GOA NATURAL GAS PVT. LTD.
A Joint Venture of Bharat Petroleum Corporation Limited
(BPCL) & GAIL GAS Limited
CITY GAS DISTRIBUTION PROJECT
BID DOCUMENT
FOR
CIVIL, STRUCTURAL, MECHANICAL AND ELECTRICAL
WORKS FOR CITY GATE STATION, MOTHER CNG
STATIONS, DAUGHTER BOOSTER STATION, AND ONLINE
STATION IN NORTH GOA GA- TWO YEARS ARC
DOMESTIC COMPETITIVE BIDDING
Bid Document No.: 05/51/23SA/GNGPL/001-iv
Visit: www.tenderwizard.com/MECON
(Tenderwizard helpdesk: 011-49424365)
VOLUME – III OF III
PREPARED AND ISSUED BY
MECON LIMITED
(A Govt. of India Undertaking)
Delhi, India
CONTENTS
List of Drawings
A. DRAWINGS OF CIVIL
Scope for building works MEC/05/11/STD/TERMINAL/001
Typical details of forecourt MEC/05/11/STD/CNG/001
Typical details of road and paver block flooring MEC/05/11/STD/CNG/002
Typical details of SS tube trench MEC/05/11/STD/CNG/003
Details of dispenser island(Reinforcement and shuttering) MEC/05/11/STD/CNG/004
Detail of boundary wall MEC/05/11/STD/CNG/005
B. DRAWINGS OF ARCHITECTURE
Typical office building for CNG stations MEC/23SA/05/48/A/004
Ground floor plan, elevation & schedule of finishes
Typical office building for CNG stations MEC/23SA/05/48/A/005
Roof plan, section & schedule of openings
Typical office building for CNG stations MEC/23SA/05/48/A/006
Toilet Details
C. DRAWINGS OF STRUCTURAL
Detail of LCV stand MEC/23SA/05/12/SD/001/1077
Detail of cat-ladder for access to roof MEC/23SA/05/12/SD/001/1076
Detail of safety guard MEC/23SA/05/12/SD/001/1075
Typical detail of gate & fencing (2100 mm high) MEC/23SA/05/12/SD/001/1074
Typical detail of gate & fencing (1500 mm high) MEC/23SA/05/12/SD/001/1073
Typical detail of loading/unloading platform MEC/23SA/05/12/SD/001/1072
D. DRAWINGS OF ELECTRICAL
ELECTRICAL SINGLE LINE DIAGRAM
Marking of trenches for Electric cables MEC/SD/05/E9/01/01
Typical section of cable trench In unpaved areas MEC/SD/05/E9/01/02
Earth Electrode In Test Pit MEC/SD/05/E9/02/01
Copper Plate Electrode In Test Pit MEC/SD/05/E9/02/02
Typical earth connection for Street light pole MEC/SD/05/E9/02/03
Earthing Of Tanks And Vessels MEC/SD/05/E9/02/04
Earthing Method For Processing Equipment MEC/SD/05/E9/02/05
Typical Installation Of Pole Mounted Street Lighting MEC/SD/05/E9/03/01
Fixture For Safe Area (Without Rungs)
Block Diagram For Ups System, 3ph. Charger And Acdb MEC/SD/05/E9/071/01
Typical Installation Of Flood Lighting Pole (With Rungs) MEC/SD/05/E9/071/02
Div.2 / Flame Proof Lighting Fixture Mounting Details MEC/SD/05/E9/071/03
Typical Installation Of Lighting Fixtures On Gi Octogonal MEC/SD/05/E9/77/04
Pole. Sheet 1 of 3
Typical Installation Of Lighting Fixtures On Gi Octogonal MEC/SD/05/E9/77/04
Pole. Sheet 2 of 3
Typical Installation Of Lighting Fixtures On Gi Octogonal MEC/SD/05/E9/77/04
Pole. Sheet 3 of 3
E. DRAWINGS LAYOUT OF CNG STATIONS
Typical Schematic layout of SS 304 tubes for MEC/STD/05/25/M/TYP/01
INSTRUMENT AIR SUPPLY SHEET(3 OF 3)
Typical detail of SS TUBES & VALVES in ISOMETRIC MEC/STD/05/25/M/TYP/01
VIEW SHEET(2 OF 3)
Schematic Layout of SS 316 tubes within TRENCHES MEC/STD/05/25/M/TYP/02
for CNG SUPPLY
Typical Schematic layout of SS 316 TUBES within MEC/STD/05/25/M/TYP/01
TRENCHES for CNG SUPPLY SHEET(1 OF 3)
STANDARD DRAWING
(CIVIL)
STANDARD DRAWING
(STRUCTURAL)
STANDARD DRAWING
(ELECTRICAL SYSTEM)
OIL & GAS SBU
WORKS CONTRACT TENDER
FOR CIVIL, ARCHITECTURE,
STRUCTURAL, ELECTRICAL &
MECHANICAL WORKS IN CNG
STATION AT NORTH GOA MECON LTD, DELHI
TITLE LIST OF STANDARD Page 1 of 1
DRAWINGS
REVISION 0
LIST OF STANDARD DRAWINGS (ELECTRICAL)
Sl. Description of Drawings Drawings No.
No.
1 MARKING OF TRENCHES FOR MEC/SD/05/E9/01/01
ELECTRIC CABLES
2 TYPICAL SECTION OF CABLE TRENCH MEC/SD/05/E9/01/02
IN UNPAVED AREAS
3 EARTH ELECTRODE IN TEST PIT MEC/SD/05/E9/02/01
4 COPPER PLATE ELECTRODE IN TEST MEC/SD/05/E9/02/02
PIT
5 TYPICAL EARTH CONNECTION FOR MEC/SD/05/E9/02/03
STREET LIGHT POLE
6 EARTHING OF TANKS AND VESSELS MEC/SD/05/E9/02/04
7 EARTHING METHOD FOR MEC/SD/05/E9/02/05
PROCESSING EQUIPMENT
8 TYPICAL INSTALLATION OF POLE MEC/SD/05/E9/03/01
MOUNTED STREET LIGHTING FIXTURE
FOR SAFE AREA (WITHOUT RUNGS)
9 BLOCK DIAGRAM FOR UPS SYSTEM, MEC/SD/05/E9/071/01
3PH. CHARGER AND ACDB
10 TYPICAL INSTALLATION OF FLOOD MEC/SD/05/E9/77/02
LIGHTING POLE (WITH RUNGS)
11 DIV.2 / FLAME PROOF LIGHTING MEC/SD/05/E9/77/03
FIXTURE MOUNTING DETAILS
12 TYPICAL INSTALLATION OF LIGHTING MEC/SD/05/E9/77/04
FIXTURES ON GI OCTOGONAL POLE. Sheet 1 of 3
13 TYPICAL INSTALLATION OF LIGHTING MEC/SD/05/E9/77/04
FIXTURES ON GI OCTOGONAL POLE. Sheet 2 of 3
14 TYPICAL INSTALLATION OF LIGHTING MEC/SD/05/E9/77/04
FIXTURES ON GI OCTOGONAL POLE. Sheet 3 of 3
STANDARD DRAWING
(MECHANICAL)