Summary List Wps Steel Structure For Peciko 8A Project
Summary List Wps Steel Structure For Peciko 8A Project
CODE & SPECIFICATION : AWS D1.1, 2015 & MHK COMP SPE EP STR 201 & 301
WPS No:
15-WPS-M/ARG/AWS/111/G1-G2/19 S355 KT0
2G,3G,4G ALL
PQR No: to E7016-1 T-Joint E7016-1 T-Joint
1 Main SMAW S TBC TBC TBC - 20 F4 & SMAW YS ≤ 355 MPa S TBC TBC TBC 24 Over 10 30 F4 &
15-PQR-2G-M/ARG/AWS/111/G2/19 S355 KT0 E7018-G Single Bevel E7018-G Single Bevel
UP-HILL UP-HILL
15-PQR-3G-M/ARG/AWS/111/G2/19 (Plate)
15-PQR-4G-M/ARG/AWS/111/G2/19 EXTENSION DECK
1 WPS di supporting
LIFTING PADEYES, SPREADER BAR ID-PCK-SWPG-1080-590041 1-5 OF 5
dengan 3 PQR
WPS No: PLAN, SECTION AND DETAIL
16-WPS-RT/ARG/AWS/111/G1-G2/19 S355 KT0
Through 2G,3G,4G ALL
PQR No: to E7016-1 T-Joint E7016-1 T-Joint
2 Thickness SMAW S TBC TBC TBC - 20 F4 & SMAW YS ≤ 355 MPa S TBC TBC TBC 24 Over 10 30 F4 &
16-PQR-2G-RT/ARG/AWS/111/G2/19 S355 KT0 E7018-G Single Bevel E7018-G Single Bevel
Repair UP-HILL UP-HILL
16-PQR-3G-RT/ARG/AWS/111/G2/19 (Plate)
16-PQR-4G-RT/ARG/AWS/111/G2/19
WPS No:
17-WPS-M/ARG/AWS/111/G1-G2/19 S355 KT0
2G,3G,4G ALL
PQR No: to E7016-1 Single V E7016-1
3 Main SMAW S TBC TBC TBC - 20 F4 & SMAW YS ≤ 355 MPa S TBC TBC TBC 24 Over 10 30 F4 Single V Groove &
17-PQR-2G-M/ARG/AWS/111/G2/19 S355 KT0 E7018-G Groove E7018-G
UP-HILL UP-HILL
17-PQR-3G-M/ARG/AWS/111/G2/19 (Plate)
17-PQR-4G-M/ARG/AWS/111/G2/19
EXTENSION DECK 1 WPS di supporting
ID-PCK-SWPG-1080-590040 1 OF 6
CONNECTION SECTIONS AND DETAILS dengan 3 PQR
WPS No:
18-WPS-RT/ARG/AWS/111/G1-G2/19 S355 KT0
Through 2G,3G,4G ALL
PQR No: to E7016-1 Single V E7016-1
4 Thickness SMAW S TBC TBC TBC - 20 F4 & SMAW YS ≤ 355 MPa S TBC TBC TBC 24 Over 10 30 F4 Single V Groove &
18-PQR-2G-RT/ARG/AWS/111/G2/19 S355 KT0 E7018-G Groove E7018-G
Repair UP-HILL UP-HILL
18-PQR-3G-RT/ARG/AWS/111/G2/19 (Plate)
18-PQR-4G-RT/ARG/AWS/111/G2/19
WPS No:
19-WPS-M/ARG/AWS/111/G1-G2/19 S355 KT0
2G,3G,4G ALL
PQR No: to E7016-1 Butt Joint E7016-1 Butt Joint
5 Main SMAW S TBC TBC TBC - 20 F4 & SMAW YS ≤ 355 MPa S TBC TBC TBC 24 Over 10 30 F4 &
19-PQR-2G-M/ARG/AWS/111/G2/19 S355 KT0 E7018-G Single Bevel E7018-G Single Bevel
UP-HILL UP-HILL
19-PQR-3G-M/ARG/AWS/111/G2/19 (Plate)
19-PQR-4G-M/ARG/AWS/111/G2/19 EXTENSION DECK ID-PCK-SWPG-1080-590040 1-6 OF 6
CONNECTION SECTIONS AND DETAILS
1 WPS di supporting
EXTENSION DECK dengan 3 PQR
LIFTING PADEYES, SPREADER BAR ID-PCK-SWPG-1080-590041 1-5 OF 5
WPS No: PLAN, SECTION AND DETAIL
20-WPS-RT/ARG/AWS/111/G1-G2/19 S355 KT0
