المحاضرة الرابعة:إختبارات محولات التوزيع
المحاضرة الرابعة:إختبارات محولات التوزيع
TTR,VEGTOR
GROUP,MAG I BDV KIT
TRANSFORMER BAUR
TEST BOX
6/7/2021 75
Competent Person
Ensure competent person Risk assessment
carry out the task. • Prepared risk assessment.
تأكيد أداء المهمة بواسطة شخص • تقييم المخاطر
مؤهل
Equipment's and Tools
Safety Rules All required equipment and
tools should be checked
General Safety Rules needs
before start of work for
to be followed. suitability and integrity.
إتباع قواعد السﻼمة العامة التاكد من جهازية المعدات قبل بداية
العمل
Permit to work
Personal Protective
Permit to work system shall Equipment's
be followed with due care
wherever applicable. PPE shall be worn as
applicable.
إذن العمل
إرتداء معدات الوقاية الشخصية
6/7/2021 76
• The • Boundary • Follow your • Do not stand • Do not hold
transformer safety tape company’s de- on apparatus the high
must be should be energizing and while the voltage cable
disconnected done safety tagging test current while test
from the • التأكد من عمل procedures is applied voltage is
power العﻼمات • اتباع ارشادات • ﻻ تقف امام applied
system. التحذيرة وعزل تفريغ الشحنات المعدة اثناء حقن • ﻻ تمسك بكوابل
• التاكد من عزل المنطقة واجراءات التيار الضغط العالي
المحول من السﻼمه عند عمل
منظومة القدرة اﻻختبار
. .
6/7/2021 77
6/7/2021 78
6/7/2021 79
6/7/2021 80
Visual inspection:
✓ Check name plate details
✓ Check level and alignment of installed transformer
✓ Check the External damages, painting and colour.
✓ Check tightness of connections and fastenings
✓ Check proper grounding.
✓ Check Oil level and oil leakage
✓ Check wire and cable connections
✓ Check cable glands and entrance
✓ Check breather and Silica gel colour
✓ Check bolt tightness.
✓ Check the Off-load tap changer is set at nominal tap.
✓ Check all the devices are labelled correctly as per drawing
6/7/2021 د 81
Site Tests:
✓ Measurement of insulation resistance with Polarization
Index
✓ Measurement of winding resistance
✓ Measurement of turns ratio with Excitation current test
✓ Separate source voltage withstand test (High Voltage tests on HV
& LV) - (Not applicable at site but to be done during FAT – FAT
Report to be evaluated)
✓ Measurement of Impedance (short-circuit current test)
✓ Vector Group Verification
✓ Checking of Transformer Protection Schemes
✓ Oil break down voltage test.
6/7/2021 د 82
TRANSFORMER
TESTS
6/7/2021 83
With good insulation, the
The polarization index is the
insulation resistance will
ratio of two time-resistance
start low and get higher as
readings: one is taken after 1
the capacitive leakage
minute and the other is
current and absorption
taken after 10 minutes.
current get smaller.
6/7/2021 84
6/7/2021 85
Mode of connection
HV-Ground
LV-Ground
HV-LV
6/7/2021 86
6/7/2021 87
Objectives Significant of the Test
6/7/2021 92
6/7/2021 93
6/7/2021 94
Objectives
• Abnormal core grounds
• Winding faults: shorts,
open circuits
• Defect in magnetic core
structure
• LTC problems
6/7/2021 95
Criteria value <± 5 % between test and factory test report
FAT
6/7/2021 96
6/7/2021 97
Objective
Determine angle
between primary and
secondary winding
when put
transformer in
service
6/7/2021 98
6/7/2021 99
1.Vector group connection and calculation
Vector group.pdf
1.TRANSFORMER 11/0.433 KV TEST REPORT by
PTP TRANSFORMER(13.07.2020)-2.pdf
6/7/2021 100
PROJECT CERTIFICATION DEAPARTMENT
SITE ACCEPTANCE TEST REPORT
1. GENERAL DATA:
Sl .No. DESCRIPTION
1 RATED HV VOLTAGE AND CURRRENT 11000V/26.2A
2 RATED LV VOLTAGE AND CURRENT 433V/666.7A
3 RATED KVA / CAPACITY 500 kVA
