Director of Forestry v. Muñoz, GR No. L-24796, June 18, 1968
Director of Forestry v. Muñoz, GR No. L-24796, June 18, 1968
L-24796
EN BANC
DIRECTOR OF FORESTRY, FOREST STATION WARDEN, DISTRICT 13, BUREAU OF FORESTRY, BOARD
OF DIRECTORS, NATIONAL WATERWORKS AND SEWERAGE AUTHORITY 1 and CHIEF OF STAFF,
ARMED FORCES OF THE PHILIPPINES, petitioners,
vs.
HON. EMMANUEL M. MUÑOZ, as Judge of the Court of First Instance of Bulacan, Branch I, the SHERIFF
OF THE PROVINCE of BULACAN, and PINAGCAMALIGAN INDO-AGRO DEVELOPMENT CORPORATION,
INC.,respondents.
-----------------------------
SANCHEZ, J.:
Two original actions involving divers legal questions are now before this Court.
In the first, L-24796, the corresponding government officials seek — on certiorari and prohibition — to annul the
order and writ of execution issued by the Court of First Instance of Bulacan in its Civil Case 3035-M allowing
Pinagcamaligan Indo-Agro Development Corporation, Inc. (Piadeco, for short) to haul its logs in the area
hereinafter to be mentioned.
In the second, L-25459, it was Piadeco's turn to ask — on prohibition and injunction — for a ruling that
respondent government officials are "without authority and jurisdiction to stop logging operations, construction of
the roads, cutting, gathering and removing of timber and other forest products" from said corporation's private
woodland area.
Because of their interrelation, the two case are here jointly considered.
Piadeco claims to be the owner of Some 72,000 hectares of land 3 located in the municipalities of Angat,
Norzagaray and San Jose del Monte, province of Bulacan, and in Antipolo and Montalban, province of Rizal.
Piadeco's evidence of ownership consists of Titulo de Propiedad No. 4136, dated April 25, 1894,4 and a deed of
absolute sale of July 12, 1962, in its favor. Piadeco applied for registration as private woodland some 10,000
hectares of this land. The Bureau of Forestry, on December 4, 1963, issued in Piadeco's name Certificate of
Private Woodland Registration No. PWR 2065-New, covering but a portion of the land an aggregate area of
4,400 hectares and an average stand of 87.20 cubic meters, situated in the municipalities of Angat, Norzagaray,
and San Jose del Monte, all of the province of Bulacan, and Montalban, in Rizal. It was to expire on December
31, 1964. By virtue of the registration certificate, Piadeco conducted logging operations..
The controversy in the these cases began on April 11, 1964, when Acting Director of Forestry Apolonio F. Rivera
issued an order cancelling PWR No. 2065-New. He required Piadeco to surrender the original certificate to him.
Ground for this cancellation was that Piadeco had violated forestry rules and regulations for cutting trees within
the Angat and Marikina Watershed Reservations, expressly excluded from the said certificate.5
https://lawphil.net/judjuris/juri1968/jun1968/gr_l-24796_1968.html 1/15
8/26/2021 G.R. No. L-24796
On April 14, 1964, Forest Station Warden Reinaldo B. Marquez, District 13, Bureau of Forestry, wrote Piadeco
requesting the latter to desist, effective the same day, April 14, 1964, from conducting its logging operation inside
or outside the area covered by PWR 2065-New, and to refrain from removing logs already cut unless they have
been scaled and properly invoiced by forestry officers.
Previously, on April 10, 1964, Nawasa's board of directors advised Piadeco, by letter, of the revocation of the
1964 grant to Piadeco, of a right of way from a barrio in Bosoboso, Antipolo, to Montalban, Rizal, as an access
road to its logging concession under PWR 2061.
Offshot of the foregoing is Piadeco's petition for certiorari and prohibition with preliminary injunction, lodged on
April 17, 1964 with the Court of First Instance of Bulacan.6 This petition was directed against the Director of
Forestry, Forest Station Warden Marquez and Nawasa, essentially upon the averment that their acts heretofore
narrated were "all precipitate, arbitrary, whimsical and capricious." On the same day, April 17, 1964, Judge
Emmanuel M. Muñoz of the Bulacan court directed the government authorities to show cause why preliminary
injunction should not issue.
On May 4, 1964, over the Director of Forestry's opposition, the judge ordered the issuance — upon a P10,000-
bond — of a writ of preliminary injunction restraining the Director of Forestry, the Forest Station Warden and
Nawasa from carrying out and executing the April 10, 1964 revocation by Nawasa of Piadeco's right of way, the
April 11, 1964 order of the Director of Forestry, and the April 14, 1964 directive of the Forest Station Warden,
heretofore mentioned.
On May 5, 1964, Piadeco moved to declare the forestry officials in default for failure to answer its petition on time.
On May 6, 1964, unaware of Piadeco's May 5 motion, the forestry officials, upon a motion dated April 29, 1964,
asked the Bulacan court to dismiss Piadeco's petition upon the averments that said court had no jurisdiction over
their persons or the subject matter of the petition, and that administrative remedies have not yet been exhausted
by Piadeco. On the same date, too, but in a separate motion, said forestry official asked for a reconsideration of
the lower court's order granting preliminary injunction, bottomed upon their charge that the illegal cutting of trees
by Piadeco inside the Angat and Marikina Watershed Reservations — which are the main source of water supply
of the City of Manila and its surrounding towns and cities — poses a grave danger of causing them to dry up to
the prejudice and irreparable injury of the inhabitants thereof. Piadeco file written opposition on May 13, 1964.
On May 14, 1964, acting on the aforesaid motion for reconsideration and opposition thereto, the judge below
ruled that although Piadeco is entitled to injunction, the continuance thereof would cause great damage to the
government, while Piadeco can be fully compensated for any damages Piadeco may suffer because of the
dissolution thereof. That bond, however, was not filed by the forestry officials.
On July 13, 1964, upon Piadeco's May 5 motion earlier adverted to, the forestry officials were declared in default.
On July 24, 1964, said forestry officials filed a verified motion to set aside the default order and to admit their
answer thereto attached. They pleaded excusable neglect and/or oversight of the clerk of the records of the
Records section of the Bureau of Forestry.
On July 29, 1964, the court shunted aside the foregoing motion for the reason that their six days' delay was not
excusable and their answer was prepared only after three days from their receipt of the order of default. A motion
for reconsideration registered by the forestry officials on August 12, 1964 was unavailing. The court below struck
down that motion on September 4, 1964.
Thus it is, that Piadeco submitted evidence ex parte to the court below against the Director of Forestry and the
Forest Station Warden.
Piadeco had, in the meantime, entered into an amicable settlement with Nawasa whereby Piadeco's case against
Nawasa was withdrawn, the right of way granted by Nawasa to Piadeco remaining revoked and cancelled; and
Nawasa's counterclaim against Piadeco was also withdrawn in consideration of P1,651.59 paid by Piadeco to
Nawasa, representing the former's liabilities to the latter.
