Application Guide For BACnet Netwroks in Building Automation - Siemens
Application Guide For BACnet Netwroks in Building Automation - Siemens
Copyright
Delivery and technical specifications subject to change.
Any form of reproduction, dissemination, copying, disclosure, modification, distribution and/or publication
of this document is strictly prohibited unless permitted expressly. Infringements will lead to compensation.
All rights, including rights created by patent grant or registration of a utility model or design are reserved.
Published by:
Siemens Switzerland Ltd.
Smart Infrastructure
Global Headquarters
Theilerstrasse 1a
CH-6300 Zug
Tel. +41 58 724-2424
www.siemens.com/buildingtechnologies
Edition: 2020-03-16
Document ID: A6V11159798_en--_03
2 | 71 A6V11159798_en--_03
Table of Contents
A6V11159798_en--_03 3 | 71
Cyber security disclaimer
1
A6V11159798_en--_03 5 | 71
About this document
2
6 | 71 A6V11159798_en--_03
Overview
General
3
3 Overview
There is a different approach in room automation with regard to flexibility, sizing, use, and reuse versus on
primary plants, for example, air handling.
Functions are required here to centrally switch all rooms with a specific room state through the entire floor
or switch lighting in rooms at a specified time. The same applies to shading systems that deploy the blinds
to a safe position during high winds based on a weather station. Building users are increasingly requiring
flexible use of rooms. For example, the rooms are newly rented out, or rooms are increased in size using
partitions and designed to the current use.
Building automation and control expects the building automation and control system to do this, or for the
room automation to automatically adapt.
On the one hand, central functions can control the room operating mode as well as centralized control of
lighting and blinds over multiple room automation stations. Protection, service, or emergency functions can
also be implemented over various devices.
On the other hand, flexible room management can be implemented with Desigo room automation and PXC3
or DXR2 room automation stations.
Repurposing can be quite easy using the separation between room and room segment. Coordination takes
place in the room between HVAC, lighting, and blinds, set points are calculated, etc., and then sent to the
assigned room segments. The physical data points are located in the segment to control aggregates and
components.
Scheduler
Scheduler
1...3
Central
Blind Control
Central
Lighting Control
Scheduler
1...3
Central
Occupancy Control
Production Distribution
Central Central
Heating Control Setpoint Control
The entire Desigo system prefers the use of BACnet/IP to avoid expensive gateway solutions. This requires
careful planning, sizing, and implementation of BACnet and IP networks.
A6V11159798_en--_03 7 | 71
Overview
3 General
3.1 General
The first and most costly mistakes are already made during the planning phase. It is not uncommon to
submit faulty bids or bids that are not understandable. Planning offices generally fail to provide clear
answers to detailed queries since the requisite knowledge on networks is often lacking. Pay close attention
to the section on network and communications if a tender is involved.
It is fairly common to forget during initial clarifications to set up the system on an existing network or
infrastructure (rack, cabinets, switches, cabling, etc.) at the customer. An appropriate examination can
save unnecessary costs.
Provided of course that the customer's infrastructure meets the same requirements for reliability,
performance, availability, expandability, IT security, etc. as described in this document. If new networks are
unavoidable, it makes sense to consider topics such as digitalization, cloud solutions, scalability, and
flexible administration using virtual and easy-to-administer networks.
Building automation and control systems do not play a significant role here.
Plant scope
Here is where the automation stations are located that take over control of primary plants such as air
handling units, heating circuits, and cooling circuits to supply the rooms or heating or refrigeration plants.
The plants are always demand-controlled over the supply chain, in other words, heat or cooling demand
occurs in a room that is forwarded to the applicable generation or over the heating or cooling circuit.
Floor scope
This is where rooms and room segments are controlled - energy-efficient HVAC functions, but also lighting
and shading systems ensure optimum room conditions.
In an HVAC environment, we have radiators, and/or heating/chilled ceilings, but also fan coil units as well
as variable air flow systems. On primary plants, hot or chilled water, but also treated air, is provided based
on demand and is treated in the room segment by radiators, heated/chilled ceilings, heating or cooling
coils. Blinds control can be used in addition to daylight or indirect lighting to heat and cool the room.
Lighting control is also integrated to provide optimum lighting, together as well with blinds control.
Central functions specify, from the superposed location (Building Scope), for example, the room operating
mode as well as room setpoints for the room or a group of rooms. The room user can also intervene with
local room operator units and adapt room conditions to his or her needs.
Building Scope
Superposed central functions, e.g. a weather station, can generate setpoints for assigned rooms based on
the outside air temperature. A scheduler can form and distribute a room operating mode for assigned
rooms in a building section or floor. Moreover, lighting and blinds components can be deployed to a defined
state via protection, service, or emergency functions. Demand signals from the rooms (Floor scope) are
evaluated here and compiled and forwarded to the primary plants such as central air handling, heating or
cooling circuits (located in the Plant Scope).
The following image illustrates the devices and functions located in different scopes and how the
communication paths are defined. It illustrates that the floor scope does not require interaction to another
floor scope nor permits and supports interaction; conversely, functions and applications communicate in
the building scope with floor and plant scopes. The plant scope processes the information (forced and
demand signals) from the building scope.
8 | 71 A6V11159798_en--_03
Overview
General
3
Desigo CC Desigo CC
BBMD
IP Subnet
Floor Scope: Flexible Rooms
BBMD
IP Subnet
Floor Scope: Flexible Rooms
BBMD
IP Subnet
Plant Scope: Primary Plants with Desigo PX00..200..D
BBMD
IP Subnet
Plant Scope: Primary Plants with Desigo PXC4 & 5
BBMD
IP-Subnetz 192.168.100.x
You can set in detail that a floor scope encompasses a floor or floor segment with a maximum of 250
participants. The floor scope can comprise multiple floors (with a total of max. 250 participants), i.e. the
floor scope stands for a zone with a max. 250 IP-capable devices or room automation stations.
Central functions and flexible room management plays an important role in the design of BACnet and IP
networks.
Central functions
Central functions are based on the concept of group master and group members.
Room operating modes, room setpoints, and operating modes for lighting or blinds groups are flexibly
distributed from a group master over group members whose group membership is typically set during
commissioning, but can also be changed later during operation using a management platform, e.g. Desigo
CC. Multiple group members can be located on a room automation station by discipline. This includes, for
example, lighting groups by floor, building section or building or blinds group by facade or over a facade
segment.
A6V11159798_en--_03 9 | 71
Overview
3 General
Moreover, the same concept can be used to compile demand signals for chilled water, hot water, or for air
handling. Demand occurs in room segments assigned to a group; it is collected, evaluated and transmitted
to generation via the applicable group master.
A group member is not the same as a room segment. A room segment can
include multiple group members.
Tenant
Retail mall Ground floor Tenant A, 1st floor Tenant B, 2n floor Tenant C 3rd floor Tenant D, 4th floor
Businesses and public Offices and hallways Offices and hallways Offices and hallways Offices and hallways
areas
Building
Emergency Shading
Lighting Service
Emergency Shading
Shading Central
Protection
Floor
Central Central
Cold Water
Operation Operation
Supply
Mode Shading
R100 Cor1
Rooms Corridors
Floor 1
Tenant A
All central functions can be interconnected to meet the advanced requirements on mid-size to large
projects.
