The investor had submitted an application for availing the subsidy under scheme (D.O.
Serve No.
NO. MFP/NMFP/BUdget-2012-17 Dt. 27/03/2015). In the meanwhile there was a
Ganraj 129, At. MAITRI to follow up with
Agriculture notification that the said scheme is no longer valid. Investor is seeking clarity from the
1 Edible Oil Ghosapuri, PSI 25-04-2017 the department in order Open
department government with regards to the said scheme and awaiting the decision on the
Industries Tal. Dist. to resolve the issue.
application made under NMFP scheme.
Beed
Atgon
As per PSI 2013 Investor has obtained the Stamp Duty Exemption Certificate for Land
Industrial
Purchase from DIC, Thane and when they have approached to Sub-Registrar, Shahpur for
Esspee Glass Complex,
Collector of Stamp duty registration of land purchase they have been asked for the adjudication for Stamp Duty The issue was closed on
2 Studio Pvt. Atgaon, 21-04-2017 Closed
Stamps Exemption which is not required as per the process. 12-05-2017
Ltd. Tal.
21-04-2017- MAITRI intervened in the matter and got the issue resolved hence the issue
Shahpur,
to be resolved in the upcoming investor meeting
Dist. Thane
The investor had requested for stamp duty exemption on lease deed and the same was
granted to the unit. Thereafter when the investor obtained the term loan the exemption
DC (Industries) to write to
on the mortgage deed was refused by the sub-register's office.
Chakan Stamp Duty IGR requesting to look
Indo Global Collector of 10-02-2017- IM decision: DC (Industries) to intervene and provide clarity on the policy of
3 MIDC, exemption on 22-12-2016 into the matter and open
Erectors LLP Stamps Stamp duty exemption to IGR, Pune
Pune. Mortgage deed resolve the issue at the
16-02-2017- Department Update: DC (I)had called a meeting with IGR to provide clarity
earliest.
on the policy of Stamp duty exemption
02-03-2017- Department Update: IGR will go thru the case in order to take a decision
Page 1 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Page 2 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Investor has applied for Eligibility certificate under Package scheme of incentive 2013 to
DIC Washim. All application process was completed and it was duly processed with final
Directorate of Eligibility approval. When it was approved by DIC Manager, Investor has got the certificate via The issue was closed on
7 Amit Pawar Washim Closed
Industries Certificate email which was not reflecting the subsidy amount and the eligible period of EC. 12-05-2017
09-05-2017- MAITRI has no contact details neither supporting documents to follow up
on the said case hence the issue to be closed from MAITRI forum
A Special Amnesty Scheme was granted on 14th March 2014 by DIC Aurangabad under
the condition that the investor has to pay the principal amount within the stipulated
time frame of 3 months and the production of the company needs to be started within 3
years. In the meanwhile, the management of the company changed which the investor
had informed DIC office through letter dated 27th December 2017 .According to the
investor, the principal amount has been paid and the department has conducted a field
visit and verified that the production has started. However, the GM DIC Aurangabad had
rejected the application stating that the Amnesty Scheme will be applicable only if new
Plot No E- unit i.e. Galaxy Spirits Pvt Ltd will invest in Fixed Capital.
Deccan The department has taken
45, MIDC Approval under The investor has made a representation and the application is now under process with
Bottling and an hearing of the investor
Chikalthana Directorate of Special the GM DIC Aurangabad to take appropriate decision On
8 Distilling 19-09-2013 on 05-05-2017 and
, Dist. Industries Amnesty 17-03-2017- IM decision: Jt. Director, DIC, Aurangabad have given his inputs and Hold
Industries requested for Compliance
Aurangaba Scheme 2013 forwarded the file to Directorate of Industries. The file is under process with Jt. Director
Pvt Ltd which are awaited.
d (PSI)
01-04-2017- Investor Update: The file is under process with Development Commissioner
(Industries)
12-04-2017- Department Update: The file is under process with Jt. Director, Industries
(PSI)
17-04-2017- Department Update: The file is under process with Jt. Director, DIC will
resolve he issue in next 2-3 days
10-05-2017- Department update: The department has taken an hearing on 05-05-2017,
minutes awaited.
Page 3 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
As per the instruction from Industries Department Investor has made an application to
avail state incentives under PSI-2013 on 09th September 2016 through online. However,
in order to avoid a confusion at a later stage, they want clarification about the eligibility
under the PSI 2013 for their unit.
14-10-2016 - IM decision: Due to unavailability of infrastructure the physical possession
of the plot was obtained in 2015 and hence Directorate of Industries to refer the case to
MIDC. MIDC to reply within 2 weeks with the inputs The department to take
Givaudan Package
Directorate Of 18-11-2016- IM decision: Directorate of Industries to send a letter to MIDC seeking effective steps and
9 India Pvt. Shirpur Scheme of 08-09-2016 Open
Industries comments on the case process the application
Ltd. Incentives
19.11.2016: MAITRI has forwarded the issue along with minutes of meeting to MIDC in accordingly.
order to provide their inputs. Upon which MIDC has commented that without the official
letter from DI, MIDC would not provide the inputs
04-01-2016- MIDC Update: MIDC is working on the inputs to be provided to DOI.
31-03-2017- MIDC Update: MIDC have given their inputs to Industries department.
17-04-2017- Department Update: Since the inputs have been received by MIDC recently,
the department to resolve the case in 3-4 days.
The investor has made an application for Industrial Promotion Subsidy through MAITRI
Directorate of portal and the reference number for the same is Nashik/IPS/Large/2017/00917 The issue was closed on
10 Gonglu Agro PSI 07-03-2017 Closed
Industries 09-05-2017- Investor Update: The Stamp Duty exemption certificate has been granted to 12-05-2017
the unit hence the case to be closed from MAITRI
MADC,
The investor has made an application for Stamp Duty Exemption certificate through
Mihan
Stamp duty MAITRI portal and the reference number for the same is
Patanjali Special Directorate of The issue was closed on
11 exemption 27-04-2017 Nagpur/SDEC/New/Large/2017/04312. Closed
Ayurveda Economic Industries 12-05-2017
Certificate 09-05-2017- Department Update: The Stamp Duty exemption certificate has been granted
Zone,
to the unit hence the case to be closed from MAITRI
Nagpur
Page 4 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
As per GOM resolution of social justice no 2008/150 Dt 22-5-2008 investor has availed
funds from our social justice and welfare department in which criteria for SC is of 70%
This is the policy issue
Plot No. - C members and other caste 30%. However as per GR no. 201602111750470610 issued by
and the provision of
- 59, MIDC industries department this scheme is for 100% SC members due to which benefits under
100% SC/ST is already in
Shrirampur - PSI 2007 have been rejected by DIC Ahmednagar. Investor is requesting for necessary
the GR so the request of
413720. Amendments in amendments in Gr. No. issued by industries department dated 11-02-2016
Directorate of unit may not be
12 Saiprabha Dist. - Government 29-03-2017 04-04-2017- MAITRI has forwarded your request for amendments in GOM resolution to Closed
Industries considered with 70:30 of
Ahmednaga Resolution the concerned department for further action. Since MAITRI is restricted in its capacity to
SC/ST and others
r, deal with issues pertaining to approvals the case to be closed in the upcoming investor
respectively. Hence the
Maharashtr meeting
issue to be closed from
a. 29-04-2017- Department Update: The eligibility for Dr Bharat Ratna Dr Balasaheb
MAITRI
Ambedkar scheme for SC/ST entrepreneurs is for the units with 100% stake holders from
SC/ST candidates itself.
Investor has been issued with the Eligibility Certificate through reference number
JDI/PUNE/PSI-1993/EC-01(RO Pune)/2016/672 Dated 27/05/2016 with the validity from
01/03/2004 to 28/02/2013. As per investor the said period was not beneficial to them
as deferral of sales tax payment was not allowed by the Sales Tax Department in the
Takaliwadi, The department to look
Shri Package absence of EC which was pending for long time. Also, they have filed the revised return
Taluka Directorate of into the matter and
13 Gurudatt Scheme of under Sales Tax Act as normal dealer and paid the due taxes accordingly to the Open
Shirol, Industries update MAITRI on the
Sugars Ltd Incentives department.
Kohalapur same.
Now, Investor is requesting to issue the "Addenda" having effective date of EC from
01/04/2016 to 31/03/2025.
17-04-2017- Department Update: The department has called for inputs from Sales Tax
department, if the investor has availed any benefits in the said period or otherwise.
Page 5 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The unit was given mega project status in 2006 on the basis of proposed investment of
1115 Crore. Due to the delay in obtaining land, investor is unable to implement the
project within stipulated time frame. Hence asking for extension up to December 2017
with changed investment amount to 520 Crore. Investor has already invested 195 Cr and
will invest the remaining amount of 325 Cr by December 2017.
17.01.2016- Department update: Unit is asked to furnish clarifications. Investor is yet to
comply
07.10.2016 - Investor Update: The company is differing the plan of Mega project and is
going to submit at written application to the PSI and a copy to MAITRI.
17-10-2016- Department Update: Investor has raised some quires to industries dept. vide
letter dated 10.10.2016. The quires are stated are, due to some uncertainties such as the
aspects in regards to the “1. Road connectivity to Demand Jetty & Terminal, 2.
Kasturirangan committee on land use around their project site, 3. Incentives from GoM
post GST and 4. Minimum criteria required for qualifying the incentives” the investor
Village
has deferred the implementation of mega project status for his unit. Investor has
Amdoshi,
requested updates from the department in regards towards the above queries.
Wagnani
26-10-2016- Department Update: Under sec, Ind-8, informed MAITRI that they need to
Wakan - The department to look
Supreme Mega project discuss the aspects vide letter dated 17-10-2016 received from investor with the higher
Roha Road, Directorate Of into the matter and
14 Petrochemic status and time 29-05-2012 authorities. Also at presently as Investor’s decision is deferred, the offer letter for Open
Taluka - Industries update MAITRI on the
als Ltd extension “Mega project status” which was issued earlier by the department shall be call off.
Roha, same.
Department to take decision on the same shortly.
Raigad,
02-11-2016- Department Update: Meeting is scheduled between investor and officials to
Maharashtr
represent the case on 07-11-2016 in ind-8, Mantralaya.
a - 402106
15-11-2016- Department Update: Department informed that no one from company's end
was present hence meeting did not happened. MAITRI informed the same to investor.
Investor to fix appointment and inform shortly.
20-12-2016 - SICOM Field visit update: Investor has raised quires vide letter dated
10.10.2016 to ind-8 department. In regards to the same, Ind-8 has requested
details/remarks from Directorate of Industries vide letter dated 29.11.2016. Department
to take a call for investor's representation post DoI remarks. Remarks are awaited from
DoI. MAITRI team shared correspondence with DoI Nodal officials for further course of
action.
19-01-2017- Department Update: DOI has furnished the inputs on the case and the file is
now under process with Ind-8.
13-04-2017- Department Update: DOI to verify the status of the project and if no
progress that the land to be called back and the same to be informed to Ind-8
17-04-2017- Department Update: The file is under process with ADI, Industries (BTAL)
Page 6 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The investor has obtained Consent to Establish dated-13-01-17 with the condition to
Vani
obtain Environment Clearance . The investor has already made an application for the
Village,
Hinganghat same which is under process with the department due to which the project is getting The department to look
Tal.
Integradet Environment Environment delayed into the matter and
15 Hinganghat 04-01-2016 Open
Textile Park Department Clearance 17-03-2017- IM decision: Deputy Secretary, Environment to look into the case and update MAITRI on the
, Dist. -
Pvt. Ltd. inform the investor if the EC is required to the said unit or not. same.
Wardha
09-05-2017- Department Update: Since the investor is constructing the CETP in the park,
the said project is categorised under red and hence Environment Clearance is required.
Plot No 15, Investor has made an online application for Environment Clearance having proposal no.
15A, 15B, SIA/MH/NCP/61235/2016. The application was excepted online with the acceptance
and 15C, F.No.- SEAC/2017/II/CR-92/TC-3 dated 08/03/2017. The investor received a mail from
The department to look
MIDC, the department requesting to submit a hard copy of the proposal and the hard copy was
IKEA India Environment Environment into the matter and
16 Turbhe, 23-12-2016 submitted on 10/03/2017. The project registration was done on 27/03/2017 on SEIAA Open
Ltd Department Clearance update MAITRI on the
Panvel web portal. The scrutiny fees where also paid on 06/04/2017. The investor met the
same.
Tehsil, principal secretary environment and was assured that there EC application would be
Dist. discussed in next SEAC meeting. The investor is awaiting approval from the department
Raigad and is requesting to grant the approval at the earliest.
The project falls under category 8(a) B as per EIA notification dated September 2006
basis which the investor has submitted an application for environment clearance. But
D-1, Kagal- according to new notification from Environment dept. date 18-10-2016 and also the The department to look
Kirolskar Oil Hatkanagal Environment Environment gazette dated 09-12-2016 the unit does not require EC. Hence the investor is seeking into the matter and
17 04-10-2014 Open
Engine e MIDC Department Clearance clarifications on the same. update MAITRI on the
Kolhapur 16-01-2017- Department update: The case will be discussed in the SEAC meeting whether same.
the unit requires the EC or not but since the said committee has been dissolved, and the
new committee is not yet conveyed the clarity is awaited.
