Northeast Frontier Railway Projects

The document provides details of the New Maynaguri - Jogighopa Rail Line project in Assam and West Bengal. Some key points: 1) The total length of the project is 288.88 km, with construction ongoing since 2000-2001. Physical progress so far is 92.6% of formation work and 90.82% of track linking. 2) The initial pink book cost was Rs. 733 crores but has since been revised upwards multiple times. Financial progress so far is 70.9%. 3) Construction is ongoing in phases, with 231.39 km commissioned so far and further phases expected for commissioning in 2020-2021.

Uploaded by

Ramana Reddy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
360 views56 pages

Northeast Frontier Railway Projects

The document provides details of the New Maynaguri - Jogighopa Rail Line project in Assam and West Bengal. Some key points: 1) The total length of the project is 288.88 km, with construction ongoing since 2000-2001. Physical progress so far is 92.6% of formation work and 90.82% of track linking. 2) The initial pink book cost was Rs. 733 crores but has since been revised upwards multiple times. Financial progress so far is 70.9%. 3) Construction is ongoing in phases, with 231.39 km commissioned so far and further phases expected for commissioning in 2020-2021.

Uploaded by

Ramana Reddy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 56

पू व र सीमा रे ल ( नमाण)

NORTHEAST FRONTIER RAILWAY


(CONSTRUCTION)

BRIEF OF ALL PROJECTS


(As on 30th, November ‐ 2020)

महा बंधक (िनमाण)


मालीगाँ व, गु वाहाटी ‐ 781011
General Manager (Const.)
N.F. Railway, Maligaon ‐ 781011
INDEX
S. No. Name of Project Page No.
NEW LINES
1 New Maynaguri - Jogighopa (288.88 Km ) 1
2 Jiribam - Imphal (NP) (110.625 Km) 2
3 Dimapur - Kohima (NP) (82.50 Km) 3
4 Jogbani - Biratnagar (18.601 Km) 4
5 Agartala - Akhaura (Gangasagar) (Bangladesh) (12.03 Km) 5
6 Bairabi - Sairang (NP) (51.38 Km) 6
7 Sivok - Rangpo (NP) (44.96 Km) 7
8 Tetelia - Byrnihat (NP) (21.50 Km) 8
9 Murkongselek - Pasighat (26.15 Km) 9
10 Araria - Galgalia (110.75 Km) 10
11 Balurghat - Hili (29.60 Km) 11
12 Jalalgarh-Kishanganj (50.871 Km) 12
13 Eklakhi - Balurghat, Itahar - Buniadpur (163.215 Km) 13
14 Kaliyaganj - Buniadpur (33.10 Km) 14
15 Byrnihat - Shillong (NP) (108.4 Km) 15
16 Dimapur - Tizit (257 Km) 16
17 Sivsagar-Jorhat (62 km) 17
18 Salona-Khumtai (99 km) 18
19 Tezpur-Silghat (25 km) 19
GAUGE CONVERSION
Katihar - Jogbani - Katihar - Barsoi - Radhikapur, MM for Raiganj - Dalkhola (43.43 km) NL
20 20
(279.57 Km)
DOUBLING
21 Ambari Falakata - New Maynaguri (37.87 Km) 21
22 Digaru-Hojai (102 Km) 22
23 Bongaigaon-Goalpara-Guwahati (176 Km) 23
24 New Maynaguri - Gumanihat (Balance portion 51.65 Km) 24
25 New Bongaigaon- Agthori (Via Rangiya) (142.97 Km) 25
26 Saraighat Bridge (7 km) 26
27 Kamakhya-New Guwahati Quadrupling (10.30 Km) 27
28 Lumding-Tinsukia Jn-Dibrugarh (381 km) 28
29 Katihar-Kumedpur & Katihar-Mukuria (64.5 km) 29
1
New Maynaguri to Jogighopa New Line Project(226.83 KM)along with Gauge Conversion from
New Mal Jn. to Changrabandha (62.05 Km)(Total-288.88 Km)

Ph-VII : Bilasipara-Chapar (21.00 Km): Nov'2020 (Commissioning)


1. Project Details Ph-VIII : Chapar-Bechamari (13.00 Km): Feb'2021 (Commissioning)
Ph-IX : Bechamari-Abhayapuri (13.65 Km): Feb'2021 (Commissioning)
Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Financial
inclusion in Total Length Rev. Budget Budget Exp. during Cum. during progress
Cost Mar-2020 Progress
Budget allotment allotment November-2020 year during the
(%age)
year

Assam:
114.00 Km

West
2000-01 Bengal: 5,071.38 3465.013 0 150.00 29.964 130.708 87.14% 70.9%
174.88 Km

Total:
288.88 Km

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 89.07 12/09/2003
2 Detailed Pt-II 383.29 23/09/2004
3 Detailed Pt-III 549.76 13/06/2008
4 Detailed Pt-IV(NCBD-CBD)GC 11.02 13/10/2009
5 Detailed Pt-V(New Mal-MZS)GC 147.05 12/05/2010
6 Revised 1st Revision 1497.74 03/08/2010
7 Revised 2nd Revision 2531.34 16/10/2015
3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 1064.707 1064.707 100
Earth Work (Lakh Cum.) 213.42 213.013 99.81
Formation (Km.) 288.885 267.503 92.6
Major Bridge - Sub Strc. (Nos.) 68 68 100
Major Bridge - Super Strc. (Nos.) 68 68 100
Minor Bridge (Nos.) 376 368 97.87
ROB (Nos.) 11 11 100
RUB (Nos.) 24 24 100
LHS (Nos.) 224 205 91.52
L-Xing (Nos.) 82 80 97.56
Tunnels (Rm.) 1055.74 960.439 90.97
Track Linking - Main Line (Km.) 288.883 262.353 90.82
Station Building (Nos.) 21 20 95.24

4. Highlights

● Intial Pink Book Cost:- Rs 733.00 Crs.


● ROR=(-) 9.01
● Ph I: New Coochbehar-Golakganj (58.92 Km) CRS Inspection Completed on 09.11.2011 and Authorization received @70 kmph on
14/11/2011. Train service started from 11.02.2012.

● Distance from Boxirhat to Golokganj=27.30 Km.The section Golokganj-Gauripur=13.02 Km was commissioned with Fakiragram-Dhubri
GC. This 13.02 Km length has not been taken into consideration in New Maynaguri-Jogighopa NL project.
● Ph II: New Mal-Changrabandha (62.05 Km): CRS Inspection held on 30.12.2015 & authorization @ 100 kmph received on 06.01.2016.
Passenger Train service started from 20.01.2016.
● Ph III: New Changrabanda-New Coochbehar (67.10 Km)-CRS inspection held on New Changrabandha – New Coochbehar section on
28.01.2016 & authorization @ 100 kmph received on 01.02.2016. Passenger Train service started from 04.03.2016.
● Ph IV: Y leg Connection Cabin to Maynaguri Road (6.10 Km):-CRS Inspection held on 28.06.2016 & Authorization @100 kmph
received on 28.06.2016.Train service started from 28.06.2016.
● Ph V: Gauripur-Alamganj (11.08 Km): CRS inspection completed on 08.12.2017 and Authorisation received @ 90 kmph on 12.12.2017.
● Ph-VI: Alamganj-Bilasipara (26.14 Km): CRS inspection done on 28.03.2019 and Authorisation received @100 kmph on 30.03.2019

Total Length Commissioned (As on 31.08.2020)= 58.92+62.05+67.10+6.10+11.08+26.14= 231.39 Km.

3rd Revised- Rs. 4541.38- sent to Railway Board on 13.08.2019.

Due to COVID-19 pandemic and heavy rainfall in Assam which lasted upto 15th October 2020, the progress suffered heavily. Now the
target are as under:-

Bilasipara-Chapar (21.00 Km): Nov'2020


Chapar-Bechamari (13.00 Km): Feb'2021
Bechamari-Abhayapuri (13.65 Km): Feb'2021

5. Assistance Required from Board

Nil

6. Issues of Concern

Due to lengthy procedure of earth cutting permission, lot of delay is taking place in execution of work. However, the procedure is
being modified after persuasion by Railways.
Regular meetings are being held with Chief Secretary/Assam, Principal Chief Conservator of Forest/Assam on the issues regarding
permissions for earth cutting and boulder collections.
Due to lockdown from March 2020, the work suffered and still lockdown is continue, the work is suffering heavily. Moreover due to
rainy season , the work again is being affected.
2
New BG Line from Jiribam-Imphal (110.625 Km.) (National Project )

Ph-II: Vangaichungpao-Khongsang (44.30 Km)= TDC: Mar'2021 (Commissioning)


1. Project Details
Ph-III: Khongsang-Imphal (55.55 Km) = TDC: Mar'2023 (Commissioning)
Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Rev. Cum. Financial
inclusion in Total Length Budget Exp. during progress
Cost Mar-2020 Budget during Progress
Budget allotment November-2020 during the
allotment year (%age)
year

Entire length in
2003-04 Manipur=110.625 12,264.15 10094.796 0 800.00 53.788 489.748 61.22% 86.3%
Km.

