FOR TENDER PURPOSE ONLY
NOTE:
C/L OF SYMMETRY
1. All dimensions are in mm
A 2. No dimension shall be scaled from the drawings, only written dimension shall be
D HANGER
6251 followed.
6273 6258
6296 3. This bridge span is designed for pedestrian loads only as per IRC -6 .
6326 4. This bridge span is design for earthquake zone II as per IRC SP 114
6365 5. Analysis and design of steel frame is as per IRC:24-2010.
6412 D 6. Analysis and design of composite concrete deck is as per IRC 22 2015
6469 7. All steel to be used in fabrication of this bridge shall be of grade of B0-E250 as per IS
6536 2062
3 8. Grade of concrete(RCC) shall be used M35.
661 9. All material shall pass test /analysis prescribe by relevant IS specification.
3
670 10. All steel work fabrication shall be done in accordance with indian codes.
800
6 11. Workshop welding :
30000
29892
680
29569
400
29030
28272
a) All workshop fabrication shall be done using SAW ( submerged arc welding )
27292
26087
process only.
24653
3
692
22984
C C 12. On site welding :
21072
C/L OF BEARING a) All welding other than workshop welding shall be done through gas shielded
18910
5 8
70 16489 FCAW ( Flux core arc welding ) process only. SMAW (shielded metal arc welding
) also known as manual metal arc welding shall NOT be permitted anywhere in
13796
2 the structure.
10818
1
72 C/L OF BEARING b) The gas shield to be used in the PCAW process may be CO2, Argon or CO2
7539
-Argon mixture .
89 B
1200
1200
1200
3941
c) In PCAW process , wind screen and/or enclosure shall be provided around the
73 welding location to prevent shielding gas from blown out.
d) Welding shall be performed on prepared metal surface free from rust, dust ,
100
moisture etc. and before every new pass ,alag must be carefully chipped off
1000 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 6250 1000 from weld surface .
1000 13. Method of launching shall be approved
200000
14. Pier and foundation used here are to represent arrangement of bow strings girder .
Actual dimensions of pier and foundation is site specific and shall be as per actual detailed
A B
design
15. Above drawing is tentative and for tender purpose only showing salient details and
LONGITUDINAL SECTIONAL ELEVATION not for actual execution .
BOTTOM CROSS BEAM C/L OF SYMMETRY BOTTOM LONG BEAM
600
600
DATE REVISION REMARKS
E E F F
6000
6600 Project : PEDESTRIAN BRIDGE ON RUDRA SAGAR LAKE
6000
2083 2083 2083 2083 2083 2083 2083
OWNER :
600
600
BOTTOM LONG BEAM UJJAIN SMART CITY LIMITED (USCL), UJJAIN
48 @ 2083 = 100 M 48 @ 2083 = 100 M PROJECT DEVELOPMENT AND MANAGEMENT
1000 1000
CONSULTANT (PDMC)
BOTTOM PLAN ROOM NO. 11, MELA OFFICE, KOTHI ROAD , UJJAIN , MP
IPE GLOBAL LIMITED. (LEAD CONSULTANT)
TOP TIE BEAM
ARCH C/L OF SYMMETRY PRICEWATERHOUSECOOPERS PVT. LTD.
600
(ASSOCIATE CONSULTANT)
SUB :
6000
G G
TENDER DRAWING
600
Issue signatures (PDMC)
81250 6250 6250 6250 6250 6250 6250 81250 1000
ARCH Designation Name
1000
TOP PLAN
Bridge Expert MANVENDRA NIGAM
Team Leader SANJAY SHAKYA
Y
Date & seal(PDMC)
X
H
Checked & recommended for approval -
1.8
Designation Name Signature
3000 3000
SECTION A-A EE CIVIL Farid Uddin Qureshi
Approved by
Designation Signature & seal
Superintending Engg.
1200
DWG. TITLE :
PROPOSED BRIDGE BOW
STRING STEEL GIRDER
AT 200 M SPAN
DETAIL - Y
Drawing No. GAD/001 R0