Page 7 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The investor has conducted the survey on 24th January 2016 for the demarcation of
Survey Nos. High Tide Line, Low Tide Line and Coastal Regulation Zone which was carried out by
13,14,15,1 Institute of Remote Sensing, Anna University, Chennai. Subsequently, application was
6,17,18,19, submitted to Environment department along
M/s
20,21,22,2 with supporting documents for confirmation of Coastal Regulation Zone (CRZ) on 22nd
International
3,32 and March 2016, however they are still awaiting the response from department.
Cargo
34 Environment CRZ 16-09-2016- IM decision: The case will be taken up in the next CRZ committee meeting. The issue was closed on
18 Terminals 22-03-2016 Closed
Village Department confirmation 29-10-2016- Department Update: The case to be discussed in the CRZ meeting scheduled 12-05-2017
and
Kalambusar on 03-11-2016.
Infrastructur
e, Taluka 10.11.2016- Department Update: The MCZMA meeting has been postponed
e Pvt Ltd
Uran, 17-03-2017- IM decision: MCZMA meeting is scheduled on 22-03-2017 in which the
District department to get clarity with regard to Coastal Regulation Zone.
Raigad 09-05-2017- Department Update: CRZ has been confirmed in the 107th CRZ committee
meeting hence the issue to be closed in the upcoming investor meeting.
The investor had made an application for Environment Clearance and received TOR on
20.01.2012 in 49th SEAC Meeting thereafter, the state committee was dissolved for
some time and the issues were taken up by Central Committee. Again the SEAC
committee was formed in Maharashtra, the investor completed and submitted the EIA on
22.01.14.
After minor clarification & compliance, the case was recommended in 105th SEAC-1 dtd In case of non performing
03.07.15. The project was considered in 89th SEIAA meeting and was deferred because CETP, an affidavit was
of PIL filed in Mumbai High Court by NGT regarding the non performance of CETP in filed with NGT by MPCB
G10, 11,
Taloja. Currently, the file is under process with the State Environment Impact to consider the ZLD and
12, 13/1, Environment Environment
19 Ravi dyeware 06-05-2011 Assessment Authority. online monitoring units. Open
MIDC Taloja Department Clearance
05.07.2016- Department update: Investor to write to SEIAA about CETP effluent NGT has given the order
MIDC
discharge and details given by CETP about its usage. MAITRI has communicated the on the filed affidavit
same to investor. The investor will write to SEIAA accordingly. hence the department to
12.08.2016-IM decision: Its operational unit. The query is for expansion of unit. take action accordingly.
According to unit, they are meeting standards of effluent and also has the online
monitoring system. It was advised that since the unit is facing the issues they should
make a presentation to NGT.
MIDC will confirm if CETP bypass can be arranged for the unit. MIDC also to include the
CETP matter on the agenda of next board meeting
Page 8 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Unit no
238/239, Investor has applied for licence for mfg. of absolute pharma alcohol on 27/12/2016 for
Bhendada, Absolute the said unit to the state excise department with the reference no. Ethanol
Grainotch MAITRI to follow up with
Tal. Excise Pharma DYS112016/478/SP DT.06/02/17. The investor has submitted all the relevant
21 Industries 27-12-2016 the department in order open
Gangapur, Department Alcohol documents along with the application to excise department and is now awaiting the
Ltd, to resolve the issue.
Dist. Licence approval.
Aurangaba 03-05-2017- Department Update: The file is under process with Commissioner, Excise.
d
The application for Molasses licence is under process with commissioner of State excise
KGS Sugar
department. MAITRI to follow up with
and Infra Excise Molasses
22 Nashik 28-09-2016 10.11.2016- Department Update: The file is under process at Minister of State Excise the department in order Open
Corporation Department licence
13-01-2017- IM Decision: MAITRI to send a mail to Dy. Commissioner, Excise in order to to resolve the issue.
Ltd.
follow up with Hon'ble Minister
Page 9 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Maharashtra Maritime board has approved an area of 500 mtrs as water front to the unit
and made a contract for 5 years. The land immediately after the water front is the Govt.
Land with survey no. 168 and MMB is requesting for allotment of the said plot which
could be further lease to the Bombay Marine Engineering & works Pvt. Ltd. & Das Off
shore
Bombay 15-02-2017- The comments from forest department has been received and the file is
Taluka The department to look
Marine under process with the desk officer, Revenue department, Mantralaya
Mhasla, Forest into the matter and
23 Engineering Govt. Land 07-03-2017- Department Update: The file is under process with PS (Revenue) for final Open
Dist. Department update MAITRI on the
& Works Pvt approval
Raigad same.
Ltd. 17-03-2017- IM decision: The department to follow up on the said file in order to resolve
the case at the earliest
17-04-2017- As per the report of Head of Forest Force dated 27th October 2016 the site
of the said unit was inspected by ACF, Mangrove and DFO MAITRI on 15th April 2017
20-04-2017- DFO, MAITRI has sent a mail to CCF, Mangrove and ACF Mangrove to
expedite the case
Page 10 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The investor had been requesting for the Approach road since 2013 from Various
1288/1, departments however the approach road was sanctioned on 31 Dec 2016 under Critical
1288/2, Infra Fund from department of Industries, Government of Maharashtra. The Deputy
The department to look
1490/1 and Conservator of Forests, Satara, had given permission to construct the road of 7.50
Satara Mega Forest Permission to into the matter and
25 1490/2 metre width and 764 metre length on 07-01-2013. Investor is now requesting for 9 Open
Food Park Department Construct road update MAITRI on the
Degaon, metres width instead of 7.50 meters
same.
Tal. & Dist.. 09-05-2017- Department Update: The DFO, Satara has approved 9 metres width instead
Satara of 7.50 meters, further the file will be put up to the committee on 12th May for final
approval
Page 11 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Enhancement of Industrial area admeasuring 745 Hectares at villages Satarda & Satose
Taluka - Sawantwadi in the Regional plan of Sindhudurg District. The investor was
informed that 40 hectares of land was having remarks from forest department hence,
investor requested to delete 40 hectares and to issue remaining area as industrial zone.
13.08.2015- Update from forest department: Forest has sent remarks to UDD on 18th
June 2015. File is under process with UDD.
23.11.2015 - UDD update: The file is forwarded to Forest Department for remarks.
14.01.2016- Forest department has sent remarks to UDD on 13.01.2016
11.02.2016- Investor update: Investor is expected to meet UDD on 18/19 February 2016
18.02.2016- Meeting update: In the meeting with UDD, Forest officials, Investor
explained that although his land is falling in region under Kasturi Ranjan committee
area, he is starting the project based on approval form MoEF as the unit has applied for
it before Kasturi Ranjan committee report/ 2013. The investor was asked to submit the
said approval of MoEF, contour survey, Slope analysis of +/-1.5 Mtr.
Satarda, 22.02.2016- Investor update- Investor has shared MoEF approval for 1.5 T plant (Env
taluka - Clr), expansion project approval (Env Clr), MoEF EAC Committee approval.
Sawantwadi 21.06.2016- Field visit report- The file is forwarded to forest department. The department to look
, District - Forest Zone 20.07.2016 - Field visit report: Forest Department has forwarded the file to UDD dated into the matter and
26 Uttam Galva 29-08-2013 Open
Sindhudurg Department Conversion 19.07.2016 with their remarks for 49.92 Ha land. (File no. TPS-1914/CR.107-14/UD-12) update MAITRI on the
, However Forest dept. has not given remarks on remaining land under forest zone in same.
Maharashtr sanctioned Regional plan.
a - 416514 06-10-2016- RM decision: As the forest department has commented on the reserved
forest but does not recognise the remaining land and without the comments of forest
department UDD will not be able to proceed further with zone conversion.
18-11-2016-IM decision : According to UDD, 49 hectares of land is private forest, which
the investor is willing to surrender. The investor has to submit a letter stating the same.
2-12-2016-Im decision : Investor has to submit a letter regarding surrender of 49
Hectares of private forest land. Issue to be reviewed after 2 months
02-01-2017- Investor update: The investor has submitted the letter requesting deletion
of 49 Hectares of private forest land
06-02-2017- Department Update: The file has been forwarded to the forest department
for their inputs
10-02-2017- IM decision: State Government (UDD) has forwarded the file to forest
department for Comments. The file to has been forwarded to DCF, Sawantwadi dated 08-
02-2017 for factual and site wise remarks. DFO, MAITRI has forwarded the inputs to the
said officer as on 14-02-2017
Page 12 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Gat No -
Investor to submit the
374,
proposal under Section 2
Village -
Technocraft NOC for laying Investor has made a formal application to Deputy Conservator of Forest (DCF), Thane to in MAITRI. DFO, MAITRI
Dhanivali, Forest
27 Industries 3' Water Pipe 07-05-2016 grant the NOC for laying water pipe line in the Gat No. 85 of Vanjale village which is to take up the issue Open
Taluka - Department
(India) Ltd. Line falling under Woodland protected forest. positively and follow on
Murbad,
the same with the
District -
concerned DFO.
Thane.
Gat No -
374, Investor to submit the
Village - NOC for proposal in MAITRI. DFO,
Technocraft Investor has made a formal application to Deputy Conservator of Forest (DCF), Thane to
Dhanivali, Forest erecting MAITRI to take up the
28 Industries 07-05-2016 grant the NOC for Overhead Transmission and erecting of Towers in the Gat No. 125 of Open
Taluka - Department Transmission issue positively and
(India) Ltd. Vanjale village which is falling under private forest.
Murbad, Tower follow on the same with
District - the concerned DFO.
Thane.
The investor has made an application on 10th March 2017 for Explosive License for
MAITRI to follow up with
Jai Thakur Bhiwadi, Home Explosives storing Chemical & Solvent (MTO) for above 50,000 liters which is under process with
29 10-03-2017 the department in order Open
Enterprises Dist. Thane Ministry Licence the department.
to resolve the issue.
Page 13 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Investor has purchased sick unit M/s Classic Oil Ltd. under Special Amnesty Scheme
from District Industries Centre, Raigad in March 2014. Thereafter, it took almost more
than 2 years for them to get the lease
agreement signed from MIDC and to get the power connection for the construction
purpose. After raising the issue through Aaple Sarkaar portal, Investor have been called
for Lokshahi meeting dated 4th January 2016 under the chairmanship of Hon'ble Chief
Plot Minister in which it was
Number B- minutised that the investment period extension to be given to the investor. In this The department to look
Industries & Investment
M/s Classic 14, Mahad regards, General Manager, DIC Raigad has written a letter dated 03rd August 2016 to into the matter and
30 Mining Period 03-08-2016 Open
Oil Ltd. MIDC, Department of Industries (PSI), Mantralya providing his views on the case mentioning the update MAITRI on the
Department Extension
District amendment in PSI 2013 GR (point same.
Raigad number 2-B) which says "If a unit is allotted a plot by MIDC but project implementation
is delayed due to infrastructure issues like roads, electricity, demarcation, other Govt.
issues etc., in such cases the investment period will extended only for the units propose
to set up in MIDC areas."
18.11.2016 - IM decision : The department to provide the comments on the case to DIC,
Raigad at the earliest
06-01-2017- Department update: The file has been referred to State government (Ind-10)
Investor wants to know the process for the setting up a IT assembly unit. Also wants to
know the below points:-
1) Subsidy and benefits provided to encourage factories in Maharashtra.
2) What are the provisions for lands to start an industrial unit.
3) What are subsidies and help government provides in Importing raw circuits and for
Getnow
Navi Industries Exporting finished goods.? Will government help in promotion and marketing of the The issue was closed on
31 Technologie PSI 27-03-2017 Closed
Mumbai Department products in other markets like Africa, US. 12-05-2017
s Pvt Ltd.
4) What are the Tax compliance conditions for the assembly unit.
24-04-2017- MAITRI has provided the investor with relevant details and referred the
investor to meet JDI(PSI).
28-04--2017-Investor update: Investor has obtained relevant details and hence the case
to be closed from MAITRI
Page 14 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Investor successfully registered on MAITRI website. However when they proceed for
service request at Sr.No. 4 for Incentives under Industrial Policy, following message is
Preetam Industries MAITRI The issue was closed on
32 01-04-2017 shown. "This email address already belongs to another user." Closed
Kochar Department Registration 12-05-2017
28-04-2017- Department Update: MAITRI has followed up with the technical team and
resolved the issue.
Due to the accident at the construction site, the said project has obtained Prohibition
order and the work has been suspended at the site. However, the inspection was carried
Godrej & Village out by the labour department on 17th April 2017 to check the safety and health
The department to look
Boyce Mfg. Vadval, measures for all the employees at the site and the hearing with Commissioner of Labour
Labour Prohibition into the matter and
33 Co. Ltd. Tambati, 07-04-2017 has been scheduled on 12th May 2017. The investor is requesting to prepone the date of Open
Department Order update MAITRI on the
(Phase I/ Ta. hearing and consider granting permission to start the work.
same.
South block) Khalapur 05-05-2017- Department Update: The hearing cannot be preponed and is scheduled on
12th May 2017and with regards to granting permission to start the work will be
considered only after the hearing
The investor has made an application for site approval for storage of solvent extract at
the said plant. The visit was conducted on 20-01-2017 by the department. The
application was rejected by the department on 01-02-2017 via letter dated No. 1540 the
The file is under process
D-3, reason being that investor had already done the construction without prior approval.