On December 29, 1964, the court below rendered judgment. It approved Piadeco's compromise agreement with
Nawasa. It held that Piadeco was the owner of the land in question; that its operation was not in violation of
forestry rules and regulations; that aside from its regulation certificate, Piadeco was permitted by Nawasa thru the
latter's Resolution 1050, Section of 1963, to conduct selective logging within the Angat-Marikina Watershed upon
payment of P2.00 for every cubic meter of timber classified in the first group and P1.75 belonging to the second
group; that similar permits were issued to other individuals by the Director of Forestry with the acquiescence of
Nawasa; that Piadeco's logging under Resolution 1050 aforesaid could not be contrary to forestry rules and
regulations; and that, upon the doctrine laid down in Santiago vs. Basilan Lumber Co., L-15532, October 31,
1963, even if Piadeco's private woodland was unregistered, it still retains its inherent "rights of ownership, among
https://lawphil.net/judjuris/juri1968/jun1968/gr_l-24796_1968.html 2/15
8/26/2021 G.R. No. L-24796
which are (its) rights to the fruits of the land and to exclude any persons from the enjoyment and disposal
thereof", its only liability being the payment of surcharges on the timber severed from the land. Thereupon, the
court reinstated the writ of preliminary injunction earlier issued and made it permanent, with costs..
Meanwhile, on December 28, 1964, one day before the rendition of the judgment just mentioned, Piadeco applied
for the renewal of its Certificate of Private Woodland Registration PWR 2065-New, which would expire on the last
day of that month. On January 12, 1965, in reply thereto, Assistant Director of Forestry J. L. Utleg denied the
renewal requested. He informed Piadeco that its Titulo de Propiedad 4136 was not registerable under Forestry
Administrative Order No. 12-2 which took effect on January 1, 1963. The expiration of its registration certificate
and the non-renewal thereof notwithstanding, Piadeco continued logging operations. It was about this time that
illegal logging was denounced by some members of Congress thereby attracting national attention. This led to a
directive by the President of the Philippines on March 8, 1965 to stop all illegal logging operations. Complying
therewith, the Secretary of Agriculture and Natural Resources wrote the Secretary of National Defense with the
request that units of the Armed Forces of the Philippines be detailed at the areas involved, deputizing them
agents of the Bureau of Forestry to assist in the enforcement of forest laws, rules and regulations, and the
protection of the forests. The Secretary of National Defense, in turn, direct the Chief of Staff of the Armed Forces
to implement the request. And, the Chief of Staff dispatched at ask force of the army into the Angat area, which
impounded and seized all logs cut by Piadeco and other loggers which were purportedly conducting illegal
operations.
On May 11, 1965, Piadeco sought from the Bulacan court an ex parte writ of execution of the December 29, 1964
decision. That decision had by then become final for failure of the forestry officials to appeal therefrom. Piadeco
prayed that it be not molested in its logging operations including the hauling of about 600 pieces (unscaled) and
1,000 pieces of mixed (scaled and unscaled) timber from the log ponds.
On May 12, 1965, the Bulacan court presided over temporarily by Judge Ricardo C. Puno set Piadeco's motion
for execution for hearing on May 27, 1965. Before the day of the hearing arrived, however, Piadeco withdrew
its ex parte motion for execution with the manifestation that it would look for a more expeditious way or a more
appropriate remedy to enable it to haul the logs before the rains set in. But on May 27, 1965, Piadeco refiled its
motion for execution with Judge Muñoz, who had meanwhile resumed his duties.
On June 1, 1965, Judge Muñoz granted Piadeco's motion. In line therewith, on June 3, 1965, the corresponding
writ of execution was issued, directing a special sheriff to make effective and execute the aforesaid lower court's
decision of December 29, 1964.
Execution notwithstanding, the forestry officials still refused to permit Piadeco to haul its logs. Because of this, on
June 11, 1965, Piadeco asked the court below to declare the forestry officials and those acting under them in
contempt. On June 30, 1965, the forestry officials opposed. They averred that Piadeco's registration certificate
already expired on December 31, 1964; that despite this expiration, Piadeco continued illegal logging operations,
which resulted in the seizure of its logs: that after December 31, 1964, the December 29, 1964 decision of the
court below became functus officio and could no longer be executed. Piadeco's rejoinder of July 1, 1965 was that
its registration certificate is not expirable and that it is not a license.
On July 8, 1965, the judge came out with an order declaring that notwithstanding "the expiration of petitioner's
[Piadeco's] license (?) on December 31, 1964, their said property remains registered with the Bureau of Forestry
subject only to renewal, in which case it can still pursue its logging operations, conditioned upon the payment by
it of forest charges." The judge took into consideration a certificate issued on May 4, 1965 by Assistant Director
of Forestry J. L. Utleg, as officer-in-charge, that "all the timber cut ... during the lifetime" of the registration
certificate "may be transported by" Piadeco "provided they are properly documented." Finding that Piadeco
"complied with all the requirements of the Bureau of Forestry and the Bureau of Internal Revenue as regards the
proper documentation of the logs in question," the judge thereupon directed the forestry officials "and all
members of the Armed Forces stationed along the way" to allow Piadeco "to haul its logs which have already
been properly documented."
This precipitated the filing on July 28, 1965 by the Director of Forestry, the Forest Station Warden, the Armed
Forces Chief of Staff 7 of an original petition with this Court (L-24796, now at bar) for certiorari and prohibition
with preliminary injunction to annul the June 1,1965 order of execution, the June 3, 1965 writ of execution and the
July 8, 1965 order allowing Piadeco to haul its logs. Named respondents were Piacedo, Judge Emmanuel M.
Muñoz of the Bulacan court, and the Provincial Sheriff of Bulacan..
On July 30, 1965, this Court issued a writ of preliminary injunction, as prayed for by the aforenamed government
officials. On August 3, 1965, Piadeco sought the dissolution thereof for the reason, amongst others, that Mr. J. L.
Utleg, Assistant Director of Forestry and Officer-in-Charge of the Bureau of Forestry, was already agreeable
mentioned, as per his letter of June 7, 1965 to Piadeco informing the latter that the writ of execution was being
referred to the Forest Station Warden for compliance. On August 9, 1965, the Solicitor General blocked Piadeco's
motion to dissolve, with an allegation, amongst others, that the June 7, 1965 letter just mentioned was deemed
https://lawphil.net/judjuris/juri1968/jun1968/gr_l-24796_1968.html 3/15
8/26/2021 G.R. No. L-24796
recalled when the Director Forestry — realizing that the said writ would allow Piadeco to continue logging after
the expiration and non-renewal of its certificate in a public forest area or in an area excluded from the expired
permit — did not give effect to the said letter.
On August 18, 1965, manifestation was made by the Solicitor General to this Court thru a motion dated August
17, 1965, that the logs seized and imposed by the armed forces were being exposed to the elements; that the
rainy season having set in, there was grave danger that the said logs might deteriorate and become useless. He
thus prayed that the forestry officials be authorized to turn the logs over to the engineer corps of the Armed
Forces for the construction of prefabricated schoolhouses pursuant to General Circular V-337, series of 1961, of
the Bureau of Internal Revenue. On August 31, 1965, Piadeco objected upon the ground that the said logs are
still its private property; and that there is no law empowering the State to seize, confiscate and turn over the cut
logs to the Armed Forces.
On September 29, 1965, Piadeco, in turn, petitioned for preliminary injunction and moved again to dissolve this
Court's writ of preliminary injunction of July 30, 1965. It called attention to the fact that the writ of preliminary
injunction issued by the court below on May 4, 1964 in Civil Case 3035-M is still enforceable and has not yet
been dissolved because the forestry officials have not filed their P10,000.00-bond as required by the trial court in
its order of May 14, 1964.
On October 8, 1965, this Court denied the two motions of Piadeco, declared that the writ of preliminary injunction
it issued stands enforced and is effective until otherwise lifted, and authorized the Solicitor General to effect the
removal of all the logs subject of his motion of August 17, 1965 from the log ponds but only for the purpose of
turning them over to the Armed Forces for safekeeping and custody pending final resolution of the case.
On October 14, 1965, Piadeco traversed the averments of the forestry officials' petition before this Court, thru an
answer dated October 12, admission of which was however denied for being late. The case was submitted
without further memoranda.
