Enriched - Record of Construction and Equipment For Oil Tankers - 2021mar12031226 - MAST
Enriched - Record of Construction and Equipment For Oil Tankers - 2021mar12031226 - MAST
Page 1 of 8
Record of Construction
and Equipment for Oil Tankers FORM B
Supplement to the International Oil Pollution Prevention Certificate
In respect of the provisions of Annex I of the International Convention for the Prevention of Pollution from Ships, 1973, as modified by the Protocol
of 1978 relating thereto (hereinafter referred to as ‘the Convention’).
Notes:
1. This form is to be used for the first two types of ships as categorized in the IOPP Certificate, i.e. “oil tanker” and “ships other than oil tankers
with cargo tanks coming under regulation 2.2 of Annex I of the convention”. For the third type of ships as categorized in the IOPP certificate,
Form A shall be used.
2. This record shall be permanently attached to the IOPP certificate, The IOPP certificate shall be available on board the ship at all times.
3. Entries in boxes shall be made by inserting either a cross(x) for the answers “yes” and “applicable” or a dash(-) for answers “no” and “not
applicable” as appropriate.
4. Unless otherwise stated, regulations mentioned in this Record refer to regulations of Annex I of the Convention and resolutions refer to those
adopted by the International Maritime Organisation.
1. Particulars of Ship:
1.1 Name of ship COMMENCEMENT
1.1.1 IMO number 9388211
1.2 Distinctive number or letters 92970
1.3 Port of registry MONROVIA
1.4 Gross tonnage 8,542
1.5 Carrying capacity of ship (m³) 14383
1.6 Deadweight of ship (tonnes) (regulation 1.23) 13091
1.7 Length of ship (m) (regulation 1.19) 120.850
1.8 Date of Build:
1.8.1 Date of building contract 16 March 2006Kindly enter date in following format: 'd-m-
yy' or 'dd-mm-yyyy' or 'd/m/yy' or 'dd/mm/yyyy'
1.8.2 Date on which keel was laid or ship was at a similar stage 26 July 2007
of construction
1.8.3 Date of delivery 18 February 2008
1.9 Major conversion (if applicable):
1.9.1 Date of conversion contract Not Applicable Kindly enter date in following format: 'd-m-
yy' or 'dd-mm-yyyy' or 'd/m/yy' or 'dd/mm/yyyy'
1.9.2 Date on which conversion was commenced Not Applicable Kindly enter date in following format: 'd-m-
yy' or 'dd-mm-yyyy' or 'd/m/yy' or 'dd/mm/yyyy'
1.9.3 Date of completion of conversion Not Applicable Kindly enter date in following format: 'd-m-
yy' or 'dd-mm-yyyy' or 'd/m/yy' or 'dd/mm/yyyy'
1.10 Unforeseen delay in delivery
--- 1.10.1 The ship has been accepted by the Administration as a “ship delivered on or before 31 December 1979” under regulation
1.28.1. due to unforeseen delay in delivery
--- 1.10.2 The ship has been accepted by the Administration as an “oil tanker delivered on or before 1 June 1982” under regulation
1.28.3 due to unforeseen delay in delivery
--- 1.10.3 The ship is not required to comply with the provisions of regulation 26 due to the unforeseen delay in delivery.
Lloyd's Register Group Limited, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause
as 'Lloyd's Register'. Lloyd's Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information
or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Lloyd's Register entity for the provision of this information
or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.
2. Equipment for the control of oil discharge from machinery space bilges and oil fuel tanks (regulations 16 and 14)
2.1 Carriage of ballast water in oil fuel tanks:
--- 2.1.1 The ship may under normal conditions carry ballast water in oil fuel tanks
X 2.1.2 The ship does not under normal conditions carry ballast water in oil fuel tanks
2.2 Type of oil filtering equipment fitted:
--- 2.2.1 Oil filtering (15ppm) equipment (regulation 14.6):
2.2.1.1 Manufacturer
X 2.2.2 Oil filtering (15ppm) equipment with alarm and automatic stopping device (regulation 14.7):
1
,
Refer to the recommendation in international performance and test specifications of oily-water separating equipment and oil content meters adopted by the
Organization on 14 November 1977 by resolution A.393(X) which superseded resolution A.233(VII). Further references is made to the Guidelines and Specifications for
pollution equipment for machinery space bilges adopted by the Marine Environment Protection Committee of the Organisation by resolution MEPC.60(33), which,
effective on 6 July 1993, superseded resolution A.393(X) and A.444(XI); and the revised Guidelines and specifications for pollution prevention equipment for machinery
spaces of ships adopted by the Marine Environment Protection Committee of the Organization by resolution MEPC.107(49) which, effective from 1 January 2005,
superseded resolutions MEPC.60(33), A.393(X) and A.444(XI)
--- 2.5.2 The ship is fitted with holding tank(s) for the total retention on board of all oily bilge water as follows:
3
Total Volume (m ) 0
--- 2.5.3 In lieu of the holding tank(s) the ship is provided with arrangements to transfer bilge water to the slop tank
--- 2A.1 The ship is required to be constructed according to regulation 12A and complies with the requirements of:
--- paragraphs 6 and either 7 or 8 (double hull construction)
--- paragraph 11 (accidental oil fuel outflow performance).
