah Pasang Penghantar TR LVTC 3x50 + 1x35mm² JASA Per 50 m
14 Upah Pasang Penghantar TR LVTC 3x35 + 1x35mm² JASA Per 50 m
15 Upah Pasang Penghantar TR LVTC 2x70 + 1x50mm² JASA Per 50 m
16 Upah Pasang Penghantar TR LVTC 2x50 + 1x50mm² JASA Per 50 m
17 Upah Pasang Penghantar TR LVTC 2x50 + 1x35mm² JASA Per 50 m
18 Upah Pasang Penghantar TR LVTC 2x35 + 1x35mm² JASA Per 50 m
19 Upah Pasang Penghantar TR LVTC 2x25 + 1x25mm² JASA Per 50 m

- PENGHANTAR TM PER KMS


1 Upah Pasang Penghantar TM A3C 3x240 + 1x150mm² Per Kms JASA Per Kms
2 Upah Pasang Penghantar TM A3C 3x240 + 1x120mm² Per Kms JASA Per Kms
5 Upah Pasang Penghantar TM A3C 3x150 + 1x150mm² Per Kms JASA Per Kms
6 Upah Pasang Penghantar TM A3C 3x150 + 1x70mm² Per Kms JASA Per Kms
9 Upah Pasang Penghantar TM A3C 3x70 + 1x70mm² Per Kms JASA Per Kms
10 Upah Pasang Penghantar TM A3C 3x70 + 1x50mm² Per Kms JASA Per Kms
11 Upah Pasang Penghantar TM A3C 3x70 + 1x35mm² Per Kms JASA Per Kms
12 Upah Pasang Penghantar TM A3C 3x35 + 1x35mm² Per Kms JASA Per Kms
13 Upah Pasang Penghantar TM A3C 1x150 + 1x70mm² Per Kms JASA Per Kms
14 Upah Pasang Penghantar TM A3C 1x120 + 1x70mm² Per Kms JASA Per Kms
15 Upah Pasang Penghantar TM A3C 1x70 + 1x70mm² Per Kms JASA Per Kms
16 Upah Pasang Penghantar TM A3C 1x70 + 1x50mm² Per Kms JASA Per Kms
17 Upah Pasang Penghantar TM A3C 1x70 + 1x35mm² Per Kms JASA Per Kms
18 Upah Pasang Penghantar TM A3C 1x35 + 1x35mm² Per Kms JASA Per Kms
19 Upah Pasang Penghantar TM A3C 3x240mm² Per Kms JASA Per Kms
20 Upah Pasang Penghantar TM A3C 3x150mm² Per Kms JASA Per Kms
21 Upah Pasang Penghantar TM A3C 3x70mm² Per Kms JASA Per Kms
22 Upah Pasang Penghantar TM A3C 3x35mm² Per Kms JASA Per Kms
23 Upah Pasang Penghantar TM A3C 2x240mm² Per Kms JASA Per Kms
24 Upah Pasang Penghantar TM A3C 2x150mm² Per Kms JASA Per Kms
25 Upah Pasang Penghantar TM A3C 2x70mm² Per Kms JASA Per Kms
26 Upah Pasang Penghantar TM A3C 2x35mm² Per Kms JASA Per Kms
27 Upah Pasang Penghantar TM A3C 1x240mm² Per Kms JASA Per Kms
28 Upah Pasang Penghantar TM A3C 1x150mm² Per Kms JASA Per Kms
29 Upah Pasang Penghantar TM A3C 1x70mm² Per Kms JASA Per Kms
30 Upah Pasang Penghantar TM A3C 1x50mm² Per Kms JASA Per Kms
31 Upah Pasang Penghantar TM A3C 1x35mm² Per Kms JASA Per Kms
32 Upah Pasang Penghantar TM A3CS 3x240 + 1x150mm² Per Kms JASA Per Kms
33 Upah Pasang Penghantar TM A3CS 3x240 + 1x120mm² Per Kms JASA Per Kms
34 Upah Pasang Penghantar TM A3CS 3x150 + 1x150mm² Per Kms JASA Per Kms
35 Upah Pasang Penghantar TM A3CS 3x150 + 1x70mm² Per Kms JASA Per Kms
36 Upah Pasang Penghantar TM A3CS 3x70 + 1x70mm² Per Kms JASA Per Kms

*) Harga KHS 2005 11


37 Upah Pasang Penghantar TM A3CS 3x70 + 1x50mm² Per Kms JASA Per Kms
38 Upah Pasang Penghantar TM A3CS 3x70 + 1x35mm² Per Kms JASA Per Kms
39 Upah Pasang Penghantar TM A3CS 3x35 + 1x35mm² Per Kms JASA Per Kms
40 Upah Pasang Penghantar TM A3CS 1x150 + 1x70mm² Per Kms JASA Per Kms
41 Upah Pasang Penghantar TM A3CS 1x120 + 1x70mm² Per Kms JASA Per Kms
42 Upah Pasang Penghantar TM A3CS 1x70 + 1x70mm² Per Kms JASA Per Kms
43 Upah Pasang Penghantar TM A3CS 1x70 + 1x50mm² Per Kms JASA Per Kms
44 Upah Pasang Penghantar TM A3CS 1x70 + 1x35mm² Per Kms JASA Per Kms
45 Upah Pasang Penghantar TM A3CS 1x35 + 1x35mm² Per Kms JASA Per Kms
46 Upah Pasang Penghantar TM A3CS 3x240mm² Per Kms JASA Per Kms
47 Upah Pasang Penghantar TM A3CS 3x150mm² Per Kms JASA Per Kms
48 Upah Pasang Penghantar TM A3CS 3x70mm² Per Kms JASA Per Kms
49 Upah Pasang Penghantar TM A3CS 3x35mm² Per Kms JASA Per Kms
50 Upah Pasang Penghantar TM A3CS 2x240mm² Per Kms JASA Per Kms
51 Upah Pasang Penghantar TM A3CS 2x150mm² Per Kms JASA Per Kms
52 Upah Pasang Penghantar TM A3CS 2x70mm² Per Kms JASA Per Kms
53 Upah Pasang Penghantar TM A3CS 2x35mm² Per Kms JASA Per Kms
54 Upah Pasang Penghantar TM A3CS 1x240mm² Per Kms JASA Per Kms
55 Upah Pasang Penghantar TM A3CS 1x150mm² Per Kms JASA Per Kms
56 Upah Pasang Penghantar TM A3CS 1x70mm² Per Kms JASA Per Kms
57 Upah Pasang Penghantar TM A3CS 1x50mm² Per Kms JASA Per Kms
58 Upah Pasang Penghantar TM A3CS 1x35mm² Per Kms JASA Per Kms
59 Upah Pasang Kabel MVTIC 3 x 240 + N 95 mm² Per Kms JASA Per 50 m

- PENGHANTAR TR PER KMS


1 Upah Pasang Penghantar TR A3C 3x70 + 1x35mm² Per Kms JASA Per Kms
2 Upah Pasang Penghantar TR A3C 2x70 + 1x70mm² Per Kms JASA Per Kms
3 Upah Pasang Penghantar TR A3C 2x70 + 1x35mm² Per Kms JASA Per Kms
4 Upah Pasang Penghantar TR A3C 2x70mm² Per Kms JASA Per Kms
5 Upah Pasang Penghantar TR A3C 2x55 + 1x35mm² Per Kms JASA Per Kms
6 Upah Pasang Penghantar TR A3C 2x55mm² Per Kms JASA Per Kms
7 Upah Pasang Penghantar TR A3C 2x35mm² Per Kms JASA Per Kms
8 Upah Pasang Penghantar TR TX # 6 ,4 , 2 Per Kms JASA Per Kms
9 Upah Pasang Penghantar TR TX # 1 / 0 & # 4/ 0 Per Kms JASA Per Kms
10 Upah Pasang Penghantar TR QX # 6, 4, 2 Per Kms JASA Per Kms
11 Upah Pasang Penghantar TR QX # 2 / 0 & 4 / 0 Per Kms JASA Per Kms
12 Upah Pasang Penghantar TR LVTC 3x70 + 1x50mm² Per Kms JASA Per Kms
13 Upah Pasang Penghantar TR LVTC 3x50 + 1x35mm² Per Kms JASA Per Kms
14 Upah Pasang Penghantar TR LVTC 3x35 + 1x35mm² Per Kms JASA Per Kms
15 Upah Pasang Penghantar TR LVTC 2x70 + 1x50mm² Per Kms JASA Per Kms
16 Upah Pasang Penghantar TR LVTC 2x50 + 1x50mm² Per Kms JASA Per Kms
17 Upah Pasang Penghantar TR LVTC 2x50 + 1x35mm² Per Kms JASA Per Kms
18 Upah Pasang Penghantar TR LVTC 2x35 + 1x35mm² Per Kms JASA Per Kms
19 Upah Pasang Penghantar TR LVTC 2x25 + 1x25mm² Per Kms JASA Per Kms

i TRAFO DISTRIBUSI
1 Upah Pasang Trafo 1 Fasa 25 KVA + Bracket JASA Unit
2 Upah Pasang Trafo 1 Fasa 50 KVA + Bracket JASA Unit
3 Upah Pasang Trafo 1 Fasa 50 KVA 1 Tiang JASA Unit
4 Upah Pasang Trafo 3 Fasa 50 KVA 1 Tiang JASA Unit
5 Upah Pasang Trafo 3 Fasa 100 KVA 1 Tiang JASA Unit
6 Upah Pasang Trafo 3 Fasa 50 KVA 2 Tiang JASA Unit
7 Upah Pasang Trafo 3 Fasa 100 KVA 2 Tiang JASA Unit
8 Upah Pasang Trafo 3 Fasa 160 KVA 2 Tiang JASA Unit
9 Upah Pasang Trafo 3 Fasa 200 KVA 2 Tiang JASA Unit

- TIANG
1 Upah Pasang Tiang Beton 7M-100 daN JASA Btg
2 Upah Pasang Tiang Beton 7M-100 daN+E JASA Btg
3 Upah Pasang Tiang Beton 9M-100 daN JASA Btg
4 Upah Pasang Tiang Beton 9M-100 daN+E JASA Btg
5 Upah Pasang Tiang Beton 9M-200 daN JASA Btg
6 Upah Pasang Tiang Beton 9M-200 daN+E JASA Btg
7 Upah Pasang Tiang Beton 9M-350 daN JASA Btg
8 Upah Pasang Tiang Beton 9M-350 daN+E JASA Btg
9 Upah Pasang Tiang Beton 11M-200 daN JASA Btg
10 Upah Pasang Tiang Beton 11M-200 daN+E JASA Btg
11 Upah Pasang Tiang Beton 11M-350 daN JASA Btg
12 Upah Pasang Tiang Beton 11M-350 daN+E JASA Btg
13 Upah Pasang Tiang Beton 12M-200 daN JASA Btg
14 Upah Pasang Tiang Beton 12M-200 daN+E JASA Btg
15 Upah Pasang Tiang Beton 12M-350 daN JASA Btg
16 Upah Pasang Tiang Beton 12M-350 daN+E JASA Btg
17 Upah Pasang Tiang Beton 12M-500 daN JASA Btg
18 Upah Pasang Tiang Beton 12M-500 daN+E JASA Btg
19 Upah Pasang Tiang Beton 13M-350 daN JASA Btg
20 Upah Pasang Tiang Beton 13M-350 daN+E JASA Btg
21 Upah Pasang Tiang Beton 13M-500 daN JASA Btg
22 Upah Pasang Tiang Beton 13M-500 daN+E JASA Btg
23 Upah Pasang Tiang Beton 14M-350 daN JASA Btg
24 Upah Pasang Tiang Beton 14M-350 daN+E JASA Btg
25 Upah Pasang Tiang Beton 14M-500 daN JASA Btg
26 Upah Pasang Tiang Beton 14M-500 daN+E JASA Btg

*) Harga KHS 2005 12


- KABEL TANAH
1 Upah Pasang Terminating Kabel 1 x 70 mm² OD JASA Unit
2 Upah Pasang Terminating Kabel 3 x 70 mm² ID JASA Unit
3 Upah Pasang Terminating Kabel 3 x 70 mm² OD JASA Unit
4 Upah Pasang Terminating Kabel 3 x 95 mm² ID JASA Unit
5 Upah Pasang Terminating Kabel 3 x 95 mm² OD JASA Unit
6 Upah Pasang Terminating Kabel 3 x 150 mm² ID JASA Unit
7 Upah Pasang Terminating Kabel 3 x 150 mm² OD JASA Unit
8 Upah Pasang Terminating Kabel 3 x 240 mm² ID JASA Unit
9 Upah Pasang Terminating Kabel 3 x 240 mm² OD JASA Unit
10 Upah Pasang Terminating Kabel 3 x 300 mm² ID JASA Unit
11 Upah Pasang Terminating Kabel 3 x 300 mm² OD JASA Unit
12 Upah Pasang Sepatu kabel bimetal 240 - 300 mm² (2 lubang) JASA Unit
13 Upah Pasang Sepatu kabel bimetal 150 mm² (2 lubang) JASA Unit
14 Upah Pasang Kabel Tanah XLPE 3 x 300 mm² (three core) JASA Per 50 m
15 Upah Pasang Kabel Tanah XLPE 3 x 240 mm² (three core) JASA Per 50 m
16 Upah Pasang Kabel NYY 1 x 70 mm² JASA Per 1 m
17 Upah Pasang Kabel NYY 1 x 150 mm² JASA Per 1 m
18 Upah Pasang Kabel NA2XS2Y 20 KV 3 x 150 mm² JASA Per 1 m
19 Upah Pasang Kabel NA2XS2Y 20 KV 3 x 95 mm² JASA Per 1 m
20 Upah Pasang Kabel NA2XS2Y 20 KV 3 x 70 mm² JASA Per 1 m
21 Upah Pasang Kabel NA2XS2Y 20 KV 1 x 70 mm² JASA Per 1 m
22 Galian Kabel - m³ JASA Per m³