If a tenant uses, for example, two floors, a central function can individually act on the given floor, that acts
for its part on an additional, superposed central function, on both floors. The example of lighting or shading
provides a good illustration of this.
10 | 71 A6V11159798_en--_03
Overview
General
3
Tenant
Retail mall Ground floor Tenant A, 2nd floor Tenant A, 3rd floor Tenant B, 4th floor Tenant B, 5th floor
Businesses and public Offices and hallways Offices and hallways Offices and hallways Offices and hallways
areas
For separate IP networks on both floors, the building and cross-floor functions are mapped in the building
scope and the floor functions in applicable floor scope.
Building
Emergency Shading
Lighting Service
Emergency Shading
Shading Central
Protection
Across Floors
Central
Emergency
Operation
Lighting
Lighting
Central
Emergency
Operation
Shading
Shading
Floor
Central Central
Room Emergency Emergency
Operation Operation
Setpoints Lighting Lighting
Lighting Lighting
Floor 1 Floor 2
Tenant A
A6V11159798_en--_03 11 | 71
Overview
3 Networking Ethernet/IP networks
Medium to large project and network of medium complexity Restriction of max. 250 devices on one IP segment.
Large building complexes, more than 200 primary plants, 500 to Multiple IP segments for plant, building, and floor scopes via
1500 rooms, lots of distributed central functions, multiple, layer 2 switches, VLAN and layer 3 switches.
different user groups BACnet internetwork over multiple IP segments with BBMD.
Example:
University, hospital, office building, residential and office
complex, shopping mall
Large project and network of high complexity Restriction of max. 250 devices on one IP segment.
Multiple buildings, more than 200 primary plants, 500 to 1500 Multiple IP segments for plant, building, and floor space via layer
rooms, lots of distributed central functions, multiple, different 2 switches, VLAN and layer 3 switches.
user groups Multiple BACnet internetworks with up to 2,000 devices each,
Example: distributed on different BACnet networks with BBMD.
University campus, hospital, large residential and office complex,
pharmaceutical or automobile companies, industrial parks
12 | 71 A6V11159798_en--_03
Overview
Networking Ethernet/IP networks
3
Life Check
Edge BBMD
IP Subnet
Floor Scope: Flexible Rooms
Edge BBMD
Distribution
IP Subnet 192.168.4.x VLAN ID4
IP Subnet
Floor Scope: Flexible Rooms
Edge BBMD
IP Subnet
Plant Scope: Primary Plants
Edge BBMD
IP Subnet 192.168.1.x
Core
These powerful switches form the backbone of a network. The servers and most important devices are
connected to the core. Moreover, these switches can take over redundancy and routing tasks (layer 3) and
are therefore managed.
Distribution switches
They are located in the riser zones, take over data from core switches and forward them to the various
floors in the building.
They are optimally designed as managed layer 2 switches to setup VLANs.
A6V11159798_en--_03 13 | 71
Overview
3 Networking Ethernet/IP networks
Edge switches
The end devices are connected here. They are located at the end of the network in the control cabinets.
They are typically unmanaged layer 2 switches; managed layer 2 switches when setting up VLANs.
VLANs
D
D
VLAN Trunk
HVAC Video
The era of setting up a separate network in building automation and control for each supplier and discipline
has passed. Multi-service networks allow each to work undisturbed on VLANs.
Managed layer 2 switches make it possible.
Implement a VLAN to optimize security and communication, if:
● More than 250 devices from the same discipline are planned (concentration of risk).
● Different security zones are required to separate primary plants form secondary plants.
● A high degree of reliability is required.
14 | 71 A6V11159798_en--_03
Overview
Networking Ethernet/IP networks
3
Port-based VLANs
Switch A
1 5
2 6
3 7
4 8
Tagged VLANs
Switch A Switch B
1 5 1 5
2 6 2 6
3 7 3 7
4 8 4 8
In contrast to untagged VLANs, tagged VLANs are frame-based rather than port-based. A port is assigned
to multiple VLANs rather just a single one. Each frame receives a VLAN tag so that the switch knows to
which VLAN an Ethernet frame belongs.
Benefits:
● A single cable suffices to connect both switches.
Disadvantages:
● Each switch (not end devices) must support tagging per IEEE 802.1q as the end device does not
recognize the data packet and rejects it, i.e. no communication occurs.
A6V11159798_en--_03 15 | 71
Overview
3 Networking Ethernet/IP networks
● Easy troubleshooting
● Managed and unmanaged switches can be used
● Very high speed and short latency
Disadvantages:
● High cabling expense
● Communication failure for a defective star point (no redundancy)
16 | 71 A6V11159798_en--_03
Overview
Networking Ethernet/IP networks
3
It is not enough to plan and implement the proper network technology to guarantee reliability and
availability.
Switches with two voltage inputs are commonly offered to increase availability. Alarm messages can also
be sent over hardware relay contacts (for example, in the event a connection or power supply fails, etc.).
The switch can also be monitored as an alternative on a suitable management platform such as Desigo CC
via the SNMP protocol.
Moreover, provide a separate or redundant power supply on important infrastructure, key automation
stations, sensors, or actuators.
Selecting the topology is not always easy. Plant or application requirements are always the decisive factor,
however. Special attention should be directed at the network since it forms the backbone of automation
communications.
A6V11159798_en--_03 17 | 71
Overview
3 Networking BACnet network
For detailed information, see Desigo Ethernet, TCP/IP, MS/TP and BACnet (CM110666) and Practical
guide on IP networks in building automation and control (CM110668).
Layer 3 Switch
w
196.168.2.x 196.168.1.x
No BACnet Broadcast
Layer 3 Switch
q
196.168.2.x 196.168.1.x
BACnet Broadcast
BBMD
BBMD
BBMD functionality is available in BACnet to nevertheless allow the use of BACnet broadcasts over
multiple IP segments.
A BBMD (BACnet Broadcast Management Device) is set up on each IP segment. The BBMDs recognize
one another through a table.
The applicable BBMD recognizes a broadcast triggered in a segment and distributes it as Unicast in a
targeted manner to all other BBMDs that are entered in the Broadcast Distribution Table BDT of BBMDs.
The broadcast is forward in other segments using their BBMDs.
Only one BBMD per IP segment is permitted. One BBMD must have a fixed IP
address and use a UDP port. BBMD is not a separate device, but rather
auxiliary functionality on a BACnet device.
In the use cases to date (Desigo PX in multiple IP segments with the same UDP port) a symmetrical BDT is
always used. In other words, all BBMDs are entered in the Broadcast Distribution Table and distributed in
this manner over the bypass to all other BBMDs in the various IP segments. Mid-sized to large Desigo
18 | 71 A6V11159798_en--_03
Overview
Networking BACnet network
3
projects, especially with Desigo room automation, operate with asymmetrical BDT entries. To this end
there is a designated BBMD (Building Scope) that knows all other BBMDs, but where the other BBMDs
only know these special BBMD.