India Mega with PS (Labour). The
Krushnoor Labour According to the investor, no construction was done but a pit was dug for the storage
34 Agro Anag Site Approval 16-01-2017 department to follow up Open
MIDC, Department tank. The investor has made a re-presentation for the said approval through MAITRI
Ltd on the case and update
Nanded 02-05-2017- Department Update: The file is under process with Director, DISH. MAITRI
MAITRI on the same.
has written a letter to PS (Labour) in order to intervene in the case.
09-05-2017- Department Update: Director, DISH has forwarded his inputs to PS (Labour)
Village -
Bhivgaon,
Investor has made an application for factory license renewal with DISH and paid the
Monsanto Tal -
Labour necessary fees however it is pending for the approval. The issue was closed on
35 Holdings Deulgaon Factory Licence 10-03-2017 Closed
Department 25-04-2017- Investor Update: The licence has been granted to the unit hence the case to 12-05-2017
Pvt. Ltd. Raja,
be closed from MAITRI
District
Buldhana
Page 15 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The investor has made an application on 08th February 2017 to Mahagenco to provide
500 tpd flyash from unit no. 7 as well as 100% flyash from unit no. 8 of Parli TPS.
The department to look
According to the investor, in the absence of local flyash the said unit will shutdown.
The India into the matter and
37 Parli Vaijnath,
Mahagenco
Dist. Beed Flyash 08-02-2017 11-04-2017- Update from MSEDCL- The flyash from unit no 7 has been granted but open
Cements update MAITRI on the
however from unit 8 the case to be discussed in the board meeting of Mahagenco which
same.
is scheduled on 17-04-2017
17-04-2017- The case was discussed in the Mahagenco board meeting, minutes awaited.
Page 16 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Shop No. 2,
1st Floor,
The investor has raised a problem that when the said business completes the work
Amrut
Regarding Fire Hydrant system they have to provide “A” Form or “B” Form to the client
Industrial
for further process for getting NOC from Fire Bridged. But the authority of providing
Estate,Opp.
“A” Form & “B” Form has given to only those company whose turn-over is more than 1.5
Shilpa Maharashtra
Good Deal Maharashtra crore Within a year as per Maharashtra Fire Board. According to the investor it is very The issue was closed on
38 Hotel, Fire board 30-03-2017 Closed
Enterprise Fire Services difficult for a small scale business to achieve that much target .so the small business 12-05-2017
Navghar license
companies have to purchase “A” Form & “B” Form from other big Companies due to this
Road,
they suffer a loss as “A” Form & “B” Form are charged high.
Bhayander
02-05-2017- The said case as been forwarded to the concerned department, however it is
(E) Thane –
not for a manufacturing unit, hence the case has not been taken up at MAITRI.
401 105.
Gen-71/1 & A 220KVA HT line passes from a nearby distance from which the investor would like to
Gen- set up sub-station by installing HT/LT transformers in order to get Uninterruptable
Innovative 71/1/1, Power directly from National grid but the plot size of the investor is inadequate to
MIDC to look into the
Infocom & IT TTC Indl Land for accommodate the substation, hence investor is requesting MIDC to allow substation on
39 MIDC 24-03-2017 matter and update Open
Parks Pvt Area, Substation adjacent plot which is the plantation area space. Investor is also ready to pay rentals as
MAITRI on the same.
Ltd Khairane per IT specific norms to utilize this plantation area for substation installation purpose.
MIDC(Navi 18-04-2017- IM decision: MIDC to provide the land to the investor to construct a
Mumbai). substation
Gen-71/1 &
The unit generates employment of maximum 60-80 persons which will help to run 3-
Gen- Data centre to be
shifts (24x7) towards operation, maintenance and service. According to the investor the
Innovative 71/1/1, exempted from the MIDC
said unit does not require to make parking provision as per MIDC norms, hence
Infocom & IT TTC Indl Parking parking regulation which
40 MIDC 24-03-2017 requesting relaxation in MIDC parking policy. Open
Parks Pvt Area, Regulation MIDC to consider and
18-04-2017- IM decision: Data Centre should be exempted from MIDC parking
Ltd Khairane update MAITRI on the
regulations. Since the minutes of board meeting are not finalised MIDC to do the
MIDC(Navi same.
necessary changes.
Mumbai).
Page 17 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The investor (Swivel Engineering Corporation, Mengi Engineering Company, Jell Pharma,
Belchem Industries (India) Pvt. Ltd., VNS Switchgear (I) Pvt. Ltd., Hicool Electronic
Industries, The Lemuriya Publication Pvt. Ltd., Maxima Boilers Pvt Ltd, Fine Organics
Industries Pvt. Ltd, H.B. FABRICATORS, SELEC controls Pvt. ltd, Goodwill Pharma Pvt.
Ltd.) has paid the EMD in June 2014 but the infrastructure is yet to be developed by
MIDC. Hence in spite of allotment of land no physical possession of the land is given by
MIDC.
13-10-2016- Department Update: There are some issues of locals who stalled
infrastructure work. MIDC is planning to start the work under police protection.
18-11-2016 - IM decision : Investor is requesting for Compensation on EMD paid and
free development period once the infrastructure is made available to the unit. MIDC to
take decision once the matter is discussed in the board meeting in order to give the
compensation to the investor on EMD and with regards to free development period MIDC
has agreed to give free extension to the investor. In the meanwhile, MIDC will start the
work under police protection.
28-11-2016- IM decision: Investor is requesting for Compensation on EMD paid and free
development period once the infrastructure is made available to the unit. MIDC to take
Additional
decision once the matter is discussed in the board meeting in order to give the
Ambernath MIDC to look into the
Pale compensation to the investor on EMD and with regards to free development period MIDC
41 Manufacture MIDC Infrastructure 25-09-2016 matter and update Open
Ambernath has agreed to give free extension to the investor. In the meanwhile, MIDC will start the
r's MAITRI on the same.
work under police protection.
Association
13-01-2017- IM Decision: MIDC is revising the layout of PAP plots which will be
completed in next 8-10 days.
10-02-2017- IM decision: The said case to be discussed in the upcoming MIDC board
meeting with regards to the compensation to be paid to the unit.
02-03-2017- Department Update: The case was discussed in the MIDC board meeting and
according to Jt. CEO MIDC, the compensation in terms of monetary cannot be
considered. MIDC to share the copy of the same with MAITRI
17-03-2017- IM decision: The case with regards to compensation on EMD and
surrendering of plots if the investors are willing to be discussed in the upcoming board
meeting of MIDC scheduled on 23rd March 2017.
18-04-2017- IM decision: MAITRI to refer the case to CEO, MIDC post which MIDC to
arrange a meeting of the association (6-7 investors) with CEO, MIDC. The date of meeting
with CEO, MIDC will be intimated to the association through letter. If required
Association is willing to present the case at the board meeting of MIDC.
08-05-2017- Investor Update: The meeting of Pale Association and CEO, MIDC was held
on 05-05-2017 and it was decided that MIDC will create a environment where direct
dialogue with Locals who are opposing to understand their views.
Page 18 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Gen-71/1 &
Gen-
According to the investor, adjacent unit (Hytone Textile plot no. 70) has encroached
Innovative 71/1/1,
between the common fencing wall by not maintaining the fire safety criteria. Since the MIDC to look into the
Infocom & IT TTC Indl
42 MIDC Encroachment 18-04-2017 investor has constructed the glass unit it is very risky in case of fire accident and the matter and update Open
Parks Pvt Area,
adjacent is creating a lot of noise pollution as well. Hence investor is requesting MIDC to MAITRI on the same.
Ltd Khairane
clear the encroachment
MIDC(Navi
Mumbai).
Page 19 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Initially Investor has constructed the factory building according to the DC rules of MIDC
in 2005 and started the production in November 2008. Being an export oriented unit
they have planned to increase their production on the basis of the demand for their
pharma products. For which there only requirement was to have the additional storage
facility on the existing plot. Therefore as per the requirement they have made an
application (SWC / 72 / 521 / 20160712 / 407820) to MIDC for additional FSI of 1:1.5 to
construct the warehouse of 4000 Sq. Meter vertically on the existing building which is
Plot No -4,
been rejected saying "AS per MIDC DC rules 2009 -Table No -19 Sr. No- 6 (Pg No -55) for
Rajeev
IT/BT 50 Sq. Meter per one car park required of plot area." As per Investor said rule is
Gandhi
applicable for IT industry as they have more manpower. Being there unit is a
Centaur Internation MIDC to look into the
Parking pharmaceutical unit with good amount of automation for producing tablets and
44 Pharmaceuti al Biotech MIDC 29-12-2016 matter and update Open
Regulations capsules. Parking policy should not apply for them.
cals Pvt Ltd Park, Phase MAITRI on the same.
02-03-2017- Department Update: The Parking regulations of MIDC has been revised to
2,
one car park per 80 sq. mtr. of built up area, MIDC to issue a written communication to
Hinjewadi,
investor and share a copy of it to MAITRI post which case can be closed.
Pune.
17-03-2017-IM decision: A survey to be conducted by SPA, MIDC and put up to CEO,
MIDC to consider it as special case under hardship.
17-04-2017- Department update: in the 369th board meeting of MIDC, the Parking
regulations for biotechnology has been revised to one car park per 100 sq. mtr. of floor
area or a part thereof.
23-04-2017- The investor is requesting MIDC to consider as special case and grant one
car park per 200 sq. mtr. of floor area
Page 20 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The investor has made an application for land allotment at Talegaon Floriculture Park
MIDC, Pune -1 for Plot - 103 and Plot No - 103 measuring 4000 sqmtrs. The investor is
requesting to allot this plot at the earliest and in this regard they have already
plot approached MIDC.
No.103and 07-04-2017- MAITRI has informed investor that this forum do not facilitate the land
Globe Gas
102, related issues as directed by Jt. CEO. MIDC. Hence the issue to be closed in the
equipment The issue was closed on
45 Talegaon MIDC Land Allotment 06-03-2017 upcoming investor meeting Closed
Industry Pvt 12-05-2017
Floriculture 11-04-2017- As per the discussion with DC (Industries) The case to be taken up in
Ltd
Park, Dist. MAITRI
Pune 18-04-2017- IM decision: The land cannot be allotted to the said unit, MAITRI to collect
the letter from MIDC and share it with the investor and then close the case.
27-04-2017- Investor Update: MAITRI has informed that the land cannot be allotted to
the said unit, hence the case to be closed in the upcoming investor meeting
The investor had acquired a parcel of Land at MIDC Kurkumbh in August 2014 as sub-
lease agreement with Tarini Steel Co Limited. (Plot No. D-4/1 MIDC Kurkumbh, Tal.
Daund, Dist.- Pune) and got the physical possession in September 2014. Thereafter the
company had applied for the MPCB consent to establishment and obtained the same in
The circular has been
February 2015 with condition to obtain the Environment clearance prior to
released basis which the
implementation of the Project. Further the company had applied for the Environment
investor to make a
clearance and obtained the same on 28th June 2016, hence the investor is asking to
representation to MIDC
grant BCC extension . The investor had made an application on 03-08-2016 to grant the
Henkel Plot No. D- with the details as to
BCC extension and had requested to consider his extension from the date of land
Adhesives 4/1 MIDC when the
acquisition. According to investor the EC was granted after a period of 2years and so he
46 Technologie Kurkumbh, MIDC BCC Extension 03-08-2016 application/compliances Closed
has requested the department to consider the same and issue him the extension.
s India Pvt. Tal. Daund, were submitted and
20.02.2017 - Investor Update - The file is pending with JT CEO for approval.