- SAMBUNGAN RUMAH
1 Upah Pasang Sambungan Rumah 1 Fasa JASA Unit
2 Upah Pasang Sambungan Rumah 3 Fasa JASA Unit
3 Upah Pasang SR + APP 1 Fasa JASA Unit
4 Upah Pasang SR + APP 3 Fasa JASA Unit
5 Upah Pasang SR + APP 3 Fasa + Wiring JASA Unit
6 Upah Pasang APP TM + Wiring JASA Unit
7 Upah Pasang Cubicle JASA Unit
7 Upah Pasang Cubicle Pelanggan JASA Unit
8 Upah Bongkar & Pasang Kwh Meter Elektronik, serta Wiring Pengujian JASA Unit

T UPAH BONGKAR
- KONSTRUKSI JTR
1 Upah Bongkar Konst. JTR J2 JASA Unit
2 Upah Bongkar Konst. JTR J3 JASA Unit
3 Upah Bongkar Konst. JTR J4 JASA Unit
4 Upah Bongkar Konst. JTR J4-A JASA Unit
5 Upah Bongkar Konst. JTR J5 JASA Unit
6 Upah Bongkar Konst. JTR J6 JASA Unit
7 Upah Bongkar Konst. JTR J6-X JASA Unit
8 Upah Bongkar Konst. JTR J7 JASA Unit
9 Upah Bongkar Konst. JTR J8 JASA Unit
10 Upah Bongkar Konst. JTR J10 JASA Unit
11 Upah Bongkar Konst. JTR J5-T JASA Unit
12 Upah Bongkar Konst. JTR J6-T JASA Unit
13 Upah Bongkar Konst. JTR J7-T JASA Unit
14 Upah Bongkar Konst. JTR MJ6-T JASA Unit
15 Upah Bongkar Konst. JTR B13-B JASA Unit
16 Upah Bongkar Konst. JTR B13-D JASA Unit
17 Upah Bongkar Konst. JTR B15-B JASA Unit
18 Upah Bongkar Konst. JTR B15-D JASA Unit
19 Upah Bongkar Konst. JTR B16-B JASA Unit
20 Upah Bongkar Konst. JTR B16-D JASA Unit
21 Upah Bongkar Konst. JTR B71-B JASA Unit

- KONSTRUKSI JTM 1 FASA


1 Upah Bongkar Konst. JTM 1 Fasa A1 JASA Unit
2 Upah Bongkar Konst. JTM 1 Fasa A1-N JASA Unit
3 Upah Bongkar Konst. JTM 1 Fasa A1-PN JASA Unit
4 Upah Bongkar Konst. JTM 1 Fasa A1-P JASA Unit
5 Upah Bongkar Konst. JTM 1 Fasa A1' JASA Unit
6 Upah Bongkar Konst. JTM 1 Fasa A1-P' JASA Unit
7 Upah Bongkar Konst. JTM 1 Fasa A2 JASA Unit
8 Upah Bongkar Konst. JTM 1 Fasa A2-N JASA Unit
9 Upah Bongkar Konst. JTM 1 Fasa A2' JASA Unit
10 Upah Bongkar Konst. JTM 1 Fasa A3 JASA Unit
11 Upah Bongkar Konst. JTM 1 Fasa A3-N JASA Unit
12 Upah Bongkar Konst. JTM 1 Fasa A3' JASA Unit
13 Upah Bongkar Konst. JTM 1 Fasa A4 JASA Unit
14 Upah Bongkar Konst. JTM 1 Fasa A4-N JASA Unit
15 Upah Bongkar Konst. JTM 1 Fasa A4' JASA Unit
16 Upah Bongkar Konst. JTM 1 Fasa A5 JASA Unit
17 Upah Bongkar Konst. JTM 1 Fasa A5-N JASA Unit
18 Upah Bongkar Konst. JTM 1 Fasa A5-1 JASA Unit
19 Upah Bongkar Konst. JTM 1 Fasa A5-2 JASA Unit
20 Upah Bongkar Konst. JTM 1 Fasa A5-3 JASA Unit
21 Upah Bongkar Konst. JTM 1 Fasa A5-4 JASA Unit
22 Upah Bongkar Konst. JTM 1 Fasa A5' JASA Unit

*) Harga KHS 2005 13


23 Upah Bongkar Konst. JTM 1 Fasa A5-1' JASA Unit
24 Upah Bongkar Konst. JTM 1 Fasa A5-2' JASA Unit
25 Upah Bongkar Konst. JTM 1 Fasa A5-3' JASA Unit
26 Upah Bongkar Konst. JTM 1 Fasa A5-4' JASA Unit
27 Upah Bongkar Konst. JTM 1 Fasa A6 JASA Unit
28 Upah Bongkar Konst. JTM 1 Fasa A6-N JASA Unit
29 Upah Bongkar Konst. JTM 1 Fasa A6' JASA Unit
30 Upah Bongkar Konst. JTM 1 Fasa A7 JASA Unit
31 Upah Bongkar Konst. JTM 1 Fasa A7-A JASA Unit
32 Upah Bongkar Konst. JTM 1 Fasa A8 JASA Unit
33 Upah Bongkar Konst. JTM 1 Fasa A8-A JASA Unit
34 Upah Bongkar Konst. JTM 1 Fasa A9 JASA Unit
35 Upah Bongkar Konst. JTM 1 Fasa A9-N JASA Unit

- KONSTRUKSI JTM 1 FASA MENJADI 3 FASA


1 Upah Bongkar Konst. JTM 1-3 Fasa B1 JASA Unit
2 Upah Bongkar Konst. JTM 1-3 Fasa B1-A JASA Unit
3 Upah Bongkar Konst. JTM 1-3 Fasa B2 JASA Unit
4 Upah Bongkar Konst. JTM 1-3 Fasa B3 JASA Unit
5 Upah Bongkar Konst. JTM 1-3 Fasa B4 JASA Unit
6 Upah Bongkar Konst. JTM 1-3 Fasa B5 JASA Unit

- KONSTRUKSI JTM 3 FASA


1 Upah Bongkar Konst. JTM 3 Fasa C1 JASA Unit
2 Upah Bongkar Konst. JTM 3 Fasa C1-N JASA Unit
3 Upah Bongkar Konst. JTM 3 Fasa C1-1 JASA Unit
4 Upah Bongkar Konst. JTM 3 Fasa C1-1N JASA Unit
5 Upah Bongkar Konst. JTM 3 Fasa C1-A JASA Unit
6 Upah Bongkar Konst. JTM 3 Fasa C1' JASA Unit
7 Upah Bongkar Konst. JTM 3 Fasa C1-1' JASA Unit
8 Upah Bongkar Konst. JTM 3 Fasa C1-A' JASA Unit
9 Upah Bongkar Konst. JTM 3 Fasa C2 JASA Unit
10 Upah Bongkar Konst. JTM 3 Fasa C2-1 JASA Unit
11 Upah Bongkar Konst. JTM 3 Fasa C2-A JASA Unit
12 Upah Bongkar Konst. JTM 3 Fasa C2-N JASA Unit
13 Upah Bongkar Konst. JTM 3 Fasa C2' JASA Unit
14 Upah Bongkar Konst. JTM 3 Fasa C2-1' JASA Unit
15 Upah Bongkar Konst. JTM 3 Fasa C2-A' JASA Unit
16 Upah Bongkar Konst. JTM 3 Fasa C3 JASA Unit
17 Upah Bongkar Konst. JTM 3 Fasa C3-VN JASA Unit
18 Upah Bongkar Konst. JTM 3 Fasa C3' JASA Unit
19 Upah Bongkar Konst. JTM 3 Fasa C4-1 JASA Unit
20 Upah Bongkar Konst. JTM 3 Fasa C5-1 JASA Unit
21 Upah Bongkar Konst. JTM 3 Fasa C7 JASA Unit
22 Upah Bongkar Konst. JTM 3 Fasa C7-1 JASA Unit
23 Upah Bongkar Konst. JTM 3 Fasa C7-N JASA Unit
24 Upah Bongkar Konst. JTM 3 Fasa C7' JASA Unit
25 Upah Bongkar Konst. JTM 3 Fasa C7-1' JASA Unit
26 Upah Bongkar Konst. JTM 3 Fasa C8 JASA Unit
27 Upah Bongkar Konst. JTM 3 Fasa C8-A JASA Unit
28 Upah Bongkar Konst. JTM 3 Fasa C8-AN JASA Unit
29 Upah Bongkar Konst. JTM 3 Fasa C8' JASA Unit
30 Upah Bongkar Konst. JTM 3 Fasa C8-A' JASA Unit
31 Upah Bongkar Konst. JTM 3 Fasa C9 JASA Unit
32 Upah Bongkar Konst. JTM 3 Fasa C9-N JASA Unit
33 Upah Bongkar Konst. JTM 3 Fasa C9' JASA Unit
34 Upah Bongkar Konst. JTM 3 Fasa C10 JASA Unit
35 Upah Bongkar Konst. JTM 3 Fasa C10-N JASA Unit
36 Upah Bongkar Konst. JTM 3 Fasa C10' JASA Unit
37 Upah Bongkar Konst. JTM 3 Fasa C11 JASA Unit
38 Upah Bongkar Konst. JTM 3 Fasa C11-N JASA Unit
39 Upah Bongkar Konst. JTM 3 Fasa C11' JASA Unit

- KONSTRUKSI JTM DOUBLE CIRCUIT


1 Upah Bongkar Konst. JTM Double Circuit DC-C1V JASA Unit
2 Upah Bongkar Konst. JTM Double Circuit DC-C1-1V JASA Unit
3 Upah Bongkar Konst. JTM Double Circuit DC-C1-1H JASA Unit
4 Upah Bongkar Konst. JTM Double Circuit DC-C1-AHN JASA Unit
5 Upah Bongkar Konst. JTM Double Circuit DC-C2-1V JASA Unit
6 Upah Bongkar Konst. JTM Double Circuit DC-C2-AH JASA Unit
7 Upah Bongkar Konst. JTM Double Circuit DC-C2-AHN JASA Unit
8 Upah Bongkar Konst. JTM Double Circuit DC-C2-1BN JASA Unit
9 Upah Bongkar Konst. JTM Double Circuit DC-C4-N JASA Unit
10 Upah Bongkar Konst. JTM Double Circuit DC-C7-N JASA Unit
11 Upah Bongkar Konst. JTM Double Circuit DC-C8 JASA Unit
12 Upah Bongkar Konst. JTM Double Circuit DC-C8-N JASA Unit

- AKSESORIES JARINGAN
1 Upah Bongkar Acc.Jar M2-11 JASA Unit
2 Upah Bongkar Acc.Jar M2-11M JASA Unit
3 Upah Bongkar Acc.Jar M2-12 JASA Unit
4 Upah Bongkar Acc.Jar M2-12A JASA Unit
5 Upah Bongkar Acc.Jar M2-15 JASA Unit

*) Harga KHS 2005 14


6 Upah Bongkar Acc.Jar M3-16 JASA Unit
7 Upah Bongkar Acc.Jar M5-2 JASA Unit
8 Upah Bongkar Acc.Jar M5-3 JASA Unit
9 Upah Bongkar Acc.Jar M5-4 JASA Unit
10 Upah Bongkar Acc.Jar M5-5 JASA Unit
11 Upah Bongkar Acc.Jar M5-6 JASA Unit
12 Upah Bongkar Acc.Jar M5-8 JASA Unit
13 Upah Bongkar Acc.Jar M5-9 JASA Unit
14 Upah Bongkar Acc.Jar M5-10 JASA Unit
15 Upah Bongkar Acc.Jar M5-12 JASA Unit
16 Upah Bongkar Acc.Jar M5-13 JASA Unit
17 Upah Bongkar Acc.Jar M5-16 JASA Unit
18 Upah Bongkar Acc.Jar M5-20 JASA Unit
19 Upah Bongkar Acc.Jar M5-24 JASA Unit
20 Upah Bongkar Acc.Jar P12C-1 JASA Unit
21 Upah Bongkar Acc.Jar P12C-2 JASA Unit
22 Upah Bongkar Acc.Jar P12S-1 JASA Unit
23 Upah Bongkar Acc.Jar P12S-2 JASA Unit
24 Upah Bongkar Acc.Jar E1-1 JASA Unit
25 Upah Bongkar Acc.Jar E1-2 JASA Unit
26 Upah Bongkar Acc.Jar E1-3 JASA Unit
27 Upah Bongkar Acc.Jar E2-1 JASA Unit
28 Upah Bongkar Acc.Jar E2-2 JASA Unit
29 Upah Bongkar Acc.Jar E2-3 JASA Unit
30 Upah Bongkar Acc.Jar E5-1 JASA Unit
31 Upah Bongkar Acc.Jar E5-2 JASA Unit
32 Upah Bongkar Acc.Jar E6-1 JASA Unit
33 Upah Bongkar Acc.Jar F1-2 JASA Unit
34 Upah Bongkar Acc.Jar F1-3 JASA Unit
35 Upah Bongkar Acc.Jar FDG JASA Unit
36 Upah Bongkar Acc.Jar Penghalang Panjat JASA Unit
37 Upah Bongkar Acc.Jar LVCB 2 Jurusan JASA Unit
38 Upah Bongkar Acc.Jar Sectionalizer 3 Fasa JASA Unit
39 Upah Bongkar Acc.Jar LVCB 4 Jurusan JASA Unit
40 Upah Bongkar Acc.Jar Disconecting Switch JASA Unit
41 Upah Bongkar Acc.Jar Konstruksi Vangnet JASA Unit
42 Upah Bongkar Acc.Jar Jaring Vangnet JASA Per 1 m

