TNBP - Wbook - Madurai (26 June 06)
TNBP - Wbook - Madurai (26 June 06)
venkat:
Enter Town name
(Arith) Increase)
Male Female Actuals lakhs Projected in Lakhs
1 1901 52,667 53,317 105,984 1.06 0.13 1.37 0.97
2 1911 67,091 67,039 134,130 1.34 28,146 0.89 1.05 1.44
3 1921 70,289 68,605 138,894 1.39 4,764 1.68 1.18 1.57
4 1931 91,676 90,342 182,018 1.82 43,124 2.50 1.69 1.74
5 1941 120,596 118,548 239,144 2.39 57,126 3.35 2.52 2.22
6 1951 183,950 177,831 361,781 3.62 122,637 4.24 3.58 3.11
7 1961 217,638 207,172 424,810 4.25 63,029 5.16 4.81 4.41
8 1971 280,927 268,187 549,114 5.49 124,304 6.11 6.13 5.98
9 1981 420,739 400,152 820,891 8.21 271,777 7.09 7.47 7.53
10 1991 481,598 459,391 940,989 9.41 120,098 Nidish:8.11Final8.76
Population
8.65
10.6 1997 - 0.00 Projection
8.73 Based
9.48 on8.89
Water Supply
10.7 1998 - 0.00 - Project8.84 9.60 8.88
10.8 1999 - 0.00 - 8.94 9.71 8.87
10.9 2000 - 0.00 - 9.05 9.82 8.83
11 2001 469,396 459,473 1,067,562 10.68 126,573 9.15 9.93 8.78
11.1 2002 1,081,120 10.81 9.26 10.04 8.72
11.2 2003 1,094,850 10.95 9.37 10.14 8.63
11.3 2004 Nidish: Based on 1,108,755 11.09 9.47 10.25 8.53
Poulation ennumeration
11.4 2005 by Corporation 11.18 11.19 9.58 10.35 8.41
11.5 2006 11.28 11.29 9.69 10.45 8.27
12 2011 11.76 11.83 10.23 10.91 7.25
12.5 2016 12.24 12.39 10.79 11.30 5.61
13 2021 12.72 12.97 11.35 11.61 3.24
13.5 2026 13.20 13.59 11.92 11.85 0.01
14 2031 13.68 14.23 12.49 11.98 -4.21
14.4 2035 14.07 14.76 12.96 12.02 -8.40
96,158
10
8
Population in Lakhs
0
2001
2002
2011
2016
1901
1911
1921
1931
1941
1951
1961
1971
1981
1991
1997
1998
1999
2000
2003
2004
2005
2006
2021
2026
2031
2035
Year
Poly 5
akhs
1.13
1.12
1.51
1.92
2.31
2.80
3.51
4.39
5.06
l Population 4.64
Based on Water 3.25
Supply
2.90
2.50
2.06
1.57
1.03
0.45
-0.20
-0.90
-1.67
-6.55
-13.52
-23.12
-35.95
-52.72
-69.49
2016
2021
2026
2031
2035
Nidish: Population
Ennumeration by Corporation,
2- Madurai Corporation - Wardwise Information 2003-04
Nidish: Population
Ennumeration by Corporation,
2- Madurai Corporation - Wardwise Information 2003-04
1.18
No. Name of the Slum Ward No. of Popun. BPL Area Surfaced Individual Housing Typology Public Sewer Standposts Handpumps
House
No. holds Popun. Roads Latrines Toilets Lines
Kutch Pucca
Nos Nos sq. km Kms. Nos Nos Nos Nos Kms. Nos
NOTIFIED SLUMS (80 nos.)
North Zone
No. Name of the Slum Ward No. of Popun. BPL Area Surfaced Individual Housing Typology Public Sewer Standposts Handpumps
House
No. holds Popun. Roads Latrines Toilets Lines
Kutch Pucca
Nos Nos sq. km Kms. Nos Nos Nos Nos Kms. Nos
39 Ambedkar Nagar 16 100 500
B1 Slum Population
1 1961 nos 0%
2 1971 nos 0%
3 1981 nos 0%
4 1991 nos 0%
6 2004 nos 333,506 30%
7 2011 nos 0%
8 2021 nos 0%
9 2031 nos 0%
B Transmission Details
1 Source 1
a Distance of City/ Town from Surface Sources km 65.00
b Distance from Source to Treatment Plant km 16.60
c Transmission Type Gravity
d Raw Water Transmission Length km 16.60
2 Source 2
a Distance of City/ Town from Surface Sources km 15.00
b Distance from Source to Treatment Plant km
c Transmission Type Pumping
d Raw Water Transmission Length km 13.20
3 Source 3
a Distance of City/ Town from Surface Sources km
b Distance from Source to Treatment Plant km
c Transmission Type
d Raw Water Transmission Length km
4 Source 4
a Distance of City/ Town from Surface Sources km
b Distance from Source to Treatment Plant km
c Transmission Type
d Raw Water Transmission Length km
C Treatment Details
1 Source 1 - Vaigai WSS - Pannaipatti WTP
a Type of Treatment (Primary/ Secondary/ Tertiary) Primary
b Total Design Capacity of Plant MLD 71.60
c Total Utilised Capacity of Plant MLD 65.00
d Water received from source MLD 65.00
2 Source 2
a Type of Treatment (Primary/ Secondary/ Tertiary) No Treatment
b Total Design Capacity of Plant MLD
c Total Utilised Capacity of Plant MLD
d Water received from source MLD
3 Source 3
E Pumping Details
1 Total No. of Pumping Stations 1.00
2 Total No. of Booster Stations 1.00
3 Total No. of Pumps
a At Head Works 0.00
b At Pumping Stations 5.00 100.00
c At Booster Stations 0.00
Total- Pumps 5.00 100.00
4 Pumping Capacity MLD
5 Total- Pumping Capacity HP 570.00
6 Total- Water Pumped MLD
F Connection Details
1 Metered nos
a Domestic/ Residential
b Non Domestic/ Commercial
c Industrial
d Institutional
Total- Metered -
2 Unmetered nos
a Domestic/ Residential 79,611 96.65%
b Non Domestic/ Commercial 2,586 3.14%
c Industrial 172 0.21%
d Institutional 0.00%
Total- Unmetered 82,369
3 Total Water Connections nos 82,369
4 Standposts nos 4,865
5 Handpumps nos 2,465 NIdish: Data
6 Population Covered nos
a Metered - 0.00%
b Unmetered 383,435 43.02%
Total 383,435
c Standposts 389,200 43.66%
d Handpumps 118,723 13.32%
Total 891,359
B Sanitation
1 Sanitary Facilities (no. of units) nos
a Septic Tanks
b Public Conveniences 456
c Low Cost Sanitation units 20,733
d Dry Latrines
e Others
Total 21,189 Nidish:
2 Population Covered nos Seats X
seat
a Septic Tanks -
b Public Conveniences 138,300 581216.55
c Low Cost Sanitation units 99,858
d Dry Latrines
e Others
Total 238,158
C Sewage Generation
1 Sewer Connections/ UGD MLD 61
2 Sanitary Units MLD
3 Others MLD -
Total MLD 61
Total 615.31
B Storm Water Drains Nidish:
1 Drain Type length km report
B Medical Facilities
1 Municipal Medical Facilities 33
a No.of Medical Centres/Clinic/Dispensaries 2
b No. of Doctors
c No. of Nurses/ Compounders
d No. of Beds
e Avg. No. of Patients per Day
2 Non-Municipal Medical Centres
Medical Centres Run by:
a Government
b Private Sector 265
Total 265
Doctors
a Government
b Private Sector
Total -
C Education
1 Municipal Schools Nos
a No. of Schools 74
b No. of Class Rooms
c No. of Students
d No. of Teachers
2 Government Schools
a No. of Schools
b No. of Class Rooms
c No. of Students
d No. of Teachers
3 Private/ Voluntary Organisation Schools
a No. of Institutions
b No. of Class Rooms
c No. of Students
d No. of Teachers
lad
info
bet
6- Madurai Corporation - Service Indicators staf
and
dev
Indicators Value Unit
d Revenue per House Service Connection - Rs. p.m.
e No. of HSCs per Water Supply Staff Nos.
f Network Length per Staff Kms
g Share of Estab. Expen. in Water Expenditure #DIV/0! %
h % Cost Recovered through Water Charges (General & Special) #DIV/0! %
E STREET LIGHTING
1 System Adequacy Indicators
a Average Street Light Spacing 25.53 Metres
2 Service Level & Coverage Indicators
a Proportion of:
High Power Fixtures to Total Poles 33.14 %
Tube Lights to Total Poles 66.43 %
Bulbs to Total Poles 0.39 %
3 Service Cost & Efficiency Indicators
a Average Annual Expenditure per Street Light Pole - Rs. p.a.
b Share of Estab. Expen. in Total Street Lignting Expenditure % lad
This
c No. of Street Lights per Lighting Staff Nos. trip
100
lad
This
trip
6- Madurai Corporation - Service Indicators 100
G FIRE SERVICES
1 System Adequacy Indicators
a Does the Municipality provide Fire Services No --
b Population per Fire Tender #DIV/0! Nos.
2 Service Cost & Efficiency Indicators
a Expenditure per Capita Rs. p.a.
b Share of Estab. Expen. in Total Fire Service Expenditure %
J HEALTH- OVERALL
1 System Adequacy Indicators
a Population per Health Centre in Town 4,153 Nos.
2 Service Level & Coverage Indicators
a Population per Doctor in Town #DIV/0! Nos.
b Command Area per Health Centre in Town 0.19 Sq.Km
K EDUCATION- OVERALL
1 System Adequacy Indicators
a Population per School 14,983 Nos.
Reservoir Wards Served ESR/ SR GLSR/ Total Zone Popu. Gross Per
Capita
CWR Capacity Supply
Lakh Litres Nos litres
North Zone
1 Aruldosspuram 1, 20, 21 20.00 50,867.00
2 Sellur 14 (0.35), 15 (0.45), 16, 17, 18, 19 (0.7) 13.60 83,567.85
3 Rajaji Park 7(0.25), 9, 10, 11(0.75), 13 (0.1), 15 (0.10) 18.00 41,083.05
4 Anna nagar I 7(0.75) 2.30 2,091.75
5 Anna nagar II 8 6.00 20,907.00
6 KK Nagar 6, 11(0.2) 8.00 17,947.80
7 Lotus Tank 11(0.05), 12(0.25), 13(0.1) 2.30 6,377.35
8 K Pudur 3, 4, 5(0.55) 15.00 43,971.80
9 Race Course 13(0.8), 14(0.15), 15(0.45) 6.80 15,891.05
10 Reserve Line 2, 5(0.45), 12(0.75), 14(0.50), 19(0.3) 20.00 71,188.35
South Zone
11 Kochadai 69, 71, 72 15.00 77,351.00
12 Pazhaganatham 41, 64, 65, 66, 67, 68, 69 25.00 94,691.00
13 Arasaradi 28, 29, 70 11.50 46,146.00
14 Arapalayam 22 to 27, 30 30.00 105,131.00
15 Sunday market I 32(0.25), 33(0.75), 36(0.75), 37(0.75) 10.00 24,937.00
16 Sunday market II 10.00
17 Tamil Sangam Road 33(0.25), 34, 35, 36(0.25), 37(0.25), 48(0.25) 20.00 35,266.00
18 East Marret Street 46(0.25), 47, 48(0.75), 49 20.00 36,793.25
19 Traveller's Bunglow 31, 32(0.75), 38(0.20), 39(0.15), 40,42,43,60 to 63 30.00 133,498.85
20 Jhansi Rani Park 38(0.80), 39(0.85), 44, 46(0.7) 20.00 53,938.35
21 Joseph Park I 45, 46(0.05), 54, 55, 56, 57, 58, 59 15.00 93,527.55
22 Joseph Park II 15.00
23 New Ramnad Road 50, 51, 52, 53 15.00 53,582.00
Total 348.50 -
Nos.
3 Total
Domestic - - - - -
Non Domestic - - - - -
Industrial - - - - -
Total- Water Connections - - - - -
Public Stand Posts - - - - -
Hand Pumps - - - - -
2004-05
-
-
-
-
79,611
2,586
172
82,369
79,611
2,586
172
82,369
4,865
2,465
108,087
21,142
1,355
130,584
1.99%
Details Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 Zone 8 Zone 9 Zone 10 Zone 11 Zone 12
Sources
1 Handpumps
2 Tubewells
3 Surface Water
4 Public Standposts
Leakages
1 No. per month
2 No. per Year
3 No. per km. length
Details Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 Zone 8 Zone 9 Zone 10 Zone 11 Zone 12
Distribution Network (mm) Pipe length in m
1 50
2 75
3 80
4 90
5 100
6 110
7 125
8 150
9 180
10 200
11 250
12 300
13 350
14 400
15 450
16 500
17 600
18 750
Total - - - - - - - - - -
Details Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 Zone 8 Zone 9 Zone 10 Zone 11 Zone 12
Rising Network (mm) Pipe length in m
1 75
2 80
3 90
4 100
5 110
6 125
7 150
8 200
9 250
10 300
11 350
12 400
13 600
14 700
Total (km) - - - - - - - - - - - -
Details Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 Zone 8 Zone 9 Zone 10 Zone 11 Zone 12
Pumping Details
No. of Pump houses
1 Pump house No.1
No. of Pumps
Total vol. (MLD)
Pump No.1 Q (cum./h)
Pump No.1 H (mCW)
Pump No.2 Q (cum./h)
Pump No.2 H (mCW)
Pump No.3 Q (cum./h)
Pump No.3 H (mCW)
Pump No.4 Q (cum./h)
Pump No.4 H (mCW)
Details Total
Sources
1 Handpumps -
2 Tubewells -
3 Surface Water -
4 Public Standposts -
Leakages
1 No. per month -
2 No. per Year -
3 No. per km. length -
Details Total
Distribution Network (mm)
1 50 -
2 75 -
3 80 -
4 90 -
5 100 -
6 110 -
7 125 -
8 150 -
9 180 -
10 200 -
11 250 -
12 300 -
13 350 -
14 400 -
15 450 -
16 500 -
17 600 -
18 750 -
Total -
Details Total
Rising Network (mm)
1 75 -
2 80 -
3 90 -
4 100 -
5 110 -
6 125 -
7 150 -
8 200 -
9 250 -
10 300 -
11 350 -
12 400 -
13 600 -
14 700 -
Total (km) -
Details Total
Pumping Details
No. of Pump houses -
1 Pump house No.1
No. of Pumps
Total vol. (MLD)
Pump No.1 Q (cum./h)
Pump No.1 H (mCW)
Pump No.2 Q (cum./h)
Pump No.2 H (mCW)
Pump No.3 Q (cum./h)
Pump No.3 H (mCW)
Pump No.4 Q (cum./h)
Pump No.4 H (mCW)
Water
Body 4
Catchment Areas 150 200 225-250 300 350-375 400 450 500 600 700 800 900 1000 1100 Egg shp.
All sewer lengths in m
Catchment Area 1
1
2
3
4
Catchment Area 1
1 -
2 -
3 -
4 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
No. Link Details Length Left Drainage (1/0) Right Drainage (1/0) Remarks Open Pucca Closed Pucca
Street name From road To road Open Cov. Open Cov. to to construct Left Right Left
improve
metres P K P K metres
South Zone
1 West masi st. Namai Tharuvar koil st. JnAnupanady channel 1700.00 - 1,700.00 - - -
2 West veli st. Scott road Jn. Kiruthumal channel 1550.00 - 1,550.00 - - -
Vakkil new st., North masi st. Jn. Anupanady channel
3 Naicker new st. 490.00 - 490.00 - - -
4 East chitrai st. Amman sannathi st. jn. Anupanady channel 1310.00 - 1,310.00 - - -
5 North chitrai St. North tower Jn. West masi st. 700.00 - 700.00 - - -
6 South Marret St. South Krishnan Koil St. JnKiruthumal channel 640.00 - 640.00 - - -
North Zone
7 Alagar koil road N.M.B bakker Junction Thevar Statue Jn. 150.00 150.00
8 K.K Nagar B2 B2 road - Arch Jn. Vandyer Channel Jn. 510.00 510.00
West 80'-0' road Jn.
(wayk board college
9 K.K Nagar enterance Jn. Vandyer Channel Jn. 750.00 750.00
B1 B1 road (from Mayor
10 A.A Nagar Bungalow) Vaigai River 500.00 500.00
11 Kuruvikani salai Anna Bus stand Vaigai River 510.00 510.00
12 B1 B1 road pumping station Yanikulai 900.00 900.00
13 A.A Nagar Ambika Theatre Yanikulai 900.00 900.00
14 Subraman Street Anna Bus stand Vaigai River 510.00 510.00
East Zone
15 Elukadal Street Amman sannathi st. jn. Anupanady channel 662.00 662.00
16 East Masi Street East Masi Street Anupanady channel 375.00 375.00
17 Kamarajar salai Kamarajar salai South Anupanady channel 1050.00 1,050.00
18 New mahali patti rd. New mahali patti rd. Anupanady channel 900.00 900.00
19 Palace Road Kamarajar salai Old Kuyavar palayam rd. 900.00 900.00
20 Chinthamani Rd. Old Kuyavar palayam rd. Anupanady channel 1025.00 1,025.00
West road
21 Bye pass road west Theni road Junction Vaigai River 1200.00 1,200.00
side
No. Link Details Length Left Drainage (1/0) Right Drainage (1/0) Remarks Open Pucca Closed Pucca
Street name From road To road Open Cov. Open Cov. to to construct Left Right Left
improve
metres P K P K metres
Bye pass road East Theni road Junction Vaigai River 1200.00
22 side 1,200.00
Bye pass road west Theni road Junction P.R.C workshop 1800.00
23 side 1,800.00
Bye pass road East Theni road Junction P.R.C workshop 1800.00
24 side 1,800.00
- - -
- - -
- - -
- - -
- - -
- - -
Total
%)
30.05
2.22
0.90
1.33
0.84
0.17
0.09
8.58
30.13
25.69
#DIV/0!
No. Ward Link Details Length Carriage way Median Left-footpath Right-footpath ROW distance Comments
No. Width
Road Name Type Left Right Type Width Type Width Left Right
metres metres metres metres metres metres
North Zone
1 4 Karpaga Nagar 1st Street 0.14 B.T.
2 4 Karpaga Nagar 2nd Street 0.17 B.T.
3 4 Karpaga Nagar 3 Street
rd
0.17 B.T.
4 4 Karpaga Nagar 4th Street 0.21 B.T.
5 4 Karpaga Nagar 5th Street 0.28 B.T.
6 4 Karpaga Nagar 6th Street 0.36 B.T.
7 4 Karpaga Nagar 7 Street
th
0.37 B.T.
8 4 Karpaga Nagar 8th Streeet 0.42 B.T.
9 4 Karpaga Nagar 9th Street 0.38 B.T.
10 4 Karpaga Nagar 10th Street 0.36 B.T.
11 4 Karpaga Nagar 11 Street th
0.43 B.T.
12 4 Karpaga Nagar 12th Street 0.35 B.T.
13 4 Karpaga Nagar 13th Street 0.43 B.T.
14 4 Karpaga Nagar 14th Street 0.38 B.T.
15 4 Karpaga Nagar 15th Street 0.35 B.T.
16 4 Karpaga Nagar 16 Street th
0.32 B.T.
17 4 Karpaga Nagar 16th 1st Cross Street 0.32 B.T.
18 4 Karpaga Nagar 16th 2nd Cross Street 0.41 B.T.
19 5 Mariamman Koil Street 0.12 B.T.
20 5 Ramavarma Nagar Main Road 1.85 B.T.
21 5 Ramavarma Nagar west 1st Street 0.11 B.T.
22 5 Ramavarma Nagar west 2nd Street 0.13 B.T.
23 5 Ramavarma Nagar west 3rd Street 0.13 B.T.
24 5 Ramavarma Nagar west 4 Street th
0.11 B.T.
25 5 Ramavarma Nagar west 5th Street 0.12 B.T.
26 5 Ramavarma Nagar west 6th Street 0.13 B.T.
27 5 Ramavarma Nagar East 1st Street 0.12 B.T.
28 5 Ramavarma Nagar East 2 Street nd
0.12 B.T.
29 5 Ramavarma Nagar East 3rd Street 0.12 B.T.
30 5 Ramavarma Nagar East 4th Street 0.12 B.T.
31 5 Ramavarama Nagar East 5th Street 0.12 B.T.
No. Ward Link Details Length Carriage way Median Left-footpath Right-footpath ROW distance Comments
No. Width
Road Name Type Left Right Type Width Type Width Left Right
metres metres metres metres metres metres
32 5 Ramavarma Nagar East 6th Street 0.12 B.T.
33 5 Indra Nagar 1st Street 0.09 B.T.
34 5 Pudur 1st Street 0.09 B.T.
35 5 Pudur 2nd Street 0.06 B.T.
