Abstract Estimate: Description Rate Amount
Abstract Estimate: Description Rate Amount
A B S T R A C T E S T I M A T E
DETAILED ESTIMATE
S.no Description No L B H Quantity
1 Earth Work Exacavation and depositing on Bank with an initial Lead
of 2m and initial Lift of 2m in Loamy and clayey soils like Black cotton
soils , red earth and ordinary gravel (SS-20A)
MATERIAL
OTG for RR Masonary 225 1 cum Blasting (cum) 70 1 cum
6mm HBG 655 1 cum Machine Crushing(%) 25
10 mm HBG 820 1 cum
20mm HBG 1175 1 cum Scaffolding-brck masry 40 1 cum
40mm HBG 745 1 cum
Gravel 72.5 1 cum
Sand for Mortar 130 1 cum
sand for Filling 110 1 cum
Cement final 5500 1 MT vitrified tiles 723 sqm
M.S. Rods(6mm) 32500 1 MT Earth Work Excavation 45.5 1 cum
M.S. Flats 34500 1 MT Sand filling charges 14 1 cum
M.S. Angles, Channels & Structural s 34500 1 MT Vibration 43 1 cum
HYSD Bars 41000 1 MT Machine Nixing 45 1 cum
Bricks ( 19 x9 x9) 3100 1000 no
Cuddapah slab (.457 x.457) black 1076 10 sqm binding wire 52 kg
1 Sand for Mortar Nagavali, srikakulam 2 130 30.2 34.3 10.9 9.04 214.44
2 Sand for Filling Nagavali, srikakulam 2 110 30.2 34.3 10.9 9.04 194.44
3 Rough Stone(OTG) Singupuram 15 225 143.4 68.3 10.9 15.84 463.44
4 CRS Singupuram 15 225 143.4 68.3 10.9 15.84 463.44
4 40mm HBG Singupuram 15 745 143.4 68.3 10.9 15.84 983.44
5 20mm HBG Singupuram 15 1175 143.4 68.3 10.9 15.84 1413.44
6 10mm HBG Singupuram 15 820 143.4 68.3 10.9 15.84 1058.44
7 Bricks(1000 No.s) Tamminaidu peta 7 3100 110.08 134.1 134.1 53.64 3531.92
8 steel srikakulam 41000 41000