31041500-OSN 1500 Commissioning Guide (V1.20)

The document provides guidance on commissioning telecommunications network equipment and testing the full network. It describes checking hardware, testing subrack functions, verifying software versions, testing optical and electrical interfaces, and ensuring services like protection switching, Ethernet, orderwire and clocks function properly across all network elements. Comprehensive testing is outlined to validate the network meets engineering requirements and services are available end-to-end.

Uploaded by

vinhlyquoc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views5 pages

31041500-OSN 1500 Commissioning Guide (V1.20)

The document provides guidance on commissioning telecommunications network equipment and testing the full network. It describes checking hardware, testing subrack functions, verifying software versions, testing optical and electrical interfaces, and ensuring services like protection switching, Ethernet, orderwire and clocks function properly across all network elements. Comprehensive testing is outlined to validate the network meets engineering requirements and services are available end-to-end.

Uploaded by

vinhlyquoc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
You are on page 1/ 5

1 Preparations for Equipment Commissioning ............................................

1-1
1.1 Instruments and Tools ............................................................................ 1-2
1.2 Engineering Information ......................................................................... 1-3
1.3 External Check ....................................................................................... 1-3
1.4 Requirements to Commissioning Engineers .......................................... 1-3
1.5 Commissioning Process ......................................................................... 1-4
2 Network Element Commissioning ............................................................... 2-1
2.1 Checking Hardware ................................................................................ 2-4
2.1.1 Checking Subracks ........................................................................ 2-4
2.1.2 Checking Cable Connection .......................................................... 2-4
2.1.3 Checking Board Appearance ......................................................... 2-5
2.1.4 Checking Interface Connection on the AUX Board ........................ 2-5
2.1.5 Checking Interface Connection on the EOW Board ....................... 2-5
2.2 Testing Subrack Functions ..................................................................... 2-6
2.2.1 Testing Power-on of the Subrack ................................................... 2-6
2.2.2 Testing the Fan .............................................................................. 2-6
2.2.3 Observing the Status of Board Indicators ...................................... 2-7
2.2.4 Delivering Commissioning Data ..................................................... 2-7
2.2.5 Testing the ALMC Button on the CXL16 ........................................ 2-8
2.2.6 Testing the RESET Button on the CXL16 Board ........................... 2-9
2.2.7 Testing the Centralized Alarm Processing System ........................ 2-10
2.2.8 Testing Ethernet Ports on the AUX Board ..................................... 2-10
2.3 Checking the Software Version .............................................................. 2-12
2.4 Testing Optical/Electrical Interface Indices ............................................ 2-12
2.4.1 Testing the Mean Launched Power ............................................... 2-12
2.4.2 Testing Actual Received Optical Power ......................................... 2-13
2.5 Testing the On/Off of All Electrical Interfaces ......................................... 2-16
2.6 Testing the Fiber Jumper Distribution .................................................... 2-16
2.7 Testing Buses of the Protection Unit of the TPS Electrical Interface 2-17 .....
2.8 Testing the Active/Standby Protection ................................................... 2-19
2.9 Testing Buses in Series and Monitoring Alarms and Performance 2-21 ........
2.10 Backing up the NE Database ............................................................... 2-23
2.11 Testing the Intra-Station ECC .............................................................. 2-24
2.12 Testing NE Restarting After Power Failure .......................................... 2-25
2.13 End of Commissioning ......................................................................... 2-26
2.13.1 Restoring the System ................................................................... 2-26
2.13.2 Compiling Related Engineering Documents ................................ 2-26
3 Network Commissioning .............................................................................. 3-1
3.1 Engineering Information ......................................................................... 3-3
3.1.1 Engineering Requirements ............................................................ 3-3
3.1.2 Networking Diagram ...................................................................... 3-3
3.1.3 IP Address Allocation Diagram ...................................................... 3-4
3.1.4 Board Layout of Each NE .............................................................. 3-4
3.1.5 Fiber & Cable Connection Table .................................................... 3-6
3.1.6 Timeslot Allocation Diagram .......................................................... 3-6
3.1.7 Ethernet Service Connection Table ............................................... 3-7
3.1.8 Board Level Protection Information ................................................ 3-8
3.1.9 Clock Tracing Diagram .................................................................. 3-8
3.1.10 Orderwire Diagram ....................................................................... 3-9
3.2 Before Commissioning ........................................................................... 3-10
3.3 Testing Network-wide Fiber Connection ................................................ 3-11
3.3.1 Checking Fiber Jumper Labeling ................................................... 3-11
3.3.2 Testing the Actual Received Optical Power ................................... 3-12
3.3.3 Checking Optical Fiber Connection ............................................... 3-13
3.4 Testing ECC Routing .............................................................................. 3-14
3.4.1 Testing NE Login ........................................................................... 3-14
3.4.2 Testing ECC Automatic Routing .................................................... 3-15
3.4.3 Testing Single Route ECC ............................................................. 3-15