Meanwhile, a companion case (L-25459, also at bar)emerged from subsequent events hereunder related.
On October 20, 1965, pending this Court's resolution of the foregoing petition of the forestry officials (L-24796),
Piadeco wrote the Director of Forestry with a request to grant it "AUTHORITY to cut, gather and remove timber"
from its alleged private woodland. At the same time, it advised the Director of Forestry that "in the absence of
such authority or permit", it "shall cut, gather and remove timber from the said area subject to the payment of
regular forest charge and 300% surcharge for unlawful cutting in accordance with the penal provisions" of
Section 266 of the Tax Code.
On November 4, 1965, Acting Director J. L. Utleg replied. He told Piadeco that "pending meticulous study" of its
application for renewal of PWR 2065-New, his "[o]ffice is not now in a position to grant" the desired authority and
"will consider any cutting, gathering and removal of timber" from the land "to be illegal, hence, subject to the
provisions of Section 266 of the National Internal Revenue Code."
Obviously taking the foregoing letter as a case, Piadeco, on December 6, 1965, advised the Director that
immediately upon receipt of said letter, it (Piadeco) resumed logging operations within its private woodland area
in the municipality of Montalban, Rizal, "thereby subjecting all timber cut therefrom to the payment of 300%
penalty, plus regular forest charges." Piadeco also requested the Director to inform the Task Force Commander
that it "can be allowed to continue its logging operation within their private woodland" subject to Section 266 of
the Tax Code.
So, on December 7, 1965, Acting Director J. L. Utleg notified the Task Force Commander, through the
Undersecretary of National Defense, that Piadeco "can conduct logging operations within its private woodland, as
it is a constitutional right on its part to use and enjoy its own property and the fruits thereof" but that whatever
timber cut therefrom "should be subject to the payment not only of the regular charges but also of the surcharges
imposed by Section 166" of the Tax Code. This notwithstanding, the army authorities refused to heed Utleg's
December 7, 1965 letter and stood pat on its posture not to allow Piadeco to conduct logging operations.
Hence, it was Piadeco's turn to come to this Court on December 22, 1965 on an original petition for injunction
and prohibition (L-25459 aforesaid) against respondents Secretary of National Defense, the Undersecretary of
National Defense, the Chief of Staff, the Judge Advocate General and the Task Force Commander (Task Force
Preserve, Tabak Division). Specifically, Piadeco charges as follows: On December 17, 1965, army men [Capt.
Zamuco, Lt. Oresque, Sgts. Albino, Gutierrez, Ramirez, and Sawada, and Cpl. Manlapus], boisterously,
unlawfully, wilfully, and feloniously entered — upon orders of a certain Major Elfano — Piadeco's land at Barrio
Anginan, Montalban, Rizal, outside the watershed reservations. They made a portion of the land their private
quarters. They prevented Piadeco's officers (a) from continuing its logging operations, especially the construction
of the road inside the land; (b) from cutting, gathering and removing timber and other forest products therefrom;
and (c)from living and moving in freedom and engaging in the pursuit of happiness on said land. Piadeco asks
https://lawphil.net/judjuris/juri1968/jun1968/gr_l-24796_1968.html 4/15
8/26/2021 G.R. No. L-24796
principally that respondent officials be declared "without authority and jurisdiction to stop logging operations,
construction of the roads, cutting, gathering and removing of timber and other forest products from the Private
Woodland area" of the former.
There was a prayer for the issuance of a writ of preliminary injunction which this Court, however, denied on
December 31, 1965, and upon reconsideration, on February 1, 1966.
After respondents' answer, and hearing on oral arguments, the case was submitted for decision.
1. Basic to an intelligent appraisal of the rights of Piadeco, who comes to us as an alleged private wood
landowner, is the all-important question: Is Piadeco's title registrable with the Bureau of Forestry?
The pertinent statutory provision is Section 1829 of the Revised Administrative Code, viz:
SEC. 1829. Registration of title to private forest land. — Every private owner of land containing timber,
firewood and other minor forest products shall register his title to the same with the Director of Forestry. A
list of such owners, with a statement of the boundaries of their property, shall be furnished by said Director
to the Collector of Internal Revenue, and the same shall be supplemented from time to time as occasion
may require.
Upon application of the Director of Forestry the fiscal of the province in which any such land lies shall
render assistance in the examination of the title thereof with a view to its registration in the Bureau of
Forestry.
Ampliatory thereof is Section 7, Forestry Administrative Order 12-1 of July 1, 1941, as amended by Forestry
Administrative Order 12-2, which took effect on January 1, 1963. It reads:
7. Titles that may be registered. — Only the following titles covering lands containing timber, firewood and
other minor forest products may be registered under and pursuant to Section 1829 of the Revised
Administrative Code;
(a) Administrative titles granted by the present Government, such as homestead patent, free patent, and
sales patent; and
(b) Judicial titles, such as Torrens Title obtained under the Land Registration Act (Act 496, as amended) or
under the Cadastral Act (Act No. 2259, as amended).
The amendment of Forestry Administrative Order 12-1 by Forestry Administrative Order 12-2 consisted in
the omission of one paragraph, paragraph (c), which particularized as one of the titles registrable pursuant to
Section 1829 of the Revised Administrative Code, "[t]itles granted by the Spanish sovereignty in the islands and
duly recognized as valid titles under the existing laws."
Piadeco's position is that such amendment contravenes said Section 1829, which does not specify the titles that
are registrable thereunder; and that it is diametrically opposed to the Opinion of the Attorney General of October
15, 1919, which ruled that a royal title "issued in September, 1896, and inscribed in the Registry of Property
within a year after its issuance is valid, and therefore its owner is entitled to the benefits" of Section 1829
aforesaid. Also cited are the Opinion of the Secretary of the Interior of November 7, 1916, stating that registration
under Section 1829 is not subject to change and revocation unless title is established in a different person by
judicial declaration; the Opinion of the Director of Forestry of January 8, 1925, which recognized as registrable,
titles "such aninformacion posesoria ..., composicion con el estado and purchase under the Spanish sovereignty"
amongst others; and the Opinion of the Collector of Internal Revenue of February 6, 1926, declaring imperfect
titles within the purview of Section 45(a) of Act 2874, as also registrable.
True it is that the law, Section 1829, does not describe with particularity titles that may be registered with the
Bureau of Forestry. Concededly, too, administrative authorities in the past considered as registrable, titles issued
during the Spanish regime. In fact, as late as 1962, Forestry Administrative Order 12-1 was still in force,
authorizing registration of such Spanish titles. But when Forestry Administrative Order 12-2 came into effect on
January 1, 1963, that order should be deemed to have repealed all such previous administrative determinations.
There should be no question now that Forestry Administrative Order 12-2 has the force and effect of law. It was
promulgated pursuant to law. Section 1817, Revised Administrative Code, empowers the Bureau of Forestry, with
the approval of the department head, to issue regulations "deemed expedient or necessary to secure the
protection and conservation of the public forests in such manner as to insure a continued supply of valuable
timber and other forest products for the future, and regulating the use and occupancy of the forests and forest
reserves, to the same end." Forestry Administrative Order 12-2 was recommended by the Director of Forestry,
and approved by the Secretary of Agriculture and Natural Resources. It is no less a valid law. It is an
administrative regulation germane to the objects and purposes of the law. A rule shaped out by jurisprudence is
https://lawphil.net/judjuris/juri1968/jun1968/gr_l-24796_1968.html 5/15
8/26/2021 G.R. No. L-24796
that when Congress authorized the promulgation of administrative rules and regulations to implement a given
legislation, "[a]ll that is required is that the regulation should be germane to the objects and purposes of the law;
that the regulation be not in contradiction with it, but conform to the standards that the law
prescribes."8 In Geukeko vs. Araneta, 102 Phil. 706, 712, we pronounced that the necessity for vesting
administrative authorities with power to make rules and regulations for various and varying details of
management has been recognized and upheld by the courts.
