0% found this document useful (0 votes)
165 views1 page

IMS - Format IMS Objective Progress Report: S. No Quality Objective Target

This document presents an IMS objective progress report with 5 quality objectives and their targets for various months. The objectives include: 1) Reduction of specific steam consumption of the extraction condensing turbine, 2) Reduction of TG power generation cost, 3) Increase Steam Fuel ratio, 4) Maintenance Cost/Unit of power generation, and 5) Safety Management with no incidents. Performance is tracked for 3 cases - both potato plants running, single potato plant running, and both potato plants shut down. Targets are provided for months April through March.

Uploaded by

Mayank Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
165 views1 page

IMS - Format IMS Objective Progress Report: S. No Quality Objective Target

This document presents an IMS objective progress report with 5 quality objectives and their targets for various months. The objectives include: 1) Reduction of specific steam consumption of the extraction condensing turbine, 2) Reduction of TG power generation cost, 3) Increase Steam Fuel ratio, 4) Maintenance Cost/Unit of power generation, and 5) Safety Management with no incidents. Performance is tracked for 3 cases - both potato plants running, single potato plant running, and both potato plants shut down. Targets are provided for months April through March.

Uploaded by

Mayank Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Doc No.

: MIL-HPR-IMS-F-19
IMS – Format Issue No. :
Issue Date :
09
24-01-2017
IMS Objective Progress Report Rev. No.
Rev. Date :
: 00
00
S. No Quality Objective TARGET
Reduction of specific steam consumption of
1 the Extraction condensing turbine for net Apr 21 May 21 June 21 July 21 Aug 21 Sep 21 Oct 21 Nov 21 Dec 21 Jan 21 Feb 21 Mar 21
power supplied to plant.

A Case I: Both unit Potato Plant Running 4.25 4.32 4.33 4.42 4.38 4.19

B Case II: Single unit Potato plant Running 4.3

Case III: Both unit potato plants under shut


C 4.6 4.9 5.32 5.24 4.58 5.39
down.
Reduction of TG power generation cost
2
Including fixed & miscellaneous cost.
A Case I: Both unit Potato Plant Running 6.2
B Case II: Single unit Potato plant Running 6.75
Case III: Both unit potato plants under shut
C 6.85
down. Base fuel price @ Rs.2.50/Kg.
3 Increase Steam Fuel ratio (on dry basis) 4.1 4.01 4.00 3.89 4.02 4.02
4 Maintenance Cost/Unit of power generation 0.2
5 Safety Management(No incident) 0
Note – Efficiency cannot be calculated in wet basis, so we are calculating on dry basis

MIL-HPR- IMS-F-19/09/24-01-2017

You might also like