No. Link Details Ward Unit Value Size Cost/Unit Const. Investment Comments
Year
From road To road
Rs. Lakh Rs. Lakh
A B C D E F G H I J K L M N O P
1 Gain and Income
2 ULB: Madurai Corporation Revenue & Capital Fund
3 INCOME General Fund WS&D Fund EE Fund
Account
4 Code
Account Head 2000-01 2001-02 2002-03 2003-04 2004-05 2000-01 2001-02 2002-03 2003-04 2004-05 2000-01 2001-02
5
6 a 1 1001 Property Tax for General Purposes 105,542,000 111,004,954 120,101,000 106,034,000 - - - -
7 a 4 1002 Water Supply and Drainage Tax - - - - 74,501,000 -
8 a 6 1003 Education Tax - - - - - - - - 42,656,000 -
9 1004 - - - - - - - - - -
10 a 12 1005 Excess Remittance - Prop. Tax and other items - 7,058,369 - - - - 84 10 - -
11 b 7 1006 Profession Tax 29,230,000 26,485,150 27,209,000 28,434,000 - 42,330 38,646 - - -
12 b 22 1007 Pilgrim Tax - - - 270,000 - - - - - -
13 b 9 1008 Tax on Carriages and Animals - - - - - - - - - -
14 b 10 1009 Tax on Carts - - - - - - - - - -
15 b 12 1010 Servant Tax - - - - - - - - - -
16 b 24 1011 Advertisement Tax 3,551,000 2,570,269 3,329,000 2,320,000 - - - - - -
17 1012 swimming pool 1,400,000 550,460 881,000 814,000 - - - - - -
18 1013 Rent on land - 2,156,256 - - - - - - - -
19 1014 Rent on land - 5,091,408 - - - - - - - -
20 e 1015 Installation Fees Machinery - - - - - - - - - -
21 e 26 1016 Fees under Places of Public Resorts Act - 9,476 - - - - - - - -
22 e 27 1017 Trade Licence Fees 7,017,000 7,826,278 7,637,000 7,216,000 - - - - - -
23 e 108 1018 Licence Fees under PFA Act 107,000 124,102 253,000 117,000 - - - - - -
24 e 29 1019 Building Licence Fees 5,777,000 5,834,054 5,809,000 6,457,000 - - - - - -
25 e 28 1020 Encroachment Fees 2,682,000 3,320,885 4,452,000 4,119,000 - - - - - -
26 e 32 1021 Parking Fees - - - - - - - - - -
27 h 31 1022 Market Fees - Daily Market - Annual Lease 11,620,000 8,637,463 17,220,000 12,990,000 - - - - - -
28 h 31 1023 Market Fees - Weekly Market - Annual Lease - 194,760 - - - - - - - -
29 e 31 1024 Private Market Fees - - - - - - - - - -
30 e 30 1025 Advertisement Fees - 317,725 - - - - - - - -
31 e 39 1026 Fees for Bays and other receipts in Bus Stand 1,428,000 889,449 2,608,000 2,234,000 - - - - - -
32 h 33 1027 Fees for Slaughter Houses 796,000 76,098 826,000 846,000 - - - - - -
33 h 32 1028 Carts Stand/Lorry Stand/Taxi Stand Fees 673,000 4,548,746 4,984,000 6,275,000 - - - - - -
34 e 30 1029 Survey Fees - - - - - - - - - -
35 h 17 1030 Cinema Theatre Income - - - - - - - - - -
36 h 94 1031 Development Charges 3,750,000 6,308,580 5,418,000 3,456,000 - - - - - -
37 e 38 1032 Fees for Fishery of Lands - - - - - - 36 - - -
38 h 66 1033 Rent on and Lease of Lands - 75,250 2,942,000 4,465,000 1,935,000 2,362,000 2,511,840 3,727,686 - -
39 h 34 1034 Income from Ferries - - - - - - - - - -
40 h 35 1035 Income from Faris and Festivals 1,501,000 1,094,738 1,115,000 1,821,000 - - - - - -
41 h 97 1036 Rent on Shopping Complex 23,435,000 32,028,744 27,718,000 24,636,000 - - - - - -
42 h 72 1037 Rent for Community Halls 2,029,000 1,893,144 1,944,000 1,575,000 - - - - - -
43 h 66 1038 Rent on Buildings 412,000 430,889 1,114,000 703,000 13,000 15,793 39,774 36,289 - -
44 e 72 1039 Fees on Pay and Use Toilets 6,127,000 5,994,546 5,228,000 6,508,000 - - - - - -
45 h 67 1040 Rent from TB/Rest House 394,000 895,767 450,000 500,000 - - - - - -
46 h 95 1041 Road Cut Restoration Charges 11,000,000 14,375,562 9,192,000 42,843,000 11,000 - 1,500 20,676 - -
47 h 70 1042 Avenue Receipts 15,342,000 13,000 - - - - 26,000 - - -
48 h 95 1043 Demolition Charges for Unauthorised constrn/bldgs serv 782,000 631,903 803,000 1,238,000 - - - - - -
49 e 39 1044 Other Fees 1,400,000 1,182,965 1,422,000 1,108,000 - 176,000 674,459 226,830 - -
50 h 106 1045 Other Income 2,158,000 2,574,495 4,677,000 4,537,000 234,000 332,559 273,469 385,271 - -
51 c 19 1046 Duty on Transfer of Property 44,311,000 27,467,002 124,552,000 89,676,000 - 6 - - - -
52 c 17 1047 Entertainment Tax 28,188,000 6,978,939 27,358,000 33,907,000 - - - - - -
53 c 21 1048 Magisterial Fines 55,000 - - 4,196,000 - - - - - -
54 c 23 1049 Compensation for Toll - - - - - - - - - -
A B C D E F G H I J K L M N O P
3 INCOME General Fund WS&D Fund EE Fund
Account
4 Code
Account Head 2000-01 2001-02 2002-03 2003-04 2004-05 2000-01 2001-02 2002-03 2003-04 2004-05 2000-01 2001-02
A B C D E F G H I J K L M N O P
3 INCOME General Fund WS&D Fund EE Fund
Account
4 Code
Account Head 2000-01 2001-02 2002-03 2003-04 2004-05 2000-01 2001-02 2002-03 2003-04 2004-05 2000-01 2001-02
A B C D E F G H I J K L M N O P
1 421 240 306 178 Expenses and Losses
2 ULB: Madurai Corporation Revenue Fund 48.93 44.38 291.72 423.21
3 EXPENDITURE General Fund WS&D Fund EE Fund
Account Account Head
4 2000-01 2001-02 2002-03 2003-04 2004-05 2000-01 2001-02 2002-03 2003-04 2004-05 2000-01 2001-02
Code
5
6 a 201/266 2001 Pay including Personal Pay 255,520,000 172,291,205 254,462,000 245,259,000 49,934,000 38,609,799 40,186,822 38,565,479 192,000 -
7 a 201/266 2002 Special Pay - 126,225 - - - - 11,263 - -
8 a 201/266 2003 D.A. - 67,937,203 - - 7,800,474 7,557,465 7,571,367 - -
9 a 201/266 2004 Inerim Relief - 15,830 - - - - - - -
10 a 201/266 2005 H.R.A. - 9,540,755 - - 1,094,844 959,855 868,078 - -
11 a 201/266 2006 C.C.A. - 2,950,543 - - 336,192 303,467 278,506 - -
12 a 201/266 2007 Cash Allowance - 5,672 - - 600 100 2,090 - -
13 a 201/266 2008 Conveyance Allowance - 250,823 - - 33,731 24,984 23,963 - -
14 a 201/266 2009 Medical Allowance - 2,177,012 - - 262,992 237,153 215,310 - -
15 a 201/266 2010 Other Allowance - 1,379,615 - - 158,587 138,613 119,098 - -
16 a 201/266 2011 Ex-Gratia / Bonus 9,747,000 124,671 45,000 - 1,734,000 11,028 - 2,278 - -
17 a 201/266 2012 Travel Expenses 501,000 254,377 364,000 249,000 1,000 9,551 6,743 4,483 - -
18 a 201/266 2013 Leave Travel Concession 33,000 116,757 - 6,000 6,000 52,776 - - - -
19 a 201/266 2014 Supply of Uniform 1,921,000 1,994,999 1,943,000 626,000 - 268,883 1,642 - -
20 f 208/269c/24 2015 Telephone Charges 1,190,000 134,822 1,201,000 1,158,000 165,000 226,430 259,829 225,038 - -
21 d 237/233 2016 Light Vehicle Maintenance 2,473,000 3,227,482 2,503,000 3,732,000 33,000 19,480 17,629 31,837 - -
22 f 210 2017 Legal Expenses 521,000 216,327 1,835,000 873,000 7,000 - 650 12,000 - -
23 f 205/269c/24 2018 Stationery & Printing 1,028,000 976,005 1,005,000 1,278,000 214,000 19,909 18,045 - - -
24 f 208/269c/24 2019 Advertisement Charges 898,000 511,864 689,000 682,000 1,000 29,818 7,620 10,900 - -
25 f 208/269c/24 2020 Other Expenses 841,000 769,639 987,000 2,623,000 16,000 218,830 101,043 - - -
26 g 208/269c/26 2021 Property Tax - Vacancy Remission - - - - - - - - -
27 g 314 2022 Provision for Doubtful Collection of Revenue Items - - - - - - - - -
28 g 314 2023 Irrecoverable Revenue Items - Written off - 16,306,019 - - - - - - -
29 f 314 2024 M.O. Commission (Pension) - - - - - - - - -
30 a 208/266 2025 Conveyance Charges - - - - - - - - -
31 f 208 2026 Copmuter Operational Expenses 259,000 277,768 209,000 245,000 - - - - -
32 g 317 2027 Interest Charged by the Bank - - - - - - - - -
33 g 317 2028 Bank Charges 25,000 25,425 46,000 43,000 1,000 257 9,400 16,919 - -
34 g 318/326 2029 Interest on Loans/Ways & Means Advances/O.D. 42,081,000 23,990,606 30,641,000 17,780,000 - 6,267,000 11,258,516 - -
35 g 317 2030 Lapsed Deposit - Refund 17,000 - 75,000 12,000 - 1,501,434 - - -
36 b 203 2031 Pension / Family Pension 86,993,000 89,200,800 88,947,000 82,818,000 19,986,000 23,023,941 16,697,291 18,419,812 34,302,000 -
37 b 203 2032 Commutation 11,913,000 15,762,293 14,701,000 9,128,000 794,839 2,873,616 4,485,485 5,949,000 -
38 b 203 2033 Death cum Retirement Gratuity 18,728,000 17,544,637 18,816,000 15,519,000 422,646 3,328,571 4,624,520 5,504,000 -
39 b 203 2034 S.P.F.G.S. 605,000 530,000 625,000 563,000 145,000 100,000 155,000 361,492 - -
40 b 201/266 2035 G.J.S. - Management Contribution 49,000 - - 129,000 - - - - -
41 g 208 2036 Audit Fees 1,499,000 500,000 - - - - -
42 h 316 2037 Loss on Sale of Asset - - - - - - -
43 h 317 2038 Depreciation - 88,523,027 - - - - -
44 b 203 2039 Pension Contribution to the Pension Fund - - - - - - -
45 f 209 2040 Municipal Contribution to other funds - 664,540 35,996,000 160,176,000 - - 2,485 - -
46 317 2041 Prior Year Expenses - - - - - - -
47 a 201/266 2042 Hospital Stoppages/Reimbursement of Medical Exp. 35,000 971 21,000 7,000 - - - - -
48 c 290 2043 Expenditure on Food Sampling 10,000 4,450 1,000 28,000 - - - - -
49 2044 Provision for Encroachments - - - - - - -
50 208/269c 2045 Building Tax - Panchayat - - - - - - -
51 f 208 2046 Books & Periodicals and Magazines 36,000 40,114 28,000 119,000 - - - - -
52 f 204 2047 Postage and Telegrams and Fax Charges 252,000 192,549 215,000 173,000 5,000 - - - - -
53 f 207/269a/26 2048 Electricity Consumption Charges for Office Buildings 576,000 685,014 600,000 856,000 - 17,227 - 87,000 -
54 d 227 2049 Office Building Maintenance 179,000 37,433 27,000 51,000 - - 5,012 - -
A B C D E F G H I J K L M N O P
55 d 227/233 2050 Repairs & Maintenance of Office Tools & Plants 168,000 439,653 268,000 197,000 3,000 - - - 9,000 -
56 a 208/266 2051 Training Programme Expenses 104,000 52,927 30,000 46,000 - - - - -
57 e 208 2052 Professional Charges - 103,916 250,000 221,000 - - 10,075 - -
58 b 202 2053 Pension & L.S. Contributions 85,000 97,859 559,000 396,000 59,000 - - 266,927 - -
59 f 209 2054 Contributions 100,000 388,783 110,000 210,000 - - - - -
60 a 201/266 2055 Staff Welfare Expenses 32,000 1,710 10,000 8,000 - - - - -
61 e 312 2056 Exhibition Expenses - 150 74,000 - - - -
62 2057 - - - - -
63 2058 - - - - -
64 2059 - - - - -
65 2060 - - - - -
66 f 212 2061 Sitting Fees for the Councillors 345,000 459,870 479,000 468,000 - - - - -
67 f 212 2062 Council Department - Travel Expenses 33,000 6,000 - - - - - -
68 f 212 2063 Expenses on Hospitality and Entertainment 65,000 32,779 24,000 256,000 2,000 - - - - -
69 e 212 2064 Expenses on opening Ceremonies 65,000 9,180 - 95,325 - - - -
70 e 207 2065 Election Expenses - 1,524,443 1,989,000 40,000 - - - - -
71 2066 - - - -
72 2067 - - -
73 2068 - - -
74 2069 - - -
75 d 228/269a 2070 Heavy Vehicle Maintenance 8,551,000 5,971,133 8,101,000 9,522,000 651,000 285,051 629,093 365,042 - -
76 d 226 2071 Repairs & Maintenance - Roads & Pavements-Concrete 135,000 36,775 - - - - - -
77 d 226 2072 Repairs & Maintenance - Roads & Pavements-BT 15,691,000 - 44,000 96,000 - - - - -
78 d 226/269c 2073 Repairs & Maintenance - Building 39,000 23,710 - - - - -
79 d 226 2074 Repairs & Maintenance - Subways & Cause Ways 9,000 - - - - - -
80 d 226 2075 Repairs & Maintenance - Bridges & Flyovers - - - - - - -
81 d 231 2076 Repairs & Maint. - Strom water/Open Drains, Culverts - - - 118,104 - 22,600 - -
82 d 227 2077 Repairs & Maintanance - Plant & Machinery 24,000 132,921 45,000 - 105,000 - -
83 d 235/233 2078 Road Cuts - - - 391,740 - -
84 d 306 2079 Maintenance of Nutritious Meal Centre 1,438,000 2,743,125 2,835,000 2,744,000 - - - -
85 d 228 2080 Maintenance for improvements to Slum Areas - - - - - -
86 d 231 2081 Maint.Chargs for Railway Level Crossing/Over Bridges - - - - - -
87 2082 - - - -
88 2083 - - - -
89 c 305 2084 Maintenance of Garden Parks 241,000 101,782 11,000 33,000 - - - -
90 d 237 2085 Plants & Implements etc. - - - - - -
91 c 272 2086 Power Charge for Sewerage System/Pumping Station - - - 4,526,000 5,051,531 7,504,023 4,970,038 - -
92 c 269a 2087 Power Chrgs for Head works/Pumping/Booster Stns - - - 13,244,000 11,990,878 10,538,077 9,830,642 - -
93 c 284 2088 Power Charges for Sreet Lights 4,893,000 4,437,501 29,172,000 42,321,000 - - - -
94 c 284 2089 Maintenance Expenses for Street Lights 2,594,000 525,759 1,874,000 2,463,000 - - -
95 c 235/269a 2090 Wages 4,390,000 7,398,666 7,667,000 12,881,000 - - -
96 c 208 2091 Stores Written Off - - - -
97 c 237 2092 Petrol / Diesel Evaporation 17,321 - - -
98 2093 - - -
99 2094 - - -
100 f 211 2095 Survey Charges - - -
101 c 235 2096 Removal of Debris - - -
102 2097 - - -
103 2098 - - -
104 c 290 2099 SWM Privatisation - - -
105 c 290 2100 Expenses on Sanitary Conservancy 17,913,000 22,603,629 22,551,000 30,667,000 - - -
106 c 295 2101 Scavenging Materials 1,376,000 491,454 41,000 1,078,000 - - -
107 c 204 2102 Paper Charges - 114,000 - - -
108 e 306 2103 Fairs and Festivals 478,000 21,800 85,000 - - -
A B C D E F G H I J K L M N O P
109 2104 varumun Kappom Thittam 135,465 - -
110 e 295 2105 Improvements to Compost Yard 2,500 2,430,000 - -
111 e 288 2106 Anti-Filaria Anti-Malaria Operations 1,353,000 587,826 1,618,000 2,950,000 - - -
112 c 290 2107 Medicines 1,226,000 3,190,505 1,039,000 - - -
113 c 206/261 2108 Rent on Buildings - - 225,000 147,000 -
114 c 296 2109 Hospital Expenses other than Medicines 56,000 134,087 108,000 - -
115 c 297 2110 Diet to Patients - - - -
116 2111 - -
117 2112 - -
118 2113 - -
119 2114 - -
120 2115 - -
121 2116 - -
122 2117 - -
123 2118 - -
124 c 298 2119 Fodder (Animal Feed) - - -
125 c 235 2120 Zoological Garden Maintenance - - -
126 c 303 2121 Running of Libraries/Reading Rooms - - -
127 d 231 2122 Maintenance of Lodgin Houses/Rest houses/T.B./I.B. 14,000 51,512 52,000 177,000 - -
128 d 226 2123 Maint. Of Kalyana Mandapams/Community/Halls/Town Hal 19,000 1,600 - -
129 d 226 2124 Maintenance of Cinema Theatre - - -
130 d 269c/234 2125 Maintenance Expenses/Water Supply/Sewerage works - 3,595,000 2,164,141 3,056,564 4,370,986 - -
131 d 230 2126 Maintenance Expenses-Elementary Schools - 62,000 335,456 23,000 -
132 d 2127 Elementary Education Bus stand - - -
133 d 269c 2128 Royalty - - -
134 d 269b 2129 Maint. Chrgs to TWAD Board/Metro Water Borad/Water Cess to Tamil Nadu - 6,150,000 500,000 - -
135 c 269a 2130 Hire Chrgs for Supply of Water through Private Lorries / Tankers - - 267,140 2,515,880 - -
136 2131 Net Surplus for the Year - - - - - -
137 2150 Interest on bond holders 412,000 34,495,248 34,369,000 33,319,000 - - -
138 2151 Consolidated stamp duty - 2,175,000 - - - - -
139 2500 Family benefits to decreased councillors 50,000 - - - - - -
140 2501 Grant from govt. - Moovalur ramamirtham marriage assista 9,270,000 - - - - - -
141 TOTAL EXPENDITURE 509,099,000 607,684,061 569,449,000 686,866,000 100,607,000 93,431,754 103,660,533 109,574,763 46,213,000 -
A B C D E F
1 What Comes in/ Suppose to come in
2 ULB: Madurai Corporation
3 ASSETS General Fund
Account Account Head
4 2000-01 2001-02
Code
5
6 3001 Specific Stock Account - 168,978
7 CD 3002 Property Tax Recoverable - Current - 10,040,807
8 AD 3003 Property Tax Recoverable - Arrears - 1,002,709,418
9 3004 Property Tax Collection Suspense Account - -
10 CD 3005 Profession Tax Recoverable - Current -
11 AD 3006 Profession Tax Recoverable - Arrears - 9,572,546
12 CD 3007 Other Taxes Recoverable - Current - -
13 AD 3008 Other Taxes Recoverable - Arrears - -
14 CD 3009 Licence Fees & Other Fees - Recoverable - Current - -
15 AD 3010 Licence Fees & Other Fees - Recoverable - Arrears - -
16 CD 3011 Lease Amounts Recoverable - Current - 95,665
17 AD 3012 Lease Amounts Recoverable - Arrears - -
18 CD 3013 Water Supply & Drainage Tax - Receivable - Current - -
19 CD 3014 Water Charges Recoverable - Current - -
20 AD 3015 Water Charges Recoverable - Arrears - -
21 CD 3016 Education Tax Receivable - Current - -
22 CD 3017 Rent on Buildings Recoverable - Current - -
23 AD 3018 Rent on Buildings Recoverable - Arrears - -
24 AD 3019 Water Supply & Drainage Tax - Receivable - Arrears - -
25 AD 3020 Education Tax Receivable - Arrears - -
26 3021 Account Receivable - Sale of Properties - -
27 3022 Survey Fees Receivable - -
28 3023 Specific Grant Receivable - -
29 3024 Cost on Sale of Land/Building - Recoverable - -
30 3025 Interest Accrued on Fixed Deposit/Dividend due on Share - -
31 3026 Road cut Restoration - Telephone Department - Recoverabel - -
32 3027 Road cut Restoration - Others - Recoverabel - -
33 338/137 3028 Festival Advance -
34 338/137 3029 Handloom Advance - -
35 338/137 3030 Khadi Advance - -
36 338/137 3031 Education Advance - -
37 338/137 3032 Flood Advance - -
38 338/137 3033 Immediate Relief Advance 102,000 2,000
39 338/137 3034 Advance for Solar Cookers - -
40 338/137 3035 Tansi Advance - -
41 338/137 3036 Advance of T.A. to the Family of the Deceased Employee - -
42 338/137 3037 Tour Advance 360,000
43 338/137 3038 Advance of Pay & T.A. on Transfer - -
44 338/137 3039 Warm Clothing Advance - -
45 338/137 3040 Calculatro Advance - -
46 338/137 3041 Computer Advance - -
47 338/137 3042 Bicycle Advance 6,000
48 338/137 3043 Motor Cycle Advance 75,000 183,650
49 338/137 3044 Car Advance - -
50 338/137 3045 Marriage Advance 424,000
51 338/137 3046 House Building Advance - -
52 3047 Interest on Staff Advances - Recoverable Account - -
53 3048 Wages to Techincal Assit. (Petty Supervision Charges) - -
54 3049 Collection of Arrears of Taxes - Doubtful - -
55 3050 Collection of Arrears Non-Taxes(Fees) - Doubtful - -
56 3051 Advance to the Suppliers 17,333,000 3,349,343
57 3052 Advance to the Contractors - -
58 3053 Materials Cost Recoverable - Contractors -
59 3054 Advances Recoverable Expenses 1,076,000 2,142,257
60 3055 Other Advance - Recoverable 45,000 24,234
61 3056 Deposits - recoverable - 36,069
62 3057 Pre-Paid Expenses - -
63 CB 3058 General Imprest Account - 9,409
64 OB 3059 Cash Account - -
65 OB 3060 Collection Account - Bank -
66 OB 3061 - do - - 241,772
67 OB 3062 - do - - -
68 OB 3063 - do - - -
69 OB 3064 Devalution Fund Account - Bank - 955,200
70 OB 3065 Personal Deposit Account - Treasury -
71 OB 3066 Payment Account - Bank -
72 OB 3067 - do - -
73 OB 3068 Old Bank Account - Bank - 14,749,520
74 OB 3069 Elementary Educational Fund - Bank - -
75 OB 3069T S B I Town Bank - -
76 215 3070 Fixed Deposit - 14,959,453
77 3071 Pension and Leave Salary Contributions Recoverable - -
78 3072 Miscellaneous Recoveries - Recoverable - -
79 3073 - -
80 3074 - -
81 3075 Materials Cost Recoverable from the water supply account - 1,221,262
A B C D E F
82 3076 - -
83 3077 - -
84 3078 - -
85 3079 - -
86 3080 Drainage charges - current - -
87 3081 Drainage charges - Arrears - -
88 3082 - -
89 3083 - -
90 3084 - -
91 3085 - -
92 3086 - -
93 3087 - -
94 3088 - -
95 3089 - -
96 3090 SJSRY - -
97 3091 - -
98 3092 - -
99 3093 - -
100 3094 - -
101 3095 - -
102 3096 - -
103 3097 - -
104 3098 - -
105 3099 Miscellaneous Recoveries - Recoverable - -
106 3100 1 Inter Fund Transfer - Ws -
107 3100 2 Inter Fund Transfer - E E - -
108 3101 Lands sold to telephone department - -
109 214/239/2 3101 Lands 5,768,654,464
110 216/273/2 3102 Buildings 28,415,000 28,502,953
111 216 3103 Subways & Cause Ways 101,000 -
112 216 3104 Bridges & Flyovers 25,000 214,666
113 224 3105 Drains & Culverts 7,331,000 -
114 300/273 3106 Heavy Vehicles 147,000 3,133,820
115 213/273 3107 Light Vehicles - 52,100
116 293 3108 Other Vehicles - 99,000
117 213/273/2 3109 Furniture Fixtures & Office Equipments 3,274,000 761,523
118 285 3110 Electrical Installations Lamps & Fittings 1,412,000 795,498
119 213 3111 Electrical Installations Others 64,000 354,234
120 225/223 3112 Plant & Machinery 358,000 -
121 216 3113 Roads & Pavements Concrete 24,064,000 9,416,336
122 216 3114 Roads & Pavements Black tooped - Gr Block 99,938,000 18,044,526
123 216 3115 Roads & Pavements others - Gross Block 12,932,000 5,247,730
124 225 3116 Instruments and equipment in hospital - -
125 223 3117 Tools and plant - Gross block - 436,800
126 223 3118 Public Fountains 463,000 -
127 310 3119 - -
128 3119 Sewerage Charges - -
129 3120 - -
130 CB 3121 Projects - in - Progress Account 35,259,000 19,355,764
131 CB 3122 Projects - in - Progress Account - Government Grants - 1,934,301
132 CB 3123(1) Capital Fund - Bank Account - 1,710,041
133 CB 3123(2) NSDP A/c - -
134 CB 3123(3) Treasury Fund - -
135 CB 3123(4) S F C - SBI 29422 - -
136 CB 3123(5) MP Fund - -
137 CB 3123(6) MUDF - -
138 CB 3123(7) TUFIDCO Capital Fund - -
139 CB 3123(8) TUFIDCO - -
140 CB 3124 TNUDF (ISP) -
141 3125 3 S F C - SBI 29422 -
142 3126 MP Fund -
143 3127 MLA Fund - 3,659,250
144 3128 6 Indian Bank 540 TUFIDCO - 7,767,760
145 64 3129 7 U B I - Tufidco - -
146 64 3130 National Slum Development Programme - -
147 337 3131 T SBI Town - Capital Fund - -
148 273 3132 Water Supply Head Works, OHT etc. -
149 274 3133 Drinage & Sewerage pipes, Conduits etc. - -
150 310/273 3134 Ground Water Wells & Deep Bore Wells - -
151 273 3135 Hand Pumps - India Mark II - -
152 273 3136 Reserviors - -
153 274 3137 Sullege Water removal Tankers - -
154 310/274 3138 Other Items - -
155 CB 3139 Water Supply & Drainage Fund - Bank - -
156 CB 3139 Ws Town Bank - -
157 CB 3140 T SBI New Deposit - -
158 CB 3140 Water Supply & Drainage Fund - Bank - -
159 CB 3141 Drainage Fees from Building Flat Promoters - Bank - -
160 CB 3142 Under Ground Drainage Scheme - Deposit - Bank - -
161 3143 - -
162 3144 - -
A B C D E F
163 3145 - -
164 3146 - -
165 3147 - -
166 3148 - -
167 3149 Drainage Fees from Building Flat Promoters - -
168 3150 Under Ground Drainage Scheme - Initial Deposits - -
169 3151 Decentralised District Plan (10th Finance Commission) - -
170 3152 Decentralised District Plan - -
171 3153 - -
172 3154 - -
173 3155 - -
174 3156 - -
175 3157 - -
176 3158 - -
177 3159 - -
178 3160 Entertainment Tax from CTV Operators - -
179 3213 Rent on land recoverable - Current - 25,280
180 3214 Rent on land recoverable - current - 511,369
181 3221 Parking Fees - Recoverable - Current -
182 3222 Market fees (daily) Recoverable - current - 723,748
183 3228 Cycle stand fees reciverable - current -
184 3236 Rent on shopping complex recoverable - current - 5,440,262
185 3239 fees on Pay & use toilet recoverable current - 74,672
186 3277 Rent on bunk stall recoverable current - 439,796
187 3313 Rent on land recoverable - Arrear - 108,307
188 3314 Rent on land recoverable - Arrear - 512,148
189 3322 Market fees (daily) Recoverable arrear - 80,000
190 3323 Market fees (weekly) Recoverable arrear - -
191 3325 Advertisement fees recoverable arrear - 30,000
192 3327 Fees for slaghter house recoverable - Arrear - -
193 3328 Cycle stand fees reciverable - Arrear - 109,722
194 3336 Rent on shopping complex recoverable - arrear - 3,799,938
195 3339 fees on Pay & use toilet recoverable - arrear - 131,683
196 3340 Rent on from travellers bunglow recoverable - arrear - 1,071,690
197 3342 Avenue receipt recoverable - Arrear -
198 3377 Rent on bunk stall recoverable - arrear - 572,208
199 6,001,858,464 1,175,578,707
A B C D E F
1
2 ULB: Madurai Corporation
3 LIABILITIES General Fund
A B C D E F
82 4075 Maint. Chrgs for Railway Level Crossing/Overbridge Payable - -
83 4076 ENTYCE Advance Recovered - -
84 4077 Inter Zonal Transfer Account - -
85 4078 Instruments & Equipments in Hospitals and Dispensaries - Accu. Depreciation - -
86 4079 Tools & Plant - Accu. Depreciation - 109,200
87 4080 Public Fountains - Accu. Depreciation - 83,535
88 4081 Head Works OHT etc. Water Supply Mains Accu. Depreciation - -
89 4082 Drainage Swereage Pipes, Conduits etc. - Accu.Depreci. - -
90 4083 Ground Water Wells/Deep Bore-Wells - Accu. Depreci. - -
91 4084 Hand Pumps India Mark II - Accu. Depreciation - -
92 4085 Reservoirs - Accu. Depreciation - -
93 4086 Suuage Water Removal Tankers - Accu. Depreciation - -
94 4087 Other Items - -
95 4088 Audit fes payable - 10,593,291
96 4089 - -
97 4090 SJSRY NRY - 8,896,621
98 4091 - -
99 4092 - -
100 4093 - -
101 4094 - -
102 4095 - -
103 4096 - -
104 4097 - -
105 4098 - -
106 4099 - -
107 4100 Family benefit fund (pensioners) - 639,793
108 4101 Health Fund - -
109 4110 Drainage Depoist - payable - -
110 4211 Labour welfare fund - -
111 4300 Bonds ( Ring road) - 282,603,722
112 4500 Vaigai River Conservative Programme - -
113 Total 230,908,000 7,719,982,343
INCOME
I Taxes & Fees
A Property Tax
1 Tax for General Purposes 1,071.71 981.09 1,150.89 1,021.81
2 Scavenging Tax
3 Lighting Tax
4 Water and Drainage Tax 893.09 817.58 959.08 851.51
5 Education Tax 446.54 408.79 479.54 425.76
Sub Total Property Tax 2,411.34 2,207.46 2,589.51 2,299.08 -
B Profession Tax
1 For General Purpose 146.85 162.53 257.29 115.13
2 For Education
Sub Total Professional Tax 146.85 162.53 257.29 115.13 -
C Other Taxes
1 Tax on carriage and Animals - - - - -
2 Tax on Carts - - - - -
3 Betterment Contribution
4 Advertisement Tax 35.51 25.70 33.29 23.20 -
5 Miscellaneous Recoveries - edu 0.43 - 0.87 0.09 -
6 Others -3
7 Servant Tax - - - - -
Sub Total Other Taxes 35.94 25.70 34.16 23.29 -
D Tax Collected by Other Agencies
1 Tax on Motor Vehicles
2 Entertainmetn Tax 281.88 69.79 273.58 339.07 -
3 Surcharge on Entertainment & Show Tax
4 Duty on Transfer of Property 443.11 274.67 1,245.52 896.76 -
5 Additional Surcharge on Land Revenue
6 Magisterial Fines 0.55 - - 41.96 -
7 Pilgrim Tax - - - 2.70 -
8 M.V. Tax Compensation - - - - -
9 Others - 1 28.36 0.05 - - -
10 Others - 2
Sub Total Taxes Collected by Other Agencies 753.90 344.51 1,519.10 1,280.49 -
E Fees
1 Fees under places of Public Resorts Act - 0.09 - - -
2 Dangerous and Offensive Trades 70.17 78.26 76.37 72.16 -
3 Encroachment 26.82 33.21 44.52 41.19 -
4 Others- 1/ Building License fee 57.77 58.34 58.09 64.57 -
5 Others- 2/ Bus Fee 14.28 8.89 26.08 22.34 -
6 Market Fees 116.20 88.32 172.20 129.90 -
7 Cart Stand Fee 6.73 45.49 49.84 62.75 -
8 Slaughter House Fees 7.96 0.76 8.26 8.46 -
9 Ferries/ PFA 1.07 1.24 2.53 1.17 -
10 Fairs and Festivals 15.01 10.95 11.15 18.21 -
11 Pay & Use Latrines/ Warrant fee 61.27 59.95 52.28 65.08 -
12 Births and Deaths/Application Fee 1.26 1.11 1.35 1.30 -
13 Scavenging Fee/ Fishery rent - - 0.00 - -
14 Fees & Other Income fine and Forfeitures 14.00 16.77 20.96 13.35 -
15 Others/ Installation Fee 36.41 - 10.15 - -
Sub Total Fees 428.95 403.38 533.78 500.48 -
Sub Total Taxes & Fees (I) 3,776.98 3,143.59 4,933.84 4,218.47 -
II Grants and Contribution
A Revenue
1 State Finance Commission Fund (SFC Fund) 1,858.00 947.87 2,186.73 1,921.05 -
2 Aid Grant - - - - -
534841322.xls/16-Abstract/08/02/2021 63/220
Business Plan - Madurai Corporation 16-Abstract
534841322.xls/16-Abstract/08/02/2021 64/220
Business Plan - Madurai Corporation 16-Abstract
534841322.xls/16-Abstract/08/02/2021 65/220
Business Plan - Madurai Corporation 16-Abstract
EXPENDITURE
A GENERAL ADMINISTRATION
1 Office Staff 2,680.30 2,591.68 2,573.00 2,463.53 -
2 Collection Staff
3 Pension/ superannuation and other benefits 1,640.79 1,231.36 1,700.42 1,232.77 -
4 Postage 2.52 1.93 2.15 1.73 -
5 Stationery and Forms 10.28 9.76 10.05 12.78 -
6 Rent on Buildings - - - 2.25 -
7 Electricity Expenses 5.76 6.85 6.00 8.56 -
8 Other 1 126.88 41.02 19.50 38.96 -
9 Other 2/ Voluntary workers Honororium 1.00 3.89 1.10 2.10 -
10 Legal Expenses 5.21 2.16 18.35 8.73 -
11 Survey Charges - - - - -
12 Election Expenses - 15.24 19.89 0.40 -
13 Telephone Charges 11.90 1.35 12.01 11.58 -
14 Computer Operational Expenses 2.59 2.78 2.09 2.45 -
15 Books & Periodicals and Magazines 0.36 0.40 0.28 1.19 -
16 Training Programme Expenses 1.04 0.53 0.30 0.46 -
17 Others/ Sitting Allowance 3.78 4.66 4.79 4.68 -
18 Capital Expenditure
Equipment 33.38 11.68 7.08 49.59 -
Acquisition of Lands - - - -
Others/Investments - 149.59 - 238.00 -
Sub-Total General Administration 4,525.79 4,074.88 4,377.01 4,079.76 -
B PUBLIC WORKS - MAJOR & MINOR WORKS
Major Works
1 Roads & Buildings (Major Works) 1,654.75 614.26 609.63 2,001.10 -
2 Administration (Major Works)
3 Others (Major Works) - Project in Progress 352.59 212.90 51.41 25.00 -
4 Secondary Schools (Major Works)
5 Elementary Schools (Major Works) - - - - -
6 Miscellaneous (Major Works)
7 Markets Cart Stands Etc., (Major Works)
8 Water Supply (Major Works) 0.11 - 0.52 - -
9 Drainage (Major Works) 590.15 225.80 523.27 1,121.58 -
10 Others (Major Works) 3.58 - - 13.18 -
Sub-Total Public Works-Major 2,601.18 1,052.96 1,184.82 3,160.86 -
Minor Works
1 Roads & Buildings (Minor Works) 159.17 1.95 0.89 0.96 -
2 Administration (Minor Works) 3.50 4.77 2.95 2.53 -
3 Others (Major Works)- light & heavy Vehicles (other 85.51 59.71 81.01 95.22 -
4 Secondary School (Minor Works) - - - - -
5 Elementary School (Minor Works) 0.23 - 0.62 - -
6 Miscellaneous (Minor Works) 0.14 0.52 0.52 1.77 -
7 Market Cart - Stand Etc., (Minor Works)
8 Water Supply (Minor Works) - Plant & Machinery 0.03 - 3.92 1.05 -
9 Drainage (Minor Works) 35.95 21.64 30.57 43.71 -
10 Light & heavy Vehicles Maintenance-Water Supply 6.84 3.05 6.47 3.97 -
534841322.xls/16-Abstract/08/02/2021 66/220
Business Plan - Madurai Corporation 16-Abstract
534841322.xls/16-Abstract/08/02/2021 67/220
Business Plan - Madurai Corporation 16-Abstract
534841322.xls/16-Abstract/08/02/2021 68/220
Business Plan - Madurai Corporation 16-Abstract
534841322.xls/16-Abstract/08/02/2021 69/220
Business Plan - Madurai Appendix - II
REVENUE ACCOUNT
I Revenue Income
A Tax- Own Sources
1 Property Tax (General Purpose) - 58% of Total PT 1,071.71 981.09 1,150.89 1,021.81
2 Property Tax (Education Purpose) - 16% of Total PT 446.54 408.79 479.54 425.76
3 Profession Tax 146.85 162.53 257.29 115.13
4 Other Taxes & Charges 35.51 25.70 33.29 23.20
Tax- Own Sources 1,700.61 1,578.11 1,921.01 1,585.90
B Assigned Revenues
1 Entertainment Tax 281.88 69.79 273.58 339.07
2 Surcharge on Stamp Duty 443.11 274.67 1,245.52 896.76
3 Other Transfers 28.91 0.05 - 44.66
Assigned Revenues 753.90 344.51 1,519.10 1,280.49
D Revenue Grants
1 State Finance Commission Grant 1,858.00 947.87 2,186.73 1,921.05
2 Other Grants 130.13 302.26 203.65 143.58
Revenue Grants 1,988.13 1,250.13 2,390.38 2,064.63
Total- Revenue Income (Excl. W&D Fund) 5,834.52 4,599.64 7,167.30 6,869.35
II Revenue Expenditure
A General Administration
1 Staff Salary and Employee Related Expenses 2,680.30 2,754.74 2,573.00 2,463.53
2 Allowances to Elected Representatives 3.78 4.66 4.79 4.68
3 General Expenses 19.01 32.98 51.54 27.99
4 Pensions and Gratuities 1,640.79 1,231.36 1,700.42 1,232.77
5 Education - Staff Salary - - - -
6 Miscellaneous 126.88 41.02 19.50 38.96
Establishment 4,470.76 4,064.76 4,349.25 3,767.93
C Debt Servicing
1 Public Works and Roads 52.52 2,622.68 43.85 1,660.42
2 Public Health and Conservancy - - - -
3 Others - 73.96 83.30 93.81
Debt Servicing 52.52 2,696.64 127.15 1,754.23
Total- Revenue Expenditure (Excl. W&D Fund) 5,273.36 7,295.39 5,297.30 6,663.18
CAPITAL ACCOUNT
III Capital Income
A Capital Loans
1 Public Works and Roads 712.70 - - 1,522.30
2 Street Lighting - - - -
3 Public Health & Conservancy - - - -
4 Education - - - -
5 Others - - - -
Capital Loans 712.70 - - 1,522.30
C Own Sources
1 Transfer from Revenue Account - 547.62 359.96 1,601.76
2 Sale of Municipal Property 0.14 1.78 0.03 0.91
Own Sources- Capital 0.14 549.39 359.99 1,602.67
F Own Sources
1 Water Connection Charge 116.83 4.59 23.14 438.16
2 Sewerage Connection Charge 5.16 0.47 0.74 0.65
W&D Own Sources- Capital 121.99 5.06 23.88 438.81
EXTRAORDINARY ACCOUNT
V EA Income
1 Cash at Bank/ in Hand - 350.67 67.86 262.41
2 Tax & Royalty
2 Cess Income 148.01 814.38 170.79 161.04
3 Cash Deposit 62.60 278.47 40.55 85.00
5 Loans and Advances
4 Staff Advance 21.06 1.88 7.41 6.81
7 PF and Pension
5 Security Deposit 114.17 197.40 94.19 24.96
6 Miscellaneous - - - -
VI EA Expenditure
1 Recoveries Payable to Outsiders
2 Tax & Royalty Transfers
3 Legal Payments
4 Security Deposit Refunds
1 Cess Transfers - - 100.00 156.58
2 Other- Deposits 171.31 0.05 70.23 3.97
3 PF and Pension 172.11 0.05 71.38 18.69
4 Miscellaneous 18.99 2.53 9.90 9.24
Revenue Expenditure
Item 2000-01 2001-02
Amount in Rs. Lakh
Establishments 4,470.76 4,064.76
Operation & Maintenance 750.08 533.99
Debt Servicing 52.52 2,696.64
Total 5,273.36 7,295.39
Growth (%) 38.34
Establishments/RI 77% 88%
Salary/RI 74% 87%
Table xx: Key assumptions for forecasting income from Property Tax
Base Case
Description Current Level
Scenario
Annual growth in number of assessments (%) 2.50% 2.50%
Average ARV per Property (Rs. Per Annum) 6,824 6,824
Tax Rate (% of ARV) 27% 27%
Periodic increase in ARV (%)
2006-07 - 30%
2011-12 - 30%
2016-17 - 30%
Collection Performance (% of Demand)
Arrears 17% 30%
Current 80% 80%
Table xx: Key assumptions for forecasting income from Water Charges
Base Case
Description Current Level
Scenario
% Water connections to property tax assessments 63.08% 63.08%
Monthly water charge per connection (Rs.)
