Executive Summary Site and Project Justification
Executive Summary Site and Project Justification
ARCHITECTURE DEPARTMENT
B. MACRO-MESO SITE ANALYSIS: REGION/ Davao City is located at the southeastern corner
PROVINCE/ TOWN of the Philippines, it is the capital city of the
region of Davao. Davao city is a 1 st class highly
REGIONAL urbanized city of Davao Region and considered
as a fastest economic growth area of the
Philippines. Davao City is bounded by Davao del
Norte, Cotabato City, Davao del Sur and the
coastal of Davao Gulf. The davao city has a total
land area of 2,443.61 km2 (943.48 sq mi). It is
divided into three congressional districts of which
are 11 districts and 182 barangays.
Historically, Former President Manuel L. Quezon
opted to create Davao as a city. It was then
davao was seen during the past as a one of the According to National Statistic Office (NSO) and
major export of products such as abaca, copra Office of the City Planning and Development
and lumber. Until then, it was became the regular Coordinator (OCPDC), District I in Urban Area
port by inter-island shipping and began direct have the most population density and have the
commercial links abroad such as United States, lowest built-up density. Followed by District II,
Japan, Australia and etc.,. who have a 42.02 population density and 1.38
It was then Davao City saw a rapid rise in it’s Built-up density and followed by District III who
population and it’s economic progress gave have the highest built-up density but considers as
considerable importance to the country’s the lowest population density with a total of
economic and foreign trade. Davao city’s 22.12.
covered 244,000 hectares in the municipality of In rural areas, District I have the most populated
Davao. Today, Davao city is still the center density with a total of 4.80 density followed by
business district of Mindanao and looks forward District III and followed by District II who have the
to accelerating further it’s economic lowest populated density with a total of 0.89 but
development. considers District II who have the highest built-up
density.
TOPOGRAPHY
POPULATION
FLOOD SUSCEPTIBILITY
Davao city is a growing population with an
estimation total household population of 1,443,
890 in 2010. According to National Statistic Office
(NSO), the table shows that the total school age
group population are 100.00%. And the working
age group population are 64.91% and a
dependent population for young age group are
31.42%.
By sex distribution, In working age group both
sexes almost shares the same percentage. It
shows that males are 32.14% total percentage
and a female are 32.77 with a total ratio of 1.02.
and valleys; (2) Soils in the intermediate uplands;
(3) soil of hills and mountains.
Davao city was also seen as high susceptibility in
floods. Particularly in low lying areas along LIQUEFACTION HAZARD
riverbanks. Development of those area can have
a significantly adverse impacts upon flooding
behavior which in turn may result in adverse
effects on other development and the community.
Development of flood prone areas would cause
the significant levels of flood danger and
damages to property and such occupants.
The city planning office are in shape applicable
development paramenters to reflect the variation
in flood risk across flood prone land and the
associated consequences on residents and their
property. Restriction may still be introduced such
in flood prone areas by the government to see
the valuable land resouces. To also protect the
existing and future inhabitants from flood hazard Liquefaction is one the main factor to consider
and the potential danger and damage associated when developing a structure. It defined as the
with use of flood prone land. granular material in solid state, which behaves
and deforms like a liquid as a consequence of
SOIL increased pore-water pressure due to earthquake
shaking. Some areas that belong to the fluvial
landforms are the most susceptible to liquefaction
being overlain by alluvial deposits wherein the
four conditions mentioned above could be
present.
Davao City is prone to earthquake but in record,
some records are are not know fault passing
through it but the soil structure of the area made
it to prone to liquefaction. Soil test must be
observe first when developing a building to test
the foundation if it is strong. The local
government do not allow the building of
structures within the fault areas.