3.4.4 ECC Pass-through Test ................................................................. 3-16
3.4.5 Testing Extended ECC .................................................................. 3-17
3.5 Testing Service Channel Availability ...................................................... 3-18
3.5.1 Checking the Correctness of NE Configuration ............................. 3-18
3.5.2 Electrical Interface Services ........................................................... 3-18
3.5.3 Optical Interface Services .............................................................. 3-19
3.6 Testing Ethernet Services ...................................................................... 3-21
3.6.1 Ethernet Private Line Services ....................................................... 3-21
3.6.2 Ethernet LAN Services ................................................................... 3-23
3.7 Testing Self-healing Protection Switching .............................................. 3-24
3.7.1 Testing Two-Fiber Bidirectional MSP Switching ............................ 3-24
3.7.2 Testing Four-Fiber Bidirectional MSP Switching ............................ 3-28
3.7.3 Testing 1+1 Linear MSP Switching ................................................ 3-30
3.7.4 Testing 1:N Linear MSP Switching ................................................ 3-34
3.7.5 Testing SNCP Service Switching ................................................... 3-36
3.8 Testing Clock Protection Switching ........................................................ 3-41
3.9 Testing Orderwire ................................................................................... 3-42
3.9.1 Testing the Addressing Call ........................................................... 3-42
3.9.2 Testing the Conference Call .......................................................... 3-42
3.9.3 Testing Orderwire Functions upon Fiber-Cut ................................. 3-44
3.9.4 Testing Orderwire Functions upon Orderwire Pass-through 3-44 ..........
3.10 Testing Network-wide BER .................................................................. 3-45
3.10.1 Testing Intra-Ring BER ................................................................ 3-45
3.10.2 Testing BER from Ring to Chain .................................................. 3-46
3.11 Test Other Items ................................................................................... 3-48
3.12 Service Configuration ........................................................................... 3-48
3.13 NM Function Verification ...................................................................... 3-48
A Test of Common Indices ............................................................................. A-1
A.1 Receiver Sensitivity ................................................................................ A-1
A.1.1 Introduction .................................................................................... A-1
A.1.2 Testing Instrument ......................................................................... A-1
A.1.3 Test Procedures ............................................................................ A-1
A.2 Receiver Overload ................................................................................. A-3
A.2.1 Introducing ..................................................................................... A-3
A.2.2 Testing Instrument ......................................................................... A-3
A.2.3 Test Procedures ............................................................................ A-3
A.3 Allowable Input Frequency Deviation at the Optical Interface A-4 ...............
A.3.1 Introduction .................................................................................... A-4
A.3.2 Testing Instrument ......................................................................... A-4
A.3.3 Test Procedures ............................................................................ A-4
A.4 Input Jitter Tolerance at the STM-N Interface ........................................ A-5
A.4.1 Introduction .................................................................................... A-5
A.4.2 Testing Instrument ......................................................................... A-5
A.4.3 Test Procedures ............................................................................ A-5
A.5 Output Jitter at the Optical Interface ...................................................... A-7
A.5.1 Introduction .................................................................................... A-7
A.5.2 Testing Instrument ......................................................................... A-7
A.5.3 Test Procedures ............................................................................ A-8
A.6 Allowable Input Frequency Deviation at the Electrical Interface A-9 ............
A.6.1 Introduction .................................................................................... A-9
A.6.2 Testing Instrument ......................................................................... A-9
A.6.3 Test Procedures ............................................................................ A-9
A.7 Input Jitter Tolerance of Electrical Interface ........................................... A-10
A.7.1 Introduction .................................................................................... A-10
A.7.2 Testing Instrument ......................................................................... A-10
A.7.3 Test Procedures ............................................................................ A-10
A.8 Output Jitter at the Electrical Interface ................................................... A-11
A.8.1 Test Procedures ............................................................................ A-11
A.9 Mapping Jitter ........................................................................................ A-12
A.9.1 Introduction .................................................................................... A-12
A.9.2 Testing Instrument ......................................................................... A-12
A.9.3 Test Procedures ............................................................................ A-12
A.10 Combined Jitter .................................................................................... A-13
A.10.1 Introduction .................................................................................. A-13
A.10.2 Testing Instrument ....................................................................... A-13
HUAWEI A.10.3 Test Procedures .......................................................................... A-13
Index.................................................................................................................

OptiX OSN 1500 Intelligent Optical Transmission


System
Commissioning Guide

V100R002

Huawei Technologies Proprietary

You might also like