And we are certainly totally unprepared to jettison Forestry Administrative Order 12-2 as illegal and
unreasonable.
Spanish titles are quite dissimilar to administrative and judicial titles under the present system. Although
evidences of ownership, these Spanish titles may be lost thru prescription. They are, therefore, neither
indefeasible nor imprescriptible. The law in this jurisdiction, both under the present sovereignty and the previous
Spanish regime is that ordinary prescription of ten years may take place against a title recorded in the Registry of
Property "in virtue of another title also recorded,"9 and extra-ordinary prescription of thirty years will run, even
"without need of title or of good faith."10 For possession for along period fixed by law, the "unquestionable
foundation of the prescription of ownership ... weakens and destroys the force and value of the best possible title
to the thing possessed by one who is not the owner thereof."11 The exception, of course, is the Torrens title,
expressly recognized to be indefeasible and impresciptible.12
And more. If a Spanish title covering forest land is found to be invalid, that land is public forest land, is part of the
public domain, and cannot be appropriated.13 Before private interests have intervened, the government may
decide for itself what portions of the public domain shall be set aside and reserved as forest land.14 Possession
of forest lands, however long, cannot ripen into private ownership.15
In this case, it is undisputed that Picadeco's title which it sought to register was issued by the Spanish
sovereignty — Titulo de Propiedad No. 4136, dated April 25 or 29, 1894. It is unmistakably not one of those
enumerated in Section 7 aforesaid. It should not have been allowed registration in the first place. Obviously,
registration thereof can never be renewed.
2. Piadeco is nonetheless insistent in its plea that it can still cut, gather, and remove timber from its alleged
private woodland, upon payment of forest charges and surcharges.
The purposes of registration, as succinctly stated in Section 6, Forestry Administrative Order 12-1 dated July 1,
1941, are:
6. Objects of registration — (a) to exempt the owners of private woodlands from the payment of forest
products gathered therefrom for commercial or industrial purposes.
(b) To regulate the transportation of forest products gathered or collected therefrom and to avoid fraud
which may be committed in connection with utilization of such forest products with respect to their origin.
(c) To determine the legality of private claims for the protection of the interest of the owners as well as of
the Government, and to exclude all land claimed under valid titles from the mass of the public forest in
order to facilitate the protection, administration, and supervision of the latter.
The foregoing has in part gained judicial approval in Santiago vs. Basilan Lumber Company, L-15532, October
31, 1963, where we pronounced: "Obviously, the purpose of the registration required in Section 1829 of the
Administrative Code is to exempt the titled owner of the land from the payment of forestry charges as provided for
under Section 266 of the National Internal Revenue Code."16 And Section 266 of the Tax Code, therein
mentioned, provides in full:
SEC. 266. Charges collectible on forest products cut, gathered and removed from unregistered private
lands. — The charges above prescribed shall be collected on all forest products cut, gathered and
removed from any private land the title to which is not registered with the Director of Forestry as required
by the Forest Law: Provided, however, That in the absence of such registration, the owner who desires to
cut, gather and remove timber and other forest products from such land shall secure a license from the
Director of Forestry in accordance with the Forest Law and regulations. The cutting, and the removing of
timber and other forest products from said private lands without license shall be considered as unlawful
cutting, gathering and removing of forest products from public forest and shall be subject to the charges
prescribed in such cases in this Chapter. (As amended by Rep. Act No. 173, approved June 20, 1947.)17
Following this provision in the Tax Code is Section 267, which in part provides:
https://lawphil.net/judjuris/juri1968/jun1968/gr_l-24796_1968.html 6/15
8/26/2021 G.R. No. L-24796
SEC. 267. Surcharges for illegal cutting and removal of forest products or for delinquency. — Where forest
products are unlawfully cut or gathered in any public forest without license or, if under license, in violation
of the terms thereof, the charges on such products shall be increased by three hundred per centum....
To recapitulate, registration of titles by the owners of private woodlands with the Bureau of Forestry results in an
exemption "from the payment of forest products gathered therefrom for commercial or industrial purposes." If an
owner fails to so register, he is obliged to pay forest charges, as prescribed in Sections 264 and 265 of the Tax
Code, because "he still retain(s) his rights of ownership, among which are his rights to the fruits of the land and to
exclude any person from the enjoyment and disposal thereof (Art. 429, New Civil Code)."18 However, as provided
in Section 266 above-quoted, if an owner does not register his title, but he desires to cut, gather and remove
timber and other forest products from his land, he may "secure a license from the Director of Forestry in
accordance with the Forest Law and regulations." If he does not, under the same Section 266, his cutting,
gathering and removing of timber and other forest products "shall be considered as unlawful cutting, gathering
and removing of forest products from public forests and shall be subject to the charges prescribed in such
cases." And this would bring into play Section 267, where, as heretofore quoted, the charges on forest products
"unlawfully cut and gathered in any public forest without license, or, if under license, in violation of the terms
thereof ... shall be increased by three hundred per centum."
But it should be stressed that all of the situations herein mentioned refer specifically to owners of private
woodlands. The position Piadeco has taken is a jump ahead of where it should be. We are not ready to grant the
assumption that Piadeco owns the forest land it seeks to register. Such unwillingness can come from even a
superficial assessment of Piadeco's pretensions of ownership based on the Titulo de Propiedad in question.
Neither said Titulo, nor a copy thereof, was presented in the two proceedings before us. What we have is merely
a description thereof, viz:
Titulo de Propiedad Numero 4136, in the name of Dn. Mariano San Pedro y Esteban, dated April 25, 1894,
being a gratuitous composicion title, grated to Dn. Mariano San Pedroy Esteban, by the Spanish
Government in the Philippines, pursuant to Resolution dated April 14, 1894, of the Board of Land
Adjustment of the (Spanish) Administration Civil de Filipinas, as authorized under Royal Decree of May 14,
1867 and August 31, 1888, and signed by Dn. Alejandro Garcia, El Jefede la Provincia de Bulacan and
Dn. Mariano Lopez Delgado El Secretario de la Junta, with the Seal of the Spanish Government in the
Philippines attached thereto and to said Titulo de Propiedad Numero 4136, is affixed a "Sello 10aA*s 1894
y 95 de Peso" documentary stamp bearing Serial Number NO. 292-404 inscribed in the Office of the
Registry of Property of Bulacan, on pages 127 and 129 of Book I, for Norzagaray, as Tax Declaration
(Fincas) Nos. 57 and 58, Inscripcion No. 1, on July 16, 1894 (or within one (1) year from April 25, 1894,
pursuant to Royal Decree of January 12, 1863), the inscription of the said TITULO DE PROPIEDAD
NUMERO 4136 of Dn. Mariano San Pedro y Esteban, having been accomplished by the Office of the Land
Registry of Bulacan, on the said date of July 16, 1894, by the then Registrar of Bulacan, Dn. Miguel de
Lizan, as follows:
Ynscrito el titulo que precede, a los folios ciento veinti-sietey ciento veintinueve del Tomo primero de
Norzagaray, fincas numeros cincuenta y siete y cincuenta y ocho inscripcion numero uno, Bulacan, diez y
seis de julio de mil ocho cientos noventa y cuatro (Fdo.) MIGUEL DE LIZAN.