Through 2G,3G,4G ALL
PQR No: to E7016-1 Butt Joint E7016-1 Butt Joint
6 Thickness SMAW S TBC TBC TBC - 20 F4 & SMAW YS ≤ 355 MPa S TBC TBC TBC 24 Over 10 30 F4 &
20-PQR-2G-RT/ARG/AWS/111/G2/19 S355 KT0 E7018-G Single Bevel E7018-G Single Bevel
Repair UP-HILL UP-HILL
20-PQR-3G-RT/ARG/AWS/111/G2/19 (Plate)
20-PQR-4G-RT/ARG/AWS/111/G2/19
WPS No:
S355 KT0 Fillet Fillet
21-WPS-M/ARG/AWS/111/G1-G2/19 ALL
to Single Single
7 PQR No: Main SMAW S TBC TBC TBC - 20 E7018-G F4 5F SMAW YS ≤ 355 MPa S TBC TBC TBC - - 10 30 E7018-G F4 &
S355 KT0 & &
21-PQR-SP-M/ARG/AWS/111/G2/19 UP-HILL EXTENSION DECK ID-PCK-SWPG-1080-590040 1-6 OF 6
(Plate) Multiple Pass Multiple Pass
21-PQR-MP-M/ARG/AWS/111/G2/19 CONNECTION SECTIONS AND DETAILS
1 WPS di supporting
EXTENSION DECK dengan 2 PQR
WPS No: LIFTING PADEYES, SPREADER BAR ID-PCK-SWPG-1080-590041 1-5 OF 5
S355 KT0 Fillet Fillet PLAN, SECTION AND DETAIL
22-WPS-PR/ARG/AWS/111/G1-G2/19 Partial ALL
to Single Single
8 PQR No: Thickness SMAW S TBC TBC TBC - 20 E7018-G F4 5F SMAW YS ≤ 355 MPa S TBC TBC TBC - - 10 30 E7018-G F4 &
S355 KT0 & &
22-PQR-SP-PR/ARG/AWS/111/G2/19 Repair UP-HILL
(Plate) Multiple Pass Multiple Pass
22-PQR-MP-PR/ARG/AWS/111/G2/19
ISOMETRIC LINE No : FOAM CONCENTRATE TANK AND MANIFOLD ATAREA T-980, LINE No.4"-FW-B05-8276 & 8282
CONTRACTOR : PT. ASTA REKAYASA UNGGUL
DRAWING No. : ID-SNP-TLA-1055-551071 FOLIO 2 Rev-1.0
MATERIAL TOBE WELDED INSPECTION NDT PERCENT % SUPPORTING PQR RANGE QUALIFIED
Pipe
SA-333 Gr.6
ID-SNP-TLA-1055-551071 SCH 160 AR-01, 02, Tenaris Groove : ATM A333 Gr.6
(8.74mm x P1 G1 Ø8" x 5.5 mm Root, Hot P1 G1 To P1 G1
03, 04, 05, WPS No. 1.5 to 11 mm API 5L X65
A234 WPB P1 G1 3" x 2" 11,13mm) To Fill & Cap
06, 07, 08, 01/ASME/WPS-M/ARUNG/2016 To 6G (Impact not A106 Gr.B GTAW All
FOLIO 2 TO To To TO F SW-14, 18, 25, 29, 33 100% - N/A N/A N/A P1 G1 To ER 70S-6 6 P1 G1 To P1 G2
09, 10, 11, Up-hill required) A234 WPB Max 12 mm Position
A105 P1 G2 2" SCH 80 To ESAB OK Tigrod
12, 13, 14, 02/ASME/WPS-R/ARUNG/2016 Pipe Fillet : A105
(5.54mm) P1 G2 Ø8" x 5.5mm 12.64 P1 G2 To P1 G2
16, 17 API 5L X65 All A350 LF2
Rev-1.0 150#RF Tenaris
REV. 02
STANDARD / CODE & GENERAL SPECIFICATION INSPECTION NOTE SCOPE Of INSPECTION : H / W SCOPE Of INSPECTION : H / W / R / I / M SCOPE Of INSPECTION : H / W / R / I / M
Sign : Date : Sign : Date : Sign : Date :
Piping Class /
ASME B313. 2014 GS-EP-PVV-171 Rev.11 150# NDE COMPANY PT. KID
Rating
- - - - - - PT. ASTA REKAYASA UNGGUL TOTAL E&P INDONESIE TOTAL E&P INDONESIE