Domestic 42.85 42.85
Non Domestic 85.00 85.00
Industrial 150.00 150.00
Periodic revision in water charges
2006-07 - 15%
2009-10 - 15%
2011-12 - 15%
2015-16 - 15%
2018-19 - 15%
Collection Performance (% of Demand)
Arrears 56% 50%
Current 70% 75%
One time connection fee (Rs.)
Domestic 1,000 1,000
Non Domestic 2,000 2,000
Industrial 4,000 4,000
Periodic revision of one time connection fee - 0 % - 3 yrs once
Table xx: Key assumptions for forecasting income from Sewerage Charges
Base Case
Description Current Level
Scenario
% Sewerage connections to PT assessments 55% 55%
Monthly sewerage charge per connection (Rs.)
Domestic 125.00 125.00
Non Domestic 250.00 250.00
Industrial 375.00 375.00
Periodic revision in sewerage charges
2006-07 - 15%
2009-10 - 15%
2011-12 - 15%
2015-16 - 15%
2018-19
Collection Performance (% of Demand)
Arrears 62% 62%
Current 86% 86%
One time connection fee (Rs.)
Domestic 6,000.00 6,000.00
Non Domestic 10,000.00 10,000.00
Industrial 10,000.00 10,000.00
Periodic revision of one time connection fee - 0 % - 3 yrs once
Table 32: Key assumptions for forecasting income from Solid Waste conservancy fee
Base Case
Description Current Level
Scenario
% coverage to PT assessments
Domestic - -
Non Domestic - -
Monthly conservancy fee per PT assessment (Rs.)
Domestic - -
Non Domestic - -
Periodic revision in conservancy fee
2006-07 - -
2009-10 - -
2011-12 - -
2015-16 - -
2018-19 - -
Collection Performance (% of Demand)
Arrears - -
Current - -
2002-03 2003-04 2000-01 2001-02 2002-03 2003-04
Amount in Rs. Lakh
2002-03 2003-04
Amount in Rs. Lakh
1,921.01 1,585.90 29.15% 34.31% 26.80% 23.09%
1,630.43 1,447.57 26.02% 30.22% 22.75% 21.07%
257.29 115.13 2.52% 3.53% 3.59% 1.68%
33.29 23.20 0.61% 0.56% 0.46% 0.34%
1,336.80 1,938.33 23.86% 31.02% 18.65% 28.22%
547.79 494.94 6.97% 10.14% 7.64% 7.21%
134.46 136.73 2.19% 2.97% 1.88% 1.99%
218.86 225.39 3.03% 3.86% 3.05% 3.28%
435.69 1,081.28 11.66% 14.05% 6.08% 15.74%
3,257.82 3,524.23 53.00% 65.33% 45.45% 51.30%
4.45
11.67
2002-03 2003-04
Amount in Rs. Lakh
273.58 339.07
1,245.52 896.76
- 44.66
1,519.10 1,280.49
21.19 18.64
340.94 (15.71)
2002-03 2003-04
Amount in Rs. Lakh
2,186.73 1,921.05
203.65 143.58
2,390.38 2,064.63
33.35 30.06
91.21 (13.63)
2002-03 2003-04
Amount in Rs. Lakh
959.08 851.51
263.88 241.16
15.00 -
7.38 1.56
1,245.34 1,094.23
730.16 760.47
180.59 148.01
- -
44.71 74.12
- -
955.47 982.59
289.87 111.64
28% 25% 26%
Investment
Scenarios
2.50%
6,824
27%
30%
30%
30%
30%
80%
Investment
Scenarios
80%
42.85
85.00
150.00
15%
15%
15%
15%
15%
50%
75%
1,000
2,000
4,000
0 % - 3 yrs once
Investment
Scenarios
80%
125.00
250.00
375.00
15%
15%
15%
15%
50%
80%
7,250
12,000
12,000
0 % - 3 yrs once
Investment
Scenarios
70%
100%
15.00
50.00
15.00
15.00
15.00
15.00
15.00
30%
80%
Sources of Revenue Income (2000 to 2004)
Average
28.34
15.06 Revenue Grants
Tax- Own Sources
25.44 28%
31%
31.17
100.00
Assigned Revenues
15%
28.34% Non Tax- Own Sources
25.02% 25%
2.83%
0.49%
25.44%
7.99%
2.26%
3.31%
11.88%
53.77%
Average
Items of Revenue Expenditure (2000 to 2004)
69.79
13.54
16.67
100.00
Debt Servicing
17%
Establishments
70%
nue Income (2000 to 2004)
Assigned Revenues
15%
n Sources
%
e Expenditure (2000 to 2004)
cing
Establishments
70%
Table XX: Full Project Cash Flow
Item Heads 2006 2007 2008 2009
Full Project Cash Flow
Water Supply (73) (353) (763)
Sewerage 6 435 962
Roads and Traffic Management (91) (332) (837)
Storm Water Drainage (93) (321) (695)
Solid Waste Management 166 306 378
Street Lighting (3) (15) (39)
Slum Upgradations (13) (41) (116)
Others - (29) (99)
Total - Project Cash flow (101) (351) (1,209)
2012-16
Sectors
Water Supply 906 543 362 -
Sewerage & Sanitation 684 411 274 -
Road and Traffic Management 1,099 550 183 -
Storm Water Drainage 469 234 78 -
Solid Waste Management 153 76 25 -
Street Lighting - - - -
Others - - - -
Total 3,310 1,814 923 -
2006-16
Sectors
Water Supply 5,434 3,260 2,173 -
Sewerage & Sanitation 2,965 1,779 1,186 -
Road and Traffic Management 1,832 916 305 -
Storm Water Drainage 938 469 156 -
Solid Waste Management 1,569 784 261 -
Street Lighting 59 35 24 -
Others - - - -
Total 12,796 7,244 4,106 -
2010 2011 2012 2013 2014 2015 2016
Rs. Lakh
(1,353) (2,170) (3,629) (5,402) (7,545) (10,095) (13,052)
1,705 3,327 5,071 6,417 6,691 6,731 6,895
(1,685) (2,905) (4,808) (7,443) (11,177) (16,167) (22,196)
(1,225) (1,923) (2,779) (3,781) (5,078) (6,744) (8,729)
403 304 50 (281) (732) (1,282) (1,811)
(85) (153) (247) (369) (524) (719) (966)
(245) (415) (833) (1,314) (1,873) (2,515) (3,240)
(211) (369) (577) (851) (1,222) (1,585) (2,029)
(2,696) (4,305) (7,753) (13,022) (21,459) (32,376) (45,128)
Total
9,056
4,561
1,221
781
2,361
118
-
18,098
1,811
1,368
1,832
781
254
-
-
6,047
10,867
5,929
3,054
1,563
2,615
118
-
24,146
2017 2018 2019 2020
- - - -
- - - -
- - - -
2,595 2,960 3,023 3,058
36 41 39 -
2,631 3,001 3,062 3,058
- - - -
6,797 7,205 7,637 8,096
10,511 11,084 11,716 12,082
- - - -
17,308 18,289 19,354 20,177
(14,677) (15,289) (16,292) (17,119)
(73,767) (89,056) (105,348) (122,467)
- - - -
34% 31% 28% 26%
29% 27% 31% 28%
1.39 1.38 1.37 1.37
10% 10% 9% 9%
- - - -
7% 7% 6% 5%
278% 276% 299% 295%
0.83 0.83 0.83 0.83
10% 10% 9% 9%
anbu:
18- Madurai Corporation -Financial Operating Plan Base Yr -2004-05 1 2 3 4 5 6 7 8
No. Item Heads Variable 2005 2006 2007 2008 2009 2010 2011 2012 2013
as of March 31 (in INR Lakh)
Opening Balance 852.2 2,667.1 4,799.5 6,345.9 7,944.8 9,867.2 11,903.8 15,344.7
REVENUE ACCOUNT
I Revenue Income
A Tax- Own Sources
1 Property Tax (General Purpose) - 44% of Total PT 989.5 1,094.9 1,577.6 1,571.7 1,579.2 1,596.5 1,620.8 2,038.6 2,102.5
2 Property Tax (Education Purpose) - 19% of Total PT 412.3 456.2 657.3 654.9 658.0 665.2 675.3 849.4 876.0
3 Profession Tax 5% 179.0 187.9 197.3 207.2 217.5 228.4 239.8 251.8 264.4
4 Other Taxes & Charges 5% 30.9 32.4 34.1 35.8 37.6 39.4 41.4 43.5 45.6
Tax- Own Sources 1,611.7 1,771.5 2,466.3 2,469.5 2,492.3 2,529.5 2,577.4 3,183.3 3,288.6
B Assigned Revenues
1 Entertainment Tax 7% 258.0 276.0 295.3 316.0 338.1 361.8 387.1 414.2 443.2
2 Surcharge on Stamp Duty 10% 786.5 865.2 951.7 1,046.9 1,151.5 1,266.7 1,393.4 1,532.7 1,686.0
3 Other Transfers 5% 19.3 20.3 21.3 22.4 23.5 24.7 25.9 27.2 28.6
Assigned Revenues 1,063.8 1,161.5 1,268.3 1,385.2 1,513.2 1,653.2 1,806.4 1,974.1 2,157.7
D Revenue Grants
1 State Finance Commission Grant 5% 1,814.8 1,905.6 2,000.9 2,100.9 2,205.9 2,316.2 2,432.1 2,553.7 2,681.3
2 Other Grants 5% 204.7 214.9 225.6 236.9 248.8 261.2 274.3 288.0 302.4
Revenue Grants 2,019.5 2,120.5 2,226.5 2,337.8 2,454.7 2,577.4 2,706.3 2,841.6 2,983.7
Total- Revenue Income 7,449.5 8,840.8 10,856.8 11,346.0 11,882.6 12,698.2 13,369.7 14,957.3 16,069.5
No. Item Heads 2014 2015 2016 2017 2018 2019 2020
as of March 31 (in INR Lakh)
Opening Balance 19,239.3 23,291.3 27,477.1 32,184.4 39,659.7 47,372.6 55,762.3
REVENUE ACCOUNT
I Revenue Income
A Tax- Own Sources
1 Property Tax (General Purpose) - 44% of Total PT 2,160.7 2,215.3 2,267.5 2,872.9 2,963.6 3,041.4 3,110.3
2 Property Tax (Education Purpose) - 19% of Total PT 900.3 923.0 944.8 1,197.0 1,234.8 1,267.2 1,296.0
3 Profession Tax 277.6 291.5 306.1 321.4 337.5 354.4 372.1
4 Other Taxes & Charges 47.9 50.3 52.8 55.5 58.3 61.2 64.2
Tax- Own Sources 3,386.6 3,480.2 3,571.2 4,446.8 4,594.1 4,724.1 4,842.6
B Assigned Revenues
1 Entertainment Tax 474.2 507.4 543.0 581.0 621.6 665.1 711.7
2 Surcharge on Stamp Duty 1,854.6 2,040.0 2,244.0 2,468.4 2,715.3 2,986.8 3,285.5
3 Other Transfers 30.0 31.5 33.1 34.7 36.4 38.3 40.2
Assigned Revenues 2,358.8 2,578.9 2,820.0 3,084.1 3,373.3 3,690.2 4,037.4
D Revenue Grants
1 State Finance Commission Grant 2,815.4 2,956.2 3,104.0 3,259.2 3,422.1 3,593.2 3,772.9
2 Other Grants 317.5 333.4 350.0 367.5 385.9 405.2 425.5
Revenue Grants 3,132.9 3,289.5 3,454.0 3,626.7 3,808.0 3,998.4 4,198.4
Total- Revenue Income 16,977.7 17,919.4 19,261.3 21,611.7 22,857.8 24,560.1 25,970.4
anbu:
18- Madurai Corporation -Financial Operating Plan Base Yr -2004-05 1 2 3 4 5 6 7 8
No. Item Heads Variable 2005 2006 2007 2008 2009 2010 2011 2012 2013
as of March 31 (in INR Lakh)
9,693.0
II Revenue Expenditure
A General Administration
1 Staff Salary and Employee Related Expenses 5% 2,748.8 2,886.2 3,030.5 3,182.1 3,341.2 3,508.2 3,683.6 3,867.8 4,061.2
2 Allowances to Elected Representatives 7% 4.8 5.2 5.5 6.0 6.4 6.9 7.4 7.9 8.5
3 General Expenses 10% 36.2 39.8 43.8 48.1 53.0 58.2 64.1 70.5 77.5
4 Pensions and Gratuities 5% 1,523.9 1,600.1 1,680.1 1,764.1 1,852.3 1,944.9 2,042.2 2,144.3 2,251.5
5 Education - Staff Salary 5% - - - - - - - - -
5 Miscellaneous 5% 59.4 62.4 65.5 68.8 72.2 75.8 79.6 83.6 87.8
Establishment 4,373.1 4,593.7 4,825.5 5,069.1 5,325.1 5,594.1 5,876.9 6,174.1 6,486.5
Total- Revenue Expenditure 6,808.3 7,247.5 9,071.1 10,175.2 10,674.9 11,210.7 11,785.5 11,987.3 12,705.4
Operating Surplus (Water and Sanitation Fund) 45.3 841.9 563.8 537.3 492.4 670.5 644.1 917.1 1,161.2
Operating Surplus (Revenue Fund) 595.9 751.4 1,221.8 633.5 715.4 817.0 940.1 2,052.9 2,202.9
Operating Surplus (Overall) 641.1 1,593.3 1,785.7 1,170.8 1,207.7 1,487.5 1,584.1 2,970.0 3,364.0
2,445.5 4,452.8 5,970.3 7,553.6 9,432.3 11,451.3 14,873.8 18,708.7
No. Item Heads 2014 2015 2016 2017 2018 2019 2020
as of March 31 (in INR Lakh)
II Revenue Expenditure
A General Administration
1 Staff Salary and Employee Related Expenses 4,264.3 4,477.5 4,701.4 4,936.4 5,183.3 5,442.4 5,714.5
2 Allowances to Elected Representatives 9.1 9.8 10.5 11.3 12.1 13.0 14.0
3 General Expenses 85.3 93.8 103.2 113.5 124.9 137.3 151.1
4 Pensions and Gratuities 2,364.1 2,482.3 2,606.4 2,736.7 2,873.5 3,017.2 3,168.1
5 Education - Staff Salary - - - - - - -
5 Miscellaneous 92.2 96.8 101.6 106.7 112.0 117.6 123.5
Establishment 6,814.9 7,160.2 7,523.1 7,904.7 8,305.8 8,727.7 9,171.2
Total- Revenue Expenditure 13,477.3 14,307.3 15,200.1 14,807.9 15,842.5 16,957.1 18,158.3
Operating Surplus (Water and Sanitation Fund) 1,144.6 1,090.8 1,369.0 2,765.0 2,712.3 3,041.0 2,982.2
Operating Surplus (Revenue Fund) 2,355.9 2,521.3 2,692.1 4,038.9 4,303.0 4,562.0 4,829.9
Operating Surplus (Overall) 3,500.4 3,612.1 4,061.1 6,803.9 7,015.3 7,603.1 7,812.1
22,739.7 26,903.5
anbu:
18- Madurai Corporation -Financial Operating Plan Base Yr -2004-05 1 2 3 4 5 6 7 8
No. Item Heads Variable 2005 2006 2007 2008 2009 2010 2011 2012 2013
as of March 31 (in INR Lakh)
CAPITAL ACCOUNT
III Capital Income
A Capital Loans
1 Water Supply
2 Sewerage
3 Road and Traffic Management
4 Storm Water Drainage
Solid Waste Management
5 Street Lighting
6 Slum Upgradations
2 Others
Capital Loans - - - - - - - - -
Capital Grants and Contribution 211.1 221.6 232.7 244.4 256.6 269.4 282.9 297.0 311.9
B Own Sources
1 Consumers Contribution WS/UGD Connection Charges - Existing 114.0 131.3 134.5 165.5 169.6 173.9 218.7
Own Sources- Capital - - 114.0 131.3 134.5 165.5 169.6 173.9 218.7
Total- Capital Income 211.1 221.6 346.7 375.6 391.1 434.9 452.5 470.9 530.6
Operating Surplus (WS Capital Account) 201.5 211.6 336.1 364.5 379.4 422.6 439.6 457.4 516.4
Operating Surplus (General Capital Account) 9.6 10.1 10.6 11.1 11.7 12.3 12.9 13.5 14.2
Operating Surplus (Overall Capital Account) 211.1 221.6 346.7 375.6 391.1 434.9 452.5 470.9 530.6
Closing Balance - Base Case 852.2 2,667.1 4,799.5 6,345.9 7,944.8 9,867.2 11,903.8 15,344.7 19,239.3
Govt. Subsidy Sought/ULB Overall Status 852.2 2,667.1 3,649.6 3,768.7 2,974.3 1,782.9 491.3 (1,188.3) (4,457.0)
NPV of Subsidy Reqd. at 2005-06 Prices (237,885) 491.3 (696.9) (5,153.9)
No. Item Heads 2014 2015 2016 2017 2018 2019 2020
as of March 31 (in INR Lakh)
CAPITAL ACCOUNT
III Capital Income
A Capital Loans
1 Water Supply
2 Sewerage
3 Road and Traffic Management
4 Storm Water Drainage
Solid Waste Management
5 Street Lighting
6 Slum Upgradations
2 Others
Capital Loans - - - - - - -
Capital Grants and Contribution 327.5 343.8 361.0 379.1 398.0 417.9 438.8
B Own Sources
1 Consumers Contribution WS/UGD Connection Charges - Existing
224.2 229.8 285.2 292.3 299.6 368.6 377.8
Own Sources- Capital 224.2 229.8 285.2 292.3 299.6 368.6 377.8
Total- Capital Income 551.6 573.6 646.2 671.4 697.6 786.6 816.7
Operating Surplus (WS Capital Account) 536.7 558.0 629.8 654.1 679.5 767.5 796.7
Operating Surplus (General Capital Account) 14.9 15.6 16.4 17.3 18.1 19.0 20.0
Operating Surplus (Overall Capital Account) 551.6 573.6 646.2 671.4 697.6 786.6 816.7
Closing Balance - Base Case 23,291.3 27,477.1 32,184.4 39,659.7 47,372.6 55,762.3 64,391.0
Govt. Subsidy Sought/ULB Overall Status (11,422.4) (20,661.1) (30,513.4) (36,999.9) (43,964.2) (50,863.5) (58,527.0)
NPV of Subsidy Reqd. at 2005-06 Prices (16,576.3) (37,237.4) (67,750.9) (104,750.7) (148,714.9) (199,578.4) (258,105.4)
(258,105.4)
B Sustainable Project Cash Flow - Option 1
1 Water Supply (6,541.0) (8,213.1) (9,983.2) (11,915.8) (13,922.3) (15,973.3) (18,104.2)
2 Sewerage 7,627.2 8,345.1 9,250.6 10,074.1 10,869.6 11,861.1 12,842.3
3 Roads and Traffic Management (1,117.7) (1,616.7) (2,219.6) (2,870.0) (3,552.8) (4,281.2) (5,058.1)
4 Storm Water Drainage (507.8) (674.4) (872.9) (1,083.2) (1,300.0) (1,529.5) (1,772.4)
5 Solid Waste Management (364.0) (650.1) (904.9) (1,177.1) (1,469.6) (1,712.8) (1,973.6)
6 Street Lighting (120.2) (149.7) (181.2) (214.0) (248.2) (283.9) (321.1)
7 Slum Upgradations (474.7) (626.4) (796.1) (920.9) (1,049.9) (1,183.4) (1,321.8)
8 Others 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total- Project Account (1,498.1) (3,585.3) (5,707.2) (8,107.0) (10,673.1) (13,103.0) (15,708.9)
anbu:
18- Madurai Corporation -Financial Operating Plan Base Yr -2004-05 1 2 3 4 5 6 7 8
No. Item Heads Variable 2005 2006 2007 2008 2009 2010 2011 2012 2013
as of March 31 (in INR Lakh)
Less: ULB Equity 704.3 769.0 879.7 932.5 1,005.7 289.1 345.7
Closing Balance (628.8) (1,165.8) (1,971.1) (2,909.9) (3,460.1) (3,883.9) (4,741.0)
ULB Overall Status - Option 1 852.2 2,667.1 4,170.7 5,180.1 5,973.7 6,957.2 8,443.7 11,460.7 14,498.2
NPV of Subsidy Reqd. at 2005-06 Prices -
Less: ULB Equity 1,048.7 1,177.4 1,534.8 1,626.9 1,719.8 1,672.5 1,893.8
Closing Balance (1,149.9) (2,577.2) (4,970.5) (8,084.3) (11,412.4) (16,533.0) (23,696.3)
ULB Overall Status - Option 2 852.2 2,667.1 3,649.6 3,768.7 2,974.3 1,782.9 491.3 (1,188.3) (4,457.0)
NPV of Subsidy Reqd. at 2005-06 Prices -
ASSUMPTIONS
No. Item Heads 2014 2015 2016 2017 2018 2019 2020
as of March 31 (in INR Lakh)
Less: ULB Equity 420.7 381.5 250.9 0.0 0.0 0.0 0.0
Closing Balance (6,844.7) (9,313.4) (11,686.2) (14,085.9) (16,652.1) (19,082.0) (21,687.9)
ULB Overall Status - Option 1 16,446.6 18,163.7 20,498.2 25,573.7 30,720.5 36,680.3 42,703.1
NPV of Subsidy Reqd. at 2005-06 Prices
Less: ULB Equity 2,580.7 2,507.3 1,807.9 0.0 0.0 0.0 0.0
Closing Balance (34,713.7) (48,138.2) (62,697.9) (76,659.5) (91,336.9) (106,625.7) (122,918.0)
ULB Overall Status - Option 2 (11,422.4) (20,661.1) (30,513.4) (36,999.9) (43,964.2) (50,863.5) (58,527.0)
NPV of Subsidy Reqd. at 2005-06 Prices
ASSUMPTIONS
Indicators Value
A RESOURCE MOBILISATION venkat:
1 Per Capita Income 555 Revenue Income
2 Sources of Funds
a Share of Own Sources in Total Revenue Income 60.92
c Share of Property Tax in Total Revenue Income 33.19
d Share of Revenue Grants & Subsidies in Total Revenue Income 26.34
3 Growth in Revenue Income 4.59
4 Growth in Own Sources of Revenue Income 2.38
5 Per Capita Own Income 246
B FUND APPLICATION
venkat:
1 Per Capita Expenditure 544 Revenue Expenditure
2 Uses of Funds
a Share of Establishment Expenditure in Total Revenue Expenditure 70.36
b Share of O&M Expenditure in Total Revenue Expenditure 14.99
c Share of Establishment Expenditure to Total Revenue Income 67.40
3 Growth in Establishment Expenditure (3.15)
4 Growth in O&M Expenditure 10.92
5 Growth in Total Revenue Expenditure 9.77
C LIABILITY MANAGEMENT
1 Per Capita Liability (2004-05 estimated)
a Outstanding Debt per Capita 709
b Outstanding Non-Debt Liability per Capita 350
c Total Outstanding Liability per Capita 1,059
2 As a Proportion of Property Tax Current Demand (2004-05 estimated)
a Outstanding Debt as % of P.T Demand 413.69
b Outstanding Non-Debt Liability as % of P.T Demand 204.23
c Total Outstanding Liability as % of P.T Demand 617.92
3 As a Proportion of Property Tax Own Revenue Income (2003-04 estimated)
a Outstanding Debt as % of Own Revenue Sources 213.02
b O/s Non-Debt Liability as % of Own Revenue Sources 105.17
c Total O/s Liability as % of Own Revenue Sources 318.19
4 Non-Debt Liability as % of Total Liability 33.05
5 Debt Servicing Ratio (D.S/ Revenue Income) 17.82
=('21- Outstanding Loans'!D29+'21- Outstanding Lo
D PERFORMANCE INDICATORS
1 Operating Ratio 1.01
ladda:
2 Growth in Per Capita Own Income 0.81 for all the items we need to
get population year wise
3 Growth in Per Capita Grant (2.26) from the 1996 to 2000-01
4 Growth in Per Capita Total Revenue Income 0.94
5 Growth in Per Capita Establishment Expenditure (7.80)
6 Growth in Per Capita O&M Expenditure 5.88
7 Growth in Per Capita Revenue Expenditure 3.06
8 Transfer Performance of Education Cess Collected
8 Capital Utilisation Ratio 2.43
Indicators Value
E EFFICIENCY INDICATORS
1 Tax Collection Performance
a Property Tax 45%
b Water Charges 62%
c Sewer Charges 78%
d Profession Tax 39%
2 Cost of Collecting Rs. 1000 of Taxes
3 No. of P.T Assessments per Tax Collection Staff 1,467
venkat:
4 Property Tax Demand per Assessment 1,857 Divide by billcollector
5 No. of Municipal Staff per 1000 Population 3.11
6 Annual Revenue (Own Source) per Municipal Staff 8.18
7 Population per P.T Assessment 12.84
Unit
venkat:
Rs. p.a
Revenue Income
%
%
%
% p.a
%
Rs. P.a
venkat:
Rs. p.a
Revenue Expenditure
%
%
%
%
%
% p.a
Rs.
Rs.
Rs.