Davao City have different type in terms of
location and it’s quality, color, texture, depth, PUBLIC TRANSPORT NETWORK
drainage, permeability and fertility. All of these
factors are attributive to the productivity of the
soil, the ease in cultivation and adaptability to
agriculture. The Land Resouce information
system (LARIS), there are basis of the foregoing
soil characteristics of Davao City and these are
classified into seven series and one
miscellaneous land type. There are three (3) soils
that are group into following: (1) Soils and Plains
fault, and Colosas fault in Paquibato district; and
the Dacudao fault and Biao Eskwela fault in
Davao City has a total of 1,856.24 kilometers of Tugbok district.
roads and highways. 7% of it’s are national Clearly, the six active faults line are not too close
roads, 39% are city roads and 54% are barangay to the site. This helps the data to clear if the
roads. Currently, Davao City has three major structured are allowed to develop. And the site is
ingress and egress points that allow linkages to advantage for the users and local community
other cities and provinces. The Philippine-Japan who travel by pass on cities.
Friendship Highway (PJFH) that runs the country CLIMATE
from Northern Luzon all the way to Southern
Mindanao and also traverses along it’s 60-
kilometres coastal area. Also, the Davao-
Bukidnon road that traverse the city fron
southeast to northwest. Currently, some of major Davao city is a mild tropical climate season.
roads of Davao City are congested due to the Davao City is not prone to any typhoon belts and
increase of population and vehicle volume that lacks major seasonal variations. Compared to
runs along the city such as cargo trucks utilizing other parts area of the Philippines in which there
the road as a consequences of rapid are distinct hot and wet season. The weather are
urbanization. always sunshiny and mild followed by nights of
Currently, Land transport infrastructures enable rains.
vehicles and people to move and travel from one The predominant wind direction is northward from
place to another. Such as the terminal in the city the Davao Gulf where the cooler air of the sea
located in Ecoland, Barangay Bucana. Covers replaces the warm air mass over the city. The
1.7 hectares and serves both the north and south advantages of high mountains in the rural parts
bound routes. Caters 800 units of buses and 24- are effectively protect the city from the strong
hour in operation. winds.
THE SITE
SWOT ANALYSIS
One of the most important when analyzing a site
condition is the S.W.O.T analysis. It helps what is
The citi hardware store is 800 meters aways from more needed and the strength of the project site,
the site. It is a store for the supplies for the to address what is the lacking and what are to
construction materials needed for the home. The minimize.
store operates for 12 hours a day from Monday to The strength of the site is very accessible to all
Saturday. types of vehicles, the site has a low terrain slope
so that it can easily to manipulate a design, the
site is nearby to the commercials, airport,
residentials and the like. And also, the site has a
lot of existing vegetations.
The weakness of the site vulnerable to
earthquake since davao is mostly earthquake
prone.
The site is mostly surrounded by commercial The opportunity of the site is it can be a good
stores that some of them operates for 24 hours a opportunity to the local community to have their
day. Some of the commercials establishments businesses.
are food chains, pharmacy stores, hardwares, The threat is designing a commercial areas can
salons and the like. feel the nearby commercial residents to
threatened.
SITE PHOTO
The initial site schematic diagram in site is have
a different zoning and will be based according to
the design guidelines for the transit hub. The
main building will be a terminal building for the
operational facility . And the second building will
be the PUJ and PUVs station building. There
will be also a bay and unloading bays for the
buses and jeepneys and the like. And there will
be a public garden space for the local
community. This proposal will serve as the pick-
up and drop off point for provincial buses.
APPENDICES
ZONING MAP
SITE
the National Capital Region (NCR). Adding some
of the most important facilities and equipment for
the healthcare workers as it can help them to
prevent from infecting a disease.
Philippines General Hospital Main located at the
Taft Avenue, Manila is a tertiary stated-owned
administered and operated by the University of
the Philippines-Manila. Philippine General
hospital Main is the largest training hospital in the
whole country of the Philippines. The Philippine
UP-Philippine General Hospital Diliman Project: general hospital served more than 600,000
An integrated medical and research center through patients every year annually and remains referral
adaptation of new normal center for tertiary care. Serving and providing
quality service for the Filipinos for the whole
CHAPTER I: PROJECT BACKGROUND nation.