For detailed information, see Desigo Ethernet, TCP/IP, MSTP and BACnet (CM110666) and the following
sections and practical examples.
In the Desigo system, the PXG3.L and PXG3.M as well as all PXC... automation
stations support BBMD functionality, with PXG3 device operating at
significantly higher performance levels. Use a PXG3 in the Building Scope
when planning highly complex large projects and networks.
Local and global broadcasts are used on a Desigo room automation project with PXC3 and DXR2
components.
● The interaction between room and room segment are based on local broadcasts.
● Central functions use global broadcasts.
The following graphic shows the interaction on one BACnet internetwork with different IP networks.
Building A BACnet Internetwork 1 (BAC0)
Desigo CC Desigo CC
BBMD
IP Subnet
Floor Scope: Flexible Rooms
BBMD
IP Subnet
Floor Scope: Flexible Rooms
BBMD
IP Subnet
Plant Scope: Primary Plants with Desigo PX00..200..D
BBMD
IP Subnet
Plant Scope: Primary Plants with Desigo PXC4 & 5
BBMD
IP-Subnetz 192.168.100.x
A6V11159798_en--_03 19 | 71
Overview
3 Merging BACnet/IP networks
A broadcast is sent when starting up a BACnet client, for example, Desigo CC. This is necessary since this
BACnet participant is located in a remote IP segment and must registered on the network as a third-party
device.
Its broadcast is recognized on the BBMD for the new network, packed, and sent to all participants entered
in the BBMD.
BBMDs in other IP segments recognize this and send the Unicast as broadcast to all participants in its
segment.
Flexible room management uses, in other words, communication in one room over multiple room segments,
local broadcasts. Lots of devices on an IP network cause lots of broadcasts.
Layer 3 Switch
q
196.168.2.x 196.168.1.x
BACnet Broadcast
BBMD
BBMD
20 | 71 A6V11159798_en--_03
Overview
Merging BACnet/IP networks
3
BACnet/IP over
Ethernet (Twisted Pair)
Ethernet (Fiber Optics)
Small Project
Floor 2
XB005 XB205-3
(Power AC 24 V)
Floor 1
XB005 XB205-3
(Power AC 24 V)
Basement
XB004-1 XB205-3
(Power AC 24 V)
Desigo CC
Workstation
Siemens SCALANCE Distribution Switches (XB205-3) are equipped as a managed layer 2 switches:
● Connects over various floors
● Can further expand the project
● Support the expansion per VLAN and ring topology
● Offers port mirroring (network analysis)
The Siemens SCALANCE Edge Switch (XB005) distributes on a floor as an unmanaged layer 2 switch:
● Important Desigo room automation stations are installed in a star topology (central functions, important
rooms)
● A few, critical automation stations can be connected in a daisy chain topology
Fiber optics network the distribution switches over longer distances. The distribution and networking on
the floors up to the edge swtiches over copper cables.
A6V11159798_en--_03 21 | 71
Overview
3 Merging BACnet/IP networks
BACnet/IP over
Ethernet (Twisted Pair)
Ethernet (Fiber Optics)
Typical Project
Floor 2
XB205-3 XB205-3
Floor 1
XB205-3 XB005
(Power AC 24 V) XB205-3
Basement
XB205-3 XB004-1
(Power AC 24 V)
S 623
Desigo CC
Workstation
Desigo Primary Automation Stations
On the actual floors, up to 20 Desigo room automation stations are network over a daisy chain. The entire
network continues operated, even if a device fails.
Copper cabling can still be used to reach individual edge switches. And from there distributed (depending
on the application) in a star or daisy chain topology.
The distribution switches are equipped as managed layer 2 switches; the edge switches as unmanaged.
This topology illustrates that you can expand in the future using layer 2 switches. Separate VLANs can be
configured for each floor to separate disciplines (HVAC, room automation, video, fire detection systems).
Ring cabling of distribution switches meet customer requirements for reliability. Important Desigo room
automations for central functions and important room are cabled in a star topology to the edge switch.
Large project
The following illustrates a large project with various disciplines. Emphasis is also placed here on speed,
availability, a structure cabling concept, and standardized connection technology. Advanced availability and
redundancy is achieved by using an additional core switch.
Glass fiber optics can cable network components across building over long distances, over EMC risky
areas, and where there is a risk of potential drift.
22 | 71 A6V11159798_en--_03
Overview
Merging BACnet/IP networks
3
BACnet/IP over
Ethernet (Twisted Pair)
Ethernet (Fiber Optics)
Dedicated communication over
Fiber Optics
Camera
PTZ Outdoor
Floor 2
Camera
PTZ Outdoor
XB005
(Power AC 24 V) Access Control
Floor 1
Controller
XB205-3 XB205-3
IP Card Reader
Fire and Security Systems Desigo Room Automation Stations Intrusion
Panel
Basement
XB004-1
Basement
(Power AC 24 V)
Fire XB205-3 XM416-4C S 623
Network S 623
IP Card Reader Desigo CC
Workstation
Fire and Security Systems Desigo Primary Automation Stations
A6V11159798_en--_03 23 | 71
BACnet/IP networks
4 Checklist for designing BACnet/IP networks
4 BACnet/IP networks
24 | 71 A6V11159798_en--_03
BACnet/IP networks
Checklist for designing BACnet/IP networks
4
What is the distance between control panels? Copper cable or glass fiber optics, clarify
the distances
Mid-sized project
Consider the following questions for detailed planning when designing a mid-sized project with a medium
level of network complexity:
Does data exchange need to be implemented Same UDP port Mounting managed layer 2 switches,
between BACnet third-party devices and Desigo configuration of VLAN, and eventually
units (PXC)? port mirroring
Are the units to control the primary plants Plant scope Plant scope on its own VLAN
centrally located in an equipment room? The same UDP port for the Desigo
system
A6V11159798_en--_03 25 | 71
BACnet/IP networks
4 Designing BACnet/IP networks
Are there Desigo room automation stations with Unmanaged layer 2 switch cabled in a
central functions? star topology
Are the no more than 20 Desigo room Cabling using daisy chain technology,
automation stations on the floor? originated at a distribution switch
You must distinguish between important and less important room automation stations if
there are more than 20 Desigo room automation units on the floor. Starting at the
distribution switch, the cabling is either in a star topology or with a max. of 20 units as
daisy chain.
Are different IP networks and different UDP One BBMD per IP segment is required Layer 3 switch
ports configured? with an asymmetrical BDT. FDT must
also be possible if there is a Desigo CC
management platform or other BAC
clients.
Large project
Consider the following questions for detailed planning when designing a large project with a high level of
network complexity:
26 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4
Project Description
● New office building with room automation for 136 rooms over 4 floors as well as preparing the
appropriate primary plants.
● Each floor is leased by another tenant and has its own occupancy and use, i.e. the room operating
mode as well as associated room setpoints, lighting per floor with central operation, and emergency
function over all floors.
● Blinds control for each facade, including protection, service, and emergency function over all floors, a
central weather station, demand-control of primary plants.
● Schedulers together with a calendar for room operating modes and lighting for each floor, superposed
functions on a monitoring device.