Two (2) vast parcels of land (agricultural and mountainous lands), together with the improvements thereon,
including all the trees in the mountains, all mineral deposits or resources ( pertenecia minera), including
lime, gravel and lumber for ship building, located in the Provinces of Bulacan, Rizal, Quezon and Quezon
City, and bounded, on the North, by Sierra Madre Mountains and Rio Grande (Laog to Kinabayunan); on
the East, by Maputi, Umiray and Caliwatcanan (Ibona Estate and Public Land); on the South by Susong
Dalaga and Cupang (Hegmatangan to Pinugay) and on the West, by Pugad-Lawin and Sapang-Alat
(Pinugay, Public Land, Bignay, Lauan to Laog).
The various types of titles granted by the Spanish crown, it will be remembered, were: (1) the "titulo real" or royal
grant; (2) the "concession especial" or special grant; (3) the "composicion con el estado" title or adjustment title;
(4) the "titulo de compra" or title by purchase; and (5) the "informacion posesoria" or possessory information title,
which could become a "titulo gratuito" or a gratuitous title.19
https://lawphil.net/judjuris/juri1968/jun1968/gr_l-24796_1968.html 7/15
8/26/2021 G.R. No. L-24796
Title by "composicion con el estado" was granted by the Direccion General de Administracion Civil, pursuant to
the Royal Decree of June 25, 1880, or by the Chief of the Province by delegation, pursuant to the Royal Decree
of August 31, 1888, or under the Royal Decree of February 13,1894, otherwise known as the Maura Law. The
theory behind this title is that all lands belong to the State. Applicants to be entitled to adjustment must possess
the lands sought to be acquired for a number of years.23 These titles, as the "titulo real", altho evidences of
ownership, may be lost by prescription.24
Piadeco's Titulo de Propiedad 4136, as heretofore described, was signed, pursuant to the Royal Decrees of May
14, 1867 and August 31, 1888, by Dn. Alejandro Garcia, el Jefe de la Provincial de Bulacan, and Dn. Mariano
Lopez Delgado, el Secretario de la Junta, purportedly with the Seal of the Spanish Government in the
Philippines.
The main difficulty here lies with the requirements, then obtaining, for the issuance of Spanish adjustment titles.
The Royal Decree of August 31, 1888 — under which Piadeco's title was issued — classified public lands subject
to adjustment into two groups:
First. Those bounded at any point thereof by other lands belonging to the State, and those which, though entirely
encircled by private lands, had a total area of more than 30 hectares.
Second. Those with an area of less than 30 hectares and entirely bounded by private lands.
By this royal decree, adjustment of the lands of the first group just mentioned continued to be heard and
determined by the general directorate of civil administration with the intervention of the Inspector General of
Forests; adjustment of lands of the second group were heard and determined by "a provincial board for the
adjustment of lands "headed by a Civil or Military-Civil Governor as president. When the provincial board
approves the adjustment, "the chief of the province, in his capacity as deputy of the General Directorate of Civil
Administration, shall issue the corresponding title."25
The property here involved unquestionably belongs to the first group. That is because the area thereof is more
than 30 hectares (72,000 or 74,000 hectares); and, going by the descripcion of its boundaries, the property is
bounded by public land. In particular, the description is that it is "bounded, on the North, by Sierra Madre
Mountains and Rio Grande (Laog to Kinabayunan); on the East, by Maputi, Umiray and Caliwatcanan (Ibona
Estate and Public Land); on the South by Susong Dalaga and Cupang (Hegmatangan to Pinugay) and on the
West, by Pugad-Lawin and Sapang-Alat (Pinugay, Public Land, Bignay, Lauanto Laog)."26
As stated, the title were was "signed by Dn. Alejandro Garcia, El Jefe de la Provincia de Bulacan, and by Dn.
Mariano Lopez Delgado, El Secretario de la Junta, with the Seal of the Spanish Government in the Philippines
attached thereto."
Piadeco now claims before this Court that its title "appears to be issued by (on its face) the DIRECTOR
GENERAL DE ADMINISTRACION DE FILIPINAS"; that the title is in printed form, with the dry seal in the form of
a mountain, bearing the inscription, "Office of the Inspector General of Forests in the Philippine Islands —
Adjustment of Lands" and the rubric of the said Inspector General of Forests and is serially numbered, pursuant
to the Circular dated February 14, 1894 of the General Directorate of Civil Administration. In the same breath,
however, Piadeco avers that the title was approved by the Chief of the Province of Bulacan as Deputy of the
General Directorate of Civil Administration and the said Chief issued Titulo 4136 pursuant to the Royal Decree of
August 31, 1888.27 These averments, we must say, merely emphasize the necessity of adducing evidence to
prove the validity of Piadeco's title, which should be done in appropriate land registration proceedings. Ramirez
vs. Director of Lands, 60 Phil. 114, 123, struck down a similar title covering land which it thereupon declared
public forest land, upon grounds, amongst others, that the title was not issued by the proper authority. On this
ground, this Court there specifically declared —
Judging from the area of the land28 in question and that of the two-third portions from which it has been
segregated, upon the supposition that the three-third portions above-mentioned constitute the whole tract
of land which had originally passed from Tomas Ilao, it is obvious that the same belonged to the first group,
as defined in the aforesaid Royal Decree, on the ground that the area thereof greatly exceeded thirty
hectares and was not entirely bounded by private lands. Notwithstanding such facts, the title Exhibit D-
2 was not issued by the General Directorate of Civil Administration with the intervention of the Inspector
General of Forests, but merely by the provincial board, in open violation of the laws and regulations
relative thereto.29
https://lawphil.net/judjuris/juri1968/jun1968/gr_l-24796_1968.html 8/15
8/26/2021 G.R. No. L-24796
But an important moiety here is the deeply disturbing intertwine of two undisputed facts. First. The title embraces
land "located in the Provinces of Bulacan, Rizal, Quezon, and Quezon City." Second. The title was signed only by
the provincial officials of Bulacan, and inscribed only in the Land Registry of Bulacan. Why? The situation,
indeed, cries desperately for a plausible answer.
To be underscored at this point is the well-embedded principle that private ownership of land must be proved not
only through the genuineness of title but also with a clear identity of the land claimed.30 This Court ruled in a
case involving a Spanish title acquired by purchase that the land must be concretely measured per hectare or
per quiñon, not in mass (cuerpos ciertos),31 That fact that the Royal Decree of August 31, 1888 used 30 hectares
as a basis for classifying lands strongly suggests that the land applied for must be measured per hectare.
Here, no definite are seems to have been mentioned in the title. In Piadeco's "Rejoinder to Opposition" dated
April 28, 1964 filed in Civil Case 3035-M, it specified the area covered by its Titulo de Propiedad as 74,000
hectares.32 In its "Opposition" of May 13, 1964 in the same case, it described the land as containing 72,000
hectares.33 Which is which? This but accentuates the nebulous identity of Piadeco's land. Piadeco's ownership
thereof then equally suffers from vagueness, fatal at least in these proceedings.
