Draft Maintenance Handbook On RRI Siemens
Draft Maintenance Handbook On RRI Siemens
MAINTENANCE HANDBOOK
ON
ROUTE RELAY INTERLOCKING
(Metal to Metal Relays)
CAMTECH/S/PROJ/2015-16/MHB-RRI-MM/1.0
FEBRUARY 2016
Foreword ii
Preface iv
Correction Slips vi
Contents viii
1. Introduction 1
12. Reference
Draft
CONTENTS
1. Introduction 1
The correction slips to be issued in future for this handbook will be numbered as
follows:
CAMTECH/S/PROJ/2010-11/HB-RRIS/1.0/C.S.# XX date--------------------------------
Draft
ROUTE RELAY INTERLOCKING
(Metal to Metal relays)
1. INTRODUCTION
1.1. Route Setting type Relay Interlocking (Route Relay Interlocking) system is
adopted for major and junction stations and Non-Route setting (Panel
Interlocking) for smaller and way side stations.
Details of Siemens Major Point Relay Group, Point Chain Relay Group,
Point Switching Relay Group and Siemens Electric Point Machine (110V
DC and 380 V AC 3 Phase) are given in this book. In addition, the
installation and testing practices to be followed for Siemens Relay
Interlocking System also are explained here.
All the required drawings of a two-line station with Siemens Route Relay
Interlocking System are given in this book. They include signaling plan,
Route section plan, table of control, wiring diagrams and contact analysis.
1. Any unsafe failure can only result in prohibition and not in a permission.
2. Each failure should draw the attention of the operator by withholding a
permission, which could otherwise be given.
3. The correct completion of an action, which has been initiated, must be
confirmed by an active indication.
4. Every indication, which might result in permission, must take the form of
an action. e.g. the current energizing a relay during the time the
permission is effective in case of a neutral relay and the pulse changing
the position of an interlocked relay.
5. Dependent actions should be switched in cascade via the indication. i.e.
the initiation of an action is identical with the indication of previous action.
6. Independent actions may take place at the same time if indication of their
correct completions are switched in series.
7. Continuous indications must be interrupted during each working cycles to
Draft
prove that the indicating device is capable of work and the information is
the result of an action.
1. By pressing signal and route button, route will set, point will be operated
to required position, point will be locked, route will be locked and signal
will clear.
2. After the passage of train, route will be unlocked, point will be unlocked
and then point can be operated to other position.
3. Conflicting signal movements can not be initiated before the completion of
previous signaled move.
4. Points can be operated independently and in case the point is not
operating after the route is set.
5. After the clearance of a signal, SM can cancel the signal route including
overlap with time lag.
6. Overlap also can be cancelled by SM if required with time lag.
7. Route can be cancelled by SM with the co-operation of S&T staff.
7.
8.
Neutral relay
Lamp proving relay
Draft
9. Time relay
10. Flasher relay
Sr PANEL R.R.I
.
No
1 Point group is Minor Point group is major
2 Points in the route, overlap and Setting of all points in the route, overlap
isolation are operated individually and isolation and also clearing the signal is
before signal and route are operated achieved by one operation of pressing the
concern GN & UN buttons.
3 NWKR/RWKR are normally energized NWKR /RWKR are normally de-energized,
picks up only when route setting is done.
4 Before any point could be operated, it Point setting is done by concern U(R) S,
should be ensured that all relevant OV Z2U(R) R. The locking provided for
route sections, overlap is in normal various stages takes care of this.
position.
5 This is confined to smaller yards and Suitable for major yards with heavy
suitable for way-side stations. shunting or on busy suburban sections.
6 Only two types of electrical lockers Locking actions are many
are provided
i) Individual point locking U(R)S
(ii) Full route locking by UR(L)R
7 The function of WR(L)R and UR(L)R Point locking is done by WR(L)R and
is done by U(R)S. individual sub route locking by UR(L)R
8 Route setting relays U(R)S, over lap U(R)S &OVZ2U(R)R relays are meant for
setting relay OVZ2U(R)R are meant operating the points.
for locking the points .
9 Irrespective of whether the move is for Sub route locking is done by UR(L)R for
shunt or main signal, sub route locking main signal move, and U(R)S for shunt
is achieved by U(R)S move.
2.2. The sequence of relays operation for different circuit is discussed below
with the help of block diagrams.
Draft
For setting a route entrance and exit buttons are depressed Draft
simultaneously. Their button relays operate and establish the direction of
traffic movement by operating the relevant direction-determining relay
ZU(R/N)R. Simultaneously if shunt signal is there in a route then main
signal/shunt signal selection relay Sh G(R/N) R relay operates and selects
the signal.
ZDUCR relay with concern Z1UR relay switches on route group by picking
up relevant U(R)S relay. This relay initiates point group relays for setting
the points to the required position in the sub route and isolation points if
any. When the point in the sub route is correctly set and detected, the
clear route-checking relay A/B DUCR picks up. The sub route-locking
relay U(R) LR operates after ensuring the points in the sub-route are
correctly set, detected and on release of the signal and route buttons to
lock the sub route electrically. In this manner all the sub route in the
signal route are set, checked and locked.
Main GZR relay with ZDUCR relay and concern button relay, switches on
relevant overlap setting relay OVZ2U(R) R and this relay initiates
operation of point group relays in the over lap and locks the same. If it is
in the required condition it locks the point groups electrically in overlap.
Note:
Draft
Automatic Route Release after the passage of train is controlled by UYR 1,
UYR2, UDKR and Sig. RE(Mn)CR.
LAST SUB-ROUTE
U(N)S
Once the white Dot indication become Steady, Press ‘GN’ and ‘EUUYN‘
Simultaneously. Release ‘EUUYN’ keeping ‘GN’ Pressed and Press ‘UN’
as in (2) above
Draft
First set the Point in the required position. When the Train has occupied the
Approach Track, Press ‘GN’ and ‘COGGN’ Simultaneously, release ‘COGGN’
Keeping ‘GN ‘ pressed and press ‘UN’ .
Draft
The major Point relay group is used only in Route Relay Interlocking. This
unit accommodates 5 interlocked relays, 13 neutral relays and a
contactor relay. There are three indication lamps in it. The fist lamp is a
yellow lamp, which lits steady normally when the points are correctly set,
locked, detected and is in correspondence with the point group.
The major point relay group operates the point during automatic route
setting and individual point operation.
Under route setting condition, the point group can get operated
automatically if the point fails in the route, overlap or isolation. In case of
individual point operation, pressing of WWN and WN or EWN and WN
operate the point group.
