100% found this document useful (1 vote)
951 views71 pages

Application Guide For BACnet Netwroks in Building Automation - Siemens

Uploaded by

Jho
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
951 views71 pages

Application Guide For BACnet Netwroks in Building Automation - Siemens

Uploaded by

Jho
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 71

Desigo™

Application Guide for BACnet Networks in


Building Automation
Technical Manual

A6V11159798_en--_03 Smart Infrastructure


2020-03-16
Copyright

Copyright
Delivery and technical specifications subject to change.

Any form of reproduction, dissemination, copying, disclosure, modification, distribution and/or publication
of this document is strictly prohibited unless permitted expressly. Infringements will lead to compensation.
All rights, including rights created by patent grant or registration of a utility model or design are reserved.

Published by:
Siemens Switzerland Ltd.
Smart Infrastructure
Global Headquarters
Theilerstrasse 1a
CH-6300 Zug
Tel. +41 58 724-2424
www.siemens.com/buildingtechnologies

Edition: 2020-03-16
Document ID: A6V11159798_en--_03

© Siemens Switzerland Ltd, 2017

2 | 71 A6V11159798_en--_03
Table of Contents

1 Cyber security disclaimer .................................................................................................................... 5


2 About this document ............................................................................................................................ 6
3 Overview ............................................................................................................................................... 7
3.1 General ................................................................................................................................................................. 8
3.1.1 Functions in a building automation and control system ................................................................... 8
3.2 Networking Ethernet/IP networks.................................................................................................................. 12
3.2.1 Scalable Desigo system - System design.........................................................................................12
3.2.2 Zones on the IP network .....................................................................................................................12
3.3 Networking BACnet network ........................................................................................................................... 18
3.4 Merging BACnet/IP networks .........................................................................................................................20
4 BACnet/IP networks .......................................................................................................................... 24
4.1 Checklist for designing BACnet/IP networks................................................................................................ 24
4.2 Designing BACnet/IP networks ...................................................................................................................... 26
4.2.1 Network for a small to mid-sized project .........................................................................................27
4.2.2 Network for mid-sized to large project structured with centralized primary plants ................... 32
4.3 BACnet referencing over different IP networks ............................................................................................ 44
4.4 Diagnostics and troubleshooting BACnet/IP networks ............................................................................... 45
5 BACnet networks with MS/TP trunks .............................................................................................. 46
5.1 Designing BACnet networks with MS/TP trunks .........................................................................................46
5.2 MS/TP cabling and topology ........................................................................................................................... 47
5.3 Checklist for designing BACnet networks with MS/TP trunks ................................................................... 48
5.4 Application examples ....................................................................................................................................... 50
5.4.1 Network for a small to mid-sized project .........................................................................................51
5.4.2 Network for mid-sized to large BACnet MS/TP project structured with centralized primary
plants.................................................................................................................................................. 57
5.5 Diagnostics and troubleshooting in BACnet networks with MS/TP trunks .............................................. 65
6 Product for network infrastructure ................................................................................................... 68
7 Glossary .............................................................................................................................................. 69

A6V11159798_en--_03 3 | 71
Cyber security disclaimer
1

1 Cyber security disclaimer


Siemens provides a portfolio of products, solutions, systems and services that includes security functions
that support the secure operation of plants, systems, machines and networks. In the field of Building
Technologies, this includes building automation and control, fire safety, security management as well as
physical security systems.
In order to protect plants, systems, machines and networks against cyber threats, it is necessary to
implement – and continuously maintain – a holistic, state-of-the-art security concept. Siemens’ portfolio
only forms one element of such a concept.
You are responsible for preventing unauthorized access to your plants, systems, machines and networks
which should only be connected to an enterprise network or the internet if and to the extent such a
connection is necessary and only when appropriate security measures (e.g. firewalls and/or network
segmentation) are in place. Additionally, Siemens’ guidance on appropriate security measures should be
taken into account. For additional information, please contact your Siemens sales representative or visit
https://www.siemens.com/global/en/home/company/topic-areas/future-of-manufacturing/industrial-
security.html.
Siemens’ portfolio undergoes continuous development to make it more secure. Siemens strongly
recommends that updates are applied as soon as they are available and that the latest versions are used.
Use of versions that are no longer supported, and failure to apply the latest updates may increase your
exposure to cyber threats. Siemens strongly recommends to comply with security advisories on the latest
security threats, patches and other related measures, published, among others, under
https://www.siemens.com/cert/en/cert-security-advisories.htm.

A6V11159798_en--_03 5 | 71
About this document
2

2 About this document


What is the purpose of this document?
This document handles the following topics:
● How to design Desigo projects with regard to IP and BACnet on the network
● What system components do we recommend
● What system settings are required

Who is the target audience for this document?


● Sales (Front and back office)
● Design and commissioning engineers

What does this document cover?


The document focuses on Desigo V6.1.

What Desigo documents are there on the topic of networks?


● Desigo Technical principles (CM110664).
● Ethernet, TCP/IP, MS/TP and BACnet fundamentals (CM110666)
● Practical guide on IP networks in building automation and control (CM110668)
● Desigo room automation engineering, mounting and installation (CM111043)
● Installation guide RXB, RXL (CM110381)
● BACnet Protocol information conformance statements (PICS) (CM110665)

6 | 71 A6V11159798_en--_03
Overview
General
3

3 Overview
There is a different approach in room automation with regard to flexibility, sizing, use, and reuse versus on
primary plants, for example, air handling.
Functions are required here to centrally switch all rooms with a specific room state through the entire floor
or switch lighting in rooms at a specified time. The same applies to shading systems that deploy the blinds
to a safe position during high winds based on a weather station. Building users are increasingly requiring
flexible use of rooms. For example, the rooms are newly rented out, or rooms are increased in size using
partitions and designed to the current use.
Building automation and control expects the building automation and control system to do this, or for the
room automation to automatically adapt.
On the one hand, central functions can control the room operating mode as well as centralized control of
lighting and blinds over multiple room automation stations. Protection, service, or emergency functions can
also be implemented over various devices.
On the other hand, flexible room management can be implemented with Desigo room automation and PXC3
or DXR2 room automation stations.
Repurposing can be quite easy using the separation between room and room segment. Coordination takes
place in the room between HVAC, lighting, and blinds, set points are calculated, etc., and then sent to the
assigned room segments. The physical data points are located in the segment to control aggregates and
components.

Scheduler
Scheduler

1...3

Central
Blind Control
Central
Lighting Control
Scheduler
1...3

Central
Occupancy Control

Production Distribution

Central Central
Heating Control Setpoint Control

The entire Desigo system prefers the use of BACnet/IP to avoid expensive gateway solutions. This requires
careful planning, sizing, and implementation of BACnet and IP networks.

A6V11159798_en--_03 7 | 71
Overview
3 General

3.1 General
The first and most costly mistakes are already made during the planning phase. It is not uncommon to
submit faulty bids or bids that are not understandable. Planning offices generally fail to provide clear
answers to detailed queries since the requisite knowledge on networks is often lacking. Pay close attention
to the section on network and communications if a tender is involved.
It is fairly common to forget during initial clarifications to set up the system on an existing network or
infrastructure (rack, cabinets, switches, cabling, etc.) at the customer. An appropriate examination can
save unnecessary costs.
Provided of course that the customer's infrastructure meets the same requirements for reliability,
performance, availability, expandability, IT security, etc. as described in this document. If new networks are
unavoidable, it makes sense to consider topics such as digitalization, cloud solutions, scalability, and
flexible administration using virtual and easy-to-administer networks.
Building automation and control systems do not play a significant role here.

3.1.1 Functions in a building automation and control system


The goal of a building automation and control system (BAC system) is to achieve and maintain an optimum
level of comfort and the lowest possible energy. The classical building automation and control system is
divided into three levels (even when using a standardized communication protocol BACnet):
● Management level
● Automation level
● Field level
In a Desigo system, this can be described in greater detail through functions and applications.

Plant scope
Here is where the automation stations are located that take over control of primary plants such as air
handling units, heating circuits, and cooling circuits to supply the rooms or heating or refrigeration plants.
The plants are always demand-controlled over the supply chain, in other words, heat or cooling demand
occurs in a room that is forwarded to the applicable generation or over the heating or cooling circuit.

Floor scope
This is where rooms and room segments are controlled - energy-efficient HVAC functions, but also lighting
and shading systems ensure optimum room conditions.
In an HVAC environment, we have radiators, and/or heating/chilled ceilings, but also fan coil units as well
as variable air flow systems. On primary plants, hot or chilled water, but also treated air, is provided based
on demand and is treated in the room segment by radiators, heated/chilled ceilings, heating or cooling
coils. Blinds control can be used in addition to daylight or indirect lighting to heat and cool the room.
Lighting control is also integrated to provide optimum lighting, together as well with blinds control.
Central functions specify, from the superposed location (Building Scope), for example, the room operating
mode as well as room setpoints for the room or a group of rooms. The room user can also intervene with
local room operator units and adapt room conditions to his or her needs.

Building Scope
Superposed central functions, e.g. a weather station, can generate setpoints for assigned rooms based on
the outside air temperature. A scheduler can form and distribute a room operating mode for assigned
rooms in a building section or floor. Moreover, lighting and blinds components can be deployed to a defined
state via protection, service, or emergency functions. Demand signals from the rooms (Floor scope) are
evaluated here and compiled and forwarded to the primary plants such as central air handling, heating or
cooling circuits (located in the Plant Scope).
The following image illustrates the devices and functions located in different scopes and how the
communication paths are defined. It illustrates that the floor scope does not require interaction to another
floor scope nor permits and supports interaction; conversely, functions and applications communicate in
the building scope with floor and plant scopes. The plant scope processes the information (forced and
demand signals) from the building scope.

8 | 71 A6V11159798_en--_03
Overview
General
3

Building A BACnet Internetwork 1 (BAC0)

System-wide Scope CC Client CC Server

Desigo CC Desigo CC

IP Subnet 192.168.102.x VLAN ID2 Foreign Device

Building Scope: Central Functions

PXC3 DXR2 Desigo PX


BACnet Communication Path

BBMD

IP Subnet 192.168.103.x VLAN ID3 BACnet/IP UDP Port: BAC0

IP Subnet
Floor Scope: Flexible Rooms

PXC3 DXR2 PXC3 DXR2 PXG3/PX

BBMD

BACnet/IP UDP Port: BAC0


IP Subnet 192.168.104.x VLAN ID4

IP Subnet
Floor Scope: Flexible Rooms

PXC3 DXR2 PXC3 DXR2 PXG3/PX

BBMD

BACnet/IP UDP Port: BAC0


IP Subnet 192.168.105.x VLAN ID5

IP Subnet
Plant Scope: Primary Plants with Desigo PX00..200..D

Desigo PX00..200..D Desigo PX00..200..D Desigo PX00..200..D

BBMD

IP Subnet 192.168.106.x VLAN ID6 BACnet/IP UDP Port: BAC0

IP Subnet
Plant Scope: Primary Plants with Desigo PXC4 & 5

PXC4.E16 PXC4.E16 PXC5.E003

BBMD

IP Subnet 192.168.107.x VLAN ID7 BACnet/IP UDP Port: BAC0

IP-Subnetz 192.168.100.x

You can set in detail that a floor scope encompasses a floor or floor segment with a maximum of 250
participants. The floor scope can comprise multiple floors (with a total of max. 250 participants), i.e. the
floor scope stands for a zone with a max. 250 IP-capable devices or room automation stations.
Central functions and flexible room management plays an important role in the design of BACnet and IP
networks.

Central functions
Central functions are based on the concept of group master and group members.
Room operating modes, room setpoints, and operating modes for lighting or blinds groups are flexibly
distributed from a group master over group members whose group membership is typically set during
commissioning, but can also be changed later during operation using a management platform, e.g. Desigo
CC. Multiple group members can be located on a room automation station by discipline. This includes, for
example, lighting groups by floor, building section or building or blinds group by facade or over a facade
segment.

A6V11159798_en--_03 9 | 71
Overview
3 General

Commanding Designing a system


Distribution/commanding of group masters to group member Restricted to max. 500 group members

Moreover, the same concept can be used to compile demand signals for chilled water, hot water, or for air
handling. Demand occurs in room segments assigned to a group; it is collected, evaluated and transmitted
to generation via the applicable group master.

Concentrate data Designing a system


Collecting data from the group members via the group master Restricted to max. 250 group members

A group member is not the same as a room segment. A room segment can
include multiple group members.

Central functions can be directly designed in an easy-to-understand manner. In a multi-story building,


rooms are rented on a floor-by-floor basis to various users. A central function exists by floor for each room
operating mode, room setpoints, lighting, and shading. All lighting and shading is switched from a central
location for each floor.
Emergency, service, and protection functions act on the entire lighting control and shading systems in the
building.

Tenant
Retail mall Ground floor Tenant A, 1st floor Tenant B, 2n floor Tenant C 3rd floor Tenant D, 4th floor

Businesses and public Offices and hallways Offices and hallways Offices and hallways Offices and hallways
areas

Building
Emergency Shading
Lighting Service

Emergency Shading
Shading Central
Protection

Floor

Room Central Warm Water


Setpoints Operation Supply
Lighting

Central Central
Cold Water
Operation Operation
Supply
Mode Shading

R100 Cor1
Rooms Corridors

Floor 1

Tenant A

All central functions can be interconnected to meet the advanced requirements on mid-size to large
projects.
If a tenant uses, for example, two floors, a central function can individually act on the given floor, that acts
for its part on an additional, superposed central function, on both floors. The example of lighting or shading
provides a good illustration of this.

10 | 71 A6V11159798_en--_03
Overview
General
3

Tenant
Retail mall Ground floor Tenant A, 2nd floor Tenant A, 3rd floor Tenant B, 4th floor Tenant B, 5th floor

Businesses and public Offices and hallways Offices and hallways Offices and hallways Offices and hallways
areas

For separate IP networks on both floors, the building and cross-floor functions are mapped in the building
scope and the floor functions in applicable floor scope.
Building
Emergency Shading
Lighting Service

Emergency Shading
Shading Central
Protection

Across Floors
Central
Emergency
Operation
Lighting
Lighting

Central
Emergency
Operation
Shading
Shading

Floor

Central Central
Room Emergency Emergency
Operation Operation
Setpoints Lighting Lighting
Lighting Lighting

Central Central Central


Emergency Emergency
Operation Operation Operation
Shading Shading
Mode Shading Shading

R100 Cor1 R200 Cor2


Rooms Corridors Rooms Corridors

Floor 1 Floor 2

Tenant A

Flexible room management


The functions are divided up: The room coordinates HVAC, lighting, or blinds functions as the shell and
generates the resulting operating modes, setpoints, etc.
In the room segment, components and aggregates such as radiators, chilled ceilings, lighting, or blinds
actuators are controlled per the operating mode set in the room.
One or more room segments can be assigned a room. The room segment is flexible, since it can be
reassigned by the management platform (by the user) under certain circumstances without an engineering
tool. The ABT engineering tool is used to regroup in the event that buttons are used for lighting and blinds.
Room 106 Room 107 Room 106

DXR2... DXR2... DXR2... DXR2...


Room Room Room Room
Functions Functions Functions Functions
GrpMaster GrpMaster GrpMaster GrpMaster

GrpMember GrpMember GrpMember GrpMember


Room Segment Room Segment Room Segment Room Segment
Functions Functions Functions Functions

A6V11159798_en--_03 11 | 71
Overview
3 Networking Ethernet/IP networks

3.2 Networking Ethernet/IP networks


The function and application summarized above are implemented on an automation station or room
automation station. These devices must be networked together. Preliminary clarifications must define the
number of room automation stations, automation stations for primary plants and superposed functions as
well as central functions are required and how they are distributed.
The functions, guidelines and recommended set forth in Practical Guide on IP Networks in Building
Automation and Control Systems (CM110668) apply to networking the devices.

3.2.1 Scalable Desigo system - System design


We must take a closer look at various aspects of the scalable Desigo system to properly define the design
criteria here and then subdivide them to ultimately derive system limits and system topologies.