● Primary plants for air handling, heat generation and distribution as well as central distribution of
refrigeration on equipment rooms.
● Primary plants and general: 5 PXC100-E.D und 1 PXC00-E.D
● Desigo room automation: 121 DXR2 or PXC3.E…
● Network infrastructure: Visualization and monitoring in the event of failure
A6V11159798_en--_03 27 | 71
BACnet/IP networks
4 Designing BACnet/IP networks
Central/System Functions
Room-related Functions
Primary-related Functions
Core level
A core switch is not needed since everything is located on one IP segment.
Distribution level
In the distribution level, in the riser zones, i.e. floor distributors:
28 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4
● Unmanaged layer 2 switches are planned that are connected with copper cable.
● A managed layer 2 switch is planned for network diagnostics and troubleshooting where a management
platform is connected. An unmanaged layer 2 switch can be used as well if the customer has no special
requirements.
Edge level
Only unmanaged layer 2 switches are planned as edge switches. The following applies:
● Important rooms / Desigo room automation stations are implemented in a star topology on a
distribution switch or remote edge switch.
● Unimportant rooms / Desigo room automation stations (max. 20) are networked in a line topology
(daisy chain).
● Central functions / Desigo room automation stations are implemented using star cabling on the layer 2
switch (e.g. AS4001).
● PXC… for the primary plants and superposed functions in the equipment room are implemented in star
cabling on a layer 2 switch.
3. Floor -
Unmanaged
Layer 2 Switch
30x PXC3/DXR
AS_4001 AS_4002 ...
2. Floor -
Unmanaged
Layer 2 Switch
30x PXC3/DXR
AS_3001 AS_3002 ...
1. Floor
Unmanaged
Layer 2 Switch
30x PXC3/DXR
AS_2001 AS_2002 ...
... AS_2030
Ground Floor
Unmanaged
Layer 2 Switch
30x PXC3/DXR
AS_1001 AS_1002 ...
... AS_1030
Managed/
Unmanaged
Layer 2 Switch
IP/VLAN overview
Network designation Network Address range
Building automation and control 192.168.11.0/24 192.168.11.2….192.168.11.254
A6V11159798_en--_03 29 | 71
BACnet/IP networks
4 Designing BACnet/IP networks
30 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4
Central function 1st floor Floor 1 Floor 2 Floor 3 The entire building,
Tenant A Tenant B Tenant C Tenant D across floors
Summary
The following tables show how to depict all devices and network components in a small project.
Reserves 5% 6
Amount 133
A6V11159798_en--_03 31 | 71
BACnet/IP networks
4 Designing BACnet/IP networks
Description 2nd floor 3rd floor 4th floor 5th floor Primary plant System level
DXR2 DXR2 DXR2 DXR2
VLAN VLAN 01 VLAN 01 VLAN 01 VLAN 01 VLAN 01 VLAN 01
Engineering 192.168.11.251
notebook
XWP/ABT
Number of DXR2 30 30 30 30
Number of PXC 5
Reserve IP 249
addresses
32 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4
Demand
● New office building with room automation for 424 rooms over 4 floors as well as preparing the
appropriate primary plants.
● Each floor is leased by another tenant and has its own occupancy and use, i.e. the room operating
mode as well as associated room setpoints, lighting per floor with central operation, and emergency
function.
● Blinds control for each facade including protection, service, and emergency function.
● Central weather station, demand-controlled control of primary plants.
● Schedulers together with a calendar for room operating modes and lighting for each floor, superposed
functions on a monitoring device.
● Primary plants for air handling, heat generation and distribution as well as central distribution of
refrigeration in an equipment room.
● Primary plants and general: 5 PXC100-E.D und 5 PXC00-E.D
● Desigo room automation: 402 PXC3.E…/DXR2
● Visualization, operating and monitoring Desigo CC
● Monitoring network components via SNMP
A6V11159798_en--_03 33 | 71
BACnet/IP networks
4 Designing BACnet/IP networks
Building
VLAN5
192.168.15.x
BAC0 Building
VLAN7
192.168.17.x
Floor ..
VLAN2
192.168.12.x
BAC0
Max 250 IP Devices
Floor ..
VLAN1
192.168.11.x
BAC0
Max. 250 IP Devices
Plant
Central/System Functions
VLAN6
192.168.16.x
BAC0
Room-related Functions
Primary-related Functions
Core level
Core Switch (Managed Layer 3) as the network core, interface for remote maintenance, and office network
as well as building additional IP segments or as a redundant backbone.
Distribution level
Managed layer 2 switches are planned on the distribution level, in the riser zones, i.e. floor distributors that:
34 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4
Edge level
Only unmanaged layer 2 switches are planned as edge switches. The following applies:
● Important rooms / Desigo room automation stations are implemented in a star topology on a
distribution switch or remote edge switch.
● Unimportant rooms / Desigo room automation stations (max. 20) are networked in a line topology
(daisy chain).
● Central functions / Desigo room automation stations are implemented using star cabling on a layer 2
switch.
● PXC… for the primary plants and superposed functions in the equipment room are connected in star
cabling on a layer 2 switch.
Floor 4 - IP Segment 04 on VLAN4
Managed Range 192.168.14.x UDP Port BAC0
Layer 2 Switch
100x PXC3/DXR
AS_4001 AS_4002 AS_4003 ...
DXR2.E..
F4BNR01 Central DXR2.E..
BBMD Functions
PXC00-E.D Asymmetric BDT 4 PXC...E.D.
DXR2.E..
F3BNR01 Central DXR2.E..
BBMD Functions
PXC00-E.D Asymmetric BDT 3 PXC...E.D.
DXR2.E.. DXR2.E..
F2BNR01 Central
BBMD Functions
PXC00-E.D
Asymmetric BDT 2
Floor 1 - IP Segment 01 on VLAN1
Managed Range 192.168.11.x UDP Port BAC0
Layer 2 Switch
100x PXC3/DXR
AS_1001 AS_1002 ...AS_1010
Desigo CC
Workstation
DXR2.E.. DXR2.E..
F1BNR01
BBMD
Central
Functions 7
Managed
PXC00-E.D Asymmetric BDT 1 Foreign
Device
Layer 3 Switch Table (FDT)
Central Functions & Time Control Switch
AS_5001ZF AS_5002ZF AS501SC BNR501 IP Segment 07 on VLAN7
Range 192.168.17.x
BBMD BACnet Internetwork BAC0
FDT
DXR2.E18 DXR2.E18 PXC00-E.D PXG3.M
5 IP Segment 05 on VLAN5
Range 192.168.15.x UDP Port BAC0
BMA
Siemens
FS20
VLAN11
Primary Plants 3x PXC100-E.D. 6 RfmAS01 RfmAS02
ISP01AS03 ISP01AS02 ISP01AS01
BAC2 BBMD
Asymmetric 10
BDT
FDT
FDT FDT Primary Server
IP Segment 6 on VLAN6 IP Segment 10 on VLAN10
BACnet Network 100 Range 192.168.16.x Range 192.168.20.x
UDP Port BAC0 UDP Port BAC0
A6V11159798_en--_03 35 | 71
BACnet/IP networks
4 Designing BACnet/IP networks
IP/VLAN overview
Network designation VLAN ID Subnet Address range Default gateway
BA_TRA_01 1 255.255.255.0 192.168.11.1 -- 254 192.168.11.254
An IP segment can also be divided on a project-by-project bases into a part with static addresses, e.g.
automation stations, etc., and a dynamic part (DHCP), e.g. for engineering laptops.