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 7.66 04/10/2005
2 Detailed Pt-II 116.16 25/06/2007
3 Detailed Pt-II 367.14 13/06/2008
4 Detailed Pt-III 663.85 20/01/2009
5 Detailed Pt-IV 1902.71 13/12/2010
6 Detailed Pt-V 1396.65 08/03/2013

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 1358.837 1343.274 98.85
Earth Work (Lakh Cum.) 702.73 671.8 95.6
Formation (Km.) 33.734 15.1 44.76
Major Bridge - Sub Strc. (Nos.) 6 5 83.33
Major Bridge - Super Strc. (Nos.) 6 4 66.67
Minor Bridge (Nos.) 112 86 76.79
ROB (Nos.) 3 3 100
RUB (Nos.) 4 2 50
LHS (Nos.) 0 0 0
Tunnels (Rm.) 56746 52777 93.01
Cut & Cover (Rm.) 1483 1110 74.85
Track Linking - Main Line (Km.) 87.94 24.01 27.3
Station Building (Nos.) 7 3 42.86

4. Highlights

● Intial Pink Book Cost :- Rs 727.56 Crs.

● ROR :- (-) 9.05 %


● Sanctioned as National Project vide RB L/No 95/W-1/LCT/NF/1/3 Dated 21.02.2005
● Ph-I: Jirbam-Vangaichungpao (11.80 Km): CRS Inspection completed on 07.02.2017 and Authorization received @ 90 kmph on
08.02.2017. Passenger Train service started from 24.03.2017.
● 1st Revised Estimate for Rs 9653.58 Crs. was submitted to Railway Board on 22.08.2016. Revised Estimate was withdrawn from
Railway Board on 13.11.2016 & Recast RE-1 adding up of new works for Rs.13809.00 Crs. is submitted to Railway Board on 15.06.2018.
Again, RE-1 of Rs. 12264.15 Crs. has been recasted including provision of Railway Electrifications and sent to Railway Board on
23.11.2020 for sanction.

5. Assistance Required from Board

Nil

6. Issues of Concern

1. Project infrastructure conditions like road network, security environment is extremely difficult. 5 Bridges on NH-37 are weak &
old with severe speed restrictions.
2. The working season available during the year is only 6 months.
3. The progress at present is very slow due to COVID 19.

4. Stay order from High Court, Guwahati regarding track linking in tunnels.
3
New line from Dimapur to Zubza (88 Km) Now Dhansiri- Sukhobi- Zubza (82.50 Km) (National
Project)

Ph-I: Dhansiri-Sukhovi (16.00 Km) Target: Jan'2021 (Commissioning)


1. Project Details Ph-II: Sukhovi-Pherima (28.00 Km) Target: Mar'2022 (Commissioning)
pH-III: Pherima-Zubza (37.90 km) Target: Mar'2023 (Commissioning)
Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Financial
inclusion in Total Length Rev. Budget Budget Exp. during Cum. progress
Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year

82.50 Km
(Assam= 2.75
2007-08 Km & 7,114.55 1478.37 0 300.00 9.31 81.833 27.28% 21.93%
Nagaland=
79.75 Km)

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 5.34 05/12/2007
2 Detailed Pt-II 11.22 21/04/2015
3 Detailed Pt-III 2309.96 26/08/2015

3. Present Status of Works


(Tabulated details for KM 0 to 82.5 only.)

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 812.806 757.676 93.22
Earth Work (Lakh Cum.) 188.09 57.72 30.69
Formation (Km.) 54.5 17.683 32.45
Major Bridge - Sub Strc. (Nos.) 24 6 25
Major Bridge - Super Strc. (Nos.) 24 2 8.33
Minor Bridge (Nos.) 157 86 54.78
ROB (Nos.) 7 1 14.29
RUB (Nos.) 18 3 16.67
LHS (Nos.) 14 14 100
Tunnels (Rm.) 28999 1738 5.99
Cut & Cover (Rm.) 1915 55 2.87
Ballast Supply (Th. Cum.) 294 27.6 9.39
Track Linking - Main Line (Km.) 82 0 0
Station Building (Nos.) 9 2 22.22

4. Highlights

● Intial Pink Book Cost :- Rs 850.00 Crs.


● ROR :- (-) 26.44%
● Sanctioned as National Project vide RB L/No 95/W-1/LCT/NF/1 dated 16.05.2007.
● BACK GROUND OF PROJECT :-
This project was sanctioned through supplementary demands of grants for the year 2006-07. It was declared a National Project vide
Board's letter No. 95/W-I/LCT/NF/1 dated 16.05.2007. Alignment was to take off from Dimapur and final location survey was taken up
accordingly. But Nagaland Government asked for the revision in the alignment vide letter No. TPT/RAIL-9/97(PT) dated 15.01.2010 citing
the problems of reserve forest & zoological park, very high compensation demanded by farmers & connectivity to the Ganeshnagar
industrial area. Finally, the take off for the project was decided from the Dhansiri station, a station in Karbi District of Assam, at about 19
Km short of Dimapur & the same was approved vide Nagaland Government letter No. TPT/IST/RAIL/2011 dated 02.02.2012. Frequent
law and order issues often hamper the progress adversely as there is separatist movement by NSCN(IM) and other groups. Working
period in Nagaland is only 4-5 months in a year due to prolong rainy season.
● Present Status:- Total detail estimate for Rs. 2326.52 (Pt. I, II, III) has been sanctioned.

Detailed Estimate of Rs. 2309 Cr. was sanctined on 26.08.2015 by Railway Board. Against which Revised Estimate amounting to Rs.
7114.55 Crs. sent to Railway Board on 02.09.2020.
Status of works is as under -

Entire project has been divided into 3 phases for the purpose of commissioning.

Work in Phase-I: (17.00 Km) (Dhansiri-Sukhovi) is in full progress and will be commissioned by January 2021.

Work in Phase-II: (28.00 km) (Sukhovi-Pherima) is partly in pain and in partly hilly area. Land acquisition of 25 Ha. covering about 700
m length is help up as, in spite of repeated chaising, State Government has not been able to provide land estimate due to ownership
dispute between two Naga tribes (Kuki and Angami). The stretch of about 700 m is very critical as Br. 150 (3x76.2 m) fully, important Br.
154 (7x76.2 m) partly and Tunnel 4 (1251 m) & Tunnel 5 (169 m) are affected by it. Phase-II contains 6 tunnels (Total 6.59 km) for
whch contracts have been awarded. There are one important and 8 major bridges. Contract for sub-structure of8 bridges have been
awarded and tender for 1 bridge is under finalization. Work is in progress in all available stretches. Target for Phase-II is December 2022.

Land in Phase-III: (38 km) (Pherima-Zubza) has been acquired 90%. Balance 14 Ha. land in 3 km length is yet to be acquired.
Revised Land Estimate from State Government is expected by 07 September 2020. Longitudinal plan and station plans have been
approved. Phase-III contains intense hilly area have 14 tunnels (Total length 24.36 km), longest tunnel being 6.61 km long. There are 12
major bridges. Tenders for Earthwork and minor bridges have been opened & and under finalization. Tendering is in progress for tunnels
and other bridges.

5. Assistance Required from Board

Sanctioned of Revised Estimate amounting to Rs. 7114.55 Cr. submitted vide letter No. W/98/Con/Dhansiri-Zubza/1st RE/285 dt.
02.09.2020.

6. Issues of Concern

1. Project working conditions related to security environment, frequent hindrances by locals and limited working season also affect the
progress.
4
New BG line from Jogbani to Biratnagar (Nepal) (18.601 Km.)(Nepal-13.156 Km,India-5.445
Km)

1. Project Details Phase-II: Nepal Customs-Biratnagar (10.60 Km) = July'2021 (Commissioning)


Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Cum. Financial
inclusion in Total Length Rev. Budget Budget Exp. during progress
Cost Mar-2020 during Progress
Budget allotment allotment November-2020 during the
year (%age)
year

India:5.445
Km, Nepal:
2010-11 13.156 Km. 374.00 466.928 0 90.00 0 100 111.11% 151.58%
Total:18.601
Km.

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 2.69 13/05/2009
2 Detailed Pt-II 238.83 28/06/2010
3 Revised 1st Revision 373.87 22/06/2016

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 146.32 146.32 100
Earth Work (Lakh Cum.) 18.5 14.31 77.35
Formation (Km.) 19.046 16.345 85.82
Major Bridge - Sub Strc. (Nos.) 3 3 100
Major Bridge - Super Strc. (Nos.) 3 2 66.67
Minor Bridge (Nos.) 30 28 93.33
RUB (Nos.) 5 5 100
L-Xing (Nos.) 12 4 33.33
Track Linking - Main Line (Km.) 19.046 7.845 41.19
Station Building (Nos.) 4 3 75

4. Highlights

● Intial Pink Book Cost :- Rs 210.00 Crs.


● ROR :- (-) 9.11 %.
● Project is funded by MEA. Fund to the tune of Rs. 238.83 Crs has been released by MEA and Rs. 235.49 Crs. has been paid to
IRCON who have been entrusted for execution of the project.

● Ph-I: Bathnaha to Nepal custom (8 Km) section Engine Rolling completed on 04.11.2018 .

5. Assistance Required from Board

MEA to release balance funds of Rs. 135 Cr. so as to avoid further delay in commissioning of the project.
Land for Biratnagar Yard is yet to be handed over to IRCON.