Project and network size Designing a system


Small to mid-size project and networks of a lower complexity Restricted to max. 500 automation stations
One building, up to 200 primary plants, 500 rooms, and just a few The devices must be on a common IP segment. For example,
central functions subnet mask 255.255.254.0 = max. 512 IP addresses.
Example: For details, see Overview of IPv4 address space.
School, hotel, small to mid-size commercial unit (office, retail)

Medium to large project and network of medium complexity Restriction of max. 250 devices on one IP segment.
Large building complexes, more than 200 primary plants, 500 to Multiple IP segments for plant, building, and floor scopes via
1500 rooms, lots of distributed central functions, multiple, layer 2 switches, VLAN and layer 3 switches.
different user groups BACnet internetwork over multiple IP segments with BBMD.
Example:
University, hospital, office building, residential and office
complex, shopping mall

Large project and network of high complexity Restriction of max. 250 devices on one IP segment.
Multiple buildings, more than 200 primary plants, 500 to 1500 Multiple IP segments for plant, building, and floor space via layer
rooms, lots of distributed central functions, multiple, different 2 switches, VLAN and layer 3 switches.
user groups Multiple BACnet internetworks with up to 2,000 devices each,
Example: distributed on different BACnet networks with BBMD.
University campus, hospital, large residential and office complex,
pharmaceutical or automobile companies, industrial parks

3.2.2 Zones on the IP network


Switches are a decisive element on a network: Core, distribution, and edge switches. Moreover, they are
available as managed or unmanaged layer 2 and managed layer 3 switches. An overview follows.
For details, see Practical guide on IP networks in building automation and control (CM110668).

12 | 71 A6V11159798_en--_03
Overview
Networking Ethernet/IP networks
3

Building A BACnet Internetwork 1 (BAC0)

System-wide Scope CC Client CC Server

Life Check

IP Subnet 192.168.2.x VLAN ID2 Foreign Device

Building Scope: Central Functions Core


PXC3 DXR2 Desigo PX

Edge BBMD

IP Subnet 192.168.3.x VLAN ID3 BACnet/IP UDP Port: BAC0

IP Subnet
Floor Scope: Flexible Rooms

PXC3 DXR2 PXC3 DXR2 PXG3/PX

Edge BBMD

BACnet/IP UDP Port: BAC0

Distribution
IP Subnet 192.168.4.x VLAN ID4

IP Subnet
Floor Scope: Flexible Rooms

PXC3 DXR2 PXC3 DXR2 PXG3/PX

Edge BBMD

IP Subnet 192.168.5.x VLAN ID5 BACnet/IP UDP Port:; BAC0

IP Subnet
Plant Scope: Primary Plants

Desigo PX Desigo PX Desigo PX

Edge BBMD

IP Subnet 192.168.6.x VLAN ID6 BACnet/IP UDP Port: BAC0

IP Subnet 192.168.1.x

Core
These powerful switches form the backbone of a network. The servers and most important devices are
connected to the core. Moreover, these switches can take over redundancy and routing tasks (layer 3) and
are therefore managed.

Distribution switches
They are located in the riser zones, take over data from core switches and forward them to the various
floors in the building.
They are optimally designed as managed layer 2 switches to setup VLANs.

A6V11159798_en--_03 13 | 71
Overview
3 Networking Ethernet/IP networks

Edge switches
The end devices are connected here. They are located at the end of the network in the control cabinets.
They are typically unmanaged layer 2 switches; managed layer 2 switches when setting up VLANs.

Layer 2 and layer 3 switches


Layer 2 switches (Ethernet switches) only take the Ethernet MAC address into account when transmitting a
data packet. No additional configuration required.
Layer 3 switches (IP router) use IP addresses to forward data packets. The routing function improves
structuring of IP networks and results in lower load caused by broadcast communication.

Managed and unmanaged


Administration is another distinguishing feature of switches. Managed switches have an IP address and
can be managed and configured using a web browser or Command Line Interface (CLI).
Unmanaged switches are take end devices online on the network. These switches have no additional
functionality such as filters, redundancy, or alarm functions.
Managed layer 2 switches support intelligent network management functions, such as port trunking, MAC
address-based VLANs and RSTP for ring topologies. Port mirroring for troubleshooting and diagnostics
using network analysis tools is an important aspect for using managed layer 2 switches.
Also important, especially on BACnet networks, is support of IEEE802.1X, or more specifically, MAC
Authentication (MAB) in general with a whitelist of permitted devices or a complete certificate-based
client-server access control and authentication that prevents unauthorized devices from connecting to a
network over public access ports. In principle, devices must first be authenticated on the switch before it
can communicate with other network elements.
Managed layer 3 switches are multifunction devices that, in addition to layer 2 functions, connect IP
subnetworks to one another, i.e. IP packets are transmitted to the correct subnetworks and broadcasts are
blocked. Moreover, a layer 3 switch can route VLANs to each other, i.e. VLANs remain autonomous, but it
supports a network transition or common interface.

VLANs
D

D
VLAN Trunk

HVAC Video
The era of setting up a separate network in building automation and control for each supplier and discipline
has passed. Multi-service networks allow each to work undisturbed on VLANs.
Managed layer 2 switches make it possible.
Implement a VLAN to optimize security and communication, if:
● More than 250 devices from the same discipline are planned (concentration of risk).
● Different security zones are required to separate primary plants form secondary plants.
● A high degree of reliability is required.

14 | 71 A6V11159798_en--_03
Overview
Networking Ethernet/IP networks
3

Port-based VLANs
Switch A

1 5
2 6
3 7
4 8

AS01 AS02 AS03 AS04


Port-based VLANs distribute a virtual managed switch to multiple switches. Each VLAN is identified by a
VLAN-ID between 1 and 4094 with VLAN-ID 1 reserved as the default VLAN.
The switch's IP address is exclusively reachable via ports that are fixed on this VLAN. In the example
above, ports 1 to 4 are assigned to VLAN 1001; ports 5 to 8 to VLAN 1002, in other words, communication
can only take place between devices 1 to 4 on the same VLAN. This is referred to as port-based VLANs or
often as untagged VLANs, since the Ethernet frames from the switch to the end device no longer have a
tag.
Benefits:
● Port-based VLANs reduce the need, especially on smaller installations, for a physical switch on each
network.
● The end devices do not need to support VLAN tagging per IEEE 802.1q, since the switch takes over this
task.

Tagged VLANs

Switch A Switch B

1 5 1 5
2 6 2 6
3 7 3 7
4 8 4 8

AS01 AS02 AS03 AS04 AS05 AS06 AS07 AS08

In contrast to untagged VLANs, tagged VLANs are frame-based rather than port-based. A port is assigned
to multiple VLANs rather just a single one. Each frame receives a VLAN tag so that the switch knows to
which VLAN an Ethernet frame belongs.
Benefits:
● A single cable suffices to connect both switches.
Disadvantages:
● Each switch (not end devices) must support tagging per IEEE 802.1q as the end device does not
recognize the data packet and rejects it, i.e. no communication occurs.

Networking in a star topology


Benefits:
● Less expensive installation
● Low operating costs
● Improved overview

A6V11159798_en--_03 15 | 71
Overview
3 Networking Ethernet/IP networks

● Easy troubleshooting
● Managed and unmanaged switches can be used
● Very high speed and short latency
Disadvantages:
● High cabling expense
● Communication failure for a defective star point (no redundancy)

Networking in a daisy chain topology (Line topology)


Benefits:
● Inexpensive
● Low cost for cabling
● Fewer switch ports required
Disadvantages:
● The loss of a device interrupts all communications to downstream devices
● Difficult overview and difficult to troubleshoot
● The latency of data transmission increases linearly with the number of downstream connected
components; the probably of failure exponentially.
Only suitable where price is decisive or on non-critical system, such as are located in normal office
buildings.

Max. 20 DXR2.E.. / PXC3.E..

Networking in a ring topology


Benefits:
● A stand-by line results in high reliability
● Suitable for all network sizes
● Easy troubleshooting
● High speed with average latency times
Disadvantages:
● High cabling and engineering costs and managed layer 2 switch with RSTP
● Alarming and network management recommended
● Comprehensive expert knowledge required for engineering
In the event of a fault, switching the communication paths on DXR2.E../PXC3.E.. can take between 10 and
30 seconds. IT should monitor switches to notify the superposed system of a failure.

16 | 71 A6V11159798_en--_03
Overview
Networking Ethernet/IP networks
3

Max. 20 DXR2.E.. / PXC3.E..

Managed Layer 2 Switches with


Rapid Spanning Tree Protocol

It is not enough to plan and implement the proper network technology to guarantee reliability and
availability.
Switches with two voltage inputs are commonly offered to increase availability. Alarm messages can also
be sent over hardware relay contacts (for example, in the event a connection or power supply fails, etc.).
The switch can also be monitored as an alternative on a suitable management platform such as Desigo CC
via the SNMP protocol.
Moreover, provide a separate or redundant power supply on important infrastructure, key automation
stations, sensors, or actuators.
Selecting the topology is not always easy. Plant or application requirements are always the decisive factor,
however. Special attention should be directed at the network since it forms the backbone of automation
communications.

DHCP or fix IP address


The question comes up repeatedly as to whether DHCP should be used on a Desigo project.
For the sake of understanding, the following arguments pro and contra DHCP are listed here.
The Dynamic Host Configuration Protocol (DHCP) is a communications protocol where a DHCP server
automatically assigns the network configuration (e.g. IP address, subnet) to a network participant (client).
The DHCP server operates as a network service in the background and waits for client queries. The clients
can be automatically or dynamically addressed based on the information on the available address pool from
its configuration file.
There are three types of address assignment:
● Under manual assignment (static DHCP), the IP addresses are assigned to specific MAC address for an
undetermined time on the DHCP server.
● The automatic assignment defined a range of IP address on the DHCP server and automatically assigns
new DHCP clients to the MAC address. A table sets the assignment and is permanent. Assignments are
not deleted and have the benefit that a participant always receives the same IP address so that the
address cannot be assigned to another participant.
● Dynamic assignment is comparable to automatic assignment. The DHCP server does however manage
data in its configuration file on how long certain IP address may be assigned to a participant before it is
required to register on the server and request an extension. The IP address becomes available if this
does not occur and can be assigned to other participants.
The DHCP procedures do have some disadvantages on a Desigo system or BACnet network:
● Access to the automation station is only through the BACnet names.
● Devices covering BBMD functionality, such as QXM7 or assigned Desigo room automation stations
always require a fixed IP address.
● It is difficult for the user to access device when addresses change since room automation stations have
a web server on board and are operated by ABT SSA for servicing and diagnostics.
For these reasons, Desigo automation stations are assigned a fixed IP address. The advantages clear
outweigh the DHCP process, since:
● Automation stations are permanently assigned to a network and always have the same IP address.
● Simply and unique address assignments are important in the Desigo Engineering tools for service,
diagnostics, and exchange.
● It permits unique project documentation on all levels.
● The devices can be uniquely assigned for servicing and diagnostics and simplifies operation via ABT
SSA (Service and system assistant).
An IP segment can also be divided on a project-by-project bases into a part with static addresses, e.g.
automation stations, etc., and a dynamic part (DHCP), e.g. for engineering laptops.

A6V11159798_en--_03 17 | 71
Overview
3 Networking BACnet network

For detailed information, see Desigo Ethernet, TCP/IP, MS/TP and BACnet (CM110666) and Practical
guide on IP networks in building automation and control (CM110668).

3.3 Networking BACnet network


The topics of IP networks and BACnet merge when networking BACnet networks. Standard knowledge of
planning and implementation suffice for small to mid-sized projects. Expert knowledge of BACnet (and not
necessarily IP networks) is required to plan, size, and implement large and complex BACnet/Desigo
projects.
Desigo is based on that standard BACnet communication protocol. Services are required to communicate
between BACnet devices. The following can be used to exchange data, for example, to transmit a demand
signal from the room and its evaluation and forwarding to the primary plant:
● A Unicast service continuously queries and evaluates the state using a cyclical read (ReadProperty).
● A Unicast service that subscribes to the demand signal (SubscribeCOV) for a specified lifetime and
receives an update if the value or its state changes.
This exchange of data between both BACnet devices can be labeled as highly targeted. The communication
protocol also supports broadcasts to all BACnet devices. Example:
● A BACnet client determines at start up all pending alarms and events to display them in a current alarm
list (GetEventInformation).
● A generic operator unit learns at start up with a broadcast who the other participants are.
● A BACnet object with a broadcast (WhoHas) is searching for another object with a unique name, e.g.
B01’Flr1’RS100’HclHwDmd.
(BACnet) broadcasts on a large IP network would take down the entire network.
Layer 3 switches (IP router) block broadcasts to prevent this.

Layer 3 Switch

w
196.168.2.x 196.168.1.x

No BACnet Broadcast

Layer 3 Switch

q
196.168.2.x 196.168.1.x

BACnet Broadcast

BBMD

BBMD

BBMD functionality is available in BACnet to nevertheless allow the use of BACnet broadcasts over
multiple IP segments.
A BBMD (BACnet Broadcast Management Device) is set up on each IP segment. The BBMDs recognize
one another through a table.
The applicable BBMD recognizes a broadcast triggered in a segment and distributes it as Unicast in a
targeted manner to all other BBMDs that are entered in the Broadcast Distribution Table BDT of BBMDs.
The broadcast is forward in other segments using their BBMDs.

Only one BBMD per IP segment is permitted. One BBMD must have a fixed IP
address and use a UDP port. BBMD is not a separate device, but rather
auxiliary functionality on a BACnet device.

In the use cases to date (Desigo PX in multiple IP segments with the same UDP port) a symmetrical BDT is
always used. In other words, all BBMDs are entered in the Broadcast Distribution Table and distributed in
this manner over the bypass to all other BBMDs in the various IP segments. Mid-sized to large Desigo

18 | 71 A6V11159798_en--_03
Overview
Networking BACnet network
3

projects, especially with Desigo room automation, operate with asymmetrical BDT entries. To this end
there is a designated BBMD (Building Scope) that knows all other BBMDs, but where the other BBMDs
only know these special BBMD.
For detailed information, see Desigo Ethernet, TCP/IP, MSTP and BACnet (CM110666) and the following
sections and practical examples.

In the Desigo system, the PXG3.L and PXG3.M as well as all PXC... automation
stations support BBMD functionality, with PXG3 device operating at
significantly higher performance levels. Use a PXG3 in the Building Scope
when planning highly complex large projects and networks.

Local and global broadcasts are used on a Desigo room automation project with PXC3 and DXR2
components.
● The interaction between room and room segment are based on local broadcasts.
● Central functions use global broadcasts.
The following graphic shows the interaction on one BACnet internetwork with different IP networks.
Building A BACnet Internetwork 1 (BAC0)

System-wide Scope CC Client CC Server

Desigo CC Desigo CC

IP Subnet 192.168.102.x VLAN ID2 Foreign Device

Building Scope: Central Functions

PXC3 DXR2 Desigo PX


BACnet Communication Path

BBMD

IP Subnet 192.168.103.x VLAN ID3 BACnet/IP UDP Port: BAC0

IP Subnet
Floor Scope: Flexible Rooms

PXC3 DXR2 PXC3 DXR2 PXG3/PX

BBMD

BACnet/IP UDP Port: BAC0


IP Subnet 192.168.104.x VLAN ID4

IP Subnet
Floor Scope: Flexible Rooms

PXC3 DXR2 PXC3 DXR2 PXG3/PX

BBMD

BACnet/IP UDP Port: BAC0


IP Subnet 192.168.105.x VLAN ID5

IP Subnet
Plant Scope: Primary Plants with Desigo PX00..200..D

Desigo PX00..200..D Desigo PX00..200..D Desigo PX00..200..D

BBMD

IP Subnet 192.168.106.x VLAN ID6 BACnet/IP UDP Port: BAC0

IP Subnet
Plant Scope: Primary Plants with Desigo PXC4 & 5

PXC4.E16 PXC4.E16 PXC5.E003

BBMD

IP Subnet 192.168.107.x VLAN ID7 BACnet/IP UDP Port: BAC0

IP-Subnetz 192.168.100.x

A6V11159798_en--_03 19 | 71
Overview
3 Merging BACnet/IP networks

A broadcast is sent when starting up a BACnet client, for example, Desigo CC. This is necessary since this
BACnet participant is located in a remote IP segment and must registered on the network as a third-party
device.
Its broadcast is recognized on the BBMD for the new network, packed, and sent to all participants entered
in the BBMD.
BBMDs in other IP segments recognize this and send the Unicast as broadcast to all participants in its
segment.
Flexible room management uses, in other words, communication in one room over multiple room segments,
local broadcasts. Lots of devices on an IP network cause lots of broadcasts.