Ltd Dist.- Pune showing the delay from
02-03-2017- According to Jt. CEO MIDC all the cases pertaining BCC have been
the government. MIDC to
discussed in the board meeting, MIDC to share the decision taken in the board with
consider the case
MAITRI.
accordingly. MAITRI to
18-04-2017- IM decision: The resolution has been passed in the MIDC board meeting and
close the case
the policy is under process. The circular will be out in 3-4 days. The investor to submit
the representation with the details as to when the application/compliances were
submitted and when was the environment clearance obtained basis which MIDC will
decide the grant
Page 21 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The Environment Clearance was delayed for 17 months due to which the BCC got
delayed. For extension to time limit MIDC has levied a penalty. Investor has applied to The circular has been
MIDC for waiver of penalty released basis which the
28.11.2016: IM Update: MIDC had given 4 years for developing the plot which the investor to make a
investor had purchased the plot from RVK & KVR steel rolling plant. Due to change in representation to MIDC
activity the existing investor has got only 2 years for development. MIDC to look into the with the details as to
IndoSpace
matter when the
(KVR BCC time
47 MIDC 28-09-2016 23-12-2016 - IM decision : MIDC to come up with BCC extension policy for the cases application/compliances Closed
Industrial Extension
where construction could not be completed due to want of EC or lack of infrastructure. were submitted and
Park)
These cases to be reviewed after 2 months To be reviewed in March 2017 showing the delay from
18-04-2017- IM decision: The resolution has been passed in the MIDC board meeting and the government. MIDC to
the policy is under process. The circular will be out in 3-4 days. The investor to submit consider the case
the representation with the details as to when the application/compliances were accordingly. MAITRI to
submitted and when was the environment clearance obtained basis which MIDC will close the case
decide the grant
The Environment Clearance was delayed for 17 months due to which the BCC got
delayed. For extension to time limit MIDC has levied a penalty. Investor has applied to The circular has been
MIDC for waiver of penalty released basis which the
28.11.2016: IM Update: MIDC had given 4 years for developing the plot which the investor to make a
investor had purchased the plot from RVK & KVR steel rolling plant. Due to change in representation to MIDC
activity the existing investor has got only 2 years for development. MIDC to look into the with the details as to
IndoSpace
matter when the
(RKV BCC time
48 MIDC 28-09-2016 23-12-2016 - IM decision : MIDC to come up with BCC extension policy for the cases application/compliances Closed
Industrial Extension
where construction could not be completed due to want of EC or lack of infrastructure. were submitted and
Park)
These cases to be reviewed after 2 months. To be reviewed in March 2017. showing the delay from
18-04-2017- IM decision: The resolution has been passed in the MIDC board meeting and the government. MIDC to
the policy is under process. The circular will be out in 3-4 days. The investor to submit consider the case
the representation with the details as to when the application/compliances were accordingly. MAITRI to
submitted and when was the environment clearance obtained basis which MIDC will close the case
decide the grant
Page 22 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
According to the investor the investor, Phase I of the said unit has already entered in The said case to be
C-1/2 MIDC,
production in Jan 2009, however due to delay in final fire NOC the BCC was not considered if it fits in the
JBM MA Chakan
Time limit obtained by the investor. Later while constructing the phase II since the investor did not norms of MIDC for free
49 Automotive Talegaon MIDC 14-04-2017 Open
Extension have the BCC, MIDC did not approve the Building plan and the construction was carried time limit extension.
Pvt. Ltd. Rd, Chakan,
out without the plan approval. The investor is requesting for regularizing the Building MIDC to update MAITRI
Dist. Pune
plan of Phase II construction and grant a free time limit extension on the same.
The unit has obtained Mega Status in September 2016 basis which the investor has made
an application for land allotment to MIDC but the land is not yet allotted to the unit.
10-02-2017-IM decision: As per MIDC, the land is still under acquisition and no timeline
can be guaranteed. It make take another 2-3 months hence PS (Industries) has suggested
Talegaon the investor to choose the land close to M/s Emerson which is already acquired. Investor
Jushi India MIDC, to re-look the suggested plot. The issue was closed on
50 MIDC Land Allotment Closed
Pvt. Ltd. Phase II, 17-03-2017- IM decision: MIDC is still in the process of acquiring the offered land only 12-05-2017
Pune after which the land allotment is possible to the said unit
18-04-2017- IM decision: The land has been allotted to the unit, MAITRI to confirm the
same and then close the case
09-05-2017- Investor Update: The land has been allotted to the unit and hence the case
to be closed in the upcoming investor meeting.
Page 23 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Investor has applied to obtain BCC for the plot number D-201 and J23/24 but MIDC has
asked investor to pay charges of 2,36,000. However, investor has got the possession of
J-23/24 on 03.03.2015 and hence asking MIDC to waive of the charges as the land
allotment was delayed by them. Also investor has received investment period extension
due to this reason for 3 years. Investor has made fresh representation on 13.03.2016 for
considering the facts
29.04.2016- Ro MIDC update: RO, Dhule has asked for compliance from the investor.
The circular has been
31.05.2016- Investor update: Investor has made the compliance
released basis which the
05.07.2016- MIDC update: Compliance letter is given to investor on 09.06.2016. The
investor to make a
investor is yet to comply. The copy of said letter is obtained.
representation to MIDC
15-11-2016- Department Update: The file has been sent to MIDC, RO Pune 2 on 08-11-
with the details as to
D 62, MIDC, 2016. Final permission to be granted to the investor shortly
when the
Laurel Wires Avdhan, 28.11.2016- MIDC Meeting Decision: MIDC will re-examine the application made by the
51 MIDC BCC extension 07-01-2016 application/compliances Closed
Ltd Dhule - 424 investor for free time limit extension for BCC
were submitted and
006 30-01-2017- The investor has obtain the investment period extension from 2015-17 and
showing the delay from
the copy of the same has been shared by MAITRI to MIDC
the government. MIDC to
02-03-2017- Investor Update: MIDC has conducted the site inspection and requested for
consider the case
Mega Satus Offer letter which investor will comply shortly
accordingly. MAITRI to
10-03-2017- Department Update: According to MIDC, investor to get the investment
close the case
period extension from Industries department post which free BCC extension may be
considered.
11-04-2017- Investor Update: According to the investor the unit has valid Investment
period extension basis which MIDC should at least grant BCC till February 2017.
18-04-2017- IM decision: Industries department will issue a government resolution that
on Mega Project should be given Free extension on Building completion certificate.
However on this case MIDC to look into the matter and update MAITRI on the same.
Page 24 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Although the plot area is 9000 sqmtrs the investor has built area less than 2317 sqmtrs
and they want to install equipment only as per the building size. The investor has
applied for provisional fire NOC to the Divisional Fire officer, MIDC as has requested
MIDC to consider there request for reducing building size and the number of equipment.
19.10.2016 - Department Update: The investor has to comply with certain changes which
D 62, MIDC, the department has suggested to get an NOC.
Laurel Wires Avdhan, Provisional fire 19.10.2016 - Investor Update: The investor is still not willing to make the changes and The issue was closed on
52 MIDC 11-08-2016 Closed
Ltd. Dhule - 424 NOC wants the department to give the revised guide lines in writing. 12-05-2017
006 02-11-2016- Investor Update: The investor has been asked for more compliances which
he thinks are not required and neither is the compliance letter issued .
18-04-2017- IM decision: MIDC has issued a compliance letter to the investor which will
be complied shortly.
21-04-2017- Department update: MIDC has issued a compliance letter to the investor
post which the investor has to apply for final fire approval and hence the case to be
closed in the upcoming investor meeting
Investor had obtained the plot from MIDC on 02-12-2003. After completion of the
Plot No. company building, the investor had entered into commercial production in the year 2007
1/2, Rajiv itself. However, As per the investor they had failed to obtain the BCC from MIDC due to
Gandhi some inevitable circumstance and the Company the extension charges twice aggregating The said case to be
M/s M-Tech Free time limit
Infotech to Rs. 12,94,000 and had got the extension up to 31st August 2013. During the considered if it fits in the
53 Innovations MIDC Extension for Open
Park, phase extension period due to some issues related to the approval of building plan and norms of MIDC for free
Ltd obtaining BCC
I, correction and re-approval thereto the extension period provided was not adequate and time limit extension
Hinjewadi, the Company again failed to obtain the BCC. Now on 06-12-2016 Investor has been
Pune issued notice from MIDC office, pune for payment of Rs. 84,04,000 for the extension of
time to obtain BCC which investor is requesting to waive off.
Page 25 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Investor has made an application for land allotment at MIDC Akola bearing token No.
SWC/169/0/20120331/125628. The investor has also signed MOU under Make India
According to MIDC,
Scheme on 13-02-2016. The investor had applied for getting 20000 sqmtrs of land, the
earlier application cannot
investor was informed by the department that they have been allotted only 12000 sqmtrs
M/s Naval be considered and the
of land as per old rates, but there was not written communication to the investor. The
54 Agro & Food Akola MIDC Land Allotment 03-04-2012 investor will have to make Closed
investor was again informed that a plot of 5000 sqmtrs was allotted but has till date not
Products a new online application.
received the allotment letter. The investor received an mail on 20-04-2017 from DIC
The issue to be closed
Akola asking them to submit the application on-line and the last date of submitting
from MAITRI forum
online application is 25-04-2017 and participate in the tender process. Investor is
requesting MIDC to consider his earlier application.
Investor has made an application to RO MIDC, Amravati for the approach road of 12
meter from amenity area (MIDC) to his plot located at survey number 39, Village –
Shivani, District – Akola which is adjacent to the Akola MIDC area.
08.02.2017- Investor update: SPA, MIDC has provided their positive comments on the
Survey no. file and forwarded to MIDC, HO for the further process. The investor has
39 of 09.03.2017- Investor update: Investor had met Dy CEO, MIDC (Mr. Pansare) who has participated in auctioning
village suggested him to opt for a land instead of approach road. Both possibilities of land and of MIDC land, hence PS
Madhur
55 Shivani, MIDC Approach Road C58:F58 approach road can be made available to the investor. (Industries) has Open
Biyani
Dist. - 18-04-2017- IM decision: MIDC is not willing to provide land for approach road of 12 suggested the investor to
Akola. meter from amenity area (MIDC), however the rejection letter is yet to be issued to the wait for the results of
investor. the auction.
09-05-2017- Department Update: MIDC is not willing to provide land for approach road
of 12 meter from amenity area (MIDC) which MAITRI has informed the investor about the
same.
The investor has already paid the entire EMD amount has obtained the possession of
Chakan land from MIDC on 03-01-2008 even than certain portion of land (plot no.
Mahindra
Industrial 885/886,888,889,890,891) is not in possession of the unit. The said land owners are
Vehicle MIDC to look into the
Area, Phase- Possession of not willing to give it to the investor. With regards to this the investor has already
56 Manufacture MIDC 14-03-2016 matter and update Open
4, Tal. Land informed RO MIDC, Pune.
rs ltd MAITRI on the same.
Khed, Dist. 18-04-2017- IM decision: Due to some land records during land acquit ion, the farmers
(Expansion)
Pune have not received the compensation. MIDC is constantly following up on the issue will be
resolved within a month
Page 26 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The investor had made an application for land allotment at Lote Parshuram Dist.
Ratnagiri, the investor was issued an offer letter for 2000sqmt on 31/07/2014. The file
is pending with MIDC (File no. D46261). But investor has not been allotted the land till
Lote date. MIDC has allotted the
Parshuram 13-01-2017- IM Decision: All the investors have been called for a joint meeting with Jt. land to the unit, MAITRI
57 Meena Sorte Ind Area, MIDC Land allotment 22.12.2016 CEO, MIDC has confirmed the same Closed
Dist. 20-01-2017- Investor Update: A meeting was conveyed under the chairmanship of Jt. and hence case to be
Ratnagiri CEO, MIDC, in which Jt. CEO MIDC had instructed CE, Planning to review the layout. closed from MAITRI
06-02-2017- Department Update: CE, Planning has submitted the revised layout to Jt.
CEO, MIDC
10-02-2017- IM decision: The file is under process with Jt. CEO, MIDC.
Investor had obtained the plot from MIDC in 2012 and made an application for
Environment Clearance on 22nd October 2012 but the same was accorded to the unit on
The circular has been
11th March 2015. As the delay in project is entirely due to internal procedures of
released basis which the
environment department investor is seeking free time limit extension in order to obtain
investor to make a
the BCC
Plot no. representation to MIDC
23.12.2016 - IM decision : MIDC to come up with BCC extension policy for the cases
D26/1 with the details as to
where construction could not be completed due to want of EC or lack of infrastructure.
Modepro Kurkumbh Time limit when the
These cases to be reviewed after 2 months
58 India Pvt. Industrial MIDC extension for 05-08-2013 application/compliances Closed
17-03-2017- IM decision: According to MIDC free time limit extension for BCC cannot be
Ltd. area, Taluka- BCC were submitted and
granted. MIDC to issue the letter informing investor of the same and share the copy of
Daund, showing the delay from
the letter with MAITRI
Dist. Pune the government. MIDC to
18-04-2017- IM decision: The resolution has been passed in the MIDC board meeting and
consider the case
the policy is under process. The circular will be out in 3-4 days. The investor to submit
accordingly. MAITRI to
the representation with the details as to when the application/compliances were
close the case
submitted and when was the environment clearance obtained basis which MIDC will
decide the grant
Page 27 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The unit was granted conditional NOC by MIDC on 19.01.2012 to lay 22 KV HT cable
from 400 KV substation (Plot No. P-10) Phase-III to "MVML supplier park" (the mail
client of Mungi engineering). According to this NOC, MIDC did not have possession of
land (from point E to F) of approx. 350 mtr and thus, midcap did not granted NOC for
Plot No:- B-
this stretch. All works of cable laying is done by the unit except for the said stretch.
12,Chakan
Investor is requesting for NOC of 350 mtr land now.
Industrial NOC for laying MIDC to look into the
Mungi 28.03.2016- MIDC update: Dy CEO2 to be approach for resolution
59 Area, Phase MIDC Electrical 12-12-2011 matter and update Open
engineering 18.05.2016- MIDC update- DY CEO2 to make the field visit by 20.05.2016
-II ,Tal- Power cable MAITRI on the same.
06-10-2016- RM decision: MAITRI to share the draft DO letter with DC(I) to be sent to
Khed, Dist.-
CEO, MIDC on long pending issues with the department.
Pune
14-10-2016- IM decision: MIDC is in process of acquiring the plot which would take 3
months, hence the case to be on hold. The issue to be reviewed in January 2017.
13-01-2017- IM Decision: MIDC is in the process of special acquisition on the plot which
is facing Right of Way issues.
The unit had obtained 28,000 sq. metres of land from MIDC at MIDC Tadali 2004.