As an alternative, you can also work in general with DHCP. You must ensure, however, that the stations
always have the same IP address. This applies to:
● BACnet device that assume BBMD functionality.
● Room automation stations with an on-board web server and are operated with ABT SSA for servicing
and diagnostics.
● Room operator units, such as QMX7.
IP segment 05 06 01 02 03 04
BDT
192.168.12.250 - - - - -
36 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4
192.168.13.250 - - - - -
192.168.14.250 - - - - -
192.168.16.1 .- - - - -
Function For system Main HVAC plant BBMD in VLAN 1 BBMD in VLAN 2 BBMD in VLAN 3 BBMD in VLAN 4
monitoring of the
system level
(Timesync)
Time switch
catalogs global
BBMD
(is the node for
all broadcast
messages
between VLAN
01-07
or between ERR
from floors and
primary plants)
Primary server
A6V11159798_en--_03 37 | 71
BACnet/IP networks
4 Designing BACnet/IP networks
38 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4
A6V11159798_en--_03 39 | 71
BACnet/IP networks
4 Designing BACnet/IP networks
A
B
40 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4
Network Management
Backbone
Bridge
Discarding ID = 4096
Root
Bridge
ID = 0 Port Priority = Low Forwarding
Summary
The following tables show how to depict all devices and network components in a midsized to large project.
Reserves 5% 21
Amount 436
Description Ground 2nd floor 3rd floor 4th floor BA Mgmt Primary System Refrigerati Sinteso
floor DXR2 DXR2 DXR2 DXR2 plants level on FS20
DXR2 machines BMA
BACnet
3rd
VLAN VLAN 01 VLAN 02 VLAN 03 VLAN 04 VLAN 05 VLAN 06 VLAN 07 VLAN 10 VLAN 11
UDP port BAC0 BAC0 BAC0 BAC0 BAC0 BAC0 BAC0 BAC0 BAC2
Subnet 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25
mask 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Default 192.168.11. 192.168.12. 192.168.13. 192.168.14. 192.168.15. 192.168.16. 192.168.17. 192.168.20. 192.168.21.
gateway 254 254 254 254 254 254 254 254 254
Engineering 192.168.11. 192.168.12. 192.168.13. 192.168.14. 192.168.15. 192.168.16. 192.168.17. 192.168.20. 192.168.21.
notebook 251 251 251 251 251 251 251 251 251
XWP/ABT
A6V11159798_en--_03 41 | 71
BACnet/IP networks
4 Designing BACnet/IP networks
Description Ground 2nd floor 3rd floor 4th floor BA Mgmt Primary System Refrigerati Sinteso
floor DXR2 DXR2 DXR2 DXR2 plants level on FS20
DXR2 machines BMA
BACnet
3rd
Reserve IP 149 149 149 149 247
addresses
Central 192.168.15.
functions, 1…2
superposed,
building
scope
PXG3.M, 192.168.15.
central 250
BBMD in
the building
scope
PXC00-E.D 192.168.15.
scheduler 51
for floor
scope
Number of 3 1 2 10
PXC, FS20,
BACnet3rd
42 | 71 A6V11159798_en--_03
BACnet/IP networks
Designing BACnet/IP networks
4
Description Ground 2nd floor 3rd floor 4th floor BA Mgmt Primary System Refrigerati Sinteso
floor DXR2 DXR2 DXR2 DXR2 plants level on FS20
DXR2 machines BMA
BACnet
3rd
PXC BBMD 192.168.16.
1
IP address 192.168.17.
range 11
Mgmt'statio
ns Desigo
CC from…
IP address 192.168.17.
range 13
Mgmt'statio
ns Desigo
CC ...to
Mgmt'statio 192.168.15.
n Desigo 250
CC, entry in
FDT
A6V11159798_en--_03 43 | 71
BACnet/IP networks
4 BACnet referencing over different IP networks
Read only
BACnet
IP Router 2.
IP Network 1. BAC0 IP Network 2. BACF
1. Desigo PX has read and write access to only one Desigo PX on another IP network (also on another
UDP port).
2. Desigo PX has read only access to only one Desigo room automation station on another IP network.
Restriction
In Desigo V6.1, the PXC3/DXR2 Desigo room automation stations cannot read data points from other IP
networks.
Syntax
B=[BACnet Network number (0=own network), Communication path (IP)"Station Address"]
[Objecttype,Object ID]{Property ID}
Example: B=[0,IP,"10.170.3.11:0xBACF"][0,63]{85}
For details, see Appendix C in Ethernet, TCP/IP, MS/TP and BACnet (CM10666).
44 | 71 A6V11159798_en--_03
BACnet/IP networks
Diagnostics and troubleshooting BACnet/IP networks
4
Are VLAN switches used on the network? ● Are all BACnet devices configured on the same VLAN?
● A number of managed switches offer information on their own web interface
on connected devices. This includes, for example, port speed, VLAN
association, and packet statistics. The latter can also provide references on
insufficient cabling.
Diagnostics via wireshark is not possible. No port mirroring configured on the managed switches
● Use of hub or configured switch
● Consultation with customer IT on the use of wireshark
Wireshark does not have the proper BACnet Layer 2 switch is used, but without port mirroring
services. Use a hub or configure a corresponding layer 2 switch via the web interface
The BACnet clients cannot access the different BBMD in multiple IP segments
BACnet devices on the various VLANs. BACnet devices do not have a unique instance number
BACnet devices do not have a fixed IP address (if configured as BBMD)
BBMD used, but all BACnet networks are the same UDP port?
Have you considered notes from technical ● Desigo Ethernet, TCP/IP, MS/TP and BACnet fundamentals (CM110666)
documentation?
Communication, speed on the Desigo network Compliance with system topology, regarding:
● Number of devices on a BACnet network.
● Max. number of 500 commanded group members. No more than 500
addresses can be managed.
● Max. number of 250 group members. The interface performance when
acquiring data is limited, in other words, only a limited number of telegrams
can be processes in brief period.
A6V11159798_en--_03 45 | 71
BACnet networks with MS/TP trunks
5 Designing BACnet networks with MS/TP trunks
46 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
MS/TP cabling and topology
5
BBMD
BACnet Communication Path
MS/TP MS/TP
BBMD
MS/TP MS/TP
BBMD
IP Subnet
Plant Scope: Primary Plants Plant Scope: Primary Plants
Desigo PX Desigo PX Desigo PX Desigo PX
BBMD
IP Subnet 192.168.106.x BACnet Network 4 (BAC0)
The following diagram illustrates which devices and functions are located in what scope and how the
communication paths are defined. The floor scope does not require/support any interaction with another
floor scope. Conversely, functions and applications in the building scope do communicate with the floor and
plant scope. The plant scope processes the information (forced and demand signals) from the building
scope.