%
%
%
%
%
%
%
%
1- Outstanding Loans'!D29+'21- Outstanding Loans'!J17)/'17- Abstract of Accounts'!AY20*100
Ratio
ladda:
% p.a
for all the items we need to
get population year wise
% p.a
from the 1996 to 2000-01
% p.a
% p.a
% p.a
% p.a
% Transferred
Ratio
Unit
%
%
%
%
Rs.
Nos.
venkat:
Rs. p.a
Divide by billcollector
Nos.
Rs. Lakhs p.a
Persons
II PROPERTY TAX
1 Demand
Arrears 2,957.61 2,943.61 3,001.03 2,807.90 2,886.74
Current 2,372.42 2,265.67 2,396.01 2,378.22 2,406.00 0.47
Total- Demand 5,330.03 5,209.28 5,397.04 5,186.12 5,292.74
2 Collection
Arrears 684.50 252.55 678.78 411.57 349.52
Current 1,726.84 1,954.91 1,910.73 1,887.51 1,876.85 3.01
Total- Collection 2,411.34 2,207.46 2,589.51 2,299.08 2,226.37
3 Collection Performance
Arrears 23% 9% 23% 15% 12% 17%
Current 73% 86% 80% 79% 78% 80%
Total- Collection Performance 45% 42% 48% 44% 42% 45%
IV SEWERAGE CHARGES
1 Demand
venkat:
Arrears 60.73 52.18 Check
Current 135.60 135.32
Total- Demand - - - 196.33 187.50
2 Collection
Arrears 37.36 23.54
Current 116.29 64.71
Total- Collection - - - 153.65 88.25
3 Collection Performance
Arrears 62% 45% 62%
Current 86% 48% 86%
No. Lending Agency Loan Year of Interest Repaymen Repayable Repayable Due Factor Annuity
Amount as
on 31-Mar-
Amount Receipt Rate t Period Principal Interest 05
Rs. Lakh % Years Rs. Lakh Rs. Lakh Rs. Lakh
A Loan from State Government/Finanical Institutions
1 Government of Tamil Nadu 1,025.00 1996-2000 14.50% 10.00 1,025.00 0.195 200.36
2 GoTN + LIC + IUDP + TWAD-WB + TWA 6,412.46 2000-01 8.75% 10.00 620.31 0.154 95.60
3 SWM 273.60 8.25% 10.00 90.10 0.151 13.58
4 TUFIDCO 500.00 2005-06 3.00% 10.00 5,473.10 0.117 641.61
5 TUFIDCO - Bridge /Roads 862.82 2003-04 8.75% 10.00 1,146.09 0.154 176.62
6 TUFIDCO 500.00 1990-91 8.00% 10.00 956.37 0.149 142.53
7 WSPF - UGD 486.99 2002-03 9.20% 10.00 527.50 0.157 82.92
8 Others - -- --
9 -- --
10 - -- --
Total- Outstanding Loans 10,060.87 - - 9,838.47
A DEBT SERVICING - EXISTING LOANS ( Rs. Lakh) 2007 2008 2009 2010 2011 2012 2013 2014 2015
1 Government of Tamil Nadu
Outstanding 1,025.00 973.27 914.04 846.22 768.56 679.65 577.84 461.28 327.81
Annuity 200.36 200.36 200.36 200.36 200.36 200.36 200.36 200.36 200.36
Interest - 148.63 141.12 132.54 122.70 111.44 98.55 83.79 66.89
Principal 51.73 59.23 67.82 77.65 88.91 101.81 116.57 133.47
2 GoTN + LIC + IUDP + TWAD-WB + TWAD
Outstanding 620.31 578.99 534.06 485.19 432.05 374.26 311.41 243.06 168.74
Annuity 95.60 95.60 95.60 95.60 95.60 95.60 95.60 95.60 95.60
Interest - 54.28 50.66 46.73 42.45 37.80 32.75 27.25 21.27
Principal 41.32 44.93 48.87 53.14 57.79 62.85 68.35 74.33
3 SWM
Outstanding 90.10 83.96 77.30 70.10 62.30 53.86 44.73 34.84 24.13
Annuity 13.58 13.58 13.58 13.58 13.58 13.58 13.58 13.58 13.58
Interest - 7.43 6.93 6.38 5.78 5.14 4.44 3.69 2.87
Principal 6.15 6.65 7.20 7.80 8.44 9.14 9.89 10.71
4 TUFIDCO
Outstanding 5,473.10 4,995.68 4,503.93 3,997.44 3,475.75 2,938.41 2,384.94 1,814.88 1,227.71
Annuity 641.61 641.61 641.61 641.61 641.61 641.61 641.61 641.61 641.61
Interest - 164.19 149.87 135.12 119.92 104.27 88.15 71.55 54.45
Principal 477.42 491.74 506.50 521.69 537.34 553.46 570.07 587.17
5 TUFIDCO - Bridge /Roads
Outstanding 1,146.09 1,069.75 986.73 896.44 798.26 691.48 575.36 449.09 311.76
Annuity 176.62 176.62 176.62 176.62 176.62 176.62 176.62 176.62 176.62
Interest - 100.28 93.60 86.34 78.44 69.85 60.50 50.34 39.30
Principal 76.34 83.02 90.28 98.18 106.78 116.12 126.28 137.33
6 TUFIDCO
Outstanding 956.37 890.35 819.05 742.05 658.88 569.07 472.07 367.31 254.16
Annuity 142.53 142.53 142.53 142.53 142.53 142.53 142.53 142.53 142.53
Interest - 76.51 71.23 65.52 59.36 52.71 45.53 37.77 29.38
Principal 66.02 71.30 77.00 83.16 89.82 97.00 104.76 113.14
7 WSPF - UGD
Outstanding 527.50 493.11 455.56 414.55 369.77 320.86 267.46 209.15 145.47
Annuity 82.92 82.92 82.92 82.92 82.92 82.92 82.92 82.92 82.92
Interest - 48.53 45.37 41.91 38.14 34.02 29.52 24.61 19.24
Principal 34.39 37.55 41.01 44.78 48.90 53.40 58.31 63.68
Total
Outstanding 9,838.47 9,085.10 8,290.67 7,451.99 6,565.58 5,627.60 4,633.82 3,579.60 2,459.78
Annuity 1,353.22 1,353.22 1,353.22 1,353.22 1,353.22 1,353.22 1,353.22 1,353.22 1,353.22
Interest - 599.85 558.78 514.54 466.80 415.24 359.44 298.99 233.39
Principal
Debt Servicing- Revenue 376.98 376.98 376.98 376.98 376.98 376.98 376.98 376.98 376.98
Debt Servicing- Water 976.24 976.24 976.24 976.24 976.24 976.24 976.24 976.24 976.24
Debt Servicing- Total 1,353.22 1,353.22 1,353.22 1,353.22 1,353.22 1,353.22 1,353.22 1,353.22 1,353.22
B DUES TO VARIOUS AGENCIES (Rs. La Phasing Period 2,007 2,008 2,009 2,010 2,011
Salaries 5 80.00 80.00 80.00 80.00 80.00
PF & Other Contribution 5 343.20 343.20 343.20 343.20 343.20
TWAD Bulk Water Charges 5 160.00 160.00 160.00 160.00 160.00
TNEB 5 144.01 144.01 144.01 144.01 144.01
GoTN (Cess) 5 167.80 167.80 167.80 167.80 167.80
Others 5 76.40 76.40 76.40 76.40 76.40
Total 971.41 971.41 971.41 971.41 971.41 - - - -
2016
174.98
200.36
47.53
152.82
87.90
95.60
14.76
80.83
12.54
13.58
1.99
11.59
622.93
641.61
36.83
604.78
162.41
176.62
27.28
149.34
131.97
142.53
20.33
122.19
75.93
82.92
13.38
69.54
1,268.67
1,353.22
162.11
376.98
976.24
1,353.22
22 - Madurai Corporation - Project Cost Schedule - Option 1 August 2, 2021 August 2, 2021
Total Identified Investment Implementable Investment
Variable Total Cost (06- 2007 2008 2009 2010 2011 Total Cost 2012 2013 2014 2015 2016 Variable Impl Base 2007 2008 2009 2010 2011 Variable Impl Base 2012 2013 2014 2015 2016
Sub-Project and Component
11) (11-16) Cost Cost
Domestic Currency- Rs. Lakh Domestic Currency- Rs. Lakh
DRAWDOWN SCHEDULE -- WATER SUPPLY
A Project Capex
Project Phasing 20% 20% 20% 20% 20% 20.00% 20.00% 20.00% 20.00% 20.00% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%
Project Construction Sus. Inv Sus. Inv
Civil Works 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 100% 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 20% 1,811.19 362.24 362.24 362.24 362.24 362.24
Sub Total- Project Const. 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 100% 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 20% 1,811.19 362.24 362.24 362.24 362.24 362.24
Base Project Cost 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 362.24 362.24 362.24 362.24 362.24
Contingencies
Physical Contingency 7.0% 633.92 126.78 126.78 126.78 126.78 126.78 633.92 126.78 126.78 126.78 126.78 126.78 7.0% 633.92 126.78 126.78 126.78 126.78 126.78 126.78 25.36 25.36 25.36 25.36 25.36
Price Contingency during Cons 6.0% 2,232.49 177.01 303.91 438.42 581.01 732.14 6,264.94 892.35 1,062.17 1,242.18 1,432.99 1,635.25 6.0% 2,232.49 177.01 303.91 438.42 581.01 732.14 1,252.99 178.47 212.43 248.44 286.60 327.05
Sub Total- Contingencies 2,866.41 303.79 430.69 565.20 707.79 858.93 6,898.86 1,019.14 1,188.96 1,368.96 1,559.77 1,762.03 2,866.41 303.79 430.69 565.20 707.79 858.93 1,379.77 203.83 237.79 273.79 311.95 352.41
Project Cost (incldg contingency) 11,922.38 2,114.99 2,241.89 2,376.40 2,518.98 2,670.12 15,954.83 2,830.33 3,000.15 3,180.16 3,370.97 3,573.23 11,922.38 2,114.99 2,241.89 2,376.40 2,518.98 2,670.12 3,190.97 566.07 600.03 636.03 674.19 714.65
Landed Project Cost- Water Supply 11,922.38 2,114.99 2,241.89 2,376.40 2,518.98 2,670.12 15,954.83 2,830.33 3,000.15 3,180.16 3,370.97 3,573.23 11,922.38 2,114.99 2,241.89 2,376.40 2,518.98 2,670.12 3,190.97 566.07 600.03 636.03 674.19 714.65
B Project Financing
Debt Component 50% 50%
FI 50% 5,961.19 1,057.49 1,120.94 1,188.20 1,259.49 1,335.06 7,977.42 1,415.17 1,500.08 1,590.08 1,685.48 1,786.61 50% 5,961.19 1,057.49 1,120.94 1,188.20 1,259.49 1,335.06 1,595.48 283.03 300.02 318.02 337.10 357.32
Govt./Donor 0% - - - - - - - - - - - - 0% - - - - - - - - - - - -
Market 0% - - - - - - - - - - - - 0% - - - - - - - - - - - -
Debt Financing 5,961.19 1,057.49 1,120.94 1,188.20 1,259.49 1,335.06 7,977.42 1,415.17 1,500.08 1,590.08 1,685.48 1,786.61 5,961.19 1,057.49 1,120.94 1,188.20 1,259.49 1,335.06 1,595.48 283.03 300.02 318.02 337.10 357.32
Government Grant/ Subsidy 30% 3,576.71 634.50 672.57 712.92 755.70 801.04 4,786.45 849.10 900.05 954.05 1,011.29 1,071.97 30% 3,576.71 634.50 672.57 712.92 755.70 801.04 957.29 169.82 180.01 190.81 202.26 214.39
Project Financing 11,922.38 2,114.99 2,241.89 2,376.40 2,518.98 2,670.12 15,954.83 2,830.33 3,000.15 3,180.16 3,370.97 3,573.23 11,922.38 2,114.99 2,241.89 2,376.40 2,518.98 2,670.12 3,190.97 566.07 600.03 636.03 674.19 714.65
Base Project Cost 4,561.12 912.22 912.22 912.22 912.22 912.22 4,561.12 912.22 1,368.33 1,368.33 912.22 - 4,561.12 912.22 912.22 912.22 912.22 912.22 1,368.33 273.67 410.50 410.50 273.67 -
Contingencies
Physical Contingency 7.0% 319.28 63.86 63.86 63.86 63.86 63.86 319.28 63.86 95.78 95.78 63.86 - 7.0% 319.28 63.86 63.86 63.86 63.86 63.86 95.78 19.16 28.74 28.74 19.16 -
Price Contingency during Cons 6.0% 1,124.41 89.15 153.07 220.81 292.63 368.75 2,912.09 449.44 802.46 938.45 721.74 - 6.0% 1,124.41 89.15 153.07 220.81 292.63 368.75 873.63 134.83 240.74 281.54 216.52 -
Sub Total- Contingencies 1,443.69 153.01 216.92 284.67 356.48 432.61 3,231.36 513.30 898.24 1,034.23 785.59 - 1,443.69 153.01 216.92 284.67 356.48 432.61 969.41 153.99 269.47 310.27 235.68 -
Project Cost (incldg contingency) 6,004.80 1,065.23 1,129.14 1,196.89 1,268.71 1,344.83 7,792.48 1,425.52 2,266.57 2,402.57 1,697.82 - 6,004.80 1,065.23 1,129.14 1,196.89 1,268.71 1,344.83 2,337.74 427.66 679.97 720.77 509.34 -
Landed Project Cost- Sewerage 6,004.80 1,065.23 1,129.14 1,196.89 1,268.71 1,344.83 7,792.48 1,425.52 2,266.57 2,402.57 1,697.82 - 6,004.80 1,065.23 1,129.14 1,196.89 1,268.71 1,344.83 2,337.74 427.66 679.97 720.77 509.34 -
B Project Financing
Debt Component 50% 50%
FI 50% 3,002.40 532.62 564.57 598.45 634.35 672.41 3,896.24 712.76 1,133.29 1,201.28 848.91 - 50% 3,002.40 532.62 564.57 598.45 634.35 672.41 1,168.87 213.83 339.99 360.39 254.67 -
Govt./Donor 0% - - - - - - - - - - - - 0% - - - - - - - - - - - -
Market 0% - - - - - - - - - - - - 0% - - - - - - - - - - - -
Debt Financing 3,002.40 532.62 564.57 598.45 634.35 672.41 3,896.24 712.76 1,133.29 1,201.28 848.91 - 3,002.40 532.62 564.57 598.45 634.35 672.41 1,168.87 213.83 339.99 360.39 254.67 -
Government Grant/ Subsidy 30.0% 1,801.44 319.57 338.74 359.07 380.61 403.45 2,337.74 427.66 679.97 720.77 509.34 - 30% 1,801.44 319.57 338.74 359.07 380.61 403.45 701.32 128.30 203.99 216.23 152.80 -
Project Financing 6,004.80 1,065.23 1,129.14 1,196.89 1,268.71 1,344.83 7,792.48 1,425.52 2,266.57 2,402.57 1,697.82 - 6,004.80 1,065.23 1,129.14 1,196.89 1,268.71 1,344.83 2,337.74 427.66 679.97 720.77 509.34 -
22 - Madurai Corporation - Project Cost Schedule - Option 1 August 2, 2021 August 2, 2021
Total Identified Investment Implementable Investment
Variable Total Cost (06- 2007 2008 2009 2010 2011 Total Cost 2012 2013 2014 2015 2016 Variable Impl Base 2007 2008 2009 2010 2011 Variable Impl Base 2012 2013 2014 2015 2016
Sub-Project and Component
11) (11-16) Cost Cost
Domestic Currency- Rs. Lakh Domestic Currency- Rs. Lakh
DRAWDOWN SCHEDULE -- ROADS AND TRAFFIC MANAGEMENT
A Project Capex
Project Phasing 13% 13% 25% 25% 25% 16.67% 16.67% 25.00% 25.00% 16.67% 13% 13% 25% 25% 25% 17% 17% 25% 25% 17%
Project Construction Sus. Inv Sus. Inv
Civil Works 12,214.70 1,526.84 1,526.84 3,053.67 3,053.67 3,053.67 18,322.04 3,053.67 3,053.67 4,580.51 4,580.51 3,053.67 10% 1,221.47 152.68 152.68 305.37 305.37 305.37 10% 1,832.20 305.37 305.37 458.05 458.05 305.37
Sub Total- Project Const. 12,214.70 1,526.84 1,526.84 3,053.67 3,053.67 3,053.67 18,322.04 3,053.67 3,053.67 4,580.51 4,580.51 3,053.67 10% 1,221.47 152.68 152.68 305.37 305.37 305.37 10% 1,832.20 305.37 305.37 458.05 458.05 305.37
Base Project Cost 12,214.70 1,526.84 1,526.84 3,053.67 3,053.67 3,053.67 18,322.04 3,053.67 3,053.67 4,580.51 4,580.51 3,053.67 1,221.47 152.68 152.68 305.37 305.37 305.37 1,832.20 305.37 305.37 458.05 458.05 305.37
Contingencies
Physical Contingency 7.0% 855.03 106.88 106.88 213.76 213.76 213.76 1,282.54 213.76 213.76 320.64 320.64 213.76 7.0% 85.50 10.69 10.69 21.38 21.38 21.38 128.25 21.38 21.38 32.06 32.06 21.38
Price Contingency during Cons 6.0% 3,358.56 149.22 256.19 739.18 979.57 1,234.39 12,817.86 1,504.50 1,790.82 3,141.47 3,624.03 2,757.03 6.0% 335.86 14.92 25.62 73.92 97.96 123.44 1,281.79 150.45 179.08 314.15 362.40 275.70
Sub Total- Contingencies 4,213.59 256.10 363.07 952.94 1,193.33 1,448.15 14,100.40 1,718.26 2,004.58 3,462.11 3,944.67 2,970.78 421.36 25.61 36.31 95.29 119.33 144.82 1,410.04 171.83 200.46 346.21 394.47 297.08
Project Cost (incldg contingency) 16,428.28 1,782.93 1,889.91 4,006.61 4,247.01 4,501.83 32,422.44 4,771.94 5,058.25 8,042.62 8,525.18 6,024.46 1,642.83 178.29 188.99 400.66 424.70 450.18 3,242.24 477.19 505.83 804.26 852.52 602.45
Landed Project Cost- Roads and Traffic Ma 16,428.28 1,782.93 1,889.91 4,006.61 4,247.01 4,501.83 32,422.44 4,771.94 5,058.25 8,042.62 8,525.18 6,024.46 1,642.83 178.29 188.99 400.66 424.70 450.18 3,242.24 477.19 505.83 804.26 852.52 602.45
B Project Financing
Debt Component 60% 60%
FI 60% 9,856.97 1,069.76 1,133.95 2,403.97 2,548.20 2,701.10 19,453.47 2,863.16 3,034.95 4,825.57 5,115.11 3,614.68 60% 985.70 106.98 113.39 240.40 254.82 270.11 1,945.35 286.32 303.50 482.56 511.51 361.47
Govt./Donor 0% - - - - - - - - - - - - 0% - - - - - - - - - - - -
Market 0% - - - - - - - - - - - - 0% - - - - - - - - - - - -
Debt Financing 9,856.97 1,069.76 1,133.95 2,403.97 2,548.20 2,701.10 19,453.47 2,863.16 3,034.95 4,825.57 5,115.11 3,614.68 985.70 106.98 113.39 240.40 254.82 270.11 1,945.35 286.32 303.50 482.56 511.51 361.47
Government Grant/ Subsidy 30.0% 4,928.49 534.88 566.97 1,201.98 1,274.10 1,350.55 9,726.73 1,431.58 1,517.48 2,412.79 2,557.55 1,807.34 30% 492.85 53.49 56.70 120.20 127.41 135.05 972.67 143.16 151.75 241.28 255.76 180.73
Project Financing 16,428.28 1,782.93 1,889.91 4,006.61 4,247.01 4,501.83 32,422.44 4,771.94 5,058.25 8,042.62 8,525.18 6,024.46 1,642.83 178.29 188.99 400.66 424.70 450.18 3,242.24 477.19 505.83 804.26 852.52 602.45
Base Project Cost 7,813.03 1,562.61 1,562.61 1,562.61 1,562.61 1,562.61 7,813.03 781.30 781.30 2,343.91 2,343.91 1,562.61 781.30 156.26 156.26 156.26 156.26 156.26 781.30 78.13 78.13 234.39 234.39 156.26
Contingencies
Physical Contingency 7.0% 546.91 109.38 109.38 109.38 109.38 109.38 546.91 54.69 54.69 164.07 164.07 109.38 7.0% 54.69 10.94 10.94 10.94 10.94 10.94 54.69 5.47 5.47 16.41 16.41 10.94
Price Contingency during Cons 6.0% 1,926.08 152.71 262.20 378.25 501.26 631.66 5,715.94 384.94 458.19 1,607.53 1,854.47 1,410.81 6.0% 192.61 15.27 26.22 37.82 50.13 63.17 571.59 38.49 45.82 160.75 185.45 141.08
Sub Total- Contingencies 2,472.99 262.10 371.58 487.63 610.64 741.04 6,262.85 439.63 512.88 1,771.61 2,018.54 1,520.19 247.30 26.21 37.16 48.76 61.06 74.10 626.29 43.96 51.29 177.16 201.85 152.02
Project Cost (incldg contingency) 10,286.02 1,824.70 1,934.18 2,050.24 2,173.25 2,303.65 14,075.88 1,220.93 1,294.19 4,115.52 4,362.45 3,082.80 1,028.60 182.47 193.42 205.02 217.33 230.36 1,407.59 122.09 129.42 411.55 436.24 308.28
Landed Project Cost- Storm Water Drainage 10,286.02 1,824.70 1,934.18 2,050.24 2,173.25 2,303.65 14,075.88 1,220.93 1,294.19 4,115.52 4,362.45 3,082.80 1,028.60 182.47 193.42 205.02 217.33 230.36 1,407.59 122.09 129.42 411.55 436.24 308.28
B Project Financing
Debt Component 60% 60%
FI 60% 6,171.61 1,094.82 1,160.51 1,230.14 1,303.95 1,382.19 8,445.53 732.56 776.51 2,469.31 2,617.47 1,849.68 60% 617.16 109.48 116.05 123.01 130.40 138.22 844.55 73.26 77.65 246.93 261.75 184.97
Govt./Donor 0% - - - - - - - - - - - - 0% - - - - - - - - - - - -
Market 0% - - - - - - - - - - - - 0% - - - - - - - - - - - -
Debt Financing 6,171.61 1,094.82 1,160.51 1,230.14 1,303.95 1,382.19 8,445.53 732.56 776.51 2,469.31 2,617.47 1,849.68 617.16 109.48 116.05 123.01 130.40 138.22 844.55 73.26 77.65 246.93 261.75 184.97
Government Grant/ Subsidy 30.0% 3,085.81 547.41 580.26 615.07 651.98 691.09 4,222.76 366.28 388.26 1,234.66 1,308.73 924.84 30% 308.58 54.74 58.03 61.51 65.20 69.11 422.28 36.63 38.83 123.47 130.87 92.48
Project Financing 10,286.02 1,824.70 1,934.18 2,050.24 2,173.25 2,303.65 14,075.88 1,220.93 1,294.19 4,115.52 4,362.45 3,082.80 1,028.60 182.47 193.42 205.02 217.33 230.36 1,407.59 122.09 129.42 411.55 436.24 308.28
22 - Madurai Corporation - Project Cost Schedule - Option 1 August 2, 2021 August 2, 2021
Total Identified Investment Implementable Investment
Variable Total Cost (06- 2007 2008 2009 2010 2011 Total Cost 2012 2013 2014 2015 2016 Variable Impl Base 2007 2008 2009 2010 2011 Variable Impl Base 2012 2013 2014 2015 2016
Sub-Project and Component
11) (11-16) Cost Cost
Domestic Currency- Rs. Lakh Domestic Currency- Rs. Lakh
DRAWDOWN SCHEDULE -- SOLID WASTE MANAGEMENT
A Project Capex
Project Phasing 8% 15% 23% 23% 30.77% 42.86% 28.57% 28.57% 0.00% 0.00% 8% 15% 23% 23% 31% 43% 29% 29% 0% 0%
Project Construction Sus. Inv Sus. Inv
Civil Works 2,360.59 181.58 363.17 544.75 544.75 726.34 1,271.09 544.75 363.17 363.17 - - 100% 2,360.59 181.58 363.17 544.75 544.75 726.34 20% 254.22 108.95 72.63 72.63 - -
Sub Total- Project Const. 2,360.59 181.58 363.17 544.75 544.75 726.34 1,271.09 544.75 363.17 363.17 - - 100% 2,360.59 181.58 363.17 544.75 544.75 726.34 20% 254.22 108.95 72.63 72.63 - -
Base Project Cost 2,360.59 181.58 363.17 544.75 544.75 726.34 1,271.09 544.75 363.17 363.17 - - 2,360.59 181.58 363.17 544.75 544.75 726.34 254.22 108.95 72.63 72.63 - -
Contingencies
Physical Contingency 7.0% 165.24 12.71 25.42 38.13 38.13 50.84 88.98 38.13 25.42 25.42 - - 7.0% 165.24 12.71 25.42 38.13 38.13 50.84 17.80 7.63 5.08 5.08 - -
Price Contingency during Cons 6.0% 678.90 17.75 60.94 131.86 174.75 293.61 730.44 268.39 212.98 249.07 - - 6.0% 678.90 17.75 60.94 131.86 174.75 293.61 146.09 53.68 42.60 49.81 - -
Sub Total- Contingencies 844.15 30.46 86.36 170.00 212.88 344.45 819.42 306.52 238.40 274.49 - - 844.15 30.46 86.36 170.00 212.88 344.45 163.88 61.30 47.68 54.90 - -
Project Cost (incldg contingency) 3,204.74 212.04 449.53 714.75 757.63 1,070.79 2,090.51 851.28 601.57 637.66 - - 3,204.74 212.04 449.53 714.75 757.63 1,070.79 418.10 170.26 120.31 127.53 - -
Landed Project Cost- Solid Waste Managaem 3,204.74 212.04 449.53 714.75 757.63 1,070.79 2,090.51 851.28 601.57 637.66 - - 3,204.74 212.04 449.53 714.75 757.63 1,070.79 418.10 170.26 120.31 127.53 - -
B Project Financing
Debt Component 60% 60%
FI 60% 1,922.84 127.22 269.72 428.85 454.58 642.47 1,254.31 510.77 360.94 382.60 - - 60% 1,922.84 127.22 269.72 428.85 454.58 642.47 250.86 102.15 72.19 76.52 - -
Govt./Donor 0% - - - - - - - - - - - - 0% - - - - - - - - - - - -
Market 0% - - - - - - - - - - - - 0% - - - - - - - - - - - -
Debt Financing 1,922.84 127.22 269.72 428.85 454.58 642.47 1,254.31 510.77 360.94 382.60 - - 1,922.84 127.22 269.72 428.85 454.58 642.47 250.86 102.15 72.19 76.52 - -
Government Grant/ Subsidy 30.0% 961.42 63.61 134.86 214.42 227.29 321.24 627.15 255.38 180.47 191.30 - - 30% 961.42 63.61 134.86 214.42 227.29 321.24 125.43 51.08 36.09 38.26 - -
Project Financing 3,204.74 212.04 449.53 714.75 757.63 1,070.79 2,090.51 851.28 601.57 637.66 - - 3,204.74 212.04 449.53 714.75 757.63 1,070.79 418.10 170.26 120.31 127.53 - -
Base Project Cost 392.97 49.12 49.12 98.24 98.24 98.24 589.45 98.24 98.24 98.24 147.36 147.36 117.89 14.74 14.74 29.47 29.47 29.47 - - - - - -
Contingencies
Physical Contingency 7.0% 27.51 3.44 3.44 6.88 6.88 6.88 41.26 6.88 6.88 6.88 10.32 10.32 7.0% 8.25 1.03 1.03 2.06 2.06 2.06 - - - - - -
Price Contingency during Cons 6.0% 108.05 4.80 8.24 23.78 31.51 39.71 423.03 48.40 57.61 67.38 116.59 133.05 6.0% 32.42 1.44 2.47 7.13 9.45 11.91 - - - - - -
Sub Total- Contingencies 135.56 8.24 11.68 30.66 38.39 46.59 464.29 55.28 64.49 74.25 126.91 143.36 40.67 2.47 3.50 9.20 11.52 13.98 - - - - - -
Project Cost (incldg contingency) 528.52 57.36 60.80 128.90 136.63 144.83 1,053.74 153.52 162.73 172.50 274.27 290.72 158.56 17.21 18.24 38.67 40.99 43.45 - - - - - -
Landed Project Cost- Street Lighting 528.52 57.36 60.80 128.90 136.63 144.83 1,053.74 153.52 162.73 172.50 274.27 290.72 158.56 17.21 18.24 38.67 40.99 43.45 - - - - - -
B Project Financing
Debt Component 50% 50%
FI 50% 264.26 28.68 30.40 64.45 68.32 72.42 526.87 76.76 81.37 86.25 137.13 145.36 50% 79.28 8.60 9.12 19.33 20.49 21.72 - - - - - -
Govt./Donor 0% - - - - - - - - - - - - 0% - - - - - - - - - - - -
Market 0% - - - - - - - - - - - - 0% - - - - - - - - - - - -
Debt Financing 264.26 28.68 30.40 64.45 68.32 72.42 526.87 76.76 81.37 86.25 137.13 145.36 79.28 8.60 9.12 19.33 20.49 21.72 - - - - - -
Government Grant/ Subsidy 30.0% 158.56 17.21 18.24 38.67 40.99 43.45 316.12 46.06 48.82 51.75 82.28 87.22 30% 47.57 5.16 5.47 11.60 12.30 13.03 - - - - - -
Project Financing 528.52 57.36 60.80 128.90 136.63 144.83 1,053.74 153.52 162.73 172.50 274.27 290.72 158.56 17.21 18.24 38.67 40.99 43.45 - - - - - -
22 - Madurai Corporation - Project Cost Schedule - Option 1 August 2, 2021 August 2, 2021
Total Identified Investment Implementable Investment
Variable Total Cost (06- 2007 2008 2009 2010 2011 Total Cost 2012 2013 2014 2015 2016 Variable Impl Base 2007 2008 2009 2010 2011 Variable Impl Base 2012 2013 2014 2015 2016
Sub-Project and Component
11) (11-16) Cost Cost
Domestic Currency- Rs. Lakh Domestic Currency- Rs. Lakh
DRAWDOWN SCHEDULE -- SLUM UPGRADTION
A Project Capex
Project Phasing 10% 10% 30% 30% 20% 20.00% 20.00% 20.00% 20.00% 20.00% 10% 10% 30% 30% 20% 20% 20% 20% 20% 20%
Project Construction Sus. Inv Sus. Inv
Civil Works 2,138.09 213.81 213.81 641.43 641.43 427.62 2,138.09 427.62 427.62 427.62 427.62 427.62 30% 641.43 64.14 64.14 192.43 192.43 128.29 20% 427.62 85.52 85.52 85.52 85.52 85.52
Sub Total- Project Const. 2,138.09 213.81 213.81 641.43 641.43 427.62 2,138.09 427.62 427.62 427.62 427.62 427.62 30% 641.43 64.14 64.14 192.43 192.43 128.29 20% 427.62 85.52 85.52 85.52 85.52 85.52
Base Project Cost 2,138.09 213.81 213.81 641.43 641.43 427.62 2,138.09 427.62 427.62 427.62 427.62 427.62 641.43 64.14 64.14 192.43 192.43 128.29 427.62 85.52 85.52 85.52 85.52 85.52
Contingencies
Physical Contingency 7.0% 149.67 14.97 14.97 44.90 44.90 29.93 149.67 29.93 29.93 29.93 29.93 29.93 7.0% 44.90 4.49 4.49 13.47 13.47 8.98 29.93 5.99 5.99 5.99 5.99 5.99
Price Contingency during Cons 6.0% 590.65 20.90 35.88 155.27 205.76 172.86 1,479.14 210.68 250.78 293.28 338.33 386.08 6.0% 177.20 6.27 10.76 46.58 61.73 51.86 295.83 42.14 50.16 58.66 67.67 77.22
Sub Total- Contingencies 740.32 35.86 50.84 200.17 250.66 202.79 1,628.80 240.62 280.71 323.21 368.26 416.01 222.10 10.76 15.25 60.05 75.20 60.84 325.76 48.12 56.14 64.64 73.65 83.20
Project Cost (incldg contingency) 2,878.41 249.67 264.65 841.59 892.09 630.41 3,766.90 668.23 708.33 750.83 795.88 843.63 863.52 74.90 79.40 252.48 267.63 189.12 753.38 133.65 141.67 150.17 159.18 168.73