According to thru investor, Coal washeries is such that the built up area of washing
plant is very small compared to the overall area of the plot due to which the open area is
used for storage of Ash bearing coal and after it passes through the washery chambers,
it has to be stocked in open space for drying and mixing before being transported.
Investor has completed the construction work and obtained Building Completion
MIDC MIDC to resolve the issue
Certificate from the Executive Engineer MIDC Division II –Nagpur. The company had
N.S.Coal Pvt. Tadali, Transfer of in next 10 days and
60 MIDC 08-07-2015 undergone losses and stopped its operation on 2009. With the intension to pay off all Open
Ltd. Dist. lease update MAITRI on the
the liabilities, the investor made an application to MIDC in July 2015 to transfer the
Chandrapur same
lease to (buyer) M/s Vikas Coal. However, MIDC under the cover of their letter dated 13-
05-2016 rejected the transfer application citing insufficient construction carried out at
site. The investor has made a representation through MAITRI and has also agreed to pay
30% penalty under MIDC rules and norms to compound insufficient construction work.
18-04-2017- IM decision: The transfer will considered and the issue will be resolved in
10-15 days
Page 28 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Investor has paid the demand note issued by MSEDCL for the 33kv power supply
installation on 28th October 2016. Now he is requesting MIDC to complete the power
New Holland 33kv Power erection work by March - 2017 from MIDC. The work is in progress
Chakan
61 Fiat (India) MIDC Supply 29-11-2016 13-01-2017- IM Decision: The tendering work is completed an work order is under and will be completed by Open
MIDC
Pvt. Ltd Erection process. MIDC to write to the Election Commission to execute the LOA end of May 2017
13-02-2017- Department Update The work is under process is under process to be
completed by May (Issue o be reviewed in May 2017)
Investor has made an online application for change of name from M/s New Holland Fiat
(India) Pvt Ltd to CNH Industrial (India) Pvt Ltd which is still under process with the
department. Because of which following further activities are held -up due to name
change process :
1) MIDC Water line agreement signing and Connection for water supply.
New Holland 2) MIDC Building plan approval for BCC
Chakan Change of The issue was closed on
62 Fiat (India) MIDC 19-10-2016 3) MIDC Fire application submission for BCC and approval . Closed
MIDC Name 12-05-2017
Pvt. Ltd 4) MPCB Consent to operate.
5) Factory License
10-02-2017-IM decision: The file is under process with legal, MIDC. MIDC to look into the
matter and resolve the case at the earliest.
18-04-2017- IM decision: The name changed is accorded to the unit and hence the issue
to be closed from MAITRI
Page 29 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The investor is facing unnecessary harassment from the forest department official
stating that the forest land is encroached and has stopped the whole activity. According
to the investor, its is MIDC plot and the work is carried out as per the demarcations
provided by MIDC. Investor is requesting to sort out the objection raised by Forest
department
13-02-2017- Department Update: The Range forest Officer, Pen had visited the site and
booked an offence against the investor
23-02-2017- RFO, MAITRI has visited the Pen Range office to follow up on the issue and
has collected the documents i.e. first offence report, statement of MIDC surveyor. Forest
Ex. Engineer and
and MIDC has decided to carry out a joint survey for which Dy. Eng., MIDC written a
Novozymes Surveyor has visited the
Patalganga, Encroachment letter to TLR office .
63 South Asia MIDC 11-02-2017 said plot on 12-05-2017. Open
Pune on Forest land 28-02-2017- MIDC Update- The demand note is yet to be raised by the TLR office
Pvt. Ltd MIDC to share the details
17-03-2017- IM decision: MIDC will pay the demand note raised by TLR post which a
with the unit shortly
joint survey will be carried out between TLR, MIDC and Forest department.
12-04-2017- MIDC update The Payment has been made by MIDC to carry out a joint
survey.
18-04-2017-IM decision: According to MIDC the joint survey has been carried out. DFO,
MAITRI to follow up with the regional office, forest for updates
04-05-2017- Department Update: The K- Prat is waited from TLR, Khlapur.
08-05-2017- Addl. Collector MAITRI has spoken to TLR, Khalapur to expedite the case.
09-05-2017- Department Update: The K-prat is ready MIDC to collect the same from the
TLR office, Khalapur
The investor has made an application for land allotment on 14-02-2006 at Additional
Patalganga Industrial Area, MIDC to setup a new facility. The investor was offered Plot
Plot No- No- E/136 admeasuring 10000 sq. mtrs. through vide letter dated 19-12-2014 which
E/136, actually had a 50 ft. wide and 35 ft. deep natural rain and storm water Nallah. The MIDC has allotted
Additional investor wrote to a letter to Area Manager, MIDC and Jt. CEO, MIDC on 29-11-2016 & 20- 800sqmtrs of land to the
Patalganga 12-2016 informing that the land is not acceptable and the plot is not suitable for investor, however with
Parveen
Area, construction. MIDC had agreed to change the plot for upon which investor made an regards to additional
64 Industries MIDC Change of plot 14-02-2006 Open
Village application to allot Plot No. F-3 in exchange of Plot No- E/136, which has a drainage. 2000 sq. mtrs. MIDC to
Pvt Ltd
Chavane, The investor was informed by MIDC that the plot F-3 is admeasuring 8800sqmtrs out of look into the matter and
Tal. Panvel, which 800sqmtrs will be reserved for drainage. The investor is willing to except 8000 update MAITRI on the
Dist. sqmtrs and has requested to grant him additional 2000 sq. mtrs. same.
Raigad The application is now pending with the department and investor is now awaiting the
response from the department regarding there application.
Page 30 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
MIDC
Akkalkot MIDC will share the
Rangoli Cluster has been approved by Directorate of Industries in the SLICMC meeting dated 28-
Road, Near allotment letter with the
Terry Tex 02-2017and the comfort letter was issued by MIDC dated 08-08-2016 for 12000 sq. mtr.
65 Yallaling MIDC Land allotment 15.03.2017 investor shortly and Open
Cluster of land in Chincholi MIDC area, Solapur. Investor has paid the reservation amount
Math, update MAITRI on the
Foundation Rs.2,40,000/- however the allotment letter is awaited from MIDC.
District same.
Solapur
The investor is unable to complete the project in the time frame given by MIDC because
of non issuance of Environment clearance by Env Department (on basis of PIL filed by
NGT). Hence, Investor applied to RO, MIDC for grant of Time limit Extension for BCC
which is still under consideration.
05.07.2016 - MIDC update: File pending with Hon'ble Minister (Industries). The CEPT of The circular has been
Taloja is not working as confirmed by MIDC, Env Dept. released basis which the
12.08.2016-IM decision: MIDC will give free time limit extension as the delay is due to investor to make a
environment Clearance. MIDC to also take the case of "Free BCC extension for want of representation to MIDC
Environment Clearance" in the agenda of next board meeting. with the details as to
G10, 11,
14-10-2016 - IM decision: The application made by the investor was to the Minister. when the
12, 13/1,
66 Ravi dyeware MIDC BCC extension 27-03-2015 MAITRI to inform the investor to make an application to MIDC and share the copy of the application/compliances Closed
MIDC Taloja
same with MAITRI. were submitted and
MIDC
10.11.2016- Investor Update: According to the investor the application has been made showing the delay from
to the department and not to the minister. The copy of the same has been shared with the government. MIDC to
MAITRI which was further forwarded to the department. consider the case
28.11.2016-IM decision: Environment department is unable to process the Environment accordingly. MAITRI to
Clearance due to NGT orders which in turn is affecting the expansion of the unit. It was close the case
further discussed that MIDC will form a policy and consider such cases on general basis.
23.12.2016-IM decision : MIDC to come up with BCC extension policy for the cases where
construction could not be completed due to want of EC or lack of infrastructure. These
cases to be reviewed after 2 months
Page 31 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The investor informed MIDC that his plot is not accessible without a proper approach
road. Due to this, the development work is not possible. Investor has obtained
conditional building plan approval on 01.10.2014 that it will stand cancelled, if the
construction work is not started within 12 months (i.e. 01.10.2015) from the date of
issuance of this approval.
Till date, approach road is not provided to the unit and hence, the investor could not
start development work. He is requesting for an approach road and a free time limit
extension for BCC.
28.03.2016- MIDC update: The file is under process with CEO, MIDC
12.04.2016- MIDC update: Tender work is under progress. The file for BCC extension is The circular has been
with Dy. CEO2 released basis which the
18.05.2016- MIDC update- The note is submitted to Jt CEO investor to make a
05.07.2016- MIDC update: A report is awaited from CE, Pune representation to MIDC
E-12,
16-09-2016- IM decision: MIDC is willing to provide the approach road and also time with the details as to
Shirala
Rex Approach Road limit extension from the day the road is provided. MIDC to issue the letter to the when the
MIDC
67 Polyextrusio MIDC & BCC 26-07-2012 investor and share the copy of the same with MAITRI. On receipt of the same MAITRI to application/compliances Closed
Growth
n Pvt. Ltd. Extension close the case at the forum. were submitted and
Centre,
06-10-2016- RM decision: MAITRI to share the draft DO letter with DC(I) to be sent to showing the delay from
Sangli.
CEO, MIDC on long pending issues with the department. the government. MIDC to
28.11.2016- The third tender has been floated by MIDC which is under process with the consider the case
Accounts Department (Estimated cost of tender 2.81crs) accordingly. MAITRI to
23-12-2016 - IM decision : MIDC to come up with BCC extension policy for the cases close the case
where construction could not be completed due to want of EC or lack of infrastructure.
These cases to be reviewed after 2 months To be reviewed in March 2017
17-03-2017- IM decision: The work related to infrastructure development has started and
MIDC has also agreed to give free time limit extension for BCC to the said unit.
18-04-2017- IM decision: The resolution has been passed in the MIDC board meeting and
the policy is under process. The circular will be out in 3-4 days. The investor to submit
the representation with the details as to when the application/compliances were
submitted and when was the environment clearance obtained basis which MIDC will
decide the grant
Page 32 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Tal -
Sinnar
Sinnar, In the total area of 475 hectares, 370 units are in production to which MIDC is providing
Taluka MIDC to look into the
Dist. - Revision Water 1500 MLD water from Malegaon for the last 22 years. According to the investor, the
68 Industrial Co- MIDC 07-04-2016 matter and update Open
Nashik, Quota sanctioned water is insufficient and is requesting additional 1000 MLD which is under
op Estate MAITRI on the same.
Maharashtr process with the department.
Ltd.
a
The investor (Makewall Specialities, Rex sealing & parking, Industry Pvt. Ltd, Parivartan
Chemicals, Sagar Foods, Finotex Industries, Swissol Chemicals India Pvt. Ltd +2) had
Survey No. Investor to meet Jt. CEO
Survey No applied for land at MIDC, Additional Ambernath in 2013 and paid full amount in 2014.
55, MIDC next week. MIDC has
55, Possession of The investor received the allotment letter for Survey No. 55 and the registration for the
70 Additional MIDC 09.05.2017 assured to resolve the Open
Additional Land said plots is done. According to the investor, the said land is Govt. land and is not in
Ambernath, said case before the next
Ambernath possession with MIDC and are in the process of acquiring it and a part payment was
MIDC MAITRI investor meeting.
made in March 2017. The investor request is to get the possession at the earliest as
they are already paying the interest on the loan taken from bank.
D-85,M I D
C
The investor has made an online application (SWC/65/521/20170412/473457
Ranjangaon
(12/4/2017)) for Plot No. D-85 at Ranjangaon for building plan approval. The file is
Swarovski Village,Kor Building Plan The issue was closed on
71 MIDC 12-04-2017 pending for approval before BPAMS, MIDC. Closed
Pvt. Ltd. egaon,Shir Approval 12-05-2017
10-05-2017- Investor Update: The plan has been approved and hence MAITRI to close the
ur,
case in the upcoming investor meeting
Ranjangaon-
412220
Page 33 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The investor has paid the extension charges for there unit at Plot No. D-4, MIDC,
Kurkumbh, tal. Daund, Dist. Pune vide Dr. No. 721, dated 05.12.2016 and has also made
a payment of Rs. 404830 as compounding charges vide Receipt no. GL 1742605 dated
Tarini Steel Refund of 06.01.2017. The investor has paid the above charges under protest to obtain BCC. The
The issue was closed on
72 Company MIDC Compounding 18-03-2017 investor has raised the objection towards the charges paid vide letter dated 01.12.2016. Closed
12-05-2017
Ltd. charges The investor is now asking for the refund of the above charges which they have paid in
protest.
11-4-2017- As per DC (Industries) the said case is with respect to the policy of MIDC,
hence investor to follow up directly with the department
MIDC has raised a demand note of Rs. 2,79,12,500/- as EMD without disclosing Land
details, however due to past experience investor is not ready to pay the EMD without
knowing the details and exact location of the offered. Investor is requesting to
Vaibhav J-2, reconsider the application requesting for Plot No. I-1 and I-2/1.