4 VECTOR GROUP SYMBOL Dyn11
5 FREQUENCY / PHASES 50 Hz/ 3
6 TYPE OF COOLING ONAN
7 IMPEDANCE AT NORMAL TAP 4.64 %
9 TYPE AND MAKE FEDERAL TRANSFORMERS AND
SWITCHGEARS LLC
10 YEAR OF MANUFACTURER 2020
11 SERIAL NUMBER 6168
Tested By Witnessed By
Name SAYED TAHA MOHAMMED AL JAFARI
Signature
B) WINDING RESISTANCE MEASUREMENT: OES 5, IEC 60076 – 1, CLAUSE 10.2 PAGE.NO :61
H.V SIDE AMB. TEMP: 37.5 °C
R ph – Y ph (Ω) Y ph –B ph (Ω) B ph – R ph (Ω)
TAP POSITION REMARKS
@ 37.5 °C @ 75°C @ 37.5°C @ 75°C @ 37.5°C @ 75°C
L.V SIDE:
r ph – n (mΩ) y ph –n (mΩ) b ph – n (mΩ)
@ 37.6 °C @ 75°C @37.6 °C @ 75°C @37.6 °C @ 75°C REMARKS
Tested By Witnessed By
Name SAYED TAHA MOHAMMED AL JAFARI
Signature
C) VECTOR GROUP CHECK: OES 5, IEC 60076 - 1 CLAUSE 10.3 PAGE.NO :63
MEASURED VOLTAGE ON
TERMINAL VOLTAGE TERMINAL VOLTAGE TERMINAL VOLTAGE TERMINAL VOLTAGE TERMINAL VOLTAGE
1U-1V 399.1 2U-2V 15.75 1U-1V 399.1 1U-2N 9.07 2N-1V 390.2
1V-1W 401.9 2V-2W 15.81 1V-2W 385.4 1V-2V 385.5 1U-2V 15.75
Signature
Tested By Witnessed By
Name SAYED TAHA MOHAMMED AL JAFARI
Signature
OES 5, CLAUSE: 17.0 TESTS (IEC 60076 -, 1 CLAUSE: 10.1.1 (E), PAGE NO: 59 - IEC60076-3)
> 55KV FOR NEW OIL / > 40KV FOR IN SERVICE OIL
4. INSTRUMENTS DETAILS:
Tested By Witnessed By
Name SAYED TAHA MOHAMMED AL JAFARI
Signature
Transformer
Vector
Group Test
conditions
YNd1, YNd11, Dyn11, YNyn0
and more
Pandian
Transformer Vector Group Test conditions
Index
Chapter Page
Cover page
Index 1
Introduction about Vector Group Notation 2
Test Conditions for Ii0 & Ii6 3
Test Conditions for YNyn0 4
Test Conditions for YNyn6 5
Test Conditions for Dd0 7
Test Conditions for Dd6 8
Test Conditions for YNd1 10
Test Conditions for YNd11 11
Test Conditions for Dyn11 12
Test Conditions for Dyn1 13
Introduction
In transformers the interconnection of the coils and the phase angle between the primary and
secondary side are denoted by standard form. Transformers with similar connections and phase shift
are grouped under a Vector group.
Connection Notation
Star Y
Delta D
HV Winding Neutral N
Zig Zag Z
Single Phase I
Star y
Delta d
LV Winding Zig Zag z
Neutral n
Single Phase i
The phase shift between the primary and secondary side are denoted in the form of Clock Position.
Taking HV side as the reference (i.e. 12 o Clock position) phase shift of the LV side is mentioned in
numerical values in multiples of 30°
0 denotes 0°, 1 denotes 30°, 6 denotes 180° and so on. In special transformer where the phase shift
is not in multiples of 30° particularly for the isolation transformer incorporated to reduce the
harmonics, directly the phase angle is been mentioned by the manufacturers
To carry out the Vector Group test one should establish the electrical connection between Primary
and Secondary since the separate winding transformers are inductively coupled whereas the auto
transformers are electrically coupled and so no need for latter.
After establishing the electrical connection between two windings under test, voltage may be
applied in either of the winding preferably in the HV side as it is safe and the voltage measured
between the various terminals will be indicative to ensure the phase shift. Testing Engineer should
derive at least three conditions to compare, add and or equate the particular set of voltage to be
measured. These conditions should be in such way to ensure the phase shift and phase sequence.
Usually 1U and 2u are connected but it is not necessarily to be so, Testing Engineer can choose by
his/her own choice and the conditions shall be derived accordingly.