Layer 3 Switch

q
196.168.2.x 196.168.1.x

BACnet Broadcast

BBMD

BBMD

As result, large, complex projects must:


● Supply BACnet devices over layer 3 switches in its own IP segment (VLAN).
● Compile BACnet devices from the building, floor and plant scope, each on their own IP segments.
● Configure asymmetrical BDTs.
● Use a powerful PXG3 for BBMD functionality in the building scope.

3.4 Merging BACnet/IP networks


The following illustrates, based on this fundamentals, how to structure a small, mid-size, or large, up to a
multi-discipline project.

Small to mid-sized project


Up to 500 automation stations.

20 | 71 A6V11159798_en--_03
Overview
Merging BACnet/IP networks
3

BACnet/IP over
Ethernet (Twisted Pair)
Ethernet (Fiber Optics)

Small Project

Floor 2
XB005 XB205-3
(Power AC 24 V)

Desigo Room Automation Stations

Floor 1
XB005 XB205-3
(Power AC 24 V)

Desigo Room Automation Stations

Basement
XB004-1 XB205-3
(Power AC 24 V)

Desigo CC
Workstation

Desigo Primary Automation Stations

Siemens SCALANCE Distribution Switches (XB205-3) are equipped as a managed layer 2 switches:
● Connects over various floors
● Can further expand the project
● Support the expansion per VLAN and ring topology
● Offers port mirroring (network analysis)
The Siemens SCALANCE Edge Switch (XB005) distributes on a floor as an unmanaged layer 2 switch:
● Important Desigo room automation stations are installed in a star topology (central functions, important
rooms)
● A few, critical automation stations can be connected in a daisy chain topology
Fiber optics network the distribution switches over longer distances. The distribution and networking on
the floors up to the edge swtiches over copper cables.

Mid-size to large project


The next example also illustrates a clearly structured network. The distribution switches are networks in
ring technology, improving network availability and reliability.
An independent IP network is set up together with a layer 3 core switch to which the most important
network components are connected.

A6V11159798_en--_03 21 | 71
Overview
3 Merging BACnet/IP networks

BACnet/IP over
Ethernet (Twisted Pair)
Ethernet (Fiber Optics)

Typical Project
Floor 2
XB205-3 XB205-3

Desigo Room Automation Stations

Floor 1
XB205-3 XB005
(Power AC 24 V) XB205-3

Desigo Room Automation Stations

Basement
XB205-3 XB004-1
(Power AC 24 V)
S 623

Desigo CC
Workstation
Desigo Primary Automation Stations

On the actual floors, up to 20 Desigo room automation stations are network over a daisy chain. The entire
network continues operated, even if a device fails.
Copper cabling can still be used to reach individual edge switches. And from there distributed (depending
on the application) in a star or daisy chain topology.
The distribution switches are equipped as managed layer 2 switches; the edge switches as unmanaged.
This topology illustrates that you can expand in the future using layer 2 switches. Separate VLANs can be
configured for each floor to separate disciplines (HVAC, room automation, video, fire detection systems).
Ring cabling of distribution switches meet customer requirements for reliability. Important Desigo room
automations for central functions and important room are cabled in a star topology to the edge switch.

Large project
The following illustrates a large project with various disciplines. Emphasis is also placed here on speed,
availability, a structure cabling concept, and standardized connection technology. Advanced availability and
redundancy is achieved by using an additional core switch.
Glass fiber optics can cable network components across building over long distances, over EMC risky
areas, and where there is a risk of potential drift.

22 | 71 A6V11159798_en--_03
Overview
Merging BACnet/IP networks
3

BACnet/IP over
Ethernet (Twisted Pair)
Ethernet (Fiber Optics)
Dedicated communication over
Fiber Optics

Camera
PTZ Outdoor
Floor 2

S 623 XB205-3 XB205-3


Camera Intrusion
PTZ Indoor Panel
Fire and Security Systems Desigo Room Automation Stations

Camera
PTZ Outdoor
XB005
(Power AC 24 V) Access Control
Floor 1

Controller
XB205-3 XB205-3
IP Card Reader
Fire and Security Systems Desigo Room Automation Stations Intrusion
Panel
Basement

XB004-1
Basement

(Power AC 24 V)
Fire XB205-3 XM416-4C S 623
Network S 623
IP Card Reader Desigo CC
Workstation
Fire and Security Systems Desigo Primary Automation Stations

Examples for industrial switches are:


● Siemens SCALANCE XB-000 range: Unmanaged switches with electric and/or optical ports for setting
up small networks, AC/DC 24 V, used in edge or distribution areas.
● Siemens SCALANCE XB-200 range: Manageable layer 2 IE switches with a console port, diagnostic LED
and redundant power supply for use as a distribution switch, supports ring technology RSTP, VLAN,
port mirroring for troubleshooting and diagnostics, configuration with Step7/TIA, Web or Command Line
Interface (CLI), SNMP.
● Siemens SCALANCE XM-400 Range: Managed Layer 3 IE Switch with auxiliary routing functions
between IP subnetworks.
For details, see:
https://mall.industry.siemens.com/mall/de/WW/Catalog/Products/9300002?tree=CatalogTree
We refer here again to topics IT security and IT basic protection.
The increasing use of Ethernet connections up to the field level means that the associated security issues
are also increasing in importance. Open communications and increased networking of different systems
and disciplines not only present enormous possibilities, but also considerable risks. The appropriate
measures must be undertake to fully protect building automation and control under the aspect of security.
As also depicted in the graphic above, you can achieve security segmentation of an important and security-
relevant discipline (e.g. fire or intrusion) via the security module Scalance S623 or Sinema Remote Control.
Cell protection with a firewall can protect against unauthorized access and data transmission via VPN
against manipulation or spying.
For details, see:
https://mall.industry.siemens.com/mall/de/WW/Catalog/Products/10224584?tree=CatalogTree
https://mall.industry.siemens.com/mall/de/WW/Catalog/Products/10263934?tree=CatalogTree
You must ensure that the IP network is secure since the BACnet protocol transmit unencrypted.
Risk factors:
● Unprotected network sockets
● Unprotected WLAN networks
● Unprotected system and hardware
● Physical access to equipment rooms, control panels, and operator units
● Access rights on the network and in the Desigo system
The elements of infrastructure, IT systems, networks, and applications must be discussed under the
aspects of security and appropriate measures need to be developed. Customer, domestic, or industry
guidelines and directives must be observed under all circumstances.
For additional details, see IT security on installations with Desigo (CM110663) and Practical Guide on IP
Networks in Building Automation and Control Systems (CM110668).

A6V11159798_en--_03 23 | 71
BACnet/IP networks
4 Checklist for designing BACnet/IP networks

4 BACnet/IP networks

4.1 Checklist for designing BACnet/IP networks


Small to mid-sized project
Consider the following questions for detailed planning when designing a small to mid-sized project with a
low level of network complexity:

Question Designing the BACnet network Designing the IP network


Is the number of Desigo room automation One BACnet network Small to mid-size project and networks
stations < 500? of a lower complexity

Does the number of primary plants, One BACnet network


implemented with Desigo PXC, < 200?

Are only HVAC and Desigo room automation


planned on this project?

Is only one building or building section


automated on this project?

Are BACnet third-party devices used? Own BACnet network

Does data exchange need to be implemented Same UDP port


between BACnet third-party devices and Desigo
units (PXC)?

Do you anticipate commanding more than 500 No → OK


group member on central functions (emergency,
service, or protection functions or operating
modes and set points for lighting, blinds, HVAC,
fire and wind, etc.)?

The central functions need to be divided


up for more than 500 group members.
A group member is not the same as a
room segment. A room segment can
include lots of group members.

Do you anticipate more than 250 group No → OK


members on central functions that supply
demand signals to supply systems?
A cooling or heating valve sends out a demand
signal. A room segment can send out multiple
demand signals.

The central functions need to be divided


up for more than 250 group members.
A group member is not the same as a
room segment. A room segment can
include lots of group members.

Superposed, it is used to monitor devices and No → OK


schedule a monitoring device. Is there more
than 500 BACnet references or more than 50
scheduler programs with a maximum of 5
references?

24 | 71 A6V11159798_en--_03
BACnet/IP networks
Checklist for designing BACnet/IP networks
4

Question Designing the BACnet network Designing the IP network


For more than 500 BACnet references,
i.e. more than 50 scheduler programs
with a maximum each of 5 references
and 250 BACnet references to the
Desigo room automation stations,
requires an additional PXC.
Recommendation:
We recommend, when managing the
project with BOS, using a monitoring
device for scheduling or checking
whether the scheduler program for the
floor scope can be implemented using
another PXC.
Moreover, an additional PXC00-E.D is
preferable for monitoring Desigo room
automation stations.
Reason: All references, etc., are deleted
if BOS checks out a monitoring device
and scheduler without Desigo room
automation stations and the CFC data is
generated from the XWP Point
Configurator.

Should the IP network be redesigned and Definition of subnetwork and IP


implemented? addresses

Can the existing infrastructure be extended? Clarify with IT

Are equipment rooms, control panels, Use of unmanaged layer 2 switches


distributors distributed over multiple floors?

What is the distance between control panels? Copper cable or glass fiber optics, clarify
the distances

Is network diagnostics and troubleshooting Managed layer 2 switches including


required? configuration for port mirroring

Is reliability and redundancy required? Managed layer 2 switches, RSTP

Is monitoring for faults/failures required? SNMP or hardware contact

Is remote access required? Use of security modules for firewall and


VPN

Is IT security required? Based on local and industry guidelines

Mid-sized project
Consider the following questions for detailed planning when designing a mid-sized project with a medium
level of network complexity:

Question Designing the BACnet network Designing the IP network


Is the number of Desigo room automation Medium to large project and network of
stations between 500 and 2500? medium complexity

Does the number of primary plants,


implemented with Desigo PXC, > 200?

Are BACnet third-party devices used? Own BACnet network

Does data exchange need to be implemented Same UDP port Mounting managed layer 2 switches,
between BACnet third-party devices and Desigo configuration of VLAN, and eventually
units (PXC)? port mirroring

Are equipment rooms, control panels, Mounting BBMD


distributors distributed over multiple building
sections or floors?

Are the units to control the primary plants Plant scope Plant scope on its own VLAN
centrally located in an equipment room? The same UDP port for the Desigo
system

A6V11159798_en--_03 25 | 71
BACnet/IP networks
4 Designing BACnet/IP networks

Question Designing the BACnet network Designing the IP network


Are the control units for the primary plants Floor scope Floor scope with room automation on its
decentralized on individual floors together with The same UDP port for the Desigo own VLAN
Desigo room automation stations? system

Are BACnet/Desigo devices together on a Managed layer 2 switches, configuration


separate BACnet network for building, plant,, of VLAN, and eventually port mirroring
and floor scope?

Are there Desigo room automation stations with Unmanaged layer 2 switch cabled in a
central functions? star topology

Are there Desigo room automation stations that


automate important and critical rooms?

Are the no more than 20 Desigo room Cabling using daisy chain technology,
automation stations on the floor? originated at a distribution switch

You must distinguish between important and less important room automation stations if
there are more than 20 Desigo room automation units on the floor. Starting at the
distribution switch, the cabling is either in a star topology or with a max. of 20 units as
daisy chain.

Are different IP networks and different UDP One BBMD per IP segment is required Layer 3 switch
ports configured? with an asymmetrical BDT. FDT must
also be possible if there is a Desigo CC
management platform or other BAC
clients.

Large project
Consider the following questions for detailed planning when designing a large project with a high level of
network complexity:

Question Designing the BACnet network Designing the IP network


Are other disciplines (fire, intrusion, video) Large project and network of high
planned on the project in addition to HVAC and complexity
Desigo room automation?

Is the number of Desigo room automation


stations between 500 and 15,000?

Does the number of primary plants,


implemented with Desigo PXC, > 200?

Does building automation and control extend to Multiple BACnet internetworks,


multiple properties, buildings, and building eventually with multiple BACnet
sections? networks.
See as well: Special case: BACnet
referencing over different IP networks
[➙ 44]

Do numerous properties and buildings required Layer 3 switches for implementing


a clearly structure IP network? multiple IP segments

Is IT security required? Implementation of relevant topics on


local or industry guidelines

4.2 Designing BACnet/IP networks


The following examples demonstrates network planning and configuring of a BACnet network up to
commissioning in the real world.
The examples illustrate the required clarifications and planning steps, the selection and configuration of
hardware components involved in implementing small to mid-sized, up to large Desigo projects.
We rely on products from the Siemens portfolio in the examples. The network components must meet the
same requirements and function if you can use existing IT infrastructure to implement the project.

26 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4

4.2.1 Network for a small to mid-sized project


Example for planning and implementing a project:

Project Description
● New office building with room automation for 136 rooms over 4 floors as well as preparing the
appropriate primary plants.
● Each floor is leased by another tenant and has its own occupancy and use, i.e. the room operating
mode as well as associated room setpoints, lighting per floor with central operation, and emergency
function over all floors.
● Blinds control for each facade, including protection, service, and emergency function over all floors, a
central weather station, demand-control of primary plants.
● Schedulers together with a calendar for room operating modes and lighting for each floor, superposed
functions on a monitoring device.
● Primary plants for air handling, heat generation and distribution as well as central distribution of
refrigeration on equipment rooms.
● Primary plants and general: 5 PXC100-E.D und 1 PXC00-E.D
● Desigo room automation: 121 DXR2 or PXC3.E…
● Network infrastructure: Visualization and monitoring in the event of failure

A6V11159798_en--_03 27 | 71
BACnet/IP networks
4 Designing BACnet/IP networks

Functional display of an example topology

Central/System Functions

Room-related Functions

Primary-related Functions

Planning and implementation, IP network

Core level
A core switch is not needed since everything is located on one IP segment.

Distribution level
In the distribution level, in the riser zones, i.e. floor distributors:

28 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4

● Unmanaged layer 2 switches are planned that are connected with copper cable.
● A managed layer 2 switch is planned for network diagnostics and troubleshooting where a management
platform is connected. An unmanaged layer 2 switch can be used as well if the customer has no special
requirements.

Edge level
Only unmanaged layer 2 switches are planned as edge switches. The following applies:
● Important rooms / Desigo room automation stations are implemented in a star topology on a
distribution switch or remote edge switch.
● Unimportant rooms / Desigo room automation stations (max. 20) are networked in a line topology
(daisy chain).
● Central functions / Desigo room automation stations are implemented using star cabling on the layer 2
switch (e.g. AS4001).
● PXC… for the primary plants and superposed functions in the equipment room are implemented in star
cabling on a layer 2 switch.
3. Floor -
Unmanaged
Layer 2 Switch
30x PXC3/DXR
AS_4001 AS_4002 ...

... AS_4028 AS_4029 AS_4030

2. Floor -
Unmanaged
Layer 2 Switch
30x PXC3/DXR
AS_3001 AS_3002 ...

... AS_3028 AS_3029 AS_3030

1. Floor
Unmanaged
Layer 2 Switch
30x PXC3/DXR
AS_2001 AS_2002 ...

... AS_2030

Ground Floor
Unmanaged
Layer 2 Switch
30x PXC3/DXR
AS_1001 AS_1002 ...

... AS_1030

Managed/
Unmanaged
Layer 2 Switch

Central Functions & Monitoring


AS_5001 AS500

DXR2.E18 PXC00-E.D Desigo CC


Central Functions Monitoring Workstation

PXC.. Primary Plants


AS01 AS02 AS05
IP Segment 5x PXC100-E.D
Range 192.168.11.x Air Treatment,
Heating-/Cooling Circuits
BACnet Network 100
UDP Port 0xBAC0

IP/VLAN overview
Network designation Network Address range
Building automation and control 192.168.11.0/24 192.168.11.2….192.168.11.254

Requires more than 200 IP addresses

Building automation and control 192.168.11.0/23 Max. 510 usable IP addresses

A6V11159798_en--_03 29 | 71
BACnet/IP networks
4 Designing BACnet/IP networks

Planning and implementation, BACnet network


A BACnet internetwork is built using a BACnet network. All Desigo devices communicate on the same UDP
port, e.g. 0xBAC0.
Local and global broadcasts are not critical for this amount of devices, rooms, and plants, i.e. BBMD
configuration is not required.
Each Desigo PXC... automation station should have FDT functionality for maintenance and diagnostics and
remote access.