Piadeco asserts that Don Mariano San Pedro y Esteban, the original owner appearing on the title, acquired his
rights over the property by prescription under Articles 4 and 5 of the Royal Decree of June 25, 1880,34 the basic
decree that authorized adjustment of lands. By this decree, applications for adjustment — showing the location,
boundaries and area of land applied for — were to be filed with the Direccion General de Administracion Civil,
which then ordered the classification and survey of the land with the assistance of the interested party or his legal
representative.35
The Royal Decree of June 5, 1880 also fixed the period for filing applications for adjustment at one year from the
date of the publication of the decree in the Gaceta de Manila on September 10, 1880, extended for another year
by the Royal Order of July 15, 1881.36 If Don Mariano sought adjustment within the time prescribed, as he should
have, then, seriously to be considered here are the Royal Orders of November 25, 1880 and of October 26,
1881, which limited adjustment to 1,000 hectares of arid lands, 500 hectares of land with trees and 100 hectares
of irrigable lands.37 And, at the risk of repetition, it should be stated again that Piadeco's Titulo is held out to
embrace 72,000 or 74,000 hectares of lands.
But if more were needed, we have the Maura Law (Royal Decree of February 13, 1894), published in the Gaceta
de Manila on April 17, 1894.38 That decree required a second petition for adjustment within six months from
publication, for those who had not yet secured their titles at the time of the publication of the law.39 Said law also
abolished the provincial boards for the adjustment of lands established by Royal Decree of December 26, 1884,
and confirmed by Royal Decree of August 31, 1888, which boards were directed to deliver to their successors,
the provincial boards established by Decree on Municipal Organization issued on May 19, 1893, all records and
documents which they may hold in their possession.40
Doubt on Piadeco's title here supervenes when we come to consider that that title was either dated April 29 or
April 25, 1894, twelve or eight days after the publication of the Maura Law.
Let us now take a look, as near as the record allows, at how Piadeco exactly acquired its rights under the Titulo.
The original owner appearing thereon was Don Mariano San Pedro y Esteban. From
Piadeco's explanation — not its evidence —41 we cull the following: On December 3,1894, Don Mariano
mortgaged the land under pacto de retro, redeemable within 10 years, for P8,000.00 to one Don Ignacio
Conrado. This transaction was said to have been registered or inscribed on December 4, 1894. Don Mariano
failed to redeem within the stipulated period. When Don Ignacio died, his daughter, Maria Socorro Conrado, his
only her, adjudicated the land to herself. At about the same time, Piadeco was organized. Its certificate of
registration was issued by the Securities and Exchange Commission on June 27, 1932. Later, Maria Socorro, heir
of Don Ignacio, became a shareholder of Piadeco when she conveyed the land to Piadeco's treasurer and an
incorporator, Trinidad B. Estrada, in consideration of a certain amount of Piadeco shares. Thereafter, Trinidad B.
Estrada assigned the land to Piadeco. Then came to the scene a certain Fabian Castillo, appearing as sole heir
of Don Mariano, the original owner of the land. Castillo also executed an affidavit of adjudication to himself over
the same land, and then sold the same to Piadeco. Consideration therefor was paid partially by Piadeco, pending
the registration of the land under Act 496.
The question may well be asked: Why was full payment of the consideration to Fabian Castillo made to depend
on the registration of the land under the Torrens system, if Piadeco was sure of the validity of Titulo de
Propiedad 4136? This, and other factors herein pointed out, cast great clouds of doubt that hang most
conspicuously over Piadeco's title.
https://lawphil.net/judjuris/juri1968/jun1968/gr_l-24796_1968.html 9/15
8/26/2021 G.R. No. L-24796
The standing presumption, we must not forget, is that land pertains to the State, and any person seeking to
establish ownership over land must conclusively show that he is the owner. 42 And his presumption clings with
greater force here where "a portion" of the land Piadeco claims is, as Piadeco itself admits, directly affected by
Proclamation No. 71 dated March 10, 1927 of the then Governor-General Leonard Wood of the Philippines,
which reserved for watershed purposes an area of 62,309.0952 hectares of land located in Montalban, Province
of Rizal, in San Jose del Monte, Norzagaray, Angat, San Rafael, and San Miguel, Province of Bulacan, in
Peñaranda, Province of Nueva Ecija, and in Infanta, Province of Tayabas (now Quezon),subject to "private rights
if any there be." Private rights must then have to be proved. It will be remembered that, by Article VIII of the
Treaty of Paris of December 10,1898, property of the public domain was relinquished and ceded by the Kingdom
of Spain to the United States of America, which, of course, transferred the same to the present Republic.
Assertion has likewise been made that Piadeco's title has already been judicially recognized in the judgment
rendered in Civil Case 3035-M, the case below, at least insofar as the portion of the land that lies in Bulacan is
concerned. This is less than persuasive. Piadeco's title was not directly in issue in the court below. A reading of
the decision thereof suggests that said title was not submitted therein. The judge did not even examine that title.
According to the decision, Piadeco's ownership was gleaned merely from the registration certificate which stated
that a copy of Piadeco's land title, including the corresponding plan, was submitted to the Director of Forestry. A
mere statement by the judge below that Piadeco appears to be the owner of the land cannot wipe out the
objectionable features of its title.
From all the foregoing, our conclusion is that we cannot give prima facie value to Piadeco's title. We cannot thus
truly state that Piadeco is a private woodland owner for purpose of these proceedings. This all the more
strengthens our view that Piadeco needs to acquire an indefeasible title to be entitled to registration under
Section 1829 of the Revised Administrative Code.
3. Even on the assumption that Piadeco's alleged title is registrable, said corporation cannot complain against the
cancellation thereof by the Director of Forestry on April 11, 1964. Why?
When the Director of Forestry cancelled Piadeco's registration certificate, he only performed his duty as he saw
fit. By Forestry Administrative Order 12-2, "[t]he Director of Forestry may cancel a certificate of registration for
any violation of the provision of this Order or of the forest and internal revenue laws and regulations or of
the terms and conditions embodied in the certificate, or when found that the area is no longer covered with forest,
or upon failure of the landowner thereof, or of his representatives, to obey, follow or implement instructions of the
said Director of Forestry."43 To him, a condition expressly written into the registration certificate was being
violated. Piadeco was found to be cutting trees within the Angat and Marikina Watershed Reservations in direct
contravention of a specific prohibition in the certificate. And this, upon the basis of positive and actual findings of
qualified and competent forestry officers.
Quite revealing is Piadeco's admission44 before the court below that "it made cuttings on that portion of its own
private land within the Angat and Marikina Watershed Reservation where it was constructing its access road to
the area covered by P.W.P. No. 2065 to the construction of which no objection was interposed by ... Nawasa as
per its resolution No. 126, Series of 1964."45 Deducible from the foregoing is that Piadeco was cutting within the
watershed reservations outside the area covered by its registration certificate, altho within the land it claims in
private ownership, which is now disputed.
Piadeco's registration certificate should remain cancelled. It could be stricken down anytime. It is a nullity. And,
notwithstanding the fact that said registration certificate had expired and was not renewed, Piadeco had the
temerity to continue operations. Correctly, there was necessity for freezing forthwith Piadeco's illegal acts.46
4. True it is that the judgment below virtually reinstated Piadeco's registration certificate. However, as shall be
discussed later on in this opinion, that judgment has now no legal effect. For, said certificate, by its very terms,
expired on December 31, 1964. Piadeco cannot be heard to protest further.
But Piadeco still insists that it objected to the expiry date of the registration certificate, when it was issued that
certificate. Granting the truth of this averment, Piadeco nonetheless accepted the certificate, did not follow up its
objection to its logical conclusion, sat supinely until the certificate was cancelled; only then did it renew the bid
that its registration certificate is non-expirable.