- PENGHANTAR TM
1 Upah Bongkar Penghantar TM A3C 3x240 + 1x150mm² JASA Per 50 m
2 Upah Bongkar Penghantar TM A3C 3x240 + 1x120mm² JASA Per 50 m
5 Upah Bongkar Penghantar TM A3C 3x150 + 1x150mm² JASA Per 50 m
6 Upah Bongkar Penghantar TM A3C 3x150 + 1x70mm² JASA Per 50 m
9 Upah Bongkar Penghantar TM A3C 3x70 + 1x70mm² JASA Per 50 m
10 Upah Bongkar Penghantar TM A3C 3x70 + 1x50mm² JASA Per 50 m
11 Upah Bongkar Penghantar TM A3C 3x70 + 1x35mm² JASA Per 50 m
12 Upah Bongkar Penghantar TM A3C 3x35 + 1x35mm² JASA Per 50 m
13 Upah Bongkar Penghantar TM A3C 1x150 + 1x70mm² JASA Per 50 m
14 Upah Bongkar Penghantar TM A3C 1x120 + 1x70mm² JASA Per 50 m
15 Upah Bongkar Penghantar TM A3C 1x70 + 1x70mm² JASA Per 50 m
16 Upah Bongkar Penghantar TM A3C 1x70 + 1x50mm² JASA Per 50 m
17 Upah Bongkar Penghantar TM A3C 1x70 + 1x35mm² JASA Per 50 m
18 Upah Bongkar Penghantar TM A3C 1x35 + 1x35mm² JASA Per 50 m
19 Upah Bongkar Penghantar TM A3C 3x240mm² JASA Per 50 m
20 Upah Bongkar Penghantar TM A3C 3x150mm² JASA Per 50 m
21 Upah Bongkar Penghantar TM A3C 3x70mm² JASA Per 50 m
22 Upah Bongkar Penghantar TM A3C 3x35mm² JASA Per 50 m
23 Upah Bongkar Penghantar TM A3C 2x240mm² JASA Per 50 m
24 Upah Bongkar Penghantar TM A3C 2x150mm² JASA Per 50 m
25 Upah Bongkar Penghantar TM A3C 2x70mm² JASA Per 50 m
26 Upah Bongkar Penghantar TM A3C 2x35mm² JASA Per 50 m
27 Upah Bongkar Penghantar TM A3C 1x240mm² JASA Per 50 m
28 Upah Bongkar Penghantar TM A3C 1x150mm² JASA Per 50 m
29 Upah Bongkar Penghantar TM A3C 1x70mm² JASA Per 50 m
30 Upah Bongkar Penghantar TM A3C 1x50mm² JASA Per 50 m
31 Upah Bongkar Penghantar TM A3C 1x35mm² JASA Per 50 m
32 Upah Bongkar Penghantar TM A3CS 3x240 + 1x150mm² JASA Per 50 m
33 Upah Bongkar Penghantar TM A3CS 3x240 + 1x120mm² JASA Per 50 m
34 Upah Bongkar Penghantar TM A3CS 3x150 + 1x150mm² JASA Per 50 m
35 Upah Bongkar Penghantar TM A3CS 3x150 + 1x70mm² JASA Per 50 m
36 Upah Bongkar Penghantar TM A3CS 3x70 + 1x70mm² JASA Per 50 m
37 Upah Bongkar Penghantar TM A3CS 3x70 + 1x50mm² JASA Per 50 m
38 Upah Bongkar Penghantar TM A3CS 3x70 + 1x35mm² JASA Per 50 m
39 Upah Bongkar Penghantar TM A3CS 3x35 + 1x35mm² JASA Per 50 m
40 Upah Bongkar Penghantar TM A3CS 1x150 + 1x70mm² JASA Per 50 m
41 Upah Bongkar Penghantar TM A3CS 1x120 + 1x70mm² JASA Per 50 m
42 Upah Bongkar Penghantar TM A3CS 1x70 + 1x70mm² JASA Per 50 m
43 Upah Bongkar Penghantar TM A3CS 1x70 + 1x50mm² JASA Per 50 m
44 Upah Bongkar Penghantar TM A3CS 1x70 + 1x35mm² JASA Per 50 m
45 Upah Bongkar Penghantar TM A3CS 1x35 + 1x35mm² JASA Per 50 m
46 Upah Bongkar Penghantar TM A3CS 3x240mm² JASA Per 50 m
47 Upah Bongkar Penghantar TM A3CS 3x150mm² JASA Per 50 m
48 Upah Bongkar Penghantar TM A3CS 3x70mm² JASA Per 50 m

*) Harga KHS 2005 15


49 Upah Bongkar Penghantar TM A3CS 3x35mm² JASA Per 50 m
50 Upah Bongkar Penghantar TM A3CS 2x240mm² JASA Per 50 m
51 Upah Bongkar Penghantar TM A3CS 2x150mm² JASA Per 50 m
52 Upah Bongkar Penghantar TM A3CS 2x70mm² JASA Per 50 m
53 Upah Bongkar Penghantar TM A3CS 2x35mm² JASA Per 50 m
54 Upah Bongkar Penghantar TM A3CS 1x240mm² JASA Per 50 m
55 Upah Bongkar Penghantar TM A3CS 1x150mm² JASA Per 50 m
56 Upah Bongkar Penghantar TM A3CS 1x70mm² JASA Per 50 m
57 Upah Bongkar Penghantar TM A3CS 1x50mm² JASA Per 50 m
58 Upah Bongkar Penghantar TM A3CS 1x35mm² JASA Per 50 m
59 Upah Bongkar Kabel MVTIC 3 x 240 + N 95 mm² JASA Per 50 m

- PENGHANTAR TR
1 Upah Bongkar Penghantar TR A3C 3x70 + 1x35mm² JASA Per 50 m
2 Upah Bongkar Penghantar TR A3C 2x70 + 1x70mm² JASA Per 50 m
3 Upah Bongkar Penghantar TR A3C 2x70 + 1x35mm² JASA Per 50 m
4 Upah Bongkar Penghantar TR A3C 2x70mm² JASA Per 50 m
5 Upah Bongkar Penghantar TR A3C 2x55 + 1x35mm² JASA Per 50 m
6 Upah Bongkar Penghantar TR A3C 2x55mm² JASA Per 50 m
7 Upah Bongkar Penghantar TR A3C 2x35mm² JASA Per 50 m
8 Upah Bongkar Penghantar TR TX # 6 ,4 , 2 JASA Per 50 m
9 Upah Bongkar Penghantar TR TX # 1 / 0 & # 4/ 0 JASA Per 50 m
10 Upah Bongkar Penghantar TR QX # 6, 4, 2 JASA Per 50 m
11 Upah Bongkar Penghantar TR QX # 2 / 0 & 4 / 0 JASA Per 50 m
12 Upah Bongkar Penghantar TR LVTC 3x70 + 1x50mm² JASA Per 50 m
13 Upah Bongkar Penghantar TR LVTC 3x50 + 1x35mm² JASA Per 50 m
14 Upah Bongkar Penghantar TR LVTC 3x35 + 1x35mm² JASA Per 50 m
15 Upah Bongkar Penghantar TR LVTC 2x70 + 1x50mm² JASA Per 50 m
16 Upah Bongkar Penghantar TR LVTC 2x50 + 1x50mm² JASA Per 50 m
17 Upah Bongkar Penghantar TR LVTC 2x50 + 1x35mm² JASA Per 50 m
18 Upah Bongkar Penghantar TR LVTC 2x35 + 1x35mm² JASA Per 50 m
19 Upah Bongkar Penghantar TR LVTC 2x25 + 1x25mm² JASA Per 50 m

- PENGHANTAR TM PER KMS


1 Upah Bongkar Penghantar TM A3C 3x240 + 1x150mm² Per Kms JASA Per Kms
2 Upah Bongkar Penghantar TM A3C 3x240 + 1x120mm² Per Kms JASA Per Kms
5 Upah Bongkar Penghantar TM A3C 3x150 + 1x150mm² Per Kms JASA Per Kms
6 Upah Bongkar Penghantar TM A3C 3x150 + 1x70mm² Per Kms JASA Per Kms
9 Upah Bongkar Penghantar TM A3C 3x70 + 1x70mm² Per Kms JASA Per Kms
10 Upah Bongkar Penghantar TM A3C 3x70 + 1x50mm² Per Kms JASA Per Kms
11 Upah Bongkar Penghantar TM A3C 3x70 + 1x35mm² Per Kms JASA Per Kms
12 Upah Bongkar Penghantar TM A3C 3x35 + 1x35mm² Per Kms JASA Per Kms
13 Upah Bongkar Penghantar TM A3C 1x150 + 1x70mm² Per Kms JASA Per Kms
14 Upah Bongkar Penghantar TM A3C 1x120 + 1x70mm² Per Kms JASA Per Kms
15 Upah Bongkar Penghantar TM A3C 1x70 + 1x70mm² Per Kms JASA Per Kms
16 Upah Bongkar Penghantar TM A3C 1x70 + 1x50mm² Per Kms JASA Per Kms
17 Upah Bongkar Penghantar TM A3C 1x70 + 1x35mm² Per Kms JASA Per Kms
18 Upah Bongkar Penghantar TM A3C 1x35 + 1x35mm² Per Kms JASA Per Kms
19 Upah Bongkar Penghantar TM A3C 3x240mm² Per Kms JASA Per Kms
20 Upah Bongkar Penghantar TM A3C 3x150mm² Per Kms JASA Per Kms
21 Upah Bongkar Penghantar TM A3C 3x70mm² Per Kms JASA Per Kms
22 Upah Bongkar Penghantar TM A3C 3x35mm² Per Kms JASA Per Kms
23 Upah Bongkar Penghantar TM A3C 2x240mm² Per Kms JASA Per Kms
24 Upah Bongkar Penghantar TM A3C 2x150mm² Per Kms JASA Per Kms
25 Upah Bongkar Penghantar TM A3C 2x70mm² Per Kms JASA Per Kms
26 Upah Bongkar Penghantar TM A3C 2x35mm² Per Kms JASA Per Kms
27 Upah Bongkar Penghantar TM A3C 1x240mm² Per Kms JASA Per Kms
28 Upah Bongkar Penghantar TM A3C 1x150mm² Per Kms JASA Per Kms
29 Upah Bongkar Penghantar TM A3C 1x70mm² Per Kms JASA Per Kms
30 Upah Bongkar Penghantar TM A3C 1x50mm² Per Kms JASA Per Kms
31 Upah Bongkar Penghantar TM A3C 1x35mm² Per Kms JASA Per Kms
32 Upah Bongkar Penghantar TM A3CS 3x240 + 1x150mm² Per Kms JASA Per Kms
33 Upah Bongkar Penghantar TM A3CS 3x240 + 1x120mm² Per Kms JASA Per Kms
34 Upah Bongkar Penghantar TM A3CS 3x150 + 1x150mm² Per Kms JASA Per Kms
35 Upah Bongkar Penghantar TM A3CS 3x150 + 1x70mm² Per Kms JASA Per Kms
36 Upah Bongkar Penghantar TM A3CS 3x70 + 1x70mm² Per Kms JASA Per Kms
37 Upah Bongkar Penghantar TM A3CS 3x70 + 1x50mm² Per Kms JASA Per Kms
38 Upah Bongkar Penghantar TM A3CS 3x70 + 1x35mm² Per Kms JASA Per Kms
39 Upah Bongkar Penghantar TM A3CS 3x35 + 1x35mm² Per Kms JASA Per Kms
40 Upah Bongkar Penghantar TM A3CS 1x150 + 1x70mm² Per Kms JASA Per Kms
41 Upah Bongkar Penghantar TM A3CS 1x120 + 1x70mm² Per Kms JASA Per Kms
42 Upah Bongkar Penghantar TM A3CS 1x70 + 1x70mm² Per Kms JASA Per Kms
43 Upah Bongkar Penghantar TM A3CS 1x70 + 1x50mm² Per Kms JASA Per Kms
44 Upah Bongkar Penghantar TM A3CS 1x70 + 1x35mm² Per Kms JASA Per Kms
45 Upah Bongkar Penghantar TM A3CS 1x35 + 1x35mm² Per Kms JASA Per Kms
46 Upah Bongkar Penghantar TM A3CS 3x240mm² Per Kms JASA Per Kms
47 Upah Bongkar Penghantar TM A3CS 3x150mm² Per Kms JASA Per Kms
48 Upah Bongkar Penghantar TM A3CS 3x70mm² Per Kms JASA Per Kms
49 Upah Bongkar Penghantar TM A3CS 3x35mm² Per Kms JASA Per Kms
50 Upah Bongkar Penghantar TM A3CS 2x240mm² Per Kms JASA Per Kms
51 Upah Bongkar Penghantar TM A3CS 2x150mm² Per Kms JASA Per Kms
52 Upah Bongkar Penghantar TM A3CS 2x70mm² Per Kms JASA Per Kms
53 Upah Bongkar Penghantar TM A3CS 2x35mm² Per Kms JASA Per Kms

*) Harga KHS 2005 16


54 Upah Bongkar Penghantar TM A3CS 1x240mm² Per Kms JASA Per Kms
55 Upah Bongkar Penghantar TM A3CS 1x150mm² Per Kms JASA Per Kms
56 Upah Bongkar Penghantar TM A3CS 1x70mm² Per Kms JASA Per Kms
57 Upah Bongkar Penghantar TM A3CS 1x50mm² Per Kms JASA Per Kms
58 Upah Bongkar Penghantar TM A3CS 1x35mm² Per Kms JASA Per Kms
59 Upah Bongkar Kabel MVTIC 3 x 240 + N 95 mm² Per Kms JASA Per 50 m

- PENGHANTAR TR PER KMS


1 Upah Bongkar Penghantar TR A3C 3x70 + 1x35mm² Per Kms JASA Per Kms
2 Upah Bongkar Penghantar TR A3C 2x70 + 1x70mm² Per Kms JASA Per Kms
3 Upah Bongkar Penghantar TR A3C 2x70 + 1x35mm² Per Kms JASA Per Kms
4 Upah Bongkar Penghantar TR A3C 2x70mm² Per Kms JASA Per Kms
5 Upah Bongkar Penghantar TR A3C 2x55 + 1x35mm² Per Kms JASA Per Kms
6 Upah Bongkar Penghantar TR A3C 2x55mm² Per Kms JASA Per Kms
7 Upah Bongkar Penghantar TR A3C 2x35mm² Per Kms JASA Per Kms
8 Upah Bongkar Penghantar TR TX # 6 ,4 , 2 Per Kms JASA Per Kms
9 Upah Bongkar Penghantar TR TX # 1 / 0 & # 4/ 0 Per Kms JASA Per Kms
10 Upah Bongkar Penghantar TR QX # 6, 4, 2 Per Kms JASA Per Kms
11 Upah Bongkar Penghantar TR QX # 2 / 0 & 4 / 0 Per Kms JASA Per Kms
12 Upah Bongkar Penghantar TR LVTC 3x70 + 1x50mm² Per Kms JASA Per Kms
13 Upah Bongkar Penghantar TR LVTC 3x50 + 1x35mm² Per Kms JASA Per Kms
14 Upah Bongkar Penghantar TR LVTC 3x35 + 1x35mm² Per Kms JASA Per Kms
15 Upah Bongkar Penghantar TR LVTC 2x70 + 1x50mm² Per Kms JASA Per Kms
16 Upah Bongkar Penghantar TR LVTC 2x50 + 1x50mm² Per Kms JASA Per Kms
17 Upah Bongkar Penghantar TR LVTC 2x50 + 1x35mm² Per Kms JASA Per Kms
18 Upah Bongkar Penghantar TR LVTC 2x35 + 1x35mm² Per Kms JASA Per Kms
19 Upah Bongkar Penghantar TR LVTC 2x25 + 1x25mm² Per Kms JASA Per Kms

- TRAFO DISTRIBUSI
1 Upah Bongkar Trafo 1 Fasa 25 KVA + Bracket JASA Unit
2 Upah Bongkar Trafo 1 Fasa 50 KVA + Bracket JASA Unit
3 Upah Bongkar Trafo 1 Fasa 50 KVA 1 Tiang JASA Unit
4 Upah Bongkar Trafo 3 Fasa 50 KVA 1 Tiang JASA Unit
5 Upah Bongkar Trafo 3 Fasa 100 KVA 1 Tiang JASA Unit
6 Upah Bongkar Trafo 3 Fasa 50 KVA 2 Tiang JASA Unit
7 Upah Bongkar Trafo 3 Fasa 100 KVA 2 Tiang JASA Unit
8 Upah Bongkar Trafo 3 Fasa 160 KVA 2 Tiang JASA Unit
9 Upah Bongkar Trafo 3 Fasa 200 KVA 2 Tiang JASA Unit

- TIANG
1 Upah Bongkar Tiang Beton 7M-100 daN JASA Btg
2 Upah Bongkar Tiang Beton 7M-100 daN+E JASA Btg
3 Upah Bongkar Tiang Beton 9M-100 daN JASA Btg
4 Upah Bongkar Tiang Beton 9M-100 daN+E JASA Btg
5 Upah Bongkar Tiang Beton 9M-200 daN JASA Btg
6 Upah Bongkar Tiang Beton 9M-200 daN+E JASA Btg
7 Upah Bongkar Tiang Beton 9M-350 daN JASA Btg
8 Upah Bongkar Tiang Beton 9M-350 daN+E JASA Btg
9 Upah Bongkar Tiang Beton 11M-200 daN JASA Btg
10 Upah Bongkar Tiang Beton 11M-200 daN+E JASA Btg
11 Upah Bongkar Tiang Beton 11M-350 daN JASA Btg
12 Upah Bongkar Tiang Beton 11M-350 daN+E JASA Btg
13 Upah Bongkar Tiang Beton 12M-200 daN JASA Btg
14 Upah Bongkar Tiang Beton 12M-200 daN+E JASA Btg
15 Upah Bongkar Tiang Beton 12M-350 daN JASA Btg
16 Upah Bongkar Tiang Beton 12M-350 daN+E JASA Btg
17 Upah Bongkar Tiang Beton 12M-500 daN JASA Btg
18 Upah Bongkar Tiang Beton 12M-500 daN+E JASA Btg
19 Upah Bongkar Tiang Beton 13M-350 daN JASA Btg
20 Upah Bongkar Tiang Beton 13M-350 daN+E JASA Btg
21 Upah Bongkar Tiang Beton 13M-500 daN JASA Btg
22 Upah Bongkar Tiang Beton 13M-500 daN+E JASA Btg
23 Upah Bongkar Tiang Beton 14M-350 daN JASA Btg
24 Upah Bongkar Tiang Beton 14M-350 daN+E JASA Btg
25 Upah Bongkar Tiang Beton 14M-500 daN JASA Btg
26 Upah Bongkar Tiang Beton 14M-500 daN+E JASA Btg

- KABEL TANAH
1 Upah Bongkar Terminating Kabel 1 x 70 mm² OD JASA Unit
2 Upah Bongkar Terminating Kabel 3 x 70 mm² ID JASA Unit
3 Upah Bongkar Terminating Kabel 3 x 70 mm² OD JASA Unit
4 Upah Bongkar Terminating Kabel 3 x 95 mm² ID JASA Unit
5 Upah Bongkar Terminating Kabel 3 x 95 mm² OD JASA Unit
6 Upah Bongkar Terminating Kabel 3 x 150 mm² ID JASA Unit
7 Upah Bongkar Terminating Kabel 3 x 150 mm² OD JASA Unit
8 Upah Bongkar Terminating Kabel 3 x 240 mm² ID JASA Unit
9 Upah Bongkar Terminating Kabel 3 x 240 mm² OD JASA Unit
10 Upah Bongkar Terminating Kabel 3 x 300 mm² ID JASA Unit
11 Upah Bongkar Terminating Kabel 3 x 300 mm² OD JASA Unit
12 Upah Bongkar Sepatu kabel bimetal 240 - 300 mm² (2 lubang) JASA Unit
13 Upah Bongkar Sepatu kabel bimetal 150 mm² (2 lubang) JASA Unit
14 Upah Bongkar Kabel Tanah XLPE 3 x 300 mm² (three core) JASA Per 50 m
15 Upah Bongkar Kabel Tanah XLPE 3 x 240 mm² (three core) JASA Per 50 m

*) Harga KHS 2005 17


16 Upah Bongkar Kabel NYY 1 x 70 mm² JASA Per 1 m
17 Upah Bongkar Kabel NYY 1 x 150 mm² JASA Per 1 m
18 Upah Bongkar Kabel NA2XS2Y 20 KV 3 x 150 mm² JASA Per 1 m
19 Upah Bongkar Kabel NA2XS2Y 20 KV 3 x 95 mm² JASA Per 1 m
20 Upah Bongkar Kabel NA2XS2Y 20 KV 3 x 70 mm² JASA Per 1 m
21 Upah Bongkar Kabel NA2XS2Y 20 KV 1 x 70 mm² JASA Per 1 m
22 Galian Kabel - m³ JASA Per m³

- SAMBUNGAN RUMAH
1 Upah Bongkar Sambungan Rumah 1 Fasa JASA Unit
2 Upah Bongkar Sambungan Rumah 3 Fasa JASA Unit
3 Upah Bongkar SR + APP 1 Fasa JASA Unit
4 Upah Bongkar SR + APP 3 Fasa JASA Unit
5 Upah Bongkar SR + APP 3 Fasa + Wiring JASA Unit
6 Upah Bongkar APP TM + Wiring JASA Unit
7 Upah Bongkar Cubicle JASA Unit
6 Upah Bongkar CT TM ID/OD JASA Unit
7 Upah Pasang CT TM ID/OD JASA Unit

U SKUTM / SKTM
1 Upah Pasang Konst. SKUTM DB01 (Suspension Assembly) JASA Unit
2 Upah Pasang Konst. SKUTM DB02 (Small Angle Assembly) JASA Unit
3 Upah Pasang Konst. SKUTM DB03 (Medium Angle Assembly) JASA Unit
4 Upah Pasang Konst. SKUTM DB04 (Large Angle Assembly) JASA Unit
5 Upah Pasang Konst. SKUTM DB05 (Adjustable Dead End Assembly) JASA Unit
6 Upah Pasang Konst. SKUTM DB06 (Fixed Dead End Assembly)) JASA Unit
7 Upah Pasang Konst. SKUTM DB08 JASA Unit
8 Upah Pasang Konst. SKUTM DB09 JASA Unit
9 Strap For Clamping, Type Insulator HDW Bh
10 Suspension Clamp HDW Bh
11 U-Bolt HDW Bh
12 Fixation Device HDW Bh
13 Pole Band HDW Bh
14 Yoke HDW Bh
15 Shackle HDW Bh
16 Parralel Groove Clamp HDW Bh
17 Strain Clamp Bolted Type HDW Bh
18 Turn Buckle HDW Bh
19 Strain Hinge HDW Bh
20 H Type Connector 50/50 mm² Cu HDW Bh
21 Cooper Strip 50 mm² Insulated Ground Colour HDW Bh
22 PVC Pipe 150 mm² HDW Bh
23 Protective Plastic HDW Bh
24 Link 50 x 25 mm HDW Bh
25 Strapping Buckle HDW Bh
26 Stainless Steel Strap 20mm x 0.7 mm HDW Bh
27 Terminal Lug For 50 mm² CU Conductor HDW Bh
28 Stainless Steel Bolt 12 x 45 HDW Bh
29 Set Of Cable Terminator For 3x150aac+90 st HDW Bh
30 Terminal Lug For 150 mm² CU conductor HDW Bh
31 H Type Connector HDW Bh
32 Three Pole Outdoor Terminator For 3x240 mm² AL XLPE U/G CABLE HDW Bh
33 Support Assembly For TIC Terminator HDW Bh
34 Single Support On Single Pole 2000mm HDW Bh

V PEMBUATAN SALURAN KABEL GI


A PEMBUATAN SALURAN KABEL OUTDOOR
1 Persiapan Pekerjaan JASA ls
2 Pemasangan Bouwplank JASA m2
3 Galian Tanah JASA m3
4 Pembuangan Tanah JASA m3
5 Urugan Pasir Padat HDW m3
6 Pembuatan Lantai Kerja HDW m3
7 Pembuatan Beton Bertulang K225 HDW m3
8 Pembuatan Tutup Beton Bertulang K225 HDW m3
9 Besi Siku 70 untuk Tray Kabel Power HDW pcs

B PEMBUATAN GALIAN TANAH


1 Galian Tanah keras sedalam 1 meter JASA Mtr
2 Urugan Pasir Dipadatkan JASA m3
3 Urugan Tanah Dipadatkan JASA m3
4 Pembuangan sisa tanah JASA Mtr
5 Pekerjaan Aspal JASA Mtr

C Mur Baut Ring Plat Ring Per Stainless Steel Ukuran 19 mm HDW Bh

VI LAIN-LAIN
1 Sertifikasi Laik Operasi JASA Lot
2 Transportasi JASA Rit
3 Rabas-Rabas Pohon JASA Kms
4 Tebang Pohon JASA Pohon
5 Potong Pohon JASA Pohon
6 Pengepresan CCO JASA Bh

*) Harga KHS 2005 18


7 Pengepresan Joint Sleve JASA Bh
8 Penegakan Tiang Miring JASA Bh
9 Pemasangan APP 1 Fasa Di Bangunan JASA Unit
10 Upah Pasang Konstruksi TM Non Kubikel CT & PT JASA Unit

*) Harga KHS 2005 19


PT. PLN ( PERSERO )
DISTRIBUSI JAWA TENGAH & DI YOGYAKARTA

RENCANA ANGGARAN BIAYA (RAB)

Pekerjaan : PEMBANGUNAN JARINGAN GUNA MELAYANI PD PT. HIT

Lokasi : GODONG - GROBOGAN


Pelaksana : PT. PLN (PERSERO) UP3 DEMAK
Anggaran : SAR 2021

BIAYA YANG DIPERLUKAN ( Rp )


NO URAIAN GOL SAT VOL HARGA SATUAN
MDU HARDWARE JASA JUMLAH

0 0 0 0
A PEMASANGAN tiang 0 0 0 0
1 Tiang Beton 14M-350 daN+E MDU Btg 4 6,942,466 27,769,864 0 0 27,769,864
2 Penomoran Tiang HDW Btg 4 10,000 0 40,000 0 40,000
0 0 0 0
B PEKERJAAN PENGGANTIAN APP 0 0 0 0
1 Upah Bongkar CT TM ID/OD JASA Unit 3 115,800 0 0 347,400 347,400
2 CT TM Indoor Tipe Blok 200/5-5A Class 0.2s MDU-KD Bh 3 2,250,810 6,752,430 0 0 6,752,430
3 Upah Pasang CT TM ID/OD JASA Unit 3 115,800 0 0 347,400 347,400
4 Transportasi JASA Rit 1 500,000 0 0 500,000 500,000
0 0 0 0
C PEKERJAAN PEMASANGAN KONSTRUKSI 0 0 0 0
+ DB08 Unit 1 0 0 0 0

1 Isolator Tarik ( Porcelain ) 20 KV + Primary Dead MDU-KD Set 3 394,550 1,183,650 0 0 1,183,650
End Clamp 150-240 mm²
2 Bolt Double Arming ⅝" x 14" HDW Bh 2 34,800 0 69,600 0 69,600
3 Bolt Machine ⅝" x 10" HDW Bh 1 17,700 0 17,700 0 17,700
4 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh 4 4,900 0 19,600 0 19,600
5 Brace Steel 770 mm HDW Bh 4 41,500 0 166,000 0 166,000

