Test report
1. Document Control
Company Name Multec Address 34 Chickasaw Crescent
Client Name Alex Ziarkowski Suburb Greenfield Park
E-mail
[email protected] State/Province NSW
Phone
[email protected] Postal Code 2176
ABN - Country/Region Australia
Report Number: MUL-13-1-REP-PT-1
Document prepared by: Frank Iapozzuto BEng (Mech) Date: 21/02/2013
Laboratory Manager
Document reviewed by: Terry Nguyen BEng (Mech) Date: 21/02/2013
Senior Test Engineer
Issue Date Release Number Description
21/02/2013 1 Initial use
2. General
Test Item: Pipe and fitting assembly
Standard tested to: Clients own method
Sample(s) selected by: Multec
Sample(s) delivered by: Multec
Mode of delivery: Courier
Date Received: 15/02/2013
Template: 2001-2 Commercial in confidence Page 1 of 4
PROVE Standards & Engineering Pty Ltd. MUL-13-1-REP-PT-1
3. General
PROVE Standards & Engineering Pty Ltd is a NATA endorsed plumbing laboratory. Multec
appointed PROVE to perform a hydrostatic pressure test on a pipe and fitting assembly. The
intent of the test was to determine if the fittings would leak under a given hydrostatic pressure.
4. Referenced documents
The following documents have been referenced for testing and reporting.
Standard Standard Name
- -
5. Specimens Description
Sample
Sample description
Code
Name: Multec
Markings on pipe: HOT/COLD MOP 1MPa at
PROVE
95°C/2MPa at 20°C MULTEC 002m
Sample ID:
Markings on fittings: W (Watermark symbol) AS 4176 DR
MULTEC1
WMKA22140 NF 16 2 CL1 14Bar
Size: DN16
Figure 5.1 Test Assembly provided by Multec
Figure 5.2 Joint assemblies
Template: 2001-2 Commercial in confidence Page 2 of 4
PROVE Standards & Engineering Pty Ltd. MUL-13-1-REP-PT-1
6. Performance requirements
Test Reference Standard: Burst pressure
Test Method Standard: Developed by Multec
Date of Test: 18/02/2013
Test Officer: Frank Iapozzuto
Conformity to burst
Sample ID Requirement Result
pressure test
Test pressure applied: 6000±100kPa
The test assembly is filled with water at
Test temperature: 23±3°C
ambient temperature and is gradually
MULTEC1 pressurized at to 6000kPa and Conforms
Observations:
maintained for 30min. The assembly is
The test assembly showed no signs
inspected for leakage or another failure.
of leakage or any other failure
Template: 2001-2 Commercial in confidence Page 3 of 4
PROVE Standards & Engineering Pty Ltd. MUL-13-1-REP-PT-1
Template: 2001-2 Commercial in confidence Page 4 of 4