At all events, Piadeco's submission is inaccurate. Forestry Administrative Order 12-2, promulgated pursuant to
law, amended Section 11 of Forestry Administrative Order 12-1, the pertinent part of which reads:
(b) Duration of the certificate. — The certificate of registration issued under this Order shall be made to
expire on the last day of the 12th month from the date of its issuance.
https://lawphil.net/judjuris/juri1968/jun1968/gr_l-24796_1968.html 10/15
8/26/2021 G.R. No. L-24796
This regulation is not without rational basis. This Court had occasion to say once47 that: "Land may be classified
as forestry or mineral today, and, by reason of the exhaustion of the timber or mineral, be classified as
agricultural land tomorrow. And vice-versa, by reason of the rapid growth of timber or the discovery of valuable
minerals, land classified as agricultural today may be differently classified tomorrow." Forestry Administrative
Order 12-2 verily declares that certificates "are renewable for as long as there are substantial amounts of forestry
in the area, upon filing of the necessary application therefor" and that those "cancelled for causes may be
renewed upon submission of application for registration by the owner and if the cause of cancellation is explained
satisfactorily."48 If only for purposes of effective regulation, annual registration of private woodlands cannot be
successfully assailed.
5. We cannot place our stamp of approval on Piadeco's claim that it should be permitted to remove from the
premises those logs that have already been cut before December 31, 1964, the expiry date of its registration
certificate. We have already said that its registration certificate is a nullity. Even if it is not, the facts and the law
will not support its plea.
It is not altogether clear whether the 600 pieces of unscaled and the 1,000 pieces of mixed (scaled and
unscaled)timber sought to be hauled by Piadeco, were cut before December 31, 1964. Piadeco could present
only one auxiliary invoice thereon, which but covers 256 logs and that very invoice stated that those logs were
"cut or ordered cut" in the area covered by P.W.R. No. 2065-New, "after its expiration on Dec. 31, 1964."49
Worse, a factual assumption that the logs were cut before that date, is meaningless in law. A contrary view would
easily lend itself to misuse and mischief. For, loopholes could then be bored through which an unscrupulous
logger may crawl. Such that a holder of a registration certificate could be at complete liberty to just cut and cut
during the lifetime of that certificate and leave the hauling for later, as he pleases, even long after expiry thereof.
This, we must say, should not be allowed to pass.
6. Absent a valid registration certificate under Section 1829 of the Revised Administrative Code, or a license to
cut, gather and remove timber, and more important, credible evidence of private ownership over the forestry land
in question, Piadeco's logging operations logically descend to the level of unlawful cutting from public forests.
Seizure made by the government authorities here of logs illegally cut cannot be branded as illegal. It was but in
obedience to Bureau of Internal Revenue General Circular No. V-337 of May 24, 1961, which prescribed rules on
the disposition of illegally cut logs, pursuant to a directive from the Office of the President to the Secretary of
Finance on March 22, 1961. Section 3 of Circular V-337 declares as follows:
3. Logs illegally cut from public forests, such as timberlands, forest reserves other than national
parks, 50 communal forests and communal pastures shall be subject to seizure and delivered to the nearest Bureau of Internal Revenue Officer
who in turn shall deliver them to the duly authorized representative of the Armed Forces of the Philippines for use in the manufacture of prefabricated
school houses. The illegal cutter shall not be allowed to pay the forest charges and surcharges and other fees on the logs cut. However, if such forest
charges and fees have already been paid, the same shall be retained by the Bureau of Internal Revenue Officer concerned as part of the collection
for forest charges, but shall not be the basis for the release of such logs. On the other hand, such payment shall be used as evidence should the
illegal cutter be prosecuted in court for the violation of the corresponding forest laws.51
Could this Court then justifiably order the delivery to Piadeco of the logs impounded right there on the land? The
answer must certainly have to be in the negative; a contrary posture is tantamount to abetting a wrong. The logs
belong to the State. They are not Piadeco's. Piadeco cannot later on come back to claim them by curing defects
in the proof of its ownership over the land. It has submitted the controversy over the logs for decision to this
Court. Any ruling thereon should bind Piadeco. It cannot be overturned by fresh convincing proof of ownership,
which it should have offered in the first place.
7. The view this Court takes of the cases at bar is but in adherence to public policy that should be followed with
respect to forest lands. Many have written much, and many more have spoken, and quite often, about the
pressing need for forest preservation, conservation, protection, development and reforestation. Not without
justification. For, forests constitute a vital segment of any country's natural resources. It is of common knowledge
by now that absence of the necessary green cover on our lands produces a number of adverse or ill effects of
serious proportions. Without the trees, watersheds try up; rivers and lakes which they supply are emptied of their
contents. The fish disappear. Denuded areas become dust bowls. As waterfalls cease to function, so will
hydroelectric plants. With the rains, the fertile topsoil is washed away; geological erosion results. With erosion
come the dreaded floods that wreak havoc and destruction to property — crops, livestock, houses and highways
— not to mention precious human lives. Indeed, the foregoing observations should be written down in a
lumberman's decalogue.
Because of the importance of forests to the nation, the State's police power has been wielded to regulate the use
and occupancy of forests and forest reserves.
https://lawphil.net/judjuris/juri1968/jun1968/gr_l-24796_1968.html 11/15
8/26/2021 G.R. No. L-24796
To be sure, the validity of the exercise of police power in the name of the general welfare cannot be seriously
attacked. Our Government has definite instructions from the Constitution's preamble to "promote the general
welfare." Jurisprudence has time and again upheld the police power over individual rights, because of the general
welfare. Five decades ago, Mr. Justice Malcolm made it clear that the "right of the individual is necessarily
subject to reasonable restraint by general law for the common good" and that the "liberty of the citizen may be
restrained in the interest of public health, or of the public order and safety, or otherwise within the proper scope of
the police power."52 Mr. Justice Laurel, about twenty years later, affirmed the precept when he declared that "the
state in order to promote the general welfare may interfere with personal liberty, with property, and with business
and occupations" and that"[p]ersons and property may be subjected to all kinds of restraints and burdens, in
order to secure the general comfort, health, and prosperity of the state."53 Recently, we quoted from a leading
American case,54 which pronounced that "neither property rights nor contract rights are absolute; for government
cannot exist if the citizen may at will use his property to the detriment of his fellow, or exercise his freedom of
contract to work them harm," and that, therefore, "[e]qually fundamental with the private right is that of the public
to regulate in the common interest.55
These precepts more than suffice to sustain the validity of the government's action with respect to Piadeco's
logging operations.
8. We come to consider the effects of the judgment in Civil Case 3035-M, where the Court of First Instance of
Bulacan adjudged Piadeco's operation not to be in violation of forestry rules and regulations and made
permanent the writ of preliminary injunction issued against the defaulting forestry authorities, upon Piadeco's ex-
parte evidence. That judgment, it should be remembered, is sought to be executed by Piadeco and the execution
proceedings in that case are not before this Court on review.
Said judgment enjoined the forestry officials from carrying out and executing the order of April 11, 1964 and the
implementing letter of April 14, 1964, cancelling Piadeco's registration certificate, PWR 2065-New. But when
execution was ordered on June 1, 1965, and the writ of execution issued on June 3, 1965, and when the court
ordered on July 8, 1965 that Piadeco be allowed to haul its logs, the registration certificate had already
expired on December 31, 1964. It is, therefore, not inappropriate for us to say that judgment had already
become functus officio56 and can no longer be executed.
The over-all position we have here taken should dispose of all other issues raised by the parties; hence,
unnecessary is a discussion thereof.