The Philippines general hospital main now is
A. THE PROJECT
currently battling for covid-19 inpatients and
Hospitals play an important role in a health care
outpatients who admitted for treatment. Currently,
in our society. It is an institutional type of building
the PGH stop accepting admitted Inpatients due
that offer different types of services such as
to the rapid growth of Covid Patients. The highest
generic medical, radiology, surgery, psychiatric
previous 250 bed-capacity of Philippine General
services, dental laboratories, and emergency and
Hospital Main has now reached to it’s 266
other outpatients care centers. Despite the rapid
admitted patients for treatments.
growth of the population of the county, it is
According to the data of Philippine General
essential and necessary for the national
Hospital Demographics, previous 2018 the
government to build Hospital every Local
Philippine General hospital served a 647, 773 for
Government Unit to makes it easier and
the total of Patients who admitted and 699, 063
convenient for the people.
for the year 2019. The year 2020 and 2021
Due to the rapid growth of covid cases in the
decreased the size of patients due to the new
Philippines, the congestion of the facilities and
implementation of new normal setup for the
hospital beds are fully occupied and some
hospital and since march 2020 there have been
doctors could not accommodate of some
limited elective admissions. The whole year of
patients. As covid-19 disease to continue to rise
2020 of total data, the PGH served more than
in the country, it is expected that some of the
200,000 and for the first half of 2021, the PGH
hospital and medical could stop accepting
served more than 150,000 of Patients who
outpatients. Most of the hospital are at maximum
admitted.
capacity and some of the patients who are even
need of treatment are being sent to home. B. PROJECT OBJECTIVES
Community transmission are still the main effect The major objectives of the proposal is to reduce
of it’s continuing growth of the Disease in the the overcrowding hospital facilities issues in
country including the hundreds of daily death. Metro Manila.
Physical and social distance are still not followed To offer more research facilities, teaching
by other people such as public transportations, hospitals with more innovative in medicine. And
restaurants, malls and wet markets and other to provide more diagnostic center and complete
crowding areas. As the number of cases rising equipment for the different kinds of disease.
rapidly, the government are implementing and The minor objective of the proposal is to provide
supporting the expansion of another hospitals in a comfortable and sustainable facility and fully
equipment for the health workers. And to provide designing a new flexible spaces thru adaptation
a functional and efficient space for the health of the new normal life.
workers. And to design and create a friendly The target users are all people around UP-PGH
humane environment for patients and staffs. Diliman within 30-kilometer radius. The
catchment area are from the National Capital
Region, Bulacan and Rizal area. It projected that
within 2042, the increase of population with 20.2
million. It will be available for the local
community who want to admit to avoid the
congested facility of other hospital.
E. PROJECT DEVELOPMENT
C. THE CLIENT The project development will first start to collect
any data spaces needed for medicals, teaching
and research center spaces. Then also to collect
any data for maps, photo-documentation, and the
lot-bearing or actual lot size for the project. And
also to collect data for the density or target
University of the Philippines market for the proposal or project. And also to
gather data and design according to the legal
University of the Philippines eyes on codes of the Philippines such as National
implementing a new general hospital in Diliman, Building Code P.D.1096, B.P. 344 and P.D.
Quezon City that will cater a 700 bed and a 1185. And also to come up with the ideas to meet
research and teaching center to be a world class the new rules and policy design for the new
hospital. The University of the Philippines also normal setup.
focus on including a research facility and The project process of the proposal is to gather
teaching center for the students. The new project data for the possible space and requirements.
will help to decongest the overcrowding of the And to secure a copy of the lot bearing of the site
facilities and beds. The private sector will be the location. And also to gather data for the density
responsible for design, build and finance to the or target market of the proposal. And to ensure
project and to the full equipment of the medical all the legal aspects of the applicable codes are
laboraties. followed correctly.
The project output of the collected and data
D. PROJECT SCOPE AND LIMITATIONS gathered for the conducted research will be the
The proposed project will be a tertiary general new UP-Philippine General Hospital Diliman: An
hospital to be located in the Arboretum Site. The integrated medical and research center through
target will be the admitted Inpatients and adaptation of new normal.