Landed Project Cost- Slum Upgradations 2,878.41 249.67 264.65 841.59 892.09 630.41 3,766.90 668.23 708.33 750.83 795.88 843.63 863.52 74.90 79.40 252.48 267.63 189.12 753.38 133.65 141.67 150.17 159.18 168.73
Government Grant/ Subsidy 30.0% 863.52 74.90 79.40 252.48 267.63 189.12 1,130.07 200.47 212.50 225.25 238.76 253.09 30% 259.06 22.47 23.82 75.74 80.29 56.74 226.01 40.09 42.50 45.05 47.75 50.62
Project Financing 2,878.41 249.67 264.65 841.59 892.09 630.41 3,766.90 668.23 708.33 750.83 795.88 843.63 863.52 74.90 79.40 252.48 267.63 189.12 753.38 133.65 141.67 150.17 159.18 168.73
Base Project Cost 1,400.40 - 350.10 350.10 350.10 350.10 2,100.60 350.10 350.10 525.15 525.15 350.10 - - - - - - - - - - - -
Contingencies
Physical Contingency 7.0% 98.03 - 24.51 24.51 24.51 24.51 147.04 24.51 24.51 36.76 36.76 24.51 7.0% - - - - - - - - - - - -
Price Contingency during Cons 6.0% 397.32 - 58.74 84.75 112.31 141.52 1,469.55 172.49 205.32 360.17 415.49 316.09 6.0% - - - - - - - - - - - -
Sub Total- Contingencies 495.35 - 83.25 109.25 136.81 166.03 1,616.59 197.00 229.82 396.93 452.25 340.60 - - - - - - - - - - - -
Project Cost (incldg contingency) 1,895.75 - 433.35 459.35 486.91 516.13 3,717.19 547.10 579.92 922.08 977.40 690.70 - - - - - - - - - - - -
Landed Project Cost- Others 1,895.75 - 433.35 459.35 486.91 516.13 3,717.19 547.10 579.92 922.08 977.40 690.70 - - - - - - - - - - - -
B Project Financing
Debt Component 80% 80%
FI 80% 1,516.60 - 346.68 367.48 389.53 412.90 2,973.75 437.68 463.94 737.66 781.92 552.56 80% - - - - - - - - - - - -
Govt./Donor 0% - - - - - - - - - - - - 0% - - - - - - - - - - - -
Market 0% - - - - - - - - - - - - 0% - - - - - - - - - - - -
Debt Financing 1,516.60 - 346.68 367.48 389.53 412.90 2,973.75 437.68 463.94 737.66 781.92 552.56 - - - - - - - - - - - -
Government Grant/ Subsidy 10.0% 189.57 - 43.34 45.94 48.69 51.61 371.72 54.71 57.99 92.21 97.74 69.07 10% - - - - - - - - - - - -
Project Financing 1,895.75 - 433.35 459.35 486.91 516.13 3,717.19 547.10 579.92 922.08 977.40 690.70 - - - - - - - - - - - -
22 - Madurai Corporation - Project Cost Schedule - Option 1 August 2, 2021 August 2, 2021
Total Identified Investment Implementable Investment
Variable Total Cost (06- 2007 2008 2009 2010 2011 Total Cost 2012 2013 2014 2015 2016 Variable Impl Base 2007 2008 2009 2010 2011 Variable Impl Base 2012 2013 2014 2015 2016
Sub-Project and Component
11) (11-16) Cost Cost
Domestic Currency- Rs. Lakh Domestic Currency- Rs. Lakh
Summary
Base Project Cost
1 Water Supply 18111.95 9,056 1,811 1,811 1,811 1,811 1,811 9,056 1,811 1,811 1,811 1,811 1,811 10,867 9,056 1,811 1,811 1,811 1,811 1,811 1,811 362 362 362 362 362
2 Sewerage 9122.23 4,561 912 912 912 912 912 4,561 912 1,368 1,368 912 - 5,929 4,561 912 912 912 912 912 1,368 274 411 411 274 -
3 Road and Traffic Management 30536.74 12,215 1,527 1,527 3,054 3,054 3,054 18,322 3,054 3,054 4,581 4,581 3,054 3,054 1,221 153 153 305 305 305 1,832 305 305 458 458 305
4 Storm Water Drinage 15626.06 7,813 1,563 1,563 1,563 1,563 1,563 7,813 781 781 2,344 2,344 1,563 1,563 781 156 156 156 156 156 781 78 78 234 234 156
5 Solid Waste Management 3631.68 2,361 182 363 545 545 726 1,271 545 363 363 - - 2,615 2,361 182 363 545 545 726 254 109 73 73 - -
6 Street Lighting 982.41 393 49 49 98 98 98 589 98 98 98 147 147 118 118 15 15 29 29 29 - - - - - -
7 Slum Upgradations 4276.18 2,138 214 214 641 641 428 2,138 428 428 428 428 428 1,069 641 64 64 192 192 128 428 86 86 86 86 86
8 Others 3501.00 1,400 - 350 350 350 350 2,101 350 350 525 525 350 - - - - - - - - - - - - -
Total 85,788 39,937 6,257 6,789 8,974 8,974 8,942 45,851 7,979 8,254 11,518 10,748 7,353 25,215 18,740 3,293 3,474 3,952 3,952 4,069 6,475 1,214 1,314 1,623 1,414 909
22 - Madurai Corporation - Project Cost Schedule - Option 2 August 2, 2021 45 August 2, 2021
Total Identified Investment Implementable Investment
Variable Total Cost (06- 2007 2008 2009 2010 2011 Total Cost 2012 2013 2014 2015 2016 Base Year Variable Impl Base 2007 2008 2009 2010 2011 Variable Impl Base 2012 2013 2014 2015 2016
Sub-Project and Component
11) (11-16) Cost Cost
Domestic Currency- Rs. Lakh USD Lakh Domestic Currency- Rs. Lakh
DRAWDOWN SCHEDULE -- WATER SUPPLY
A Project Capex
Project Phasing 20% 20% 20% 20% 20% 20.00% 20.00% 20.00% 20.00% 20.00% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%
Project Construction Sus. Inv Sus. Inv
Land - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Civil Works 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 201.24 100% 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 100% 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19
Procurement of Equipment - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
HSC Cost - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Rehabilitation Works - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Sub Total- Project Const. 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 201.24 100% 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 100% 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19
Project Management
Design Studies 0.0% - - - - - 0.0% - - - -
Project Supervision 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Benefit Monitoring & Evaluation 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Project Mgmt. - - - - - - - - - - - - - - - - - - - - - - - - -
Institutional Development
PIU Operations 0.00% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Training & Capacity Building 0.00% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Preoperative Expenses 0.00% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Inst. Development - - - - - - - - - - - - - - - - - - - - - - - - -
Base Project Cost 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 201.24 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19 9,055.97 1,811.19 1,811.19 1,811.19 1,811.19 1,811.19
Contingencies
Physical Contingency 7.0% 633.92 126.78 126.78 126.78 126.78 126.78 633.92 126.78 126.78 126.78 126.78 126.78 14.09 7.0% 633.92 126.78 126.78 126.78 126.78 126.78 633.92 126.78 126.78 126.78 126.78 126.78
Price Contingency during Const 6.0% 2,232.49 177.01 303.91 438.42 581.01 732.14 6,264.94 892.35 1,062.17 1,242.18 1,432.99 1,635.25 49.61 6.0% 2,232.49 177.01 303.91 438.42 581.01 732.14 6,264.94 892.35 1,062.17 1,242.18 1,432.99 1,635.25
Sub Total- Contingencies 2,866.41 303.79 430.69 565.20 707.79 858.93 6,898.86 1,019.14 1,188.96 1,368.96 1,559.77 1,762.03 63.70 2,866.41 303.79 430.69 565.20 707.79 858.93 6,898.86 1,019.14 1,188.96 1,368.96 1,559.77 1,762.03
Project Cost (incldg contingency) 11,922.38 2,114.99 2,241.89 2,376.40 2,518.98 2,670.12 15,954.83 2,830.33 3,000.15 3,180.16 3,370.97 3,573.23 264.94 11,922.38 2,114.99 2,241.89 2,376.40 2,518.98 2,670.12 15,954.83 2,830.33 3,000.15 3,180.16 3,370.97 3,573.23
Financing Charges
Loan and Guarantee Application 0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Guarantee Utilization Fee 0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Interest During Construction 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Financing Charges - - - - - - - - - - - - - - - - - - - - - - - - -
Landed Project Cost- Water Supply 11,922.38 2,114.99 2,241.89 2,376.40 2,518.98 2,670.12 15,954.83 2,830.33 3,000.15 3,180.16 3,370.97 3,573.23 264.94 11,922.38 2,114.99 2,241.89 2,376.40 2,518.98 2,670.12 15,954.83 2,830.33 3,000.15 3,180.16 3,370.97 3,573.23
B Project Financing
Debt Component 50% 50%
FI 50% 5,961.19 1,057.49 1,120.94 1,188.20 1,259.49 1,335.06 7,977.42 1,415.17 1,500.08 1,590.08 1,685.48 1,786.61 132.47 50% 5,961.19 1,057.49 1,120.94 1,188.20 1,259.49 1,335.06 7,977.42 1,415.17 1,500.08 1,590.08 1,685.48 1,786.61
Govt./Donor 0% - - - - - - - - - - - - - 0% - - - - - - - - - - - -
Market 0% - - - - - - - - - - - - - 0% - - - - - - - - - - - -
Debt Financing 5,961.19 1,057.49 1,120.94 1,188.20 1,259.49 1,335.06 7,977.42 1,415.17 1,500.08 1,590.08 1,685.48 1,786.61 132.47 5,961.19 1,057.49 1,120.94 1,188.20 1,259.49 1,335.06 7,977.42 1,415.17 1,500.08 1,590.08 1,685.48 1,786.61
Government Grant/ Subsidy 30% 3,576.71 634.50 672.57 712.92 755.70 801.04 4,786.45 849.10 900.05 954.05 1,011.29 1,071.97 79.48 30% 3,576.71 634.50 672.57 712.92 755.70 801.04 4,786.45 849.10 900.05 954.05 1,011.29 1,071.97
Project Financing 11,922.38 2,114.99 2,241.89 2,376.40 2,518.98 2,670.12 15,954.83 2,830.33 3,000.15 3,180.16 3,370.97 3,573.23 264.94 11,922.38 2,114.99 2,241.89 2,376.40 2,518.98 2,670.12 15,954.83 2,830.33 3,000.15 3,180.16 3,370.97 3,573.23
22 - Madurai Corporation - Project Cost Schedule - Option 2 August 2, 2021 45 August 2, 2021
Total Identified Investment Implementable Investment
Variable Total Cost (06- 2007 2008 2009 2010 2011 Total Cost 2012 2013 2014 2015 2016 Base Year Variable Impl Base 2007 2008 2009 2010 2011 Variable Impl Base 2012 2013 2014 2015 2016
Sub-Project and Component
11) (11-16) Cost Cost
DRAWDOWN SCHEDULE -- SEWERAGE
A Project Capex
Project Phasing 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 30.00% 30.00% 20.00% 0.00% 20% 20% 20% 20% 20% 20% 30% 30% 20% 0%
Project Construction Sus. Inv Sus. Inv
Land - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Civil Works 4,561.12 912.22 912.22 912.22 912.22 912.22 4,561.12 912.22 1,368.33 1,368.33 912.22 - 101.36 100% 4,561.12 912.22 912.22 912.22 912.22 912.22 100% 4,561.12 912.22 1,368.33 1,368.33 912.22 -
Procurement of Equipment - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
HSC Cost - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Rehabilitation Works - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Sub Total- Project Const. 4,561.12 912.22 912.22 912.22 912.22 912.22 4,561.12 912.22 1,368.33 1,368.33 912.22 - 101.36 100% 4,561.12 912.22 912.22 912.22 912.22 912.22 100% 4,561.12 912.22 1,368.33 1,368.33 912.22 -
Project Management
Design Studies 0.0% - - - - - 0.0% - - - -
Project Supervision 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Benefit Monitoring & Evaluation 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Project Mgmt. - - - - - - - - - - - - - - - - - - - - - - - - -
Institutional Development
PIU Operations 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Training & Capacity Building 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Preoperative Expenses 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Inst. Development - - - - - - - - - - - - - - - - - - - - - - - - -
Base Project Cost 4,561.12 912.22 912.22 912.22 912.22 912.22 4,561.12 912.22 1,368.33 1,368.33 912.22 - 101.36 4,561.12 912.22 912.22 912.22 912.22 912.22 4,561.12 912.22 1,368.33 1,368.33 912.22 -
Contingencies
Physical Contingency 7.0% 319.28 63.86 63.86 63.86 63.86 63.86 319.28 63.86 95.78 95.78 63.86 - 7.10 7.0% 319.28 63.86 63.86 63.86 63.86 63.86 319.28 63.86 95.78 95.78 63.86 -
Price Contingency during Const 6.0% 1,124.41 89.15 153.07 220.81 292.63 368.75 2,912.09 449.44 802.46 938.45 721.74 - 24.99 6.0% 1,124.41 89.15 153.07 220.81 292.63 368.75 2,912.09 449.44 802.46 938.45 721.74 -
Sub Total- Contingencies 1,443.69 153.01 216.92 284.67 356.48 432.61 3,231.36 513.30 898.24 1,034.23 785.59 - 32.08 1,443.69 153.01 216.92 284.67 356.48 432.61 3,231.36 513.30 898.24 1,034.23 785.59 -
Project Cost (incldg contingency) 6,004.80 1,065.23 1,129.14 1,196.89 1,268.71 1,344.83 7,792.48 1,425.52 2,266.57 2,402.57 1,697.82 - 133.44 6,004.80 1,065.23 1,129.14 1,196.89 1,268.71 1,344.83 7,792.48 1,425.52 2,266.57 2,402.57 1,697.82 -
Financing Charges
Loan and Guarantee Application 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Guarantee Utilization Fee 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Interest During Construction 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Financing Charges - - - - - - - - - - - - - - - - - - - - - - - - -
Landed Project Cost- Sewerage 6,004.80 1,065.23 1,129.14 1,196.89 1,268.71 1,344.83 7,792.48 1,425.52 2,266.57 2,402.57 1,697.82 - 133.44 6,004.80 1,065.23 1,129.14 1,196.89 1,268.71 1,344.83 7,792.48 1,425.52 2,266.57 2,402.57 1,697.82 -
B Project Financing
Debt Component 50% 50%
FI 50% 3,002.40 532.62 564.57 598.45 634.35 672.41 3,896.24 712.76 1,133.29 1,201.28 848.91 - 66.72 50% 3,002.40 532.62 564.57 598.45 634.35 672.41 3,896.24 712.76 1,133.29 1,201.28 848.91 -
Govt./Donor 0% - - - - - - - - - - - - - 0% - - - - - - - - - - - -
Market 0% - - - - - - - - - - - - - 0% - - - - - - - - - - - -
Debt Financing 3,002.40 532.62 564.57 598.45 634.35 672.41 3,896.24 712.76 1,133.29 1,201.28 848.91 - 66.72 3,002.40 532.62 564.57 598.45 634.35 672.41 3,896.24 712.76 1,133.29 1,201.28 848.91 -
Government Grant/ Subsidy 30.0% 1,801.44 319.57 338.74 359.07 380.61 403.45 2,337.74 427.66 679.97 720.77 509.34 - 79.48 30% 1,801.44 319.57 338.74 359.07 380.61 403.45 2,337.74 427.66 679.97 720.77 509.34 -
Project Financing 6,004.80 1,065.23 1,129.14 1,196.89 1,268.71 1,344.83 7,792.48 1,425.52 2,266.57 2,402.57 1,697.82 - 172.89 6,004.80 1,065.23 1,129.14 1,196.89 1,268.71 1,344.83 7,792.48 1,425.52 2,266.57 2,402.57 1,697.82 -
22 - Madurai Corporation - Project Cost Schedule - Option 2 August 2, 2021 45 August 2, 2021
Total Identified Investment Implementable Investment
Variable
Total Cost (06- 2007 2008 2009 2010 2011 Total Cost 2012 2013 2014 2015 2016 Base Year Variable Impl Base 2007 2008 2009 2010 2011 Variable Impl Base 2012 2013 2014 2015 2016
Sub-Project and Component
11) (11-16) Cost Cost
DRAWDOWN SCHEDULE -- ROADS AND TRAFFIC MANAGEMENT
A Project Capex
Project Phasing 13% 13% 25% 25% 25% 16.67% 16.67% 25.00% 25.00% 16.67% 13% 13% 25% 25% 25% 17% 17% 25% 25% 17%
Project Construction Sus. Inv Sus. Inv
Land - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Civil Works 12,214.70 1,526.84 1,526.84 3,053.67 3,053.67 3,053.67 18,322.04 3,053.67 3,053.67 4,580.51 4,580.51 3,053.67 271.44 100% 12,214.70 1,526.84 1,526.84 3,053.67 3,053.67 3,053.67 100% 18,322.04 3,053.67 3,053.67 4,580.51 4,580.51 3,053.67
Procurement of Equipment - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Rehabilitation Works - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Sub Total- Project Const. 12,214.70 1,526.84 1,526.84 3,053.67 3,053.67 3,053.67 18,322.04 3,053.67 3,053.67 4,580.51 4,580.51 3,053.67 271.44 100% 12,214.70 1,526.84 1,526.84 3,053.67 3,053.67 3,053.67 100% 18,322.04 3,053.67 3,053.67 4,580.51 4,580.51 3,053.67
Project Management
Design Studies 0.0% - - - - - 0.0% - - - -
Project Supervision 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Benefit Monitoring & Evaluation 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Project Mgmt. - - - - - - - - - - - - - - - - - - - - - - - - -
Institutional Development
PIU Operations 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Training & Capacity Building 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Preoperative Expenses 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Inst. Development - - - - - - - - - - - - - - - - - - - - - - - - -
Base Project Cost 12,214.70 1,526.84 1,526.84 3,053.67 3,053.67 3,053.67 18,322.04 3,053.67 3,053.67 4,580.51 4,580.51 3,053.67 271.44 12,214.70 1,526.84 1,526.84 3,053.67 3,053.67 3,053.67 18,322.04 3,053.67 3,053.67 4,580.51 4,580.51 3,053.67
Contingencies
Physical Contingency 7.0% 855.03 106.88 106.88 213.76 213.76 213.76 1,282.54 213.76 213.76 320.64 320.64 213.76 19.00 7.0% 855.03 106.88 106.88 213.76 213.76 213.76 1,282.54 213.76 213.76 320.64 320.64 213.76
Price Contingency during Const 6.0% 3,358.56 149.22 256.19 739.18 979.57 1,234.39 12,817.86 1,504.50 1,790.82 3,141.47 3,624.03 2,757.03 74.63 6.0% 3,358.56 149.22 256.19 739.18 979.57 1,234.39 12,817.86 1,504.50 1,790.82 3,141.47 3,624.03 2,757.03
Sub Total- Contingencies 4,213.59 256.10 363.07 952.94 1,193.33 1,448.15 14,100.40 1,718.26 2,004.58 3,462.11 3,944.67 2,970.78 93.64 4,213.59 256.10 363.07 952.94 1,193.33 1,448.15 14,100.40 1,718.26 2,004.58 3,462.11 3,944.67 2,970.78
Project Cost (incldg contingency) 16,428.28 1,782.93 1,889.91 4,006.61 4,247.01 4,501.83 32,422.44 4,771.94 5,058.25 8,042.62 8,525.18 6,024.46 365.07 16,428.28 1,782.93 1,889.91 4,006.61 4,247.01 4,501.83 32,422.44 4,771.94 5,058.25 8,042.62 8,525.18 6,024.46
Financing Charges
Loan and Guarantee Application 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Guarantee Utilization Fee 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Interest During Construction 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Financing Charges - - - - - - - - - - - - - - - - - - - - - - - - -
Landed Project Cost- Roads and Traffic Management 16,428.28 1,782.93 1,889.91 4,006.61 4,247.01 4,501.83 32,422.44 4,771.94 5,058.25 8,042.62 8,525.18 6,024.46 365.07 16,428.28 1,782.93 1,889.91 4,006.61 4,247.01 4,501.83 32,422.44 4,771.94 5,058.25 8,042.62 8,525.18 6,024.46
B Project Financing
Debt Component 60% 60%
FI 60% 9,856.97 1,069.76 1,133.95 2,403.97 2,548.20 2,701.10 19,453.47 2,863.16 3,034.95 4,825.57 5,115.11 3,614.68 219.04 60% 9,856.97 1,069.76 1,133.95 2,403.97 2,548.20 2,701.10 19,453.47 2,863.16 3,034.95 4,825.57 5,115.11 3,614.68
Govt./Donor 0% - - - - - - - - - - - - - 0% - - - - - - - - - - - -
Market 0% - - - - - - - - - - - - - 0% - - - - - - - - - - - -
Debt Financing 9,856.97 1,069.76 1,133.95 2,403.97 2,548.20 2,701.10 19,453.47 2,863.16 3,034.95 4,825.57 5,115.11 3,614.68 219.04 9,856.97 1,069.76 1,133.95 2,403.97 2,548.20 2,701.10 19,453.47 2,863.16 3,034.95 4,825.57 5,115.11 3,614.68
Government Grant/ Subsidy 30.0% 4,928.49 534.88 566.97 1,201.98 1,274.10 1,350.55 9,726.73 1,431.58 1,517.48 2,412.79 2,557.55 1,807.34 79.48 30% 4,928.49 534.88 566.97 1,201.98 1,274.10 1,350.55 9,726.73 1,431.58 1,517.48 2,412.79 2,557.55 1,807.34
Project Financing 16,428.28 1,782.93 1,889.91 4,006.61 4,247.01 4,501.83 32,422.44 4,771.94 5,058.25 8,042.62 8,525.18 6,024.46 335.03 16,428.28 1,782.93 1,889.91 4,006.61 4,247.01 4,501.83 32,422.44 4,771.94 5,058.25 8,042.62 8,525.18 6,024.46
22 - Madurai Corporation - Project Cost Schedule - Option 2 August 2, 2021 45 August 2, 2021
Total Identified Investment Implementable Investment
Variable
Total Cost (06- 2007 2008 2009 2010 2011 Total Cost 2012 2013 2014 2015 2016 Base Year Variable Impl Base 2007 2008 2009 2010 2011 Variable Impl Base 2012 2013 2014 2015 2016
Sub-Project and Component
11) (11-16) Cost Cost
DRAWDOWN SCHEDULE -- STORM WATER DRAINAGE
A Project Capex
Project Phasing 20% 20% 20% 20% 20.00% 10.00% 10.00% 30.00% 30.00% 20.00% 20% 20% 20% 20% 20% 10% 10% 30% 30% 20%
Project Construction Sus. Inv Sus. Inv
Land - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Civil Works 7,813.03 1,562.61 1,562.61 1,562.61 1,562.61 1,562.61 7,813.03 781.30 781.30 2,343.91 2,343.91 1,562.61 173.62 100% 7,813.03 1,562.61 1,562.61 1,562.61 1,562.61 1,562.61 100% 7,813.03 781.30 781.30 2,343.91 2,343.91 1,562.61
Procurement of Equipment - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Rehabilitation Works - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Sub Total- Project Const. 7,813.03 1,562.61 1,562.61 1,562.61 1,562.61 1,562.61 7,813.03 781.30 781.30 2,343.91 2,343.91 1,562.61 173.62 100% 7,813.03 1,562.61 1,562.61 1,562.61 1,562.61 1,562.61 100% 7,813.03 781.30 781.30 2,343.91 2,343.91 1,562.61
Project Management
Design Studies 0.0% - - - - - 0.0% - - - -
Project Supervision 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Benefit Monitoring & Evaluation 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Project Mgmt. - - - - - - - - - - - - - - - - - - - - - - - - -
Institutional Development
PIU Operations 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Training & Capacity Building 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Preoperative Expenses 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Inst. Development - - - - - - - - - - - - - - - - - - - - - - - - -
Base Project Cost 7,813.03 1,562.61 1,562.61 1,562.61 1,562.61 1,562.61 7,813.03 781.30 781.30 2,343.91 2,343.91 1,562.61 173.62 7,813.03 1,562.61 1,562.61 1,562.61 1,562.61 1,562.61 7,813.03 781.30 781.30 2,343.91 2,343.91 1,562.61
Contingencies
Physical Contingency 7.0% 546.91 109.38 109.38 109.38 109.38 109.38 546.91 54.69 54.69 164.07 164.07 109.38 12.15 7.0% 546.91 109.38 109.38 109.38 109.38 109.38 546.91 54.69 54.69 164.07 164.07 109.38
Price Contingency during Const 6.0% 1,926.08 152.71 262.20 378.25 501.26 631.66 5,715.94 384.94 458.19 1,607.53 1,854.47 1,410.81 42.80 6.0% 1,926.08 152.71 262.20 378.25 501.26 631.66 5,715.94 384.94 458.19 1,607.53 1,854.47 1,410.81
Sub Total- Contingencies 2,472.99 262.10 371.58 487.63 610.64 741.04 6,262.85 439.63 512.88 1,771.61 2,018.54 1,520.19 54.96 2,472.99 262.10 371.58 487.63 610.64 741.04 6,262.85 439.63 512.88 1,771.61 2,018.54 1,520.19
Project Cost (incldg contingency) 10,286.02 1,824.70 1,934.18 2,050.24 2,173.25 2,303.65 14,075.88 1,220.93 1,294.19 4,115.52 4,362.45 3,082.80 228.58 10,286.02 1,824.70 1,934.18 2,050.24 2,173.25 2,303.65 14,075.88 1,220.93 1,294.19 4,115.52 4,362.45 3,082.80
Financing Charges
Loan and Guarantee Application 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Guarantee Utilization Fee 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Interest During Construction 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Financing Charges - - - - - - - - - - - - - - - - - - - - - - - - -
Landed Project Cost- Storm Water Drainage 10,286.02 1,824.70 1,934.18 2,050.24 2,173.25 2,303.65 14,075.88 1,220.93 1,294.19 4,115.52 4,362.45 3,082.80 228.58 10,286.02 1,824.70 1,934.18 2,050.24 2,173.25 2,303.65 14,075.88 1,220.93 1,294.19 4,115.52 4,362.45 3,082.80
B Project Financing
Debt Component 60% 60%
FI 60% 6,171.61 1,094.82 1,160.51 1,230.14 1,303.95 1,382.19 8,445.53 732.56 776.51 2,469.31 2,617.47 1,849.68 137.15 60% 6,171.61 1,094.82 1,160.51 1,230.14 1,303.95 1,382.19 8,445.53 732.56 776.51 2,469.31 2,617.47 1,849.68
Govt./Donor 0% - - - - - - - - - - - - - 0% - - - - - - - - - - - -
Market 0% - - - - - - - - - - - - - 0% - - - - - - - - - - - -
Debt Financing 6,171.61 1,094.82 1,160.51 1,230.14 1,303.95 1,382.19 8,445.53 732.56 776.51 2,469.31 2,617.47 1,849.68 137.15 6,171.61 1,094.82 1,160.51 1,230.14 1,303.95 1,382.19 8,445.53 732.56 776.51 2,469.31 2,617.47 1,849.68
Government Grant/ Subsidy 30.0% 3,085.81 547.41 580.26 615.07 651.98 691.09 4,222.76 366.28 388.26 1,234.66 1,308.73 924.84 79.48 30% 3,085.81 547.41 580.26 615.07 651.98 691.09 4,222.76 366.28 388.26 1,234.66 1,308.73 924.84
Project Financing 10,286.02 1,824.70 1,934.18 2,050.24 2,173.25 2,303.65 14,075.88 1,220.93 1,294.19 4,115.52 4,362.45 3,082.80 239.49 10,286.02 1,824.70 1,934.18 2,050.24 2,173.25 2,303.65 14,075.88 1,220.93 1,294.19 4,115.52 4,362.45 3,082.80
22 - Madurai Corporation - Project Cost Schedule - Option 2 August 2, 2021 45 August 2, 2021
Total Identified Investment Implementable Investment
Variable
Total Cost (06- 2007 2008 2009 2010 2011 Total Cost 2012 2013 2014 2015 2016 Base Year Variable Impl Base 2007 2008 2009 2010 2011 Variable Impl Base 2012 2013 2014 2015 2016