The petition for certiorari and prohibition in L-24796 is hereby granted; the June 1, 1965 order of execution, the
June 3, 1965 writ of execution issued pursuant thereto, and the July 8, 1965 order, allowing respondent
Pinagcamaligan Indo-Agro Development Corporation, Inc. to haul its logs, all of the Court of First Instance of
Bulacan in Civil Case 3035-M, are hereby declared null and void; the writ of preliminary injunction issued herein
is hereby made permanent; and the Chief of the Engineer Corps, Armed Forces of the Philippines, who was
permitted by this Court on October 8, 1965 to retain for safekeeping and custody the logs previously seized by
the State from the log ponds of respondent Pinagcamaligan Indo-Agro Development Corporation, Inc., is now
given authority to use the same for the manufacture of prefabricated school houses; and —
The petition of Pinagcamaligan Indo-Agro Development Corporation, Inc. for injunction and prohibition in L-25459
is hereby denied.
Costs in both cases against Pinagcamaligan Indo-Agro Development Corporation, Inc. So ordered.
Concepcion, C.J., Reyes, J.B.L., Dizon, Makalintal, Zaldivar, Castro, Angeles and Fernando, JJ., concur.
Footnotes
1Hereinafter referred to merely as Nawasa. Nawasa should be deemed excluded as a petitioner inasmuch
as it did not make any appearance before this Court as such, because of its amicable settlement with
respondent Pinagcamaligan Indo-Agro Development Corporation, Inc.
2On March 14, 1966, this Court noted petitioner's motion for substitution of party respondents and for leave
of court to include incumbents of the positions of Secretary and Undersecretary of National Defense, and
the Chief of Staff, Armed Forces of the Philippines.
3Rollo of L-24796, p. 48. According to Piadeco also in another pleading, the area is 74,000 hectares. Id., p.
36. Piadeco's pleadings are attached to the record as annexes of the Government's petition.
https://lawphil.net/judjuris/juri1968/jun1968/gr_l-24796_1968.html 12/15
8/26/2021 G.R. No. L-24796
4Some portions of the record place the date as April 29, 1894.
5One condition of the certificate is that it "does not permit the holder to cut trees within the strip of one (1)
kilometer wide from the boundary of the Angat and Marikina Watershed Reservation."
6Civil Case 3035-M, Court of First Instance of Bulacan, entitled "Pinagcamaligan Indo-Agro Development
Corporation, Inc., Petitioner, vs. The Director of Forestry, et al., Respondents."
7On August 3, 1965, Piadeco moved that this Court delete Nawasa as one of the petitioners in view of its
compromise agreement with Piadeco, to which the Solicitor General signified no objection.
8People vs. Exconde, 101 Phil. 1125, 1129-1130, citing Calalang vs. Williams, 70 Phil. 727; Pangasinan
Transportation vs. Public Service Commission, 70 Phil., 221; People vs. Rosenthal, 68 Phil. 328; Rubi vs.
Provincial Board of Mindoro, 39 Phil. 660.
9Article 1126, Civil Code; Article 1949, Spanish Code. Ordinary prescription as between absentees is
twenty years under Article 1957, Spanish Civil Code.
11Kincaid vs. Cabututan, 35 Phil. 383, 395, where the title of ownership lost by prescription was previously
acquired from the Spanish government.
13See: Ankron vs. Government, 40 Phil. 10, 14; Li Seng Giap y Cia vs. Director of Lands, 55 Phil. 693;
695; Fernandez Hermanos vs. Director of Lands, 57 Phil. 929, 936; Alfafara vs. Mapa, 95 Phil. 125, 128.
14Ankron vs. Government, supra, at p. 16, citing Ramos vs. Director of Lands, 39 Phil. 175; Jocson vs.
Director of Forestry, 39 Phil. 560.
15Adorable vs. Director, L-13663, March 25, 1960. See also: Vaño vs. Government, 41 Phil. 161, 162.
16Emphasis supplied.
17Emphasis supplied.
19For a discussion of these titles, see Ventura, Land Titles and Deeds, 1955 ed., pp. 17-32; Noblejas, Land
Titles and Deeds, 1965 ed., pp. 4-9; Peña, Registration of Land Titles and Deeds, 1961 ed., pp. 2634;
Ponce, The Philippine Torrens System, 1964 ed., pp. 11-31.
20To be noted here is this Court's resolution of October 20,1965 (Rollo, pp. 139, 227) denying the first to
the eighth extensions of time sought by respondent Piadeco within which to answer. In the interest of
substantial justice, as Piadeco's answer is attached to the record and the Solicitor General not having
moved to expunge the same therefrom, said answer is here considered in the disposition of L-24796.
21Rollo, p. 486.
22Rollo, p. 187.
23Law 19, Title 12, Book IV, Laws of the Indies. See: Valenton vs. Murciano, 3 Phil. 537, 540, 548, 553;
J.M. Tuason & Co., Inc. vs. Santiago, 99 Phil. 615, 628-629.
26Emphasis supplied.
https://lawphil.net/judjuris/juri1968/jun1968/gr_l-24796_1968.html 13/15
8/26/2021 G.R. No. L-24796
28The area in the Ramirez case was 203 hectares, 85 ares and 44 centares (at p. 115). Compare this with
the alleged area herein involved — 72,000 or 74,000 hectares.
29Emphasis supplied. The Royal Decree referred to is the Royal Decree of August 31, 1888.
30Oligan vs. Mejia, 17 Phil. 494, 496; Villa Abrille vs. Bañuelos, 20 Phil. 1, 8, citing Sison vs. Ramos, 13
Phil. 54 and Belen vs. Belen, 13 Phil. 202; Licad vs. Bacani, 51 Phil. 51, 54-56; Lasam vs. Director, 65
Phil. 367, 371.
33Id., p. 48.
36Ibid.
37See: Government vs. Avila, 46 Phil. 146, 154; Bayot vs. Director of Lands, 98 Phil. 935, 941. Article 15
of the royal Decree of January 26, 1889 limited the area that may be acquired by purchase to 2,500
hectares, with allowable error up to 5%. Ponce, op. cit., p. 19.
39Ibid.
42De Ralla vs. Director of Lands, 83 Phil. 491, 501, citing Director of Lands vs. Penales, 63 Phil. 1065.
43Second paragraph, section 11(c), Forestry Administrative Order 12-1, as amended by Forestry
Administrative Order 12-2; emphasis supplied.
45Emphasis supplied.
46See: Cornejo vs. Gabriel, 41 Phil. 188, 193-194; Bisschop vs. Galang, L-18365, May 31, 1963.
48Fifth paragraph, Section 11(c), Forestry Administrative Order 12-1, as amended by Forestry
Administrative Order 12-2.
50Logs cut from national parks are governed by the preceding section, Section 2, which also directs
prosecution and seizure of the logs under Republic Act 122, for use in the manufacture of prefabricated
school houses.
52Rubi vs. Provincial Board of Mindoro, 39 Phil. 660, 706. See also: Ermita-Malate Hotel and Hotel
Operators Ass'n. Inc. vs. City of Manila, 20 Supreme Court Reports Anno. 849, 864; Morfe vs. Mutuc, L-
20387, January 31, 1968.
53Calalang vs. Williams, 70 Phil. 726, 733, cited in Ermita-Malate Hotel and Motel Operators Ass'n, Inc. vs.
City of Manila, supra, at p. 865.
https://lawphil.net/judjuris/juri1968/jun1968/gr_l-24796_1968.html 14/15
8/26/2021 G.R. No. L-24796
54Nebbia vs. New York, 291 U.S. 502, 523, 78 L. ed. 940,948-949.
55Philippine American Life Insurance Company vs. Auditor General, L-19255, January 18, 1968.
56Manila Railroad Company vs. Yatco, L-23056, May 27,1968, citing Villasenor vs. Albano, 1967C Phild.
882, 885, and cases cited.
https://lawphil.net/judjuris/juri1968/jun1968/gr_l-24796_1968.html 15/15