6. Issues of Concern

Land for Biratnagar yard in Nepal portion is not yet handed over by Govt of Nepal.

Matter is under consideration by SC of Nepal.

Further 90 days notification for raising objections completed.

CDO/Biratnagar will now notify Nepal Railway for taking over the land.
5
New BG Line from Agartala to Akhaura (Gangasagar)(Bangladesh) New Line Project (12.03 Km)
(India-5.46 Km, Bangladesh-6.57 Km)

Target: Indian Portion


1. Project Details (i) Nischintapur Yard (2.00 Km) = Mar'2021.
(ii) Nischintapur-Agartala (3.46 Km) = Mar'2022.
Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Cum. Financial
inclusion in Total Length Rev. Budget Budget Exp. during progress
Cost Mar-2020 during Progress
Budget allotment allotment November-2020 during the
year (%age)
year

Tripura,India=5.46
Km,
2012-13 Bangladesh=6.57 967.50 401.7 0 100.00 0 55.92 55.92% 47.3%
Km
Total:12.03 Km

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Detail Estimate 569.63 21/03/2018

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 86.83 86.83 100
Earth Work (Lakh Cum.) 9 8.3 92.22
Formation (Km.) 5.46 0 0
Major Bridge - Sub Strc. (Nos.) 1 0 0
Major Bridge - Super Strc. (Nos.) 1 0 0
Minor Bridge (Nos.) 3 1 33.33
ROB (Nos.) 0 0 0
RUB (Nos.) 0 0 0
L-Xing (Nos.) 1 0 0
Track Linking - Main Line (Km.) 0 0 0
Station Building (Nos.) 1 0 0

4. Highlights

● Intial Pink Book Cost :- Rs 252.00 Crs.

● Cost of Detail Estimate for Indian portion is Rs 580.00 Crs .with elevated corridor/viaduct of 3.31 km.The detail estimate also includes
cost of Rs 16.50 Crs. of road from transshipment yard to NH 44.
● ROR:- 0 %
● MOU has been signed between Govt. of India and Bangladesh on 16.02.2013.
● IRCON has been nominated on 03.01.2014 by Ministry of Railways to execute the work in India portion for which agreement has been
signed with N. F. Railway/Con on 12.11.2014.
● Bangladesh Govt. and Ministry of External Affairs, Govt of India have nominated IRCON to act as technical advisor for Bangladesh
portion.
● Last Inter-ministerial meeting was held by Advsior, Transport, NITI Aayog, New Delhi on 18.6.15. Consequent upon the meeting held
on 18.06.2015, Joint Spot visit was conducted on 27.06.2015 by Railway, State Govt, IRCON & CONCOR officials to explore the possibility
of construction of elevated corridor to reduce requirement of land and its cost.
● DPR for Bangladesh portion has already been submitted by IRCON to MEA for approval.
● IRCON has taken up earth work in Nishchintpur yard and also for road connectivity from NH to yard.

● The project completion has been divided into two stages as under:
(i) Construction of Nischintpur Yard near Indo-Bangladesh Border with provision of Meter Gauge for receiving Meter Gauge trains from
Bangladesh and vice-versa.
(ii) Viaduct portion with provision of Broad gauge track for connecting Nishintpur (Meter Gauge) yard and Agartala Main station.
5. Assistance Required from Board

Nil

6. Issues of Concern

Nil
6
New BG line from Bairabi to Sairang (51.38 Km) (National Project)

1. Project Details Bairabi-Kawnpui-Sairang (51.38 Km)-Target: Dec'2023.


Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Financial
inclusion in Total Length Rev. Budget Budget Exp. during Cum. during progress
Cost Mar-2020 Progress
Budget allotment allotment November-2020 year during the
(%age)
year

Entire length
2008-09 in Mizoram= 5,521.45 3587.908 0 475.00 18.314 194.039 40.85% 68.5%
51.38 Km

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 9.15 16/05/2008
2 Detailed Pt-II 2384.33 01/09/2011
3 Revised RE-1 5021.45 16/10/2019

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 487.47 427.28 87.65
Earth Work (Lakh Cum.) 347.89 305.8 87.9
Formation (Km.) 24.563 8.97 36.52
Major Bridge - Sub Strc. (Nos.) 55 11 20
Major Bridge - Super Strc. (Nos.) 55 0 0
Minor Bridge (Nos.) 87 63 72.41
ROB (Nos.) 5 2 40
RUB (Nos.) 6 3 50
Tunnels (Rm.) 12639.2 11136.75 88.11
Cut & Cover (Rm.) 2674 522.6 19.54
Track Linking - Main Line (Km.) 51.03 0 0
Station Building (Nos.) 4 0 0

4. Highlights

● Intial Pink Book Cost :-Rs 619.34 Crs.


● ROR :- (-) 7.86 %.
● Sanctioned as National Project vide RB L/No.- 95/W-1/NE/NF/12 Dated 24.10.2008.
● Shri Narendra Modi, Ho'nble Prime Minister has laid the foundation stone of this project at Maligaon, Guwahati on 29.11.2014.
● 1st BG daily passenger train service from Bairabi(Mizoram) to Silchar (Assam) was inaugurated by Shri Narendra Modi, Ho'nble Prime
Minister of India by remote from Shillong on 27.05.2016 after completion of Katakhal-Bairabi (83.55 Km) GC project.
● Shri Suresh Prabhakar Prabhu, Union Railway Minister along with Shri Rajen Gohain, MoSR with other dignitaries has laid the
foundation stone of Sairang (Aizawl) Station Building at Sairang on 11.11.2016.

● Out of 32 Nos. tunnels (12639.75 Rm), 11136.75 Rm have been completed till 31.05.2020.

● The longest tunnel (Tunnel No-1) of length 1881 Rm has been completed.
Present Staus of Work:-
(i) Full fledged work has already started in entire section.
(ii) Land acquisition has been completed, except 53,90 Hect. Land at Sairang station yard.

5. Assistance Required from Board

Nil

6. Issues of Concern

(1) Land cost deposited to State Govt in March 20 but 59.30 Hectare of land yet to be handed over to Railway.
(2) Frequent problem of issue of Inner Line Permit by State Government to Labours/supervisors/Engineers. Mandatory provision of 14
days quarantine [even Rapid Antigen Test (Corona) is negative] to all outsiders for containment of Pandemic Covid-19 has further
created the problem and negative environment has been created inform of terror among labour, supervisor and engineers.
(3) Non Availability of Construction Material in Mizoram State. Frequent Assam-Mizoram State land boundary dispute & frequent ban on
Forest produce in adjoining State Assam; badly affect the project progress.
(4) Termination of 12 contracts of a single contractor for his failure.

(5) Available working seasons is only 4 to 5 months in Mizoram state due to prolong rainy seasons. Therefore, there is requirement of all
assistance from State Govt. to utilise dry working spell for completion of project in target time.
7
New BG line from Sivok to Rangpo (44.96 Km) (National Project)

1. Project Details Sivok-Rangpo (44.96 Km), TDC: Mar 2023 (Commissioning)


Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Financial
inclusion in Total Length Rev. Budget Budget Exp. during Cum. progress
Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year

(i) West Bengal=


41.55 Km & ii)
2008-09 Sikkim=3.41 7,500.00 1335.021 0 557.00 403.311 425.155 76.33% 23.47%
Km,Total=44.96
Km

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 0.47 27/01/2009
2 Detailed Pt-II 4.47 09/10/2009
3 Detailed Pt-III 4084.69 02/12/2015

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 125.58 0 0
Earth Work (Lakh Cum.) 10.62 0 0
Formation (Km.) 44.96 0 0
Major Bridge - Sub Strc. (Nos.) 15 0 0
Major Bridge - Super Strc. (Nos.) 15 0 0
Minor Bridge (Nos.) 6 0 0
ROB (Nos.) 1 0 0
Tunnels (Rm.) 38552 3381.65 8.77
Track Linking - Main Line (Km.) 44.96 0 0
Station Building (Nos.) 4 0 0

4. Highlights

● Intial Pink Book Cost:- Rs 1339.48 Crs.


● ROR :- (-) 10.34 %
● Sanctioned as National Project vide RB L/No 2000/W-1/NF/36(Sikkim)/Pt Dated 11.05.2009.
● Final Location Survey completed and Detailed Estimate for Rs. 4084.69 Cr. sanctioned by Railway Board on 02.12.2015 .
● Work has been entrusted to IRCON for execution & MOU signed on 07.05.2010.
● Geo-Physical Investigations completed. Tunneling work in progress.
● West Bengal= 41.55 Km and Sikkim= 3.41 Km.

Bridge and tunnel works are in progress.


Work is being executed by IRCON.

5. Assistance Required from Board

ADIT land proposal is pending with state government for want of clearance and wildlife clearance of T1 ADIT in Mahananda Wildlife
Sanctuary.

