304 Ope Som-Mcq-2019
304 Ope Som-Mcq-2019
24 In production planning function , It Involves fixing priorities for each job and C
determining the starting time & finishing time ,we are thinking about
………………….
(A) Routing
(B) Estimating
(C) Scheduling
(D) Loading
25 Which of the following is not one of the four types of variation that is A
estimated in time-series analysis?
(A) Predictable
(B) Trend
(C) Cyclical
(D) Irregular
26 In production planning function , when we say Decide the quantity of products B
to be produced & cost involved on the basis of sales forecast we are
thinking about ………………….
(E) Routing
(F) Estimating
(G) Scheduling
(H) Loading
27 Which of the following is not a qualitative forecasting technique? D
(A) Surveys of consumer expenditure plans
(B) Perspectives of foreign advisory councils
(C) Consumer intention polling
(D) Time-series analysis
28 Time-series analysis is based on the assumption that C
(A) Random error terms are normally distributed.
(B) There are dependable correlations between the variable to be forecast
and other independent variables.
(C) Past patterns in the variable to be forecast will continue unchanged into
the future.
(D) The data do not exhibit a trend.
29 Which of the below is not in the procedure of routing? B
(A) Product Analysis
(B) Waste Material
(C) Manufacturing operation
(D) Production cost
30 _________ plan and manage the project on a day-to-day basis for this stage B
_________ define the coordination, control activities and identify the suitable
personnel to carry them out.
(A) Project coordinators, stage teams
(B) Stage managers, project coordinators
(C) Stage teams, key stakeholders
(D) Stage managers, key stakeholders
31 Which of the following quality control tools helps in pin-pointing the exact D
points at which errors have crept in?
(A) Histogram
(B) Flow chart
(C) Scatter diagram
(D) Control charts
32 Which of the following is the creation of database, by developers in association B
with the business analyst, to generate diagrams and documentation?
(A) Logical model
(B) Physical model
(C) Data model
(D) Process model
33 _________________ involves understanding the scope and various A
processes in a project cycle.
(A) Project management
(B) Total quality management
(C) Process management
(D) Program management
34 Analyzes historical data to reveal relationships between (easily or in advance) B
observable quantities and forecast quantities. Uses this relationship to make
predictions.
(A) Judgmental
(B) Associative models
(C) Time series
(D) Line regression
35 Which of the below is not a time series model? D
(A) Simple moving average
(B) Trend adjusted ES
(C) ARIMA
(D) Delphi
36 Time series method & Use historical data as the basis of estimating future A
outcomes is used in …………………..
(A) Extrapolation
(B) Correlation
(C) Combination of both
(D) None of all
37 Relates system loads to various demographic and economic factors and C
Knowledge about the interrelationship between nature of load growth and
other measurable factors is done in which type of forecasting method?
(A) Extrapolation
(B) Technical
(C) Correlation
(D) Combination of both
38 What is not important for production planning and control? C
(A) Increasing production
(B) Co-coordinating Plant Activity
(C) Cost uncontrolled
(D) Rationalization of Production Activities
39 The outcomes of the logical model and physical model are called C
the_____________ and______________
(A) Control flow diagrams, business process diagrams
(B) Business process diagrams, data flow diagrams
(C) Entity relationship diagrams, business process diagrams
(D) Entity relationship diagrams, control flow diagrams
40 A …………. is a document providing information and instructions for B
converting the raw material in finished part or product.
(A) Rough Sheet
(B) Route Sheet
(C) Spread Sheet
(D) Master Sheet
41 A …………..is an instrument to measure changes. This method is based on the B
notion that “the future can be predicted from certain happenings in the
present.”
(A) Regression analysis
(B) Barometer
(C) Econometric Module
(D) Trend projection method
42 ……………is considered to be the foundation for planning & controlling the B
production activities. On • the basis of earlier production programmes in
terms of sales, delivery date, etc., a master schedule is prepared. On this
basis, the feasibility of a new production programme is evaluated.
(A) Plant Layout
(B) Master scheduling
(C) Simple Scheduling
(D) Plant
43 …………….is concerned with the execution of the planning functions. It gives C
necessary authority to start a particular work which has already planned
under routing and scheduling functions.
(A) Packaging
(B) Manufacturing
(C) Dispatching
(D) Producing
44 The ………. are those which take place after some time lag with respect to the B
business cycle. Examples of lagging series are, labour cost per unit of the
manufacturing output, loans outstanding, leading rate of short term loans, etc.
(A) The leading series
(B) Lagging series
(C) Barometric technique
(D) Coincident or concurrent series
45 Routing process does not include. B
(A) Deciding what part to be purchase
(B) Determining plant requirement
(C) Determining manufacturing & operation sequence
(D) Determining a lot size
46 “Whether the products manufactured are of requisite quality or not is it carried B