10 Seconds To Full Backup Power With Close Before Excitation (CBE)

The Close Before Excitation (CBE) feature from DEIF allows backup power systems with multiple generators to reach full power output in less than 10 seconds. CBE works by starting all generators simultaneously and ramping up their voltage together, eliminating the need for synchronization between generators. This allows critical facilities to comply with regulations requiring backup power within 10-15 seconds of a grid failure. CBE can also be used to soft start transformers connected to the generators.

Uploaded by

rikirik2008
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
120 views5 pages

10 Seconds To Full Backup Power With Close Before Excitation (CBE)

The Close Before Excitation (CBE) feature from DEIF allows backup power systems with multiple generators to reach full power output in less than 10 seconds. CBE works by starting all generators simultaneously and ramping up their voltage together, eliminating the need for synchronization between generators. This allows critical facilities to comply with regulations requiring backup power within 10-15 seconds of a grid failure. CBE can also be used to soft start transformers connected to the generators.

Uploaded by

rikirik2008
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

9/3/2021 10 seconds to full backup power with Close Before Excitation (CBE)

Search

12 November 2019

10 seconds to full backup power with Close


Before Excitation

Home / 
Blog / 
10 seconds to full backup power with Close Before Excitation

Share with friends


5

In backup power installations with multiple gensets, getting full backup power quickly can be a
challenge, as the gensets need to be synchronised. The Close Before Excitation (CBE)
feature from DEIF allows any number of gensets to attain nominal power in less than 10
seconds, allowing you to comply with regulatory and other demands. In addition, CBE can be
used to carry out soft-start procedures and avoid current spikes, for example when the
gensets feed step-up transformers.

When grid power fails, backup power is often needed very quickly. For hospital applications,
for example, EU regulations require full backup power to be available within 15 seconds of a
grid blackout while the US FPA stipulates a 10 second limit. With traditional genset start-up
procedures, however, it is very difficult to comply with these regulations because all gensets
need to be synchronised. This takes extra time; a luxury you may not be able to afford.


https://www.deif.com/blog/posts/10-seconds-to-full-backup-power-with-close-before-excitation/ 1/5
9/3/2021 10 seconds to full backup power with Close Before Excitation (CBE)

CBE: Search
nominal power quickly
DEIF’s Close Before Excitation (CBE) feature lets you solve this problem. With CBE, you can
deliver the required power from multiple gensets in less than 10 seconds. The feature is
included in DEIF generator controllers such as the AGC-4; here is how it works:

When grid power fails, and the mains breakers open, the genset controllers crank the genset
engines but do not activate excitation yet. As soon as the genset engines are running at
around 400 RPM, all generator breakers are closed at once, connecting all gensets (still
without excitation) to the bus bar. At around 900 RPM, the automatic voltage regulation (AVR)
feature of the genset controllers activates excitation for all connected gensets, ramping up
voltage to nominal power in a controlled manner. At nominal speed and voltage, the tie
breakers are closed, and the critical power system delivers the required power to the
connected loads. No matter how many gensets are connected to the bus bar, the process can
be completed in less than 10 seconds.

No genset synchronisation
The big difference between CBE and traditional genset starting procedures is that with CBE,
there is no need for genset synchronisation. With a traditional starting procedure, the first
genset to attain nominal speed and voltage is connected to the bus bar before the others. As
subsequent gensets become ready, they are connected to the bus bar, but they need to be
synchronised with previously connected gensets in order to prevent voltage and frequency
irregularities. Each synchronisation takes time, in addition to the time it takes to bring the first
genset online, and particularly in large installations with multiple gensets, this can mean that
full backup power is not available until 25 to 30 seconds after the mains failure – or even
longer. With CBE, there is no traditional synchronisation and therefore far less delay.


https://www.deif.com/blog/posts/10-seconds-to-full-backup-power-with-close-before-excitation/ 2/5
9/3/2021 10 seconds to full backup power with Close Before Excitation (CBE)

Search

Transformer soft-start with CBE


CBE can also be used as a soft-start method when the gensets connect to a transformer, for
example if your system has step-up transformers between the gensets and the busbar. If you
applied the full power of the gensets to the transformers, the unmagnetised transformers
would appear as short circuits to the gensets, resulting in a transitory high inrush current
which could, in the worst cases, cause the generators to trip because of overcurrent. With
CBE, voltage is ramped up gradually, limiting inrush currents and effectively soft-starting the
transformers. You therefore avoid voltage spikes, and the current is gradually ramped up
without causing short circuits.

CBE can thus be used to control genset power delivery dynamically and intelligently. The
greatest benefit, however, is its ability to provide massive backup power on very short notice.
In many applications, it is not just a question of regulatory compliance; it can literally be a
matter of life or death.

Read more about the DEIF AGC-automatic genset 4 controller with CBE

Download a FREE whitepaper about power management systems including a discussion of


CBE 

Share with friends 


https://www.deif.com/blog/posts/10-seconds-to-full-backup-power-with-close-before-excitation/ 3/5
9/3/2021 10 seconds to full backup power with Close Before Excitation (CBE)

5
Search

About author

Ulrik Mosgaard Hannesbo


Application Engineer

Send email

Related blogs

Tips for choosing a critical power Eliminate single points of failure in


service plan your critical power system
12 MAY 2020 04 MAY 2020


https://www.deif.com/blog/posts/10-seconds-to-full-backup-power-with-close-before-excitation/ 4/5
9/3/2021 10 seconds to full backup power with Close Before Excitation (CBE)

Search

Energised and de-energised


explained
22 APRIL 2020

We’re pretty social too

About us DEIF A/S

About
Frisenborgvej 33

Career
7800 Skive

Contact
Denmark

CSR

Tel: +45 9614 9614

Terms of use

Email: [email protected]
Logo and pictures

Sign up for our newsletter

Unsubscribe from newsletter


https://www.deif.com/blog/posts/10-seconds-to-full-backup-power-with-close-before-excitation/ 5/5

You might also like