6. Issues of Concern

ADIT land proposal is pending with state government in want of clearance and wildlife clearance of T1 ADIT in Mahananda Wildlife Sanctuary.
8
New BG Line from Tetelia-Byrnihat as an alternative alignment to Azara-Byrnihat new line
(21.50 Km.)(National Project)

1. Project Details Ph-II: Kamalajari-Byrnihat (11.35 Km) Target: Mar'2023 (Commissioning)


Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Cum. Financial
inclusion in Total Length Rev. Budget Budget Exp. during progress
Cost Mar-2020 during Progress
Budget allotment allotment November-2020 during the
year (%age)
year

Assam-19.20
Km,
2006-07 Meghalaya-2.30 1,532.00 721.916 0 90.00 11.704 48.825 54.25% 50.31%
Km
Total: 21.50 Km.

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 1.16 21/03/2007
2 Detailed Pt-II 384.04 05/08/2010

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 172.777 172.777 100
Earth Work (Lakh Cum.) 58.92 45.5 77.22
Formation (Km.) 21.5 12 55.81
Major Bridge - Sub Strc. (Nos.) 5 3 60
Major Bridge - Super Strc. (Nos.) 5 3 60
Minor Bridge (Nos.) 28 21 75
ROB (Nos.) 0 0 0
RUB (Nos.) 19 16 84.21
LHS (Nos.) 2 1 50
L-Xing (Nos.) 1 1 100
Tunnels (Rm.) 3728 2353.6 63.13
Track Linking - Main Line (Km.) 23 11 47.83
Station Building (Nos.) 2 1 50

4. Highlights

● Initial Pink Book Cost :- Rs 200.00 Crs.


● ROR :- (-) 7.95 %
● Sanctioned as National Project vide RB L/No 95/W-1/LCT/NF/1 Dated 16.05.2007.
● Ph-I: CRS Authorization Received for Tetelia-Kamalajari (10.15 Km) section on 25.10.2018.The section has been handed over to Open
Line on 28.06.2019.

● Works in Meghalaya portion (2.25 Km) was stopped on 27.05.2017 by KUS and work remains suspended since than. Several meetings
held with State Govt. to resume the work in Meghalays. Work in Assam portion are in progress and going well.

Revised estimate 1105 Crs. has been submitted to Railway Board for approval.

5. Assistance Required from Board

Sanction of Revised Estimate of Tetelia-Byrnihat submitted on 06.02.2020.

6. Issues of Concern

(1) Works in Meghalaya portion 2.25 km suspended since 27th May-2017 due to resistance by Khasi Students Union(KSU). KSU demands
for introducing inner line permit to check infiltration into their state.
(2) There is an unauthorised RCC building at Byrnihat (Meghalaya), the case is now pending in district court(Ri-bhoi district).
(3) Land acquisition for 4.77 Ha for goods approach road from NH to Byrnihat station is pending with district administration for want of
NOC from Khasi Hills Autonomous District Council(KHADC).
(4) In-spite of repeated request by Railway, DC/Ri-Bhoi district has not given permission to resume the works at Byrnihat area
(Meghalaya).

(5) Matter has been pursued regularly at the level of Chief Secretary and Chief Minister, Meghalaya, but issues not resolved till date.
9
New BG line from Murkongselek to Pasighat (26.15 Km)

Target: Ph-I: Murkongselek-Sille (15.60 km)= TDC: Mar'2023.


1. Project Details
Ph-II: Sille-Pasighat (11.46 km) = TDC: Not Fixed.
Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Financial
inclusion in Total Length Rev. Budget Budget Exp. during Cum. progress
Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year

Assam=1.79
Km &
2011-12 Arunachal 750.00 262.988 0 30.00 1.456 10.833 36.11% 36.51%
Pradesh
=24.36 Km

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 2.31 10/06/2011
2 Detailed Pt-II 414.84 20/06/2016

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 170.71 42.02 24.61
Earth Work (Lakh Cum.) 21.43 0 0
Formation (Km.) 26.35 0 0
Major Bridge - Sub Strc. (Nos.) 23 0 0
Major Bridge - Super Strc. (Nos.) 24 0 0
Minor Bridge (Nos.) 37 0 0
ROB (Nos.) 2 0 0
RUB (Nos.) 3 0 0
LHS (Nos.) 3 0 0
Track Linking - Main Line (Km.) 26.35 0 0
Station Building (Nos.) 3 0 0

4. Highlights

● Intial Pink Book Cost :- Rs 165.82 Crs.


● ROR :- (-) 6.33 %.
● Assam= 1.79 Km and Arunachal Pradesh= 24.36 Km.
● Detail Estimate is sanctioned for Rs 414.85 Crs. on 20.06.2016.
●The foundation stone of New BG line from Murkongselek to Pasighat (26.15 Km) laid by Shri Suresh Prabhakar Prabhu, Minister
Railways by video link on 7th May 2017. The function conducted at Naharlagun was graced by the presence of Shri Prema Khandu, Chief
Minister of Arunachal Pradesh, Shri Rajen Gohain, Minister of State (Railways) and Shri Kiren Rijiju Minister of State (Home Affairs).

Assam Portion - 2.6 Km. (7.10 Hect.):- Land acquisition completed, land yet to be handed over by State Govt.

Arunachal Pradesh Portion (163.61):- Out of 163.61 Ha. land, 34.92 Ha. land handed over to Railway but balance 128.69 Ha.
land has not been handed over. Since the rate of land is high, negotiation with State Authority and public representative is undergoing to
reduce the rate for balance portions. Hon'ble Chief Minister of Arunachal Pradesh reviewed the project through video conference with
GM/NFR on 03.08.2020. State Govt. refused to reduced the rates saying that the land owners are not prepared to dealt their land at
reduced rate. As per the decision taken in meeting, DC Pasighat has to submit the land estimate to Railway after taking approval of State
Govt.

5. Assistance Required from Board

Nil

6. Issues of Concern

Land acquisition proceedings was suspended by DC/East Siang/Pasighat (Arunachal Pradesh) in June 2017 after objection raised by Railways
regarding fixation of high basic rate of land.

Govt. of Arunachal Pradesh has communicated the approval of land rates to DC/East Siang/Pasighat (Arunachal Pradesh) in the month of Jan 2020
and LA estimate is awaited from DC/Pasighat.

All the awards have been declared by DC/Dhemaji (Assam) for total land of 7.1 Hect. in Assam portion. Handing over of land to Railway representative
is in progress in Assam portion.
10
New BG Line from Araria to Galgalia (Thakurganj) (110.75 Km)

Ph-I: Araria-Kaliaganj (Excluding Yard)(51.38 Km)= Target : Mar'2023 (Commissioning)


1. Project Details
Ph-II: Kaliaganj-Galgalia (Thakurganj) (59.37 Km)= Target : Mar'2024 (Commissioning)
Rs. in Crs.
2020-2021
Overall
Year of % financial
Total Anticipated Exp. Up to Financial
inclusion in Rev. Budget Budget Exp. during Cum. progress
Length Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year

Entire
length in
2006-07 2,145.00 979.301 0 0.00 0 0.101 100600% 45.66%
Bihar=
110.75 Km

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 2.99 22/06/2007
2 Detailed Pt-II 529.88 25/02/2009
3 Revised 1st Revised Including Land 2132.03 29/05/2018

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 1336.473 459 34.34
Earth Work (Lakh Cum.) 173.186 20.9 12.07
Formation (Km.) 119.96 0 0
Major Bridge - Sub Strc. (Nos.) 73 2 2.74
Major Bridge - Super Strc. (Nos.) 73 1 1.37
Minor Bridge (Nos.) 185 5 2.7
ROB (Nos.) 1 0 0
RUB (Nos.) 117 4 3.42
L-Xing (Nos.) 1 0 0
Track Linking - Main Line (Km.) 121.164 0 0
Station Building (Nos.) 13 0 0

4. Highlights

● Intial Pink Book Cost:- Rs 300.00 Crs.

● ROR :- (-) 8.72 %

● Revised Estimate of Rs 2132.03 Crs. had been sanctioned by Railway Board vide letter No. 2016/W-I/NF/RE/Arraria-Galgalia dated
29.05.2018.

● 66.84% land has been acquired till date. Balance land acquisition is in progress.

● Work is in progress from Thakurganj to Powa Khali section.

● Project is of strategic important also.

● No allotment of funds in 2020-21, hence no progress during 2020-21.

5. Assistance Required from Board

No fund allotted for FY-2020-21. Fund allotment of Approx. 200.00 Cr. is required for FY-2020-21.

6. Issues of Concern

Nil
11
New BG line from Balurghat to Hili ( 29.60 Km)

1. Project Details Target not fixed


Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Financial
inclusion in Total Length Rev. Budget Budget Exp. during Cum. progress
Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year

Entire length
in West
2010-11 471.00 141.829 0 0.00 0 0 0% 30.11%
Bengal=
29.60 Km.

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 1.06 29/04/2010
2 Detailed Pt-II 241.16 29/12/2010

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 166.281 0 0
Earth Work (Lakh Cum.) 30 0.3 1
Formation (Km.) 29.6 0 0
Major Bridge - Sub Strc. (Nos.) 10 4 40
Major Bridge - Super Strc. (Nos.) 8 0 0
Minor Bridge (Nos.) 43 0 0
RUB (Nos.) 23 0 0
L-Xing (Nos.) 1 0 0
Track Linking - Main Line (Km.) 29.6 0 0
Station Building (Nos.) 4 1 25

4. Highlights

● Intial Pink Book Cost :- Rs 170.91 Crs.