You can determine that a floor can be a floor or floor segment, i.e. a MS/TP trunk with max. 64 participants
(e.g. max. 64 DXR2.M). The MS/TP trunk can, however, also encompass multiple floors with max. 64
participants, in other words, a floor represents a zone with max. 64 BACnet MS/TP-capable devices/room
automation stations. The following also applies to the MS/TP trunk: There are no central functions with
group master function and rooms/room segments can only communicate within the trunk.
An IP network can include a max. 8 BACnet MS/TP-IP router and max. 250 DXR2.M devices. A separate
device is needed per IP network that takes over the BBMD functionality. Devices implementing central
functions can only communicated via BACnet/IP.
Different BACnet networks are interconnected to one BACnet internetwork that can include a max. 50
BACnet MS/TP-IP routers or max. 2500 DXR2.M devices.
A6V11159798_en--_03 47 | 71
BACnet networks with MS/TP trunks
5 Checklist for designing BACnet networks with MS/TP trunks
This is a good point to refer once again to the two system limits to complete the concept:
Are only HVAC and Desigo room automation For lighting and blinds controls, see
stations planned on this project? Section Network topology in the manual
Desigo room automation engineering,
mounting and installation (CM111043)
Are multiple BACnet MS/TP IP routers used? An IP network can include a max. 8
BACnet MS/TP IP routers and max. 250
DXR2.M devices.
48 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Checklist for designing BACnet networks with MS/TP trunks
5
Can an existing cable be used to network Note the topology, cable types, max.
BACnet MS/TP devices? cable length, outgoing lines and
terminating resistances, line topology
with stub lines
MS/TP does not support a star topology
What is the distance between control panels? Clarify the distances (Ethernet sections
over copper may only be ca. 90 meters
long)
Mid-sized project
Consider the following questions for detailed planning when designing a mid-sized project with a medium
level of network complexity:
A6V11159798_en--_03 49 | 71
BACnet networks with MS/TP trunks
5 Application examples
Are the devices to control the primary plants Plant scope Plant scope on its own VLAN
centrally located in an equipment room? BACnet network
Are the control units for the primary plants Floor scope Floor scope on its own VLAN
decentralized on different floors together with Own BACnet network
Desigo room automation stations?
Large project
Consider the following questions for detailed planning when designing a large project with a high level of
network complexity:
50 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Application examples
5
Project Description
● New office building with room automation for 136 rooms over 4 floors as well as preparing the
appropriate primary plants.
● Each floor is leased by another tenant and has its own occupancy and use, i.e. the room operating
mode as well as associated room setpoints, lighting per floor with central operation, and emergency
function over all floors.
● Blinds control for each facade, including protection, service, and emergency function over all floors, a
central weather station, demand-control of primary plants.
● Schedulers together with a calendar for room operating modes and lighting for each floor, superposed
functions on a monitoring device.
● Primary plants for air handling, heat generation and distribution as well as central distribution of
refrigeration on equipment rooms.
● Primary plants and general: 5 PXC100-E.D und 1 PXC00-E.D
● Desigo room automation stations: 120 DXR2.M and 1 DXR2.E18
● Network infrastructure: Visualization and monitoring in the event of failure
A6V11159798_en--_03 51 | 71
BACnet networks with MS/TP trunks
5 Application examples
Central/System Functions
Room-related Functions
Primary-related Functions
Core level
A core switch is not needed since everything is located on one IP segment.
Distribution level
In the distribution level, in the riser zones, i.e. floor distributors:
52 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Application examples
5
● Unmanaged layer 2 switches are planned that are connected with copper cable
● A managed layer 2 switch is planned for network diagnostics and troubleshooting where a management
platform is connected. An unmanaged layer 2 switch can be used as well if the customer has no special
requirements.
BACnet MS/TP networks can have a max. cable length depending on the set baud rate. If the overall length
is, however, exceeded, a new BACnet network must be created and connected via a BACnet MS/TP IP
router to BACnet/IP over the Ethernet.
The rules apply again for BACnet/IP networks, i.e. the Ethernet network must be installed as an
unmanaged layer 2 switch. Of course, a PXC.. can integrated in the given zones to control primary plants,
depending on building planning.
Floor 3 -
Unmanaged
Layer 2 Switch
AS_4001
PXG3.M DXR2.E..
Central Functions
30x DXR
BACnet AS_4002.. ...... AS_4030
NW 40
Floor 2 -
Unmanaged
Layer 2 Switch
AS_3001
PXG3.M DXR2.E..
Central Functions
30x DXR
BACnet AS_3002.. ...... AS_3030
Floor 1 - NW 30
Unmanaged
Layer 2 Switch
AS_2001
PXG3.M DXR2.E..
Central Functions
30x DXR
BACnet AS_2002.. ...... AS_2030
Ground Floor - NW 20
Unmanaged
Layer 2 Switch
AS_1001
PXG3.M DXR2.E..
Central Functions
30x DXR
BACnet AS_1002.. ...... AS_1030
NW 10
Managed/
Unmanaged
Layer 2 Switch
IP/VLAN overview
Network designation Network Address range
Building automation and control 192.168.11.0/24 192.168.11.2….192.168.11.254
A6V11159798_en--_03 53 | 71
BACnet networks with MS/TP trunks
5 Application examples
The BACnet MS/TP IP router connects the BACnet/IP network to the different BACnet MS/TP networks on
the floors. Note that each network must receive a unique network number.
Local and global broadcasts are not critical for this amount of devices, rooms, and plants, i.e. BBMD
configuration is not required.
Each Desigo PXC.. automation station should have FDT functionality for maintenance and diagnostics and
remote access.
54 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Application examples
5
Central function 1st floor Floor 1 Floor 2 Floor 3 The entire building,
Tenant A Tenant B Tenant C Tenant D across floors
Summary
The following tables show how to depict all devices and network components in a small project.
Reserves 5% 1 6
Amount 12 126
A6V11159798_en--_03 55 | 71
BACnet networks with MS/TP trunks
5 Application examples
Description 2nd floor 3rd floor 4th floor 5th floor Primary plant System level
DXR2 DXR2 DXR2 DXR2
VLAN VLAN 01 VLAN 01 VLAN 01 VLAN 01 VLAN 01 VLAN 01
Engineering 192.168.11.250
notebook
XWP/ABT
Number of DXR2 30 30 30 30
MS/TP segment/ 1 2 3 4
BACnet network
number
PXG3.M, MS/TP 0 0 0 0
start address
SNMP, read enabled, public enabled, public enabled, public enabled, public
community
Number of PXC 5
56 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Application examples
5
Demand
● New office building with room automation for 424 rooms over 4 floors as well as preparing the
appropriate primary plants.
● Each floor is leased by another tenant and has its own occupancy and use, i.e. the room operating
mode as well as associated room setpoints, lighting per floor with central operation, and emergency
function.
● Blinds control for each facade including protection, service, and emergency function.
● Central weather station, demand-controlled control of primary plants.
● Schedulers together with a calendar for room operating modes and lighting for each floor, superposed
functions on a monitoring device.
● Primary plants for air handling, heat generation and distribution as well as central distribution of
refrigeration in an equipment room.