Sub-Project and Component
11) (11-16) Cost Cost
DRAWDOWN SCHEDULE -- SOLID WASTE MANAGEMENT
A Project Capex
Project Phasing 8% 15% 23% 23% 30.77% 42.86% 28.57% 28.57% 0.00% 0.00% 8% 15% 23% 23% 31% 43% 29% 29% 0% 0%
Project Construction Sus. Inv Sus. Inv
Land - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Civil Works 2,360.59 181.58 363.17 544.75 544.75 726.34 1,271.09 544.75 363.17 363.17 - - 52.46 100% 2,360.59 181.58 363.17 544.75 544.75 726.34 100% 1,271.09 544.75 363.17 363.17 - -
Procurement of Equipment - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Rehabilitation Works - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Sub Total- Project Const. 2,360.59 181.58 363.17 544.75 544.75 726.34 1,271.09 544.75 363.17 363.17 - - 52.46 100% 2,360.59 181.58 363.17 544.75 544.75 726.34 100% 1,271.09 544.75 363.17 363.17 - -
Project Management
Design Studies 0.0% - - - - - 0.0% - - - -
Project Supervision 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Benefit Monitoring & Evaluation 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Project Mgmt. - - - - - - - - - - - - - - - - - - - - - - - - -
Institutional Development
PIU Operations 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Training & Capacity Building 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Preoperative Expenses 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Inst. Development - - - - - - - - - - - - - - - - - - - - - - - - -
Base Project Cost 2,360.59 181.58 363.17 544.75 544.75 726.34 1,271.09 544.75 363.17 363.17 - - 52.46 2,360.59 181.58 363.17 544.75 544.75 726.34 1,271.09 544.75 363.17 363.17 - -
Contingencies
Physical Contingency 7.0% 165.24 12.71 25.42 38.13 38.13 50.84 88.98 38.13 25.42 25.42 - - 3.67 7.0% 165.24 12.71 25.42 38.13 38.13 50.84 88.98 38.13 25.42 25.42 - -
Price Contingency during Const 6.0% 678.90 17.75 60.94 131.86 174.75 293.61 730.44 268.39 212.98 249.07 - - 15.09 6.0% 678.90 17.75 60.94 131.86 174.75 293.61 730.44 268.39 212.98 249.07 - -
Sub Total- Contingencies 844.15 30.46 86.36 170.00 212.88 344.45 819.42 306.52 238.40 274.49 - - 18.76 844.15 30.46 86.36 170.00 212.88 344.45 819.42 306.52 238.40 274.49 - -
Project Cost (incldg contingency) 3,204.74 212.04 449.53 714.75 757.63 1,070.79 2,090.51 851.28 601.57 637.66 - - 71.22 3,204.74 212.04 449.53 714.75 757.63 1,070.79 2,090.51 851.28 601.57 637.66 - -
Financing Charges
Loan and Guarantee Application 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Guarantee Utilization Fee 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Interest During Construction 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Financing Charges - - - - - - - - - - - - - - - - - - - - - - - - -
Landed Project Cost- Solid Waste Managaement 3,204.74 212.04 449.53 714.75 757.63 1,070.79 2,090.51 851.28 601.57 637.66 - - 71.22 3,204.74 212.04 449.53 714.75 757.63 1,070.79 2,090.51 851.28 601.57 637.66 - -
B Project Financing
Debt Component 60% 60%
FI 60% 1,922.84 127.22 269.72 428.85 454.58 642.47 1,254.31 510.77 360.94 382.60 - - 42.73 60% 1,922.84 127.22 269.72 428.85 454.58 642.47 1,254.31 510.77 360.94 382.60 - -
Govt./Donor 0% - - - - - - - - - - - - - 0% - - - - - - - - - - - -
Market 0% - - - - - - - - - - - - - 0% - - - - - - - - - - - -
Debt Financing 1,922.84 127.22 269.72 428.85 454.58 642.47 1,254.31 510.77 360.94 382.60 - - 42.73 1,922.84 127.22 269.72 428.85 454.58 642.47 1,254.31 510.77 360.94 382.60 - -
Government Grant/ Subsidy 30.0% 961.42 63.61 134.86 214.42 227.29 321.24 627.15 255.38 180.47 191.30 - - 79.48 30% 961.42 63.61 134.86 214.42 227.29 321.24 627.15 255.38 180.47 191.30 - -
Project Financing 3,204.74 212.04 449.53 714.75 757.63 1,070.79 2,090.51 851.28 601.57 637.66 - - 129.33 3,204.74 212.04 449.53 714.75 757.63 1,070.79 2,090.51 851.28 601.57 637.66 - -
22 - Madurai Corporation - Project Cost Schedule - Option 2 August 2, 2021 45 August 2, 2021
Total Identified Investment Implementable Investment
Variable Total Cost (06- 2007 2008 2009 2010 2011 Total Cost 2012 2013 2014 2015 2016 Base Year Variable Impl Base 2007 2008 2009 2010 2011 Variable Impl Base 2012 2013 2014 2015 2016
Sub-Project and Component
11) (11-16) Cost Cost
DRAWDOWN SCHEDULE -- STREET LIGHTING
A Project Capex
Project Phasing 13% 13% 25% 25% 25.00% 16.67% 16.67% 16.67% 25.00% 25.00% 13% 13% 25% 25% 25% 17% 17% 17% 25% 25%
Project Construction Sus. Inv Sus. Inv
Land - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Civil Works 392.97 49.12 49.12 98.24 98.24 98.24 589.45 98.24 98.24 98.24 147.36 147.36 8.73 100% 392.97 49.12 49.12 98.24 98.24 98.24 100% 589.45 98.24 98.24 98.24 147.36 147.36
Procurement of Equipment - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Rehabilitation Works - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Sub Total- Project Const. 392.97 49.12 49.12 98.24 98.24 98.24 589.45 98.24 98.24 98.24 147.36 147.36 8.73 100% 392.97 49.12 49.12 98.24 98.24 98.24 100% 589.45 98.24 98.24 98.24 147.36 147.36
Project Management
Design Studies 0.0% - - - - - 0.0% - - - -
Project Supervision 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Benefit Monitoring & Evaluation 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Project Mgmt. - - - - - - - - - - - - - - - - - - - - - - - - -
Institutional Development
PIU Operations 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Training & Capacity Building 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Preoperative Expenses 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Inst. Development - - - - - - - - - - - - - - - - - - - - - - - - -
Base Project Cost 392.97 49.12 49.12 98.24 98.24 98.24 589.45 98.24 98.24 98.24 147.36 147.36 8.73 392.97 49.12 49.12 98.24 98.24 98.24 589.45 98.24 98.24 98.24 147.36 147.36
Contingencies
Physical Contingency 7.0% 27.51 3.44 3.44 6.88 6.88 6.88 41.26 6.88 6.88 6.88 10.32 10.32 0.61 7.0% 27.51 3.44 3.44 6.88 6.88 6.88 41.26 6.88 6.88 6.88 10.32 10.32
Price Contingency during Const 6.0% 108.05 4.80 8.24 23.78 31.51 39.71 423.03 48.40 57.61 67.38 116.59 133.05 2.40 6.0% 108.05 4.80 8.24 23.78 31.51 39.71 423.03 48.40 57.61 67.38 116.59 133.05
Sub Total- Contingencies 135.56 8.24 11.68 30.66 38.39 46.59 464.29 55.28 64.49 74.25 126.91 143.36 3.01 135.56 8.24 11.68 30.66 38.39 46.59 464.29 55.28 64.49 74.25 126.91 143.36
Project Cost (incldg contingency) 528.52 57.36 60.80 128.90 136.63 144.83 1,053.74 153.52 162.73 172.50 274.27 290.72 11.74 528.52 57.36 60.80 128.90 136.63 144.83 1,053.74 153.52 162.73 172.50 274.27 290.72
Financing Charges
Loan and Guarantee Application 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Guarantee Utilization Fee 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Interest During Construction 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Financing Charges - - - - - - - - - - - - - - - - - - - - - - - - -
Landed Project Cost- Street Lighting 528.52 57.36 60.80 128.90 136.63 144.83 1,053.74 153.52 162.73 172.50 274.27 290.72 11.74 528.52 57.36 60.80 128.90 136.63 144.83 1,053.74 153.52 162.73 172.50 274.27 290.72
B Project Financing
Debt Component 60% 60%
FI 60% 317.11 34.42 36.48 77.34 81.98 86.90 632.24 92.11 97.64 103.50 164.56 174.43 7.05 60% 317.11 34.42 36.48 77.34 81.98 86.90 632.24 92.11 97.64 103.50 164.56 174.43
Govt./Donor 0% - - - - - - - - - - - - - 0% - - - - - - - - - - - -
Market 0% - - - - - - - - - - - - - 0% - - - - - - - - - - - -
Debt Financing 317.11 34.42 36.48 77.34 81.98 86.90 632.24 92.11 97.64 103.50 164.56 174.43 7.05 317.11 34.42 36.48 77.34 81.98 86.90 632.24 92.11 97.64 103.50 164.56 174.43
Government Grant/ Subsidy 30.0% 158.56 17.21 18.24 38.67 40.99 43.45 316.12 46.06 48.82 51.75 82.28 87.22 79.48 30% 158.56 17.21 18.24 38.67 40.99 43.45 316.12 46.06 48.82 51.75 82.28 87.22
Project Financing 528.52 57.36 60.80 128.90 136.63 144.83 1,053.74 153.52 162.73 172.50 274.27 290.72 87.70 528.52 57.36 60.80 128.90 136.63 144.83 1,053.74 153.52 162.73 172.50 274.27 290.72
22 - Madurai Corporation - Project Cost Schedule - Option 2 August 2, 2021 45 August 2, 2021
Total Identified Investment Implementable Investment
Variable Total Cost (06- 2007 2008 2009 2010 2011 Total Cost 2012 2013 2014 2015 2016 Base Year Variable Impl Base 2007 2008 2009 2010 2011 Variable Impl Base 2012 2013 2014 2015 2016
Sub-Project and Component
11) (11-16) Cost Cost
DRAWDOWN SCHEDULE -- SLUM UPGRADTION
A Project Capex
Project Phasing 10% 10% 30% 30% 20% 20.00% 20.00% 20.00% 20.00% 20.00% 10% 10% 30% 30% 20% 20% 20% 20% 20% 20%
Project Construction Sus. Inv Sus. Inv
Land - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Civil Works 2,138.09 213.81 213.81 641.43 641.43 427.62 2,138.09 427.62 427.62 427.62 427.62 427.62 47.51 100% 2,138.09 213.81 213.81 641.43 641.43 427.62 100% 2,138.09 427.62 427.62 427.62 427.62 427.62
Procurement of Equipment - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Rehabilitation Works - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Sub Total- Project Const. 2,138.09 213.81 213.81 641.43 641.43 427.62 2,138.09 427.62 427.62 427.62 427.62 427.62 47.51 100% 2,138.09 213.81 213.81 641.43 641.43 427.62 100% 2,138.09 427.62 427.62 427.62 427.62 427.62
Project Management
Design Studies 0.0% - - - - - 0.0% - - - -
Project Supervision 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Benefit Monitoring & Evaluation 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Project Mgmt. - - - - - - - - - - - - - - - - - - - - - - - - -
Institutional Development
PIU Operations 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Training & Capacity Building 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Preoperative Expenses 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Inst. Development - - - - - - - - - - - - - - - - - - - - - - - - -
Base Project Cost 2,138.09 213.81 213.81 641.43 641.43 427.62 2,138.09 427.62 427.62 427.62 427.62 427.62 47.51 2,138.09 213.81 213.81 641.43 641.43 427.62 2,138.09 427.62 427.62 427.62 427.62 427.62
Contingencies
Physical Contingency 7.0% 149.67 14.97 14.97 44.90 44.90 29.93 149.67 29.93 29.93 29.93 29.93 29.93 3.33 7.0% 149.67 14.97 14.97 44.90 44.90 29.93 149.67 29.93 29.93 29.93 29.93 29.93
Price Contingency during Const 6.0% 590.65 20.90 35.88 155.27 205.76 172.86 1,479.14 210.68 250.78 293.28 338.33 386.08 13.13 6.0% 590.65 20.90 35.88 155.27 205.76 172.86 1,479.14 210.68 250.78 293.28 338.33 386.08
Sub Total- Contingencies 740.32 35.86 50.84 200.17 250.66 202.79 1,628.80 240.62 280.71 323.21 368.26 416.01 16.45 740.32 35.86 50.84 200.17 250.66 202.79 1,628.80 240.62 280.71 323.21 368.26 416.01
Project Cost (incldg contingency) 2,878.41 249.67 264.65 841.59 892.09 630.41 3,766.90 668.23 708.33 750.83 795.88 843.63 63.96 2,878.41 249.67 264.65 841.59 892.09 630.41 3,766.90 668.23 708.33 750.83 795.88 843.63
Financing Charges
Loan and Guarantee Application 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Guarantee Utilization Fee 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Interest During Construction 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Financing Charges - - - - - - - - - - - - - - - - - - - - - - - - -
Landed Project Cost- Slum Upgradations 2,878.41 249.67 264.65 841.59 892.09 630.41 3,766.90 668.23 708.33 750.83 795.88 843.63 63.96 2,878.41 249.67 264.65 841.59 892.09 630.41 3,766.90 668.23 708.33 750.83 795.88 843.63
Government Grant/ Subsidy 30.0% 863.52 74.90 79.40 252.48 267.63 189.12 1,130.07 200.47 212.50 225.25 238.76 253.09 79.48 30% 863.52 74.90 79.40 252.48 267.63 189.12 1,130.07 200.47 212.50 225.25 238.76 253.09
Project Financing 2,878.41 249.67 264.65 841.59 892.09 630.41 3,766.90 668.23 708.33 750.83 795.88 843.63 124.26 2,878.41 249.67 264.65 841.59 892.09 630.41 3,766.90 668.23 708.33 750.83 795.88 843.63
22 - Madurai Corporation - Project Cost Schedule - Option 2 August 2, 2021 45 August 2, 2021
Total Identified Investment Implementable Investment
Variable Total Cost (06- 2007 2008 2009 2010 2011 Total Cost 2012 2013 2014 2015 2016 Base Year Variable Impl Base 2007 2008 2009 2010 2011 Variable Impl Base 2012 2013 2014 2015 2016
Sub-Project and Component
11) (11-16) Cost Cost
DRAWDOWN SCHEDULE -- OTHERS
A Project Capex
Project Phasing 0% 25% 25% 25% 25.00% 16.67% 16.67% 25.00% 25.00% 16.67% 0% 25% 25% 25% 25% 17% 17% 25% 25% 17%
Project Construction Sus. Inv Sus. Inv
Land - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Civil Works 1,400.40 - 350.10 350.10 350.10 350.10 2,100.60 350.10 350.10 525.15 525.15 350.10 31.12 100% 1,400.40 - 350.10 350.10 350.10 350.10 100% 2,100.60 350.10 350.10 525.15 525.15 350.10
Procurement of Equipment - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Rehabilitation Works - - - - - - - - - - - - - 0% - - - - - - 100% - - - - - -
Sub Total- Project Const. 1,400.40 - 350.10 350.10 350.10 350.10 2,100.60 350.10 350.10 525.15 525.15 350.10 31.12 100% 1,400.40 - 350.10 350.10 350.10 350.10 100% 2,100.60 350.10 350.10 525.15 525.15 350.10
Project Management
Design Studies 0.0% - - - - - 0.0% - - - -
Project Supervision 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Benefit Monitoring & Evaluation 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Project Mgmt. - - - - - - - - - - - - - - - - - - - - - - - - -
Institutional Development
PIU Operations 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Training & Capacity Building 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Preoperative Expenses 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Inst. Development - - - - - - - - - - - - - - - - - - - - - - - - -
Base Project Cost 1,400.40 - 350.10 350.10 350.10 350.10 2,100.60 350.10 350.10 525.15 525.15 350.10 31.12 1,400.40 - 350.10 350.10 350.10 350.10 2,100.60 350.10 350.10 525.15 525.15 350.10
Contingencies
Physical Contingency 7.0% 98.03 - 24.51 24.51 24.51 24.51 147.04 24.51 24.51 36.76 36.76 24.51 2.18 7.0% 98.03 - 24.51 24.51 24.51 24.51 147.04 24.51 24.51 36.76 36.76 24.51
Price Contingency during Const 6.0% 397.32 - 58.74 84.75 112.31 141.52 1,469.55 172.49 205.32 360.17 415.49 316.09 8.83 6.0% 397.32 - 58.74 84.75 112.31 141.52 1,469.55 172.49 205.32 360.17 415.49 316.09
Sub Total- Contingencies 495.35 - 83.25 109.25 136.81 166.03 1,616.59 197.00 229.82 396.93 452.25 340.60 11.01 495.35 - 83.25 109.25 136.81 166.03 1,616.59 197.00 229.82 396.93 452.25 340.60
Project Cost (incldg contingency) 1,895.75 - 433.35 459.35 486.91 516.13 3,717.19 547.10 579.92 922.08 977.40 690.70 42.13 1,895.75 - 433.35 459.35 486.91 516.13 3,717.19 547.10 579.92 922.08 977.40 690.70
Financing Charges
Loan and Guarantee Application 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Guarantee Utilization Fee 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Interest During Construction 0.0% - - - - - - - - - - - - - 0.0% - - - - - - - - - - - -
Sub Total- Financing Charges - - - - - - - - - - - - - - - - - - - - - - - - -
Landed Project Cost- Others 1,895.75 - 433.35 459.35 486.91 516.13 3,717.19 547.10 579.92 922.08 977.40 690.70 42.13 1,895.75 - 433.35 459.35 486.91 516.13 3,717.19 547.10 579.92 922.08 977.40 690.70
B Project Financing
Debt Component 80% 80%
FI 80% 1,516.60 - 346.68 367.48 389.53 412.90 2,973.75 437.68 463.94 737.66 781.92 552.56 33.70 80% 1,516.60 - 346.68 367.48 389.53 412.90 2,973.75 437.68 463.94 737.66 781.92 552.56
Govt./Donor 0% - - - - - - - - - - - - - 0% - - - - - - - - - - - -
Market 0% - - - - - - - - - - - - - 0% - - - - - - - - - - - -
Debt Financing 1,516.60 - 346.68 367.48 389.53 412.90 2,973.75 437.68 463.94 737.66 781.92 552.56 33.70 1,516.60 - 346.68 367.48 389.53 412.90 2,973.75 437.68 463.94 737.66 781.92 552.56
Government Grant/ Subsidy 10.0% 189.57 - 43.34 45.94 48.69 51.61 371.72 54.71 57.99 92.21 97.74 69.07 26.49 10% 189.57 - 43.34 45.94 48.69 51.61 371.72 54.71 57.99 92.21 97.74 69.07
Project Financing 1,895.75 - 433.35 459.35 486.91 516.13 3,717.19 547.10 579.92 922.08 977.40 690.70 64.41 1,895.75 - 433.35 459.35 486.91 516.13 3,717.19 547.10 579.92 922.08 977.40 690.70
22 - Madurai Corporation - Project Cost Schedule - Option 2 August 2, 2021 45 August 2, 2021
Total Identified Investment Implementable Investment
Variable Total Cost (06- 2007 2008 2009 2010 2011 Total Cost 2012 2013 2014 2015 2016 Base Year Variable Impl Base 2007 2008 2009 2010 2011 Variable Impl Base 2012 2013 2014 2015 2016
Sub-Project and Component
11) (11-16) Cost Cost
Summary
Base Project Cost
1 Water Supply 9,056 1,811 1,811 1,811 1,811 1,811 9,056 1,811 1,811 1,811 1,811 1,811 9,056 1,811 1,811 1,811 1,811 1,811 9,056 1,811 1,811 1,811 1,811 1,811
2 Sewerage 4,561 912 912 912 912 912 4,561 912 1,368 1,368 912 - 4,561 912 912 912 912 912 4,561 912 1,368 1,368 912 -
3 Road and Traffic Management 12,215 1,527 1,527 3,054 3,054 3,054 18,322 3,054 3,054 4,581 4,581 3,054 12,215 1,527 1,527 3,054 3,054 3,054 18,322 3,054 3,054 4,581 4,581 3,054
4 Storm Water Drinage 7,813 1,563 1,563 1,563 1,563 1,563 7,813 781 781 2,344 2,344 1,563 7,813 1,563 1,563 1,563 1,563 1,563 7,813 781 781 2,344 2,344 1,563
5 Solid Waste Management 2,361 182 363 545 545 726 1,271 545 363 363 - - 2,361 182 363 545 545 726 1,271 545 363 363 - -
6 Street Lighting 393 49 49 98 98 98 589 98 98 98 147 147 393 49 49 98 98 98 589 98 98 98 147 147
7 Slum Upgradations 2,138 214 214 641 641 428 2,138 428 428 428 428 428 2,138 214 214 641 641 428 2,138 428 428 428 428 428
8 Others 1,400 - 350 350 350 350 2,101 350 350 525 525 350 1,400 - 350 350 350 350 2,101 350 350 525 525 350
Total 39,937 6,257 6,789 8,974 8,974 8,942 45,851 7,979 8,254 11,518 10,748 7,353 39,937 6,257 6,789 8,974 8,974 8,942 45,851 7,979 8,254 11,518 10,748 7,353
ASSUMPTIONS
No. Item Heads Variable 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
as of March 31
WATER SUPPLY CUSTOMER PROFILE
A Total Customers
1 Authorized Customers- Current Level
a Domestic 96.65% 79,611 81,601 83,641 85,732 87,876 90,073 92,324 94,632 96,998 99,423 101,909 104,457 107,068 109,745 112,488
b Non Domestic 3.14% 2,586 2,651 2,717 2,785 2,854 2,926 2,999 3,074 3,151 3,230 3,310 3,393 3,478 3,565 3,654
c Industrial 0.21% 172 176 181 185 190 195 199 204 210 215 220 226 231 237 243
Authorized Customers 82,369 84,428 86,539 88,702 90,920 93,193 95,523 97,911 100,359 102,868 105,439 108,075 110,777 113,547 116,385
Coverage to PT Assessment 63% 63% 63% 63% 63% 63% 63% 63% 64% 64% 64% 65% 65% 66% 67%
2 New Connections- Nos.
a Domestic 1,990 2,040 2,091 2,143 2,197 2,252 2,308 2,366 2,425 2,486 2,548 2,611 2,677 2,744
b Commercial 65 66 68 70 71 73 75 77 79 81 83 85 87 89
c Industrial 4 4 5 5 5 5 5 5 5 5 6 6 6 6
Consumers accessing supply 2,059 2,111 2,163 2,218 2,273 2,330 2,388 2,448 2,509 2,572 2,636 2,702 2,769 2,839
3 Authorized Customers- Additional Investment
a Domestic 97% - - 1,223 1,390 7,031 7,381 7,744 34 23 11 - 0 - 13 - - -
b Non Domestic 3% - - 40 45 228 240 252 1 1 0 - 0 - 0 - - -
c Industrial 0% - - 3 3 15 16 17 0 0 0 - 0 - 0 - - -
Authorized Customers - - 1,266 1,438 7,275 7,637 8,013 35 23 12 - 0 - 14
Coverage to PT Assessment 64% 65% 70% 75% 80% 80% 80% 80% 80% 80% 80% 80% 80%
Total Coverage to WS Conn. 64% 65% 70% 75% 80% 80% 80% 80% 80% 80% 80% 81% 81%
4 Total Connections
anbu:
a Domestic PT asst.*coverage %*sus. 79,611 81,601 84,865 88,346 97,520 107,098 117,095 119,437 121,825 124,262 126,747 129,281 131,893 134,569 137,313
% Invest (total WS)
b Non Domestic 2,586 2,651 2,757 2,870 3,168 3,479 3,804 3,880 3,957 4,036 4,117 4,199 4,284 4,371 4,460
c Industrial 172 176 183 191 211 231 253 258 263 268 274 279 285 291 297
Authorized Customers 82,369 84,428 87,805 91,406 100,899 110,809 121,151 123,574 126,046 128,566 131,138 133,760 136,462 139,231 142,070
No. Item Heads Variable 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
as of March 31
Connection Charges - 21.37 27.38 28.06 28.76 35.38 36.26 37.17 50.57 51.83 53.13 67.90 69.60 71.34 87.83
No. Item Heads Variable 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
as of March 31
No. Item Heads Variable 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
as of March 31
4 Total Connections
a Domestic 44,086 45,188 52,511 59,896 68,359 77,208 93,776 110,574 120,392 122,793 125,241 127,738 129,639 131,568 133,525
b Non Domestic 1,432 1,468 2,926 3,196 3,503 3,822 4,393 4,972 5,326 5,439 5,555 5,673 5,773 5,875 5,979
c Industrial 95 98 172 189 209 229 267 305 327 334 341 348 354 360 367
Authorized Customers 45,613 46,753 55,608 63,281 72,071 81,260 98,435 115,851 126,046 128,566 131,138 133,760 135,766 137,803 139,870
4 Total Connections
a Domestic 135,512
b Non Domestic 6,084
c Industrial 373
Authorized Customers 141,969
No. Item Heads Variable 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
as of March 31
No. Item Heads Variable 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
as of March 31
ASSUMPTIONS
Sewer Connections
User contribution - Domestic (INR) 6,000 6,000 6,000 7,250 7,250 7,250 8,700 8,700 8,700 10,440 10,440 10,440 12,528 12,528 12,528 15,034
User contribution - Non domestic (INR) 10,000 10,000 10,000 12,000 12,000 12,000 14,400 14,400 14,400 17,280 17,280 17,280 20,736 20,736 20,736 24,883
User contribution - Industrial (INR) 10,000 10,000 10,000 12,000 12,000 12,000 14,400 14,400 14,400 17,280 17,280 17,280 20,736 20,736 20,736 24,883
Monthly tariff - Domestic (INR) 125 125 125 145 145 145 170 170 170 200 200 200 230 230 230 265
Monthly tariff - Non domestic (INR) 150 150 150 175 175 175 205 205 205 240 240 240 280 280 280 325
Monthly tariff - Industrial (INR) 375 375 375 435 435 435 505 505 505 585 585 585 675 675 675 780
Conservancy Fee
Monthly Charge - Domestic (INR) 15 15 15 20 20 20 25 25 25 30 30 30 35
Monthly Charge - Non domestic (INR) 50 50 50 60 60 60 70 70 70 85 85 85 100
Monthly Charge - Industrial (INR) - - - - - - - - - - - -
venkat:
NRCP Proposal
ASSUMPTIONS
Sewer Connections
User contribution - Domestic (INR) 15,034
User contribution - Non domestic (INR) 24,883
User contribution - Industrial (INR) 24,883
Monthly tariff - Domestic (INR) 265
Monthly tariff - Non domestic (INR) 325
Monthly tariff - Industrial (INR) 780
Conservancy Fee
Monthly Charge - Domestic (INR) 35
Monthly Charge - Non domestic (INR) 100
Monthly Charge - Industrial (INR) -
No. Item Heads Variable 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
as of March 31
WATER SUPPLY CUSTOMER PROFILE
A Total Customers
1 Authorized Customers- Current Level
a Domestic 96.65% 79,611 81,601 83,641 85,732 87,876 90,073 92,324 94,632 96,998 99,423 101,909 104,457 107,068 109,745 112,488
b Non Domestic 3.14% 2,586 2,651 2,717 2,785 2,854 2,926 2,999 3,074 3,151 3,230 3,310 3,393 3,478 3,565 3,654
c Industrial 0.21% 172 176 181 185 190 195 199 204 210 215 220 226 231 237 243
Authorized Customers 82,369 84,428 86,539 88,702 90,920 93,193 95,523 97,911 100,359 102,868 105,439 108,075 110,777 113,547 116,385
Coverage to PT Assessment 63% 63% 63% 63% 63% 63% 63% 63% 64% 64% 64% 65% 65% 66% 67%