● ROR :- (-) 9.27 %
● This project connect the Bangladesh Border at Hilli.

This project has been kept in abeyance by Railway Board vide DO L/No 2019/W-1/Genl./Budget/1 Dated
24.09.2019. Rly Bd. instructed that no further expenditure & execution on this project to be made till further
orders.

6. Issues of Concern

166.281 Hect. land is required. Land aquisition proceedings are in progress. However, land is yet to be handed over.
Gazatte notification under section 20 (E) published on 21.01.2019. Meeting held with Chief Secretary, Govt. of West Bengal on
19.02.2019 by GM/Con NFR for submission of Land estimates. Joint Survey completed. Land estimates under preparation.
Proposal for land acquisition has been submitted to concerned DM and it is under process with District Authority.
This project has been kept in abeyance by Railway Board vide DO L/No 2019/W-1/Genl./Budget/1 Dated 24.09.2019. Rly Bd.
instructed that no further expenditure & execution on this project to be made till further orders.
12
New BG Line from Jalalgarh-Kishanganj (50.871 Km)

1. Project Details Target not fixed


Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Cum. Financial
inclusion in Total Length Rev. Budget Budget Exp. during progress
Cost Mar-2020 during Progress
Budget allotment allotment November-2020 during the
year (%age)
year

Entire length in
2008-09 Bihar=50.871 360.00 12.825 0 0.00 0 0 0% 3.56%
Km

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 2.99 29/05/2008
2 Detailed Pt-II 13.68 25/02/2009

3. Present Status of Works


(Scope for 7.5 KM length only.)

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 35 0 0
Earth Work (Lakh Cum.) 4 0 0
Formation (Km.) 7.5 0 0
Major Bridge - Sub Strc. (Nos.) 2 0 0
Major Bridge - Super Strc. (Nos.) 2 0 0
Minor Bridge (Nos.) 7 0 0
RUB (Nos.) 3 0 0
L-Xing (Nos.) 2 0 0
Track Linking - Main Line (Km.) 7.5 0 0
Station Building (Nos.) 1 0 0
4. Highlights

● Intial Pink Book Cost :- Rs 282.92 Crs.


● ROR :- 4.34 %
● Railway Board has sanctioned only part estmate of Rs. 13.68 Crs. for 7.50 Km.
● The Scope shown above for only 7.50 Km Length.
● Present Status of Work:-

This project has been kept in abeyance by Railway Board vide DO L/No 2019/W-1/Genl./Budget/1 Dated 24.09.2019. Rly Bd.
instructed that no further expenditure & execution on this project to be made till further orders.

5. Assistance Required from Board

Nil

6. Issues of Concern

Nil
13
New BG Line: Gazole-Itahar (27.20 Km), Itahar-Raiganj (22.16 Km) & Iatahar-Buniadpur
(27.095 Km) as a Material Modification of Eklakhi to Balurghat (86.76Km) New Line project:
(Total=163.215Km)

Gazole-Itahar (27.20 Km), Itahar-Raiganj (22.16 Km) & Itahar-Buniadpur (27.095 Km): Target
1. Project Details
Not fixed.
Rs. in Crs.
2020-2021
Overall
Year of % financial
Total Anticipated Exp. Up to Financial
inclusion in Rev. Budget Budget Exp. during Cum. progress
Length Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-1(Eklakhi-Balurghat) 82.45 05/09/1995
2 Detailed Pt-II(Gazole-Itahar) (MM) 85.59 04/03/2008
3 Detailed Pt-III(Itahar-Raiganj) (MM) 129.3 09/05/2011
4 Revised 1st Revision(Only for Eklakhi-Balurghat) 200.34 07/05/2002

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 431.973 47.12 10.91
Earth Work (Lakh Cum.) 70.49 0 0
Formation (Km.) 76.455 0 0
Major Bridge - Sub Strc. (Nos.) 24 0 0
Major Bridge - Super Strc. (Nos.) 24 0 0
Minor Bridge (Nos.) 125 0 0
RUB (Nos.) 62 0 0
L-Xing (Nos.) 3 0 0
Track Linking - Main Line (Km.) 76.455 0 0
Station Building (Nos.) 9 3 33.33
4. Highlights

● Intial Pink Book Cost :- Rs 36.38 Crs.


● ROR :- (-) 9.45 %
● Eklakhi to Balurghat (86.76 Km) commissioned on 30.12.2004.
● Gazole-Itahar (27.20 Km), Raiganj-Itahar ( 22.16 Km) & Itahar to Buniadpur ( 27.095 Km) new line work sanctioned as a
Material Modification to Eklakhi to Balurghat project.
● Rs. 67.41 lakh paid to DM/Malda against land acquisition in July'2014.
● 1st Revised Estimate for Pt-II (Gazole-Itahar) for Rs 284.21 Crs. was submitted to Rly Bd. on 04.04.2014. Rly Bd's observation dated
16.06.2015 replied on 08.07.2015. Sanction from Rly Bd. is awited.
● Meeting with District Magistrate/Dinajpur held in Dec-2017 and discussed about land acquisition of Gazole-Itahar-Raiganj section.
Present Status of Work:-

● The present status of work shown in table for balanced work only.
(i) Gazole-Itahar:- Section (27.20 Km ):-

Issues: 103.321 Hect out of 150.442 Hect is not yet handed over. Land for 10 Km length (47.121 Hect.) already handed over to Railways.

Action taken: 10 Km land have been received in Malda District and estimation submitted for tender. For the rest portion Land plan and
record of Rights submitted to respective DM of Uttar and Dakshin Dinajpur . Regular chase up with Spl LAO is in progress for physical
verification. Collection of Mouza map is in progress from DM office . All project sheet approved including yard drawing and Major ,Minor
bridges. Regular meeting being held with state authority. Project sheet and all Major and Minor Bridge drawing approved including Yard
Plan.

ii) MM for Itahar-Raiganj (22.16 Km) New Line:-

Issues: 125.60 Hect is required. Land plans have been submitted and not yet approved by State Govt of West Bengal. Land is not yet
handed over.

Action taken: Approved Land Plan with record of Right submitted to DM/Uttar Dinajpur. Verification is in progress. Regular meeting was
held with state authority. All Drawings are approved.
(iii) MM for Itahar-Buniadpur New Line (27.095 Km):- Project has been declared as special Railway project. Competent authority
nominated by Railway Board through gazette notification. Land plans approved. Field work for FLS completed & project sheets approved.

This project has been kept in abeyance by Railway Board vide DO L/No 2019/W-1/Genl./Budget/1 Dated
24.09.2019. Rly Bd. instructed that no further expenditure & execution on this project to be made till further
orders.

5. Assistance Required from Board

Nil

6. Issues of Concern

ITAHAR-RAIGANJ (New Line): (22.16 Km)

125.60 Hect. land is required. Land plans have been submitted and not yet approved by State Govt. of West Bengal. Land is not yet handed over.

GAZOLE-ITAHAR (New Line): (27.20 Km):

103.321 Hect out of 150.442 Hect is not yet handed over. Land for 10 Km length (47.121 Hect.) already handed over to Railways.
10 Km land have been received in Malda District. For the rest portion Land plan and record of Rights submitted to respective DM of Uttar and Dakshin Dinajpur.
This project has been kept in abeyance by Railway Board vide DO L/No 2019/W-1/Genl./Budget/1 Dated 24.09.2019. Rly Bd. instructed that no further
expenditure & execution on this project to be made till further orders.
14
New BG line from Kaliyaganj to Buniadpur (33.10 Km)

1. Project Details Target not fixed


Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Financial
inclusion in Total Length Rev. Budget Budget Exp. during Cum. progress
Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year

Entire length
in West
2010-11 380.00 76.207 0 0.00 0 0 0% 20.05%
Bengal=
33.10 Km

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 0.75 29/04/2010
2 Detailed Pt-II 221.47 29/12/2010

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 157.938 0 0
Earth Work (Lakh Cum.) 29.3 0.08 0.27
Formation (Km.) 33.1 0.05 0.15
Major Bridge - Sub Strc. (Nos.) 5 3 60
Major Bridge - Super Strc. (Nos.) 5 0 0
Minor Bridge (Nos.) 48 0 0
ROB (Nos.) 1 0 0
RUB (Nos.) 26 0 0
L-Xing (Nos.) 3 0 0
Track Linking - Main Line (Km.) 33.1 0 0
Station Building (Nos.) 3 0 0

4. Highlights

● Intial Pink Book Cost :- Rs 205.31 Crs.


● ROR :- (-) 10.51 %
● Land acquisition process restarted by DM/Daksin Dinajpur.

This project has been kept in abeyance by Railway Board vide DO L/No 2019/W-1/Genl./Budget/1 Dated
24.09.2019. Rly Bd. instructed that no further expenditure & execution on this project to be made till further
orders.

6. Issues of Concern

156.30 Hect. land is required. Land plans have been under preparation.Land not yet handed over.
All project sheet approved including Yard plans, Major & Minor Bridges plans.
Proposal for land acquisition has been submitted to concerned District Authority.
15
New BG Line from Byrnihat-Shillong (108.4 Km) (National Project)

1. Project Details Byrnihat-Shillong: TDC: Not Fixed.


Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Financial
inclusion in Total Length Rev. Budget Budget Exp. during Cum. progress
Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year

Entire length in
2010-11 Meghalaya= 4,083.02 1048.276 0 0.00 0 0 0% 25.67%
108.40 Km.