Planning and implementation, HVAC and room automation


Plant scope:
● Desigo PXC…E.D to control primary plants.
Building scope:
● Desigo PXC00-E.D for superposed functions, e.g. scheduler for occupancy and use times by floor and
monitoring Desigo room automation stations.
● Desigo DXR2.E18/PXC3.E… for central functions over multiple floors.
Floor scope:
● Desigo DXR2.E18/PXC3.E… for central functions.
● Desigo DXR2.E../PXC3.E... for room and room segments / HVAC, lighting, and blinds.
If project implementation permits (from a cost standpoint), we recommend distributing monitoring of
Desigo room automation stations or schedulers for the floors over different monitoring units (PXC00-E.D).

Planning and implementation of central functions


Central function 1st floor Floor 1 Floor 2 Floor 3 The entire building,
Tenant A Tenant B Tenant C Tenant D across floors

Hardware AS1001 AS2001 AS3001 AS4001 AS5001

Central weather CenWthStn


station

Central setpoint CenSsn


generation via
seasonal
compensation

Central operating CenOp_EG CenOp_1OG CenOp_2OG CenOp_3OG


mode determination

AS500 SchedOp0 SchedOp1 SchedOp2 SchedOp3


Scheduler for room Scheduler, room Scheduler, room Scheduler, room Scheduler, room
operating mode operating mode operating mode 2nd operating mode 3rd operating mode 4th
ground floor floor floor floor

Central operation CenOpLgt_EG CenOpLgt_1OG CenOpLgt_2OG CenOpLgt_3OG


lighting

AS500 SchedLg0 SchedLg1 SchedLg2 SchedLg3


Scheduler for Scheduler, lighting Scheduler, lighting, Scheduler, lighting, Scheduler, lighting,
lighting, building occupancy, ground building occupancy, building occupancy, building occupancy,
occupancy floor 2nd floor 3rd floor 4th floor

AS500 SchedLg6 SchedLg7 SchedLg8 SchedLg9


Scheduler for Scheduler, lighting Scheduler, lighting Scheduler, lighting Scheduler, lighting
lighting, system system operation. system operation. system operation. system operation.
operation First floor 2nd floor 3rd floor 4th floor

Central emergency CenEmgLgt_EG CenEmgLgt_1OG CenEmgLgt_2OG CenEmgLgt_2OG


function lighting

Central emergency CenEmgLgt


lighting (overall)

Central shading CenOpShd_EG CenOpShd_1OG CenOpShd_2OG CenOpShd_3OG


operation

30 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4

Central function 1st floor Floor 1 Floor 2 Floor 3 The entire building,
Tenant A Tenant B Tenant C Tenant D across floors

AS500 SchedSh0 SchedSh1 SchedSh2 SchedSh3


Scheduler for Scheduler, shading, Scheduler, shading, Scheduler, shading, Scheduler, shading,
shading, building occupancy, ground occupancy, 2nd floor occupancy, 3rd floor occupancy, 4th floor
occupancy floor

AS500 SchedSh6 SchedSh7 SchedSh8 SchedSh9


Scheduler for Scheduler, shading Scheduler, shading Scheduler, shading Scheduler, shading
shading, system system operation. system operation. system operation. system operation.
operation Ground floor 2nd floor 3rd floor 4th floor

Central emergency CenEmgShd


shading (overall)

Central protection CenPrtShd


function shading

Central service CenSrvShd_EG CenSrvShd_1OG CenSrvShd_2OG CenSrvShd_3OG


function
Blinds

Central facade CenFcdShd_W


shading west

Central facade CenFcdShd_S


shading south

Central facade CenFcdShd_E


shading east

Hot water supply SplyHw


chain

Supply chain chilled SplyChw


water

Recommendation: Network components


● Siemens SCALANCE XB005 - as the edge switch for cabling PXC and Desigo room automation stations.
● Siemens SCALANCE XB005 - At the distribution level in the riser zones.
● Siemens SCALANCE XB205 - At the distribution level with port mirroring for diagnostics.

IT security and IT basic protection


The elements of infrastructure, IT systems, networks, and applications must be discussed under the
aspects of security and appropriate measures need to be developed. Customer, domestic, or industry
guidelines and directives must be observed under all circumstances.
For additional details, see IT security on installations with Desigo (CM110663) and Practical Guide on IP
Networks in Building Automation and Control Systems (CM110668).

Summary
The following tables show how to depict all devices and network components in a small project.

Plant category Number of IP devices


PXC primary plants 5

PXC3/DXR2 individual room control & central functions 121

PXC00-E.D system controller, building scope 1

Reserves 5% 6

Amount 133

A6V11159798_en--_03 31 | 71
BACnet/IP networks
4 Designing BACnet/IP networks

Network components Type Siemens Layer Managed No.


Edge switch per floor XB005 2 No 9

Distribution switch in the equipment XB200 1 Yes 1


rooms

Description 2nd floor 3rd floor 4th floor 5th floor Primary plant System level
DXR2 DXR2 DXR2 DXR2
VLAN VLAN 01 VLAN 01 VLAN 01 VLAN 01 VLAN 01 VLAN 01

UDP port BAC0 BAC0 BAC0 BAC0 BAC0 BAC0

Subnet mask 255.255.255.0 255.255.255.0 255.255.255.0 255.255.255.0 255.255.255.0 255.255.255.0

Default gateway 192.168.11.254 192.168.11.254 192.168.11.254 192.168.11.254 192.168.11.254 192.168.11.254

Engineering 192.168.11.251
notebook
XWP/ABT

Number of DXR2 30 30 30 30

Reserve IP 220 220 220 220


addresses

IP address range 192.168.11.11 192.168.11.51 192.168.11.101 192.168.11.151


for DXR2 from…

IP address range 192.168.11.50 192.168.11.100 192.168.11.150 192.168.11.200


for DXR2 ...to

Central functions 192.168.11.50 192.168.11.100 192.168.11.150 192.168.11.200


floor (DXR2…)

Central functions 192.168.11.201


for the overall
building
(PXC3/DXR2)

System controller 192.168.11.202


monitoring floors
(PXC00-E.D)

Number of PXC 5

Reserve IP 249
addresses

IP address range 192.168.11.203


PXC primary
plants from…

IP address range 192.168.11.210


PXC primary
plants ...to

IP address range 192.168.11.211


Mgmt'stations
Desigo CC
from…

IP address range 192.168.11.215


Mgmt'stations
Desigo CC f...to

4.2.2 Network for mid-sized to large project structured with centralized


primary plants
Example for planning and implementing a project:

32 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4

Demand
● New office building with room automation for 424 rooms over 4 floors as well as preparing the
appropriate primary plants.
● Each floor is leased by another tenant and has its own occupancy and use, i.e. the room operating
mode as well as associated room setpoints, lighting per floor with central operation, and emergency
function.
● Blinds control for each facade including protection, service, and emergency function.
● Central weather station, demand-controlled control of primary plants.
● Schedulers together with a calendar for room operating modes and lighting for each floor, superposed
functions on a monitoring device.
● Primary plants for air handling, heat generation and distribution as well as central distribution of
refrigeration in an equipment room.
● Primary plants and general: 5 PXC100-E.D und 5 PXC00-E.D
● Desigo room automation: 402 PXC3.E…/DXR2
● Visualization, operating and monitoring Desigo CC
● Monitoring network components via SNMP

A6V11159798_en--_03 33 | 71
BACnet/IP networks
4 Designing BACnet/IP networks

Functional display of an example topology

Building
VLAN5
192.168.15.x
BAC0 Building
VLAN7
192.168.17.x

Floor ..
VLAN2
192.168.12.x
BAC0
Max 250 IP Devices

Floor ..
VLAN1
192.168.11.x
BAC0
Max. 250 IP Devices

Plant
Central/System Functions
VLAN6
192.168.16.x
BAC0

Room-related Functions

Primary-related Functions

Planning and implementation, IP network

Core level
Core Switch (Managed Layer 3) as the network core, interface for remote maintenance, and office network
as well as building additional IP segments or as a redundant backbone.

Distribution level
Managed layer 2 switches are planned on the distribution level, in the riser zones, i.e. floor distributors that:

34 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4

● Are connected with copper cabling.


● Ensure that Desigo room automation stations from the given floor are located on its own VLAN and
therefore isolated from other Desigo room automation stations on other floors for the purposes of local
BACnet broadcasts.
● You can configure port mirroring of each VLAN for network diagnostics and troubleshooting.

Edge level
Only unmanaged layer 2 switches are planned as edge switches. The following applies:
● Important rooms / Desigo room automation stations are implemented in a star topology on a
distribution switch or remote edge switch.
● Unimportant rooms / Desigo room automation stations (max. 20) are networked in a line topology
(daisy chain).
● Central functions / Desigo room automation stations are implemented using star cabling on a layer 2
switch.
● PXC… for the primary plants and superposed functions in the equipment room are connected in star
cabling on a layer 2 switch.
Floor 4 - IP Segment 04 on VLAN4
Managed Range 192.168.14.x UDP Port BAC0
Layer 2 Switch
100x PXC3/DXR
AS_4001 AS_4002 AS_4003 ...

... AS_4098 AS_4099 AS_4100

DXR2.E..
F4BNR01 Central DXR2.E..
BBMD Functions
PXC00-E.D Asymmetric BDT 4 PXC...E.D.

Floor 3 - IP Segment 03 on VLAN3


Managed Range 192.168.13.x UDP Port BAC0
Layer 2 Switch
100x PXC3/DXR
AS_3001 AS_3002 AS_3003 ...

... AS_3098 AS_3099 AS_3100

DXR2.E..
F3BNR01 Central DXR2.E..
BBMD Functions
PXC00-E.D Asymmetric BDT 3 PXC...E.D.

Floor 2 - IP Segment 02 on VLAN2


Managed Range 192.168.12.x UDP Port BAC0
Layer 2 Switch
100x PXC3/DXR

AS_2001 AS_2002 ...AS_2010

DXR2.E.. DXR2.E..
F2BNR01 Central
BBMD Functions
PXC00-E.D
Asymmetric BDT 2
Floor 1 - IP Segment 01 on VLAN1
Managed Range 192.168.11.x UDP Port BAC0
Layer 2 Switch
100x PXC3/DXR
AS_1001 AS_1002 ...AS_1010

Desigo CC
Workstation

DXR2.E.. DXR2.E..
F1BNR01
BBMD
Central
Functions 7
Managed
PXC00-E.D Asymmetric BDT 1 Foreign
Device
Layer 3 Switch Table (FDT)
Central Functions & Time Control Switch
AS_5001ZF AS_5002ZF AS501SC BNR501 IP Segment 07 on VLAN7
Range 192.168.17.x
BBMD BACnet Internetwork BAC0
FDT
DXR2.E18 DXR2.E18 PXC00-E.D PXG3.M
5 IP Segment 05 on VLAN5
Range 192.168.15.x UDP Port BAC0
BMA
Siemens
FS20
VLAN11
Primary Plants 3x PXC100-E.D. 6 RfmAS01 RfmAS02
ISP01AS03 ISP01AS02 ISP01AS01
BAC2 BBMD
Asymmetric 10
BDT
FDT
FDT FDT Primary Server
IP Segment 6 on VLAN6 IP Segment 10 on VLAN10
BACnet Network 100 Range 192.168.16.x Range 192.168.20.x
UDP Port BAC0 UDP Port BAC0

A6V11159798_en--_03 35 | 71
BACnet/IP networks
4 Designing BACnet/IP networks

IP/VLAN overview
Network designation VLAN ID Subnet Address range Default gateway
BA_TRA_01 1 255.255.255.0 192.168.11.1 -- 254 192.168.11.254

BA_TRA_02 2 255.255.255.0 192.168.12.1 -- 254 192.168.12.254

BA_TRA_03 3 255.255.255.0 192.168.13.1 -- 254 192.168.13.254

BA_TRA_04 4 255.255.255.0 192.168.14.1 -- 254 192.168.14.254

BA_Mgmt 5 255.255.255.0 192.168.15.1 -- 254 192.168.15.254

BA_Hvac 6 255.255.255.0 192.168.16.1 -- 254 192.168.16.254

BA_CC_BuB 7 255.255.255.0 192.168.17.1 -- 254 192.168.17.254

BA_Rfm 10 255.255.255.0 192.168.20.1 -- 254 192.168.20.254

DMS_FS20 11 255.255.255.0 192.168.21.1 -- 254 192.168.21.254

An IP segment can also be divided on a project-by-project bases into a part with static addresses, e.g.
automation stations, etc., and a dynamic part (DHCP), e.g. for engineering laptops.
As an alternative, you can also work in general with DHCP. You must ensure, however, that the stations
always have the same IP address. This applies to:
● BACnet device that assume BBMD functionality.
● Room automation stations with an on-board web server and are operated with ABT SSA for servicing
and diagnostics.
● Room operator units, such as QMX7.

Planning and implementation, BACnet network


Each Desigo PXC... automation station should have FDT functionality for maintenance and diagnostics and
remote access.
A BACnet internetwork must be set up. Each IP segment becomes a BACnet network.
A BBMD must be used in each IP segment in order for BACnet and IP networks to interact. This permits
isolating local broadcasts from the flexible room management (room/room segment). Global broadcasts,
originating from central functions, are managed on the BACnet device that assumes the BBMD
functionality by asymmetrical BDT entries (Broadcast Distribution Table).
Set up the device accordingly in the XWP network configurator. The following is a overview of the BACnet
configuration:

Device name BNR501 ISP01AS01 F1BNR01 F2BNR01 F3BNR01 F4BNR01

Device Type PXG3.M PXC100-E.D PXG3.M PXG3.M PXG3.M PXG3.M

IP address 192.168.15.250 192.168.16.250 192.168.11.250 192.168.12.250 192.168.13.250 192.168.14.250

BACnet Network NET100 NET100 NET01 NET02 NET03 NET04


no.

UDP Port BAC0 BAC0 BAC0 BAC0 BAC0 BAC0

IP segment 05 06 01 02 03 04

BBMD true true true true true true

BDT

IP address 192.168.15.250 192.168.16.1 192.168.11.250 192.168.12.250 192.168.13.250 192.168.14.250

192.168.11.250 192.168.15.250 192.168.15.250 192.168.15.250 192.168.15.250 192.168.15.250

192.168.12.250 - - - - -

36 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4

192.168.13.250 - - - - -

192.168.14.250 - - - - -

192.168.16.1 .- - - - -

Function For system Main HVAC plant BBMD in VLAN 1 BBMD in VLAN 2 BBMD in VLAN 3 BBMD in VLAN 4
monitoring of the
system level
(Timesync)
Time switch
catalogs global
BBMD
(is the node for
all broadcast
messages
between VLAN
01-07
or between ERR
from floors and
primary plants)
Primary server

How and why asymmetrical BDT entries?


Local broadcasts that use the flexible room management to locate and address room segments from the
room, are routed to an own VLAN or BACnet network to a defined UDP port (0xBAC0). Local broadcasts are
thus encapsulated and no longer forwarded to other networks.
BACnet Broadcast Management Devices (through the BDT) must, however, be defined for global BACnet
broadcasts (originating, among others, from central functions) to operate successfully on the different IP
segments and BACnet networks.
From the project topology described above, a PXG3.M (BNR501) must for performance reasons in building
scope:
● Support the BBMD function on the first port.
● Enter its own IP address in the BDT to 0xBAC0 (first port).
● Enter all other IP address for the BBMDs in the other IP segments that also communicated on UDP port
0xBAC0.
A BBMD must be defined for each of the other IP segments.
The BDT is also enabled in FxBNR01 to BAC0. In the BDT is the own IP address and address for BNR501.
For performance reasons, we recommend using a PXG3 (BNR) on the floor scope on a midsize to large
project.
The Desigo CC management platform registers as a third-party device in BNR501. The broadcast can be
triggered here and forward via the asymmetrical BBMD entries to all other participants in the various IP
segments.
The project example illustrated above relies on Desigo room automation stations that support Desigo
Version 6.1. In the event that Desigo room automation stations, version 6.0 are used for various reasons
(project progress):
● Desigo room automation stations in the floor scope must be placed on another UDP port to isolate local
broadcasts (room/room segment).
● The routing functionality must be configured for the BACnet router.

Planning and implementation, HVAC and room automation


Plant scope:
● Desigo PXC…E.D to control primary plants.
Building scope:
● Desigo PXC00-E.D for superposed functions, e.g. scheduler for occupancy and use times by floor.
● Desigo DXR2.E18 for central functions over multiple floors.
Floor scope:

A6V11159798_en--_03 37 | 71
BACnet/IP networks
4 Designing BACnet/IP networks

● Desigo PXC00-E.D for monitoring Desigo room automation stations.