● Primary plants and general: 5 PXC100-E.D und 5 PXC00-E.D
● Desigo room automation: 406 DXR2…
● Visualization, operating and monitoring Desigo CC
● Monitoring network components via SNMP
Core level
Core Switch (Managed Layer 3) as the network core, interface for remote maintenance, and office network
as well as building additional IP segments or as a redundant backbone.
Distribution level
Managed layer 2 switches are planned on the distribution level, in the riser zones, i.e. floor distributors that:
● Are connected with copper cabling.
● Ensure that Desigo room automation stations from the given floor are located on its own VLAN and
therefore isolated from other Desigo room automation stations on other floors for the purposes of local
BACnet broadcasts.
● You can configure port mirroring of each VLAN for network diagnostics and troubleshooting.
Edge level
Only unmanaged layer 2 switches are planned as edge switches. BACnet MS/TP networks can have a max.
cable length depending on the set baud rate. If the overall length is, however, exceeded, a new BACnet
network must be created and connected via a BACnet MS/TP IP router to BACnet/IP over the Ethernet.
The rules apply again for BACnet/IP networks, i.e. the Ethernet network must be installed as an
unmanaged layer 2 switch. A PXC.. can integrated in the given zones to control primary plants, depending
on building planning.
A6V11159798_en--_03 57 | 71
BACnet networks with MS/TP trunks
5 Application examples
Floor 4 -
Managed 4 IP Segment 04 on VLAN4
Range 192.168.14.x UDP Port BAC0
Layer 2 Switch
100x PXC3/DXR
AS_4000
F4BNR01 BBMD F4BNR01
PXG3.M PXG3.M
Asymmetric BDT
DXR2.E.. AS_4001 ... AS_4050 AS_4051 ... AS_4100
Central Functions
BACnet BACnet
NW40 NW41
DXR2.E.. DXR2.E..
Floor 3 -
Managed 3 IP Segment 03 on VLAN3
Range 192.168.13.x UDP Port BAC0
Layer 2 Switch
100x PXC3/DXR
AS_3000
F3BNR01 BBMD F3BNR01
PXG3.M PXG3.M
Asymmetric BDT
DXR2.E.. AS_3001 ... AS_3050 AS_3051 ... AS_3100
Central Functions
BACnet BACnet
NW30 NW31
DXR2.E.. DXR2.E..
Floor 2 -
Managed 2 IP Segment 02 on VLAN2
Range 192.168.12.x UDP Port BAC0
Layer 2 Switch
100x PXC3/DXR
AS_2000
F2BNR01 BBMD F2BNR01
PXG3.M PXG3.M
Asymmetric BDT
DXR2.E.. AS_4001 ... AS_4050 AS_2051 ... AS_2100
Central Functions
BACnet BACnet
NW20 NW21
DXR2.E.. DXR2.E..
Floor 1 -
Managed 1 IP Segment 01 on VLAN1
Range 192.168.11.x UDP Port BAC0
Layer 2 Switch
100x PXC3/DXR
AS_1000
F1BNR01 BBMD F1BNR01
PXG3.M PXG3.M
Asymmetric BDT
DXR2.E.. AS_1001 ... AS_1050 AS_1051 ... AS_1100
Central Functions
BACnet BACnet
NW10 NW11
Desigo CC
Managed Workstation
Layer 3 Switch DXR2.E.. DXR2.E.. 7
Siemens
FS20 RfmAS01 RfmAS02
VLAN11 Primary Plants 3x PXC100-E.D.
BAC2 ISP01AS03 ISP01AS02 ISP01AS01
BBMD 10
Asymmetric 6
BDT
FDT
Primary Server
BACnet Network 100 IP Segment 6 on VLAN6 IP Segment 10 on VLAN10
Range 192.168.16.x Range 192.168.20.x
UDP Port BAC0 UDP Port BAC0
IP/VLAN overview
Network designation VLAN ID Subnet Address range Default gateway
BA_TRA_01 1 255.255.255.0 192.168.11.1 -- 254 192.168.11.254
58 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Application examples
5
An IP segment can also be divided on a project-by-project bases into a part with static addresses, e.g.
automation stations, etc., and a dynamic part (DHCP), e.g. for engineering laptops.
As an alternative, you can also work in general with DHCP. You must ensure, however, that the stations
always have the same IP address. This applies to:
● BACnet device that assume BBMD functionality.
● Room automation stations with an on-board web server and are operated with ABT SSA for servicing
and diagnostics.
IP segment 05 06 01 02 03 04
BDT
192.168.12.20 - - - - -
192.168.13.30 - - - - -
192.168.14.40
192.168.16.1 - - - - -
Function Central BBMD Main HVAC plant BBMD for BBMD for BBMD for BBMD for
(is the node for BBMD VLAN01 VLAN02 VLAN03 VLAN04
all broadcast BACnet MS/TP BACnet MS/TP BACnet MS/TP BACnet MS/TP
messages IP router to the IP router to the IP router to the IP router to the
between VLAN DXR on the 1st DXR on the 2nd DXR on the 2rd DXR on the 4th
01-07 floor floor floor floor
A6V11159798_en--_03 59 | 71
BACnet networks with MS/TP trunks
5 Application examples
BACnet Broadcast Management Devices (through the BDT) must, however, be defined for global BACnet
broadcasts (originating, among others, from central functions) to operate successfully on the different IP
segments and BACnet networks.
From the project topology above, a PXG3.M (BNR501) must be in the building scope for performance
reasons:
● Support the BBMD function on the first port.
● Enter its own IP address in the BDT to 0xBAC0 (1.Port).
● Enter all other IP address for the BBMDs in the other IP segments that also communicated on UDP port
0xBAC0.
A BBMD must be defined for any other IP segments, i.e. the BDT is also enabled on the PXG3 to BAC0. In
the BDT is the own IP address and address for BNR501.
The Desigo CC management platform registers as a third-party device in BNR501. The broadcast can be
triggered here and forward via the asymmetrical BBMD entries to all other participants in the various IP
segments.
As an alternative, you can of course work with DHCP. Important is that all devices that support BBMD
functionality must receive a fixed IP address.
60 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Application examples
5
A6V11159798_en--_03 61 | 71
BACnet networks with MS/TP trunks
5 Application examples
A
B
62 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Application examples
5
Benefits
● The backbone is executed redundantly as ring.
● The smaller, e.g. unmanaged switches are connected in a star topology based on importance or price
pressure.
● Cost savings during installation.
● Compromises are possible, e.g. more important devices can be planned directly on the ring switch.
Disadvantages
● Distribution switches typically support SNMP; a failure can be reported via the Desigo CC management
platform. This would go unnoticed in this topology.
● The probability of failure increases for switches connected in a star topology.
For details, see Section 3.3.5 in Practical guide on IP networks in building automation and control
(CM110668).
Summary
The following tables show how to depict all devices and network components in a midsized to large project.