2. Status of Estimates

Sl. Estimate Sanctioned Date of


Estimate
No. Type Amount Sanction
1 Detailed Pt-1 25.51 18/03/2010
2 Detailed Pt-II (Byrnihat-Lailad) 880.95 13/04/2011
1st R.E.-UPTO 19.10 KM(BYRNIHAT TO LAILAD)Sanctioned by
3 Revised 1202.33 20/03/2017
GM/Con.

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 2517 0 0
Earth Work (Lakh Cum.) 546 0 0
Formation (Km.) 108.4 0 0
Major Bridge - Sub Strc. (Nos.) 100 0 0
Major Bridge - Super Strc. (Nos.) 100 0 0
Minor Bridge (Nos.) 51 0 0
ROB (Nos.) 8 0 0
RUB (Nos.) 13 0 0
Tunnels (Rm.) 39060 0 0
Cut & Cover (Rm.) 0 0 0
Track Linking - Main Line (Km.) 108.4 0 0
Station Building (Nos.) 10 0 0

4. Highlights

● Intial Pink Book Cost :- Rs. 4083.02 Crs.


● ROR : (-) 8.34 %

1. Final location survey completed in 103 Km. section out of total 108.40 Km. Survery work stopped by Khasi Student Union in May-2017
and works remains suspended since then.

2. Proposed alignment submitted to State Govt. for approval.

3. Rs. 209.37 Crs. deposited with State Govt in March-2017 for LA of Byrnihat Laided section for 182 Hect. land. No progress on the
issue.

4. Regular meeting held with State Govt to resolve the issues. PROGATI meetings held on 21.08.2020 and 09.11.2020 in wihch State
Govt. assured to resolver the issues by December-2020.

5. Assistance Required from Board

Till now, no land has been given by Govt.of Meghalaya though Railway has deposited Rs. 209.37 Crs. to DC/Ri-Bhoi District in
March'2017. There is acute Law and Order problems created by Khasi Students Union (KSU). They are not supporting the Railway Line
coming into Meghalaya with the apprehension that it will increase the influx of out siders.

6. Issues of Concern

(1) Final Location Survey could not be completed due to resistance by Khasi Students Union (KSU).
(2) The cost of land from Byrnihat to Lailad (approx.18km) of Rs. 209.37 crores was deposited to DC/Ri-Bhoi district on
30-03-2017. But till now, land could not be given to Railways due to NOC not given by KHADC (Khasi Hills Autonomous District
Council).

(3) KSU issue and land matter not yet resolved by state govt.
16
New BG Line from Dimapur to Tizit (257 Km.)

1. Project Details Target Not Fixed.


Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Cum. Financial
inclusion in Total Length Rev. Budget Budget Exp. during progress
Cost Mar-2020 during Progress
Budget allotment allotment November-2020 during the
year (%age)
year

Entire length in
2013-14 Nagaland=257.00 4,274.00 0 0 0.00 0 0 0% 0%
Km.

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 2.57 12/09/2016

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 0 0 0
Earth Work (Lakh Cum.) 0 0 0
Formation (Km.) 0 0 0
Major Bridge - Sub Strc. (Nos.) 0 0 0
Major Bridge - Super Strc. (Nos.) 0 0 0
Minor Bridge (Nos.) 0 0 0
ROB (Nos.) 0 0 0
RUB (Nos.) 0 0 0
L-Xing (Nos.) 0 0 0
Tunnels (Rm.) 0 0 0
Track Linking - Main Line (Km.) 0 0 0
Station Building (Nos.) 0 0 0
4. Highlights
● Intial Pink Book Cost :- Rs. 4274.00 Crs.
● ROR :- (-) 6.18%
● New Work Sanctioned in 2013-14.
● Planning commission and CCEA clearance is awaited.
●. Total New Line=246.25 Km (Rangapahar-Tizit=237.50 Km, Tuli-New Tuli=4.75 Km & Bihubar-Naginimora=4.00 Km)
●. Total GC=Simaluguri-Bihubar=10.94 Km
●. Total Length=246.25 Km +10.94 Km= 257.19 Km
● This project has been kept in abeyance by Railway Board vide DO L/No 2019/W-1/Genl./Budget/1 Dated 24.09.2019. Rly Bd.
instructed that no further expenditure & execution on this project to be made till further orders.
5. Assistance Required from Board

Nil

6. Issues of Concern

Approval from planning commission & CCEA clearance is awaited.


17
Sivsagar-Jorhat (62 km) New line project

1. Project Details Target: Not Fixed.


Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Financial
inclusion in Total Length Rev. Budget Budget Exp. during Cum. progress
Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year

Entire length
2017-18 in Assam= 1,450.00 0 0 0.00 0 0 0% 0%
62 Km.

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 0.87 25/04/2017

3. Present Status of Works

Activity Total Scope Physical Progress % Progress

4. Highlights

Year of Inclusion : 2017-18.


Initial Pink Book Cost :- Rs. 1296.00 Crs.
FLS Completed and Detail Estimate is under process.

5. Assistance Required from Board

Nil
6. Issues of Concern

Nil
18
Salona-Khumtai (99 km) New line project

1. Project Details Target: Not Fixed.


Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Cum. Financial
inclusion in Total Length Rev. Budget Budget Exp. during progress
Cost Mar-2020 during Progress
Budget allotment allotment November-2020 during the
year (%age)
year

Entire length in
2017-18 Assam=99.00 6,542.50 0 0 0.00 0 0 0% 0%
Km

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction

3. Present Status of Works

Activity Total Scope Physical Progress % Progress

4. Highlights

Year of Inclusion : 2017-18


Initial Pink Book Cost :- Rs. 5958.00 Crs.
Final Location Survey in progress. TDC:- December,2020. Issue of reserve forest is being addressed.

5. Assistance Required from Board

Nil
6. Issues of Concern

Nil
19
Tezpur-Silghat(25 km) New line project

1. Project Details Target: Not Fixed


Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Financial
inclusion in Total Length Rev. Budget Budget Exp. during Cum. progress
Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year

Entire length
2017-18 in Assam= 2,279.84 0 0 0.00 0 0 0% 0%
25.00 Km.

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 4.38 26/07/2017

3. Present Status of Works

Activity Total Scope Physical Progress % Progress

4. Highlights

Year of inclusion 2017-18.


Initial Pink Book Cost :- Rs. 2025.00 Crs.
FLS completed & Detailed Estimate amounting to Rs. 3582.30 Crores submitted to Railway Board vide L/No. W/98/Con/Tezpur-
Silghat/Pt.II dated 27.09.2018. Sanction awaited from Railway Board.

5. Assistance Required from Board

Nil

6. Issues of Concern

Nil
20
Jogbani – Katihar – Barsoi – Radhikapur and Katihar - Teznarayanpur section (236.14Km) and
Material Modification for New line from Raiganj to Dalkhola (43.43 Km) (Total 279.57Km.)

1. Project Details Raiganj-Dalkhola (43.43 Km): Target not fixed.


Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Financial
inclusion in Total Length Rev. Budget Budget Exp. during Cum. progress
Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year

i) West
Bengal=
82.21 Km &
2000-01 ii) Bihar= 1,900.00 1907.244 0 0.00 0 0 0% 100.38%
197.36 Km,
Total=
279.57 Km

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 489.13 04/03/2008
2 Detailed Pt-II (3 Line Xing stn. at Jhana) 5 09/04/2008
3 Detailed Pt-III (Raiganj-Dalkhola) (MM) 291.53 09/05/2011
4 Detailed Pt-IV (KIR-TNPR)(Prov of Crossing station at Manihari) 6.8 23/11/2011
5 Revised 1st Revision 724.31 22/07/2010

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 341.99 17.11 5
Earth Work (Lakh Cum.) 39.97 6 15.01
Formation (Km.) 43.43 5.06 11.65
Major Bridge - Sub Strc. (Nos.) 13 5 38.46
Major Bridge - Super Strc. (Nos.) 13 7 53.85
Minor Bridge (Nos.) 97 3 3.09
ROB (Nos.) 6 0 0
RUB (Nos.) 32 0 0
LHS (Nos.) 6 0 0
L-Xing (Nos.) 2 0 0
Track Linking - Main Line (Km.) 43.43 34.25 78.86
Station Building (Nos.) 6 0 0

4. Highlights

● Intial Pink Book Cost :- Rs 100.00 Crs.


