Non Conformance Form

Universal Testing Laboratory found an inaccuracy in their Universal Testing Machine (UTM) during retesting of steel rebar samples. The UTM was showing lower yield strength readings on its display screen than were reflected on the stress-strain graph. This violates the laboratory's quality management system requirements for measurement traceability and calibration. An investigation was initiated to identify and correct the cause of the uncertainty in the UTM readings.

Uploaded by

Researcher
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
692 views1 page

Non Conformance Form

Universal Testing Laboratory found an inaccuracy in their Universal Testing Machine (UTM) during retesting of steel rebar samples. The UTM was showing lower yield strength readings on its display screen than were reflected on the stress-strain graph. This violates the laboratory's quality management system requirements for measurement traceability and calibration. An investigation was initiated to identify and correct the cause of the uncertainty in the UTM readings.

Uploaded by

Researcher
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

North-South Commuter Railway Extension Project

CP N-05 : Building and Civil Engineering Work for Depot Building Including
Related Infrastructure and Track Work Ballast
(Contract No : NSCREX-
03-N05)

NON-CONFORMANCE REPORT FORM (NCRF)

Reference Number NSCR-PSC-UTL-N05-CRKDPT-NCR-000005 NCR DATE 7-Jun-21

Organization/Subcontractor Universal Testing Laboratory Item Location Universal Laboratory,Brgy. Margot

Drawing/Specification No.

DESCRIPTION OF NON CONFORMITY: UNIVERSAL TESTING MACHINE INACCURACY OF TEST RESULT

It has been observed that the Universal Testing Machine (SERIAL NO.16801) used in the testing of rebars was giving a discrepancy/ inaccurate reading during the

recently conducted retest/validation of the 36-mm rebar yield strength of the rebar from STEEL ASIA .After the completion of the test it was found that the final reading

reflected on the measuring device screen is showing a reading that is lower than the actual reading being shown on the stress/strain graph of the machine during the

test. (See attached photos). UTL laboratory is instructed to investigate, identify and correct as necessary the cause of this uncertainties in their UTM.

Reference Document : BS EN ISO 9001:2015 QMS Requirements

7.1.5.2 Measurement traceability


When measurement traceability is a requirement, or is considered by the organization to be an essential part of providing confidence in the validity of measurement
results, measuring equipment shall be:

a) Calibrated or verified, or both, at specified intervals, or prior to use, against measurement standards traceable to international or national measurement standards;
when no such standards exist, the basis used for calibration or verification shall be retained as documented information;
b) Identified in order to determine their status;
c) safeguarded from adjustments, damage or deterioration that would invalidate the calibration status and subsequent measurement results.

The organization shall determine if the validity of previous measurement results has been adversely affected when measuring equipment is found to be unfit for its
intended purpose, and shall take appropriate action as necessary.

INITIATOR: REVIEW/VALIDATION

NAME & SIGNATURE FLORANTE TAVERA LAUREANO TINIO/ MICHAEL MAGAT

POSITION LABORATORY MANAGER QA/QC MANAGER

IMMEDIATE CORRECTION:

PROPOSED CORRECTIVE ACTION:

SEVERITY LEVEL Level 1 Level 2 Level 3

DISPOSITION USE-AS-IS REWORK REPAIR REJECT

PREPARED BY: ACCEPTED BY:

SIGNATURE

NAME

POSITION CONSTRUCTION MANAGER QUALITY CONTROL MANAGER

DATE

VERIFICATION OF CORRECTIVE ACTION

CONSTRUCTION POSCO E&C QC ENGINEER

SIGNATURE

NAME

POSITION

DATE

NCR HAS BEEN CLOSED: Approved Approved with comments Rejected

Name:

Signature: Date:

FORM NO. CPN05-POSCO-QA-004


NON-CONFORMANCE REPORT FORM (NCRF) REV.B 15-FEB-21