● Desigo DXR2.E18/PXC3.E.. for central functions within the floor scope.
● Desigo DXR2.E../PXC3.E.. for room and room segments / HVAC, lighting, and blinds.
You can operate with cascading group master functions if lighting and blinds exceed a maximum of 500
commandable group members. This could, for example, be used for emergency control of blinds actuators
over multiple facades over lighting over multiple floors.

Notes on project implementation


In the project example above was generously planned (since it is a midsized to large project) and one
PXC00-E.D was assigned to each floor scope as well. It assumes monitoring of Desigo room automation
stations. The PXC00-E.D in the building scope is used for scheduling and superposed functions for various
floors as well as central functions for room operating mode, lighting, and blinds.
Depending on building design, air handling may be decentralized on various floors. A PXC100-E.D each is
used in the floor scope to this end. It takes over scheduling and superposed functions for the floor / floor
scope. The PXC00-E.D monitoring unit is used in the building scope to monitor Desigo room automation
stations.

Planning and implementation of central functions


Central function Ground floor Floor 1 Floor 2 Floor 3 Entire building
Hardware AS1001 AS2001 AS3001 AS4001 AS5001ZF

Central weather CenWthStn


station

Central setpoint CenSsnN


generation via CenSsnE
seasonal
CenSsnS
compensation for
North, East, South, CenSsnW
West

Central operating CenOp_EG CenOp_1OG CenOp_2OG CenOp_3OG


mode determination

AS501SC SchedOp0 SchedOp1 SchedOp2 SchedOp3


Scheduler for room Scheduler, room Scheduler, room Scheduler, room Scheduler, room
operating mode operating mode operating mode 2nd operating mode 3rd operating mode 4th
ground floor floor floor floor

Central operation CenOpLgt_EG CenOpLgt_1OG CenOpLgt_2OG CenOpLgt_3OG


lighting

AS501SC SchedLg0 SchedLg1 SchedLg2 SchedLg3


Scheduler for Scheduler, lighting Scheduler, lighting, Scheduler, lighting, Scheduler, lighting,
lighting, building occupancy, ground building occupancy, building occupancy, building occupancy,
occupancy floor 2nd floor 3rd floor 4th floor

AS501SC SchedLg6 SchedLg7 SchedLg8 SchedLg9


Scheduler for Scheduler, lighting Scheduler, lighting Scheduler, lighting Scheduler, lighting
lighting, system system operation system operation system operation system operation
operation Ground Floor. 2nd floor. 3rd floor. 4th floor.

Central emergency CenEmgLgt_EG CenEmgLgt_1OG CenEmgLgt_2OG CenEmgLgt_2OG


function lighting

Central emergency CenEmgLgt


lighting (overall)

Zentrale Bedienung CenOpShd_EG CenOpShd_1OG CenOpShd_2OG CenOpShd_3OG


Jalousie

AS501SC SchedSh0 SchedSh1 SchedSh2 SchedSh3


Scheduler for Scheduler, shading, Scheduler, shading, Scheduler, shading, Scheduler, shading,
shading, building occupancy, ground occupancy, 2nd floor occupancy, 3rd floor occupancy, 4th floor
occupancy floor

38 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4

Central function Ground floor Floor 1 Floor 2 Floor 3 Entire building


AS501SC SchedSh6 SchedSh7 SchedSh8 SchedSh9
Scheduler for Scheduler, shading Scheduler, shading Scheduler, shading Scheduler, shading
shading, system system operation system operation system operation system operation
operation ground floor. 2nd floor. 3rd floor. 4th floor.

Central emergency CenEmgShd


shading (overall)

Central protection CenPrtShd


function shading

Central service CenSrvShd_EG CenSrvShd_1OG CenSrvShd_2OG CenSrvShd_3OG


function shading

Central facade CenFcdShd_W


shading west

Central facade CenFcdShd_S


shading south

Central facade CenFcdShd_E


shading east

Hot water supply SplyHw SplyHw SplyHw SplyHw SplyHw (Total)


chain

Supply chain chilled SplyChw SplyChw SplyChw SplyChw SplyChw (Total)


water

Supply chain SplyAir SplyAir SplyAir SplyAir SplyAir (Total)


ventilation

Recommendation: Network components


● Siemens SCALANCE XB005 - as the edge switch for cabling PXC and Desigo room automation stations.
● Siemens SCALANCE XB205 - At the distribution level in the riser zones for setting up VLANs and port
mirroring for diagnostics.
● Siemens SCALANCE XM405 - As core switch for possible IP routing.
SCALANCE switches from the product family X-200 or X-400 support SNMP and can be monitored on
Desigo CC.

IT security and IT basic protection


The elements of infrastructure, IT systems, networks, and applications must be discussed under the
aspects of security and appropriate measures need to be developed. Customer, domestic, or industry
guidelines and directives must be observed under all circumstances.
For additional details, see IT security on installations with Desigo (CM110663) and Practical Guide on IP
Networks in Building Automation and Control Systems (CM110668).

Reliability and redundancy


Distribution switches can be cabled on the floor distributors from the core switch in a Gbit ring as
backbone if the customer requires extended availability. To this end, special network components must be
planned on midsized to highly complex networks with basic cabling of fiber optics and copper cable.

A6V11159798_en--_03 39 | 71
BACnet/IP networks
4 Designing BACnet/IP networks

A – Distribution Switch B – Core Switch C – Edge Switch


Fiber Optics Twisted Pair
Yet another level for increasing reliability and redundancy is to employ two core switches at different
locations.

A
B

Cabling of distribution switches and Desigo room automation stations


The distribution switches can be cabled in a ring, if RSTP capable, which offer high reliability. The
important Desigo room automation stations (important rooms, central functions) are connected directly to
the distribution switch. Less critical Desigo room automation stations are cabled to either remote edge
switches or over daisy chain technology.
Desigo PXC3.E.../DXR2 room automation stations support cabling based on daisy chain topology. The max.
number is 20 devices and in the event of a failed automation station, all other stations are no longer
reachable.
Desigo room automation stations can be cabled as ring topology if higher reliability is required.
This requires support for layer 2 switches RSTP (Rapid Spanning Tree Protocol) as well as SNMP
monitoring and that any loss of superposed systems is reported.
In the event of a fault, switching the communication paths can take between 10 and 30 seconds.
DXR2/PXG3 automation stations route the RSTP protocol for the switches. It does not actually process the
RSTP protocol.
For details, see Section 3.3.5 in Practical guide on IP networks in building automation and control
(CM110668).

40 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4

Network Management
Backbone

Bridge
Discarding ID = 4096
Root
Bridge
ID = 0 Port Priority = Low Forwarding

Summary
The following tables show how to depict all devices and network components in a midsized to large project.

Plant category Number of IP devices


PXC primary plants 3

DXR2/PXC3 individual room control & central functions 400

PXC00-E.D system controller, floor scope 4

DXR2 for central functions, building scope 2

PXC00-E.D system controller, building scope 1

PXG3.M for BBMD functionality 5

Reserves 5% 21

Amount 436

Network components Type Siemens Layer Managed No.


Edge switch on the floors XB-005 2 No 16

Distribution switch per floor XB-200 2 Yes 6

Core switch in the equipment rooms XM 400 3 Yes 1

Description Ground 2nd floor 3rd floor 4th floor BA Mgmt Primary System Refrigerati Sinteso
floor DXR2 DXR2 DXR2 DXR2 plants level on FS20
DXR2 machines BMA
BACnet
3rd
VLAN VLAN 01 VLAN 02 VLAN 03 VLAN 04 VLAN 05 VLAN 06 VLAN 07 VLAN 10 VLAN 11

UDP port BAC0 BAC0 BAC0 BAC0 BAC0 BAC0 BAC0 BAC0 BAC2

Subnet 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25
mask 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0

Default 192.168.11. 192.168.12. 192.168.13. 192.168.14. 192.168.15. 192.168.16. 192.168.17. 192.168.20. 192.168.21.
gateway 254 254 254 254 254 254 254 254 254

Engineering 192.168.11. 192.168.12. 192.168.13. 192.168.14. 192.168.15. 192.168.16. 192.168.17. 192.168.20. 192.168.21.
notebook 251 251 251 251 251 251 251 251 251
XWP/ABT

Number of 101 101 101 101 3


DXR2/PXC3
and PXC00-
E.D

A6V11159798_en--_03 41 | 71
BACnet/IP networks
4 Designing BACnet/IP networks

Description Ground 2nd floor 3rd floor 4th floor BA Mgmt Primary System Refrigerati Sinteso
floor DXR2 DXR2 DXR2 DXR2 plants level on FS20
DXR2 machines BMA
BACnet
3rd
Reserve IP 149 149 149 149 247
addresses

IP address 192.168.11. 192.168.12. 192.168.13. 192.168.14. 192.168.15.


range for 1 1 1 1 1
DXR2
from…

IP address 192.168.11. 192.168.12. 192.168.13. 192.168.14. 192.168.15.


range for 200 200 200 200 50
DXR2 ...to

PXC00-E.D 192.168.11. 192.168.12. 192.168.13. 192.168.14.


monitoring, 201 201 201 201
floor scope

Central 192.168.11. 192.168.12. 192.168.13. 192.168.14.


functions, 1 1 1 1
floor scope

Central 192.168.15.
functions, 1…2
superposed,
building
scope

PXG3.M, 192.168.11. 192.168.12. 192.168.13. 192.168.14.


BBMD in 250 250 250 250
the floor
scope

PXG3.M, 192.168.15.
central 250
BBMD in
the building
scope

PXC00-E.D 192.168.15.
scheduler 51
for floor
scope

Number of 3 1 2 10
PXC, FS20,
BACnet3rd

Reserve IP 251 253 248 240


addresses

IP address 192.168.16. 192.168.17. 192.168.20. 192.168.21.


range 1 1 1 1
from…

IP address 192.168.16. 192.168.17. 192.168.20. 192.168.21.


range ...to 249 249 249 249

42 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4

Description Ground 2nd floor 3rd floor 4th floor BA Mgmt Primary System Refrigerati Sinteso
floor DXR2 DXR2 DXR2 DXR2 plants level on FS20
DXR2 machines BMA
BACnet
3rd
PXC BBMD 192.168.16.
1

IP address 192.168.17.
range 11
Mgmt'statio
ns Desigo
CC from…

IP address 192.168.17.
range 13
Mgmt'statio
ns Desigo
CC ...to

Mgmt'statio 192.168.15.
n Desigo 250
CC, entry in
FDT

A6V11159798_en--_03 43 | 71
BACnet/IP networks
4 BACnet referencing over different IP networks

4.3 BACnet referencing over different IP networks


A common exception is the necessity to provide an individual data point to multiple locations in the
building. One example is a weather station where the value is required on all BACnet networks. A coupling
of BACnet networks via BBMDs for just this one data point is possible, but costly.
As a consequence, Desigo V6.1 was extended with the functionality of BACnet referencing to connect
point-to-point between different IP networks / UDP ports.
No BBMD configuration is required for this functionality since it is a point-to-point connection (Unicast).
The following topology is thus also supported:

Read only
BACnet
IP Router 2.
IP Network 1. BAC0 IP Network 2. BACF

1. Read and commend

Desigo PX Desigo PX Desigo Room Automation


Extended Syntax 10.170.3.11 PXC3/DXR2
B = [0,IP, "10.170.3.11:0xBACF"] [0,63]{85} AND command A1 with Object ID 63 10.170.3.12
For Desigo Room Automation: A1 with Object ID 63
B = [0,IP, "10.170.3.12:0xBACF"] [0,63]{85}

1. Desigo PX has read and write access to only one Desigo PX on another IP network (also on another
UDP port).
2. Desigo PX has read only access to only one Desigo room automation station on another IP network.

Restriction
In Desigo V6.1, the PXC3/DXR2 Desigo room automation stations cannot read data points from other IP
networks.

Syntax
B=[BACnet Network number (0=own network), Communication path (IP)"Station Address"]
[Objecttype,Object ID]{Property ID}
Example: B=[0,IP,"10.170.3.11:0xBACF"][0,63]{85}
For details, see Appendix C in Ethernet, TCP/IP, MS/TP and BACnet (CM10666).

44 | 71 A6V11159798_en--_03
BACnet/IP networks
Diagnostics and troubleshooting BACnet/IP networks
4

4.4 Diagnostics and troubleshooting BACnet/IP networks


General procedure for diagnostics and troubleshooting
BACnet on IP involves the use of a large number of components and this results in a certain degree of
complexity and a corresponding vulnerability to errors.
If a problem arises in the system, it must be located in a step-by-step procedure. Always start you analysis
at the lowest system. Only continue to the next higher system once you are sure that the system is
operating correctly. A sketch of the topology is extremely helpful when attempting to locate problems.
Create a sketch if none exists.
The following questions can help to troubleshoot communication problems.

Faults Possible causes & troubleshooting


Is the link signal available on the IP ● Is the extension module (PXC modular) plugged in firmly?
components? ● Are all connectors firmly in their sockets?
With switches, the link signal is indicated by a ● Is there supply voltage for the switches?
continuous or flashing LED. In all devices in the
● Were the RX and TX connections mixed up on fiber optics?
Desigo system, the Service LED is continuously
ON if no link signal is detected. ● Is the setting for the switch/router port correct?

Are VLAN switches used on the network? ● Are all BACnet devices configured on the same VLAN?
● A number of managed switches offer information on their own web interface
on connected devices. This includes, for example, port speed, VLAN
association, and packet statistics. The latter can also provide references on
insufficient cabling.

Diagnostics via wireshark is not possible. No port mirroring configured on the managed switches
● Use of hub or configured switch
● Consultation with customer IT on the use of wireshark

Wireshark does not have the proper BACnet Layer 2 switch is used, but without port mirroring
services. Use a hub or configure a corresponding layer 2 switch via the web interface

No communication between the BACnet client Is a firewall available?


and the various BACnet devices. Consultation with IT, cannot be discovered using the diagnostics tool.
Firewall, UDP port configuration is not entered

The BACnet clients cannot access the different BBMD in multiple IP segments
BACnet devices on the various VLANs. BACnet devices do not have a unique instance number
BACnet devices do not have a fixed IP address (if configured as BBMD)
BBMD used, but all BACnet networks are the same UDP port?

Have you considered notes from technical ● Desigo Ethernet, TCP/IP, MS/TP and BACnet fundamentals (CM110666)
documentation?

Communication, speed on the Desigo network Compliance with system topology, regarding:
● Number of devices on a BACnet network.
● Max. number of 500 commanded group members. No more than 500
addresses can be managed.
● Max. number of 250 group members. The interface performance when
acquiring data is limited, in other words, only a limited number of telegrams
can be processes in brief period.

A6V11159798_en--_03 45 | 71
BACnet networks with MS/TP trunks
5 Designing BACnet networks with MS/TP trunks

5 BACnet networks with MS/TP trunks

5.1 Designing BACnet networks with MS/TP trunks


MS/TP is Master-Slave/Token-Passing and stands for the BACnet data link protocol with services based
on EIA-485 as the physical layer. It permits simple cabling on site with 3 wires up to a max. cable length of
1200 meters.
The logical principle behind MS/TP is the token passing, i.e. a token is transmitted in the system from one
device to another over the EIA-485 bus. A device can only communicate after receive this token. MS/TP
distinguishes between two types of devices:
● Master devices
● Slave devices
A BACnet slave can be read/written, but never receives the token. The disadvantage of slave devices is
that slave devices cannot actually send out messages and always requires a master on the network to
establish communications. On the other hand, it has the advantage of the transferring less tokens the more
slaves that exist on the EIA-485 bus, which then accelerates overall communication. Overall, however, the
disadvantages outweigh the advantages so that most MS/TP devices are set up as master devices.
Each mast on the network periodically outputs a poll for the next master, i.e. it checks its successor ability
to forward the token. Each master sends out a query between the own address and the next known master
address. For example, if the current address of the master device is 12 and the next known master address
thus far is 22, the addresses 13...21 is polled periodically in ascending order to see whether a new mast
device was added to the network with an address in this range. Unused gaps in addresses should be
avoided since the system must wait for a timeout error to determine that there is no corresponding master
under the queried address and this would negatively impact performance of a BACnet MS/TP system.
BACnet MS/TP has less bandwidth than BACnet/IP. MS/TP networks typically operated at 76.8 kBit/s,
while IP networks operate at 100..1000 kBit/s.
All MS/TP devices must have the same baud rate in general with the slowest MS/TP device specifying the
setting limit. You must ensure that no single MS/TP device slows down the system to achieve solid
performance.
Even if MS/TP cannot be used as a general BACnet backbone, MS/TP devices still represent the correct
choice for lots of applications due to the following benefits:
● Simple, cost-effective cabling based on proven EIA-485 technology
● MS/TP generally supports cable lengths of max. 1200m without additional network devices, thus
supporting distributed control
● BACnet MS/TP is officially supported in the BACnet standard resulting in a seamless BACnet system at
all levels
● BACnet MS/TP devices are cost-efficient on applications that do not require fast update rates (such as
VAV and heat pump controllers) and where BACnet/IP devices cannot be used for cost reasons.
It is nevertheless important to correctly use and install the MS/TP networks to take advantage of the
benefits. The following outlines aspects that are important for achieving optimum system performance.