● ROR :- (-) 9.13 %
● Barsoi- Radhikapur (54.42 Km): CRS authorisation received on 24.01.2006 @ 80 kmph.
● Katihar- Mukurai (34.61 Km): CRS authorisation received on 15.10.2007 @ 75 kmph.
● Katihar- Jogbani (108.38 Km): CRS authorisation on 09.05.2008 @ 75 kmph.
● Katihar-Manihari (24.35 Km): CRS authorisation received on 12.09.2011 & Commissioned for Passenger Traffic.
● Manihari-Teznarayanpur (10.18 Km): CRS authorisation received on 25.03.2013 @ 75 kmph.
● Restoration of International Railway route from Radhikapur (India) to Birol (Bangladesh) has been completed on 14.09.2016 by
Rolling Engine between Radhikapur(India) to upto international border of Bangladesh (303 Rm length). With an objective to resume
trade and commerce with neighbouring country Bangladesh and Nepal as per SAARC summit, Indian Railway have constructed the
railway track connectting Radhikapur(India) and Birol(Bangladesh). The Railway track connecting Dhaka via Dinajpur District of
Bangladesh to Kolkata via Radhikapur was built in 1857 and it was a metre gauge track. Railway connectivity between Indian and
Bangaladesh was in service upto 1st April of 2005. It is learnt that passenger train service through this route was operational from 1857
to 1948. Bangladesh Railways had also converted the track MG to BG from Dinajpur to Birol three years ago.
● In Raiganj-Dalkhola section verification of land plans at site and preparation of zirat report is in progress with revenue authorities.
● GM/Con/NFR attended a meeting with Chief Secretary, Govt. of Bihar at Patna on 10.08.2018 for early handing over of Raiganj-
Dalkhola section land.

● This project has been kept in abeyance by Railway Board vide DO L/No 2019/W-1/Genl./Budget/1 Dated 24.09.2019. Rly Bd. instructed that no further
expenditure & execution on this project to be made till further orders.

5. Assistance Required from Board

Adequate fund to be provided for execution of work & Land acquisition of Raiganj - Dalkhola.

6. Issues of Concern

This project has been kept in abeyance by Railway Board vide DO L/No 2019/W-1/Genl./Budget/1 Dated 24.09.2019. Rly Bd. instructed that no further
expenditure & execution on this project to be made till further orders.
21
Ambari Falakata -New Maynaguri Doubling Project ( 37.27Km.)

1. Project Details Ph-V: Jalpaiguri Road- Y leg connection (5.71 Km)= TDC: Jan'2021 (Commissioning)
Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Financial
inclusion in Total Length Rev. Budget Budget Exp. during Cum. progress
Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year

Entire length in
West
2011-12 800.00 772.367 0 5.00 5.357 10.263 205.26% 97.83%
Bengal=37.87
Km.

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 1.88 08/07/2011
2 Detailed Pt-II 312.12 17/08/2012
3 Revised 1 st Revise Estimate 486.96 06/02/2017

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 2.23 2.23 100
Earth Work (Lakh Cum.) 17.9 17.9 100
Formation (Km.) 42.89 40.49 94.4
Major Bridge - Sub Strc. (Nos.) 10 9 90
Major Bridge - Super Strc. (Nos.) 10 9 90
Minor Bridge (Nos.) 36 36 100
ROB (Nos.) 1 1 100
RUB (Nos.) 11 11 100
LHS (Nos.) 0 0 0
Track Linking - Main Line (Km.) 42.89 41.89 97.67
Station Building (Nos.) 3 2 66.67

4. Highlights

● Intial Pink Book Cost :- Rs 257.93 Crs.


● ROR:- 3.35 %
● Ph-I: Ambari Falakata-Belakoba Section (10.28 Km.):- Commissioned and Passenger Services started from 25.05.2014.
● Ph-II: Belakoba-Raninagar Jalpaiguri ( 9.08 Km):- Commissioned on 03.11.2015.
● Ph-III: Raninagar Jalpaiguri-Jalpaiguri Road ( 6.94 Km):- Commissioned on 09.02.2018.

● Ph-IV: 'Y' leg Connection Cabin-New Maynaguri (5.86 Km):- Commissioned on 09.04.2019.

●1st Revised Estimate for Rs 486.96 Crs sanctioned by CAO/C/2/MLG on 06.02.2017.


● Total length commissioned upto 01.03.2020= 10.28 km+9.08 km+6.94 km+5.86 km= 32.16 km

All work completed except Jalpaiguri road to Y leg connection (5.71 Km) due to tilted well pier could not be completed. Now targeted
in Jan'2021.

2nd Revised Estimate Rs. 769.83 Crs.:- under vetting.

5. Assistance Required from Board

Nil

6. Issues of Concern

Nil
22
Digaru-Hojai (102KM)

Ph-II: Kampur-Hojai (27.36 Km) : TDC- Jan'2021.


1. Project Details Ph-III: Dharamtul-Kampur (32.46 Km) : TDC- Feb'2021.
Ph-V: Jagiroad-Dharamtul (18.75 km) : TDC- May'2021.
Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Financial
inclusion in Total Length Rev. Budget Budget Exp. during Cum. progress
Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year

Entire length in
2015-16 1,873.21 1194.908 0 400.00 42.343 204.201 51.05% 74.69%
Assam=102 Km

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed DE 870.96 27/01/2016

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 9.161 3.725 40.66
Earth Work (Lakh Cum.) 35.73 34.42 96.33
Formation (Km.) 102 51 50
Major Bridge - Sub Strc. (Nos.) 11 9 81.82
Major Bridge - Super Strc. (Nos.) 11 6 54.55
Minor Bridge (Nos.) 73 67 91.78
ROB (Nos.) 5 0 0
Ballast Supply (Th. Cum.) 355 126.3 35.58
Track Linking - Main Line (Km.) 101.5 52.5 51.72
Station Building (Nos.) 14 5 35.71

4. Highlights

● ROR=(-) 5.19 %
● Initial Pink Book Cost = Rs 945.64 Crs.
● 1st Revised estimate Rs. 2136.01 Crs. vetted by finance and sent to Railway Board on 22.11.2019.
● Sri Suresh Prabhakar Prabhu, Union Railway Minister along with Shri Rajen Gohain,MoSR laid the foundation stone of the project at
Maligaon,Guwahati on 10.11.2016.

● Sri Rajen Gohain, Minister of State (Railways) laid the foundation stone of ROB at Jagiroad on 10.12.2017.
● Sri Rajen Gohain, Minister of State (Railways) laid the foundation stone of ROB at Kampur on 29.03.2018.
Present Status of Work:-
(i) Earthwork, Minor bridges & Major bridges in progress.
(ii) Due to lengthy procedure of granting earth cutting permission, large number of applications of Rly agencies were pending with State
Govt. of Assam since long and progress of work suffered. However, now the procedure of granting permissions has been simplified by
PCCF, Govt. of Assam on 29.08.2018.

1st Revised estimate Rs. 2136.01 Crs. - sent to Railway Board on 24.11.2019.

Ph-I: Digaru - Jagiroad (23.628 Km): CRS inspection completed on 10.10.2020 and authorization received @ 90 kmph on
13.10.2020.

5. Assistance Required from Board

Nil.

6. Issues of Concern

There were procedural delays in getting permission of earthwork royalty from Forest/Revenue departments of Govt. of Assam.
Issue is now resolved and works are being expdited.
Regular meetings are being held with Chief Secretary/Assam, Principal Chief Conservator of Forest/Assam on the issues regarding
permissions for Earth cutting. Last meeting held on 18.01.2019 and issue resolved.
Progress of work affected due to COVID-19 Pandemic.
23
Bongaigaon-Goalpara-Guwahati (176KM)

Ph-III: Abhayapuri-Pancharatna (26.43 Km):-TDC: Feb'2021 (Commissioning)


Ph-IV: Pancharatna-Dudhnoi (28.12 Km):- TDC: Jan'2021 (Commissioning)
Ph-V: Dudhnoi-Dhupdhara (29.71 Km):- TDC: Nov'2021 (Commissioning)
1. Project Details Ph-VI: Dhupdhara-Bamunigaon (25.39 Km):- TDC: Dec'2021 (Commissioning)
Ph-VII:Bamunigaon-Azara (35.68 Km):- TDC: Feb'2022 (Commissioning)
Ph-VIII: Azara-Kamakhya (13.22 Km):-TDC: Mar'2023 (NGT issue exists, TDC may differ)

Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Financial
inclusion in Total Length Rev. Budget Budget Exp. during Cum. during progress
Cost Mar-2020 Progress
Budget allotment allotment November-2020 year during the
(%age)
year

Entire length
2015-16 in Assam=176 2,950.00 1549.03 0 450.00 65.215 319.188 70.93% 63.33%
Km.

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed DE 2232.32 02/09/2016

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 7.23 0 0
Earth Work (Lakh Cum.) 135.6 95.6 70.5
Formation (Km.) 167 33.6 20.12
Major Bridge - Sub Strc. (Nos.) 56 27 48.21
Major Bridge - Super Strc. (Nos.) 56 7 12.5
Minor Bridge (Nos.) 379 253 66.75
ROB (Nos.) 0 0 0
RUB (Nos.) 5 0 0
LHS (Nos.) 56 24 42.86
Ballast Supply (Th. Cum.) 755 75.81 10.04
Track Linking - Main Line (Km.) 125.1 17.2 13.75
Station Building (Nos.) 16 6 37.5

4. Highlights

● ROR =3.84%.
● Initial Pink book cost=Rs 1832.00 Crs.
● Sri Suresh Prabhakar Prabhu, Union Railway Minister along with Shri Rajen Gohain, MoSR has laid the foundation stone of the project
at Maligaon,Guwahati on 10.11.2016.

Ph-I: New Bongaigaon-Majgaon (8.53 Km): CRS inspection completed and authorization received @ 90 kmph on 21.01.2020 with
authority to increase the speed to 110 kmph.