Outpatients within the catchment area of PGH
Diliman Covers the NCR and the contiguous CHAPTER II: SITE JUSTIFICATION
provinces of Bulacan and Rizal. The scope will
A. SITE SELECTION CRITERIA
be focused on designing and planning &
For the selection site criteria, it is important to
circulation of the spaces such as the hospital
choose an appropriate site that will be feasible for
700-beds, functional areas, research
the project.
laboratories, educational program and
For the General Site Criteria, the Lot Size and
emergency areas and to cater all the needs of
Area is 20 points because the lot size is suitable
the users. The project is also focusing on
and the 4.2 hectares is pass to the tertiary
hospital design project. The Vehicular
Accessibility is 20 points because the site is
accessible to any type of vehicle. The pedestrian Metro manila or officially a National Capital
accessibility is 10 because the site location has Region (NCR), is located at Southwestern portion
existing pedestrian walkways that is suitable for of Luzon and also one of the largest Regional in
the transportation travel and existing traffic the Philippines. Composed of 16 cities which is
control system. The vulnerability to natural City of Manila, Quezon City, Caloocan City,
hazard is 5 because the site location is 5 Taguig City, Makati City, Paranaque City, Pasay
kilometers away to the active west valley fault City, Las Pinas City, Malabon City, Navotas City,
line of Marikina. The Climate is 5 because the Marikina City, Pasig City, Mandaluyong City,
site location has an irregular dry season and wet Muntinlupa City, San Juan City and as well as
season. The availability of Utilities is 20 because Valenzuela City.
the quezon city supplied by the meralco power Metro Manila has many central business districts
company and Maynilad water services. The such as Makati Central Business District,
existing of hospitals is 3 points because the site Bonifacio Global City, Ortigas Center and
location is mostly surrounded by hospitals within Alabang. Metro Manila is home of the tallest
2 kilometers away. The total points for the skyscrapers in the whole country and include
general site criteria is 83. many Landmarks such as Shangri-La Plaza,
EDSA Shrine and SM Megamall.
For the specific site criteria, the target community Metro Manila main transportation is Jeepneys,
is 30 points because it is near to the residentials followed by Railway Train, and Buses. The roads
and commercials. The vulnerable to man-made of metro manila are built from the city of manila
hazard is 20 because the site location is free that connects to each cities and metropolis
from the smoke hazard of industrial composed of 10 radials and 6 circumferential
establishment. The site potential is 30 because major roads.
the location of the site is a tourism development,
business sectors and agencies, job opportunities TOWN MAP
and rationalized residential planning. The
property land use & zoning is 3 because the lot of
the site is an open space & park and it is not
intended for institutional, but the site is not part of
the protected forest area of arboretum. The total
points for the specific site criteria is 83.
REGIONAL
Quezon City’s is a larger area of government-
owned land for the development of public
improvements and for the local community.
Quezon City has six districts, among the six
districts, Districts II has the most largest
population with a 688, 773 or 23.46% of the total
population. While District V, has the most fastest
with 1.79% which is even higher than the city’s
growth rate of 1.17%.
Quezon City is borded by Manila to the also provided with alternate route to avoid
Southwest, and Caloocan and Valenzuela to the congested and traffic volume issues.
west and northwest. San juan and Mandaluyong
by south lies. Marikina and Pasig to the POPULATION
Southeast. While Marilao River lies San Jose del
Monte in the province of Bulacan.
The Quezon City name after the former President
Manuel Luis Quezon select the city, it was
established during commonwealth period and
then replaced Manila in 1948. After the World
War from 1939-1945 the construction begin again
on capitol site. There are many historical
landmarks that can be seen around in Quezon
City including the EDSA People Power
Revolution and the site of Unang Sigaw ng
Balintawak. According to Philippine Statistics Authority,
Quezon City has the most high total population
ROAD NETWORK rate and from 2000-2020. With the rapid increase
of population in the city and the result of growth
population, every district demand for additional
institutions, health care and and the like.
SOIL DESCRIPTION
Quezon City is provided by two concessionaires
of the Metropolitan Waterworks and Sewerage
System (MWSS).
Quezon city’s north and west parts are within the
Quezon City’s has a prevalent tuff layer. Quezon concession area of Maynilad Water Services, Inc.
city have soils with high bearing capacities at while the southeast is under the Manila Water
shallow depths. It is recommended to place on Co., Inc.,
foundations so it has more capable of carrying Some of the older residential communities are
loads that are suited for shallow depths. mostly developed by then the PHHC (now NHA)
are: Roxas District, Quirino 2 and 3, project 4, 6,
UTILITIES and 7, Malaya Housing project (UP Village,
POWER SUPPLY
Teachers Village, Central, Pinyahan and
Sikatuna village) GSIS Village, Congressional
Village, South Triangle, Kamuning, Heroes Hill,
and Philam Subdivision.