Plasto MIDC,HING 18-04-2017- IM decision: The requested plot cannot be considered as it is a residential
The issue was closed on
73 Printing & NA, MIDC Land allotment plot. In order to know the available plots in the said area, investor to meet Jt. CEO, MIDC Closed
12-05-2017
Packaging NAGPUR - or Dy. CEO MIDC
Pvt.Ltd. 440016 09-05-2017- Investor Update: MIDC is not willing to allot the I-1& I-2/1 plot as it is
residential plot and the vacant plot and not developed hence investor is planning to buy
plot from locals and does not want to pursue the case from MAITRI. to be closed in
upcoming investor meeting
Page 34 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Investor has completed all the relevant steps on MPCB online along with the required In case of non performing
payment of fees for obtaining Consent to Establish on 16th August 2016. However, CETP, an affidavit was
application is still pending for the grant of approval. filed with NGT by MPCB
Duxen Plot No. K
18.11.2016 - IM decision : The department's decision on charging the previous dues to consider the ZLD and
Pharmaceuti 3/7, Addl. Consent to
75 MPCB 16-08-2016 from the investor is incorrect. In such cases the MIDC cannot claim previous dues. The online monitoring units. Open
cals [P] Ambernath Establish
concerned department should approach the liquidator for previous dues. MIDC will NGT has given the order
Limited area
consider the case and issue the No due certificate shortly on the filed affidavit
23.12.2016 - IM Update : Consent to Establish is pending due to NGT orders. To be hence the department to
reviewed after 2 months March 2017 take action accordingly.
According to the
investor, as there is no
The investor has made an application for Renewal of there Consent to operate which was
increase in the load.
M/s Rane granted on 13-04-2016. Later when the investor had requested amendments in the
Plot No. W- Renewal of MPCB should put up the
Rao consent for change of product, investor received the consent without the amendments
76 147, MIDC, MPCB Consent with 15-12-2015 facts of the case in the Open
Reshamia with the condition to provide a bank guarantee of Rs. 1 lakh and not to take any
Taloja Amendment committee meeting. DC
Laboratories effective steps towards proposed product mix. Investor is requesting the department to
(Industries) to speak to
grant the change of product.
MS (MPCB) in order to
resolve the case.
Vile Bhagad
POSCO MIDC, Investor has made an application (UAN No- MPCB-CONSENT 0000020604)for consent to The department to look
Maharashtra Taluka Consent to establish for manufacturing of Electrical Steel and Galvanized Coil which is pending for into the matter and
77 MPCB 03-02-2017 Open
Steel Pvt Mangaon, Establish approval. update MAITRI on the
Ltd. District same.
Raigad
Page 35 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Application was submitted on 16.04.2015. Investor took over a part of the land and
products from an existing company, which already had consent to operate. MPCB kept
denying the CTE on various grounds even after investor applied for ZLD; received legal
opinion from MPCB legal cell that the party should be granted the consent and; even
after investor submitted a letter from MIDC stating that they have given permission for
the project. Investor is claiming that the process does not involve any hazardous
chemicals, it only involves inorganic salts and the effluent also contained easily
separable inorganic salts of benign elements. Investor is proposing to manufacture
catalysts which are very important for green processes, but not available to Indian
companies because of its strategic importance.
13.04.2016- IM Decision: DC (I) has requested Technical Advisor, MIDC for clarity over
issue, as MIDC should issue permission to the unit as per high court order.
11.5.2016: department update: The Consent was issued under Green Category which is
not serving the purpose of the investor.
05.07.2016- MIDC update: MIDC has written letter to Investor and MPCB that MIDC is not In case of non performing
a competent authority to give any such NOC nor have any authority to judge CETP, an affidavit was
A-94, MIDC performance of treatment of effluent generated by units. filed with NGT by MPCB
Phase 1, 08.07.2016- IM Decision: The supreme court has stashed high court order- Hence, to consider the ZLD and
Procat tech Consent to
78 Dombivali MPCB 16-04-2015 MPCB's request to obtain MIDC NOC is not required anymore. NGTs decision is prevailing online monitoring units. Open
LLP Operate
East, Thane that unit with ZLD should be granted consent to establish. MPCB to resolve the issue at NGT has given the order
earliest. MIDC has no role to play. Investor to share all support document with new nodal on the filed affidavit
officer of MPCB. hence the department to
18.07.2016 - Department update: The issue was discussed in the CC meeting held on take action accordingly.
18.07.2016 Minutes awaited. NGT's opinion (dated 29.07.2016) on the matter will also
be considered by MPCB.
12.08.2016-IM decision: The file under process with the legal wing.
16-09-2016: IM decision: State Government should go to court against the NGT order.
06-10-2016- RM decision: According to the department, since this unit is a Zero Liquid
Discharge, MPCB to consider the case in the next CAC meeting.
14-10-2016- IM decision: It has been decided in the Committee Meeting of MPCB to
present the cases having zero liquid discharge before NGT bench. The DC(I) suggested
that the investor should also approach NGT separately in order to strengthen the MPCB
case.
18.11.2016-All such issues to be incorporated in affidavit of MPCB to be filed before
NGT on 06-12-2016 for approval from NGT. It was also informed that investor should
simultaneously approach NGT
Page 36 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The investor has made an application for Consent in order to start laboratory and
W 141 repacking activity and the reference for the same is MPCB-consent_0000020610
SPAK The department to look
Dombivali 06-04-2017- Department Update: MPCB had issued Closure directions on 25-05-2016 to
ORGOCHEM into the matter and
79 Phase II MPCB Consent 03-02-2017 the said industry for not achieving the consented standards. Now, the industry has Open
(INDIA) PVT update MAITRI on the
Dist. Thane replied that, they have stopped the production activity and dismantlement the unit. They
LTD same.
have submitted letter that they are going for R & D activity and applied for the same.
The file is under process with MPCB, H.Q regarding restart of activity
The investor has made an application for Consent to Establish and the case was
discussed in the CAC meeting held on 08th July 2016 but the consent was not approved
due to the non performance of CETP. A letter has been issued by MPCB on 21st
September 2015 stating that "With
regards to the orders issued by NGT and High court the board has decided
In case of non performing
not to consider expansion/establishment of the industrial units in the area of non
Plot no. g-3 CETP, an affidavit was
performance of CETP's except units with zero Liquid Discharge and no pollution
Valvoline Additional filed with NGT by MPCB
potential". Since this unit has no pollution potential
Cummins Ambernath, to consider the ZLD and
Consent to according to the investor, he is requesting the department to consider the consent.
80 Pvt. MIDC phase MPCB 07-04-2016 online monitoring units. Open
Establish 14-10-2016- IM decision: It has been decided in the Committee Meeting of MPCB to
Ltd.(expansi II, NGT has given the order
present the cases having zero liquid discharge before NGT bench. The DC(I) suggested
on) Ambernath, on the filed affidavit
that the investor should also approach NGT separately in order to strengthen the MPCB
421506 hence the department to
case
take action accordingly.
18-11-2016- IM decision: All such issues to be incorporated in affidavit of MPCB to be
filed before NGT on 06-12-2016 for approval from NGT. It was also informed that
investor should simultaneously approach NGT
23.12.2016 - Department Update: As per instructions by PS(I), all the NGT related cases
to be put on hold for time being
The said unit has obtained consent operate dated 23-09-2016, now the unit wants to go
The case has been taken
Vinati B-12/B- for product change without crossing the sanctioned capacity. The investor has received
Consent to up in the Committee
81 Organics 13/1, MIDC, MPCB 09-11-2016 the MOEF clearance vide circular date 14-12-2006. Open
Operate meeting, consent will be
Pvt. Ltd. Mahad The unit has made an online application for amendments in consent to operate on 9-11-
granted shortly
2016 (UAN No MPCB 0000015828) which is under process with the department.
Page 37 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
According to the new circular issued by CPCB dated 02-02-2017 which states that
Vinati The case has been taken
B-12/B- Proponents with valid Environment Clearance can directly apply for consent to operate
Organics Consent to up in the Committee
82 13/1, MIDC, MPCB 19-01-2017 to there respective PCB's. However the investor has still made an online application for Open
Pvt. Ltd. Establish meeting, consent will be
Mahad consent to establish on 19/01/2017 (UAN No MPCB 0000019612) for their expansion
(Expansion) granted shortly
plant which is under process with the department.
B-1, MIDC Investor has applied Group Captive Open Access where they can buy a power from third The department to look
Bekaert
Ranjangaon Special Energy party (Sai Wardha Power Generation Ltd.) in which the investor too holds a small into the matter and
83 Industries MSEDCL 04.04.2017 Open
, Tal.Shirur, Meter Report ownership shares. For processing the same Investor has applied for the SEM report from update MAITRI on the
Pvt Ltd
Dist. Pune Baramati, MSEDCL which is under process with the department. same.
According to the investor, there are 6 electrical poles passing through the premises of
the said unit and these poles are supplying power to the Adivasi Village adjacent to the
unit. The investor has to remove these electrical poles passing through the said plot at
MIDC and MSEDCL has
their expense. In order to do so the investor has proposed the installation of a 63kVA
suggested the investor to
transformer and also suggested the alternate route for the HT Cable so that the
carry out the work within
Novozymes Shifting of electricity supply to the Village is not disrupted. The investor is requesting support and
Patalganga, the premises near the
84 South Asia MSEDCL overhead 05-04-2016 assistance with identification of suitable place for the installation of the transformer – Open
Raigad boundary wall of the unit.
Pvt. Ltd cables so that there are no Right-of-Way (ROW) issues.
Investor to check and
18-04-2017- IM decision: A joint survey to be carried out between the investor, MIDC and
revert to the concerned
MSEDCL to suggest an alternate route and a suitable place for installation of
department on the same.
transformer
03-05-2017- Department Update: The said road does not come under MIDC hence would
not be able to resolve the ROW issue.
Page 38 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Investor has applied to MSEDCL Regional Office, Kolhapur for electricity duty refund
which is pending for the grant of approval.
16-09-2016- IM decision: A committee has been formed under PS (Energy) to decide on
Village
Octaga the refund of electricity duty, this case would be taken up in the next committee meeting The department to look
Karnoor,
Green Power Electricity Duty 06-10-2016- RM decision: Issue will be taken up in the next Committee meeting of into the matter and
85 Tal. Kagal, MSEDCL 08-10-2014 Open
& Sugar Co. refund Electricity Duty refund. update MAITRI on the
Dist..
Ltd. 18-11-2016-IM Update: MAITRI to share a draft DO letter and the list of all Electricity same.
Kolhapur
duty refund cases with DC(Industries) to be taken up with the committee
23.12.2016- IM decision : As per the instructions of PS (I) and DC (I) issues related to
Electricity Duty Refund to be reviewed after 2 months
Investor applied for NOC for approach road form Pen-Khopoli road (SH 88) to their unit.
The approval of NOC is awaited
11.01.2016 - Compliances are done by the unit on 23.12.2015. The file is pending at Pen
office, PWD
22.02.2016- Field visit update: The file is under process at Alibaug office, PWD.
07.04.2016- Field visit update: The file is sent back to Pen office for signature /
compliance of Pen Office.
13.08.2016-Department update: The file has been forwarded from Pen office to Alibaug
office
30-09-2016- Department Update: The file will be forwarded to EE, PWD Alibaug within a
Godrej & Village week.
The department to look
Boyce Mfg. Vadval, 14-10-2016- IM decision: A field visit to be conducted by Deputy Director, Mrs. Kharat
into the matter and
86 Co. Ltd. Tambati, PWD Approach road 24-09-2015 20-10-2016- Department update: The file is under process at the SE Office, Konkan Open
update MAITRI on the
(Phase I/ Ta. Bhavan, CBD.
same.
South block) Khalapur 16-11-2016- Department update: The file to be put up for signatures of SE, PWD shortly
12-12-2016- Department Update: The file has been forwarded to the office of CE, PWD
(Bandhkam Bhavan, Fort) for further processing
09-01-2017- Department Update: Queries have been raised by CE PWD office. The file has
been sent down to EE, PWD, Alibaug office for clarifications
10-02-2017- IM decision: Inputs have been sent by EE, PWD, Alibaug to the office of CE,
PWD (Bandhkam Bhavan, Fort) for further processing
18-02-2017- Department Update: The proposal has been sent to PWD (Raste 7),
Mantralaya
08-03-2017- Department Update: The file is under process with PS (PWD) for final
signatures
Page 39 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Investor applied for NOC for approach road form Pen-Khopoli road (SH 88) to their unit.
The approval of NOC is awaited
11.01.2016 - Compliances are done by the unit on 23.12.2015.The file is pending at Pen
office.
22.02.2016- Field visit update: The file is under process at Alibaug office, PWD
07.04.2016- Field visit update: The file is sent back to Pen office for signature /
compliance of Pen Office.
13.08.2016-Department update: The file has been forwarded from Pen office to Alibaug
office
30-09-2016- Department Update: The file will be forwarded to EE, PWD Alibaug within a
Godrej & Village week.
The department to look
Boyce Mfg. Vadval, 14-10-2016- IM decision: A field visit to be conducted by Deputy Director, Mrs. Kharat
into the matter and
87 Co. Ltd. Tambati, PWD Approach road 24-09-2015 20-10-2016- Department update: The file is under process at the SE Office, Konkan Open
update MAITRI on the
(Phase II/ Ta. Bhavan, CBD.
same.