Z1WR :
This is the first relay to operate in the point group, under route initiation to
operate a point in the route, overlap or isolation. It is a K-50 ‘B’ type relay
with two coils, but only one coil is being used. U(R)S, UZ 4R or OVZ2(R)R
can operate Z1WR relay provided point detection is available (WKR1). If
a point is flashing during initiation of a route, the point will not get initiated.
In this case individual point operation has to be resorted to. Z 1WR will
drop only when the point group is initiated and dropping of WKR1 proves
it.
Z1WR1:
This is also a K-50 B type relay having pick up and holds coils. It is the
first relay to pick up in the point group during individual operation of points
and is the third relay to operate under route initiation. Pick up coil to
operate; it checks up that all the NWKRs and RWKRs in released
condition, thus ensuring that the points are free to be operated. Once
W(R)R is operated, the holding coil gets energized and hold the relay, till
WR is operated.
WLR :
Draft
This is a K-50 B type relay with two coils, called pick up and hold coils.
This relay is the second relay to operate in the point group during route
initiation. The very function of this relay is to ensure that, mere picking of
Z1WR will not operate the point group, but only through a positive route
initiation. WLR checks the following indications ZDUCR, Z1UR1, TPR,
Z1WRand W(R)R. Once operated it holds through its own F/C and
WKR2 B/C. This relay also switches on point chain group relay WWR.
WKR1:
This is the Point detection relay. (Coil resistance 1840 , Pick up current
— 17-19 ma and normal working current — 27-28 ma). Normally remains
in energized condition proving that points are correctly set, locked and
detected and are in correspondence with point group. The detection
current passes through WKR2 coil and all the four conductors and WKR1
coil. WKR1 contact together with (N)WLR / (R)WLR give corresponding
point indication in the panel.
W(R/N)R:
This relay facilitates Super imposed detection. W(R)R is energized for
point operation and W(N)R is picked up for detection. During group
initiation, W(R)R picks up when WKR1 is dropped. W(R)R energisation
causes the interruption in feed to Z1WR1 pick up coil at the same time,
through W(R)R F/C, WR B/C and Z1WR1 F/C holding coil is brought into
use, and the relay Z1WR1, drops only when WR is energized.
(R/N) WLR1, 2, 3. : For operating a point from ‘N’ to ‘R’, Z1RWR energizes
and cause latching of(R) WLR1,2 & 3. For setting to normal Z1NWR
operates and latches (N)WLR1, 2 & 3. Even though normal and reverse
operations are initiated by Z1NWR and Z1RWR, they drop prior to point
operation. They only register the operation command by latching (R/N)
WLR relays. Moreover, point operation circuit, it is not advisable to use
neutral Relay contacts, hence the relevant latch relays (R /N) WLR
contacts only are used in point control circuits. The point correspondence
and detection circuit prove these relay contacts.
W(R/N)LR :
This is the Point group lock relay. When a point falls in the
route/overlap/isolation, W(R)LR picks up and locks the point group
electrically. Lighting the middle indication on the point relay group and on
Draft
the panel indicates this. W(R)LR to operate, WKR1 must be up and also
U(R)S / UZ4R / OVZ2(R)R must be up.
NWKR I RWKR picks up only after W(R)LR operate.
WKR2:
This relay indicates out of correspondence of points and point relay
group. Normally it remains in de-energized state. During point detection,
this relay comes in series with WKR1. Since the relay coil resistance being
low (52.3 ), it requires a current of about 120 ma to energize. While point
under detection the current flowing is only about 27 ma. Hence, WKR2
cannot pick up. WKR2 also provide cross protection. WKR2 operates
under following conditions:
WJR:
This is the Over load Protection Relay — Motor used in point machines
are series wound high, torque motors, duration of its working shall be
less, otherwise can cause permanent damage to motor. In order to
provide protection during point obstruction. This relay controls the feed to
the point motor for about 10 to 15 seconds. During reverse to normal
operation WJR is made to pick up in succession to Z1WR1 to de-energize
WKR1.
TP1R — TP1P2R :
These are repeaters of point zone track relays. Through these relays
contacts the track locking as well as occupation and clearance indications
are given.
WKR3 :
This relay proves the end of operation of points. It has two coils. At the
end of point operation through the detection contacts WKR3 picks up with
110 V DC through 1K resistor and holds through holding coil with 60V.
picking up of WKR3 drops WJR & WKR2 and they in turn drop WR, there
of give the path for W(N)R to operate. Once W(N)R is operated WKR3
drops and detection feed is switched on.
WR :
This is a heavy-duty contactor relay having 2 F/C and 3 B/C. Coil
resistance is 60 ) ± 10%. The initial pick up current is 1 amp and the
economizer circuit will bring the current to 90 ma. All contacts are
Draft
uniformly rugged for 10 amps switching and continuous current. For point
operation, this is the last relay to pick up for switching the feed to the
motor and first relay to drop for disconnecting the motor feed when points
is set or obstructed. Z1WR1 is made to drop by this relay.
3.4.1. Siemens point circuits basically consist of a point group .The point group
has 23 relays K50 type (numbered from I to 29) and a Contactor Relay and out
of these K50 relays five are double coil relays. They are WLR, Z1WR1, WKR3,
Z1NWR, and Z1RWR. To really understand any circuit we not only need to know Draft
that when a particular relay picks up but also that when that particular relay
drops. Only then we can understand these circuits in the real sense.
3.4.2. Z1WR is the first relay to pick up during point operation during route
setting .It picks up through seven contacts - when WR is down, W (N) R is up,
CHY(R) R is down, U(R)S is set or OVZ2U(R) R is set, point group is not in the
position required for the route or overlap i.e. R (W) LR1 or N (W) LR1 is up, W (N)
R is up, WKR1 is up. It is interesting to note that the circuit does not check as to
whether the track is up or the point is unlocked at this stage. These features are
checked at the WLR stag &. Z1WR drops when WKR1 drops.
The same circuit sequence is used for W (R) LR circuit except that the point
group is required to be in the same position as required by the sub-route or the
overlap. This means that if the point is in the same position as required by the
sub-route or overlap then Z1WR will not pick up and straightaway W (R) LR will
pick up. If the point is not in the required position then after the point operates
and after completion of point operation W(R) LR will pick up.
The above also implies that if the slot for KLCR is given then the point cannot be
locked i.e. W(R)LR cannot pick up hence NWKR or RWKR cannot pick up. The
point can then only be operated by individual operation and not by route setting.
U(R)S back contact or U(N)S pick up contact should not be used in W(N)LR
circuit. The reason is that the last sub-route relay to normalize should unlock the
point. The same logic applies to OV relay contacts in point locking and unlocking
circuits
Going by the same logic we can also see that in G(N)LR circuit or OVZ 2U(N)R
circuit if U(N)PS is taken then G(N)LR or OVZ2U(N)R will not pick up during
three button cancellation as U(N)PS requires the buttons to be released and the
three button path requires the buttons to be pressed. The circuit would then
require the three-button operation to be done twice
Draft
It is interesting to note that if a route is set for a particular movement and if any
sub routes U(N)PS does not pick up and U(R)PS remains up, then if the signal is
given again for the same route, the signal will re-clear i.e. the fact that U(R)PS
has not normalized is not detected .The important point is that the points remain
locked due to U(R)PS back contact in W(N)LR circuit. Thus it becomes all the
more important to use U(R)PS back in W(N)LR circuit
Coming back to point operation, we see that the first coil of WLR picks up when
ZDUCR is up, Z1UPR or Z1UPRI (as the case may be) is up, Z1WR is up, TPR is
up, W(R) LR is down. Thus at this stage it is checked that the point track is free
and the point is unlocked the second coil of WLR picks up through WKR 2 back
contact. Thus WLR drops when WKR2 picks up. A look at the Indication Circuit
tells us that the point locking indication will start flashing on the Indication Panel
and on the point group (center indication) when W(R) LR is down and either
Z1WR or WLR is up Thus the point locking indication will start flashing only when
points are operated during route setting and not when individual operation of
points is done. The locking indication will be flashing till WKR2 picks up to drop
WLR. Similarly in the point chain group circuit WWR of the next point will pick up
when WLR of the previous point has dropped This means that the next point
operation will be initiated when WKR2 of the previous point has picked up to drop
WLR If the next point is to be operated simultaneously with the previous point
then the WLR contact in the WWR circuit needs to be by-passed. The circuit for
Z1WR and WLR also tells us that if before the point gets unlocked, a movement
is initiated that causes Z1WR to pick up, the locking indication of point will
extinguish even though the point is locked. This may happen at a busy station.
An example is that when a movement is going on over a point and before the
point gets unlocked another movement, which required this point for isolation is
initiated. Through the UZ4(R)R or U(R)S which operates the point for isolation
the Z1WR may pick up as Z1WR does not check that the point is unlocked .WLR
will not pick up and the point will not operate but since the locking indication has
extinguished it is not immediately noticed that the point is not operating due to its
being locked.
In such cases the concerned UZ4(R) R or U(R) S should be put in that limb along
with (R) WLR1 down or (N) WLRI down paths in the W(N)LR circuit as per the
point condition required .Thus if the point is required in normal then it should be
put in the (R)WLRI down limb .If this is done then even if the second movement
is initiated before the point gets unlocked the point would get unlocked after the
movement over it is completed .If by this time the buttons for the second
movement are in pressed condition the point will operate else its locking
indication will remain in flashing condition .The point can then be operated by
individual operation
3.4.4. After WLR picks up the operation of points chain group is initiated
through the pick up contacts of Z1WR and WLR. This in turns leads to WWR of
the concerned point to pick up in the chain group when its turn comes in the
sequence of chain group operation. When WWR picks up the first coil of Z 1WR1
of the point group picks up through the back contacts of NWKR, RWKR and all
their repeaters and through the pick up contact of TP 1TP2R. Z1WR1 is the first
Draft
relay in the point group to pick up during individual operation of points. This
means that the circuits for point operation during route setting and individual
operation are identical from here onwards.
3.4.5. Z1WR1 drops when WR picks up for point operation. Thus Z1WR1 picking
up and dropping is an indication that the point operation circuit is progressing till
WR is getting picked up. If the 110 V supply is available then the fault in point
operation is most likely outdoors .A common example is the case of stone in
point.
Z1WR1 picking up causes the first coil of WKR3 to pick up through (N)WLR3 pick
up and W(N)R pick up contacts for normal to reverse operation of points .It is
interesting to note that WKR3 picks up twice in normal to reverse operation of
points and once in reverse to normal operation. WKR3 picking up causes WKR1
to drop .For both of these once WKR3 picks up through 110 Volts to indicate end
of point operation and holds through 60 Volts. For reverse to normal operation
WJR picks up to drop WKR1. WKR3 that picks up for N to R operation drops
when W (N) R drops .WJR that picks up for R to N operation holds till WR picks
up and finally drops when WKR3 picks up through 110 Volts to indicate end of
point operation or when the charge stored in the 2500 micro F condenser is
unable to keep WJR in picked up condition.
3.4.6. It is interesting to note that WJR timings are slightly lesser for reverse to
normal operation than for normal to reverse operation. This is because the 60 V
path for picking up WJR gets broken earlier in reverse to normal operation. For
reverse to normal operation WJR is held in picked up condition by the charged
2500 micro F condenser after Z1NWR drops i.e. before WR picks up where as in
normal to reverse operation this happens after WR picks up and causes Z 1WR1
to drop. The timing difference is marginal but worth tracing in the circuitry
3.4.7. After WKR1drops, W(R)R picks up through Z1WR1 pick up and WKR1
down. W(R)R picking up causes three events -
a) It causes WKR3 to drop
The above means that during individual operation of points if the buttons are
kept pressed then although the point group will change over but WR will not pick
up and the point will not operate.
It is important to note that after W(R) R picks up even if the point track is
b) It causes (R)WLR1, 2,3 or (N) WLR1, 2,3 to pick up. (R) WLR3 causes second
coil of Z1RWR to drop. (N) WLR3 causes second coil of Z1NWR to drop
3.4.9. Z1RWR and WKR2 picking up cause WJR to pick up for N to R operation.
For R to N operation WJR is already up at this stage as discussed earlier .WJR
drops by either WKR3 picking up indicating end of point operation or by the
charge in the 2500 micro F condenser unable to hold it in picked up condition
after point operation begins. If the charge in the condenser is unable to hold
WJR for the time required for the point to operate, WJR will drop before the point
fully operates causing WR to drop. The points will then either not move at all or it
will fail in mid-way. Thus the timing of WJR must be adequate to enable the point
to operate fully .The timing should be at least 10 sec. and can be measured by
operating the point after removing its 110 V fuse .The time between WR picking
up and dropping can be taken as the timing of WJR.
WJR ensures that the feed to the point motor is cut off after a certain time delay
so that no damage is caused to the point motor due to continuous supply being
available in case the point does not set due to any reason. An example is of
stone in point. In such circumstances the point machine should declutch and
after WJR drops the motor would stop rotating .For points that are far off from the
relay room it has been observed that in case of any obstruction the point motor
does not declutch and instead stops rotating. This is due to the fact that the point
machine draws higher current in case of any obstruction.
This higher current leads to higher voltage drop in the conductors from the relay
room to the point machine so that the voltage available at the motor terminals
becomes very low A solution to the problem is to put cable cores in parallel for
conductors 1,2 and 4.
3.4.10. WR now picks up through pickup contacts of WKR2 and WJR and
back contacts of W(N)R, Z1RWR and Z1NWR. 110 Volt supply now extends to
the point through conductor no.2 and 4 for N to R operation and through
conductor no. 1 and 4 for R to N operation. Conductor no.4 always carries 110
volt negative for point operation. It is interesting to note that conductor no.4
always carries 60 V positive for point detection for both Normal and Reverse
positions of the point and 110 V negative for both N to R and R to N operations
of point. Conductor no.3 always carries 60 V negative for point detection for both
Normal and Reverse detection and during point operation does not carry 110 V
Draft
supply. Hence for points that are far from the relay room cores are required to be
connected in parallel for conductor nos.1,2 and 4 and not normally for conductor
no.3.
For a right hand cross-over for N to R operation the first machine operates first
and then the second machine operates .For R to N operation the second
machine operates first .The sequence is opposite for a left hand cross-over.
When the point operates it is interesting to note the sequence in which the
detection assembly contacts make. First the detection contact breaks, then the
other operation contacts makes i.e. during point operation both the operation
contacts 1/1a and 2\2a are made facilitating mid stroke reversal. When the point
gets locked one operation contact breaks and the other position detection
contact makes. Thus for a right hand crossover for N to R operation the
sequence is 2\2a and 3\3a made for N detection, 3\3a breaks as operation
commences, 1/1a makes (thus during operation both 1\1a and 2\2a are made),
when the first machine becomes locked in reverse its 2\2a contact breaks and
4\4a makes. Through this 4\4a contact 110 V supply now extends to the second
machine .For reverse detection 1\1a and 4\4a are made. WR picking up causes
second coil of Z1WR1 to drop, the first coil already having dropped when
W(N)R drops. WR drops when WKR3 picks up at the end of point operation
through 110 V Supply through the detection contacts of both the machines in
series (4\4a of both machines for N to R operation and 3\3a of both machines for
R to N operation).
3.4.11. At the end of point operation when the detection contacts of both the
machines are made the first coil of WKR3 picks up through 110V supply and
drops WR as discussed above. The second coil of WKR3 then picks up from 60
V supply through Z1WR1 back and W(N)R back contacts the first coil drops as
soon as the 110V supply gets disconnected when WR drops.
3.4.12. W(N)R picks up through back contacts of WR, WKR2 and Z1WR1.
W(N)R picking up causes WKR3 to drop and the point detection circuit is
completed and WKR1 picks up.
For Normal detection: The 60 V supply required to pick up WKR1 goes out
from the relay room through conductors 1 (-) and 4 (+) .The incoming supply
back to relay room conies through 3 (-) and 2 (+). This is the case for both right
hand and left hand crossover. Between 1 and 3 are the detection contacts for
both the machines i.e.3\3a of both the machines for a right hand crossover and
4\4a of both the machines for a left hand cross-over. Between 4 and 2 are the
operation contact 2\2a, carbon, CH contact, and motor terminals of the first
machine for a right hand crossover, or the operation contact 1\1a, carbon, CH
contact, motor terminals of the second machine for a left hand crossover. We
already know that for a right hand cross-over when the points are normal, 2\2a
and 3\3a are made and when reverse 1\Ia and 4\4a are made .The combinations
Draft
are opposite for a left hand cross-over.
For Reverse Detection: The 60 V supply required to pick up WKR1 goes out
from the relay room through conductors 2(-) and 4 (+).The incoming supply to
the relay room comes through conductors 3 (-) and I (+). This is for both left hand
and right hand crossover.
a) The counting in dominos is always such that the indication bulb for RG
comes at terminal no. 3 .The counting from 1 to 15 can then be easily done.
b). During point operation the white slits start flashing as soon as WKR 1
drops. These flashing white slits change over to the other position i.e. to reverse
position as soon as (R) WLR2 picks up in N to R operation and to normal position
as soon (N) WLR2 picks up in R to N operation. Thus if the flashing white slits
change to the other position, it means that the point group has operated to the
(R) WLR2 / (N) WLR2 stage.
d) During point operation by route setting, the point locking indication will
flash till WKR2 picks up to drop WLR
e) Z2WR1 is used for both Normal and Reverse indications of the point
whereas Z2WR2 is used only when (N) WLR3 is up i.e. for normal indication only.
Also Z2WR2 picks up through the sub route or overlap which only requires the
point to be Normal for Straight Movement.
Draft
then drops. This is because conductor no.1 carries outgoing 60 V negative from
the relay room when the point is normal.
ii) If 60 V positive comes on conductor no.2, the point does not fail as
conductor no.2 itself carries 60 V positive incoming to the relay room from the
field. If point buttons are pressed then point operation does not take place as
WKR1 does not drop. This happens, as the WKR3 back contact, which causes
WKR1 to drop, is by-passed by this false feed on conductor no.2.
iii) If 60 V positive comes on conductor no.3, the 60 V fuse gets blown off
and WKR1 drops. This happens as conductor carries 60 V negative outgoing
from the relay room when the point is normal or reverse.
iv) If 60 V positive comes on conductor no.4, the point does not fail as
conductor no.4 carries 60 V outgoing positive from the relay room when the point
is normal or reverse. When the buttons are pressed for point operation the point
does not operate, as WKR1 does not drop.
vi) If 60 V negative comes on conductor no.2, WKR 2 gets picked up and the
point fails. When the buttons are pressed for point operation, the point group
operates. WR picks up but the 110 V fuse gets blown off immediately as for point
operation 110 V positive goes from conductor no.2 and N 60 and N 110 are
looped.
vii) If 60 V negative comes on conductor no.3, the point does not fail as
conductor no.3 carries 60 V negative as explained above. When the buttons are
pressed for point operation, the point group operates .The point also operates
but the 110 V fuse blows off before WKR3 picks up WR then drops due to WJR
dropping after time delay. Since WKR3 has not picked up WKR2 remains up and
W(R) R remains up. Due to this WKR1 does not pick up and the point remains
failed.
viii) If 60 V negative comes on conductor no.4, WKR2 picks up and the point
fails. When the buttons are pressed the point operates but WKR 2 picks up as
soon as W(R) R drops. Due to this the point remains failed.
b) Point is Reverse
iii) If 60 V positive comes on conductor no.3, the 60 V fuse gets blown off as
conductor no.3 carries incoming 60 V negative to the relay room whether the
point is normal or reverse
iv) If 60 V positive comes on conductor no.4, the point does not fail as conductor
no.4 carries outgoing 60 V positive when the point is normal or reverse. When
the buttons are pressed for point operation WJR picks up and the point group
operates. WR picks up and drops immediately as B 60 is shorted to N 60 through
WR pick up contact and W(R) R pick up contact.
vi) If 60 V negative comes on conductor no.2, the point does not fail as
conductor no.2 carries outgoing 60 V negative from the relay room when the
point is reverse. When the buttons are pressed for point operation WJR picks up
but WKR1 does not drop as the WJR back contact in N 60 path is by-passed.
The point hence does not operate.
vii) If 60 V negative comes on conductor no.3, the point does not fail as
conductor no.3 carries incoming 60 V negative to the relay room when the point
is normal or reverse. When the buttons are pressed for point operation, WJR
picks up but WKR1 does not drop .The point hence does not operate.
viii) If 60 V negative comes on conductor no.4. WKR2 picks up and the point
fails as conductor no.4 carries outgoing 60 V positive from the relay room when
the point is normal or reverse when the buttons are pressed for point operation,
the point operates. WKR2 remains picked up and the point remains failed. The
above analysis gives us some insight in the important role played by WKR2 relay
in point circuits .It also tells us about the important design parameter of Siemens
circuits that the polarity of supply carried by each conductor changes for point
operation and for detection also for normal and reverse positions of the point.
This causes such faults as described above to be detected. These are
summarized as under
R5 - 39 Ohms: it is connected in series with the WJR condenser .lt reduces the
initial charging surge of the condenser and improves the time delay for WJR to
drop.
R6 - 270 Ohms: it is connected in series with the coil of WKR2 relay. WKR2
relay is connected in series with WKR1 relay but it does riot pick up as it requires
a higher pick up current .So when the coil of WKR1 is not in its circuit the WKR2
relay picks up. Thus WKR2 picking up is prevented by WKR1 coil resistance and
R6 in series.
R7 - 1000 Ohms: it is connected in series with the WKR3 relay and drops the
110 V supply for the WKR3 relay to pick up which has a 60 V coil.
R8- 270 Ohms, R9 & R10-660 Ohms and 680 Ohms respectively. R11-210
Ohms. R8, R9, R10 and R11 are not used in our circuits
a) For a cross-over there are two track circuits .For example for cross-over
101/102 there are two track circuits 101T and 102T .One TPR of one track circuit
is picked up in the point group and all TPRs of the other track circuit are picked
up outside the point group. TP1TP2R of both the track circuits is picked up inside
e) All TPRs of 1021 are picked up outside the point group through the
common fuse of TPR relays. The above also tells us that if the 60 V fuse for
TPRs is blown off, all TPRs will drop but if the 60 V fuse for point group is blown
off then 101/102 TP1TP2R, 101 TP1 R and 101 TP2R will drop while 101 TPR
(relay no.27) will remain up. Since these relays ate used in GRI circuit the signal
will go to danger .For areas without 25 KV A.C. traction since the 60 V fuse is
common for internal circuits and WKR1 circuit, when the 60 V fuse for point
group is blown off, WKR1 will drop and the point indication will become flashing
white (since 27 no relay is up) and partly steady red as 101 TP 1R and 101 TP2R
have dropped .The rightmost indication on the point group is for TPITP2R and it
will become steady red. The leftmost indication on the point group is for WKR 1
and it will become flashing.
For areas with 25 KV A.C. traction, the TPRs pick up through the internal
60 V fuse for the point group and the fuse for WKR 1 circuit is separate .If the
internal 60 V fuse is blown off then WKRI will remain up and 101 TP 1R, 101
TP2R and 101/102 TP1TP2R will drop and 101 TPR (relay no.27) will be up .Due
to this the signal will go to danger, the point indication will remain steady white,
and the point indication will become partly steady red .The rightmost indication
on the point group will be steady red .lf the fuse for external circuit WKR 1 is
blown off then the TPRs will be up and only the point indication will be flashing
white. It is relevant to note here that if the fuse for entire 60 V supply for areas
without A.C. traction is blown off then all track circuit indications will be red, all
point indications will be flashing red, all signals indications will be flashing red .lf
the fuse for TPRs is blown off, all track circuit indications will be red, all point
indications will be steady red, all signals will be steady red. For areas with A.C
traction if the fuse for entire 60 V internal supply is blown off, all track circuit
indications will be steady red, all points will be steady red and all signals will be
flashing red .lf tile fuse for entire 60 V external supply is blown off, all track circuit
indications will be steady red, all point indications will be flashing red and all
signals will be steady red.
The two indication slides of a point machine are connected through the ground
connections to the tongue rails The connection should be such that the left hand
tongue rail should be connected to the first indication slide looking from the toe of
the tongue rail. This will ensure that the roller of detection assembly for the
Draft
closed tongue rail falls in tile smaller notch of the detection slide. This is an
important matter and should be seen by placing the indication slides and
observing as to in which notch the roller drops when the first indication slide to
the left hand and right hand tongue rail.
Siemens electric point machine type BSG-ANTR-9 (Non-trail able) with internal
Locking serves to operate the point tongue rails and lock them in their respective
end positions. Provision is available for the detection of both the switch rails, mid
stroke operation and crank handle setting of the points.
The rotary motion of the motor is transmitted through reduction gears and
transmission assembly and converted into a linear movement of a toothed rack
through a pinion. The gear rack drives the switch rails to the required position
and the same get locked at the end of its stroke by a segment engaging in the
locking slide. The tongue rails actuate the locking slide and detection slides. The
locking slide also will be locked in the same manner as gear rack is locked. At
the end of the movement of tongue rails, the switching unit in the machines cuts
off the operation feed by opening the control contacts and closes the detection
circuit by making the detection contacts.
In case of tongue rails not reaching the end position the motor free wheels, after
declutching at the end of each operation thus ensuring a smooth stopping. Crank
handle contacts break when the crank handle key is inserted and turned so that
the crank handle can engage with the extended shaft of motor armature for
setting point manually.
3.5.1. The following features are adopted while installing the point
machine:
The inner contacts of switch pedestal are detection contacts and outer contacts
are control contacts.
The internal wiring of a point machine, based on the type of turn out point for
which it is used.
The internal wiring of point machine installed at the left side of point is similar to
that fitted at right side. The position of short and long connection detection rods
depends upon the position of point machine. If the machine is installed at left
side of the point the first one should be short connection detection rod and the
second long connection rod. If the machine is at right side of the point the rods
should be interchanged. When the point is correctly set, locked and detected in
normal position, continuity will be available between main cable cores on
terminal No1 with 4 made 2 with 3. Continuity between 1and 3, 2 and 4 will be
available if the point is in reverse setting.
110 Volts D C. machine has a split field series wound motor where as 380 V
A.C. 3 phase machine is provided with an induction motor.
The switch pedestals of D.C. machine and A.C. machine are similar but
conditions at which their contacts are being made or broken are different Draft
In case of D.C. machine, when the motor starts operation its detection contacts
break first and then the control contacts make. Similarly, at the end of operation
the control contacts break after which the corresponding detection contacts
make. Thus the detection contacts and the corresponding control contacts (ND
and NC or RD and RC) cannot make simultaneously at any instant.
For AC. machine, the switch pedestal contacts are provided in such a way that
when the motor starts operation, its control contacts make first and then the
corresponding detection contacts break. Similarly at the end the detection
contacts make before the control contacts break. Thus ND and NC or RD and
RC will be available simultaneously for a short period while starting and stopping
the machine.
Crank handle contact is provided only in the negative side of point operation
circuit of D.C. machine where as they are proved in two phases in the case of 3
phase machine.
Relay WKR2 once picked up through Z1RWR or Z1NWR front contact is held
through its own stick path in the point relay group of D.C. machine. WKR2 in
point group of 3-phase machine is made to hold in picked up condition with the
help of induced voltage in the secondary winding of a current transformer
provided externally. Initially when 3-phase supply is switched on both the primary
windings of this transformer will get connected in such a way that the voltage
induced in the secondary winding will be added up. Once the motor starts and
the detection contacts break current can flow through only one primary winding.
But the induced voltage in the secondary winding is enough to hold WKR 2 in
picked up position. At the end of the operation, when the point is set, locked and
detected, both the primary windings of the transformer will be connected in
series across the same phase so that the fluxes produced in the two primary
windings will cancel each other and therefore the secondary voltage reduces to
zero with the result WKR2 drops.
B60V, (270) resistance, WKR2 coil, WKR3, W(R)R., conductor No.4, crank
handle out contact, armature, reverse field, reverse control contact, conductor
No.2, (R)WLR3, (N)WLR1, WKRI coil, WKR2, W(R)R., conductor No.3,
normal detection contact, conductor No.1, (N)WLR3, WJR, W(R)R, N60V.
Even though current flows through WKR2 coil and WKR1 coil in series, WKR1
alone picks up, proving that the point is correctly set in normal or reverse
position, the motor is intact in the point machine and all the four cable conductors
are good. WKR2 does not pick up since the current is not enough.
B110V, 6 amps fuse, WR, W(R)R, (R)WLR3, Conductor No.2, reverse Draft
control contact, reverse field, armature, crank handle cut out contact, conductor
No.4, W(R)R, WR, N110 V.
The motor rotates and when the point is set to reverse the reverse control
contact break and reverse detection contact makes, so that B110V is diverted
through reverse detection contact, conductor No.3, W(N)R, 1 K. ohm
resistance, WKR3 coil, N110V. WKR3 picks up causing WJR to drop and
consequently WR also drops which cuts the motor operation feed. WKR3 holds
through its own front contact and W(N)R back contact , Z1WRI back contact.
WKR3 drops when W(N)R picks up.
Draft
Draft
Draft
Draft
Draft
In AC machine, switch pedestal contacts are provided in such a way that when
the motor starts operation, its control contacts made first and then corresponding
detection contacts break. Similarly at the end of operation, detection contacts
made before the control contacts break. Thus ND & NC or RD & RC will be
available for a short period while starting and stopping the machine.
Relay WKR2 picks up through Z1RWR or Z1NWR front contact and holds its
own front contact in DC operation point group. In 3 phase group WKR2 is made
to hold in picked up position with the help of induced voltage in the secondary
winding of current transformer provided externally. When 3 phase supply is
switched on, both the primary windings of the transformer will get connected in
such a way that the voltage induced in the secondary will be added up. Once
the motor starts and detection contacts break, current can flow through only one
primary winding. But induced voltage in the secondary winding is enough to hold
the WKR2 in picked up position. At the end of operation, when point is set,
locked and detected, both primary windings of the transformer will be connected
in series across the same phase so that flux produced in two primary windings
will cancel each other and therefore secondary voltages reduces to zero with the
result WKR2 relay drops.
a) Point operation Circuit : The 3 phase supply to operate the point from
normal to reverse is connected as given below:
R 380 V, WR front, (R)WLR1 front, (N)WLR3 back, W1, CH ½, W-Z, ND, W4,
W(N)R back, d5-d4 and N 380 V.
Y380 V, WR front, dl-d2, WR front, W(R)R front, (R) WLR3 front, W2, CH 3/4.V-
Y, RC, X-U, W3, W(R)R front WR front and B380V.
With the flow of phase current through the W-Z and the line current through V-Y
and X-U of the stator windings of the 3 phase motor, a rotating magnetic field is
produced which causes the rotor to rotate.
When the rotor starts rotating NC contact makes (before ND breaks) so that ‘R’
phases is connected to ‘Y’ and ‘B’ phases through the stator windings, forming a
Draft
star connection. Now ND breaks and therefore the neutral is disconnected. At
the end, when the point is set to reverse, RD makes (before RC breaks) so that
the ‘Y’ phase is connected to neutral through the stator winding V-Y. Now, the
current of the same phase will be flowing through the two differentially wound
primary windings of the transformer and therefore the resultant Ampere Turn of
the primary become zero. WKR2 drops and consequently WR also de-energizes
cutting off the 3 phase supply to the point machine.
b) Point Detection Circuits: The 60V detection circuit is completed, proving all
the three stator windings, detection contacts and the corresponding control
contacts in addition to proving all the four cable conductors for picking up WKR 1.
The detection circuits is completed as given below:
In case of cross over points, the stator windings of last operated point motor is
proved in addition to detection contacts of both end machine. The control contact
in parallel with another set of detection contacts of the last operated machine
also is proved in this circuit.
Draft
Draft
Draft
5. SIEMENS POINT CHAIN RELAY GROUP
This relay group is used only in Route Relay Interlocking and placed on the top
of the rack just above major point relay group. One chain group can caters for
eight major point groups. There are eight WWR relays in it, which pick up one
after another and also drop one after another. The pick up contact of one relay
(WWR) is used for one major point group to energize Z 1WR1 relay during
automatic operation of point. Thus the picking up ofZ1WR1 in each major point
group is ensured one after another during route setting so that the operation of
point relay group/starting of point machine is staggered and not simultaneous.
Note - Relay name in bold means they are outside the point chain group.
Draft
6. CONTROL OF OTHER THAN SIEMENS POINT MACHINE WITH
SIEMENS POINT SWITCHING RELAY GROUP
6.1. Controls of other than Siemens Point machine using Point Switching
Relay Group:
This relay group is used in conjunction with Siemens Point Relay group (major or
minor) wherever the operating feed for point machine is required to be arranged
locally. This may be necessitated when other than Siemens Electric Point
Machine is not Compatible with Siemens Point relay group are used or for point
machines which are far away from relay room and does not get enough voltage
from relay room. The point switching group work like a slave of the main point
relay group.
With the route initiated, the main point group initiating relay Z 1WR picks up and
relay WLR and Z1WR1 picks up.
Z1WR of PSG operating opens WKR1 relay circuit of MPG and W(R)R operates
and switches on normal or reverse point initiating relay i.e., Z1NWR or Z1RWR.
After energizing of these relays WKR2 and WJR picks up. Simultaneously in
case of normal operation of points relays (N) WLR1, 2.3 operate successively.
Correspondingly relay (R) WLR1 2.3 operates for reverse operation. When the
third relay operates point initiating relay Z1NWR or Z1RWR drops and switches
on point contractor relay WR. WR in main group operating completes the circuit
for (N) WR or (R) WR and N/RWR relay operates for both operations. (N) WR or
(R) WR and N/RWR picking up WR relay operate, completing the motor
operation circuit and the point are operated to the required position. When the
point operation is completed WKR3 of PSG operates WKR3 of PSG switched on
WKR3 of MPG and relay WKR2, WJR, WR in main group and WR, N/RWR in
PSG drops, disconnecting point operation supply.
Relay W (N) R, W (N) PR in PSG and W (N) R of MPG operate. WKR2 of PSG
drops. W (N) R of MPG operating causes Z1WR of PSG to drop. WKR3 of both
the groups drop WKR1 of PSG now operates and closed the circuit for WKR 1 of
MPG. Now W(R) LR operates locking the points electrically.
For individual point operation the sequence of operation are same except for
locking of point group electrically.
NWR, Draft
WNR, Z1WR, WKR2, NWR, WNR, NWR, W(N)PR, WKR3, N-
60.
WKR1 in main point relay group picks up.
Sequence of Relay Operation Main point Group and Point Switching group
Draft
7.1. Control of point machine in Siemens RRI with out using major point
group.
Draft
For control of Sunderam Clayton LM 55 or Siemens point machines with out
using a point group in relay room an additional relay group called as Siemens
contractor relay group located at site is used to work in conjunction with the
neutral and interlocked mini groups in the cabin.
When the route is initiated, the concerned point initiating relay Z1WR picks up
and switches on WLR, these two relay front contacts switches on point chain
group WWR relays and finally WR1 operates and during individual point
operation when the concern point button and group button is pressed WR1
operates directly proving track locking condition etc. WR1 switches on (R/N)
WR1 relays this relay disconnects a supply to RKR or NKR and RR or NR relays,
after dropping of these relays WR2 relay operates and this relay switches on
(R/N) WR2 and NR/RR picks up. Now the circuit is ready to switch on point
contactor relay unit at location. For this buttons are required to be released for
individual point operation and in case point operation in route Z 1WR relay drops
and finally WR1 relay drops and now RWR or NWR relay operates at location,
this relay switches on point contactor relay group. By operating N/R relay,
W(R/N) R relays, XR and finally WCR relay. WCR relay is a contactor relay,
having heavy-duty front contacts, with these. Contacts point operation supply is
extended to point machine, once the point is set detected and locked in normal
or reverse WNKR or WRKR picks up and drops RWR/NWR which causes NR,
XR WCR to drop and feed to the point m/c is disconnected and now detection
supply is extended from location to relay room to operate NKR or RKR once the
NKR or RKR picks up and drops WR2 relay. Through NKR or RKR front contact
steady indication is given on panels. If the point is operated in a route W(R)LR
relay latches and locks the point circuit electrically and proving crank handle
contact in the crank handle unit concern RWKR or NWKR relay picks up.
7.2 Following relays are used in relay room. All the relays are provided in
mini groups only.
1) WNR :- Point button relay
2) WWNR :- Point group button relay
3) EWNR :- Emergency point group button relay.
4) Z1WR :- Point initiating relay to respond during route initiation
5) WLR :- Points lock relay
6) WWR :- Point switching staggering relay
7) WR1 :-Point initiating relay No.1
8) (R/N)WR1 :- (R)WR1 :- Reverse point control relay No1.
(N)WR1: - Normal point control relay No1
9) RR :- Point group normal proving relay
10) NR :-Point group reverse proving relay.
11) WR2 :-Point operation initiating relay No.2
12) (R/N)WR2 :-(R)WR2:- reverse Point control relay No.2
(N)WR2:- Normal point control relay No. 2
13) NKR :- Point Normal detection relay
14) RKR :- Point Reverse detection relay
15)W(R/N)LR :- Point group electrically locking relay
16)RWKR :- Reverse point indication relay
17)NWKR
18) Z2 WR1
:-
:-
Normal point indication relay
Panel Point indication controlling relays No1.
Draft
19) Z2WR2 :- Panel Point indication controlling relay No 2.
It prevents recycles operation of point, when it is failed to set and locked. This
relay is provided with a stick circuit and drops only when the RWR/NWR relay
drops.
Two number of `Q’ series neutral relays used for switching the point contactor
relays are called as RWR and NWR.
Two number of `Q’ series relays are used in the location to detect the point
normal and reverse position.
Draft
7.1
Draft
Fig No : 7.2
Draft
Fig No : 7.3
Draft
Fig No :7.4
Draft
Fig No : 7.5
Draft
8. SEMI AUTOMATIC SIGNALS IN RRI (SIEMENS)
8.1. The semiautomatic signal for main line is first cleared by manual operation
and converted into an automatic signal to enable successive trains to be passed
with out the need for setting the routes. For making the signal to work as
automatic, after clearing the signal, the concern signal button and AGGN,
Automatic working initiating group button red in colour located on top of the
control panel have to be pressed simultaneously.
The details of introduction of auto working and its cancellation are dealt with in
the following paragraphs. When the signal and route buttons for main line are
pressed simultaneously and released, the route will be set and locked and the
signal will be cleared. By pressing GN and AGGN button, relay GLSPR picks up
and automatic route setting relay AU(R)R operates and latches. AU(R)R
operating `A’ marker light lit on the signal.
When the train passes the signal and occupies 1st track circuit, signal goes to
danger and relay UDKR drops, proving the sequential actuation of track circuits.
Concern UYR1 and UYR2 picks up and sticks. When the train clears route
section track circuit relay UDKR picks up. With UYR1 and UYR2 relays pick up
and proving the indication locking conditions of signal, the set sub route releases
U(N)S relay operates. Once the route normalized GLSPR relay drop. When the
train clears all the track circuit Automatic lock relay AULR picks up and sticks.
This relay drops every time when the train passes the signal and picks up when
it clears the route until automatic working is cancelled. With automatic lock relay
AULR and signal unlocking relay G(N)LR operating, AUZ1UR automatic route
initiating relay picks up. For each semiautomatic signal a separate route
initiating relay is provided.
These automatic route initiation relays are interlocked in similar way as the
button relays to ensure only one route initiation at a time is possible. This relay
operates only after a train has completed its movement over the route has been
released. This is achieved by proving in its control circuit that
AUZ1UR operating completes the route initiation circuit. The front contacts of
GNPR and UNPR are by passed by AUZ1UR front contact. Proving other
interlocking conditions Mn GZR and ZDUCR relay picks up, after this route
setting operation takes place. Once the route is initiated and set, relay GLSR
picks up and switches on GLSPR to operate. GLSPR picks up AUZ1UR relay
drops and allthe route initiating relay drops and route locking and signal
clearance takes place.
First set the route for main line by pressing concern GN and UN.
For converting manual working signal to auto working signal, press concern GN
& AGGN buttons simultaneously.
In Route Initiation and Signal Clearance circuit, the front contact of GNPR and
UNPR are by passed by AUZ1UR front contact. The sequence of relay operation
for signal clearance is same as in the case of manual operation.
Draft
First press signal button and AGGYN button simultaneously. Automatic working
cancellation relay AUYR picks up and sticks and cuts off the supply to `A’ marker
lamp and AECR relay drops. Proving signal displaying OFF aspect and `A’
marker light extinguished. Relay AU(N)R (Auto working relay normal coil)
operates and latches and once AU(N)R picks up disconnect the supply to AUYR
and AUYR relay drops. Now the signal is working as a manual signal.
First press signal button and AGGYN button simultaneously. Auto working
Cancellation relay picks up and sticks, it causes the supply to `A’ marker lamp to
be disconnected and AECR relay drops.
Press signal button and full route cancellation button (EUUYN)
simultaneously and release EUUYN button only and then press concern route
button. Route cancellation relay EUYR picks up and releases set route sections,
overlaps and auto working of signal.
For circuit explanation refer circuit diagram no : 3.15
Draft
a)
Draft
Fig No : 8.1
Draft
Fig No :8.2
Generally, the supply made available is of 3 phase 440V, 50Hz and various
transformers, rectifiers/battery chargers are employed to obtain different voltages
required for different circuits. In signal lamp supply a constant voltage is
required to be maintained. For this a constant voltage transformer i.e. voltage
stabilizers are employed to over come the problem of supply fluctuations.
In Siemens RRI, the supply arrangements also take into account the various
load. Number of transformers, rectifiers/Battery chargers are employed, and
generally the supply arrangement is made as under:
a) D.C 120 Volts supply for operation of point machines
b) D.C 60 volts supply for Internal circuits.
c) D.C 60 volts supply for External circuits
d) D.C 12 0r 24 volts supply for cutting in relay circuits
e) A.C 110 volts supply for track circuits.
f) A.C 110 volts supply for signal lamp circuits.
g) A.C 24 volts supply for panel indication circuits.
The power supply control panel is located separately in power supply room
which consists of various controlling switches, supply indications in front of the
panel, ammeters, voltmeters, frequency meters, voltage sensing relays, flasher
relay, automatic power supply change over facility from main to standby supply
whenever the main supply fails, various fuses, air circuit breakers with control
equipment for various supplies etc. In addition of this, earth leakage detector
sets for various circuits supply are also provided separately adjacent to the L.T.
Panel.
RRI Bhusaval, central Railway, power supply arrangement circuit is attached for
reference.
Draft
Fig No : 9.1
Draft
Fig No : 9.2
Draft
Fig No : 9.3
Draft
Fig No : 9.4
Draft
Fig No : 9.5
Draft
Fig No : 9.6
Draft
Fig No : 9.7
Draft
Fig No : 9.8
PANEL
1. Ensure that EWN and EUYN buttons are sealed properly. They are
resealed properly after their use and entries are to be made in the register
provided for the same.
2. Ensure that all counters are operating correctly and entries are recorded
in the register along with reasons.
3. Ensure the cancellation of the sub routes by SI’s key and EUYN button
and is done only after the receipt of the memo from operating staff and complete
verification of the position of the routes.
4. Ensure that the crank handle box is sealed properly and entries of crank
handle are recorded properly in the register.
5. Ensure that all the indications (route, point track, signals etc) are properly
illuminated on the panel.
6. Ensure that visual/audible indications for signals, points and function
failure indications etc. are indicated /displayed correctly.
RELAY ROOM
7. Ensure that relay room is double locked, one by S&T staff and other by
operating staff. Record entries in the special register for the purpose whenever
the relay room is opened for maintenance or attending failures.
8. Ensure that signal, point, route group, mini group and other relays are
sealed.
9. Ensure that testing of circuits, replacement of relays group etc are carried
out only after the acceptance of disconnection memo by operating staff.
10. Record the track relay voltages regularly.
11. Carry out the locking testing of panel for various routes periodically and
record in the register.
12. Carry our track locking, approach locking, route locking etc. periodically
and record in the register.
POWER ROOM
DON’T’S
1. Do not open the relay room with out prior permission of operating staff
and necessary entries in the register.
2.
EUYN button.
Draft
Do not allow unauthorized person to cancel the sub routes by SI’s key and
Some of the possible failure symptoms and the possible causes are
given below.
******************
Draft
REVIEW QUESTIONS
Subjective :
Q1. Prepare Flow Chart for Main Signal Clearance Circuit in case of Rout Setting
type Siemens Relay Interlocking System?
Q2. Prepare Flow Chart for Point Operation in case of. Rout Setting type
Siemens Relay Interlocking System?
Objective:
2. Feed to the GLSR Relay Cuts off when GPR Relay Pick up.
(True)
6. ZR Relay pick contact up is must for Sequential Route Release circuit. of UYR
1 & UYR2
(True)
7. WKR1
(False)
is the final relay to pick up in point Draft
group.
10. WKR2 is also picked up when point at site and Point group in relay room is
not in correspondence.
(False)