2 New Connections- Nos.
a Domestic 1,990 2,040 2,091 2,143 2,197 2,252 2,308 2,366 2,425 2,486 2,548 2,611 2,677 2,744
b Commercial 65 66 68 70 71 73 75 77 79 81 83 85 87 89
c Industrial 4 4 5 5 5 5 5 5 5 5 6 6 6 6
Consumers accessing supply 2,059 2,111 2,163 2,218 2,273 2,330 2,388 2,448 2,509 2,572 2,636 2,702 2,769 2,839
3 Authorized Customers- Additional Investment
a Domestic 97% - - 1,223 1,390 7,031 7,381 7,744 34 23 11 - 0 - 13 - - -
b Non Domestic 3% - - 40 45 228 240 252 1 1 0 - 0 - 0 - - -
c Industrial 0% - - 3 3 15 16 17 0 0 0 - 0 - 0 - - -
Authorized Customers - - 1,266 1,438 7,275 7,637 8,013 35 23 12 - 0 - 14
Coverage to PT Assessment 64% 65% 70% 75% 80% 80% 80% 80% 80% 80% 80% 80% 80%
Total Coverage to WS Conn. 64% 65% 70% 75% 80% 80% 80% 80% 80% 80% 80% 81% 81%
4 Total Connections
anbu:
a Domestic PT asst.*coverage %*sus. 79,611 81,601 84,865 88,346 97,520 107,098 117,095 119,437 121,825 124,262 126,747 129,281 131,893 134,569 137,313
% Invest (total WS)
b Non Domestic 2,586 2,651 2,757 2,870 3,168 3,479 3,804 3,880 3,957 4,036 4,117 4,199 4,284 4,371 4,460
c Industrial 172 176 183 191 211 231 253 258 263 268 274 279 285 291 297
Authorized Customers 82,369 84,428 87,805 91,406 100,899 110,809 121,151 123,574 126,046 128,566 131,138 133,760 136,462 139,231 142,070
No. Item Heads Variable 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
as of March 31
C Projected Connection Charges (INR Lakh)
1 Domestic - 19.90 25.50 26.14 26.79 32.95 33.78 34.62 47.32 48.50 49.71 63.69 65.29 66.92 82.31
2 Non Domestic - 1.29 1.66 1.70 1.74 2.14 2.19 2.25 2.88 2.95 3.03 3.72 3.82 3.91 4.90
3 Industrial - 0.17 0.22 0.23 0.23 0.28 0.29 0.30 0.37 0.38 0.39 0.48 0.49 0.51 0.62
Connection Charges - 21.37 27.38 28.06 28.76 35.38 36.26 37.17 50.57 51.83 53.13 67.90 69.60 71.34 87.83
No. Item Heads Variable 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
as of March 31
3 Authorized Customers- Additional Investment
a Domestic 54% - - 663 6,089 7,135 7,487 15,171 15,368 8,352 897 908 918 282 270 257
b Non Domestic 2% - - 22 198 232 243 493 499 271 29 29 30 9 9 8
c Industrial 0% - - 1 13 15 16 33 33 18 2 2 2 1 1 1
Authorized Customers - - 686 6,300 7,382 7,747 15,697 15,900 8,641 928 939 949 292 279 266
Coverage to PT Assessment 0% 0% 20% 45% 50% 55% 65% 75% 80% 80% 80% 80% 80% 80% 80%
Total Coverage to WS Conn. 63% 69% 71% 73% 81% 94% 100% 100% 100% 100% 99% 99% 98%
4 Total Connections
a Domestic 44,086 45,188 52,511 59,896 68,359 77,208 93,776 110,574 120,392 122,793 125,241 127,738 129,639 131,568 133,525
b Non Domestic 1,432 1,468 2,926 3,196 3,503 3,822 4,393 4,972 5,326 5,439 5,555 5,673 5,773 5,875 5,979
c Industrial 95 98 172 189 209 229 267 305 327 334 341 348 354 360 367
Authorized Customers 45,613 46,753 55,608 63,281 72,071 81,260 98,435 115,851 126,046 128,566 131,138 133,760 135,766 137,803 139,870
No. Item Heads Variable 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
as of March 31
1 Tariff Demand (INR Lakh)
Arrear - - 25.18 64.37 125.53 222.37 337.91 478.38 553.22 595.30 669.64 708.48 729.49
Current - 125.88 258.89 466.74 798.04 1,133.61 1,547.11 1,570.15 1,593.45 1,859.97 1,868.29 1,876.26 2,170.93
Total Demand - - - 125.88 284.07 531.11 923.57 1,355.99 1,885.02 2,048.53 2,146.67 2,455.27 2,537.94 2,584.74 2,900.42
2 Tariff Collection (INR Lakh)
Arrear - - 12.59 32.18 62.77 111.19 168.95 239.19 276.61 297.65 334.82 354.24 364.75
Current - 100.71 207.12 373.39 638.43 906.89 1,237.69 1,256.12 1,274.76 1,487.97 1,494.63 1,501.01 1,736.74
Total Collection - - - 100.71 219.70 405.58 701.19 1,018.08 1,406.65 1,495.31 1,551.37 1,785.62 1,829.46 1,855.25 2,101.49
Total Collection performance #DIV/0! 80% 77% 76% 76% 75% 75% 73% 72% 73% 72% 72% 72%
No. Item Heads Variable 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
as of March 31
ASSUMPTIONS
Sewer Connections
User contribution - Domestic (INR) 6,000 6,000 6,000 7,250 7,250 7,250 8,700 8,700 8,700 10,440 10,440 10,440 12,528 12,528 12,528 15,034
User contribution - Non domestic (INR) 10,000 10,000 10,000 12,000 12,000 12,000 14,400 14,400 14,400 17,280 17,280 17,280 20,736 20,736 20,736 24,883
User contribution - Industrial (INR) 10,000 10,000 10,000 12,000 12,000 12,000 14,400 14,400 14,400 17,280 17,280 17,280 20,736 20,736 20,736 24,883
Monthly tariff - Domestic (INR) 125 125 125 145 145 145 170 170 170 200 200 200 230 230 230 265
Monthly tariff - Non domestic (INR) 250 250 250 290 290 290 335 335 335 390 390 390 450 450 450 520
Monthly tariff - Industrial (INR) 375 375 375 435 435 435 505 505 505 585 585 585 675 675 675 780
Conservancy Fee
Monthly Charge - Domestic (INR) 15 15 15 20 20 20 25 25 25 30 30 30 35
Monthly Charge - Non domestic (INR) 50 50 50 60 60 60 70 70 70 85 85 85 100
Monthly Charge - Industrial (INR) - - - - - - - - - - - -
venkat:
NRCP Proposal
ASSUMPTIONS
Sewer Connections
User contribution - Domestic (INR) 15,034
User contribution - Non domestic (INR) 24,883
User contribution - Industrial (INR) 24,883
Monthly tariff - Domestic (INR) 265
Monthly tariff - Non domestic (INR) 520
Monthly tariff - Industrial (INR) 780
Conservancy Fee
Monthly Charge - Domestic (INR) 35
Monthly Charge - Non domestic (INR) 100
Monthly Charge - Industrial (INR) -
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
as of March 31
PROJECT OPERATIONS SCHEDULE -- WATER SUPPLY
A Operation & Maintenance Schedule (INR Lakh)
1 Annual Maintenance Cost 6.00% - 127 269 428 605 801 883 972 1,069 1,173 1,286 1,364 1,445 1,532
O&M Charges (to P&L) - 127 269 428 605 801 883 972 1,069 1,173 1,286 1,364 1,445 1,532
Vijay Padmanabhan:
Depreciation calculated on
Project Landed Cost.
PROJECT OPERATIONS SCHEDULE -- SEWERAGE
A Operation & Maintenance Schedule (INR Lakh)
1 Annual Maintenance Cost 4.00% - 43 90 144 203 269 302 348 397 441 468 496 526 557
O&M Charges (to P&L) - 43 90 144 203 269 302 348 397 441 468 496 526 557
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
as of March 31
PROJECT OPERATIONS SCHEDULE -- WATER SUPPLY
A Operation & Maintenance Schedule (INR Lakh)
1 Annual Maintenance Cost 6.00% - 127 269 428 605 801 1,019 1,260 1,526 1,820 2,144 2,273 2,409 2,553
O&M Charges (to P&L) - 127 269 428 605 801 1,019 1,260 1,526 1,820 2,144 2,273 2,409 2,553
1 2 3 4 5 6 7 8
26- Madurai Corporation -Implementable Project Debt Servicing Schedul 1 2 3 4 5 6 7 8 9 10 11 12 13
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
DEBT SERVICING SCHEDULE -- I st Phase as of March 31
9
14Schedul
26- Madurai Corporation -Implementable Project Debt Servicing
1 2 3 4 5 6 7 8
26- Madurai Corporation -Implementable Project Debt Servicing Schedul 1 2 3 4 5 6 7 8 9 10 11 12 13
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
DEBT SERVICING SCHEDULE -- I st Phase as of March 31
DEBT SERVICING SCHEDULE -- ROADS AND TRAFFIC MANAGEMENT
Debt Conditions FI
Loan Amount (INR Lakh) 985.70
Rate of Interest (%) 8.50%
Term of Loan (yrs) 20.00
Moratorium (yrs) 5.00
Annuity Factor 0.120
Type of Repayment EI
9
14Schedul
26- Madurai Corporation -Implementable Project Debt Servicing
1 2 3 4 5 6 7 8
26- Madurai Corporation -Implementable Project Debt Servicing Schedul 1 2 3 4 5 6 7 8 9 10 11 12 13
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
DEBT SERVICING SCHEDULE -- I st Phase as of March 31
DEBT SERVICING SCHEDULE -- SOLID WASTE MANAGEMENT
Debt Conditions FI
Loan Amount (INR Lakh) 1,922.84
Rate of Interest (%) 8.50%
Term of Loan (yrs) 20.00
Moratorium (yrs) 5.00
Annuity Factor 0.120
Type of Repayment EI
9
14Schedul
26- Madurai Corporation -Implementable Project Debt Servicing
1 2 3 4 5 6 7 8
26- Madurai Corporation -Implementable Project Debt Servicing Schedul 1 2 3 4 5 6 7 8 9 10 11 12 13
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
DEBT SERVICING SCHEDULE -- I st Phase as of March 31
DEBT SERVICING SCHEDULE -- SLUM UPGRADATIONS
Debt Conditions FI
Loan Amount (INR Lakh) 518.11
Rate of Interest (%) 8.50%
Term of Loan (yrs) 20.00
Moratorium (yrs) 5.00
Annuity Factor 0.120
Type of Repayment EI
ASSUMPTIONS
Wholesale Price Index 6%
Discount Rate 8.5%
Vijay Padmanabhan:
Valued at x% of the
guarantee ceiling.
9
14Schedul
26- Madurai Corporation -Implementable Project Debt Servicing
ASSUMPTIONS
Wholesale Price Index
Discount Rate
1 2 3 4 5 6 7 8
26- Madurai Corporation -Implementable Project Debt Servicing Schedul 1 2 3 4 5 6 7 8 9 10 11 12 13
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
DEBT SERVICING SCHEDULE -- I st Phase as of March 31
DEBT SERVICING SCHEDULE -- II nd Phase
Vijay Padmanabhan:
DEBT SERVICING SCHEDULE -- WATER SUPPLY Valued at x% of the
guarantee ceiling.
Debt Conditions FI
Loan Amount (INR Lakh) 1,595
Rate of Interest (%) 8.50%
Term of Loan (yrs) 20.00
Moratorium (yrs) 5.00
Annuity Factor 0.120
Type of Repayment EI
9
14Schedul
26- Madurai Corporation -Implementable Project Debt Servicing
1 2 3 4 5 6 7 8
26- Madurai Corporation -Implementable Project Debt Servicing Schedul 1 2 3 4 5 6 7 8 9 10 11 12 13
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
DEBT SERVICING SCHEDULE -- I st Phase as of March 31
DEBT SERVICING SCHEDULE -- ROADS AND TRAFFIC MANAGEMENT
Debt Conditions FI
Loan Amount (INR Lakh) 1,945
Rate of Interest (%) 8.50%
Term of Loan (yrs) 20.00
Moratorium (yrs) 5.00
Annuity Factor 0.120
Type of Repayment EI
9
14Schedul
26- Madurai Corporation -Implementable Project Debt Servicing
1 2 3 4 5 6 7 8
26- Madurai Corporation -Implementable Project Debt Servicing Schedul 1 2 3 4 5 6 7 8 9 10 11 12 13
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
DEBT SERVICING SCHEDULE -- I st Phase as of March 31
DEBT SERVICING SCHEDULE -- SOLID WASTE MANAGEMENT
Debt Conditions FI
Loan Amount (INR Lakh) 251
Rate of Interest (%) 8.50%
Term of Loan (yrs) 20.00
Moratorium (yrs) 5.00
Annuity Factor 0.120
Type of Repayment EI
9
14Schedul
26- Madurai Corporation -Implementable Project Debt Servicing
1 2 3 4 5 6 7 8
26- Madurai Corporation -Implementable Project Debt Servicing Schedul 1 2 3 4 5 6 7 8 9 10 11 12 13
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
DEBT SERVICING SCHEDULE -- I st Phase as of March 31
DEBT SERVICING SCHEDULE -- SLUM UPGRADATIONS
Debt Conditions FI
Loan Amount (INR Lakh) 452
Rate of Interest (%) 8.50%
Term of Loan (yrs) 20.00
Moratorium (yrs) 5.00
Annuity Factor 0.120
Type of Repayment EI
Phase I & II
Debt Servicing - Water & Sewerage - - - - - 1,010.09 1,058.99 1,110.82 1,154.94 1,178.75 1,485.38 1,509.47 1,535.00
Debt Servicing - Others - - - - - 388.87 434.36 509.49 589.13 661.86 988.08 1,017.90 1,066.73
Debt Servicing - Total - - - - - 1,398.96 1,493.35 1,620.31 1,744.06 1,840.61 2,473.47 2,527.37 2,601.73
9
14Schedul
26- Madurai Corporation -Implementable Project Debt Servicing
Phase I & II
Debt Servicing - Water & Sewerage 1,553.04
Debt Servicing - Others 1,115.62
Debt Servicing - Total 2,668.66
1 2 3 4 5 6 7 8 9
26 A- Madurai Corporation -Full Project Debt Servicing Sched 1 2 3 4 5 6 7 8 9 10 11 12 13 14
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
DEBT SERVICING SCHEDULE -- I st Phas as of March 31
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
as of March 31
CASH FLOW STATEMENT -- WATER SUPPLY
Opening Balance (73) (354) (766) (1361) (2184) (3549) (4991) (6541) (8213) (9983) (11916) (13922) (15973)
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
as of March 31
CASH FLOW STATEMENT -- ROADS AND TRAFFIC MANAGEMENT
Opening Balance (9) (33) (84) (169) (291) (481) (744) (1118) (1617) (2220) (2870) (3553) (4281)
1 Debt Drawdown
FI 107 113 240 255 270 286 303 483 512 361
2 Equity Drawdown
Equity by ULB 18 19 40 42 45 48 51 80 85 60
Equity by Customers
3 Govt. Grant 53 57 120 127 135 143 152 241 256 181
Total- Source of Funds 178 189 401 425 450 477 506 804 853 602 - - - -
1 Debt Drawdown
FI 109 116 123 130 138 73 78 247 262 185
2 Equity Drawdown
Equity by ULB 18 19 21 22 23 12 13 41 44 31
Equity by Customers
3 Govt. Grant 55 58 62 65 69 37 39 123 131 92
Total- Source of Funds 182 193 205 217 230 122 129 412 436 308 - - - -
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
as of March 31
CASH FLOW STATEMENT -- SOLID WASTE MANAGEMENT
Opening Balance 166 306 378 403 304 84 (119) (364) (650) (905) (1177) (1470) (1713)
1 Debt Drawdown
FI 9 9 19 20 22 - - - - -
Govt./Donor - - - - - - - - - -
Market - - - - - - - - - -
2 Equity Drawdown
Equity by ULB 3 4 8 8 9 - - - - -
Equity by Customers
3 Govt. Grant 5 5 12 12 13 - - - - -
Total- Source of Funds 17 18 39 41 43 - - - - - - - - -
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
as of March 31
CASH FLOW STATEMENT -- SLUM UPGRADATIONS
Opening Balance (4) (12) (35) (73) (125) (227) (342) (475) (626) (796) (921) (1050) (1183)
1 Debt Drawdown
FI 45 48 151 161 113 80 85 90 96 101
Govt./Donor - - - - - - - - - -
Market - - - - - - - - - -
2 Equity Drawdown
Equity by ULB 7 8 25 27 19 13 14 15 16 17
Equity by Customers
3 Govt. Grant 22 24 76 80 57
4 Interest Accrued on Bonds
5 Add: Bank Loans
Total- Source of Funds 75 79 252 268 189 94 99 105 111 118 - - - -
1 Debt Drawdown
FI - - - - - - - - - -
2 Equity Drawdown
Equity by ULB - - - - - - - - - -
Equity by Customers
3 Govt. Grant - - - - - - - - - -
4 Rent
Vijay Padmanabhan:
Total- Source of Funds DSCR
Valued
To be =
determined
at(PAT
x% +of Dep.
the -
by the
+ - - - - - - - - - - - - -
Interest) / ceiling.
guarantee
guranteeing (Interest
agency +/
Principal) = 1.5 to 2.0
authority.
B Disposition of Funds (INR Lakh) (Numerator = PBDIT)
1 Project Capex - - - - - - - - - - - - - -
2 Operation & Maintenance - - - - - - - - - - - - - -
3 Repayments- FI - - - - - - - - - - - - - -
4 Interest During Construction - - - - - - - - - -
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
as of March 31
Total- Disposition of Funds - - - - - - - - - - - - - -
Net Cashflow 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Closing Balance 0 0 0 0 0 0 0 0 0 0 0 0 0 0
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
as of March 31
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
as of March 31
CASH FLOW STATEMENT -- WATER SUPPLY
Opening Balance (73) (353) (763) (1353) (2170) (3629) (5402) (7545) (10095) (13052) (16610) (20293) (24073) (27993)
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
as of March 31
CASH FLOW STATEMENT -- ROADS AND TRAFFIC MANAGEMENT
Opening Balance (91) (332) (837) (1685) (2905) (4808) (7443) (11177) (16167) (22196) (28700) (35528) (42812) (50581)
1 Debt Drawdown
FI 1,070 1,134 2,404 2,548 2,701 2,863 3,035 4,826 5,115 3,615
2 Equity Drawdown
Equity by ULB 178 189 401 425 450 477 506 804 853 602
Equity by Customers
3 Govt. Grant 535 567 1,202 1,274 1,351 1,432 1,517 2,413 2,558 1,807
Total- Source of Funds 1,783 1,890 4,007 4,247 4,502 4,772 5,058 8,043 8,525 6,024 - - - - -
1 Debt Drawdown
FI 1,095 1,161 1,230 1,304 1,382 733 777 2,469 2,617 1,850
2 Equity Drawdown
Equity by ULB 182 193 205 217 230 122 129 412 436 308
Equity by Customers
3 Govt. Grant 547 580 615 652 691 366 388 1,235 1,309 925
Total- Source of Funds 1,825 1,934 2,050 2,173 2,304 1,221 1,294 4,116 4,362 3,083 - - - - -
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
as of March 31
1 Debt Drawdown
FI 34 36 77 82 87 92 98 103 165 174
Govt./Donor - - - - - - - - - -
Market - - - - - - - - - -
2 Equity Drawdown
Equity by ULB 6 6 13 14 14 15 16 17 27 29
Equity by Customers
3 Govt. Grant 17 18 39 41 43 46 49 52 82 87
Total- Source of Funds 57 61 129 137 145 154 163 172 274 291 - - - - -
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
as of March 31
CASH FLOW STATEMENT -- OTHERS
Opening Balance 0 (29) (99) (211) (369) (577) (851) (1222) (1585) (2029) (2497) (2988) (3515) (4144)
1 Debt Drawdown
FI - 347 367 390 413 438 464 738 782 553
2 Equity Drawdown
Equity by ULB - 43 46 49 52 55 58 92 98 69
Equity by Customers
3 Govt. Grant - 43 46 49 52 55 58 92 98 69
4 Rent
Total- Source of Funds - 433 459 487 516 547 580 922 977 691 - - - - -
WS&SS
RI 67 597 907 1,316 2,374 2,589 2,508 1,778 1,836 2,126 2,091 2,117 2,402 2,446
RE 771 1,122 1,504 1,920 2,372 3,155 3,988 4,764 5,361 5,634 5,617 5,869 6,136 6,389
No. Item Heads Variable 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
as of March 31
Status (704) (525) (597) (604) 2 (566) (1,480) (2,986) (3,525) (3,508) (3,526) (3,752) (3,734) (3,943)
General Fund
RI 177 195 209 277 292 305 375 390 403 485 500 513 598 615
RE 623 1,097 2,005 2,786 3,623 4,659 5,846 8,196 10,064 11,284 10,936 11,439 12,153 12,965
Status (446) (902) (1,796) (2,509) (3,330) (4,354) (5,471) (7,806) (9,661) (10,799) (10,436) (10,926) (11,555) (12,349)
Arasaradi
Ideal Condition
1 Capacity of Pump 570 HP
2 Power Consumption per HP/hour 0.747 KW
3 No. of Hours of Pumping 16.00 hours
4 Total Power Consumption 2,486,614 KW/annum
5 Unit Rate of Power 3.85 INR/KW
6 Total Energy Charges per annum 95.73 INR Lakh
Current Status
7 Total Power Consumption 1,527,311 KW/annum
8 Total Energy Charges per annum 58.35 INR Lakh
9 Current Efficiency assuming Ideal is 100% 164.06 %
10 Annual Increment in Energy Cost 5 %
11 Interest Rate 8.5 %
12 Continue with the current Pump if net savings is < 5.0 %
13 Repair the current Pump if net savings is between 10.0 %
previous and less than
14 Replace the current Pump if net savings is > 10.0 %
15 Age of Pump 7.0
S.No. Year Capital Cost of O & M New Pump O&M Savings in Cost of Net Savings % Savings
Pump Existing pump energy Cost Funds from
Current
INR Lakh
1 2006 13.68 95.73 58.35 -37.38 1.16 -38.54 -66%
2 2007 100.52 61.27 -39.25 1.16 -40.41 -66%
3 2008 105.55 64.34 -41.21 1.16 -42.37 -66%
4 2009 110.82 67.55 -43.27 1.16 -44.43 -66%
5 2010 116.37 70.93 -45.44 1.16 -46.60 -66%
6 2011 122.18 74.48 -47.71 1.16 -48.87 -66%
7 2012 128.29 78.20 -50.09 1.16 -51.26 -66%
8 2013 134.71 82.11 -52.60 1.16 -53.76 -65%
9 2014 141.44 86.22 -55.23 1.16 -56.39 -65%
10 2015 148.52 90.53 -57.99 1.16 -59.15 -65%
11 2016 155.94 95.05 -60.89 1.16 -62.05 -65%
12 2017 163.74 99.81 -63.93 1.16 -65.10 -65%
13 2018 171.93 104.80 -67.13 1.16 -68.29 -65%
14 2019 180.52 110.04 -70.49 1.16 -71.65 -65%
15 2020 189.55 115.54 -74.01 1.16 -75.17 -65%
Kochadai HW
Ideal Condition
1 Capacity of Pump 170 HP
2 Power Consumption per HP/hour 0.747 KW
3 No. of Hours of Pumping 16.00 hours
4 Total Power Consumption 741,622 KW/annum
5 Unit Rate of Power 3.85 INR/KW
6 Total Energy Charges per annum 28.5524 INR Lakh
Current Status
7 Total Power Consumption 396,426 KW/annum
8 Total Energy Charges per annum 15.03 INR Lakh
9 Current Efficiency assuming Ideal is 100% 189.92 %
10 Annual Increment in Energy Cost 5 %
11 Interest Rate 8.5 %
12 Continue with the current Pump if net savings is < 5.0 %
13 Repair the current Pump if net savings is between 10.0 %
previous and less than
14 Replace the current Pump if net savings is > 10.0 %
15 Age of Pump
S.No. Year Capital Cost of O & M New Pump O&M Savings in Cost of Net Savings % Savings
Pump Existing pump energy Cost Funds from
Current
INR Lakh
1 2006 40.80 28.55 15.03 -13.52 3.47 -16.99 -113%
2 2007 29.98 15.79 -14.19 3.47 -17.66 -112%
3 2008 31.48 16.58 -14.90 3.47 -18.37 -111%
4 2009 33.05 17.40 -15.65 3.47 -19.12 -110%
5 2010 34.71 18.27 -16.43 3.47 -19.90 -109%
6 2011 36.44 19.19 -17.25 3.47 -20.72 -108%
7 2012 38.26 20.15 -18.12 3.47 -21.58 -107%
8 2013 40.18 21.15 -19.02 3.47 -22.49 -106%
9 2014 42.18 22.21 -19.97 3.47 -23.44 -106%
10 2015 44.29 23.32 -20.97 3.47 -24.44 -105%
11 2016 46.51 24.49 -22.02 3.47 -25.49 -104%
12 2017 48.83 25.71 -23.12 3.47 -26.59 -103%
13 2018 51.28 27.00 -24.28 3.47 -27.74 -103%
14 2019 53.84 28.35 -25.49 3.47 -28.96 -102%
15 2020 56.53 29.77 -26.77 3.47 -30.23 -102%
Collector Well
Ideal Condition
1 Capacity of Pump 135 HP
2 Power Consumption per HP/hour 0.747 KW
3 No. of Hours of Pumping 16.00 hours
4 Total Power Consumption 588,935 KW/annum
5 Unit Rate of Power 3.85 INR/KW
6 Total Energy Charges per annum 22.67 INR Lakh
Current Status
7 Total Power Consumption 131,874 KW/annum
8 Total Energy Charges per annum 6.13 INR Lakh
9 Current Efficiency assuming Ideal is 100% 369.98 %
10 Annual Increment in Energy Cost 5 %
11 Interest Rate 8.5 %
12 Continue with the current Pump if net savings is < 5.0 %
13 Repair the current Pump if net savings is between 10.0 %
previous and less than
14 Replace the current Pump if net savings is > 10.0 %
15 Age of Pump 32.0
S.No. Year Capital Cost of O & M New Pump O&M Savings in Cost of Net Savings % Savings
Pump Existing pump energy Cost Funds from
Current
INR Lakh
1 2006 32.40 22.67 6.13 -16.55 2.75 -19.30 -315%
2 2007 23.81 6.43 -17.37 2.75 -20.13 -313%
3 2008 25.00 6.76 -18.24 2.75 -21.00 -311%
4 2009 26.25 7.09 -19.15 2.75 -21.91 -309%
5 2010 27.56 7.45 -20.11 2.75 -22.87 -307%
6 2011 28.94 7.82 -21.12 2.75 -23.87 -305%
7 2012 30.39 8.21 -22.17 2.75 -24.93 -304%
8 2013 31.90 8.62 -23.28 2.75 -26.04 -302%
9 2014 33.50 9.05 -24.45 2.75 -27.20 -300%
10 2015 35.17 9.51 -25.67 2.75 -28.42 -299%
11 2016 36.93 9.98 -26.95 2.75 -29.70 -298%
12 2017 38.78 10.48 -28.30 2.75 -31.05 -296%
13 2018 40.72 11.01 -29.71 2.75 -32.47 -295%
14 2019 42.76 11.56 -31.20 2.75 -33.95 -294%
15 2020 44.89 12.13 -32.76 2.75 -35.51 -293%
Melakkal HW
Ideal Condition
1 Capacity of Pump 60 HP
2 Power Consumption per HP/hour 0.747 KW
3 No. of Hours of Pumping 16.00 hours
4 Total Power Consumption 261,749 KW/annum
5 Unit Rate of Power 3.85 INR/KW