X 2A.2 The ship is not required to comply with the requirements of regulation 12A.
3. Means for retention and disposal of oil residues (sludge) (regulation 12) and oily bilge water holding tank(s)*
X 3.1 The ship is provided with oil residue (sludge) tanks for retention of oil residues (sludge) on board as follows:
Tank Identification Tank Location Volume
3
Frames (from)-(to) Lateral position (m )
Sludge Tank 18-24 Port E/R Partial Deck 2.9
Oily Bilge Tank 16-20 Port E/R D. Bottom 4.1
Fuel Oil Drain Tank 20-22 Port E/R D. Bottom 3.5
Scavenging Air Box Drain Tank 18-20 Port E/R D. Floor 0.4
Stuffing Box L.O. Drain Tank 18-20 Stbd E/R D. Bottom 2.5
Lube Oil Drain Tank 20-22 Stbd E/R D. Bottom 3.6
Incinerator Waste Oil Tank 13-14 Stbd E/R Partial Deck 0.4
3
Total Volume (m ) 17.4
* Oily bilge water holding tank(s) are not required by the Convention; if such tank(s) are provided they shall be listed in Table 3.3.
,
3.2 Means for the disposal of oil residues (sludge) retained in oil residue (sludge) tanks:
X 3.2.1 Incinerator for oil residues (sludge)
--- 3.2.2 Auxiliary boiler suitable for burning oil residues (sludge)
X 3.2.3 Other acceptable means, state which
Approval sludge transfer arrangement to slop tank (port) is provided
X 3.3 The ship is provided with holding tank(s) for the retention on board of oily bilge water as follows:
3
Total Volume (m ) 17.4
4. Standard Discharge Connection (regulation 13)
X 4.1 The ship is provided with a pipeline for the discharge of residues from machinery bilges and sludges to reception facilities, fitted
with a standard discharge connection in accordance with regulation 13
5. Construction (regulations 18,19, 20, 21, 22, 23, 26, 27, 28 and 33)
X 5.1 In accordance with the requirements of regulation 18, the ship is qualified as a segregated ballast tanker in compliance with
regulation 18.9
5.2 Segregated ballast tanks (SBT) in compliance with regulation 18 are distributed as follows:
and dated
--- 5.3.4 The ship is not required to be but is equipped with COW in compliance with the safety aspects of the Revised COW
Specifications (resolution A.446(XI) as amended by resolutions A.497(XII) and A.897(21))
5.4 Limitation of size and arrangement of cargo tanks (regulation 26)
X 5.4.1 The ship is required to be constructed according to, and complies with, the requirements of regulation 26
The ship is required to be constructed according to, and complies with, the requirements of regulation 26.4 (see regulation
--- 5.4.2
2.2)
5.5 Subdivisions and stability (regulation 28):
X 5.5.1 The ship is required to be constructed according to, and complies with, the requirements of regulation 28
The information and data required under regulation 28.5, have been supplied to the ship in an approved form, and are
X 5.5.2
included in
Damage Stability Information
2 Oil tankers the keels of which are laid or which are at a similar stage of construction, on or after 2 October 1986 should be fitted with a system approved under
,
resolution A.586(14)
3 Oil tankers the keels of which are laid or which are at similar stage of construction, on or after 1 January 2005 should be fitted with a system approved under resolution
MEPC.108(49)
4 For oil content meters installed on tankers built prior to 2 October 1986, refer to the recommendation on international performance and test specifications for
oily-water separating equipment and oil content meters adopted by the Organization by resolution A.393.(X). For oil content meters as part of discharge monitoring and
control systems installed on tankers built on or after 2 October 1986, refer to the Guidelines and specifications for oil discharge monitoring and control systems for oil
tankers adopted by the Organization by resolution A.586(14). For oil content meters as part of discharge monitoring and control systems installed on tankers the keel of
which are laid or are in a similar stage of construction on or after 1 January 2005, refer to the revised Guidelines and specifications for oil discharge monitoring and control
systems for oil tankers adopted by the Organisation by resolution MEPC.108(49)
5 Refer to the specification for oil/water interface detectors adopted by the Marine Environment Protection Committee of the organization by resolution MEPC.5(XIII)
6.3.1.2 Type and model number as per Certificate of Type Test Portable: HERMetic UITmeter GTEX SS1-Q2 15m
--- 6.5.1.3 voyages within 50 nautical miles of the nearest land outside special area(s) of 72 hours or less in duration restricted to:
approved by LR EMEA
6
,
9. Exemption
--- 9.1 Exemptions have been granted by the Administration from the requirements of chapter 3 of Annex I of the Convention in
accordance with regulation 3.1 on those items listed under paragraph(s)
of this Record
of this Record
11. Compliance with part II-A – chapter 1 of the Polar Code
--- 11.1 The ship is in compliance with additional requirements in the environment-related provisions of the introduction and section 1.2
of chapter I of part II-A of the Polar Code.
Rafael A. Brashich
Surveyor to Lloyd's Register Central & South America Ltd