6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh 3 389,800 0 1,169,400 0 1,169,400

7 Lock Nut ⅝" HDW Bh 4 11,400 0 45,600 0 45,600


8 Oval Eye Bolt ⅝" x 10" HDW Bh 1 19,200 0 19,200 0 19,200
9 Oval Eye Nut ⅝" HDW Bh 2 21,000 0 42,000 0 42,000
10 Pole Band Double Rack 7" atau 7 ½" HDW Bh 1 49,300 0 49,300 0 49,300
11 Schackle Anchor ⅝" HDW Bh 3 16,000 0 48,000 0 48,000
12 Washer Square 2 ¼" HDW Bh 11 1,500 0 16,500 0 16,500
13 H Type Connector 50/50 mm² Cu HDW Bh 2 38,500 0 76,999 0 76,999
14 Cooper Strip 50 mm² Insulated Ground Colour HDW Bh 3 31,720 0 95,160 0 95,160
15 PVC Pipe 150 mm² HDW Bh 1 51,240 0 51,240 0 51,240
16 Protective Plastic HDW Bh 6 3,477 0 20,862 0 20,862
17 Link 50 x 25 mm HDW Bh 6 3,477 0 20,862 0 20,862
18 strapping buckle HDW Bh 6 5,531 0 33,189 0 33,189
19 Stainless Steel Strap 20mm x 0.7 mm HDW Bh 1 4,302 0 4,302 0 4,302

20 Strap For Clamping, Type Insulator HDW Bh 2 16,226 0 32,452 0 32,452

21 Parralel Groove Clamp HDW Bh 1 72,743 0 72,743 0 72,743


22 Strain Clamp Bolted Type HDW Bh 1 45,445 0 45,445 0 45,445

23 Turn Buckle HDW Bh 1 84,821 0 84,821 0 84,821

24 Strain Hinge HDW Bh 1 53,867 0 53,867 0 53,867


25 Fixation Device HDW Bh 1 84,821 0 84,821 0 84,821
26 Pole Band Double Rack 7" atau 7 ½" HDW Bh 2 49,300 0 98,600 0 98,600

27 Compresion Conector H type 240 mm² / 240 mm² HDW Bh 3 45,000 0 135,000 0 135,000

28 AAAC 240 mm² MDU-KD Mtr 3 28,200 84,600 0 0 84,600


29 Lightning Arester (Polymer) 21 KV, 10 KA MDU-KD Bh 3 648,050 1,944,150 0 0 1,944,150
30 Terminating kabel 3 x 240 mm² OD HDW Set 1 5,350,100 0 5,350,100 0 5,350,100
31 Upah Pasang Konst. SKUTM DB08 JASA Unit 1 358,140 0 0 358,140 358,140
0 0 0 0

+ CC8 Unit 2 0 0 0 0

1 Isolator Pinpost Porcelain MDU-KD Bh 2 207,470 414,940 0 0 414,940


2 Isolator Pinpost Porcelain MDU-KD Bh 4 207,470 829,880 0 0 829,880
Isolator Tarik ( Porcelain ) 20 KV + Primary Dead
3 MDU-KD Set 12 394,550 4,734,600 0 0 4,734,600
End Clamp 150-240 mm²
4 Armour Tape ¼" wide HDW Mtr 4 6,800 0 27,200 0 27,200
5 Bolt Double Arming ⅝" x 14" HDW Bh 4 34,800 0 139,200 0 139,200
6 Bolt Machine ⅝" x 10" HDW Bh 6 17,700 0 106,200 0 106,200
7 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh 8 4,900 0 39,200 0 39,200
8 Brace Steel 770 mm HDW Bh 8 41,500 0 332,000 0 332,000
9 Center Bracket 12.5 KN HDW Bh 2 90,200 0 180,400 0 180,400
10 Clevis Swinging Secondary HDW Bh 4 15,500 0 62,000 0 62,000

11 Compresion Conector H type 240 mm² / 240 mm² HDW Bh 8 45,000 0 360,000 0 360,000

12 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh 4 389,800 0 1,559,200 0 1,559,200

13 Lock Nut ⅝" HDW Bh 6 11,400 0 68,400 0 68,400


14 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² HDW Bh 8 29,600 0 236,800 0 236,800
15 Oval Eye Bolt ⅝" x 10" HDW Bh 6 19,200 0 115,200 0 115,200
PT. PLN ( PERSERO )
DISTRIBUSI JAWA TENGAH & DI YOGYAKARTA

RENCANA ANGGARAN BIAYA (RAB)

Pekerjaan : PEMBANGUNAN JARINGAN GUNA MELAYANI PD PT. HIT

Lokasi : GODONG - GROBOGAN


Pelaksana : PT. PLN (PERSERO) UP3 DEMAK
Anggaran : SAR 2021

BIAYA YANG DIPERLUKAN ( Rp )


NO URAIAN GOL SAT VOL HARGA SATUAN
MDU HARDWARE JASA JUMLAH

16 Oval Eye Nut ⅝" HDW Bh 18 21,000 0 378,000 0 378,000


17 Pole Band Double Rack 7" atau 7 ½" HDW Bh 2 49,300 0 98,600 0 98,600
18 Schackle Anchor ⅝" HDW Bh 16 16,000 0 256,000 0 256,000
19 Spool Insulator ANSI 53 - 4 HDW Bh 4 26,400 0 105,600 0 105,600
20 Tie Wire # 4 / Alluminium bonding wire # 20 HDW Mtr 10.8 5,100 0 55,080 0 55,080
21 Washer Square 2 ¼" HDW Bh 26 1,500 0 39,000 0 39,000
22 Upah Pasang Konst. JTM 3 Fasa C8 JASA Unit 2 192,800 0 0 385,600 385,600
0 0 0 0
+ CC7 Unit 5 0 0 0 0
Isolator Tarik ( Porcelain ) 20 KV + Primary Dead
1 End Clamp 150-240 mm² MDU-KD Set 15 394,550 5,918,250 0 0 5,918,250

2 Armour Tape ¼" wide HDW Mtr 5 6,800 0 34,000 0 34,000


3 Bolt Double Arming ⅝" x 14" HDW Bh 10 34,800 0 348,000 0 348,000
4 Bolt Machine ⅝" x 10" HDW Bh 5 17,700 0 88,500 0 88,500
5 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh 20 4,900 0 98,000 0 98,000
6 Brace Steel 770 mm HDW Bh 20 41,500 0 830,000 0 830,000
7 Clevis Swinging Secondary HDW Bh 5 15,500 0 77,500 0 77,500

8 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh 10 389,800 0 3,898,000 0 3,898,000

9 Lock Nut ⅝" HDW Bh 20 11,400 0 228,000 0 228,000


10 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² HDW Bh 10 29,600 0 296,000 0 296,000
11 Oval Eye Bolt ⅝" x 10" HDW Bh 5 19,200 0 96,000 0 96,000
12 Oval Eye Nut ⅝" HDW Bh 15 21,000 0 315,000 0 315,000
13 Pole Band Double Rack 7" atau 7 ½" HDW Bh 5 49,300 0 246,500 0 246,500
14 Pole Band Single Rack 7" atau 7 ½" HDW Bh 5 34,700 0 173,500 0 173,500
15 Schackle Anchor ⅝" HDW Bh 15 16,000 0 240,000 0 240,000
16 Spool Insulator ANSI 53 - 4 HDW Bh 5 26,400 0 132,000 0 132,000
17 Washer Square 2 ¼" HDW Bh 55 1,500 0 82,500 0 82,500
18 Upah Pasang Konst. JTM 3 Fasa C7 JASA Unit 5 101,800 0 0 509,000 509,000

+ CC1-A Unit 1 0 0 0 0
1 Isolator Pinpost Porcelain MDU-KD Bh 1 207,470 207,470 0 0 207,470
2 Isolator Pinpost Porcelain MDU-KD Bh 2 207,470 414,940 0 0 414,940
3 Bolt Machine ⅝" x 10" HDW Bh 3 17,700 0 53,100 0 53,100
4 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh 2 4,900 0 9,800 0 9,800
5 Bolt Single Up Side ⅝" x 10" HDW Bh 1 33,600 0 33,600 0 33,600
6 Brace Steel 770 mm HDW Bh 2 41,500 0 83,000 0 83,000
7 Center Bracket 12.5 KN HDW Bh 1 90,200 0 90,200 0 90,200

8 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh 1 389,800 0 389,800 0 389,800

9 Lock Nut ⅝" HDW Bh 4 11,400 0 45,600 0 45,600


10 Pole Band Single Rack 7" atau 7 ½" HDW Bh 1 34,700 0 34,700 0 34,700
11 Spool Insulator ANSI 53 - 2 HDW Bh 1 17,000 0 17,000 0 17,000
12 Tie Wire # 4 / Alluminium bonding wire # 20 HDW Mtr 6.2 5,100 0 31,620 0 31,620
13 Washer Square 2 ¼" HDW Bh 5 1,500 0 7,500 0 7,500
14 Upah Pasang Konst. JTM 3 Fasa C1-A JASA Unit 1 83,900 0 0 83,900 83,900
0 0 0 0
+ Pemasangan ABSW (CM3-16) Unit 2 0 0 0 0
1 ABSW 20 KV HDW Set 2 22,685,000 0 45,370,000 0 45,370,000
2 AAAC 240 mm² MDU-KD Mtr 24 28,200 676,800 0 0 676,800
3 Sepatu Kabel AL/CU Kepala-240 mm² HDW Bh 12 124,300 0 1,491,600 0 1,491,600

4 Compresion Conector H type 240 mm² / 240 mm² HDW Bh 12 45,000 0 540,000 0 540,000

5 Upah Pasang SM / CM 3 - 16 (ABSW) JASA Unit 2 1,539,900 0 0 3,079,800 3,079,800


0 0 0 0
+ CM2-15 Unit 2 0 0 0 0
1 Pole Band Double Up Side 9" atau 12" HDW Bh 2 68,600 0 137,200 0 137,200
2 Pole Band Double Up Side 7" atau 7 ½" HDW Bh 4 61,800 0 247,200 0 247,200
3 Ground rod ⅝" x 8" Copper Weld HDW Bh 8 208,500 0 1,668,000 0 1,668,000
4 Clamp Ground Rod ⅝" HDW Bh 8 4,880 0 39,040 0 39,040
5 Bimetalic Connector 35 - 240 mm² HDW Bh 4 46,600 0 186,400 0 186,400
6 Ground wire Cu 50 mm² HDW Mtr 14 80,100 0 1,121,400 0 1,121,400
7 Ground rod & Washer HDW Bh 4 9,500 0 38,000 0 38,000

8 Grounding Iron Plate Form Plat / Eart safety mats HDW Bh 2 1,308,700 0 2,617,400 0 2,617,400

9 Compresion Conector H type 50 mm² / 70 mm² HDW Bh 2 22,400 0 44,800 0 44,800


10 Upah Pasang Acc.Jar M2-15 JASA Unit 2 173,100 0 0 346,200 346,200
0 0 0 0
+ CM2-12 Unit 4 0 0 0 0
1 Bimetalic Connector 35 - 240 mm² HDW Bh 4 46,600 0 186,400 0 186,400
2 Ground wire Cu 16 mm² HDW Mtr 3.2 24,000 0 76,800 0 76,800
PT. PLN ( PERSERO )
DISTRIBUSI JAWA TENGAH & DI YOGYAKARTA

RENCANA ANGGARAN BIAYA (RAB)

Pekerjaan : PEMBANGUNAN JARINGAN GUNA MELAYANI PD PT. HIT

Lokasi : GODONG - GROBOGAN


Pelaksana : PT. PLN (PERSERO) UP3 DEMAK
Anggaran : SAR 2021

BIAYA YANG DIPERLUKAN ( Rp )


NO URAIAN GOL SAT VOL HARGA SATUAN
MDU HARDWARE JASA JUMLAH

3 Ground rod & Washer HDW Bh 4 9,500 0 38,000 0 38,000


4 Upah Pasang Acc.Jar M2-12 JASA Unit 4 12,200 0 0 48,800 48,800
0 0 0 0
+ CM2-12A Unit 1 0 0 0 0
1 Bimetalic Connector 35 - 240 mm² HDW Bh 1 46,600 0 46,600 0 46,600
2 Ground wire Cu 16 mm² HDW Mtr 1 24,000 0 24,000 0 24,000
3 Ground rod & Washer HDW Bh 1 9,500 0 9,500 0 9,500
4 Upah Pasang Acc.Jar M2-12A JASA Unit 1 16,000 0 0 16,000 16,000
0 0 0 0
+ CE1-3 Unit 1 0 0 0 0
1 Bolt Machine ⅝" x 10" HDW Bh 1 17,700 0 17,700 0 17,700
2 Guy Attachment / Guy hok HDW Bh 1 9,600 0 9,600 0 9,600
3 Guy Wire 70 mm² HDW Mtr 12 24,200 0 290,400 0 290,400
4 Three Bolt Clamp HDW Bh 2 39,700 0 79,400 0 79,400
5 Washer Square 2 ¼" HDW Bh 1 1,500 0 1,500 0 1,500
6 Upah Pasang Acc.Jar E1-3 JASA Unit 1 45,800 0 0 45,800 45,800
0 0 0 0
+ F1-3 1
1 Expanding Anchor 10.000 lbs HDW Bh 1 120,900 0 120,900 0 120,900
2 Rod Anchor ¾" x 8' 1
3 Kousen HDW Bh 1 4,500 0 4,500 0 4,500
4 Upah Pasang Acc.Jar F1-3 JASA Unit 1 45,600 0 0 45,600 45,600
0 0 0 0
+ CM5-5 12
1 Isolator Pinpost Porcelain MDU-KD Bh 12 207,470 2,489,640 0 0 2,489,640
2 Washer Square 2 ¼" HDW Bh 24
3 Tie Wire # 4 / Alluminium bonding wire # 20 HDW Mtr 21.6 5,100 0 110,160 0 110,160
4 Upah Pasang Acc.Jar M5-5 JASA Unit 12 23,600 0 0 283,200 283,200
0 0 0 0
+ SJ6 3
1 Armour Tape ¼" wide HDW Mtr 3 6,800 0 20,400 0 20,400
2 Clevis Swinging Secondary HDW Bh 3 15,500 0 46,500 0 46,500
3 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² HDW Bh 6 29,600 0 177,600 0 177,600
4 Oval Eye Nut ⅝" HDW Bh 3 21,000 0 63,000 0 63,000
5 Pole Band Single Rack 7" atau 7 ½" HDW Bh 3 34,700 0 104,100 0 104,100
6 Spool Insulator ANSI 53 - 4 HDW Bh 3 26,400 0 79,200 0 79,200
7 Upah Pasang Konst. JTR J6 JASA Unit 3 27,500 0 0 82,500 82,500

