Ups Test Report: Customer Make & Type Project Serial No Bay Date

This document is a UPS test report that records the results of electrical checks of a UPS system over time. It includes checks of battery capacity, voltage, load, discharge current, and output measurements before the test begins and then again at 10, 20, and 30 minutes. The report documents the customer, make and type of UPS, serial number, date, and status and remarks for each measurement point. It is signed by representatives of the testing consultant and client.

Uploaded by

Fareh Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
363 views

Ups Test Report: Customer Make & Type Project Serial No Bay Date

This document is a UPS test report that records the results of electrical checks of a UPS system over time. It includes checks of battery capacity, voltage, load, discharge current, and output measurements before the test begins and then again at 10, 20, and 30 minutes. The report documents the customer, make and type of UPS, serial number, date, and status and remarks for each measurement point. It is signed by representatives of the testing consultant and client.

Uploaded by

Fareh Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

UPS TEST REPORT

Customer Make & Type


Project Serial No
Bay Date

S.No. Type of Inspection/Test Status


REMARKS
1. Electrical check before starting Test
A Battery Capacity 
B Total battery Voltage 
C Connected Load 
D Discharge current 
E Output Current 
F Output Voltage 
2. Electrical checks after 10 Mins
A Battery Capacity 
B Total battery Voltage 
C Connected Load 
D Discharge current 
E Output Current 
F Output Voltage 
2. Electrical check after 20 mins
A Battery Capacity 
B Total battery Voltage 
C Connected Load 
D Discharge current 
E Output Current 
F Output Voltage 
2. Electrical check after 30 mins
A Battery Capacity 
B Total battery Voltage 
C Connected Load 
D Discharge current 
E Output Current 
F Output Voltage 

Email: [email protected]
UPS TEST REPORT

Remarks

B.E.S.T Consultant Client

Sign: ……………………………. Sign: ……………………………. Sign: …………………………….

Name: Name: Name:

Desg: Desg: Desg:

Date: Date: Date: