WRD Demand No - 67 - Details of Works For Irrigation
WRD Demand No - 67 - Details of Works For Irrigation
67
BUDGET PUBLICATION
Details of Works * for Public Works - 40 Irrigation
ABSTRACT
(RS. IN THOUSANDS)
Sl. No. Head of account Page No. RE 2020-21 IBE 2021-22 RBE 2021-22
* For object heads 416 Major Works, 464 Lands and 499 Miscellaneous
1
ABSTRACT ( 4215 CAPITAL OUTLAY ON WATER SUPPLY AND SANITATION)
Rs. in Thousands
Interim Revised
Expenditure Revised
S. Estimate Budget Budget
Head of account upto Estimate
No Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
2
Demand No.40 Wate Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4215 CAPITAL OUTLAY ON WATER SUPPLY AND
SANITATION
01 Water supply
51 Lands (Charged)
3
Demand No.40 Wate Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4215 CAPITAL OUTLAY ON WATER SUPPLY AND
SANITATION
01 Water Supply
01 Major Works
4
Demand No.40 Wate Resources Department
40-01 Public Works - Irrigation
01 Water Supply
01 Major Works
464 Lands
51 Lands (Charged)
5
ABSTRACT (4700 Capital outlay on Major Irrigation)
(Rs. in thousands)
Interim Revised
Expenditure Revised
Sl. Estimate Budget Budget
Head of account upto Estimate
No. Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
1 4700-01-789 UA Weir under NADP - RKVY 60700 38837 5544 0 15300
2 4700-01-789 UB Weir under NADP - RKVY 10200 0 0 0 10200
3 4700-01-796 UA Weir under NADP - RKVY 4130 2160 361 0 1530
4 4700-01-796 UB Weir under NADP - RKVY 1020 0 0 0 1020
5 4700-01-800 AA Reservoirs 1757009 1114182 464448 162548 162548
6 4700-01-800 AB Reservoirs-NABARD 1234016 80254 85200 310003 310003
7 4700-01-800 BA Dam & Appurtenant works 197554 49609 137943 10000 10000
8 4700-01-800 BB Dam & Appurtenant works-NABARD 3876000 1199278 2000000 1036563 742372
9 4700-01-800 CA Canals 71790092 6089731 21368573 14893360 9950382
10 4700-01-800 CB Canals-NABARD 794835 86172 20700 387436 387436
11 4700-01-800 DA Weir 91244 15018 76215 160000 59813
12 4700-01-800 DB Weir-NABARD 2004906 301914 334212 1153367 1153367
13 4700-01-800 EA Water Course 387749 2340 325500 59920 59920
14 4700-01-800 EB Water Course-NABARD 251676 5069 158985 87576 87576
15 4700-01-800 FA Barrage 4726497 1403257 2428151 1101092 895015
16 4700-01-800 FB Barrage-NABARD 146214 142263 3950 1 1
17 4700-01-800 GA Buildings 3223 2090 1133 570 1
18 4700-01-800 PA Reservoir under TNIAM Project-II 7168816 2209693 3286998 3171066 3171066
19 4700-01-800 PB Dam & Appurtenant works 882231 1512264 12000 400000 205000
20 4700-01-800 PC Canals 36108030 7147812 3669841 3241329 3241329
21 4700-01-800 UA Weir under NADP - RKVY 205620 165536 2713 0 34170
22 4700-01-800 UB Weir under NADP - RKVY 22780 0 0 0 22780
23 4700-02-800 AA Reservoirs 48551 5701 42850 1 1
24 4700-02-800 BA Dam & Appurtenant works 163700 118949 44750 1 1
25 4700-02-800 CA Canals 886759 36 847518 100002 4966
26 4700-02-800 CB Canals-NABARD 2786331 64594 34106 388018 388018
27 4700-02-800 DA Weir 24063 0 0 9063 9063
28 4700-02-800 DB Weir-NABARD 900350 124303 132814 642165 624107
29 4700-02-800 EA Water Course 159125 133869 9563 15562 15562
30 4700-02-800 EB Water Course-NABARD 0 0 0 300000 0
31 4700-02-800 FB Barrage-NABARD 94541 0 24156 70385 54873
32 4700-02-800 PA Reservoir under TNIAM Project-II 1157374 41691 635792 239985 239985
33 4700-02-800 PB Dam & Appurtenant works 1298777 332855 452169 550000 550000
34 4700-03-800 AA Reservoirs 306996 141897 11028 500002 471
35 4700-03-800 AB Reservoirs - NABARD 623645 0 200000 433794 433794
36 4700-03-800 BB Dam and Appurtenant works -NABARD assistance
378936 336942 11098 27840 27840
37 4700-03-800 CA Canals 20000 9409 10000 591 591
38 4700-03-800 CB Canals-NABARD 0 0 997500 1000000 0
39 4700-03-800 DA Weir 20000 0 0 20000 20000
40 4700-03-800 DB Weir-NABARD 638405 71720 303407 300000 208384
41 4700-03-800 EA Water Course 1642132 0 149000 1493132 1493132
42 4700-03-800 EB Water Course-NABARD 90954 0 0 224234 78234
43 4700-03-800 FB Barrage-NABARD 132442 0 0 200000 132442
44 4700-03-800 PA Reservoir under TNIAM Project-II 1283480 511305 235815 797756 797756
45 4700-03-800 PB Dam & Appurtenant works 103375 93101 2 10000 1
46 4700-04-800 AA Reservoirs 748544 688794 6404 36858 36858
47 4700-04-800 DA Weir 10000 0 10000 0 77613
48 4700-04-800 DB Weir-NABARD 138180 0 36151 90694 90694
49 4700-04-800 EB Water Course-NABARD 1400100 1319940 79974 2 2
50 4700-04-800 FB Barrage-NABARD 265677 0 75717 189954 189954
51 4700-04-800 PA Reservoir under TNIAM Project-II 915600 67866 44509 11495 11495
52 4700-04-800 PB Dam & Appurtenant works 952281 927962 10696 30000 1
53 4700-05-800 AA Reservoirs 565301 355235 6333 100000 100000
54 4700-05-800 AB Reservoirs - NABARD 188185 0 53633 134552 134552
55 4700-05-800 BA Dam & Appurtenant works 133554 11275 53711 68568 68568
56 4700-05-800 CA Canals 1053600 908882 7005392 13000005 500003
57 4700-05-800 CB Canals-NABARD 1484422 459862 5289 200000 150000
58 4700-05-800 DA Weir 195160 0 102499 313350 84998
59 4700-05-800 DB Weir-NABARD 1098187 142006 511317 413088 413088
60 4700-05-800 EA Water Course 119437 43289 75343 110000 58455
61 4700-05-800 GA Buildings 5000 394 500 1500 1500
62 4700-05-800 PA Reservoir under TNIAM Project-II 2001695 846147 722927 607113 607113
63 4700-05-800 PB Dam & Appurtenant works 147700 135868 0 20000 1
Total 155907101 29461371 47324430 48824541 28124945
6
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 789 UA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
789 Special Component Plan for Scheduled Castes
State's Expenditure
UA Weir under NADP - RKVY
416 Major works
01 Major works
(DPC 4700 01 789 UA 41601)
7
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 789 UB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
789 Special Component Plan for Scheduled Castes
State's Expenditure
UB Weir under NADP - RKVY - State Share
416 Major works
01 Major works
(DPC 4700 01 789 UB 41601)
8
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 796 UA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
796 Tribal Area Sub-Plan
State's Expenditure
UA Weir under NADP - RKVY
416 Major works
01 Major works
(DPC 4700 01 800 UA 41601)
9
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 796 UB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
796 Tribal Area Sub-Plan
State's Expenditure
UB Weir under NADP - RKVY - State Share
416 Major works
01 Major works
(DPC 4700 01 800 UB 41601)
10
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 AA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
AA Reservoirs
464 Lands
51 Lands (Charged) 0 0 0 0 0
(DPC 4700 01 800 AA 46451)
416 Major Works
01 Major Works
(DPC 4700 01 800 AA 41601)
Sarabanga Basin Division, salem
Formation of a new tank across 262970 422 100000 162548 162548
Ponni odai at Gangavalli Taluk
Salem District
G.O.(MS) No.204/PW(N1) Dept,
dated.21.11.19.
AS / TS / RAS : 262970
11
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 AB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
AB Reservoirs - NABARD Assistance
416 Major works
01 Major works
(DPC 4700 01 800 AB 41601)
Sarabanga Basin Division, Salem
Rehabilitation and improvement to 7 tanks 96522 50521 46000 1 1
and Construction of 7 artificial recharge well
structure in Omalur Taluk, Salem District with
NABARD Loan
G.O.(2D).No.43, PW (W1) Dept. Dt.24.08.2018
AS / TS / RAS : 96522
12
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 BA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
BA Dam and Appurtenant Works
416 Major works
01 Major works
(DPC 4700 01 800 BA 41601)
13
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 BB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
14
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 CA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
CA Canals
416 Major works
01 Major works
(DPC 4700 01 800 CA 41601)
15
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 CA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
CA Canals
416 Major works
01 Major works
(DPC 4700 01 800 CA 41601)
Coleroon Basin Division, Chidambaram
Desilting of Channels and Drains in Cauvery Delta
20000 0 20000 0 0
Region in Cuddalore District.
G.O.(Ms.).No.142, PW (W2) Dept, dt.26.05.2020
AS / TS / RAS : 20000
AS / TS / RAS : 2544500
16
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 CA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
CA Canals
416 Major works
01 Major works
(DPC 4700 01 800 CA 41601)
Sarabanga Basin Division, Salem.
Diversion of surplus water from Kattaru in Kariakoil 73000 282 50000 22718 63914
Reservoir
G.O.(4D).No.13, PW (N1) Dept, dt.05.11.2019
AS / TS / RAS :73000
Package I
Extention, Renovation and Modernisation of Noyyal
River System LS 0 to 34 Km
Bhavanisagar Dam Division, Bhavanisagar 885850 9495 729550 146805 146805
Package II
Extention, Renovation and Modernisation of Noyyal
River System LS 34 Km to 72 Km
Bhavanisagar Dam Division, Bhavanisagar 862900 716 719600 142584 142584
R.C.Division, Trichy
Extention, Renovation and Modernisation of Kattalai 3352500 34590 1000000 1501400 1501400
High Level Canal Irrigation System in Cauvery Basin
CE / Plan Formulation 2500 0 1100 0 0
Total 3352500 34590 1001100 1501400 1501400
G.O.(Ms).No.207, PW (W1) Dept, dt.22.11.2019
AS / TS / RAS : 3355000
17
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 CA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
CA Canals
416 Major works
01 Major works
(DPC 4700 01 800 CA 41601)
Sarabanga Basin Division, Salem
Extention, Renovation and Modernisation of 1837500 376 499000 1000000 1000000
Rajavaikkal Irrigation System in Cauvery Basin
CE / Plan Formulation 2500 0 1000 0 0
1840000 376 500000 1000000 1000000
G.O.(Ms).No.208, PW (W1) Dept, dt.22.11.2019
AS / TS / RAS : 1840000
CE / Chennai Region
Desiliting works to remove Shoals and desiliting of 22000 0 0 0 22000
Cauvery Delta at Chennai Region for 58 Nos. of
desilting works
G.O.(2D) No.57, PW (W2) Dept, dt.17.05.2021
AS / TS / RAS : 22000
18
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 CA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
CA Canals
416 Major works
01 Major works
(DPC 4700 01 800 CA 41601)
CE / Trichy Region
Formation of Flood canal from Cauvery (Kattalai) to
South Vellar as the Phase I of Cauvery - Vellar-
Manimuthar- Vaigai-Gundar flood diversion canal
scheme
464 Lands
01 Lands (Voted)
Upper Pennaiyar Basin Division, Dharmapuri
Diversion of Surplus Water from Chinnar River - 72047 31027 41020 1 1
Land acquisition in Dharmapuri District for Diversion
of Surplus water of Chinnar river by excavation of a
New supply canal from L.S. 5.00 Km. of the existing
Jerthalav Canal to feed Erranahalli Tank, Pulikarai
Tank and 12 other tanks in Palacode Taluk of
Dharmapuri Dt.
G.O.Ms.No.12, PW (S2) Dept. dt.01.02.2019
AS / TS / RAS :72047
464 Lands
51 Lands (Charged)
Land Acquitision Enhanced Compensation towards 2542 0 2542 0 0
Chinnavedampatti tank Project land acquired from
Survey No.167/2 and 175/1A2 extent 0.88.0 Hectare
compensation sanctioned
G.O.Ms.No.236, PW (Q1) Dept. dt.28.09.2020
AS / TS / RAS : 2542
499 Miscellaneous
01 Miscellaneous
Nadanthalvazhi Cauvery 150000 150000 150000
19
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 CB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
CB Canals
416 Major works
01 Major works
(DPC 4700 01 800 CB 41601)
20
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 DA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
DA Weir
416 Major works
01 Major works
(DPC 4700 01 800 DA 41601)
21
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 DA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
DA Weir
416 Major works
01 Major works
(DPC 4700 01 800 DA 41601)
Sarabanga Basin Division, Salem
Construction of checkdam across 4732 0 0 0 4732
Karumanthankinaru odai near Aduvapatti of
Pakkanadu Edapadi Taluk, Salem District
GO(4D)No.14/PW(N1)Dept/dt.01.02.2021
AS / TS / RAS : 4732
22
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 DB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
DB Weir -NABARD assistance
416 Major works
01 Major works
(DPC 4700 01 800 DB 41601)
23
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 DB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
DB Weir -NABARD assistance
416 Major works
01 Major works
(DPC 4700 01 800 DB 41601)
CE / Coimbatore Region
Construction of Cascade of Check Dams from 797941 0 0 717941 717941
Bhavanisagar Dam to Kalingarayan Anicut of Erode
District.
G.O.(4D) No. 87, PW (S1) Dept. dt.15-12-2020
AS / TS / RAS : 797941
CE / Trichy Region
Construction of Tail End Regulator across Manjalar 78900 0 0 23670 23670
River @ LS 146.500 Km. in Kalamanallur village of
Tharangampadi Taluk in Nagapattinam District
G.O.(Ms) No. 10, PW (W1) Dept. dt.12-01-2021
AS / TS / RAS : 78900
24
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 DB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
DB Weir -NABARD assistance
416 Major works
01 Major works
(DPC 4700 01 800 DB 41601)
Ariyar Basin Division, Trichy
Construction of check dam across the 19793 0 0 0 19793
Thekkamalaiyar River at North Ammapatti of
Kumaravadi village of Manapparai Taluk in Trichy
District.
G.O. (4D) No. 42 Pw(N1)Dept/Dt 23.02.2021
AS / TS / RAS : 19793
25
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 EA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
26
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 EA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
27
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 EA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
28
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 EA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
29
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 EA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
30
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 EB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
EB Water Courses-NABARD assistance
416 Major works
01 Major works
(DPC 4700 01 800 EB 41601)
31
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 FA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
FA Barrage
416 Major works
01 Major works
(DPC 4700 01 800 FA 41601)
Construction of Barrage with head sluices across
river Coleroon in Adhanur-Kumaramangalam village
in Cuddalore and Nagapattinam District
Special Project Division, Kumbakonam 4632500 1401981 2427927 801092 801092
CE/DRCS 1276 224 0 0
Total 4632500 1403257 2428151 801092 801092
G.O.Ms.No.13, PW (Q2) Dept. dt.06.02.2020
AS / TS / RAS : 4632500
32
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 FB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
FB Barrage-NABARD assistance
416 Major works
01 Major works
(DPC 4700 01 800 FB 41601)
33
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 GA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
GA Buildings
416 Major works
01 Major works
(DPC 4700 01 800 GA 41601)
34
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 PA (Rs. in thousands)
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin Commercial
800 Other Expenditure
Externally Aided Projects
PA Reservoir under TNIAM Project-II
416 Major works
01 Major works
(DPC 4700 01 800 PA 416 01)
G.O 140 dt 21.06.2017
35
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
36
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
37
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 PC (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
Externally Aided Projects
PC Canals
416 Major works
01 Major works
(DPC 4700 01 800 PC 41601)
38
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 PC (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
Externally Aided Projects
PC Canals
416 Major works
01 Major works
(DPC 4700 01 800 PC 41601)
Grant Anicut Canal Division, Thanjavur
Updation of DPR for Extension, Renovaton and 1800 0 1800 0 0
Modernisation (ERM) Project of Grant Anicut
Canaly System by M/s. WAPCOS Ltd.
G.O.(Ms) No.159, PW (WR1) Dept. dt.30.06.2020
AS / TS / RAS :1800
39
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 UA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
UA Weir under NADP - RKVY
416 Major works
01 Major works
(DPC 4700 01 800 UA 41601)
40
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 01 800 UB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
01 Cauvery Basin - Commercial
800 Other Expenditure
State's Expenditure
UB Weir under NADP - RKVY - State Share
416 Major works
01 Major works
(DPC 4700 01 800 UB 41601)
41
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 02 800 AA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
02 Pennaiyar Basin - Commercial
800 Other Expenditure
State's Expenditure
AA Reservoirs
416 Major Works
01 Major Works
(DPC 4700 02 800 AA 41601)
CE/ Chennai Region
Upper Palar Basin Division, Vellore
Landscaping arrangements and other works in 46746 5701 41045 1 1
Andiyappanur Odai Reservoir Project System
G.O.(3D) No.54, PW (T1) Dept. dt.13.11.2018
AS / TS / RAS :467446
464 Lands
51 Lands (Charged)
Upper Palar Basin Division, Vellore
Land acquisition Enhanced compensation under 1077 0 1077 0 0
Andiappanur Odai Reservoir Scheme
G.O.(3D) No.66, PW (T1) Dept. dt.25.09.2020
AS / TS / RAS : 1077
42
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 02 800 BA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
02 Pennaiyar Basin - Commercial
800 Other Expenditure
State's Expenditure
BA Dam and Appurtenant Works
416 Major Works
01 Major Works
(DPC 4700 02 800 BA 41601)
Supplying and Erecting the spillway radial gates at 163700 118949 44750 1 1
Shenbagathope Reservoir
G.O.(3D) No.43, PW (T2) Dept. dt.15.10.2019
AS / TS / RAS : 163700
43
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 02 800 CA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
State's Expenditure
CA Canals
416 Major Works
01 Major Works
44
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 02 800 CA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
State's Expenditure
CA Canals
464 Lands
01 Lands (Voted)
(DPC 4700 02 800 CA 46401)
45
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 02 800 CB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
02 Pennaiyar Basin - Commercial
800 Other Expenditure
State's Expenditure
CB Canals- NABARD assistance
416 Major Works
01 Major Works
(DPC 4700 02 800 CB 41601)
CE / Chennai Region
Diversion of flood water of the Pennaiyar river by 2333470 0 0 225000 225000
excavation of a New Canal from the right side and
left side of lthe existing Ennekol Anicut ot the
drought prone sub basin areas in Krishnagiri and
Dharmapuri District.
G.O.(MS).No.30, PW (S2) Dept. dt.28.01.2021
AS / TS / RAS : 2333470
CE / Chennai Region
Improvements to the Nandhan Channel from 265739 0 0 75000 75000
L.S.12.400 km to L.S.37.880 km in Gingee,
Vikkaravandi and Villupuram Taluks of Villupuram
District.
G.O(Ms) / No.334 PW(T1) / Dept, dt.29.12.2020.
AS / TS / RAS : 265739
Announement / New Schemes 0 0
46
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 02 800 DA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
02 Pennaiyar Basin - Commercial
800 Other Expenditure
State's Expenditure
DA Weir
416 Major Works
01 Major Works
(DPC 4700 02 800 DA 41601)
CE/Chennai Region
Construction of an Artificial Recharging Structure 24063 0 0 9063 9063
across the thondiyar river in Melchithamur Village
near Vilukkam in Gingee Taluk of Villupuram District.
47
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 02 800 DB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
02 Pennaiyar Basin - Commercial
800 Other Expenditure
State's Expenditure
DB Weir-NABARD assistance
416 Major Works
01 Major Works
(DPC 4700 02 800 DB 41601)
48
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 02 800 EA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
02 Pennaiyar Basin - Commercial
800 Other Expenditure
State's Expenditure
EA Water Courses
416 Major Works
01 Major Works
(DPC 4700 02 800 EA 41601)
49
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 02 800 EB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
02 Pennaiyar Basin - Commercial
800 Other Expenditure
State's Expenditure
EB Water Course- NABARD assistance
416 Major Works
01 Major Works
(DPC 4700 02 800 EB 41601)
50
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 02 800 FB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
02 Pennaiyar Basin - Commercial
800 Other Expenditure
State's Expenditure
FB Barrage- NABARD assistance
416 Major Works
01 Major Works
(DPC 4700 02 800 FB 41601)
51
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 02 800 PA (Rs. in thousands)
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
02 Pennaiyar Basin - Commercial
800 Other Expenditure
52
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
AS / TS / RAS : 1700
AS / TS / RAS : 29145
AS / TS / RAS : 6400
AS / TS / RAS : 60000
53
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
9 Rehabilitation OF Dams under Pennaiyar Basin area - 900000 0 402167 550000 550000
DRIP II
G.O.Ms.No.187 PW (WR1) Dated 10.08.2020
AS / TS / RAS :900000
TOTAL - 4700 02 800 PB 1298777 332855 452169 550000 550000
54
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 03 800 AA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
03 Palar Basin - Commercial
800 Other Expenditure
State's Expenditure
AA Reservoirs
416 Major Works
01 Major Works
(DPC 4700 03 800 AA 41601)
464 Lands
51 Lands (Charged)
(DPC 4700 03 800 AA 46451 (C) )
55
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 03 800 AB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
03 Palar Basin - Commercial
800 Other Expenditure
State's Expenditure
AB Reservoir -NABARD assistance
416 Major Works
01 Major Works
(DPC 4700 03 800 AB 41601)
56
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 03 800 BB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
03 Palar Basin - Commercial
800 Other Expenditure
State's Expenditure
BB Dam and Appurtenant works -NABARD assistance
416 Major Works
01 Major Works
(DPC 4700 03 800 BB 41601)
57
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 03 800 CA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
03 Palar Basin - Commercial
800 Other Expenditure
State's Expenditure
CA Canals
416 Major Works
01 Major Works
(DPC 4700 03 800 CA 41601)
58
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 03 800 CB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
03 Palar Basin - Commercial
800 Other Expenditure
State's Expenditure
CB Canals - NABARD
416 Major Works
01 Major Works
(DPC 4700 03 800 CB 41601)
EIC, WRD (Reserve)
Long Term Flood Mitigation Works under NABARD 997500 1000000 0
G.O.No.
AS / TS / RAS :
59
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 03 800 DA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
03 Palar Basin - Commercial
800 Other Expenditure
State's Expenditure
DA Weir
416 Major Works
01 Major Works
(DPC 4700 03 800 DA 41601)
CE/Chennai Region
Construction of causeway across Palar River 0 0 0 0 0
G.O.
AS / TS / RAS :
60
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 03 800 DB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
03 Palar Basin - Commercial
800 Other Expenditure
State's Expenditure
DB Weir - NABARD assistance
416 Major Works
01 Major Works
(DPC 4700 03 800 DB 41601)
CE / Trichy Region
Construction of check dam across Palar River in 40606 0 0 30606 30606
Thethur village of Marungapuri Taluk in Trichy
District
G.O.Ms.No.275, PW (N2) Dept. dt.07.11.2020
AS / TS / RAS : 40606
61
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 03 800 EA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
03 Palar Basin - Commercial
800 Other Expenditure
State's Expenditure
EA Water Course
416 Major Works
01 Major Works
(DPC 4700 03 800 EA 41601)
62
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 03 800 EB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
03 Palar Basin - Commercial
800 Other Expenditure
State's Expenditure
EB Water Course- NABARD assistance
416 Major Works
01 Major Works
(DPC 4700 03 800 EB 41601)
AS / TS / RAS : 34234
63
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 03 800 FB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
03 Palar Basin - Commercial
800 Other Expenditure
State's Expenditure
FB Barrage-NABARD
416 Major Works
01 Major Works
(DPC 4700 03 800 FB 41601)
CE / Chennai Region
Construction of an Anicut across the cheyyar river 132442 0 0 132442 132442
near Vambalur Village to feed the Tatchur and
Vinnamangalam Tanks in Polur Taluk of
Tiruvannamalai District.
G.O(Ms) / No.330 PW(T2) / Dept Dated:28.12.2020.
AS / TS / RAS : 132442
64
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 03 800 PA (Rs. in thousands)
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-20 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
03 Palar Basin - Commercial
800 Other Expenditure
State's Expenditure
PA Reservoir under TNIAM Project-II
416 Major works
01 Major works
65
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 03 800 PA (Rs. in thousands)
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-20 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
03 Palar Basin - Commercial
800 Other Expenditure
State's Expenditure
PA Reservoir under TNIAM Project-II
416 Major works
01 Major works
66
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 03 800 PB (Rs. in thousands)
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Minor Irrigation
03 Palar Basin Commercial
800 Other Expenditure
State's Expenditure
PB Dam and Appurtant Works
416 Major works
01 Major works
(DPC 4700 03 800 PB 416 01)
1 Rehabilitation and Improvement of Mordhana Dam
46745 39064 0 0 0
G.O.Ms.No.61 PW (WR1) Dated 26-04-2013
67
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 04 800 AA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
04 Vellar Basin - Commercial
800 Other Expenditure
State's Expenditure
AA Reservoirs
416 Major Works
01 Major Works
(DPC 4700 04 800 AA 41601)
68
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 04 800 DA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
04 Vellar Basin - Commercial
800 Other Expenditure
State's Expenditure
DA Weir
416 Major Works
01 Major Works
(DPC 4700 04 800 DA 41601)
69
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 04 800 DB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
04 Vellar Basin - Commercial
800 Other Expenditure
State's Expenditure
DB Weir- NABARD assistance
416 Major Works
01 Major Works
(DPC 4700 04 800 DB 41601)
70
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 04 800 EB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
04 Vellar Basin - Commercial
800 Other Expenditure
State's Expenditure
EB Water Courses- NABARD assistance
416 Major Works
01 Major Works
(DPC 4700 04 800 EB 41601)
71
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 04 800 FB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
04 Vellar Basin - Commercial
800 Other Expenditure
State's Expenditure
FB Barrage - NABARD assistance
416 Major Works
01 Major Works
(DPC 4700 04 800 FB 41601)
72
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 04 800 PA (Rs. in thousands)
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
04 Vellar Basin - Commercial
800 Other Expenditure
73
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
74
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 05 800 AA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
05 Vaigai Basin - Commercial
800 Other Expenditure
State's Expenditure
AA Reservoirs
416 Major Works
01 Major Works
(DPC 4700 05 800 AA 41601)
Amaravathi Basin Division, Dharapuram
Formation of Tank across Nallathangal Odai in 427000 352500 0 1 1
Ponnivadi Village Dharapuram Taluk of Erode
District.
G.O.Ms.No.13 PW (S2) Dept. dt. 05.01.2001
AS / TS / RAS : 427000
Saruguniar Basin Division, Sivagangai
Restoration of Mudikondan Tank in Kumarapatti, 6566 2735 3831 0 0
Sivagangai District
G.O.(4D) No.02, PW (P1) Dept. dt.06.01.2020
AS / TS / RAS : 6566
CE / Madurai Region
Reclamation of Vandiyur tank to its original standards 6849 0 0 6849 6849
existing within the Corporation limit in Madurai North
Taluk of Madurai District
G.O.(4D) No.04, PW (P1) Dept. dt.19.01.2021
AS / TS / RAS : 6849
CE / Madurai Region
Reclamation of Kodikulam tank to its original 8200 0 0 8200 8200
standards existing within the Corporation limit in
Madurai North Taluk of Madurai District
G.O.(4D) No.05, PW (P1) Dept. dt.19.01.2021
AS / TS / RAS : 8200
CE / Madurai Region
Reclamation of Andaneri tank to its original 6622 0 0 6622 6622
standards existing within the Corporation limit in
Madurai North Taluk of Madurai District
G.O.(4D) No.06, PW (P1) Dept. dt.19.01.2021
AS / TS / RAS : 6622
CE / Madurai Region
Desilting, sterngthening of Banks, Restoration of 8809 0 0 8809 8809
supply channel and Formation of Footpath in
Thallakulam Puthukulam Tank in Madurai North
Taluk of Madurai District
G.O.(4D) No.07, PW (P1) Dept. dt.19.01.2021
AS / TS / RAS : 8809
Lower Vaigai Basin Division, Paramakudi
Construction of Additional vents across the supply 99350 0 0 0 69519
Channel of the Ramanathapuram Big Tank in
Ramanathapuram District
G.O.(Ms) No.54, PW (S1) Dept. dt.19.02.21
AS / TS / RAS : 99350
Announement / New Schemes 69519 0
Total (416-01 Major Works) 563396 355235 3831 100000 100000
75
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 05 800 AA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
05 Vaigai Basin - Commercial
800 Other Expenditure
State's Expenditure
AA Reservoirs
464 Lands
51 Lands (Charged)
Nanganjiar Basin Division, Palani
Enhanced compensation - Reservoir across 1131 0 1131 0 0
Chinnakompararu & Uppodai in Kodalvavi village,
Dindigul west Taluk, Dindigul District
G.O.(3D) No.86, PW (S2) Dept, dt.05.11.2020
AS / TS / RAS : 1131
76
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 05 800 AB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
05 Vaigai Basin - Commercial
800 Other Expenditure
State's Expenditure
AB Reservoir-NABARD assistance
416 Major Works
16 Major Works
(DPC 4700 05 800 AB 41601)
77
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 05 800 BA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
05 Vaigai Basin - Commercial
800 Other Expenditure
State's Expenditure
BA Dam and Appurtenant Works
416 Major Works
01 Major Works
(DPC 4700 05 800 BA 41601)
78
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 05 800 CA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
05 Vaigai Basin - Commercial
800 Other Expenditure
State's Expenditure
CA Canals
416 Major Works
16 Major Works
(DPC 4700 05 800 CA 41601)
79
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 05 800 CA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
05 Vaigai Basin - Commercial
800 Other Expenditure
State's Expenditure
CA Canals
464 Lands
01 Lands (Voted)
CE / Trichy Region
Intra State Linking of Rivers Manimuthar-Vaigai- 6000000 500000 250000
Gundar linkage
G.O.Ms.No.101, PW (N2) Dept. dt.27.04.20
G.O.Ms.No.102, PW (N2) Dept. dt.27.04.20
G.O.Ms.No.102, PW (N2) Dept. dt.30.04.20
AS / TS / RAS :
464 Lands
51 Lands (Charged)
Gundar Basin Division, Madurai
Extension of Nilaiyur Channel - Canals 0 0 0 1 1
80
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 05 800 CB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
05 Vaigai Basin - Commercial
800 Other Expenditure
State's Expenditure
CB Canals-NABARD assistance
416 Major Works
16 Major Works
(DPC 4700 05 800 CB 41601)
81
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 05 800 DA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
05 Vaigai Basin - Commercial
800 Other Expenditure
State's Expenditure
DA Weir
416 Major Works
16 Major Works
(DPC 4700 05 800 DA 41601)
CE / Chennai Region
Construction of Check Dam across Varattar River 0 0 0 0 0
82
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 05 800 DA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
05 Vaigai Basin - Commercial
800 Other Expenditure
State's Expenditure
DA Weir
83
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 05 800 DB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
05 Vaigai Basin - Commercial
800 Other Expenditure
State's Expenditure
DB Weir-NABARD assistance
416 Major Works
16 Major Works
(DPC 4700 05 800 DB 41601)
84
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 05 800 DB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
05 Vaigai Basin - Commercial
800 Other Expenditure
State's Expenditure
DB Weir-NABARD assistance
Manjalar Basin Division, Periyakulam
Reconstruction of Kattuperiyakulam anicut across 33467 0 33000 467 467
Thirumanimuthar River in Natham Village in Dindigul
district
G.O.(Ms).No.110, PW (W1) Dept, dt.29.04.2020
AS / TS / RAS :33467
85
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 05 800 DB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
05 Vaigai Basin - Commercial
800 Other Expenditure
State's Expenditure
DB Weir-NABARD assistance
Periyar Vaigai Basin Division, Madurai
Construction of Bed Dam across the Vaigai River to 173994 0 49588 124406 124406
feed Madakulam Tanks for recharging the ground
water ponmeni, Ellis Nagar, palanganathan, SS
Colony, Madakulam and TVS Nagar in Madurak
Corporation Area in Madurai District.
G.O.(Ms).No.125, PW (W1) Dept, dt.06.05.2020
AS / TS / RAS 173994
86
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 05 800 EA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
05 Vaigai Basin - Commercial
800 Other Expenditure
State's Expenditure
EA Water Courses
416 Major Works
16 Major Works
(DPC 4700 05 800 EA 41601)
87
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 05 800 GA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
05 Vaigai Basin - Commercial
800 Other Expenditure
State's Expenditure
GA Buildings
416 Major Works
16 Major Works
(DPC 4700 05 800 GA 41601)
88
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4700 05 800 PA (Rs. in thousands)
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4700 Capital Outlay on Major Irrigation
05 Vaigai Basin - Commercial
800 Other Expenditure
Externally Aided Projects
PA Reservoir under TNIAM Project-II
416 Major works
01 Major works
(DPC 4700 05 800 PA 416 01)
5 Renovation of Irrigation Infrastructures in Theni and 126671 105234 5047 100 100
Dindigul Districts under TNIAM Project-II
AS/TS/RAS:126671
AS/TS/RAS:1108604
89
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
AS / TS / RAS : 76850
AS / TS / RAS : 20400
AS / TS / RAS : 10000
AS / TS / RAS : 7600
AS / TS / RAS : 20100
90
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
AS / TS / RAS : 12750
91
ABSTRACT (4701 Capital Outlay on Medium Irrigation)
(Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Sl. No. Head of Account upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
1 4701 01 800 AA Reservoirs 85000 0 76000 300001 9001
2 4701 01 800 BA Dam & Appurtenant works 202200 128128 2487 3 3
3 4701 01 800 CA Canals 9409790 5984515 2299679 790752 790752
4 4701 01 800 CB Canals-NABARD 410815 0 120000 290815 290815
5 4701 01 800 DB Weir-NABARD 712812 0 0 189855 189855
6 4701 01 800 EA Water Course 20279 1186 1 3280 3280
7 4701 01 800 EB Water Course-NABARD 73557 0 73557 200000 1
8 4701 01 800 FA Barrage 59300 20292 1 206665 1
9 4701 01 800 PA Reservoir under TNIAM Project-II 1567068 936994 582174 50753 50753
10 4701 01 800 PB Dam and Appurtenant Works 302318 259419 10000 200000 1
11 4701 02 800 AA Reservoirs 347228 202234 60846 14101 14101
12 4701 02 800 CB Canals-NABARD 247893 0 70649 177244 177244
13 4701 02 800 DA Weir 178600 0 0 30000 30000
14 4701 02 800 DB Weir-NABARD 431799 236774 963670 500000 27726
15 4701 02 800 EB Water Course-NABARD 405071 374531 20376 10164 10164
16 4701 02 800 FB Barrage-NABARD 324500 0 92477 232004 232004
17 4701 02 800 PA Reservoir under TNIAM Project-II 167499 131996 8731 62131 62131
18 4701 02 800 PB Dam & Appurtenant works 24730 17651 4224 0 0
19 4701 03 800 AA Reservoirs 19238 0 19159 1 80
20 4701 03 800 BA Dam & Appurtenant works 17500 0 0 250000 17500
21 4701 03 800 CA Canals 180000 32543 0 1 1
22 4701 03 800 DA Weir 69855 0 0 49855 49855
23 4701 03 800 FA Barrage 20000 0 10000 26665 26665
24 4701 03 800 PA Reservoir under TNIAM Project-II 70800 63142 7657 1 1
25 4701 03 800 PB Dam and Appurtenant Works 65700 59915 2 150000 1
26 4701 04 800 CB Canals-NABARD 68253 0 19452 48801 48801
27 4701 04 800 DB Weir-NABARD 49260 0 14039 35221 29260
28 4701 04 800 EA Water Course 5327 0 8158 1002 1002
29 4701 04 800 FB Barrage-NABARD 101046 0 28798 72248 72248
15637438 8449320 4492137 3891563 2133246
92
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
CE / Madurai Region
9000 0 0 9000 9000
Rehabilitation and Improvements to
the Seevalaperi Tank in Seevalaperi
village of Palayamkottai Taluk in
Tirunelveli District
464 Lands
01 Lands ( Voted )
(DPC 4701 01 800 AA 46451
93
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4701 Capital Outlay on Medium Irrigation
01 Thamirabarani Basin Commercial
800 Other Expenditure
BA Dam and Appurtenant Works
416 Major Works
464 Lands
51 Lands (Charged)
(DPC 4701 01 800 BA 46451)
94
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
CE / Madurai Region
Reconstruction of the bridge at L.S. 5421 0 0 4421 4421
13.000 Km existing across the
Kodagan channel in Suthamalli
village of Tirunelveli Taluk and
District
G.O.Ms.No.304 PW (P2) Dept,
Dated: 10.12.2020
AS / TS / RAS : 5421
464 Lands
51 Lands (Charged)
(DPC 4701 01 800 CA 46451)
95
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
G.O.(Ms) No.64/PW(P2)Dept/
Dt:26.02.2020.
AS / TS / RAS : 410815
96
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
CE / Madurai Region
Construction of a Check dam across
the Thamiraparani river between
Alwarthoppu and Alawarthirunagari
251412 0 0 72425 72425
villages of Sirvaikundam Taluk in
Thoothukudi District
CE / Madurai Region
Construction of Tail End Check
Dams at confluence points of
Thamiraparani River with sea in
Punnakayal and Sendamangalam
461400 0 0 117430 117430
Villages of Thiruchenthur Taluk and
Mukkani Village of Srivaikundam
taluk in Thoothukudi District
97
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
CE / Madurai Region
4279 0 0 3279 3279
Reconstruction of the bridge at L.S.
22.230 Km existing across the
Kannadian Channel in Cheranmahadevi
village and Taluk of Tirunelveli District
G.O.(4D).No.76 PW (P2) Dept, Dt:
27.10.2020
AS / TS / RAS : 4279
98
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
99
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
100
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4701 01 800 PA (Rs. in thousands)
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
AS/TS/RAS:871643
AS/TS/RAS:205300
AS/TS/RAS:54225
101
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
AS / TS / RAS : 179666
AS / TS / RAS : 18600
102
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
Rehabilitation Renovation
Eco Restoration and Protection of
98100 43254 54846 1 1
Peerkankaranai Tank in Tambaram
Taluk, Kancheepuram District
G.O.(4D).No.4, PW (T2) Dept,
dt.14.05.2018
AS/TS/RAS:98100
103
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
104
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
105
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
106
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
107
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4701 Capital Outlay on Medium Irrigation
02 Chennai Basin Commercial
800 Other Expenditure
FB Barrage - NABARD
416 Major Works
01 Major Works
(DPC 4701 02 800 FB 41601)
108
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4701 Capital Outlay on Medium Irrigation
02 Chennai Basin - Commercial
800 Other Expenditure
Externally Aided Projects
PA Reservoir under TNIAM Project-II
416 Major works
01 Major works
(DPC 4701 02 800 PA 416 01)
G.O.113 dt 23.05.2017
2 Periya Irumbedu Tank, Mullipakkam Tankm Otteri Tank, 38010 36495 1516 1 1
Kottamedu Maduvu, Veppedu Kattakalani, Thiruporur
Sekkadi Thangal in Tiruporur taluk of Kanchipuram
District
3 Repair and Rehabilitation of Flood affected breached 25664 23294 2370 1 1
Systems and Non-Systems Tanks, Pallipet and
Thiruttani Taluks, Thiruvallur District
6 Repair and Rehabilitation of flood affected Tank system 19183 17569 1614 1 1
of Podatturpet non system Tank and Pallipet non
system Tank in Pallipet Taluk of Tiruvallur District
109
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
AS / TS / RAS : 24730
110
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
464 Lands
51 Lands (Charged)
(DPC 4701 03 800 AA 46451)
111
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
112
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4701 Capital Outlay on Medium Irrigation
03 Vaippar Basin Commercial
800 Other Expenditure
CA Canals
416 Major Works
01 Major Works
(DPC 4701 03 800 41601)
Vaippar Basin Division,
Virudhunagar
Implementation of Accelerated
Irrigation Programme- Kanjampatti
180000 32543 0 0 0
Odai - Vilathikulam Taluk of Tuticorin
District.
G.O.Ms.No.63 PW (W1) D,Dated:
01.03.2011
AS/TS/RAS: 180000
464 Lands
51 Lands (Charged)
(DPC 4701 03 800 CA 46451)
113
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
CE / Madurai Region
Construction of Check dam across 12500 0 0 2500 2500
Vallampatti Odai in
Sankarapandiyapuram village of
Vembakkottai Taluk of Virudhunagar
District
G.O.(4D) No.73, PW (R1) Dept.
dt.09.10.2020
AS / TS / RAS : 12500
114
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
21666 0 0 0 8000
Construction of an Anicut across the
Ullar river to feed Melakarisalkulam
in Rayagiri Village of Sivagiri Taluk
of Tenkasi District.
G.O. (Ms) No.298 / PW(P2) Dept /
dated.30.11.2020
AS / TS / RAS : 21666
115
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4701 03 800 PA (Rs. in thousands)
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4701 Capital Outlay on Medium Irrigation
03 Vaippar Basin - Commercial
800 Other Expenditure
State's Expenditure
PA Reservoir under TNIAM Project-II
416 Major works
01 Major works
(DPC 4701 03 800 PA 416 01)
G.O 140 dt 21.06.2017
116
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
AS / TS / RAS : 65700
117
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
118
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
119
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
120
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
121
Abstract ( 4702 Capital Outlay on Minor irrigation)
Rs. In Thousands
Interim Revised
Expenditure Revised
S. Estimate Budget Budget
Head of account upto Estimate
No Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
Varahanadhi Basin-Water
2 4702 00 101 AD 150000 145203 0 300000 0
Course-NABARD
Varahanadhi Basin-Weir-
3 4702 00 101 AE 628292 368439 205733 352617 52617
NABARD assistance
Parambikulam Aliyar Basin-
4 4702 00 101 AF 62000 0 0 200000 42000
Canals
Parambikulam Aliyar Basin
5 4702 00 101 AG 801000 69309 6000 300000 206691
Canals - NABARD
Nambiyar Basin-Weir-
11 4702 00 101 AM 1046499 607963 384668 48889 48889
NABARD assistance
122
Abstract ( 4702 Capital Outlay on Minor irrigation)
Rs. In Thousands
Interim Revised
Expenditure Revised
S. Estimate Budget Budget
Head of account upto Estimate
No Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
Paravanar Basin under
21 4702 00 101 PC 19769 18261 1508 90001 90001
TNIAM Project-II
Varahanadhi Basin under
22 4702 00 101 PD 75649 63549 4309 2965 2965
TNIAM Project-II
Varahanadi Basin under Dam
23 4702 00 101 PE 59296 45605 3001 10000 1
and Appurtant Works
123
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
Varahanadhi Basin-Reservoir
G.O.Ms.No.98, PW (W1) Dept, dt.22.04.2020
CE / Chennai Region
Mission for Water Resources Management and 1566991 0 1410175 1017 323064
Reviving Kudimaramath for 2020-2021
CE / IWS
Proposal for Hiring Vehicle 181 0 181 0 0
AS / RAS / TS : 2067
124
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
125
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
CE / Chennai Region
Construction of Check dam and Anicuts
across all River Basins of Tamil Nadu (2020-
21)
G.O.(2D) No.25, PW (T1) Dept.
225770 0 173155 52615 52615
dt.07.04.2020
126
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
127
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
128
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
PARAMBIKULAM DIVISION,
PARAMBIKULAM
Formation of park and fencing along the water 0 0 0 0 0
spread area of Thirumurthy Dam, Tiruppur
District with NABARD Loan
G.O. awaited
129
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
130
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4702 00 101 AJ (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4702-00 Capital Outlay on Minior Irrigation
101 Surface Water
State's Expenditure
AJ Parambikulam Aliyar Basin-
Reservoirs
416 Major works
01 Major works
(DPC 4702 00 101 AJ 41601)
CE / IWS
Proposal for Hiring Vehicle 925 0 925 0 0
131
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4702 00 101 AK (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4702-00 Capital Outlay on Minior Irrigation
101 Surface Water
State's Expenditure
AK Paramikulam Aliyar Basin-Weir-NABARD
assistance
416 Major works
01 Major works
(DPC 4702 00 101 AK 41601)
CE / Coimbatore Region
Construction of Check dam and Anicuts
across all River Basins of Tamil Nadu (2020- 37500 0 20000 17500 17500
21)
G.O.(2D) NO.24, PW (S1) Dept.
dt.07.04.2020
132
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4702 00 101 AL (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4702-00 Capital Outlay on Minior Irrigation
101 Surface Water
State's Expenditure
AL Nambiyar Basin-Reservoirs
416 Major works
01 Major works
(DPC 4702 00 101 AL 41601)
CE / Madurai Region
Mission for Water Resources 1563737 0 1439667 2013 2013
Management and Reviving
Kudimaramath 2020-21
CE / IWS
Proposal for Hiring Vehicle 719 0 719 0 0
464 Lands
51 Lands (Charged)
(DPC 4702 00 101 AL 46451)
133
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4702 00 101 AM (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4702-00 Capital Outlay on Minior Irrigation
101 Surface Water
State's Expenditure
AM Nambiyar Basin-Weir- NABARD assistance
416 Major works
01 Major works
(DPC 4702 00 101 AM 41601)
CE / Madurai Region
Construction of Check dam and Anicuts across all
River Basins of Tamil Nadu (2020-21)
G.O.Ms. No.97, PW (P2) Dept, dt. 07.04.2020 42559 0 42559 1 1
G.O.(3D) No.26, PW (W1) Dept, dt. 24.08.2018 574779 355785 195472 20000 20000
G.O.(3D) No.38, PW (W1) Dept, dt. 19.09.2018 79374 38160 12000 28887 28887
134
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
135
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
136
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4702 00 101 AQ (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4702-00 Capital Outlay on Minior Irrigation
101 Surface Water
State's Expenditure
AQ Agniyar Basin - Reservoirs
416 Major works
01 Major works
(DPC 4702 00 101 AQ 41601)
CE / IWS
Proposal for Hiring Vehicle 875 0 875 0 0
137
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4702 00 101 AU (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4702-00 Capital Outlay on Minior Irrigation
101 Surface Water
State's Expenditure
AU Agniyar Basin-Weir- NABARD assistance
416 Major works
01 Major works
(DPC 4702 00 101 AU 41601)
CE / Trichy Region
AU Agniyar Basin - Weir - NABARD
Construction of Check dam and Anicuts across all 0 0 100000 0 0
River Basins of Tamil Nadu (New Schemes for
2020-21)
G.O.(3D) No.38, PW (W1) Dept, dt. 19.09.2018 63536 54271 8654 1 1000
Construction of a Checkdam across Kallar river
Panaimadal village of Pethanaickenpalayam Taluk
in Salem District
138
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
139
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
140
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
141
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
142
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
143
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
144
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4702 00 101 PC (Rs. in thousands)
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
31-03-2020 Estimate Estimate
2020-21
2021-22 2021-22
4702 00 Capital Outlay on Minor Irrigation
101 Surface Water
State's Expenditure
PC Paravanar Basin- Reservoirs
416 Major works
01 Major works
(DPC 4702 00 101 PC 416 01)
1 Rehabilitation and Modernisation of 19769 18261 1508 1 1
Thoppukollai-Mudavan Eri in Thoppukollai
village, Kurinjipadi Taluk, Cuddalore District
145
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4702 00 101 PD (Rs. in thousands)
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
31-03-2020 Estimate Estimate
2020-21
2021-22 2021-22
4702 00 Capital Outlay on Minor Irrigation
101 Surface Water
State's Expenditure
PD Varahanadhi Basin under TNIAM Project-
II
416 Major works
01 Major works
(DPC 4702 00 101 PD 416 01)
1 Renovation of Irrigation Infrastructures in 75649 63549 4309 2965 2965
Theni District under TNIAM Project-II
G.O 140 dt 21.06.2017
AS / TS / RAS : 75649
146
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4702 00 101 PE (Rs. in thousands)
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4702 00 Capital Outlay on Minor Irrigation
101 Surface Water
State's Expenditure
PE Varahanadi Basin under Dam and
Appurtant Works
416 Major works
01 Major works
(DPC 4702 00 101 PE 416 01)
1 Rehabilitation and Improvement of Vidur 59296 45605 3000 0 0
Dam
G.O.Ms.No.61 PW (WR1) Dated 26-04-2013
AS / TS / RAS : 59296
147
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4702 00 Capital Outlay on Minor Irrigation
101 Surface Water
State's Expenditure
PF Parambikulam Aliyar Basin - Dam and
Appurtenant Works
416 Major works
01 Major works
(DPC 4702 00 101 PE 416 01)
AS / TS / RAS : 25100
AS / TS / RAS : 25100
AS / TS / RAS : 88250
148
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4702 00 Capital Outlay on Minor Irrigation
101 Surface Water
State's Expenditure
PF Parambikulam Aliyar Basin - Dam and
Appurtenant Works
416 Major works
AS / TS / RAS : 43810
149
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4702 00 Capital Outlay on Minor Irrigation - Commercial
101 Surface Water
State's Expenditure
PG Nambiyar Basin -Dam and Appurtenant Works
416 Major works
01 Major works
(DPC 4702 00 101 PG 416 01)
150
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4702 00 101 PH (Rs. in thousands)
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4702 00 Capital Outlay on Minor Irrigation
101 Surface Water
State's Expenditure
PH Kodaiyar Basin under Dam and Appurtant
Works
416 Major works
01 Major works
(DPC 4702 00 101 PH 416 01)
1 Rehabilitation and Improvement of Poigaiyar 11529 5386 0 1 0
Dam
G.O.Ms.No.61 PW (WR1) Dated 26-04-2013
Chittar Basin Dn., Kudiyiruppu, Tenkasi
AS / TS / RAS : 11529
151
Demand No.40 - Water Resources Department
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4702 00 Capital Outlay on Minor Irrigation
101 Surface Water
State's Expenditure
PI Kallar Basin under TNIAM Project-II
416 Major works
01 Major works
(DPC 4702 00 101 PI 416 01)
1 Renovation of Irrigation Infrastructures in 5825 4840 820 80 80
Thoothukudi District under TNIAM Project-II
152
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
AS / TS / RAS : 11529
153
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4702 00 Capital Outlay on Minor Irrigation - Commercial
101 Surface Water
State's Expenditure
PK Rehabilitation and Improvement of Dams of
TANGEDCO
416 Major works
01 Major works
(DPC 4702 00 101 PK 416 01)
154
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4702 00 Capital Outlay on Minor Irrigation
101 Surface Water
State's Expenditure
PL Nambiyar Basin under phase III of TNIAMP
416 Major works
01 Major works
(DPC 4702 00 101 PL 416 01)
1 Renovation of Irrigation Infrastructures in 49700 49700
Nambiyar sub basin in Tirunelvel District under
phase III of TNIAMP
G.O.
AS / TS / RAS :
155
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4702 00 Capital Outlay on Minor Irrigation - Commercial
800 Other Expenditure
State's Expenditure
PA Improvements to civil and electrical works in the
office of Chief Engineer and Dam Safety
416 Major works
01 Major works
(DPC 4702 00 800 PA 416 01)
AS / TS / RAS : 5000
156
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4702 00 Capital Outlay on Minor Irrigation - Commercial
800 Other Expenditure
State's Expenditure
PB Construction of New Quality Laboratory and Sub
division and Officers under DRIP
416 Major works
01 Major works
(DPC 4702 00 800 PB 416 01)
AS / TS / RAS : 5000
157
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
AS / TS / RAS : 92400
158
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
Interim Revised
Expenditure Revised
Budget Budget
Details of Works AS upto Estimate
Estimate Estimate
31-03-2020 2020-21
2021-22 2021-22
4702 00 Capital Outlay on Minor Irrigation
800 Other Expenditure
State's Expenditure
PD Instrumentation of DRIP
AS / TS / RAS : 92400
159
ABSTRACT (4711 Capital Outlay on Flood Control Projects)
(Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Sl. No. Head of Account upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
8 4711-01-103 LB 0 0 0 0 0
13 4711-01-103 UC 0 0 0 5598 0
160
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4711 01 103 KL (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
464 Lands
51 Lands (Charged)
(DPC 4711 01 103 KL 36451)
Araniyar Basin Division, Chennai
Land acquisition of land measuring an extent of 6254 37712 37712 1 1 1
sq.ft. in T.S.No.25/6 in Block No.13 in Ayanavaram
village and Taluk, Chennai District through private
negoitation utilised for formation of the Otteri Nullah
and payment of compensation to the legal heirs of the
land owners
G.O.Ms.No.36, PW (K2) Dept. dt.29.04.2019
AS / TS / RAS : 37712
161
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4711 01 103 KO (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4711 Capital Outlay on Flood Control Projects
01 Flood Control
103 Civil Works
State's Expenditure
KO Desilting, widening and Construction of Flood
Protection Works in Chennai City water ways
416 Major Works
01 Major Works
(DPC 4711 01 103 KO 41601)
Premonsoon Works 2020-21
162
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4711 01 103 KP (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4711 Capital Outlay on Flood Control Projects
01 Flood Control
103 Civil Works
State's Expenditure
KP Flood Protection to avoid inundation Karur, Trichy
and Perambalur Districts
416 Major Works
01 Major Works
(DPC 4711 01 103 KP 41601)
CE / Trichy Region
Flood Protection to avoid inundation in Karur, 28000 27969 1 1 1
Tiruchy and Perambalur Districts
(G.O.Ms.No.216/PW(N2)Dept / dt.24.08.12) RAS
Rs.2142226 thousands) (out of this Railway
Bridge) RAS is Rs.28000 thousands)
AS / TS / RAS : 28000
163
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4711 01 103 KU (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4711 Capital Outlay on Flood Control Projects
01 Flood Control
103 Civil Works
State's Expenditure
KU Remedial measures for flood affected area in Vellar
River near Killai Railway Track in Chidambaram
Taluk of Cuddalore District.
416 Major Works
01 Major Works
(DPC 4711 01 103 KU 41601)
Coleroon Basin Division, Chidambaram.
Technical Advisory charges for the Permanenet 428 0 428 1 1
Flood Protective of the Vellar closer to the Railway
Tract at Killai in Chidhambaram Taluk of Cuddalore
District
GO.(2D).No.43, PW (T1) Dept. dt.23.07.2020
AS / TS / RAS :428
164
Demand No.40 Water Resources Department
40-01 Public Works - Irrigation
4711 01 103 KX (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4711 Capital Outlay on Flood Control Projects
01 Flood Control
103 Civil Works
State's Expenditure
KX Rehabilitation and Restoration of Flood Damaged
Adyar River and Vegavathi River in Kancheepuram
District
416 Major Works
01 Major Works
(DPC 4711 01 103 KX 41601)
165
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4711 01 103 KZ (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4711 Capital Outlay on Flood Control Projects
01 Flood Control
103 Civil Works
State's Expenditure
KZ Reformation of RMS wall at Chinnathurai in
Vilavancode Taluk, Kanniyakumari District with
NABARD Loan
416 Major Works
01 Major Works
(DPC 4711 01 103 KZ 41601)
Kodayar Basin Division, Nagercoil
Reformation of RMS Wall at Chinnathurai in 19500 19249 193 0 0
Vilavancode Taluk Of Kanyakumari District.
G.O(D) No.83, PW (W1) Dept. dt.28.03.2018
AS / TS / RAS : 19500
166
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4711 01 103 LA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
167
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4711 01 103 LB (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
CE / Coimbatore Region
Rehabilitation of drainage and installation of 0 0 0 0
sewage water treatment plan
G.O.
AS / TS / RAS :
168
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4711 01 103 LC (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
169
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4711 01 103 LF (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4711 Capital Outlay on Flood Control Projects
01 Flood Control
103 Civil Works
State's Expenditure
LF Construction of Groyne at Agastheeswaram Taluk of
Kanniyakumari District with NABARD Loan
416 Major Works
01 Major Works
(DPC 4711 01 103 LF 41601)
Anti Sea Erosion Division, Nagercoil
Construction of Groynes at Kovalam, Azhikkal, 448200 0 20000 428200 428200
Periyanayagi Villages of Agastheeswaram Taluk and
Melmidalam and Enayam Villages of Vilavancode
Taluk of Kanniyakumari District.
G.O.(Ms) No.95 / PW (WR2)Dept /
Dated:07.04.2020.
AS / TS / RAS : 448200
170
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4711 01 103 PA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
171
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4711 01 103 UA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4711 Capital Outlay on Flood Control Projects
01 Flood Control
103 Civil Works
Schemes shared between State and Centre
UA Repair, Renovation and Restoration of Water
Bodies
416 Major Works
01 Major Works
(DPC 4711 01 103 UA 41601)
Repair, Renovation and Restoration of Water
Bodies
CE / Chennai Region 108872 0 108872 0 0
CE / Madurai Region 343584 0 205500 0 0
CE / Coimbatore 40663 0 17181 0 0
EIC, WRD & CE (Gl.) PWD (Reserve) 0 0 124088 8398 0
Total 493119 0 455641 8398 0
G.O.Ms.No.19, PW (W1) Dept. dt.06.01.2020
(Phase IV)
AS / TS / RAS : 493119
172
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4711 01 103 UC (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
173
Demand No.40 - Water Resources Department
40-01 Public Works - Irrigation
4711 02 103 AA (Rs. in thousands)
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
174
Demand No.40 - Water Resources Department
40-02 Public Works - Ground Water
Interim Revised
Expenditure Revised
Estimate Budget Budget
Details of Works upto Estimate
Amount Estimate Estimate
31.03.2020 2020-21
2021-22 2021-22
4702 00 Capital Outlay on Major Irrigation
102 Ground Water
State's Expenditure
JD Scheme for Artificial Ground Water Re-
charge Structure
175