+ OMSET SR
1 Upah Pasang SR + APP 1 Fasa JASA Unit 4 50,000 0 0 200,000 200,000

+ PEMASANGAN KABEL POWER Unit 0 0 0 0


2
1 Terminating kabel 3 x 300 mm² ID HDW Set 2 5,418,700 0 10,837,400 0 10,837,400
2 Terminating kabel 3 x 300 mm² OD HDW Set 2 6,564,600 0 13,129,200 0 13,129,200
3 Sepatu Kabel AL/CU Ring-300 mm² HDW Bh 12 159,200 0 1,910,400 0 1,910,400
4 Sepatu Kabel AL/CU Ring-150 mm² HDW Bh 4 95,300 0 381,200 0 381,200
5 Pipa PVC 6" panjang 4 meter HDW Bh 6 148,000 0 888,000 0 888,000
6 Tanda urutan Fasa untuk kabel HDW Bh 6 8,000 0 48,000 0 48,000
7 Pole Band Single Up Side 4" atau 4 ½" HDW Bh 2 37,000 0 74,000 0 74,000
8 Pole Band Single Up Side 7" atau 7 ½" HDW Bh 2 51,100 0 102,200 0 102,200
9 Pole Band Single Up Side 9" atau 12" HDW Bh 4 51,800 0 207,200 0 207,200
10 AAAC 240 mm² MDU-KD Mtr 12 28,200 338,400 0 0 338,400

11 Compresion Conector H type 240 mm² / 240 mm² HDW Bh 12 45,000 0 540,000 0 540,000

Mur Baut Ring Plat Ring Per Stainless Steel Ukuran


12 HDW Bh 12 12,000 0 144,000 0 144,000
19 mm
13 Kabel NA2XSEYBY 20 KV, 3 x 300 mm² MDU-KD Mtr 100 475,520 47,552,000 0 0 47,552,000
14 Kabel NYY 1 x 150 mm² MDU-KD Mtr 100 176,540 17,654,000 0 0 17,654,000

15 Upah Pasang Terminating Kabel 3 x 300 mm² ID JASA Unit 2 569,630 0 0 1,139,260 1,139,260

16 Upah Pasang Terminating Kabel 3 x 300 mm² OD JASA Unit 2 659,799 0 0 1,319,599 1,319,599

17 Upah Pasang Kabel Tanah XLPE 3 x 300 mm² (three JASA Per 50 m 2 562,142 0 0 1,124,283 1,124,283
core)

18 Upah Pasang Kabel NYY 1 x 150 mm² JASA Per 1 m 100 1,200 0 0 120,000 120,000
0 0 0 0
+ PEMASANGAN SUTM Unit 0 0 0 0
1 AAAC 240 mm² MDU-KD Mtr 690 28,200 19,458,000 0 0 19,458,000
2 AAAC 150 mm² MDU-KD Mtr 230 17,140 3,942,200 0 0 3,942,200
Upah Pasang Penghantar TM A3C 3x240 +
3 JASA Per Kms 0.23 9,302,000 0 0 2,139,460 2,139,460
1x150mm² Per Kms
PT. PLN ( PERSERO )
DISTRIBUSI JAWA TENGAH & DI YOGYAKARTA

RENCANA ANGGARAN BIAYA (RAB)

Pekerjaan : PEMBANGUNAN JARINGAN GUNA MELAYANI PD PT. HIT

Lokasi : GODONG - GROBOGAN


Pelaksana : PT. PLN (PERSERO) UP3 DEMAK
Anggaran : SAR 2021

BIAYA YANG DIPERLUKAN ( Rp )


NO URAIAN GOL SAT VOL HARGA SATUAN
MDU HARDWARE JASA JUMLAH

0 0 0 0
+ PEKERJAAN PEMBONGKARAN Unit 0 0 0 0
1 Upah Bongkar Tiang Beton 9M-100 daN JASA Btg 1 250,977 0 0 250,977 250,977
2 Upah Bongkar Konst. JTR J6 JASA Unit 3 16,500 0 0 49,500 49,500
3 Upah Bongkar Sambungan Rumah 1 Fasa JASA Unit 4 15,000 0 0 60,000 60,000
0 0 0 0
SLO 0 0 0
1 Sertifikasi Laik Operasi JASA Lot 1 2.5% 5,127,874 5,127,874

Jumlah MDU - Hardware - Jasa : 142,365,814 103,369,761 18,010,293 263,745,868


PPN 10% : 14,236,581 10,336,976 1,801,029 26,374,587
Jumlah Total : 156,602,395 113,706,737 19,811,323 290,120,455

Demak, …............ 2020


Mengetahui,
Manager

….........................
PT. PLN ( PERSERO )
DISTRIBUSI JAWA TENGAH & DI YOGYAKARTA

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan : PD PT. HARTONO ISTANA TEKNOLOGI
Lokasi : JL. Semarang Km.09
Perubahan Daya : I3/4.330 KVA-I3/6.330KVA
Pelaksana : PT. PLN (PERSERO) UP3 DEMAK
Anggaran : SAR 2021

BIAYA YANG DIPERLUKAN ( Rp )


NO URAIAN GOL SAT VOL HARGA SATUAN
MDU HARDWARE JASA JUMLAH

0 0 0 0
A PEMASANGAN TIANG 0 0 0 0
1 Tiang Beton 14M-350 daN+E MDU Btg 4 6,942,466 27,769,864 0 0
2 Penomoran Tiang HDW Btg 4 8,900 0 35,600 0 35,600
0 0 0 0
B PEKERJAAN PENGGANTIAN APP 0 0 0 0
1 Upah Bongkar CT TM ID/OD JASA Unit 3 115,800 0 0 347,400 347,400
2 CT TM Indoor Tipe Blok 200/5-5A Class 0.2s MDU-KD Bh 3 2,250,810 6,752,430 0 0
3 Upah Pasang CT TM ID/OD JASA Unit 3 193,000 0 0 579,000 579,000
0 0 0 0
C PEKERJAAN PEMASANGAN KONSTRUKSI 0 0 0 0
+ DB08 Unit 0 0 0 0 0
Isolator Tarik ( Porcelain ) 20 KV + Primary Dead End
1 Clamp 150-240 mm² MDU-KD Set 0 394,550 0 0 0

2 Bolt Double Arming ⅝" x 14" HDW Bh 0 20,800 0 0 0 0


3 Bolt Machine ⅝" x 10" HDW Bh 0 15,800 0 0 0 0
4 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh 0 4,400 0 0 0 0
5 Brace Steel 770 mm HDW Bh 0 37,000 0 0 0 0
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh 0 329,300 0 0 0 0
7 Lock Nut ⅝" HDW Bh 0 10,200 0 0 0 0
8 Oval Eye Bolt ⅝" x 10" HDW Bh 0 17,100 0 0 0 0
9 Oval Eye Nut ⅝" HDW Bh 0 18,700 0 0 0 0
10 Pole Band Double Rack 7" atau 7 ½" HDW Bh 0 43,900 0 0 0 0
11 Schackle Anchor ⅝" HDW Bh 0 14,300 0 0 0 0
12 Washer Square 2 ¼" HDW Bh 0 1,400 0 0 0 0
13 H Type Connector 50/50 mm² Cu HDW Bh 0 23,000 0 0 0 0
14 Cooper Strip 50 mm² Insulated Ground Colour HDW Bh 0 18,900 0 0 0 0
15 PVC Pipe 150 mm² HDW Bh 0 30,500 0 0 0 0
16 Protective Plastic HDW Bh 0 2,100 0 0 0 0
17 Link 50 x 25 mm HDW Bh 0 2,100 0 0 0 0
18 strapping buckle HDW Bh 0 3,300 0 0 0 0
19 Stainless steel strap HDW Bh 0 3,300 0 0 0 0
20 Strap For Clamping, Type Insulator HDW Bh 0 9,700 0 0 0 0
21 Parralel Groove Clamp HDW Bh 0 43,300 0 0 0 0
22 Strain Clamp Bolted Type HDW Bh 0 27,100 0 0 0 0
23 Turn Buckle HDW Bh 0 50,500 0 0 0 0
24 Strain Hinge HDW Bh 0 32,100 0 0 0 0
25 Fixation Device HDW Bh 0 50,500 0 0 0 0
26 Pole Band Double Rack 7" atau 7 ½" HDW Bh 0 43,900 0 0 0 0
27 Compresion Conector H type 240 mm² / 240 mm² HDW Bh 0 40,100 0 0 0 0
28 AAAC 240 mm² MDU-KD Mtr 0 28,200 0 0 0
29 Lightning Arester (Polymer) 21 KV, 10 KA MDU-KD Bh 0 648,050 0 0 0
30 Terminating kabel 3 x 240 mm² OD HDW Set 0 4,761,600 0 0 0 0
31 Upah Pasang Konst. SKUTM DB08 JASA Unit 0 358,140 0 0 0 0
0 0 0 0
+ CC8 Unit 3 0 0 0 0
1 Isolator Pinpost Porcelain MDU-KD Bh 3 207,470 622,410 0 0
2 Isolator Pinpost Porcelain MDU-KD Bh 6 207,470 1,244,820 0 0

3 Isolator Tarik ( Porcelain ) 20 KV + Primary Dead End MDU-KD Set 18 394,550 7,101,900 0 0
Clamp 150-240 mm²
4 Armour Tape ¼" wide HDW Mtr 6 6,100 0 36,600 0 36,600
5 Bolt Double Arming ⅝" x 14" HDW Bh 6 20,800 0 124,800 0 124,800
6 Bolt Machine ⅝" x 10" HDW Bh 9 15,800 0 142,200 0 142,200
7 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh 12 4,400 0 52,800 0 52,800
8 Brace Steel 770 mm HDW Bh 12 37,000 0 444,000 0 444,000
9 Center Bracket 12.5 KN HDW Bh 3 80,300 0 240,900 0 240,900
10 Clevis Swinging Secondary HDW Bh 6 13,800 0 82,800 0 82,800
11 Compresion Conector H type 240 mm² / 240 mm² HDW Bh 12 40,100 0 481,200 0 481,200
12 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh 6 329,300 0 1,975,800 0 1,975,800
13 Lock Nut ⅝" HDW Bh 9 10,200 0 91,800 0 91,800
14 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² HDW Bh 12 26,400 0 316,800 0 316,800
15 Oval Eye Bolt ⅝" x 10" HDW Bh 9 17,100 0 153,900 0 153,900
16 Oval Eye Nut ⅝" HDW Bh 27 18,700 0 504,900 0 504,900
PT. PLN ( PERSERO )
DISTRIBUSI JAWA TENGAH & DI YOGYAKARTA

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan : PD PT. HARTONO ISTANA TEKNOLOGI
Lokasi : JL. Semarang Km.09
Perubahan Daya : I3/4.330 KVA-I3/6.330KVA
Pelaksana : PT. PLN (PERSERO) UP3 DEMAK
Anggaran : SAR 2021

BIAYA YANG DIPERLUKAN ( Rp )


NO URAIAN GOL SAT VOL HARGA SATUAN
MDU HARDWARE JASA JUMLAH

17 Pole Band Double Rack 7" atau 7 ½" HDW Bh 3 43,900 0 131,700 0 131,700
18 Schackle Anchor ⅝" HDW Bh 24 14,300 0 343,200 0 343,200
19 Spool Insulator ANSI 53 - 4 HDW Bh 6 23,500 0 141,000 0 141,000
20 Tie Wire # 4 / Alluminium bonding wire # 20 HDW Mtr 16.2 4,600 0 74,520 0 74,520
21 Washer Square 2 ¼" HDW Bh 39 1,400 0 54,600 0 54,600
22 Upah Pasang Konst. JTM 3 Fasa C8 JASA Unit 3 169,900 0 0 509,700 509,700
0 0 0 0
+ CC7 Unit 6 0 0 0 0
Isolator Tarik ( Porcelain ) 20 KV + Primary Dead End
1 MDU-KD Set 18 394,550 7,101,900 0 0
Clamp 150-240 mm²
2 Armour Tape ¼" wide HDW Mtr 6 6,100 0 36,600 0 36,600
3 Bolt Double Arming ⅝" x 14" HDW Bh 12 20,800 0 249,600 0 249,600
4 Bolt Machine ⅝" x 10" HDW Bh 6 15,800 0 94,800 0 94,800
5 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh 24 4,400 0 105,600 0 105,600
6 Brace Steel 770 mm HDW Bh 24 37,000 0 888,000 0 888,000
7 Clevis Swinging Secondary HDW Bh 6 13,800 0 82,800 0 82,800
8 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh 12 329,300 0 3,951,600 0 3,951,600
9 Lock Nut ⅝" HDW Bh 24 10,200 0 244,800 0 244,800
10 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² HDW Bh 12 26,400 0 316,800 0 316,800
11 Oval Eye Bolt ⅝" x 10" HDW Bh 6 17,100 0 102,600 0 102,600
12 Oval Eye Nut ⅝" HDW Bh 18 18,700 0 336,600 0 336,600
13 Pole Band Double Rack 7" atau 7 ½" HDW Bh 6 43,900 0 263,400 0 263,400
14 Pole Band Single Rack 7" atau 7 ½" HDW Bh 6 30,900 0 185,400 0 185,400
15 Schackle Anchor ⅝" HDW Bh 18 14,300 0 257,400 0 257,400
16 Spool Insulator ANSI 53 - 4 HDW Bh 6 23,500 0 141,000 0 141,000
17 Washer Square 2 ¼" HDW Bh 66 1,400 0 92,400 0 92,400
18 Upah Pasang Konst. JTM 3 Fasa C7 JASA Unit 6 60,600 0 0 363,600 363,600