But some particular of Quezon City are not yet
covered by the supply of Maynilad, these are:
Payatas, Holy Spirit, North Fairview and in
Kaligayahan.
DRAINAGE SYSTEM
APPENDICES
ZONING MAP
B. PROJECT OBJECTIVES
The project objectives is to provide a health care
facility for the individual with disabilities. And to
provide a comfortable and sustainable
A Proposed Center for the Individual with rehabilitation center. And to experience the user’s
Disabilities and Rehabilitation Center an adaptation of a new normal design facility.
And to provide a health care workers a fully
CHAPTER I: PROJECT BACKGROUND equipment of a facility. And to provide an
educational program center for their special
A. THE PROJECT needs. And to improve their quality of life gaining
Disability is one of the main concern and priority life management skills. And also to rebuild the
of the county in the Philippines. Some people social connectedness to family and community.
who are disabled, don’t have a chance to go to
school, work and socialize with other people. C. THE CLIENT
Aside from poverty, disabled persons also face
the discrimination and abuse from anyone.
Disability have two classification, the first one is
Physical Disability and the second is
Psychological Disability. The Physical Disability
consists of Visual Impairment, Hearing
Impairment, Mobility and Deaf. While the second
one, Psychological Disability consists of National Council on Disability Affairs
Neurodevelopmental Disorders, Bipolar and
Related Disorders, Anxiety Disorders, Stress- The national council on disability affairs is the
Related Disorders, and any other form of mental government agency and it aims to formulate the
illnesses that affects the mentality of the human policies and coordinate all the activities of all
body. agencies whether public or private, concerning
Sometimes, it is very difficult for the Individual disabilities issues. The National council on
with disabilities to find job because they are the disability affairs develop and promote respects
most vulnerable group in the society. Based on
for rights and privileges on persons with The project output will be the new center for the
disabilities. individual with disabilities and rehabilitation
center.
E. PROJECT DEVELOPMENT
The project development will start first to gather
the lot bearing of the site and all of the B. MACRO-MESO SITE ANALYSIS: REGION/
documentation of the location. And to gather data PROVINCE/ TOWN
of a total demographics of a persons with
disabilities in the town of Imus. And to also apply REGIONAL
the legal aspects such as B.P. 344 and the laws
of R.A. No. 7277 “Magna Carta”. And to also to
come up with ideal space for the new normal
setup.
arriving in the late 16th century found important
to the unusual tongue of land thrust and deep
waters into Manila Bay. The province of Cavite
was formerly known as “Tangway”, it played an
important part in trade with the settlements
around Manila Bay wherein it was considered the
mooring place for Chinese junks. On August 26,
CALABARZON is a designated Region IV-A.
1896 when Philippines revolution against Spain
Comprises of five province which are Cavite,
broke, Cavite became a bloody war theatre. It
Batangas, Laguna, Quezon and Rizal.
was then Emilio Aguinaldo the first Philippine
Calabarzon has a total of 19 cities, a 122
President came from the town of Kawit and
municipalities and a total of 4, 011 barangays.
directed the conduct of the Revolution from his
CALABARZON is a growing economy and with a
base in the province. On June 12, 1898, the
high population growth makes a region a second
Philippines was declared the Philippine
shares to a Gross Domestic Product (GDP).
Independence and proclaimed the first republic of
CALABARZON is bounded on north by National
the Philippines in his balcony of his home in
Capital Region (NCR), and on the east by the
Kawit.
Pacific Ocean, on the southeast by Bicol region,
The province of Cavite was one of the largest
and on the south by MIMAROPA Region and last
province in the Philippines. The province of
on the west by Manila Bay.