1P 2p
Ii0
Connect 1P and 2p
Keep the neutral(1N & 2n)l floating 2n
Apply Voltage in HV side
1N
Condition
1P & 2p
Measure Voltage between
V1P2n
1. 1P and 2n (V1P2n ) 2n
2. 2n and 1N (V2n1N ) V1P1N
3. 1P and 1N (V1P1N ) V1N2n
Ii6 1P 2n
Connect 1P and 2p
Keep the neutral(1N & 2n)l floating
Apply Voltage in HV side 2p
1N
Condition 2n
Measure Voltage between V1P2n
1P & 2p
1. 1P and 2n (V1P2n )
2. 2n and 1N (V2n1N )
V2n1N
3. 1P and 1N (V1P1N )
1N
YNyn0 1U
2u
Connect 1U and 2u
Keep the neutral floating 2n
Apply 3Φ Voltage in HV side 2w 2v
1N
1W 1V
Condition – 1
1W 1V
Condition – 2
1W 1V
Condition – 3
1W 1V
YNyn6 1U 2v 2w
2n
Connect 1U and 2u
Keep the neutral floating
Apply 3Φ Voltage in HV side 2u
1N
1W 1V
Condition – 1
2v 2w
Measure Voltage between 2n
1W 1V
2v 2w
Condition – 2 2n
V1W2v = V1V2w
1N
1W 1V
YNyn6…(contd)
2v 2w
2n
Condition – 3
2. 1W and 2w (V1w2w )
1W 1V
*By connecting 1U and 2u the Voltage V1W2w may be high, hence the author feels
comfortable to connect 1U and 2n. Then the Condition – 1 changes as follows
1W 1V
1U
Dd0 2u
Connect 1U and 2u
Apply 3Φ Voltage in HV side
2w 2v
1W 1V
Condition – 1
Condition – 2
1. 1U and 2v (V1U2v )
2. 2v and 1V (V2v1V ) 2w 2v
3. 1U and 1V (V1U1V )
Condition – 3
1U&2u
Measure Voltage between
2v V1W2v
1. 1W and 2v (V1W2v ) 2w
2. 1W and 2w (V1w2w )
Dd6 1U
Connect 1U and 2u 2v 2w
Apply 3Φ Voltage in HV side
2u
1W 1V
Condition – 1
2v 2w
Measure Voltage between
1W 1V
Condition – 2
1. 1U and 2v (V1U2v )
1U&2u
2. 2v and 1V (V1V2v ) V1U2v
3. 1U and 1V (V1U1V ) V1V2v
1W 1V
Dd6…(contd)
Condition – 3
1. 1W and 2v (V1W2v )
1U&2u
2. 1W and 2w (V1w2w )
V1W2w
V1W2w > V1w2v
1W 1V
*By connecting 1U and 2u the Voltage V1W2w may be high, hence the author feels
comfortable to connect 1U and 2v and conditions shall be derived accordingly.
YNd1 1U 2u
Connect 1U and 2u 2w
Keep the neutral floating 2v
Apply 3Φ Voltage in HV side
1N
1W 1V
Condition - 1
1U & 2u
Measure Voltage between V1U2v 2w V1U1N
2v
1. 1U and 2v (V1U2v ) V2v1N
2. 2v and 1N (V2v1N )
1N
3. 1U and 1N (V1U1N )
1W 1V
V1U2v + V2v1N = V1U1N
Condition – 2 1U & 2u
Condition – 3
1U & 2u
Measure Voltage between
2w
2v
1. 1W and 2v (V1W2V )
2. 1V and 2v (V1V2v ) V1W2v V1V2v
1N
V1W2V = V1V2v
1W 1V
YNd11
1U 2u
Connect 1U and 2u
2v
Keep the neutral floating
2w
Apply 3Φ Voltage in HV side
1N
1W 1V
Condition - 1
V1U2w 2v
1. 1U and 2w (V1U2w )
2w V1U1N
2. 2w and 1N (V2w1N ) V2w1N
3. 1U and 1N (V1U1N )
1N
V1U2w + V2w1N = V1U1N
1W 1V
Condition - 2
1. 1W and 2v ( V1W2v ) 2v
2w
2. 1V and 2v (V1V2v )
V1W2v V1V2v
V1W2v > V1V2v 1N
1W 1V
Condition -3
2. 1V and 2w (V1V2w ) 2v
2w
V1W2w = V1V2w
V1W2w V1V2w
1N
1W 1V
Dyn11
1U
2u
Connect 1U and 2u
Keep the neutral floating
Apply 3Φ Voltage in HV side 2n 2v
2w
1W 1V
1U& 2u
Condition - 1 V1U2n
V1U1V
Measure Voltage between 2n 2v
Condition - 2 1U& 2u
Condition -3
1U& 2u
Measure Voltage between
2n
2v
1. 1V and 2v (V1V2v )
2. 1V and 2w (V1V2w ) 2w
V1V2v = V1V2w 1W 1V
Dyn1 1U 2u
Connect 1U and 2u 2w 2n
Keep the neutral floating
Apply 3Φ Voltage in HV side 2v
1W 1V
Condition - 1
1U&2u
V1U2n
Measure Voltage between V1U1W
2n
2w
1. 1U and 2n (V1U2n )
V2n1W
2. 2n and 1W (V2n1W ) 2v
3. 1U and 1W (V1U1W )
1W 1V
V1U2n + V2n1W = V1U1W
1U&2u
V1V2v
Condition - 2
2n
2w
Measure Voltage between
2v
1. 1V and 2v ( V1V2v )
2. 1V and 2w (V1V2w ) 1W 1V
Condition -3 1U&2u