Project: Tasiast Debottlenecking Project - Tailings THICKENER/4699-THK-201

This document summarizes daily inspection reports for surface preparation and coating of a tailings thickener for a mining project in Tasiast, Mauritania. Tests were performed for surface cleanliness, profile, dust contamination, soluble salts, and dry film thickness (DFT) of applied coatings. For the external surface, all tests conform to standards except soluble salts which exceeded the limit of 100 mg/m2. DFT measurements for both primary and top coats were within specifications. The report documents coating products, batch numbers, areas inspected, and test results, with an overall assessment that the applications conform to requirements.

Uploaded by

Rekhis Oussama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
146 views2 pages

Project: Tasiast Debottlenecking Project - Tailings THICKENER/4699-THK-201

This document summarizes daily inspection reports for surface preparation and coating of a tailings thickener for a mining project in Tasiast, Mauritania. Tests were performed for surface cleanliness, profile, dust contamination, soluble salts, and dry film thickness (DFT) of applied coatings. For the external surface, all tests conform to standards except soluble salts which exceeded the limit of 100 mg/m2. DFT measurements for both primary and top coats were within specifications. The report documents coating products, batch numbers, areas inspected, and test results, with an overall assessment that the applications conform to requirements.

Uploaded by

Rekhis Oussama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Ref.

:SPCIR001 Rev00

Surface Preparation and Coating daily Inspections SPCIR N° :001


report 15/07/2021
Page 1 / 2

Customer :
PROJECT : Tasiast debottlenecking project -tailings THICKENER/4699-
THK-201

External surface
Surface Hygrometric DFT Salt test Dust Holiday
Test preparation conditions measurement Contamination test
performed: test
x x X X X -
Equipment - -
Reference
RJ08500 743062 LC01444 COND01

Date 15/07/2021
Time 8H:00 15H:00
Hygrometric Air Temp.°C 30.2 35.7
conditions
check
RH % 59.1 47.6
Dew point °C 21.3 22.8
Surface Temp.°C 24.2 34.6

Tests Standards Requirements Results Decisions


Cleaning grade ISO 8501-1 Sa 2.5 OR SP10 Sa 2.5-SP10 Conform
preparation

64.5 µm
Surface

(Batch will be attached to the report)


check

Surface profile ISO 8503-5 40-70 µm Conform

Standard: ISO 8502-3 Spot n° /Tested area 1


contamination
check

Adhesive tape: 20mmX250mm Dust size class 1


Background: White paper Dust quantity rating 1
Decision
Dust

Requirements: 2 CONFORM

(Batch will be attached to the report)

Spot n° /Tested area 1 (internal surface)


Standard: ISO 8502-6 & 9
Soluble salts check

Adhesive patch: 52mmX52mm Air temperature (°C): 30


Water injected: 3ml Result (mg/m²) 220
Decision Not CONFORM

Requirements: < 100 mg/m²

NACE CIP N:82901 FLSMIDTH KINROSS


Ref.:SPCIR001 Rev00

Surface Preparation and Coating daily Inspections SPCIR N° :001


report 15/07/2021
Page 2 / 2

Customer :
PROJECT : Tasiast debottlenecking project -tailings THICKENER/4699-
THK-201

Type of application Number of


Coat n° Product Patche N°
manpower
CARBOZINC 11 ROLLER /BRUSH 1
201030006A
Part A
1st
CARBOZINC 11
10011000001750
part B
2nd CARBOGUARD 893 210105013A ROLLER /BRUSH 1
WHITE part A
CARBOGUARD 893 210224028A
Part B

DFT check for CARBOWELD 11 after 24H (16/07/2021)

Selected area n° 1 2 3 4 5 6
Standard: ISO 2808 Spot n° 1 (µm) 57.9 60.6 56.9 54.1 53 59
Calibration mode: ROUGH Spot n° 2 (µm) 56.5 60 53.5 57.4 58.1 56.7
DFT check

Spot n° 3 (µm) 58.9 57.9 57.8 53 59 59


80%min. spec. DFT: 48µm
Spot n° 4 (µm) 56.3 51.3 51.4 57.4 58.9 58.2
Spot n° 5 (µm) 58.9 55.8 61 48.2 52.7 49.4
Min. spec DFT:60 µm
Average (µm) 57.7 57.1 56.1 54 56.3 56.5
Result: CONFORM

DFT check for CARBOGUARD 893 after 24H (16/07/2021)

Selected area n° 1 2 3 4 5 6
Standard: ISO 2808 Spot n° 1 (µm) 189.3 187.6 191.2 175.3 191.7 199.7
Total DFT check

Calibration mode: ROUGH Spot n° 2 (µm) 188.2 194.6 170 194.9 177.3 185.2
Spot n° 3 (µm) 168.5 178.3 190.9 179.9 190.6 191.6
80%min. spec. DFT: 168m
Spot n° 4 (µm) 169.9 188.9 192.1 186.1 181.1 172
Spot n° 5 (µm) 171.7 198.4 190.7 178.6 175.3 196.2
Min. spec DFT: 210 µm
Average (µm) 177.5 189.6 187 183 183.2 188.9
Result: CONFORM

NACE CIP N:82901 FLSMIDTH KINROSS