Cavite belongs to the Region IV-A or
The population of CALABARZON is at
CALABARZON region. The province of Cavite
16,195,042 based on 2020 Census. And in 2015,
was bounded by the provinces of Batangas in the
the population of CALABARAZON reached 14.41
South, Laguna in the east, Rizal in the northeast,
million which represents 14.27% of the country’s
Metro Manila and Manila Bay in the north and
population of 100.98 million. The population
West Philippine Sea in the west. The province of
growth is attributed mainly to in-migration for
Cavite has the GPS coordinates of 14.2456
work and with these migrant workers bringing
degree on North and 120.8786 degree on East.
their families. And also the total land area of
TOWN
CALABARZON is 16,228.61 square kilometres
for 5.4% of the country’s total land area of
300,000 square kilometres.
PROVINCIAL
UTILITIES
The city of Imus are prone in High Flooding due POWER SUPPLY
to the bad weather and typhoons. The Imus
CDRRMO come up with the plan and strategies
to prevent and mitigate by using and updating the
Comprehensive Land Use Plan of Imus LGU.
The major districts of Imus are more susceptible
to Flooding rising to 0.01m to 2.00 meters. While
on the other hand, the high lying area of Imus are
less to flooding. It is one of the vital and important factor to
consider the power source of the site. It gives the
ROAD NETWORK electricity and lighting of the building. One of the
The province of Cavite is accessible by the main source of electricity of Imus City of Cavite is
classified roads as National, Provincial, the Meralco. Not just in locality of Imus, but in the
City/Municipal, and barangay roads. whole region of Cavite. All barangays of Imus are
The city of Imus is located at the southern of already merged. With the rapid urbanization of
Metro Manila. Imus is 23 Kilometer or 15 miles Imus, the local government should coordinate
away from the Metro Manila. It can be access with concerned agencies such as giving
through the adjoining road of Emilio Aguinaldo adequate power supply to the all the local
Highway and Coastal Road Highway. community of Imus as well as the projected
DRAINAGE requirements of residential, commercial,
The city of Imus River has a total length of 38.4 institutional and industrial of Imus, Cavite.The
kilometer, it’s drainage location are in bacoor number of customers in residential has the
bay. It’s tributaries are found in Baluctot also biggest numbers with the total of 117,229 and the
drain at Imus River. It’s point of origin are the commercial numbers are 7,228 and Industrial
North of Tagaytay passing in Balite, Sabutan, establishments numbers are 42, the streetlights
Biga, Silang, Palapala, City of Dasmarinas, are 96, it comes the total number of customers
Pasong Bayog, San Agustin and connects to are 124,595.
Pasong Bayog passing Salitran, Baluctot, Anabu
II & Anabu I going to Tanzang Luma, Palico, WATER SUPPLY
Imus down to Salinas and
Mabolo, Bacoor toward drainage. Tributaries
which started from Bucal going to San Agustin
join or connect to Imus River in Pasong Bayog.
CLIMATE
It is one of the main factor to consider the water
source of the Site. The local community of Imus,
Cavite is provided by the for the municipalities of
Cavite. Maynilad is an agent and contractor of
the Metropolitan Waterworks and Sewerage
System (MWSS).
The branch of Maynilad in Imus Cavite is located It is important to consider the preliminary phase
in G. Aguinaldo Highway, Imus, Cavite. However,
of wind and sun path analysis factor, to ensure
some barangays of Imus still obtain water from the building has a good light, orientation, views
private deep wells. It is not guaranteed that water
and vistas. And also to provide and
from the deep wells are safe to drink. understanding of the site. As shown in the figure
Due to the rapid urbanization and commercial
above, the site is oriented the north and the
establishment investing in Imus, Cavite, the local southwest monsoon (from lower left) is usually
government unit of Imus must see to it that all
affects the country from late June to October, this
consumers such as residentials, commercials
type of Monsoon usually continue to bring on and
and industrials are provided with adequate water
off rain and cold weather. To the top right is
supply. Northeast Monsoon (Hanging Amihan) is usually
affects the country from December and ends in
C. MICRO SITE ANALYSIS: THE SITE AND ITS
IMMEDIATE ENVIRONS
June. It is also a type of monsoon that bring
THE SITE heavy rains. Initially, this is a cold, dry air mass
that comes from Siberia and gathers moisture
from pacific ocean and spread to the entire
country of the Philippines. It is the
characterization of cloudiness with rains and
showers.
APPENDICES
ZONING
SITE