Ph-II: Majgaon-Abhayapuri (8.96 Km): CRS inspection completed and authorization received @ 100 kmph on 28.11.2020 with authority to increase the
speed to 120 kmph.

Present Status of Work:-


All works such as Earthwork, Major/Minor Bridges, RBG Buildings, Staff Quarters etc. are in progress at various locations between New
Bongaigaon to Kamakhya.

5. Assistance Required from Board

Nil

6. Issues of Concern

National Green Tribunal (NGT)/East Zone, Kolkata ordered to stop doubling works in km 163 to km168 (5km) in between Azara and
Kamakhya stations, which is the last block section of the project. The existing line and proposed double line in this stretch pass through
Deepor Beel and falls partly in Elephant corridor, where instances of dashing with elephants have taken place in past. Though no Forest
Land acquisition is involved, (NGT) has ordered and directed to stop doubling works since Jan-2018 till the mitigation measures to avoid
collision with elephants are done. Mitigation measures suggested by the Wildlife Institute of India (WII), Dehradun is diversion of the
existing line and double line from km 163 to km 172 on Northern periphery of Deepor Beel through viaduct for freeing the elephant
corridor. It involves additional works costing Rs. 1040 Crs. This additional works is not in the scope of sanctioned doubling works.
Railway has submitted in the Affidavit to bear this additional cost by MoEF as per extant instructions issued by Rly Board and land
required in new alignment to be provided free of cost by state govt. in lieu of surrender of Railway land along existing alignment through
Deepor Beel. The case is pending with NGT/East Zone/Kolkata under hearing. Since the alignment is changing from km 163 to km 172
from the existing alignment, it tantamount material modification in the estimate and require sanction of Railway Board once the
alignment and funding issue is decided by NGT.
24
New Maynaguri - Gumanihat - Doubling of remaining portion (51.65 Km)

Target: Ph-II= Betgara-Kolaigram (23.32 km)= Dec'2020.


1. Project Details
Ph-III= Koliagram-Gumanihat (24.02 km)= Mar'2021.
Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Financial
inclusion in Total Length Rev. Budget Budget Exp. during Cum. progress
Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year

Entire length in
West
2016-17 760.00 628.026 0 200.00 14.401 192.098 96.05% 107.91%
Bengal=51.65
Km

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed DE 602.27 10/08/2017

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 0 0 0
Earth Work (Lakh Cum.) 40.71 40.06 98.4
Formation (Km.) 50.77 43.44 85.56
Major Bridge - Sub Strc. (Nos.) 14 14 100
Major Bridge - Super Strc. (Nos.) 14 10 71.43
Minor Bridge (Nos.) 43 43 100
ROB (Nos.) 5 0 0
RUB (Nos.) 14 14 100
LHS (Nos.) 1 1 100
Track Linking - Main Line (Km.) 50.77 21.03 41.42
Station Building (Nos.) 5 2 40
Yard Works (Nos.) 1 0 0

4. Highlights

● ROR= 7.95 %
● Initial Pink Book Cost = Rs 556.31 Crs.
● Detail Estimate of Rs 602.27 crs sanctioned by Rly Bd vide Bd's L/No F(X)II/2016/PW/3/Pt-3 dated 10.08.2017.
● Ph-I New Maynaguri-Betgara (4.60 Km) = Commissioned and passenger train service started from 09.04.2019.

● Section from Betgara - Altagram - Dhupguri - Kolaigram, total 22.32 Km is targetted for commissioning in December 2020

.● Section from Kolaigram - Salbari - Falakata - Gumanihat, total 24.9 Km is targetted for commissioning in March 2021

5. Assistance Required from Board

Nil

6. Issues of Concern

Progress of work affected due to Covid-19 pandemic.


25
New Bongaigaon - Agthori (Via Rangiya) Doubling Project (142.97 Km)

i) New Bongaigaon-Patiladaha (27.67 Km) =TDC: Mar'2022.


1. Project Details ii) Patiladaha-Nalbari: (64.92 Km) = TDC: Mar'23.
iii) Nalbari-Agthori: (50.38 Km) = TDC: Mar'23.
Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Cum. Financial
inclusion in Total Length Rev. Budget Budget Exp. during progress
Cost Mar-2020 during Progress
Budget allotment allotment November-2020 during the
year (%age)
year

Entire length in
2013-14 Assam=142.97 2,047.51 0.254 0 200.00 3.579 25.7 12.85% 1.27%
Km

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I (FLS) 6.5 20/04/2017
2 Detailed Detailed Estimate 2042.51 02/08/2019

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


Land Acquisition (Hect.) 0 0 0
Earth Work (Lakh Cum.) 96.81 0 0
Formation (Km.) 142.97 0 0
Major Bridge - Sub Strc. (Nos.) 75 0 0
Major Bridge - Super Strc. (Nos.) 75 0 0
Minor Bridge (Nos.) 38 0 0
ROB (Nos.) 0 0 0
RUB (Nos.) 0 0 0
Track Linking - Main Line (Km.) 142.97 0 0
Station Building (Nos.) 18 0 0

4. Highlights

● Intial Pink Book Cost:- Rs 1798.00 Crs.


● ROR: 7.75 %
● FLS completed and Detailed Estimate sanctioned for Rs.2042.51 Crs. by Railway Board on 02.08.2019.
● CCEA clearance obtained on 17.07.2019.

5. Assistance Required from Board

Nil

6. Issues of Concern

Nil
26
Saraighat Bridge (7 km) Doubling Project

1. Project Details Target: Not Fixed.


Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Financial
inclusion in Total Length Rev. Budget Budget Exp. during Cum. progress
Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year

Entire length
2017-18 in Assam=7 1,126.67 0 0 1.00 0 0 0% 0%
km

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 0.84 01/10/2017

3. Present Status of Works

Activity Total Scope Physical Progress % Progress

4. Highlights

Year of Inclusion : 2017-18.


Pink Book Cost :- Rs. 1676.64 Crs.
Survey done departmentally.
Estimate submitted to Rly. Bd. on 26.03.2018 at a cost of Rs. 1126.67 Crs. Sanction is awaited.
27
Kamakhya-New Guwahati Quadrupling (10.30 km)

1. Project Details Target: Not Fixed.


Rs. in Crs.
2020-2021
Overall
Year of % financial
Anticipated Exp. Up to Cum. Financial
inclusion in Total Length Rev. Budget Budget Exp. during progress
Cost Mar-2020 during Progress
Budget allotment allotment November-2020 during the
year (%age)
year

Entire lenth in
2017-18 Assam=10.30 6,125.00 0 0 1.00 0 0 0% 0%
km

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction


1 Detailed Pt-I 5.7 16/06/2017

3. Present Status of Works

Activity Total Scope Physical Progress % Progress

4. Highlights

Year of Inclusion :2017-18.


Initial Pink Book Cost :- Rs. 3062.00.
Meeting was held by AM/Works with CE/Con/9, CPDE & CTPM, NFR on 06.08.2019. It was discussed to drop the work as it is not
found of land. Feasible due to non-availability presence of large nos of ROB and level crossings in 10 Km long length. Alignment
passing through thickly populated part of Guwahati City. Land not available to lay to additional two lines. Even elevated
construction is feasible only after closure of existing train operation for long period.
Instead it is planned to study two separate bye pass lines to Guwahati from North side as well as South side to ease congestion at
Guwahati.
6. Issues of Concern

Meetings were held with PHODs of open line and constructions for discussions of the various options for Quadrupling, site
constraints, methodology for execution of works under running traffic. Due to site constraints in congested city area and requirement
for blocking of existing tracks, the proposal for quadrupling is dropped.

Meeting was also held on 06-08-2019 by AM/Works with NFR where CE/Con/9, CPDE & CTPM had attended the meeting. They
agreed with the proposal and suggested to carry out the FLS of two separate bye pass line for Guwahati under the variations of
same FLS work.

It is planned to study two separate bye pass lines to Guwahati from North side as well as South side to ease congestion at
Guwahati.
28
Lumding-Tinsukia Jn-Dibrugarh Doubling (381 km) (Umbrella work PB#57/2019-20/NR)

1. Project Details
Rs. in Crs.
2020-2021
Overall
Year of % financial
Total Anticipated Exp. Up to Financial
inclusion in Rev. Budget Budget Exp. during Cum. progress
Length Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year
2020-21 3,810.00 0 0 0.00 0 0 0% 0%

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction

3. Present Status of Works

Activity Total Scope Physical Progress % Progress


29
Katihar-Kumedpur & Katihar-Mukuria (64.5 km) Doubling (Umbrella work PB#57/2019-20/NR)

1. Project Details
Rs. in Crs.
2020-2021
Overall
Year of % financial
Total Anticipated Exp. Up to Financial
inclusion in Rev. Budget Budget Exp. during Cum. progress
Length Cost Mar-2020 Progress
Budget allotment allotment November-2020 during year during the
(%age)
year
2020-21 645.00 0 0 0.00 0 0 0% 0%

2. Status of Estimates

Sl. No. Estimate Type Estimate Sanctioned Amount Date of Sanction

3. Present Status of Works

Activity Total Scope Physical Progress % Progress