46 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
MS/TP cabling and topology
5

5.2 MS/TP cabling and topology


Physically, an MS/TP bus is a line topology, even if it is logically a ring (due to the token passing principle).
The following applies:
● The MS/TP network may only be implemented within a building.
● BACnet MS/TP networks may only be wired in a line topology. T connections/branches are prohibited.
Stub lines are one exception (up to a maximum of 30 meters).
● In the Desigo system there are actually no pure BACnet /MS/TP networks. BACnet/IP is always used
as the backbone.
For details, see Desigo Ethernet, TCP/IP, MSTP and BACnet (CM110666) and Desigo room automation
engineering, mounting and installation (CM111043, section 10 Network topology).
As a rule a BACnet MS/TP-IP router to the IP network is always required when setting up a Desigo project
with BACnet MS/TP devices. Since both the PXC… for primary plants (in plant scope) and the central
functions (in the building scope) as well as Desigo CC as a BACnet-capable management platform only
communicated over BACnet/IP.
On smaller to mid-sized projects with low complexity, all BACnet/IP devices use the same UPD port; the
BACnet-MS/TP-IP router only connects to the BACnet MS/TP networks.
On mid-sized to large projects at medium to high complexity, the BACnet MS/TP-IP router also takes over
the BBMD functionality.
Building A BACnet Internetwork 0 (BAC0) Building A BACnet Internetwork 0 (BAC0)

System-wide Scope CC Client CC Server System-wide Scope CC Client CC Server

Desigo CC Desigo CC Desigo CC Desigo CC

IP Subnet 192.168.102.x Foreign Device


Unmanaged
Layer 3
Layer 2 Switch
Switch
Building Scope: Central Functions Building Scope:; Central Functions
PXC3 DXR2 Desigo PX PXC3 DXR2 Desigo PX

BBMD
BACnet Communication Path

IP Subnet 192.168.103.x / BAC0

Floor Central Functions


Floor Scope: Flexible Rooms n Floor Scope: Flexible Rooms
BACnet Router BACnet Router

MS/TP MS/TP
BBMD

IP Subnet 192.168.104.x BACnet Network 2 (BAC0)

Floor Central Functions


Floor Scope: Flexible Rooms n Floor Scope: Flexible Rooms
BACnet Router BACnet Router

MS/TP MS/TP
BBMD

IP Subnet 192.168.105.x BACnet Network 3 (BAC0)

IP Subnet
Plant Scope: Primary Plants Plant Scope: Primary Plants
Desigo PX Desigo PX Desigo PX Desigo PX

BBMD
IP Subnet 192.168.106.x BACnet Network 4 (BAC0)

IP Subnet 192.168.100.x IP Subnet 192.168.100.x

The following diagram illustrates which devices and functions are located in what scope and how the
communication paths are defined. The floor scope does not require/support any interaction with another
floor scope. Conversely, functions and applications in the building scope do communicate with the floor and
plant scope. The plant scope processes the information (forced and demand signals) from the building
scope.
You can determine that a floor can be a floor or floor segment, i.e. a MS/TP trunk with max. 64 participants
(e.g. max. 64 DXR2.M). The MS/TP trunk can, however, also encompass multiple floors with max. 64
participants, in other words, a floor represents a zone with max. 64 BACnet MS/TP-capable devices/room
automation stations. The following also applies to the MS/TP trunk: There are no central functions with
group master function and rooms/room segments can only communicate within the trunk.
An IP network can include a max. 8 BACnet MS/TP-IP router and max. 250 DXR2.M devices. A separate
device is needed per IP network that takes over the BBMD functionality. Devices implementing central
functions can only communicated via BACnet/IP.
Different BACnet networks are interconnected to one BACnet internetwork that can include a max. 50
BACnet MS/TP-IP routers or max. 2500 DXR2.M devices.

A6V11159798_en--_03 47 | 71
BACnet networks with MS/TP trunks
5 Checklist for designing BACnet networks with MS/TP trunks

This is a good point to refer once again to the two system limits to complete the concept:

Command process Designing a system


Distribution/commanding of group masters to group member Restricted to max. 500 group members

Collect data Designing a system


Collecting data from the group members via the group master Restricted to max. 250 group members

5.3 Checklist for designing BACnet networks with MS/TP


trunks
Small to mid-sized project
Consider the following questions for detailed planning when designing a small to mid-sized project with a
low level of network complexity:

Question Designing the BACnet network Designing the IP network


Is the number of Desigo room automation One BACnet network Small to mid-size project and networks
stations < 500? of a lower complexity

Does the number of primary plants, One BACnet network


implemented with Desigo PXC, < 200?

Are only HVAC and Desigo room automation For lighting and blinds controls, see
stations planned on this project? Section Network topology in the manual
Desigo room automation engineering,
mounting and installation (CM111043)

Is the number of Desigo room automation Segments over multiple


stations on a flow (MS/TP segment) > 64? BACnet MS/TP IP routers

Are multiple BACnet MS/TP IP routers used? An IP network can include a max. 8
BACnet MS/TP IP routers and max. 250
DXR2.M devices.

Are BACnet third-party devices used? Own UDP port

Does data exchange need to be implemented Same UDP port


between BACnet third-party devices and Desigo
units (PXC)?

Do you anticipate commanding more than 500 No → OK


group member on central functions (emergency,
service, or protection functions or operating
modes and set points for lighting, blinds, HVAC,
fire and wind, etc.)?

The central functions need to be divided


up for more than 500 group members.
A group member is not the same as a
room segment.
A room segment can include lots of
group members.

Do you anticipate more than 250 group No → OK


members on central functions that supply
demand signals to supply plants?
A cooling or heating valve sends out a demand
signal. A room segment can send out multiple
demand signals.

48 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Checklist for designing BACnet networks with MS/TP trunks
5

Question Designing the BACnet network Designing the IP network


The central functions need to be divided
up for more than 250 group members.
A group member is not the same as a
room segment.
A room segment can include lots of
group members.

Superposed, it is used to monitor devices and No → OK


schedule a monitoring device. Are there more
than 500 BACnet references or more than 50
scheduler programs with a maximum of 5
references?

Plan for another PXC for more than 500


BACnet references, i.e. more than 50
scheduler programs with a maximum
each of 5 references and 250 BACnet
references to the Desigo room
automation stations.
Recommendation:
We recommend, when managing the
project with BOS, using a monitoring
device for scheduling or checking
whether the scheduler program for the
floor scope can be implemented using
another PXC.
Moreover, an additional PXC00-E.D is
preferable for monitoring Desigo room
automation stations.
Reason: All references, etc., are deleted
if BOS checks out a monitoring device
and scheduler without Desigo room
automation stations and the CFC data is
generated from the XWP Point
Configurator.

Can an existing cable be used to network Note the topology, cable types, max.
BACnet MS/TP devices? cable length, outgoing lines and
terminating resistances, line topology
with stub lines
MS/TP does not support a star topology

Should the IP network be redesigned and Definition of subnetwork and IP


implemented? addresses

Can the existing infrastructure be extended? Clarify with IT

Are equipment rooms, control panels, Use of unmanaged layer 2 switches


distributors distributed over multiple floors?

What is the distance between control panels? Clarify the distances (Ethernet sections
over copper may only be ca. 90 meters
long)

Are network diagnostics and troubleshooting Managed layer 2 switches including


required? configuration for port mirroring

Are reliability and redundancy required? Managed layer 2 switches, RSTP

Is monitoring for faults/failures required? SNMP or hardware contact

Is remote access required? Use of security modules for firewall and


VPN

Is IT security required? Based on local and industry guidelines

Mid-sized project
Consider the following questions for detailed planning when designing a mid-sized project with a medium
level of network complexity:

A6V11159798_en--_03 49 | 71
BACnet networks with MS/TP trunks
5 Application examples

Question Designing the BACnet network Designing the IP network


Is the number of Desigo room automation Medium to large project and network of
stations between 500 and 2500? medium complexity

Does the number of primary plants,


implemented with Desigo PXC, < 200?

Are BACnet third-party devices used? Own UDP port

Is data exchange to Desigo devices (PXC) Same UDP port


required?

Are equipment rooms, control panels,


distributors distributed over multiple building
sections or floors?

Are the devices to control the primary plants Plant scope Plant scope on its own VLAN
centrally located in an equipment room? BACnet network

Are the control units for the primary plants Floor scope Floor scope on its own VLAN
decentralized on different floors together with Own BACnet network
Desigo room automation stations?

Are BACnet/Desigo devices together on a Managed layer 2 switches, configuration


separate BACnet network for building, plant, of VLAN, and eventually port mirroring
and floor scope?

Are different IP networks configured? One BBMD per IP segment is required


with an asymmetrical BDT.
FDT must also be possible if there is a
Desigo CC management platform or
other BAC clients for operation.

Large project
Consider the following questions for detailed planning when designing a large project with a high level of
network complexity:

Question Designing the BACnet network Designing the IP network


Are other disciplines (fire, intrusion, video) Large project and network of high
planned on the project in addition to HVAC and complexity
Desigo room automation?

Is the number of Desigo room automation


stations between 500 and 15,000?

Does the number of primary plants,


implemented with Desigo PXC, < 200?

Does building automation and control extend to Multiple BACnet internetworks,


multiple properties, buildings, and building eventually with multiple BACnet
sections? networks

Are there multiple properties or building Layer 3 switches for implementing


requiring a clearly structured IP network? multiple IP segments

Is IT security required? Based on local and industry guidelines

5.4 Application examples


The following examples demonstrates network planning and configuring of a BACnet network up to
commissioning in the real world.
The examples illustrate the required clarifications and planning steps, the selection and configuration of
hardware components involved in implementing small to mid-sized, up to large Desigo projects.
We rely on products from the Siemens portfolio in the examples. The network components must meet the
same requirements and function if you can use existing IT infrastructure to implement the project.

50 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Application examples
5

5.4.1 Network for a small to mid-sized project


Example for planning and implementing a project.

Project Description
● New office building with room automation for 136 rooms over 4 floors as well as preparing the
appropriate primary plants.
● Each floor is leased by another tenant and has its own occupancy and use, i.e. the room operating
mode as well as associated room setpoints, lighting per floor with central operation, and emergency
function over all floors.
● Blinds control for each facade, including protection, service, and emergency function over all floors, a
central weather station, demand-control of primary plants.
● Schedulers together with a calendar for room operating modes and lighting for each floor, superposed
functions on a monitoring device.
● Primary plants for air handling, heat generation and distribution as well as central distribution of
refrigeration on equipment rooms.
● Primary plants and general: 5 PXC100-E.D und 1 PXC00-E.D
● Desigo room automation stations: 120 DXR2.M and 1 DXR2.E18
● Network infrastructure: Visualization and monitoring in the event of failure

A6V11159798_en--_03 51 | 71
BACnet networks with MS/TP trunks
5 Application examples

Functional display of an example topology

Central/System Functions

Room-related Functions

Primary-related Functions

Planning and implementation, IP network

Core level
A core switch is not needed since everything is located on one IP segment.

Distribution level
In the distribution level, in the riser zones, i.e. floor distributors:

52 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Application examples
5

● Unmanaged layer 2 switches are planned that are connected with copper cable
● A managed layer 2 switch is planned for network diagnostics and troubleshooting where a management
platform is connected. An unmanaged layer 2 switch can be used as well if the customer has no special
requirements.
BACnet MS/TP networks can have a max. cable length depending on the set baud rate. If the overall length
is, however, exceeded, a new BACnet network must be created and connected via a BACnet MS/TP IP
router to BACnet/IP over the Ethernet.
The rules apply again for BACnet/IP networks, i.e. the Ethernet network must be installed as an
unmanaged layer 2 switch. Of course, a PXC.. can integrated in the given zones to control primary plants,
depending on building planning.
Floor 3 -
Unmanaged
Layer 2 Switch
AS_4001
PXG3.M DXR2.E..
Central Functions

30x DXR
BACnet AS_4002.. ...... AS_4030
NW 40
Floor 2 -
Unmanaged
Layer 2 Switch
AS_3001
PXG3.M DXR2.E..
Central Functions

30x DXR
BACnet AS_3002.. ...... AS_3030

Floor 1 - NW 30
Unmanaged
Layer 2 Switch
AS_2001
PXG3.M DXR2.E..
Central Functions

30x DXR
BACnet AS_2002.. ...... AS_2030
Ground Floor - NW 20
Unmanaged
Layer 2 Switch
AS_1001
PXG3.M DXR2.E..
Central Functions

30x DXR
BACnet AS_1002.. ...... AS_1030
NW 10
Managed/
Unmanaged
Layer 2 Switch

Central Functions & Monitoring


AS_5001 AS500

DXR2.E18 PXC00-E.D Desigo CC


Central Functions Time Control Switch & Monitoring Workstation

PXC.. Primary Plants


AS01 AS02 AS05
IP Segment 5x PXC100-E.D
Range 192.168.11.x Air Treatment,
BACnet Network 100 Heating/Cooling Circuits
UDP Port 0xBAC0

IP/VLAN overview
Network designation Network Address range
Building automation and control 192.168.11.0/24 192.168.11.2….192.168.11.254

Planning and implementation, BACnet networks


A BACnet internetwork is built using a multiple BACnet networks. All BACnet/IP capable Desigo devices
communicate on the same UDP port, e.g. 0xBAC0.

A6V11159798_en--_03 53 | 71
BACnet networks with MS/TP trunks
5 Application examples

The BACnet MS/TP IP router connects the BACnet/IP network to the different BACnet MS/TP networks on
the floors. Note that each network must receive a unique network number.
Local and global broadcasts are not critical for this amount of devices, rooms, and plants, i.e. BBMD
configuration is not required.
Each Desigo PXC.. automation station should have FDT functionality for maintenance and diagnostics and
remote access.

Planning and implementation, HVAC and room automation


Plant scope:
● Desigo PXC…E.D to control primary plants.
Building scope:
● Desigo PXC00-E.D for superposed functions, e.g. scheduler for occupancy and use times by floor and
monitoring Desigo room automation stations.
● Desigo DXR2.E18 for central functions over multiple floors.
Floor scope:
● Desigo DXR2.E exclusively for central functions.
● Desigo DXR2.M.. for rooms with HVAC, lighting, and blinds, or room segments with HVAC.
● PXG3.M BACnet-MS/TP IP router.
If project implementation permits (from a cost standpoint), we recommend distributing monitoring of
Desigo room automation stations or schedulers for the floors over different monitoring units (PXC00-E.D).

Planning and implementation of central functions


Central function 1st floor Floor 1 Floor 2 Floor 3 The entire building,
Tenant A Tenant B Tenant C Tenant D across floors

Hardware AS1001 AS2001 AS3001 AS4001 AS5001

Central weather CenWthStn


station

Central setpoint CenSsn


generation via
seasonal
compensation

Central operating CenOp_EG CenOp_1OG CenOp_2OG CenOp_3OG


mode determination

AS500 SchedOp0 SchedOp1 SchedOp2 SchedOp3


Scheduler for room Scheduler, room Scheduler, room Scheduler, room Scheduler, room
operating mode operating mode operating mode 2nd operating mode 3rd operating mode 4th
ground floor floor floor floor

Central operation CenOpLgt_EG CenOpLgt_1OG CenOpLgt_2OG CenOpLgt_3OG


lighting

AS500 SchedLg0 SchedLg1 SchedLg2 SchedLg3


Scheduler for Scheduler, lighting Scheduler, lighting, Scheduler, lighting, Scheduler, lighting,
lighting, building occupancy, ground building occupancy, building occupancy, building occupancy,
occupancy floor 2nd floor 3rd floor 4th floor

AS500 SchedLg6 SchedLg7 SchedLg8 SchedLg9


Scheduler for Scheduler, lighting Scheduler, lighting Scheduler, lighting Scheduler, lighting
lighting, system system operation system operation system operation system operation
operation Ground Floor. 2nd floor. 3rd floor. 4th floor.