North block) Khalapur 16-11-2016- Department update: The file to be put up for signatures of SE, PWD shortly
12-12-2016- Department Update: The file has been forwarded to the office of CE, PWD
(Bandhkam Bhavan, Fort) for further processing
09-01-2017- Department Update: Queries have been raised by CE PWD office. The file has
been sent down to EE, PWD, Alibaug office for clarifications
10-02-2017- IM decision: Inputs have been sent by EE, PWD, Alibaug to the office of CE,
PWD (Bandhkam Bhavan, Fort) for further processing
18-02-2017- Department Update: The proposal has been sent to PWD (Raste 7),
Mantralaya
08-03-2017- Department Update: The file is under process with PS (PWD) for final
signatures
Page 40 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
As per IT/ITES Policy 2003, 2009 and GR no. ITP- 2013/ CR-265/IND-2 dated 25-08-
2015 the property taxes on all establishments/ properties/ building/ premises of IT and
Plot No. 24
ITES units have to be levied on par with residential premises. But from 2003 the said
Rajiv
unit has been paying taxes at commercial rates per sq. ft. as against residential rates.
Gandhi
18.11.2016: IM decision - MAITRI to follow up with the department to resolve the case
Infotech
20-12-2016- As instructed by DC(Industries) the case to be forwarded to ZP CEO MAITRI to follow up with
Park, Phase
88 Infosys RDD Taxes 18-10-2016 17-03-2017- IM decision: The taxes on par with residential premises for IT/ITES units is the department in order Open
II, Village
statutory. MAITRI to follow up with the department if the case could be resolved. to resolve the issue.
Maan,
18-04-2017- IM decision: MAITRI will refer the said case to Directorate of Industries.
Taluka
Shri. S. V. Patil (Jt. Director Industries) will prepare a note with the signature of DC
Mulshi,
(Industries). This note would be forwarded to PS (Industries) who in turn would request
Pune 57
PS (RDD) to issue a Circular to ensure Gram Panchayat taxes are in sink with IT/ITES
Policy GR no. ITP- 2013/ CR-265/IND-2 dated 25-08-2015.
Plot No. 24
Rajiv
The investor is requesting for following facilities from the Gram Panchayat:
Gandhi
1) Collection & disposal of Waste
Infotech
2) Cleanliness, Supply & provision of drinking water MAITRI to follow up with
Park, Phase
89 Infosys RDD Infrastructure 18-10-2016 3) providing proper facilities for waste water disposal the department in order Open
II, Village
4) Street lighting, construction & repairs of Village roads. to resolve the issue.
Maan,
18.11.2016: IM decision - MAITRI to follow up with the department to resolve the case
Taluka
20-12-2016- As instructed by DC(Industries) the case to be forwarded to ZP CEO
Mulshi,
Pune 57
As per IT/ITES Policy GR no. ITP- 2013/ CR-265/IND-2 dated 25-08-2015 the property
taxes on all establishments/ properties/ building/ premises of IT and ITES units have to
be levied on par with residential premises. But from the said unit has been paying taxes
MIDC, Gram at industrial rates per sq. ft. as against residential rates. MAITRI to follow up with
Persistent
90 Hingewadi, RDD panchayat 20-01-2017 18-04-2017- IM decision: MAITRI will refer the said case to Directorate of Industries. the department in order Open
Systems
Dist. Pune Taxes Shri. S. V. Patil (Jt. Director Industries) will prepare a note with the signature of DC to resolve the issue.
(Industries). This note would be forwarded to PS (Industries) who in turn would request
PS (RDD) to issue a Circular to ensure Gram Panchayat taxes are in sink with IT/ITES
Policy GR no. ITP- 2013/ CR-265/IND-2 dated 25-08-2015.
Page 41 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The investor has purchased the land and building through Auction process (from official
liquidator High court, Alibaug) in 2012. As per investor, delayed documents from High
court resulted in delayed registration in 2015. Thereafter, investor had applied for NOC
from Gram panchayat to start the activity and the same has not been received by the
unit. 22-09-2016- Field Visit: A joint meeting to be scheduled between the Sarpanch,
Investor & RDD, Alibaug. 15-12-2016- Field Visit Update: The case is to be taken up in
the upcoming Gram Sabha meeting to be held on 20-12-2016, investor and Concerned
BDO to be present for the meeting
Survey No.
20-12-2016- Investor Update: The said case was not taken up in the meeting
36/ I-B
02-01-2017- Department Update: The BDO assured to resolve the issue by conduction a CEO, Zilla Parishad has
,Near
meeting between Sarpanch and Investor called a meeting of the
Samartha Chinchoti NOC (power
06-01-2017- Investor Update: The BDO had asked the investor to meet the Sarpanch to concerned Sarpanch and
Opto- Gram connection &
91 RDD 10-04-2015 resolve the issue. However the investor application was not accepted by the Sarpanch the investor on 18-05- Open
Electropolym Panchayat, start of
12-01-2017- MAITRI has referred the case to CEO, Zilla Parishad for intervention 2017. MAITRI to follow
er Pvt. Ltd. Phansapur activity)
10-02-2017- IM decision: A meeting has been scheduled on 18th February 2017 at 4:00 up with Zilla Parishad on
tarf Umate
pm under the chairmanship of DC (Industries) the attendees for the same will the further course of action.
Village,
concerned CEO Zilla Parishad, BDO, Sarpanch and the investor
Alibaug
28-02-2017- MAITRI has shared the copy of the minutes with the concerned Addl. CEO
Zilla Parishad, BDO, Sarpanch and the investor
03-04-2017- Investor Update The notice has been issued by the Registrar of companies
for sticking of their name for not starting operations from past 2 years.
18-04-2017- IM decision: Development Commissioner (Industries) to speak to CEO Zilla
Parishad in order to resolve the case.
09-05-2017- Department Update: The Zilla Parishad has decided to take action against
the concerned Gram Panchayat
A proposed village road between Valse and Devgaon is passing through the said food
1288/1, park which would further get connected to Mumbai Bangalore Highway which may
1288/2, increase the traffic passing through the Food park. According to the investor, this may
1490/1 and impact the Hygiene and sanitation risk of the Food park, hence is requesting for
Satara Mega Realignment of The issue was closed on
92 1490/2 RDD 14-03-2017 Realignment of the said road from outside the food park. Closed
Food Park DP road 12-05-2017
Degaon, 09-05-2017- Investor Update: According to Zilla Parishad, in order to shift the DP road
Tal. & Dist.. investor should provide land to them and investor is working on is. Investor does not
Satara want to further pursue the case from MAITRI, hence the case to be closed in upcoming
investor meeting
Page 42 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The investor is requesting Gram panchayat Karegaon to issue revised bill for gram
panchayat tax based on G.N. of Bombay High court dated 3.12.1999.
07.11.2015- Investor meeting decision: SICOM to coordinate with RDD regarding same.
December 2015- Investor update: the file is pending with CEO, ZP
09.12.2015- ZP update- ZP, CEO has instructed Gram panchayat to hold the matters of
gram panchayat levied tax quoting a GR issued by the Principal Secretary.
10.12.2015- Investor update-Investor is requesting MAITRI to approach RDD to direct
CEO, ZP. Investor has requested MAITRI to take up his suggestion on draft MH
panchayat taxes and fees (amendment) of 7.11.2015.
1.1.2016- MAITRI has forwarded unit's suggestions received on 28.12.2015 to the PS
Industries , DC (I) and PSI for further process. and informed the investor that MAITRI
cannot assist in this issue.
07.04.2016- Field visit update: The issue was to be taken up in the ZP board meeting on
11.04.2016. They are awaiting another notification from Government.
D-108,M I D
06.05.2016- Field visit update: The investor is citing rule-9 of payment and lump sum
C
contribution by factories lieu of taxes, Rules 1961- according to which- In the event of
Ranjangaon
failure on the part of a Panchayat & the occupier to arrive at an agreement, the matter MAITRI to follow up with
Swarovski Village,Kor
93 RDD Tax 21-10-2015 shall be referred either by the panchayat or the occupier to arrive at an agreement, to the the department in order open
Pvt. Ltd. egaon,Shir
State Government through Chief Executive Officer concerned, who shall submit the same to resolve the issue.
ur,
after obtaining the views of the standing committee of the Zilla Parishad to the State
Ranjangaon-
Government for decision through the Commissioner with all the necessary documents."
412220
However, the ZP is not referring the case to RDD and keeping the file on hold
20.05.2016- IM decision: The case is referred to RDD on 18.05.2016. Investor to be
called for the next MAITRI Meeting.
01.08.2016- Investor update: Investor to comply with appeal of entire Ranjangaon units
facing similar issue - to Divisional Commissioner, RDD.
11-11-2016- Investor Update: The investor has complied with Divisional Commissioner,
Pune for his final decision.
13.12.2016: Department Update: Investor has complied with requested documents to the
Divisional Commissioner, RDD
13-01-2017- IM decision: The file is under process with section officer from Divisional
Commissioner office, Pune. Department has asked the status from ZP officials on long
pending applications submitted by investor.
10-05-2017- Department Update: The comments from Gram panchayat has been called by
Zilla Parishad
Page 43 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Investor applied to TLR office to obtain original K-Prat of Atitatadi Mojani Mo. Ra. No.
1789/10 but received only 1/2 copy. The rest 2/2 copy is not yet received. Investor also
require the KaJaPa for previous demarcation (Demarcation dates- 08/07/2011,
11/07/2011, 13/07/2011 for Mo. Ra No. 1783, 1781, 1779, 1782, 1778, 1789,
1789/10) as these documents will be needed for every future approval.
31.05.2016- Department update (SLR): It will take 2 weeks as the office is being shifted.
14.10.2016 - IM Decision: As the Nodal officer for MAITRI was not present for the
meeting, the issue was not discussed. As discussed in the MAITRI meeting held on
20.05.2016, MAITRI to prepare the list of all the issues and share it with DC(I) to be sent
to PS(Revenue) for further action.
Plot No. 11.11.2016- Investor Update: The demand note for the demarcation has been issued and
1,5,6,10 the same has been paid by the investor but the demarcation is scheduled in February 17
Alfa Laval Revenue measurement The issue was closed on
94 and 14, Tal. 30-01-2012 20.12.2016-Investor Update : Investor to approach the collector to re-consider the date Closed
India Ltd. Department of land 12-05-2017
Khandala, for land demarcation
Dist. Satara 03.01.2017- Investor Update : The land demarcation will be carried out on 03.01.2017 at
the plot.
23.12.2016 - IM decision: TILR to carry out the land measurement by 30.12.2016 and
provide K-Prat accordingly.
05-01-2016- Department update: The measurement has been carried out on 30-12-2016
but awaiting the K- Prat from the department
17-03-2017- IM decision: Development commissioner (Industries) had spoken to RDC,
Satara with regards to the case and informed the investor to meet the concerned RDC
along with blue prints in order to resolve the case.
05-05-2017- Investor Update: The unit has obtained the K-Prat document and hence the
case to be closed from MAITRI
Investor had applied to District collector, Nanded on 01th April 2017 for grant of NOC
PLOT NO D- to store Hexane Solvent in the unit at Plot no. D-3, Krushnoor Industrial Area, tal. The department to look
India Mega NOC for
3, MIDC, Revenue Naigaon, Dist. Nanded. The investor is awaiting the NOC from department into the matter and
95 Agro Anaj Storage of 01.04.2017 Open
KRASHNOO Department 27-04-2017- Department Update: Collector office has requested inputs from the update MAITRI on the
Ltd Hexane Solvent
R. following departments (1) Superintendent of Police, Nanded (2) Executive Engineer, same.
MIDC (3) District Supplies Officer (4) MSEDCL, Dehlur (4) Tehsildar
Page 44 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
In 2013 Town Planning office, Kolhapur, had issued a letter stating that the said the
land is not obstructed by any road basis which the investor had purchased the
Jambhali, Agricultural land and applied for NA permission. The application was further sent to The department to look
Chakote
Tal. Shirol, Building Plan Town Planning for comments on which the Town Planning has commented that the same into the matter and
96 Agro Foods UDD 12-09-2017 Open
Dist. Approval land is obstructed by a 31. Mtr. RP Road and has rejected the plan and informed the update MAITRI on the
Pvt.Ltd.
Kolhapur investor to revise the plan. same.
18-04-2017- IM decision: The department to confirm if the road is passing through the
unit. Investor to connect with Nodal Officer, UDD in order to resolve the issue
Investor's request is a
policy change matter and
the time limit for the
change/revision in GR
cannot be guaranteed. PS
The investor had acquired 22 acres of Agricultural land in 2011 but since the NA was (Industries) has
taking very long investor started the construction of the industrial shed in anticipation suggested the unit to
that NA and Building plan will be approved with the construction activities. But by time make an application for
N-78,79,
the investor completed the construction of phase 1 only the NA permission was Building plan approval
MIDC,
obtained. According to the investor, the construction of industrial shed is as per the DC for phase 2 and MAITRI
Hingna
Diffusion rules of the local planning authority. Investor is requesting NIT to regularise the to intervene in the matter
Road, Building Plan
97 Engineers UDD 25-10-2016 construction due to which he cannot proceed further for Phase 2 & 3 of the project. and resolve the case. open
Nagpur – Approval
Limited 06-02-2017- Investor Update: The file is under process with Deputy Engineer, NIT However in order to
440016
10-02-2017- IM decision: According to PS (Industries) the rate of Rs. 5500/- should be regularise the
considered. The department to look into the matter and update MAITRI on the same. construction and obtain
17-03-2017- IM decision: According to the department if the rate of 5500/- is considered the Final Fire NOC and
than it would be much higher that the demand note raised. The department to look into Building Completion
the matter and update MAITRI in the same. Certificate for Phase 1,
DC (Industries) has
suggested the unit to
make the payment under
protest and obtain the
approval.