+ CC1-A Unit 0 0 0 0 0
1 Isolator Pinpost Porcelain MDU-KD Bh 0 207,470 0 0 0
2 Isolator Pinpost Porcelain MDU-KD Bh 0 207,470 0 0 0
3 Bolt Machine ⅝" x 10" HDW Bh 0 15,800 0 0 0 0
4 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh 0 4,400 0 0 0 0
5 Bolt Single Up Side ⅝" x 10" HDW Bh 0 20,000 0 0 0 0
6 Brace Steel 770 mm HDW Bh 0 37,000 0 0 0 0
7 Center Bracket 12.5 KN HDW Bh 0 80,300 0 0 0 0
8 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh 0 329,300 0 0 0 0
9 Lock Nut ⅝" HDW Bh 0 10,200 0 0 0 0
10 Pole Band Single Rack 7" atau 7 ½" HDW Bh 0 30,900 0 0 0 0
11 Spool Insulator ANSI 53 - 2 HDW Bh 0 15,200 0 0 0 0
12 Tie Wire # 4 / Alluminium bonding wire # 20 HDW Mtr 0 4,600 0 0 0 0
13 Washer Square 2 ¼" HDW Bh 0 1,400 0 0 0 0
14 Upah Pasang Konst. JTM 3 Fasa C1-A JASA Unit 0 73,200 0 0 0 0
0 0 0 0
+ Pemasangan ABSW (CM3-16) Unit 2 0 0 0 0
1 ABSW 20 KV HDW Set 2 20,400,000 0 40,800,000 0 40,800,000
2 AAAC 240 mm² MDU-KD Mtr 24 28,200 676,800 0 0
3 Sepatu Kabel AL/CU Kepala-240 mm² HDW Bh 12 110,700 0 1,328,400 0 1,328,400
4 Compresion Conector H type 240 mm² / 240 mm² HDW Bh 24 40,100 0 962,400 0 962,400
Mur Baut Ring Plat Ring Per Stainless Steel Ukuran 19
HDW Bh 24 7,200 172,800 172,800
mm
5 Upah Pasang SM / CM 3 - 16 (ABSW) JASA Unit 2 549,800 0 0 1,099,600 1,099,600

0 0 0 0
+ CM2-15 Unit 2 0 0 0 0
1 Pole Band Double Up Side 9" atau 12" HDW Bh 2 40,900 0 81,800 0 81,800
2 Pole Band Double Up Side 7" atau 7 ½" HDW Bh 4 55,100 0 220,400 0 220,400
3 Ground rod ⅝" x 8" Copper Weld HDW Bh 8 185,600 0 1,484,800 0 1,484,800
4 Clamp Ground Rod ⅝" HDW Bh 8 4,400 0 35,200 0 35,200
5 Bimetalic Connector 35 - 240 mm² HDW Bh 4 41,500 0 166,000 0 166,000
6 Ground wire Cu 50 mm² HDW Mtr 14 71,300 0 998,200 0 998,200
7 Ground rod & Washer HDW Bh 4 8,500 0 34,000 0 34,000
8 Grounding Iron Plate Form Plat / Eart safety mats HDW Bh 2 1,164,800 0 2,329,600 0 2,329,600
9 Compresion Conector H type 50 mm² / 70 mm² HDW Bh 2 13,400 0 26,800 0 26,800
10 Upah Pasang Acc.Jar M2-15 JASA Unit 2 154,100 0 0 308,200 308,200
PT. PLN ( PERSERO )
DISTRIBUSI JAWA TENGAH & DI YOGYAKARTA

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan : PD PT. HARTONO ISTANA TEKNOLOGI
Lokasi : JL. Semarang Km.09
Perubahan Daya : I3/4.330 KVA-I3/6.330KVA
Pelaksana : PT. PLN (PERSERO) UP3 DEMAK
Anggaran : SAR 2021

BIAYA YANG DIPERLUKAN ( Rp )


NO URAIAN GOL SAT VOL HARGA SATUAN
MDU HARDWARE JASA JUMLAH

0 0 0 0
+ CM2-12 Unit 4 0 0 0 0
1 Bimetalic Connector 35 - 240 mm² HDW Bh 4 41,500 0 166,000 0 166,000
2 Ground wire Cu 16 mm² HDW Mtr 3.2 21,400 0 68,480 0 68,480
3 Ground rod & Washer HDW Bh 4 8,500 0 34,000 0 34,000
4 Upah Pasang Acc.Jar M2-12 JASA Unit 4 10,900 0 0 43,600 43,600
0 0 0 0
+ CM2-12A Unit 3 0 0 0 0
1 Bimetalic Connector 35 - 240 mm² HDW Bh 3 41,500 0 124,500 0 124,500
2 Ground wire Cu 16 mm² HDW Mtr 3 21,400 0 64,200 0 64,200
3 Ground rod & Washer HDW Bh 3 8,500 0 25,500 0 25,500
4 Upah Pasang Acc.Jar M2-12A JASA Unit 3 14,300 0 0 42,900 42,900
0 0 0 0
+ CE1-3 Unit 3 0 0 0 0
1 Bolt Machine ⅝" x 10" HDW Bh 3 15,800 0 47,400 0 47,400
2 Guy Attachment / Guy hok HDW Bh 3 8,600 0 25,800 0 25,800
3 Guy Wire 70 mm² HDW Mtr 36 21,600 0 777,600 0 777,600
4 Three Bolt Clamp HDW Bh 6 35,400 0 212,400 0 212,400
5 Washer Square 2 ¼" HDW Bh 3 1,400 0 4,200 0 4,200
6 Upah Pasang Acc.Jar E1-3 JASA Unit 3 27,800 0 0 83,400 83,400
0 0 0 0
+ F1-3 3
1 Expanding Anchor 10.000 lbs HDW Bh 3 107,700 0 323,100 0 323,100
2 Rod Anchor ¾" x 8' HDW Bh 3 120,900
3 Kousen HDW Bh 3 2,700 0 8,100 0 8,100
4 Upah Pasang Acc.Jar F1-3 JASA Unit 3 38,000 0 0 114,000 114,000
0 0 0 0
+ CM5-5 12
1 Isolator Pinpost Porcelain MDU-KD Bh 12 207,470 2,489,640 0 0
2 Washer Square 2 ¼" HDW Bh 24 1,400
3 Tie Wire # 4 / Alluminium bonding wire # 20 HDW Mtr 21.6 4,600 0 99,360 0 99,360
4 Upah Pasang Acc.Jar M5-5 JASA Unit 12 21,100 0 0 253,200 253,200
0 0 0 0
+ SJ6 10
1 Armour Tape ¼" wide HDW Mtr 10 6,100 0 61,000 0 61,000
2 Clevis Swinging Secondary HDW Bh 10 13,800 0 138,000 0 138,000
3 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² HDW Bh 20 26,400 0 528,000 0 528,000
4 Oval Eye Nut ⅝" HDW Bh 10 18,700 0 187,000 0 187,000
5 Pole Band Single Rack 7" atau 7 ½" HDW Bh 10 30,900 0 309,000 0 309,000
6 Spool Insulator ANSI 53 - 4 HDW Bh 10 23,500 0 235,000 0 235,000
7 Upah Pasang Konst. JTR J6 JASA Unit 10 26,500 0 0 265,000 265,000

+ OMSET SR
1 Upah Pasang SR + APP 1 Fasa JASA Unit 4 48,500 0 0 194,000 194,000

+ PEMASANGAN KABEL POWER Unit 1 0 0 0 0


1 Terminating kabel 3 x 300 mm² ID HDW Set 1 4,822,700 0 4,822,700 0 4,822,700
2 Terminating kabel 3 x 300 mm² OD HDW Set 1 5,842,500 0 5,842,500 0 5,842,500
3 Sepatu Kabel AL/CU Ring-300 mm² HDW Bh 6 136,000 0 816,000 0 816,000
4 Sepatu Kabel AL/CU Ring-150 mm² HDW Bh 2 56,800 0 113,600 0 113,600
5 Pipa PVC 6" panjang 4 meter HDW Bh 3 131,800 0 395,400 0 395,400
6 Tanda urutan Fasa untuk kabel HDW Bh 12 7,200 0 86,400 0 86,400
7 Pole Band Single Up Side 4" atau 4 ½" HDW Bh 1 33,000 0 33,000 0 33,000
8 Pole Band Single Up Side 7" atau 7 ½" HDW Bh 1 45,500 0 45,500 0 45,500
9 Pole Band Single Up Side 9" atau 12" HDW Bh 2 30,900 0 61,800 0 61,800
10 AAAC 240 mm² MDU-KD Mtr 6 28,200 169,200 0 0
11 Compresion Conector H type 240 mm² / 240 mm² HDW Bh 6 40,100 0 240,600 0 240,600

12 Mur Baut Ring Plat Ring Per Stainless Steel Ukuran 19 HDW Bh 6 7,200 0 43,200 0 43,200
mm
13 Kabel NA2XSEYBY 20 KV, 3 x 300 mm² MDU-KD Mtr 100 475,520 47,552,000 0 0
14 Kabel NYY 1 x 150 mm² MDU-KD Mtr 100 176,540 17,654,000 0 0
15 Upah Pasang Terminating Kabel 3 x 300 mm² ID JASA Unit 1 507,000 0 0 507,000 507,000
16 Upah Pasang Terminating Kabel 3 x 300 mm² OD JASA Unit 1 587,300 0 0 587,300 587,300
PT. PLN ( PERSERO )
DISTRIBUSI JAWA TENGAH & DI YOGYAKARTA

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan : PD PT. HARTONO ISTANA TEKNOLOGI
Lokasi : JL. Semarang Km.09
Perubahan Daya : I3/4.330 KVA-I3/6.330KVA
Pelaksana : PT. PLN (PERSERO) UP3 DEMAK
Anggaran : SAR 2021

BIAYA YANG DIPERLUKAN ( Rp )


NO URAIAN GOL SAT VOL HARGA SATUAN
MDU HARDWARE JASA JUMLAH

17 Upah Pasang Kabel Tanah XLPE 3 x 300 mm² (three core) JASA Per 50 m 2 232,800 0 0 465,600 465,600

18 Upah Pasang Kabel NYY 1 x 150 mm² JASA Per 1 m 100 1,100 0 0 110,000 110,000
0 0 0 0
+ CM2-11 Unit Unit 2
Ground rod ⅝" x 8" Copper Weld Bh 1 185,600
Bimetalic Connector 35 - 240 mm² Bh 1 41,500
Clamp Ground Rod ⅝" Bh 1 4,400
Ground wire Cu 16 mm² Mtr 10 21,400
Ground rod & Washer Bh 2 8,500
Pipa PVC ½" Bh 5.5 5,500
Stopping Buckle / Yokes Bh 6 2,100
Stainless Steel Strap 20 X 0.7 mm Mtr 4.8 13,400
Upah Pasang Acc.Jar M2-11M Unit 1 58,300

+ PEMBUATAN SALURAN KABEL OUTDOOR

1 Persiapan Pekerjaan JASA ls 1 178,500 178,500 178,500


2 Pemasangan Bouwplank JASA m2 8 56,700 453,600 453,600
3 Galian Tanah JASA m3 8 44,200 353,600 353,600
4 Pembuangan Tanah JASA m3 8 89,300 714,400 714,400
5 Urugan Pasir Padat JASA m3 8 144,600 1,156,800 1,156,800
6 Pembuatan Lantai Kerja JASA m3 8 669,400 5,355,200 5,355,200
7 Pembuatan Beton Bertulang K225 JASA m3 8 3,014,000 24,112,000 24,112,000
8 Pembuatan Tutup Beton Bertulang K225 JASA m3 8 3,014,000 24,112,000 24,112,000
9 Besi Siku 70 untuk Tray Kabel Power HDW pcs 8 110,100 880,800 880,800

+ PEMASANGAN SUTM Unit 0 0 0 0


1 AAAC 240 mm² MDU-KD Mtr 750 28,200 21,150,000 0 0
2 AAAC 150 mm² MDU-KD Mtr 250 17,140 4,285,000 0 0

3 Upah Pasang Penghantar TM A3C 3x240 + 1x150mm² JASA Per 50 m 5 423,400 0 0 2,117,000 2,117,000

0 0 0 0
+ PEKERJAAN PEMBONGKARAN Unit 0 0 0 0
1 Upah Bongkar Tiang Beton 9M-100 daN JASA Btg 1 149,400 0 0 149,400 149,400
2 Upah Bongkar Konst. JTR J6 JASA Unit 3 10,700 0 0 32,100 32,100
3 Upah Bongkar Sambungan Rumah 1 Fasa JASA Unit 4 13,400 0 0 53,600 53,600
0 0 0 0
+ LAIN LAIN Unit
Compresion Conector H type 240 mm² / 240 mm² HDW Bh 42 40,100 1,684,200
Joint sleeve 240 mm² HDW Bh 6 68,700 412,200
Compresion Conector H type 70 mm² / 70 mm² HDW Bh 12 26,400 316,800
Bongkar Pasang LBS JASA Unit 1 1,851,480 1,851,480