Central emergency CenEmgLgt_EG CenEmgLgt_1OG CenEmgLgt_2OG CenEmgLgt_2OG


function lighting

Central emergency CenEmgLgt


lighting (overall)

Central shading CenOpShd_EG CenOpShd_1OG CenOpShd_2OG CenOpShd_3OG


operation

54 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Application examples
5

Central function 1st floor Floor 1 Floor 2 Floor 3 The entire building,
Tenant A Tenant B Tenant C Tenant D across floors

AS500 SchedSh0 SchedSh1 SchedSh2 SchedSh3


Scheduler for Scheduler, shading, Scheduler, shading, Scheduler, shading, Scheduler, shading,
shading, building occupancy, ground occupancy, 1st floor occupancy, 2nd floor occupancy, 3rd floor
occupancy floor

AS500 SchedSh6 SchedSh7 SchedSh8 SchedSh9


Scheduler for Scheduler, shading Scheduler, shading Scheduler, shading Scheduler, shading
shading, system system operation system operation system operation system operation
operation ground floor. 1st floor. 2nd floor. 3rd floor.

Central emergency CenEmgShd


shading (overall)

Central protection CenPrtShd


function shading

Central service CenSrvShd_EG CenSrvShd_1OG CenSrvShd_2OG CenSrvShd_3OG


function shading

Central facade CenFcdShd_W


shading west

Central facade CenFcdShd_S


shading south

Central facade CenFcdShd_E


shading east

Hot water supply SplyHw


chain

Supply chain chilled SplyChw


water

Recommendation: Network components


● Siemens SCALANCE XB005 – Optional, as edge switch for cabling the BACnet-MS/TP IP router
PXG3.M in the event the maximum cable length for the BACnet-MS/TP network is exceeded.
● Siemens SCALANCE XB005 - At the distribution level in the riser zones.
● Siemens SCALANCE XB205 - At the distribution level with port mirroring for diagnostics.

IT security and IT basic protection


The elements of infrastructure, IT systems, networks, and applications must be discussed under the
aspects of security and appropriate measures need to be developed. Customer, domestic, or industry
guidelines and directives must be observed under all circumstances.
For additional details, see IT security on installations with Desigo (CM110663) and Practical Guide on IP
Networks in Building Automation and Control Systems (CM110668).

Summary
The following tables show how to depict all devices and network components in a small project.

Plant category Number of IP devices Number of MS/TP devices


PXC primary plants 5

DXR2 individual room control & central 1 120


functions

PXC00-E.D system controller, building scope 1

PXG3.M BACnet-MS/TP IP router 4

Reserves 5% 1 6

Amount 12 126

A6V11159798_en--_03 55 | 71
BACnet networks with MS/TP trunks
5 Application examples

Network components Type Siemens Layer Managed No.


Edge switch per floor XB005 2 No 4

Distribution switch in the equipment XB200 1 Yes 1


rooms

Description 2nd floor 3rd floor 4th floor 5th floor Primary plant System level
DXR2 DXR2 DXR2 DXR2
VLAN VLAN 01 VLAN 01 VLAN 01 VLAN 01 VLAN 01 VLAN 01

UDP port BAC0 BAC0 BAC0 BAC0 BAC0 BAC0

Subnet mask 255.255.255.0 255.255.255.0 255.255.255.0 255.255.255.0 255.255.255.0 255.255.255.0

Default gateway 192.168.11.254 192.168.11.254 192.168.11.254 192.168.11.254 192.168.11.254 192.168.11.254

Engineering 192.168.11.250
notebook
XWP/ABT

Number of DXR2 30 30 30 30

MS/TP segment/ 1 2 3 4
BACnet network
number

Baud rate 115200 115200 115200 115200


(kBit/s)

PXG3.M, MS/TP 0 0 0 0
start address

MS/TP 30/50 30/50 30/50 30/50


addressing,
Max.Master /
Max.Info

SNMP, read enabled, public enabled, public enabled, public enabled, public
community

IP address 192.168.11.10 192.168.11.20 192.168.11.30 192.168.11.40


PXG3.M router

Central functions 192.168.11.200


for the overall
building
(DXR2.E18)

System controller 192.168.11.201


monitoring floors
(PXC00-E.D)

Number of PXC 5

IP address range 192.168.11.100


PXC primary
plants from…

IP address range 192.168.11.199


PXC primary
plants ...to

IP address range 192.168.11.210


Mgmt'stations
Desigo CC
from…

IP address range 192.168.11.215


Mgmt'stations
Desigo CC f...to

56 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Application examples
5

5.4.2 Network for mid-sized to large BACnet MS/TP project structured


with centralized primary plants
Example for planning and implementing a project.

Demand
● New office building with room automation for 424 rooms over 4 floors as well as preparing the
appropriate primary plants.
● Each floor is leased by another tenant and has its own occupancy and use, i.e. the room operating
mode as well as associated room setpoints, lighting per floor with central operation, and emergency
function.
● Blinds control for each facade including protection, service, and emergency function.
● Central weather station, demand-controlled control of primary plants.
● Schedulers together with a calendar for room operating modes and lighting for each floor, superposed
functions on a monitoring device.
● Primary plants for air handling, heat generation and distribution as well as central distribution of
refrigeration in an equipment room.
● Primary plants and general: 5 PXC100-E.D und 5 PXC00-E.D
● Desigo room automation: 406 DXR2…
● Visualization, operating and monitoring Desigo CC
● Monitoring network components via SNMP

Planning and implementation, IP network

Core level
Core Switch (Managed Layer 3) as the network core, interface for remote maintenance, and office network
as well as building additional IP segments or as a redundant backbone.

Distribution level
Managed layer 2 switches are planned on the distribution level, in the riser zones, i.e. floor distributors that:
● Are connected with copper cabling.
● Ensure that Desigo room automation stations from the given floor are located on its own VLAN and
therefore isolated from other Desigo room automation stations on other floors for the purposes of local
BACnet broadcasts.
● You can configure port mirroring of each VLAN for network diagnostics and troubleshooting.

Edge level
Only unmanaged layer 2 switches are planned as edge switches. BACnet MS/TP networks can have a max.
cable length depending on the set baud rate. If the overall length is, however, exceeded, a new BACnet
network must be created and connected via a BACnet MS/TP IP router to BACnet/IP over the Ethernet.
The rules apply again for BACnet/IP networks, i.e. the Ethernet network must be installed as an
unmanaged layer 2 switch. A PXC.. can integrated in the given zones to control primary plants, depending
on building planning.

A6V11159798_en--_03 57 | 71
BACnet networks with MS/TP trunks
5 Application examples

Floor 4 -
Managed 4 IP Segment 04 on VLAN4
Range 192.168.14.x UDP Port BAC0
Layer 2 Switch
100x PXC3/DXR
AS_4000
F4BNR01 BBMD F4BNR01
PXG3.M PXG3.M
Asymmetric BDT
DXR2.E.. AS_4001 ... AS_4050 AS_4051 ... AS_4100
Central Functions
BACnet BACnet
NW40 NW41

DXR2.E.. DXR2.E..

Floor 3 -
Managed 3 IP Segment 03 on VLAN3
Range 192.168.13.x UDP Port BAC0
Layer 2 Switch
100x PXC3/DXR
AS_3000
F3BNR01 BBMD F3BNR01
PXG3.M PXG3.M
Asymmetric BDT
DXR2.E.. AS_3001 ... AS_3050 AS_3051 ... AS_3100
Central Functions
BACnet BACnet
NW30 NW31

DXR2.E.. DXR2.E..

Floor 2 -
Managed 2 IP Segment 02 on VLAN2
Range 192.168.12.x UDP Port BAC0
Layer 2 Switch
100x PXC3/DXR
AS_2000
F2BNR01 BBMD F2BNR01
PXG3.M PXG3.M
Asymmetric BDT
DXR2.E.. AS_4001 ... AS_4050 AS_2051 ... AS_2100
Central Functions
BACnet BACnet
NW20 NW21

DXR2.E.. DXR2.E..

Floor 1 -
Managed 1 IP Segment 01 on VLAN1
Range 192.168.11.x UDP Port BAC0
Layer 2 Switch
100x PXC3/DXR
AS_1000
F1BNR01 BBMD F1BNR01
PXG3.M PXG3.M
Asymmetric BDT
DXR2.E.. AS_1001 ... AS_1050 AS_1051 ... AS_1100
Central Functions
BACnet BACnet
NW10 NW11
Desigo CC
Managed Workstation
Layer 3 Switch DXR2.E.. DXR2.E.. 7

Central Functions & Monitoring 5


AS_5001ZF AS_5002ZF AS501SC BNR501
Foreign
BBMD Device
FDT Table (FDT)
DXR2.E18 DXR2.E18 PXC00-E.D PXG3.M
IP Segment 07 on VLAN7
IP Segment 05 on VLAN5 Range 192.168.17.x
BMA Range 192.168.15.x UDP Port BAC0 BACnet Internetwork BAC0

Siemens
FS20 RfmAS01 RfmAS02
VLAN11 Primary Plants 3x PXC100-E.D.
BAC2 ISP01AS03 ISP01AS02 ISP01AS01
BBMD 10
Asymmetric 6
BDT
FDT
Primary Server
BACnet Network 100 IP Segment 6 on VLAN6 IP Segment 10 on VLAN10
Range 192.168.16.x Range 192.168.20.x
UDP Port BAC0 UDP Port BAC0

IP/VLAN overview
Network designation VLAN ID Subnet Address range Default gateway
BA_TRA_01 1 255.255.255.0 192.168.11.1 -- 254 192.168.11.254

BA_TRA_02 2 255.255.255.0 192.168.12.1 -- 254 192.168.12.254

BA_TRA_03 3 255.255.255.0 192.168.13.1 -- 254 192.168.13.254

BA_TRA_04 4 255.255.255.0 192.168.14.1 -- 254 192.168.14.254

BA_Mgmt 5 255.255.255.0 192.168.15.1 -- 254 192.168.15.254

58 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Application examples
5

Network designation VLAN ID Subnet Address range Default gateway


BA_Hvac 6 255.255.255.0 192.168.16.1 -- 254 192.168.16.254

BA_CC_BuB 7 255.255.255.0 192.168.17.1 -- 254 192.168.17.254

BA_Rfm 10 255.255.255.0 192.168.20.1 -- 254 192.168.20.254

DMS_FS20 11 255.255.255.0 192.168.21.1 -- 254 192.168.21.254

An IP segment can also be divided on a project-by-project bases into a part with static addresses, e.g.
automation stations, etc., and a dynamic part (DHCP), e.g. for engineering laptops.
As an alternative, you can also work in general with DHCP. You must ensure, however, that the stations
always have the same IP address. This applies to:
● BACnet device that assume BBMD functionality.
● Room automation stations with an on-board web server and are operated with ABT SSA for servicing
and diagnostics.

Planning and implementation, BACnet network


Each Desigo PXC.. automation station should have FDT functionality for maintenance and diagnostics and
remote access.
A BACnet internetwork is built using a multiple BACnet networks. The IP segment as well as each MS/TP
segment forms a BACnet network. A BBMD must be used in each IP segment in order for BACnet and IP
networks to interact. This permits isolating local broadcasts from the flexible room management
(room/room segment). Global broadcasts, originating from central functions, are managed on the BACnet
device that assumes the BBMD functionality by asymmetrical BDT entries (Broadcast Distribution Table).
Set up the device accordingly in the XWP network configurator. The following table provide an overview of
the BACnet configuration:

Device name BNR501 ISP01AS01 F1BNR01 F2BNR01 F3BNR01 F4BNR01

Device Type PXG3.M PXC100-E.D PXG3.M PXG3.M PXG3.M PXG3.M

IP address 192.168.15.250 192.168.16.1 192.168.11.10 192.168.12.20 192.168.13.30 192.168.14.40

BACnet Network NET100 NET100 NET01 NET02 NET03 NET04


no.

UDP port BAC0 BAC0 BAC0 BAC0 BAC0 BAC0

IP segment 05 06 01 02 03 04

BBMD true true true true true true

BDT

IP address 192.168.15.250 192.168.16.1 192.168.11.250 192.168.12.250 192.168.13.250 192.168.14.250

192.168.11.10 192.168.15.250 192.168.15.250 192.168.15.250 192.168.15.250 192.168.15.250

192.168.12.20 - - - - -

192.168.13.30 - - - - -

192.168.14.40

192.168.16.1 - - - - -

Function Central BBMD Main HVAC plant BBMD for BBMD for BBMD for BBMD for
(is the node for BBMD VLAN01 VLAN02 VLAN03 VLAN04
all broadcast BACnet MS/TP BACnet MS/TP BACnet MS/TP BACnet MS/TP
messages IP router to the IP router to the IP router to the IP router to the
between VLAN DXR on the 1st DXR on the 2nd DXR on the 2rd DXR on the 4th
01-07 floor floor floor floor

How and why asymmetrical BDT entries?


Local broadcasts that use the flexible room management to locate and address room segments from the
room, are routed to an own VLAN or BACnet network to a defined UDP port (0xBAC0). Local broadcasts are
thus encapsulated and no longer forwarded to other networks.

A6V11159798_en--_03 59 | 71
BACnet networks with MS/TP trunks
5 Application examples

BACnet Broadcast Management Devices (through the BDT) must, however, be defined for global BACnet
broadcasts (originating, among others, from central functions) to operate successfully on the different IP
segments and BACnet networks.
From the project topology above, a PXG3.M (BNR501) must be in the building scope for performance
reasons:
● Support the BBMD function on the first port.
● Enter its own IP address in the BDT to 0xBAC0 (1.Port).
● Enter all other IP address for the BBMDs in the other IP segments that also communicated on UDP port
0xBAC0.
A BBMD must be defined for any other IP segments, i.e. the BDT is also enabled on the PXG3 to BAC0. In
the BDT is the own IP address and address for BNR501.
The Desigo CC management platform registers as a third-party device in BNR501. The broadcast can be
triggered here and forward via the asymmetrical BBMD entries to all other participants in the various IP
segments.
As an alternative, you can of course work with DHCP. Important is that all devices that support BBMD
functionality must receive a fixed IP address.

Planning and implementation, HVAC and room automation


Plant scope:
● Desigo PXC…E.D to control primary plants.
Building scope:
● Desigo PXC00-E.D and DXR2.E18 for superposed functions, e.g. scheduler for occupancy and use times
by floor and central functions across floors.
● PXG3.M BACnet MS/TP IP router as central BBMD for structuring the BACnet networks.
Floor scope:
● Desigo DXR2.E18 exclusively for central functions.
● Desigo DXR2.M.. for rooms with HVAC, lighting, and blinds, or room segments with HVAC.
● PXG3.M BACnet-MS/TP IP router.
You can operate with cascading group master functions if lighting and blinds exceed a maximum of 500
commandable group members. This can, for example, be used for emergency control of blinds actuators
over multiple facades over lighting over multiple floors.

Notes on project implementation


In the project example above was generously planned (since it is a midsized to large project) and one
PXC00-E.D was assigned to each floor scope as well. It assumes monitoring of Desigo room automation
stations. The PXC00-E.D in the building scope is used for scheduling and superposed functions for various
floors as well as central functions for room operating mode, lighting, and blinds.
Depending on the building plan, air handing may not be centralized, but rather distributed decentralized on
each floor. A PXC100-E.D each is used in the floor scope to this end. It takes over scheduling and
superposed functions for the floor / floor scope. The PXC00-E.D monitoring unit is used in the building
scope to monitor Desigo room automation stations.