Reserves 5% 1 20
Amount 24 420
A6V11159798_en--_03 63 | 71
BACnet networks with MS/TP trunks
5 Application examples
Description Ground 2nd floor 3rd floor 4th floor BA Mgmt Primary System Refrigerati Sinteso
floor DXR2 DXR2 DXR2 DXR2 plants level on FS20
DXR2 machines BMA
BACnet
3rd
VLAN VLAN 01 VLAN 02 VLAN 03 VLAN 04 VLAN 05 VLAN 06 VLAN 07 VLAN 10 VLAN 11
UDP port BAC0 BAC0 BAC0 BAC0 BAC0 BAC0 BAC0 BAC0 BAC2
Subnet 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25 255.255.25
mask 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Default 192.168.11. 192.168.12. 192.168.13. 192.168.14. 192.168.15. 192.168.16. 192.168.17. 192.168.20. 192.168.21.
gateway 254 254 254 254 254 254 254 254 254
Engineering 192.168.11. 192.168.12. 192.168.13. 192.168.14. 192.168.15. 192.168.16. 192.168.17. 192.168.20. 192.168.21.
notebook 251 251 251 251 251 251 251 251 251
XWP/ABT
PXG3.M, 192.168.15.
central 250
BBMD in
the building
scope
MS/TP 10 20 30 40
segment /
BACnet
network
number
from...
MS/TP 19 29 39 49
segment /
BACnet
network
number ... to
64 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Diagnostics and troubleshooting in BACnet networks with MS/TP trunks
5
Description Ground 2nd floor 3rd floor 4th floor BA Mgmt Primary System Refrigerati Sinteso
floor DXR2 DXR2 DXR2 DXR2 plants level on FS20
DXR2 machines BMA
BACnet
3rd
PXG3.M, 0 0 0 0
MS/TP start
address
Central 192.168.15.
functions, 1…2
superposed,
building
scope
Number of 3 1 2 10
PXC, FS20,
BACnet3rd
IP address 192.168.17.
range 11
Mgmt'statio
ns Desigo
CC from…
IP address 192.168.17.
range 13
Mgmt'statio
ns Desigo
CC ...to
Mgmt'statio 192.168.15.
n Desigo 250
CC, entry in
FDT
A6V11159798_en--_03 65 | 71
BACnet networks with MS/TP trunks
5 Diagnostics and troubleshooting in BACnet networks with MS/TP trunks
operating correctly. A sketch of the topology is extremely helpful when attempting to locate problems.
Create a sketch if none exists.
BACnet MS/TP devices are introduced to the Desigo system over the BACnet MS/TP IP router to the
Ethernet. In other words, you consider topics from the BACnet/IP world and include it in your analysis when
troubleshooting problems.
The following questions can help to troubleshoot communication problems.
No communication to the BACnet MS/TP ● Is the entered baud rate incorrect? The same transmission rate must be
devices. configured on all MS/TP devices on the same EIA-485 bus, with the slowest
of the devices specifying the value.
● Max. 115 kBaud, but the baud rate must be set back to 76.8 kBaud at cable
lengths in excess of ~750 m.
● The devices are incorrectly configured (no master) or no slave proxy is set for
the slave.
● Check the terminating resistances and terminals or cabling.
● The network is not or incorrectly configured. Check the settings on the
BACnet routers PXG3.M and on the DXR2.M... devices.
New BACnet MS/TP devices are not recognized. ● The MAX_MASTER value must be set to the highest available MS/TP address
(max. number of devices).
● Max. number of 64 MS/TP Desigo room automation devices is exceeded.
The network does not recognize the BACnet ● Check whether the wiring between the last visible and next device is OK.
MS/TP devices at the end of the trunk.
Communication is not reliable. ● Baud rates are not optimally set and should not be less than 76,800 baud.
● Check the cable shielding and terminating resistances.
● Terminating resistances are missing or installed in the wrong location.
● Wrong cable, incorrect polarity or the cable is grounded.
● A MS/TP third-party device on the trunk.
● Cable length exceeded. Install a repeater in the middle of the trunk.
66 | 71 A6V11159798_en--_03
BACnet networks with MS/TP trunks
Diagnostics and troubleshooting in BACnet networks with MS/TP trunks
5
Communication no longer restarts after a power ● Communication – Data traffic is too high or way too high. In other words,
outage or communication no longer starts after reduce or cease the following:
a power outage on the BACnet/IP router. – Room segment communication
– No lighting or blinds application
– Max. one Desigo CC management platform
– Max. 5 trends per room
– Max. 3 alarms per room
– No central functions for gathering, i.e. for the hot water supply chain,
chilled water, air
BACnet networks ● PXG3.M runs automatic network checks, and indicates errors with an
illuminated Info-LED.
● PXG3.M operates on large projects as BBMD. These devices must have a
fixed IP address and not DHCP.
● Only one PXG3.M with BBMD functionality permitted per BACnet network.
Have you considered notes from technical ● Desigo Ethernet, TCP/IP, MS/TP and BACnet fundamentals (CM110666)
documentation? ● Desigo room automation engineering, mounting and installation (CM111043,
Section Network topology)
A6V11159798_en--_03 67 | 71
Product for network infrastructure
6
68 | 71 A6V11159798_en--_03
Glossary
7
7 Glossary
Term Definition
AS or PXC Automation station for control of primary plants: PXC50/100/200-E.D
Group master Group master in Desigo room automation to distribute operating modes, setpoints, or
coordination signals to assigned group members.
Group member Group member – logistical merger of HVAC, lighting, or shading functions.
CLI Command line interface, often referred to as console or terminal, is input pane to control
software, typically (but not necessarily) text based.
SNMP (Simple Network Management Protocol) A protocol developed by the Internet Engineering
Task Force (IETF) to monitor and control network elements, including printers, switches,
or computer, from a centralized location.
Latency time Delay time, i.e. time interval from end of an event or command to the start of the reaction
to this event.
Network latency exists on communication networks. On Ethernet networks, this latency is
caused by runtimes on the transmission medium and Ethernet switching. The latency time
describes the time period that passed until bit received on the switch port leaves the
destination port. The period is indicated in microseconds and is based on the switching
method.
STEP7/TIA Engineering tool for programming and commissioning automation stations and room
automation stations.
BBMD (BACnet Broadcast Management Device) Is used to distribute BACnet broadcasts over
multiple IP segments.
Symmetrical BDT (BACnet Distribution Table) Symmetrical means that all BBMDs are entered in the BDT,
the BBMDs recognize one another and the unicast is distributed to all devices entered in
the table.
Asymmetrical BDT (BACnet Distribution Table) Asymmetrical means that the BACnet broadcast originating
from a BACnet client on one IP segment travel in only one direction and are can be
distributed to all other IP segments. No broadcasts are distributed from the queried IP
segment to other IP segment so that broadcast data traffic on BACnet networks,
distributed over multiple IP segments, can be controlled and kept to a minimum.
A6V11159798_en--_03 69 | 71
Glossary
7
70 | 71 A6V11159798_en--_03
Issued by © Siemens Switzerland Ltd, 2017
Siemens Switzerland Ltd Technical specifications and availability subject to change without notice.
Smart Infrastructure
Global Headquarters
Theilerstrasse 1a
CH-6300 Zug
+41 58 724 2424
www.siemens.com/buildingtechnologie
s
A6V11159798_en--_03