Page 45 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Investor is facing extortion from local people for giving them contracts. Since investor
is not fulfilling their demand, the local people are now demanding to close the unit
stating the noise from unit is disturbing the nearby school. Although, the investor has
supported the school by providing computer, clean drinking water and by repairing the
school building. Investor has requested Dist. Collector to resolve the issue. He has also
proposed to run the unit during non-school hours as well as to install sound proof
material and air conditioner in six classrooms of the school. The investor has also shown
willingness to find a different location and relocate the school.
11.03.2016- IM decision: PS has writer a letter to the collector in order to look into the
matter to resolve the case. MPCB had visited the unit to check noise levels/pollution. The
unit is currently working in non-school hours only. It was suggested to the unit that it
may continue to work as per norms and if school is creating issues, he may approach
MAITRI.
10-11-2016- Department Update: After the intervention of Addl. Collector MAITRI, it was
informed that a meeting was conducted between the District Collector and local
villagers.
Village 02-01-2017- Field Visit: The collector office has requested the inputs from SDO and
Honad, town Planning.( Four Reminders sent). The Town Planning has reverted on 14-10-2016
The department to look
Shilphata, that MSRDC is the competent authority upon which Collector has written a letter to
Jyoti Steel into the matter and
98 Khopoli, UDD Local issues 22-02-2016 MSRDC on 11-11-2016 for the inputs Open
Industries update MAITRI on the
Dist. 30-01-2016- MSRDC update: MSRDC is the new planning authority from February 2016
same.
Raigad wherein the plan and the BCC of the said unit was approved by Town Planning, hence
MSRDC is requesting the entire file of NA Permission and BCC in order to provide the
inputs.
28-02-2017- Department Update: Collector Office, Allibaug has handed over the entire
file to MSRDC for their report.
02-03-2-17- Department Update: MSRDC has confirmed the receipt of the documents
received from Collector, Office as on 01-02-2017, as per the layout plan MSRDC to
conduct a site inspection and put up the file to the Chief Planner for approval post
which comments will be given to the collector office
10-03-2017- Department Update: According to the site visit conducted by MDRDC the
school was built in 1988 and the zone was declared as industrial area in the year 19991
as per DCR. The unit was built in 2014 the distance between the School and the said
unit is just 2 ft. The unit has shown less construction in the approved plan than actually
constructed and the school is constructed directly with the boundary wall which is
illegal as per law. Hence a letter to be issued by MSRDC (Pune), to the said unit as well as
the school in order to submit the updated layout plan
22-03-2017- Department Update: MSRDC has sent a letter to Collector office & Gram
panchayat requesting for the approved plan of the industry and the school.
Page 46 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Survey No. 30/2, 31/3 & 35-1/B at Village Konas Sawantwadi is the ancestral land of the
investor, on which he want to set up mineral water plant. The said land is notified as
other forest area by town planning department without informing the investor. Forest
department does not recognise this land parcel as other forest area.
The investor is facing issues in obtaining the NA permission, Building permission, etc.
even with revised layout plans. His applications are pending at Tehsildar , Sawantwadi.
09.10.2015- Investor meeting update: MAITRI to visit the Tehsildar of Sawantwadi and
collect the tourism Map.
02-11-2015- Department update: TP officer, Sindhudurg has submitted ground reality
report to Jt. Director , Konkan region on 01.11.2015.
Survey No.
07.11.2015- investor meeting decision: As the plot is notified as "other forest zone",
Manner & 30/2, 31/3 The department to look
the investor will have to apply for the Zone Conversion. MAITRI to share the contact
Skill & 35-1/B, Building Plan into the matter and
99 UDD 22-07-2015 details of Jt. Secretary, UDD, who will guide the investor in making the application for Open
International village Approval update MAITRI on the
zone conversion. MAITRI has shared details on 17.11.2015. Investor has met Secy, UDD
Pvt. Ltd Konas same.
on 4.12.2015
Sawantwadi
23.11.2015- Field visit update: File is with Shri. Shende (Jt. Director Town Planning).
Expected time to forward the file to Shri. Rajan Kop (Dir. Town Planning) is 1 week.
1.12.2015- Investor update- File is sent to Pune office for further action on 1.12.2015
10.12.2015- Investor update: They have obtained approval of CGWA with condition to
invest certain amount of money within 6 months, which is ending in a month. The
investor is requesting early resolution of UDD issue so that he can start his project
without any problem further. The investor was asked to carry out a contour survey (30
degree) and ensure to have 12 mtr wide road near his plot
14.01.2016- Investor meeting decision: MAITRI to write a draft letter to Jt. Director,
Konkan Region asking for the empanelled agencies for contour report. MAITRI to visit
the Nodal officer and take it in writing the list of empanelled agencies.
Page 47 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
the Nodal officer and take it in writing the list of empanelled agencies.
19.01.2016- Investor update-Investor has hired architect for contour survey and applied
to gram panchayat for NOC for the road. Field visit update: UDD does not have
empanelled list for carrying out the activities. the architect of the investor should attach
his certificate with the report. Investor needs to apply for zone conversion with
Divisional commissioner, TP with reference to GR dated 6.5.2015 and 4.1.2016)
01.02.2016- Department update: The proposal for conversion of said land (if slope=<30
degree) to Agriculture-no development land is forwarded to UDD Mantralaya. (So that,
unit like manner & skill, if applicable, can apply for NA permission on the land). The
report of contour survey form investor will be referred in this. As per the department,
the procedure of conversion of land and notification issuance will take 6-8 months.
Department asked the investor to meet them
18.02.2016- Meeting update: In a meeting of UDD with investor, The entire region is
falling under Kasturi Ranjan committee. But being a green category project, he is allowed
to put up the project in the region. The ground reality report is forwarded to Hon'ble
Minister, UDD.
28.04.2016- Field visit update: The file is moved to Hon'ble CM's desk
21.07.2016- Department update: The compliance letter has been issued to the investor.
09.09.2016-Department Update: UDD has published a notice dt. 23.08.2016 u/s 20(3) to
add following new proviso in the sanctioned regulation no. 3 of Regional Plan
Regulations;
a. In case of forest zone having ownership other than Forest department and having
gradient less than or equal to 300 shall be considered as if included in Agriculture/No
Development zone and users therein shall be permitted.
b. Owner shall submit a contour map surveyed by competent agency. Trueness of such
contour map shall be certified by Government surveying agencies(like MRSAC, Survey of
India, City Survey)
16-09-2016- IM decision: The final notification is awaited regarding plots having
gradient less than or equal to 30 degree shall be considered as if included in
Agriculture/No Development zone.
18-11-2016-IM Update: The draft notification is in public domain till 28-11-2016. The
final notification is awaited regarding plots having gradient less than or equal to 30
degree shall be considered as if included in Agriculture/No Development zone.
13-01-2017- IM Decision: The file is under process with Director, Town Planning. Further
the file will be sent to the government. The process will take 2-3 months
Page 48 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The investor has booked a gala at Renaissance Industrial park, Vashare, Tal. Bhiwandi,
Dist. Thane and had paid a token of Rs. 1lac. The investor was allotted Gala No. 10 in
Gala No. 9, building No. A-I and had also paid the total amount of Rs. 795530 between 03-01-2012
Bldg. No A- to 02-04-2012. When the investor approached the bank for loan, in the mean time
II, Renaissance Infra cancelled the letter of allotment of there gala and allotted a smaller
Renaissanc Gala No.9 in bldg. No. A-II. The investor was assured all the facilities with the available
Omega Town Planning The issue was closed on
100 e Industrial UDD 14.04.2017 infrastructure and till date there is no infrastructure provided at their gala. There are no Closed
Industries Approval 12-05-2017
Park, proper NOC obtained by the Renaissance, and the investor is demanding MAITRI
Bhiwandi, intervention to instruct Renaissance to get the proper approvals so that he can avail
Vashare, loan from the bank. However the investor has approached the court as well for the said
Dist. Thane case.
02-04-2017 MAITRI cannot pursue the case as the issue is now Sub-judice and hence the
case to be closed in the upcoming investor meeting
Investor applied for lifting 0.259 MLD water (0.257 MLD for Industrial usage+ 0.00175
MLD for drinking purpose) from 'Nira Ujawa Canal' up for their distillery plant. The same
Gut no was rejected stating no water permission will be given to the sugar production units.
477, 478/1, Investor is requesting for water permission as the final product is Ethanol and Alcohol The water quota has been
494 & 567, and, not sugar. Hence, investor again submitted an application to Hon’ble Secretary, sanction to the unit in
Water
New Phaltan Village Water quota WRD and the file is under process with Krishna khore Vikas Mahamandal, Pune the Governing Council
101 Resources 17-06-2015 Closed
Sugar Works Sakharwadi, sanction 17-03-2017- IM decision: The Governing Council Meeting is scheduled in 17-03-2017 in meeting held on 17-03-
Department
Taluka order to decide the procedure to approve lifting of water from water bodies. 2017 hence the issue to
Phaltan, 11-04-2017- Department update: The Governing Council Meeting was held on 17-03- be closed from MAITRI.
Satara 2017, the file is under process with the minister for approval
18-04-2017- IM decision: The Governing Council Meeting was held on 17-03-2017, the
file is under process with the minister for approval
Page 49 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
Investor has applied for the approval of lifting the water from Ozherkhed Dam with WRD,
Nashik as the unit does not have a permanent source of water to meet the production
requirements. On the above application Chief Engineer WRD, Nashik had written a letter
to Hon’ble Secretary, WRD, Mantralaya with his comments on 20-04-2016 for further
approval. However there is no action on the case.
16-09-2016- IM decision: The file is under process with Secretary (Water Resources), the
department to look into the matter and update the same to MAITRI
06-10-2016- RM decision: A cabinet sub committee is proposed which would handle The said case was not
water quota sanction. The committee is yet to be convened. considered in the
14-10-2016 - IM decision: The water quota sanction would be finalised only after the sub governing Council
committee is formed. However if the investor wants a temporary connection (1 year), the meeting as there were
Ruchi
Water same can be applied to the water resources department. some errors in the
Kagome
102 Resources Water Sanction 20-04-2016 18-11-2016- IM decision: The department to look into the matter and update MAITRI on submitted proposal. Open
Foods India
Department the same Department to rectify the
Pvt Ltd.
20-12-2015- Department Update: The file is under process with Godavari Marathwada same and submit the
Mahamandal and the Executive has the power to issue the water quota same n the next
13-01-2017-IM decision: The case to be discussed in the Governing Council Meeting governing council
which will be chaired by Hon'ble Minister after which the procedure for water quota meeting for approval.
sanction will be finalized
17-03-2017- IM decision: The Governing Council Meeting is scheduled in 17-03-2017 in
order to decide the procedure to approve lifting of water from water bodies.
11-04-2017- Department update: The Governing Council Meeting was held on 17-03-
2017, the file is under process with the minister for approval
18-04-2017- IM decision: The Governing Council Meeting was held on 17-03-2017, the
file is under process with the minister for approval
Page 50 of 51
Maharashtra Industry Trade Investment Facilitation Cell
Minutes of 30th Investor Meeting - 12th May 2017 at Investor Facilitation Cell
S.N Name of the Name of the Application Decision taken in MAITRI Issue
Location Department Issue description and chronology
o Company Service date meeting 12-05-2017 Status
The investor is seeking permission to lift water from Urmodi river which is about 4 kms
from the factory site.
22.06.2016- WRD update: The file is forwarded to Chief Principal Secretary Finance
08.07.2016- WRD update: It will be taken up in next cabinet
12.08.2016-IM decision: The file has been forwarded to the cabinet on 19.07.2016
06-10-2016- RM decision: A cabinet sub committee is proposed which would handle
water quota sanction. The committee is yet to be convened.
14-10-2016- IM decision: The water quota sanction would be finalised only after the sub
1288/1, committee is formed. However if the investor wants a temporary connection (1 year), the
The water quota has been
1288/2, same can be applied to the water resources department.
sanction to the unit in
1490/1 and Water 20-12-2016- Department Update: The file is under process with Krishna Khore Vikas
Satara Mega Water quota the Governing Council
103 1490/2 Resources 02-01-2015 Mahamandal and the Executive has the power to issue the water quota Open
Food Park sanction meeting held on 17-03-
Degaon, Department 23-12-2016 - IM decision : Department to expedite the issue and update MAITRI about
2017 hence the issue to
Tal. & Dist.. the same
be closed from MAITRI.
Satara 13-01-2017-IM decision: The case to be discussed in the Governing Council Meeting
which will be chaired by Hon'ble Minister after which the procedure for water quota
sanction will be finalized
17-03-2017- IM decision: The Governing Council Meeting is scheduled in 17-03-2017 in
order to decide the procedure to approve lifting of water from water bodies.
11-04-2017- Department update: The Governing Council Meeting was held on 17-03-
2017, the file is under process with the minister for approval
18-04-2017- IM decision: The Governing Council Meeting was held on 17-03-2017, the
file is under process with the minister for approval