Planning and implementation of central functions


Central function Ground floor Floor 1 Floor 2 Floor 3 Entire building
Hardware AS_1000 AS_2000 AS_3000 AS_4000 AS_5001ZF
AS_5002ZF

Central weather CenWthStn


station

Central setpoint CenSsnN


generation via CenSsnE
seasonal
CenSsnS
compensation for
North, East, South, CenSsnW
West

Central operating CenOp_EG CenOp_1OG CenOp_2OG CenOp_3OG


mode determination

60 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Application examples
5

Central function Ground floor Floor 1 Floor 2 Floor 3 Entire building


AS501SC SchedOp0 SchedOp1 SchedOp2 SchedOp3
Scheduler for room Scheduler, room Scheduler, room Scheduler, room Scheduler, room
operating mode operating mode operating mode 2nd operating mode 3rd operating mode 4th
ground floor floor floor floor

Central operation CenOpLgt_EG CenOpLgt_1OG CenOpLgt_2OG CenOpLgt_3OG


lighting

AS501SC SchedLg0 SchedLg1 SchedLg2 SchedLg3


Scheduler for Scheduler, lighting Scheduler, lighting, Scheduler, lighting, Scheduler, lighting,
lighting, building occupancy, ground building occupancy, building occupancy, building occupancy,
occupancy floor 2nd floor 3rd floor 4th floor

AS501SC SchedLg6 SchedLg7 SchedLg8 SchedLg9


Scheduler for Scheduler, lighting Scheduler, lighting Scheduler, lighting Scheduler, lighting
lighting, system system operation system operation system operation system operation
operation Ground Floor. 2nd floor. 3rd floor. 4th floor.

Central emergency CenEmgLgt_EG CenEmgLgt_1OG CenEmgLgt_2OG CenEmgLgt_2OG


function lighting

Central emergency CenEmgLgt


lighting (overall)

Central blinds CenOpShd_EG CenOpShd_1OG CenOpShd_2OG CenOpShd_3OG


operation

AS501SC SchedSh0 SchedSh1 SchedSh2 SchedSh3


Scheduler for blinds, Scheduler, blinds, Scheduler, blinds, Scheduler, blinds, Scheduler, blinds,
building occupancy occupancy, ground occupancy, 1st floor occupancy, 2nd floor occupancy, 3rd floor
floor

AS501SC SchedSh6 SchedSh7 SchedSh8 SchedSh9


Scheduler for blinds, Scheduler, shading Scheduler, shading Scheduler, shading Scheduler, shading
system operation system operation system operation system operation system operation
ground floor. 1st floor. 2nd floor. 3rd floor.

Central emergency CenEmgShd


shading (overall)

Central protection CenPrtShd


function shading

Central service CenSrvShd_EG CenSrvShd_1OG CenSrvShd_2OG CenSrvShd_3OG


function shading

Central facade CenFcdShd_W


shading west

Central facade CenFcdShd_S


shading south

Central facade CenFcdShd_E


shading east

Hot water supply SplyHw SplyHw SplyHw SplyHw SplyHw (Total)


chain

Supply chain chilled SplyChw SplyChw SplyChw SplyChw SplyChw (Total)


water

Supply chain SplyAir SplyAir SplyAir SplyAir SplyAir (Total)


ventilation

Recommendation: Network components


● Siemens SCALANCE XB005 - as the edge switch for cabling PXC and Desigo room automation stations.
● Siemens SCALANCE XB205 - At the distribution level in the riser zones for setting up VLANs and port
mirroring for diagnostics.
● Siemens SCALANCE XM405 - As core switch for possible IP routing.
Siemens SCALANCE switches from the product family X-200 or X-400 support SNMP and can be monitored
on Desigo CC.

A6V11159798_en--_03 61 | 71
BACnet networks with MS/TP trunks
5 Application examples

IT security and IT basic protection


The elements of infrastructure, IT systems, networks, and applications must be discussed under the
aspects of security and appropriate measures need to be developed. Customer, domestic, or industry
guidelines and directives must be observed under all circumstances.
For additional details, see IT security on installations with Desigo (CM110663) and Practical Guide on IP
Networks in Building Automation and Control Systems (CM110668).

Reliability and redundancy


Distribution switches can be cabled on the floor distributors from the core switch in a Gbit ring as
backbone if the customer requires extended availability. To this end, special network components must be
planned on midsized to highly complex networks with basic cabling of fiber optics and copper cable.

A – Distribution Switch B – Core Switch C – Edge Switch


Fiber Optics Twisted Pair
Yet another level for increasing reliability and redundancy is to employ two core switches at different
locations.

A
B

Cabling the distribution switches


The distribution switches can be cabled in RSTP, increasing reliability. The BACnet MS/TP IP routers are
either connected directly to the distribution switch or on remote edge switches.

62 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Application examples
5

Benefits
● The backbone is executed redundantly as ring.
● The smaller, e.g. unmanaged switches are connected in a star topology based on importance or price
pressure.
● Cost savings during installation.
● Compromises are possible, e.g. more important devices can be planned directly on the ring switch.
Disadvantages
● Distribution switches typically support SNMP; a failure can be reported via the Desigo CC management
platform. This would go unnoticed in this topology.
● The probability of failure increases for switches connected in a star topology.
For details, see Section 3.3.5 in Practical guide on IP networks in building automation and control
(CM110668).

Summary
The following tables show how to depict all devices and network components in a midsized to large project.

Plant category Number of IP devices Number of MS/TP devices


PXC primary plants 3

DXR2 individual room control 400

PXC00-E.D system controller, floor scope 4

PXC00-E.D system controller, building scope 1

DXR2.E18 for central functions, floor scope 4

DXR2.E18 for central functions, building scope 2

PXG3.M as BBMD, routing to by BACnet MS/TP 8

PXG3.M, as central BBMD, building scope 1

Reserves 5% 1 20

Amount 24 420

Network components Type Siemens Layer Managed No.


Edge switch on the floors XB-005 2 No 4

Distribution switch per floor XB-200 2 Yes 6

Core switch in the equipment rooms XM 400 3 Yes 1

A6V11159798_en--_03 63 | 71
BACnet networks with MS/TP trunks
5 Application examples

Description Ground 2nd floor 3rd floor 4th floor BA Mgmt Primary System Refrigerati Sinteso
floor DXR2 DXR2 DXR2 DXR2 plants level on FS20
DXR2 machines BMA
BACnet
3rd
VLAN VLAN 01 VLAN 02 VLAN 03 VLAN 04 VLAN 05 VLAN 06 VLAN 07 VLAN 10 VLAN 11

UDP port BAC0 BAC0 BAC0 BAC0 BAC0 BAC0 BAC0 BAC0 BAC2

Subnet 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25
mask 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0

Default 192.168.11. 192.168.12. 192.168.13. 192.168.14. 192.168.15. 192.168.16. 192.168.17. 192.168.20. 192.168.21.
gateway 254 254 254 254 254 254 254 254 254

Engineering 192.168.11. 192.168.12. 192.168.13. 192.168.14. 192.168.15. 192.168.16. 192.168.17. 192.168.20. 192.168.21.
notebook 251 251 251 251 251 251 251 251 251
XWP/ABT

IP address 192.168.11. 192.168.11. 192.168.11. 192.168.11.


range 10 20 30 40
PXG3.M
router
from…

IP address 192.168.11. 192.168.11. 192.168.11. 192.168.11.


range 19 29 39 49
PXG3.M
router ... to

IP address 192.168.11. 192.168.12. 192.168.13. 192.168.14. 192.168.15.


range for 1 1 1 1 1
DXR2.E18
(central
function)
from…

IP address 192.168.11. 192.168.12. 192.168.13. 192.168.14. 192.168.15.


range for 9 9 9 9 9
DXR2.E18
(central
function)
to…

PXG3.M as 192.168.11. 192.168.11. 192.168.11. 192.168.11.


BBMD, 10 20 30 40
routing to
MS/TP

PXG3.M, 192.168.15.
central 250
BBMD in
the building
scope

Number of 101 101 101 101 2


DXR2/PXC3

MS/TP 10 20 30 40
segment /
BACnet
network
number
from...

MS/TP 19 29 39 49
segment /
BACnet
network
number ... to

Baud rate 115200 115200 115200 115200


(kBit/s)

64 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Diagnostics and troubleshooting in BACnet networks with MS/TP trunks
5

Description Ground 2nd floor 3rd floor 4th floor BA Mgmt Primary System Refrigerati Sinteso
floor DXR2 DXR2 DXR2 DXR2 plants level on FS20
DXR2 machines BMA
BACnet
3rd
PXG3.M, 0 0 0 0
MS/TP start
address

MS/TP 100/50 100/50 100/50 100/50


addressing,
Max.Master
/ Max.Info

SNMP, read enabled, enabled, enabled, enabled,


community public public public public

Central 192.168.11. 192.168.12. 192.168.13. 192.168.14.


functions, 1 1 1 1
floor scope

Central 192.168.15.
functions, 1…2
superposed,
building
scope

Number of 3 1 2 10
PXC, FS20,
BACnet3rd

Reserve IP 251 253 248 240


addresses

IP address 192.168.16. 192.168.17. 192.168.20. 192.168.21.


range 1 1 1 1
from…

IP address 192.168.16. 192.168.17. 192.168.20. 192.168.21.


range ...to 249 249 249 249

PXC BBMD 192.168.16.


1

IP address 192.168.17.
range 11
Mgmt'statio
ns Desigo
CC from…

IP address 192.168.17.
range 13
Mgmt'statio
ns Desigo
CC ...to

Mgmt'statio 192.168.15.
n Desigo 250
CC, entry in
FDT

5.5 Diagnostics and troubleshooting in BACnet networks with


MS/TP trunks
Typical faults and their solution
BACnet on MS/TP involves the use of a large number of components and this results in a certain degree of
complexity and a corresponding vulnerability to errors.
If a problem arises in the system, it must be located in a step-by-step procedure. Always start you analysis
at the lowest system. Only continue to the next higher system once you are sure that the system is

A6V11159798_en--_03 65 | 71
BACnet networks with MS/TP trunks
5 Diagnostics and troubleshooting in BACnet networks with MS/TP trunks

operating correctly. A sketch of the topology is extremely helpful when attempting to locate problems.
Create a sketch if none exists.
BACnet MS/TP devices are introduced to the Desigo system over the BACnet MS/TP IP router to the
Ethernet. In other words, you consider topics from the BACnet/IP world and include it in your analysis when
troubleshooting problems.
The following questions can help to troubleshoot communication problems.

Faults Possible causes & troubleshooting


Check cabling prior to commissioning ● 3-wire cabling wherever possible. Is the common reference signal wiring only
grounded on one end with the PTC thermistor (TRF250-120)?
● Are the wires + and - for the EIA-485 bus correctly terminated with 120 Ohm
resistance at both physical ends of the wires?
● Note that some MS/TO devices have integrated resistance. Make sure they
are disabled (unless the corresponding device is in fact at the end of the EIA-
485 bus).
● Make sure in a mixed operation of 2 and 3-wire environment, that the cable
shield is not used as a common reference signal wire for 3-wire devices.
● MS/TP does not support a star topology Split up the cabling and eventually
network it over multiple trunks and routers.
● Check in a mixed operation with 2 and 3-wire environment that the cable
shield is not connected.

No communication to the BACnet MS/TP ● Is the entered baud rate incorrect? The same transmission rate must be
devices. configured on all MS/TP devices on the same EIA-485 bus, with the slowest
of the devices specifying the value.
● Max. 115 kBaud, but the baud rate must be set back to 76.8 kBaud at cable
lengths in excess of ~750 m.
● The devices are incorrectly configured (no master) or no slave proxy is set for
the slave.
● Check the terminating resistances and terminals or cabling.
● The network is not or incorrectly configured. Check the settings on the
BACnet routers PXG3.M and on the DXR2.M... devices.

New BACnet MS/TP devices are not recognized. ● The MAX_MASTER value must be set to the highest available MS/TP address
(max. number of devices).
● Max. number of 64 MS/TP Desigo room automation devices is exceeded.

The network does not recognize the BACnet ● Check whether the wiring between the last visible and next device is OK.
MS/TP devices at the end of the trunk.

Communication is not reliable. ● Baud rates are not optimally set and should not be less than 76,800 baud.
● Check the cable shielding and terminating resistances.
● Terminating resistances are missing or installed in the wrong location.
● Wrong cable, incorrect polarity or the cable is grounded.
● A MS/TP third-party device on the trunk.
● Cable length exceeded. Install a repeater in the middle of the trunk.

66 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Diagnostics and troubleshooting in BACnet networks with MS/TP trunks
5

Faults Possible causes & troubleshooting


Communication is slow. ● A master device normally holds the token for only a few milliseconds, with the
forwarding to the next device taking up to 250 ms. In other words, a high
number of devices causes a high cycle which requires a very conservative
(long) timeout value. You must configure the following timeouts if MS/TP
devices participate in the communication:
– APDU timeout: 6000 ms
– APDU segment timeout: 5000 ms
– Max Info frames: 50
● Operation on the Desigo CC management platform requires, where there are
lots of BACnet MS/TP devices, reading the functions sequentially by
discipline. This requires training course and operator instructions.

Communication no longer restarts after a power ● Communication – Data traffic is too high or way too high. In other words,
outage or communication no longer starts after reduce or cease the following:
a power outage on the BACnet/IP router. – Room segment communication
– No lighting or blinds application
– Max. one Desigo CC management platform
– Max. 5 trends per room
– Max. 3 alarms per room
– No central functions for gathering, i.e. for the hot water supply chain,
chilled water, air

BACnet networks ● PXG3.M runs automatic network checks, and indicates errors with an
illuminated Info-LED.
● PXG3.M operates on large projects as BBMD. These devices must have a
fixed IP address and not DHCP.
● Only one PXG3.M with BBMD functionality permitted per BACnet network.

Have you considered notes from technical ● Desigo Ethernet, TCP/IP, MS/TP and BACnet fundamentals (CM110666)
documentation? ● Desigo room automation engineering, mounting and installation (CM111043,
Section Network topology)

A6V11159798_en--_03 67 | 71
Product for network infrastructure
6

6 Product for network infrastructure


How can we use Siemens SCALANCE products? This is only general information and not a product catalog.

Siemens SCALANCE Switches


Siemens SCALANCE XB-000 series:
● Unmanaged layer-2 switches
● AC & DC 24 V voltage supply
● Main application: Edge & distribution level

Siemens SCALANCE XB-200 series:


● Managed layer-2 switches
● Support ring topology & virtual networks (VLAN)
● Port mirroring for service
● Main application: Distribution level

Siemens SCALANCE XB-400 series:


● Managed layer 3 switches (key plug required)
● Auxiliary router functionality
● Main application: Core level

SITOP power supply


SITOP lite:
● 120/230 V AC
● 24 V / 2.5 A, 5 A, 10 A
● CE, cULus

SITOP Simatic design:


● 120/230 V AC
● 24 V / 3 A, 8 A
● CE, cULus

68 | 71 A6V11159798_en--_03
Glossary
7

7 Glossary
Term Definition
AS or PXC Automation station for control of primary plants: PXC50/100/200-E.D

Group master Group master in Desigo room automation to distribute operating modes, setpoints, or
coordination signals to assigned group members.

Group member Group member – logistical merger of HVAC, lighting, or shading functions.

BAC system Building automation and control system

CLI Command line interface, often referred to as console or terminal, is input pane to control
software, typically (but not necessarily) text based.

SNMP (Simple Network Management Protocol) A protocol developed by the Internet Engineering
Task Force (IETF) to monitor and control network elements, including printers, switches,
or computer, from a centralized location.

Latency time Delay time, i.e. time interval from end of an event or command to the start of the reaction
to this event.
Network latency exists on communication networks. On Ethernet networks, this latency is
caused by runtimes on the transmission medium and Ethernet switching. The latency time
describes the time period that passed until bit received on the switch port leaves the
destination port. The period is indicated in microseconds and is based on the switching
method.

STEP7/TIA Engineering tool for programming and commissioning automation stations and room
automation stations.

BBMD (BACnet Broadcast Management Device) Is used to distribute BACnet broadcasts over
multiple IP segments.

Symmetrical BDT (BACnet Distribution Table) Symmetrical means that all BBMDs are entered in the BDT,
the BBMDs recognize one another and the unicast is distributed to all devices entered in
the table.

Asymmetrical BDT (BACnet Distribution Table) Asymmetrical means that the BACnet broadcast originating
from a BACnet client on one IP segment travel in only one direction and are can be
distributed to all other IP segments. No broadcasts are distributed from the queried IP
segment to other IP segment so that broadcast data traffic on BACnet networks,
distributed over multiple IP segments, can be controlled and kept to a minimum.

A6V11159798_en--_03 69 | 71
Glossary
7

Overview of IPv4 address room

70 | 71 A6V11159798_en--_03
Issued by © Siemens Switzerland Ltd, 2017
Siemens Switzerland Ltd Technical specifications and availability subject to change without notice.
Smart Infrastructure
Global Headquarters
Theilerstrasse 1a
CH-6300 Zug
+41 58 724 2424
www.siemens.com/buildingtechnologie
s
A6V11159798_en--_03