Jumlah MDU - Hardware - Jasa : 144,569,964 78,239,060 64,661,700 142,900,760


Jumlah Total : 144,569,964 78,239,060 64,661,700 142,900,760

Seratus Juta Empat Ratus Dua Puluh Tujuh Ribu Dua Ratus Dua Puluh Rupiah

Demak, 04 Maret 2021

Manager Bagian Konstruksi

AGUS SALIM
II. KAJIAN KELAYAKAN FINANSIAL (KKF) PT. HARTONO ISTANA TEKNOLOGI
E WBP E LWBP Cost (Juta IDR) Benefit (Juta IDR) Factor PV Net ΣPV Net Pay Back
Tahun Energi (kWh) (kWh) (kWh) Nett Benefit PV Benefit Periode
Invest O&M Transfer Price Losses Total BP E Sales Total Benefit

0 2020 960,000.00 160,000.00 800,000.00 143 2.86 1,048.32 23.59 1,217.67 1,262 1,077.21 2,339.21 1,121.55 1 1,121.55 1,121.55
1 2021 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.89 2.18 1,123.73
2 2022 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.80 1.95 1,125.68
3 2023 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.71 1.74 1,127.42
4 2024 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.64 1.55 1,128.97
5 2025 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.57 1.39 1,130.36
6 2026 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.51 1.24 1,131.60
7 2027 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.45 1.11 1,132.71
8 2028 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.40 0.99 1,133.70
9 2029 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.36 0.88 1,134.58
10 2030 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.32 0.79 1,135.37
11 2031 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.29 0.70 1,136.07
12 2032 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.26 0.63 1,136.70
13 2033 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.23 0.56 1,137.26
14 2034 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.20 0.50 1,137.76
15 2035 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.18 0.45 1,138.20
16 2036 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.16 0.40 1,138.60
17 2037 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.15 0.36 1,138.96
18 2038 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.13 0.32 1,139.28
19 2039 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.12 0.28 1,139.56
20 2040 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.10 0.25 1,139.82
21 2041 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.09 0.23 1,140.04
22 2042 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.08 0.20 1,140.24
23 2043 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.07 0.18 1,140.42
24 2044 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.07 0.16 1,140.59
25 2044 960,000.00 160,000.00 800,000.00 2.86 1,048.32 23.59 1,074.77 1,077.21 1,077.21 2.45 0.06 0.14 1,140.73
Total Cost 28,086.80 Total Benefit 29,269.49
BEP 498
PP #VALUE!
BCR 1.04
NPV 1,018.51
IRR #VALUE!
KAJIAN KELAYAKAN PROYEK

#REF!

NOMOR PRK : #REF!

RENCANA ANGGARAN INVESTASI


PT. PLN ( PERSERO )
#REF!

#REF!
NAMA PROGRAM : #REF!
INISIATIF STRATEGIS : #REF!
NAMA KEGIATAN : #REF!
#REF! : 290,120,455 RUPIAH

DJTY DLM PLG 10,274,838 BPP 2016 TR 1,248


ANGKA 2016 VA/PLG 1,257 BIKEU-Akt. TM 1,085
KWH/PLG 2,372 DES'2016 TT 999
RP/KWH 897 RATA2 1,168
JAM NYALA TOTAL 1,887 / Tahun TTL - 2017 TR 1,467
JAM NYALA PLG TM 2,734 / Tahun TA (JULI - SEPT) TM 1,144
PROGRAM PERKUATAN JARINGAN TT 997

URAIAN STN SEBELUM SESUDAH SELISIH KETERANGAN

Jumlah Padam Kali/thn #REF! #REF! #REF!


Lama Padam Jam/kejadian #REF! #REF! #REF!
Jam/thn #REF! #REF! #REF!
Beban PMT Ampere #REF! #REF! #REF! Per kejadian
Beban Hilang Ampere #REF! #REF! #REF! Per kejadian
Pelanggan Padam Plg/kejadian #REF! #REF! #REF!
Plg/thn #REF! #REF! #REF!
KWh Hilang KWH/thn #REF! #REF! #REF! Power Factor : 0.85
Rupiah Hilang Rp/thn #REF! #REF! #REF! Penjualan
SAIDI Jam/Plg/Thn #REF! #REF! #REF!
SAIFI Kali/Plg/Thn #REF! #REF! #REF!
Losses Maximum KW #REF! #REF! #REF! ETAP
Losses Perkiraan KWH/thn #REF! #REF! #REF!
Rp/thn #REF! #REF! #REF!

PROGRAM PENURUNAN SUSUT / LISTRIK PEDESAAN


KAJIAN RESIKO

NAMA KEGIATAN : #REF!


TUJUAN KEGIATAN : #REF!
WAKTU PELAKSANAAN : #REF!

IDENTIFIKASI RISIKO ANALISIS RISIKO INHEREN RENCANA PENANGANAN RISIKO KEY RISK INDICATOR (KRI)
NO PENYEBAB RISIKO TINGKAT TINGKAT TINGKAT TINGKAT TINGKAT TINGKAT
DESKRIPSI PEMILIK PENCEGAHAN DAN ATAU PEMULIHAN INDIKATOR TARGET TRESHOLD PIC
CONTROLLABLE & UNCONTROLLABLE KEMUNGKINAN DAMPAK RESIKO KEMUNGKINAN DAMPAK RESIKO
1. Kompetensi disyaratkan dalam dokumen kontrak
1 Keterlambatan pelaksanaan pekerjaan oleh pihak ketiga Konstruksi 1. Kurangnya kompetensi pelaksana pekerjaan C. Sedang 4. Signifikan TINGGI 2. Metode Kerja, Waktu, dan Jumlah Pelaksana Pekerjaan dituangkan dalam B. Kecil 2. Minor RENDAH Kontrak Pekerjaan 100% 100% Asman Konstruksi
2. Metode Kerja, dan Surber Daya tidak memadai CDA
2
3
4
5
6
7
8
9
10
11
12
13
14
15

#REF!
#REF!

#REF!
PT. PLN (PERSERO) UP3 DEMAK
Keterangan Gambar :
No Nama Material Baru Eksisting
1 Tiang Beton
2 Tiang Besi
3 JTM 3 Fasa
4 JTM 1 Fasa
5 JTR 1 Fasa Only / UB
6 JTR 3 Fasa Only / UB
7 Trafo 1 Fasa
8 Trafo 3 Fasa
SYG 07-.. 9 Fuse Cut Out s s
1 C12-350 dAN 10 ABSW
1 CC8
1 LBS 11 Vang Net
12 Schoor
13 Kabel Power
SYG 07-..
1 C12-350 dAN
1 CC8 Bongkar Pasang Konstruksi :
1 LBS Pasang Bongkar
1 CM3-16
1 CM2-15 SYG 16-02
C14-350 dAN+E 2 Btg C9-200 dAN+E 1 Btg
6 CM5-6 1 C14-350 dAN DB08 1 U CJ6 2 U
1 CC7 1 CC8
3 CM5-5 1 CM3-16
CC8 1 U SR 4 U
3 SJ-6 1 CM2-15 CC7 1 U
4 SR 1 CM2-12 LBS 1 U
CM3-16 1 U
CM2-15 1 U
CM5-5 3 U
CE1-3 1 U
SYG 07-.. F1-3 1 U
1 C9-200 dAN
3 CJ-6 SYG 16-01 CM2-12A 1 U
4 SR 1 C14-350 dAN SJ-6 3 U
1 DB-08
1 CM2-12 SR 4 U
1 CM2-12A CM2-12 2 U
1 CE1-3
1 F1-3 KABEL POWER 50 Mtr
Term. OD 3 Core 1 Set
Term. ID 3 Core 1 Set
GI SAYUNG A3C 240 mm2 300 Mtr
A3C150 mm2 100 Mtr

Keterangan Tambahan :

Golongan
No. Gambar 1 Lembar dr
Gambar dari Skala
Perihal:

PEMBANGUNAN JARINGAN GUNA MELAYANI PD PT. HIT DAYA 4330 KVA


MENJADI 6330 KVA

Digambar SPV. RENSIS


Diperiksa MAN. PERENCANAAN
Diketahui MAN. PERENCANAAN
Disetujui MANAGER
GAMBAR PETA PT. HARTONO ISTANA TEKNOLOGI

LOKASI
PELANGGAN
PT. PLN ( PERSERO )
DISTRIBUSI JAWA TENGAH & DI YOGYAKARTA

REKAP MDU
Pekerjaan : PEMBANGUNAN JARINGAN GUNA MELAYANI PD PT. HIT
Lokasi : GODONG - GROBOGAN
Pelaksana : PT. PLN (PERSERO) UP3 DEMAK
Anggaran : SAR 2021
Nomor PRK Err:509

BIAYA YANG DIPERLUKAN ( Rp )

NO URAIAN GOL SAT VOL HARGA


SATUAN
MDU HARDWARE JASA JUMLAH

0 0 0 0

+ REKAP MDU 0 0 0 0

1 CT TM Indoor Tipe Blok 200/5-5A Class 0.2s MDU-KD Bh 3 2,250,810 6,752,430 0 0 6,752,430

2 Isolator Tarik ( Porcelain ) 20 KV + Primary Dead End Cl MDU-KD Set 30 394,550 11,836,500 0 0 11,836,500

3 AAAC 240 mm² MDU-KD Mtr 729 28,200 20,557,800 0 0 20,557,800

4 Lightning Arester (Polymer) 21 KV, 10 KA MDU-KD Bh 3 648,050 1,944,150 0 0 1,944,150

5 Isolator Pinpost Porcelain MDU-KD Bh 20 207,470 4,149,400 0 0 4,149,400

6 Kabel NA2XSEYBY 20 KV, 3 x 300 mm² MDU-KD Mtr 100 475,520 47,552,000 0 0 47,552,000

7 Kabel NYY 1 x 150 mm² MDU-KD Mtr 100 176,540 17,654,000 0 0 17,654,000

8 AAAC 150 mm² MDU-KD Mtr 230 17,140 3,942,200 0 0 3,942,200

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0 0 0 0 0 0

Jumlah MDU - Hardware - Jasa : 114,388,480 0 0 114,388,480

PPN 10% : 11,438,848 0 0 11,438,848

Jumlah Total : 125,827,328 0 0 125,827,328

#REF!
Mengetahui,
0 Manager

0 ….........................
PT. PLN ( PERSERO )
DISTRIBUSI JAWA TENGAH & DI YOGYAKARTA

REKAP KEBUTUHAN TIANG


Pekerjaan : PD PT. HARTONO ISTANA TEKNOLOGI
Lokasi : JL. Semarang Km.09
Perubahan Daya : I3/4.330 KVA-I3/6.330KVA
Pelaksana : PT. PLN (PERSERO) UP3 DEMAK
Anggaran : SAR 2021

BIAYA YANG DIPERLUKAN ( Rp )


HARGA
NO URAIAN SAT VOL
SATUAN MDU HARDWARE JASA JUMLAH

0 0 0 0
+ REKAP TIANG 0 0 0 0
1 1 Tiang Beton 14M-350 daN+E Btg 4 6,942,466 27,769,864 0 0 27,769,864
2 0 0 0 0
3 0 0 0 0
4 0 0 0 0

Jumlah MDU - Hardware - Jasa : 27,769,864 0 0 27,769,864


PPN 10% : 2,776,986 0 0 2,776,986
Jumlah Total : 30,546,850 0 0 30,546,850
SERATUS DUA PULUH SEMBILAN JUTA LIMA RATUS TUJUH BELAS RIBU LIMA RATUS LIMA PULUH TIGA RUPIAH

Demak, 22 April 2020


Mengetahui,
0 Manager

0 ….........................
PT. PLN ( Persero )
UNIT INDUK DISTRIBUSI JAWA TENGAH & DIY.
UP3 DEMAK

KEPADA :
PT. SAPTO ARGO PERKASA
Sekuro 19/04 Mlonggo
Jepara

SURAT PERINTAH MULAI KERJA


No. 002 .PK/DAN.02.03/031400/2020 Tanggal 04 Maret 2020

Berdasarkan SPK nomor : 025.Pj/HKM.00.01/DMK/2019 Tanggal 31 Mei 2019 Kesepakatan Harga Satuan ( KHS ), maka :

1. Harap dilaksanakan : Pembangunan Jardist, untuk PB / PD atas :


a. N a m a : PT HARTONO ISTANA TEKNOLOHI
b. No. Agenda : 5255113013110
c. Tarif / Daya : PD I3/4.330 KVA- I3/6.330 KVA
d. Alamat : JL. Semarang KM.09
e. Penyulang :

f. Pekerjaan : Sesuai Gambar dan RAB ( terlampir ).

2. Sumber anggaran :

3. Nilai Pekerjaan : Rp 100.427.220


( Terbilang : Seratus Juta Empat Ratus Dua Puluh Tujuh Ribu Dua Ratus Dua Puluh Rupiah )
Belum termasuk Ppn 10 %.

4. Masa Pekerjaan : 04 Maret 2021 s/d 31 Maret 2021

5. Masa Pemeliharaan : 30 ( tiga puluh ) hari sejak tanggal Berita Acara Penyambungan.

Demikian untuk dilaksanakan dengan sebaik - baiknya.

SETUJU MELAKSANAKAN SESUAI KETENTUAN


DIREKTUR PEMBERI PERINTAH.
PT. SAPTO ARGO PERKASA MANAGER UP3 DEMAK

IMAM SYAFI'I AHMAD SAMSURI

Paraf
#REF!

LOSSES SEBELUM PEKERJAAN

TOTAL DEMAND :
APPARENT LOSSES :

TEGANGAN : KV
ARUS : A
#REF!

LOSSES SESUDAH PEKERJAAN

TOTAL DEMAND :
APPARENT LOSSES :

TEGANGAN : KV
ARUS : A