6 Total Energy Charges per annum 10.08 INR Lakh
Current Status
7 Total Power Consumption 244,702 KW/annum
8 Total Energy Charges per annum 7.97 INR Lakh
9 Current Efficiency assuming Ideal is 100% 126.36 %
10 Annual Increment in Energy Cost 5 %
11 Interest Rate 8.5 %
12 Continue with the current Pump if net savings is < 5.0 %
13 Repair the current Pump if net savings is between 10.0 %
previous and less than
14 Replace the current Pump if net savings is > 10.0 %
15 Age of Pump 42.0
S.No. Year Capital Cost of O & M New Pump O&M Savings in Cost of Net Savings % Savings
Pump Existing pump energy Cost Funds from
Current
INR Lakh
1 2006 14.40 10.08 7.97 -2.10 1.22 -3.33 -42%
2 2007 10.58 8.37 -2.21 1.22 -3.43 -41%
3 2008 11.11 8.79 -2.32 1.22 -3.54 -40%
4 2009 11.67 9.23 -2.43 1.22 -3.66 -40%
5 2010 12.25 9.69 -2.56 1.22 -3.78 -39%
6 2011 12.86 10.18 -2.68 1.22 -3.91 -38%
7 2012 13.50 10.69 -2.82 1.22 -4.04 -38%
8 2013 14.18 11.22 -2.96 1.22 -4.18 -37%
9 2014 14.89 11.78 -3.11 1.22 -4.33 -37%
10 2015 15.63 12.37 -3.26 1.22 -4.49 -36%
11 2016 16.41 12.99 -3.42 1.22 -4.65 -36%
12 2017 17.24 13.64 -3.60 1.22 -4.82 -35%
13 2018 18.10 14.32 -3.78 1.22 -5.00 -35%
14 2019 19.00 15.04 -3.96 1.22 -5.19 -35%
15 2020 19.95 15.79 -4.16 1.22 -5.39 -34%
S.No. Year Capital Cost of O & M New Pump O&M Savings in Cost of Net Savings % Savings
Pump Existing pump energy Cost Funds from
Current
INR Lakh
1 2006 21.60 2.83 2.88 0.04 1.84 -1.79 -62%
2 2007 2.98 3.02 0.04 1.84 -1.79 -59%
3 2008 3.12 3.17 0.05 1.84 -1.79 -56%
4 2009 3.28 3.33 0.05 1.84 -1.79 -54%
5 2010 3.45 3.50 0.05 1.84 -1.79 -51%
6 2011 3.62 3.67 0.05 1.84 -1.78 -49%
7 2012 3.80 3.85 0.06 1.84 -1.78 -46%
8 2013 3.99 4.05 0.06 1.84 -1.78 -44%
9 2014 4.19 4.25 0.06 1.84 -1.77 -42%
10 2015 4.40 4.46 0.06 1.84 -1.77 -40%
11 2016 4.62 4.68 0.07 1.84 -1.77 -38%
12 2017 4.85 4.92 0.07 1.84 -1.76 -36%
13 2018 5.09 5.16 0.07 1.84 -1.76 -34%
14 2019 5.34 5.42 0.08 1.84 -1.76 -32%
15 2020 5.61 5.69 0.08 1.84 -1.75 -31%
Manallur HW
Ideal Condition
1 Capacity of Pump 255 HP
2 Power Consumption per HP/hour 0.747 KW
3 No. of Hours of Pumping 6.00 hours
4 Total Power Consumption 417,162 KW/annum
5 Unit Rate of Power 3.85 INR/KW
6 Total Energy Charges per annum 16.06 INR Lakh
Current Status
7 Total Power Consumption 253,472 KW/annum
8 Total Energy Charges per annum 14.72 INR Lakh
9 Current Efficiency assuming Ideal is 100% 109.08 %
10 Annual Increment in Energy Cost 5 %
11 Interest Rate 8.5 %
12 Continue with the current Pump if net savings is < 5.0 %
13 Repair the current Pump if net savings is between 10.0 %
previous and less than
14 Replace the current Pump if net savings is > 10.0 %
15 Age of Pump 18.0
S.No. Year Capital Cost of O & M New Pump O&M Savings in Cost of Net Savings % Savings
Pump Existing pump energy Cost Funds from
Current
INR Lakh
1 2006 61.20 16.06 14.72 -1.34 5.20 -6.54 -44%
2 2007 16.86 15.46 -1.40 5.20 -6.61 -43%
3 2008 17.71 16.23 -1.47 5.20 -6.68 -41%
4 2009 18.59 17.04 -1.55 5.20 -6.75 -40%
5 2010 19.52 17.90 -1.63 5.20 -6.83 -38%
6 2011 20.50 18.79 -1.71 5.20 -6.91 -37%
7 2012 21.52 19.73 -1.79 5.20 -6.99 -35%
8 2013 22.60 20.72 -1.88 5.20 -7.08 -34%
9 2014 23.73 21.75 -1.98 5.20 -7.18 -33%
10 2015 24.92 22.84 -2.07 5.20 -7.28 -32%
11 2016 26.16 23.98 -2.18 5.20 -7.38 -31%
12 2017 27.47 25.18 -2.29 5.20 -7.49 -30%
13 2018 28.84 26.44 -2.40 5.20 -7.60 -29%
14 2019 30.28 27.76 -2.52 5.20 -7.72 -28%
15 2020 31.80 29.15 -2.65 5.20 -7.85 -27%
S.No. Year Capital Cost of O & M New Pump O&M Savings in Cost of Net Savings % Savings
Pump Existing pump energy Cost Funds from
Current
INR Lskhs
1 2006 9.60 0.84 1.11 0.27 0.82 -0.54 -49%
2 2007 0.88 1.17 0.29 0.82 -0.53 -45%
3 2008 0.93 1.23 0.30 0.82 -0.51 -42%
4 2009 0.97 1.29 0.32 0.82 -0.50 -39%
5 2010 1.02 1.35 0.33 0.82 -0.48 -36%
6 2011 1.07 1.42 0.35 0.82 -0.47 -33%
7 2012 1.13 1.49 0.37 0.82 -0.45 -30%
8 2013 1.18 1.57 0.39 0.82 -0.43 -27%
9 2014 1.24 1.65 0.40 0.82 -0.41 -25%
10 2015 1.30 1.73 0.43 0.82 -0.39 -23%
11 2016 1.37 1.81 0.45 0.82 -0.37 -20%
12 2017 1.44 1.90 0.47 0.82 -0.35 -18%
13 2018 1.51 2.00 0.49 0.82 -0.32 -16%
14 2019 1.58 2.10 0.52 0.82 -0.30 -14%
15 2020 1.66 2.21 0.54 0.82 -0.27 -12%
Decision
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Decision
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Continue
Decision
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Decision
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Decision
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Decision
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Decision
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
S.No. Year Capital O & M New Pump O & M Existing Savings in energy Cost of Funds Net Savings % Savings from Decision
Cost of pump Cost Current
Pump
INR Lakh
1 2006 19.20 7.63 3.60 -4.03 1.63 -5.67 -157% Continue
2 2007 8.02 3.78 -4.24 1.63 -5.87 -155% Continue
3 2008 8.42 3.97 -4.45 1.63 -6.08 -153% Continue
4 2009 8.84 4.17 -4.67 1.63 -6.30 -151% Continue
5 2010 9.28 4.38 -4.90 1.63 -6.54 -149% Continue
6 2011 9.74 4.59 -5.15 1.63 -6.78 -148% Continue
7 2012 10.23 4.82 -5.41 1.63 -7.04 -146% Continue
8 2013 10.74 5.07 -5.68 1.63 -7.31 -144% Continue
9 2014 11.28 5.32 -5.96 1.63 -7.59 -143% Continue
10 2015 11.84 5.58 -6.26 1.63 -7.89 -141% Continue
11 2016 12.44 5.86 -6.57 1.63 -8.20 -140% Continue
12 2017 13.06 6.16 -6.90 1.63 -8.53 -139% Continue
13 2018 13.71 6.47 -7.25 1.63 -8.88 -137% Continue
14 2019 14.40 6.79 -7.61 1.63 -9.24 -136% Continue
15 2020 15.12 7.13 -7.99 1.63 -9.62 -135% Continue
S.No. Year Capital O & M New Pump O & M Existing Savings in energy Cost of Funds Net Savings % Savings from Decision
Cost of pump Cost Current
Pump
INR Lakh
1 2006 0.70 0.33 0.33 0.00 0.06 -0.06 -18% Continue
2 2007 0.35 0.35 0.00 0.06 -0.06 -17% Continue
3 2008 0.37 0.37 0.00 0.06 -0.06 -16% Continue
4 2009 0.38 0.38 0.00 0.06 -0.06 -16% Continue
5 2010 0.40 0.40 0.00 0.06 -0.06 -15% Continue
6 2011 0.42 0.42 0.00 0.06 -0.06 -14% Continue
7 2012 0.45 0.44 0.00 0.06 -0.06 -14% Continue
8 2013 0.47 0.47 0.00 0.06 -0.06 -13% Continue
9 2014 0.49 0.49 0.00 0.06 -0.06 -12% Continue
10 2015 0.52 0.51 0.00 0.06 -0.06 -12% Continue
11 2016 0.54 0.54 0.00 0.06 -0.06 -11% Continue
12 2017 0.57 0.57 0.00 0.06 -0.06 -11% Continue
13 2018 0.60 0.60 0.00 0.06 -0.06 -10% Continue
14 2019 0.63 0.62 0.00 0.06 -0.06 -10% Continue
15 2020 0.66 0.66 0.00 0.06 -0.06 -9% Continue
S.No. Year Capital O & M New Pump O & M Existing Savings in energy Cost of Funds Net Savings % Savings from Decision
Cost of pump Cost Current
Pump
INR Lakh
1 2006 0.70 0.25 0.04 -0.22 0.06 -0.28 -732% Continue
2 2007 0.27 0.04 -0.23 0.06 -0.29 -725% Continue
3 2008 0.28 0.04 -0.24 0.06 -0.30 -718% Continue
4 2009 0.29 0.04 -0.25 0.06 -0.31 -711% Continue
5 2010 0.31 0.05 -0.26 0.06 -0.32 -705% Continue
6 2011 0.32 0.05 -0.28 0.06 -0.34 -698% Continue
7 2012 0.34 0.05 -0.29 0.06 -0.35 -693% Continue
8 2013 0.36 0.05 -0.31 0.06 -0.36 -687% Continue
9 2014 0.38 0.06 -0.32 0.06 -0.38 -682% Continue
10 2015 0.39 0.06 -0.34 0.06 -0.40 -677% Continue
11 2016 0.41 0.06 -0.35 0.06 -0.41 -672% Continue
12 2017 0.44 0.06 -0.37 0.06 -0.43 -667% Continue
13 2018 0.46 0.07 -0.39 0.06 -0.45 -663% Continue
14 2019 0.48 0.07 -0.41 0.06 -0.47 -659% Continue
15 2020 0.50 0.07 -0.43 0.06 -0.49 -655% Continue
S.No. Year Capital O & M New Pump O & M Existing Savings in energy Cost of Funds Net Savings % Savings from Decision
Cost of pump Cost Current
Pump
INR Lakh
1 2006 0.56 0.21 0.20 0.00 0.06 -0.06 -31% Continue
2 2007 0.22 0.21 0.00 0.06 -0.06 -29% Continue
3 2008 0.23 0.22 0.00 0.06 -0.06 -28% Continue
4 2009 0.24 0.24 0.00 0.06 -0.06 -27% Continue
5 2010 0.25 0.25 0.00 0.06 -0.06 -26% Continue
6 2011 0.26 0.26 0.00 0.06 -0.06 -24% Continue
7 2012 0.28 0.27 0.00 0.06 -0.06 -23% Continue
8 2013 0.29 0.29 0.00 0.06 -0.06 -22% Continue
9 2014 0.30 0.30 0.00 0.06 -0.06 -21% Continue
10 2015 0.32 0.32 -0.01 0.06 -0.06 -20% Continue
11 2016 0.34 0.33 -0.01 0.06 -0.06 -19% Continue
12 2017 0.35 0.35 -0.01 0.06 -0.06 -19% Continue
13 2018 0.37 0.36 -0.01 0.06 -0.07 -18% Continue
14 2019 0.39 0.38 -0.01 0.06 -0.07 -17% Continue
15 2020 0.41 0.40 -0.01 0.06 -0.07 -16% Continue
S.No. Year Capital O & M New Pump O & M Existing Savings in energy Cost of Funds Net Savings % Savings from Decision
Cost of pump Cost Current
Pump
INR Lakh
1 2006 0.73 0.33 0.21 -0.12 0.06 -0.18 -86% Continue
2 2007 0.34 0.22 -0.12 0.06 -0.18 -84% Continue
3 2008 0.36 0.23 -0.13 0.06 -0.19 -83% Continue
4 2009 0.38 0.24 -0.14 0.06 -0.20 -82% Continue
5 2010 0.40 0.25 -0.14 0.06 -0.20 -80% Continue
6 2011 0.42 0.26 -0.15 0.06 -0.21 -79% Continue
7 2012 0.44 0.28 -0.16 0.06 -0.22 -78% Continue
8 2013 0.46 0.29 -0.17 0.06 -0.23 -77% Continue
9 2014 0.48 0.31 -0.17 0.06 -0.23 -76% Continue
10 2015 0.51 0.32 -0.18 0.06 -0.24 -75% Continue
11 2016 0.53 0.34 -0.19 0.06 -0.25 -75% Continue
12 2017 0.56 0.36 -0.20 0.06 -0.26 -74% Continue
13 2018 0.59 0.37 -0.21 0.06 -0.27 -73% Continue
14 2019 0.61 0.39 -0.22 0.06 -0.28 -72% Continue
15 2020 0.65 0.41 -0.23 0.06 -0.29 -71% Continue
S.No. Year Capital O & M New Pump O & M Existing Savings in energy Cost of Funds Net Savings % Savings from Decision
Cost of pump Cost Current
Pump
INR Lakh
1 2006 0.56 0.24 0.20 -0.05 0.06 -0.11 -54% Continue
2 2007 0.25 0.21 -0.05 0.06 -0.11 -53% Continue
3 2008 0.27 0.22 -0.05 0.06 -0.11 -52% Continue
4 2009 0.28 0.23 -0.05 0.06 -0.11 -50% Continue
5 2010 0.29 0.24 -0.06 0.06 -0.12 -49% Continue
6 2011 0.31 0.25 -0.06 0.06 -0.12 -48% Continue
7 2012 0.32 0.26 -0.06 0.06 -0.12 -47% Continue
8 2013 0.34 0.27 -0.07 0.06 -0.13 -46% Continue
9 2014 0.36 0.29 -0.07 0.06 -0.13 -45% Continue
10 2015 0.38 0.30 -0.07 0.06 -0.13 -44% Continue
11 2016 0.39 0.32 -0.08 0.06 -0.14 -43% Continue
12 2017 0.41 0.33 -0.08 0.06 -0.14 -42% Continue
13 2018 0.43 0.35 -0.08 0.06 -0.14 -41% Continue
14 2019 0.46 0.37 -0.09 0.06 -0.15 -40% Continue
15 2020 0.48 0.39 -0.09 0.06 -0.15 -39% Continue
S.No. Year Capital O & M New Pump O & M Existing Savings in energy Cost of Funds Net Savings % Savings from Decision
Cost of pump Cost Current
Pump
INR Lakh
1 2006 0.42 0.22 0.10 -0.12 0.06 -0.18 -193% Continue
2 2007 0.23 0.10 -0.13 0.06 -0.19 -190% Continue
3 2008 0.24 0.11 -0.14 0.06 -0.20 -187% Continue
4 2009 0.26 0.11 -0.14 0.06 -0.20 -184% Continue
5 2010 0.27 0.12 -0.15 0.06 -0.21 -182% Continue
6 2011 0.28 0.12 -0.16 0.06 -0.22 -179% Continue
7 2012 0.30 0.13 -0.17 0.06 -0.23 -177% Continue
8 2013 0.31 0.13 -0.18 0.06 -0.23 -175% Continue
9 2014 0.33 0.14 -0.18 0.06 -0.24 -173% Continue
10 2015 0.34 0.15 -0.19 0.06 -0.25 -171% Continue
11 2016 0.36 0.16 -0.20 0.06 -0.26 -169% Continue
12 2017 0.38 0.16 -0.21 0.06 -0.27 -167% Continue
13 2018 0.40 0.17 -0.22 0.06 -0.28 -165% Continue
14 2019 0.42 0.18 -0.24 0.06 -0.29 -164% Continue
15 2020 0.44 0.19 -0.25 0.06 -0.31 -162% Continue
S.No. Year Capital Cost No. of Lights Actual Normativ Net Transfer of Net Cash Transfer to
Energy Cost e Energy Savings Savings to ULB flow Operator
Cost
ASSUMPTIONS
Connections
Domestic Connections 79,611 81,601 84,865 88,346 97,520 107,098 117,095 119,437 121,825 124,262 126,747 129,281 131,893 134,569 137,313
Non Domestic Connections 2,586 2,651 2,757 2,870 3,168 3,479 3,804 3,880 3,957 4,036 4,117 4,199 4,284 4,371 4,460
Industrial Connections 172 176 183 191 211 231 253 258 263 268 274 279 285 291 297
Total Connections 82,369 84,428 87,805 91,406 100,899 110,809 121,151 123,574 126,046 128,566 131,138 133,760 136,462 139,231 142,070
Public Standposts 4,865 4,865 4,379 3,941 3,547 3,192 3,192 3,192 3,192 3,192 3,192 3,192 3,192 3,192 3,192
Domestic Unauthorized Connections - - - - - - -
Total Connections (Overall) 84,428 87,805 91,406 100,899 110,809 121,151 123,574 126,046 128,566 131,138 133,760 136,462 139,231 142,070
venkat:
- - source
Water Revenue Expenditure (INR Lakh) Augumentation
Staff and Establishment 50% 1.48 1.55 1.63 1.71 1.80 1.89 1.98 2.08 2.19 2.30 2.41 2.53 2.66 2.79 2.93
Electricity Charges 40% 2.24 2.46 2.70 2.98 3.27 3.60 3.96 4.36 4.79 5.27 5.80 6.38 7.02 7.72 8.49
Repairs and Maintenance 45% 95.92 105.51 116.06 127.67 140.43 154.48 169.93 186.92 205.61 226.17 248.79 273.67 301.03 331.14 364.25
Current Revenue Expenditure 99.64 109.52 120.40 132.36 145.51 159.97 175.87 193.36 212.59 233.74 257.00 282.58 310.71 341.65 375.67
O&M on New Investment - 126.90 269.03 427.75 604.56 801.04 883.06 972.05 1,068.53 1,173.10 1,286.36 1,363.54 1,445.36 1,532.08
Debt Servicing - - 89.89 185.17 286.16 393.22 506.70 741.91 767.41 794.44 823.09 853.47 909.98 909.98 909.98
Total Revenue Expenditure 99.64 109.52 337.19 586.55 859.42 1,157.75 1,483.61 1,818.33 1,952.05 2,096.71 2,253.19 2,422.41 2,584.23 2,696.98 2,817.73
Tariff
Net Cash Flow O&M (Year on Year) 105.93 352.63 185.12 (33.57) (254.39) (393.51) (631.35) (927.77) (915.46) (1,014.49) (1,136.86) (1,092.54) (1,193.62) (1,261.23) (1,147.67)
Cumulative O&M 105.93 458.56 643.69 610.12 355.73 (37.79) (669.14) (1,596.91) (2,512.37) (3,526.86) (4,663.73) (5,756.27) (6,949.89) (8,211.12) (9,358.79)
Indicators
Realization thru only tariff (O&M+Debt Servicing) 206% 422% 155% 94% 70% 66% 57% 49% 53% 52% 50% 55% 54% 53% 59%
Realization thru only tariff (excl.Debt Servicing) 206% 422% 211% 138% 106% 100% 87% 83% 88% 83% 78% 85% 83% 80% 88%
% Domestic Conn. To Residential Prop. 74% 74% 75% 76% 82% 88% 93% 93% 93% 93% 93% 93% 94% 94% 95%
% Connections to Properties 63% 64% 65% 70% 75% 80% 80% 80% 80% 80% 80% 80% 81% 81%
Net Cash Flow O&M (Year on Year) 1,302.56 1,575.22 1,850.31 2,415.51 2,500.99 2,535.31 2,954.51 3,018.18 3,046.26 3,546.76
Cumulative O&M 1,302.56 2,877.78 4,728.09 7,143.59 9,644.59 12,179.90 15,134.41 18,152.58 21,198.85 24,745.61
Closing Balance (110.85) 472.45 791.30 899.74 1,001.36 1,302.56 1,575.22 1,558.06 2,074.36 2,108.02 2,098.22 2,493.61 2,442.77 2,446.77 2,921.74
Indicators
Realization thru only tariff (O&M+Debt Servicing) 0% 488% 691% 574% 497% 505% 495% 301% 336% 311% 287% 305% 276% 266% 286%
Realization thru only tariff (excl.Debt Servicing) 0% 488% 691% 574% 497% 505% 495% 482% 548% 512% 471% 491% 471% 448% 476%
Connections
Domestic Connections 140,125
Non Domestic Connections 4,552
Industrial Connections 303
Total Connections 144,980
Public Standposts 3,192
Domestic Unauthorized Connections -
Total Connections (Overall) 144,980
Tariff
Net Cash Flow O&M (Year on Year) (1,205.86)
Cumulative O&M ###
Indicators
Realization thru only tariff (O&M+Debt Servicing) 59%
Realization thru only tariff (excl.Debt Servicing) 85%
% Domestic Conn. To Residential Prop. 95%
% Connections to Properties 82%
Year 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Multilevel Car Parking Rs. Lakhs
Near Central Market - Phase I 40.88 42.92 45.07 47.32 49.69 52.17 54.78 57.52 60.40 63.42 66.59 69.92 73.41
Near Central Market - Phase II 20.44 21.46 22.54 23.66 24.84 26.09 27.39 28.76 30.20
Avani Mula Street 11.68 12.26 12.88 13.52 14.20 14.91 15.65 16.43 17.26 18.12 19.03 19.98 20.98
Goripalayam 17.52 18.40 19.32 20.28 21.30 22.36 23.48 24.65 25.89 27.18 28.54 29.97 31.46
Tamil Sangam Road 14.60 15.33 16.10 16.90 17.75 18.63 19.57 20.54 21.57 22.65 23.78 24.97 26.22
North Velli street, Anna Nagar Main Rd 17.52 18.40 19.32 20.28 21.30 22.36 23.48 24.65 25.89 27.18 28.54 29.97 31.46
Total Inflow 61.32 64.39 67.61 70.99 74.53 78.26 82.17 86.28 90.60 95.13 99.88 104.88 110.12
Advertisement Fee
Markets/Busstands
Average Size of Hoardings 20.00 Sq.m
Average Rate/sq.m/half yearly 300.00 Rupees
Total no of Hoardings/Boards 50 Nos
Total Revenue from - Markets/Busstands 6.00 INR Lakh/annum
Year Variables 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Rs. Lakh
Out Flow
ULB Contribution 240.00
Truck Owners Association Contribution 240.00
Loan Repayment 219.81 219.81 219.81 219.81
Annual O&M 6.00 6.36 6.74 7.15 7.57 8.03 8.51 9.02 9.56 10.14 10.75 11.39
Periodic Maintenance 36.00 42.88 51.07
Total Out flow 480.00 225.81 226.17 226.55 262.95 7.57 8.03 51.39 9.02 9.56 61.20 10.75 11.39
Inflow
Parking Fee 146.00 146.00 146.00 146.00 189.80 189.80 189.80 189.80 246.74 246.74 246.74 246.74 320.76
Total - Inflow 146.00 146.00 146.00 146.00 189.80 189.80 189.80 189.80 246.74 246.74 246.74 246.74 320.76
Net Cash flow (334.00) (79.81) (80.17) (80.55) (73.15) 182.23 181.77 138.41 237.72 237.18 185.54 235.99 309.37
NPV @12% 116.47
IRR 15%
Year 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Rs. Lakh
Own vehicle maintenance Charges 177.00 187.62 198.88 210.81 223.46 236.87 251.08 266.14 282.11 299.04 316.98 336.00 356.16 377.53
Periodic Maintenance 110.63 110.63
Cost of Capital - interest 60.18 60.18 60.18 60.18 60.18 60.18 60.18 60.18 60.18 60.18 60.18 60.18 60.18 60.18
Driver+Cleaner Salary 141.60 150.10 159.10 168.65 178.77 189.49 200.86 212.91 225.69 239.23 253.58 268.80 284.93 302.02
378.78 397.90 418.16 439.64 573.03 486.54 512.12 539.24 567.98 709.07 630.74 664.98 701.27 739.73
Rental Charges 279.84 296.63 314.43 333.30 353.29 374.49 396.96 420.78 446.03 472.79 501.15 531.22 563.10 596.88
98.94 101.26 103.73 106.34 219.74 112.05 115.16 118.46 121.95 236.29 129.59 133.75 138.17 142.85
Net Savings in Maintenance 78.06 86.36 95.15 104.47 3.72 124.82 135.92 147.68 160.16 62.75 187.39 202.24 217.99 234.68
Salary savings due to Privatization 3.78 4.01 4.25 4.50 4.77 5.06 5.36 5.68 6.02 6.39 6.77 7.18 7.61
Savings - Vehicle Privatization 101.26 103.73 106.34 219.74 112.05 115.16 118.46 121.95 236.29 129.59 133.75 138.17 142.85
2020
77.09
31.71
22.02
33.04
27.53
33.04
115.63
2020
12.07
60.82
72.89
320.76
320.76
247.87
2020
400.18
60.18
320.14
780.50
632.70
147.81
252.37
8.06
147.81
Implementable Investment
Opening Balance
Sources of Fund
Project Capex
O&M
Debt Servicing
Net Cash Flow
Less: ULB Equity
Closing Balance
Surplus/Deficit with ULB
Debt / Revenue Surplus Ratio 2% 4% 17% 18% 19% 20% 20%
Operating Ratio 0.82 0.75 0.78 0.85 0.86 0.93 0.93
2012 2013 2014 2015 2016 2017 2018 2019 2020
as of March 31 (in INR Lakh)
Assumptions
Tariff Rs. / kl 0.002
O&M % 4
O&M Inc. pa % -
Rate (NPV) % 7 7 7 7 7
Rate (IRR) %
Results
NPV Rs. Lakh 13,752 10,280 3,745 14,026
Water ML 6,876
Sold Rs. / kl 0.000150 0.000054
FIRR
AIFC Rs. / kl 0.000204
2009 1,560
2010 1,560
2011 1,560
2012 1,560
2013 1,560
2014 1,560
2015 1,560
2016 1,560
2017 1,560
2018 1,560
2019 1,560
Assumptions
Tariff
O&M
O&M Inc. pa
Rate (NPV) 7
Rate (IRR) 10
Results
NPV (274)
Water
Sold (0.000004)
FIRR 7%
AIFC
AIFC
Year Non Incr. Incr. Total NTL TL Total Water Water Non Incr. Incr. NTL Total Capex Opex Opp. Cost Total
Prodc. Cons. of Water
Water Sold in ML UFW in ML ML ML Benefits in Rs. Lakh Resource Cost in Rs. Lakh
A Water Supply
2004 - - - - - - - - - - - - 12,100 - - 12,100
2005 80 120 200 29 57 86 286 229 400 360 109 869 - 447 46 492
2006 160 240 400 57 114 171 571 457 800 720 217 1,737 - 447 91 538
2007 240 360 600 86 171 257 857 686 1,200 1,080 326 2,606 - 447 137 584
2008 320 480 800 114 229 343 1,143 914 1,600 1,440 434 3,474 - 447 183 629
2009 400 600 1,000 143 286 429 1,429 1,143 2,000 1,800 543 4,343 - 447 229 675
2010 400 600 1,000 143 286 429 1,429 1,143 2,000 1,800 543 4,343 - 447 229 675
2011 400 600 1,000 143 286 429 1,429 1,143 2,000 1,800 543 4,343 - 447 229 675
2012 400 600 1,000 143 286 429 1,429 1,143 2,000 1,800 543 4,343 - 447 229 675
2013 400 600 1,000 143 286 429 1,429 1,143 2,000 1,800 543 4,343 - 447 229 675
2014 400 600 1,000 143 286 429 1,429 1,143 2,000 1,800 543 4,343 - 447 229 675 Vijay Padm
Determined
2015 400 600 1,000 143 286 429 1,429 1,143 2,000 1,800 543 4,343 - 447 229 675 WTP/Socioe
2016 400 600 1,000 143 286 429 1,429 1,143 2,000 1,800 543 4,343 - 447 229 675 Survey.
2017 400 600 1,000 143 286 429 1,429 1,143 2,000 1,800 543 4,343 - 447 229 675
2018 400 600 1,000 143 286 429 1,429 1,143 2,000 1,800 543 4,343 - 447 229 675
2019 400 600 1,000 143 286 429 1,429 1,143 2,000 1,800 543 4,343 - 447 229 675
Rate (IRR) %
Conv Factor 1.1 1.015
UFW % 10 20
Distribution % 60
Results
NPV Rs. Lakh 9,297 8,368 2,524 20,188 10,804 2,716 1,063 14,582
Sold ML 4,649 664 1,328 1,992 6,641 5,313
AIFC Rs. / kl 0.0038 0.0038
EIRR
AIEC 0.0027
2017 3,668
2018 3,668
2019 3,668
Rate (IRR) 10
Conv Factor
UFW
Distribution
Results
NPV 5,606
Sold
AIFC
EIRR 19%
AIEC
AIEC
Items % Water Source Storage Total Source Storage Total Traded Labour Equipment
Consumed
Actual- Rs. / kl Weighted Average- Rs. / kl Cost break down (%)
Conversion Factor 1.11 0.65 1
Existing Source
Municipal Supply 0% - - - - -
Alternative Source
Neighbour 10% 18,100 500 18,600 1,810 50 1,860 20% 40% 40%
Electric Well 10% 3,300 500 3,800 330 50 380 30% 60% 10%
Open Well 70% 3,200 500 3,700 2,240 350 2,590 10% 80% 10%
Vendor 10% 18,500 500 19,000 1,850 50 1,900 20% 50% 30%
Total/Average 100% 43,100 2,000 45,100 6,230 500 6,730 20% 49% 31%
Items % Water Source Storage Total Source Storage Total Traded Labour Equipment
Consumed
Actual- Rs. / kl Weighted Average- Rs. / kl Cost break down (%)
10,012 14,364 13,981
Items Economic
Supply
Rs. / kl
Conversion Factor
Existing Source
Municipal Supply
Alternative Source
Neighbour
Electric Well
Open Well
Vendor
Total/Average
1,860
380
2,590
1,900
6,730
1,641
313
1,893
1,609
5,724
18,600
3,800
3,700
19,000
45,100
16,405
3,127
2,705
16,093
Items Economic
Supply
Rs. / kl
38,358