Appendix 2 Split of Work Scope: Power Generation A Engine System
Appendix 2 Split of Work Scope: Power Generation A Engine System
SupplyEPGL/ MAN
InstallationEPGL
SupplyClient
InstallationClient
Quantity
Section
Items
POWER GENERATION
A Engine System
Engine 18V48/60TS mounted on a steel foundation
6 Nos x x
frame
SaCoSone Interface cabinet 1 per engine x x
SaCoSone Auxiliary Cabinet 1 per engine x x
Turbocharger control unit 1 per engine x x
Tools
Engine Tools
Set of standard and special tools for the engine 1 lot x
Crank web deflection measuring device 1 lot x
Electric valve cone grinder 1 lot x
Electric valve seat grinder 1 lot x
Electronic firing pressure gauge 1 lot x
Assembly and reversing device for cylinder heads 1 lot x
Set of tools for turbocharger 1 lot x
Plant Tools
Tools for nozzle cooling water unit 1 lot x
Mobile strainer cleaning unit for automatic filter 1 lot x
Workshop equipment/ tools 1 lot per
x
(equivalent to USD 250000) plant
B Generating Set
Coupling Arrangement
Flexible coupling 1 lot x x
Flywheel cover 1 lot x x
Engine Seating
Foundation frame seating 1 lot x x
Pipe Adapters
Flexible pipe connections for the engine 1 lot x x
Rubber expansion joint for intake air duct 1 lot x x
Adapter for exhaust gas duct 1 lot x x
Low Pressure Turbo Charger Ducts
Intake air ducting 1 lot x x
Exhaust gas ducting 1 lot x x
InstallationEPGL
SupplyClient
InstallationClient
Quantity
Section
Items
InstallationEPGL
SupplyClient
InstallationClient
Quantity
Section
Items
InstallationEPGL
SupplyClient
InstallationClient
Quantity
Section
Items
InstallationEPGL
SupplyClient
InstallationClient
Quantity
Section
Items
InstallationEPGL
SupplyClient
InstallationClient
Quantity
Section
Items
InstallationEPGL
SupplyClient
InstallationClient
Quantity
Section
Items
InstallationEPGL
SupplyClient
InstallationClient
Quantity
Section
Items
InstallationEPGL
SupplyClient
InstallationClient
Quantity
Section
Items
H CIVIL
H1 Power Plant Buildings and Utilities
Engine Hall
Engine hall sub structure and brick walls 1 lot x x
Engine hall prefab super structure 1 lot x x
Turbine Hall
Turbine hall sub structure and brick walls 1 lot x x
Turbine hall prefab super structure 1 lot x x
Electrical / Control Building
Control Building sub structure and brick walls 1 lot x x
Control Building prefab super structure 1 lot x x
Fuel Treatment Plant Building
FTP sub structure and brick walls 1 lot x x
FTP prefab super structure 1 lot x x
Exhaust Chimney
Sub structure 1 lot x x
Prefab (steel) super structure 1 lot x x
Radiators Support Structure
Sub structure 1 lot x x
Prefab (steel) super structure 1 lot x x
H2 Other Power Plant Buildings
Pump House
Sub structure and brick/concrete works 1 lot x x
Prefab super structure 1 lot x x
Oil Unloading Area
Sub structure and brick/concrete works 1 lot x x
Prefab super structure(if any) 1 lot x x
Day Tank Containment Area
Sub structure and brick/concrete works 1 lot x x
Prefab super structure (if any) 1 lot x x
Fuel Storage Containment Area
Sub structure and brick/concrete works 1 lot x x
Prefab super structure (if any) 1 lot x x
Water Treatment And Fire Fighting 1
InstallationEPGL
SupplyClient
InstallationClient
Quantity
Section
Items
InstallationEPGL
SupplyClient
InstallationClient
Quantity
Section
Items
H6 Site Works
Site Preparation
Site clearing 1 x
Removal of contaminated material 1 x
Top soil removal (if required) 1 x
Site levelling - cutting and filling 1 x
Site excavation 1 x
Site filling (after takeover) 1 x
Soil improvement 1 x
Underground Network
Drainage system 1 x
Earthing network 1 x
Landscaping
Landscaping 1 x x
Paving And Surfacing
Access road 1 x x
Internal Roads 1 x x
Gravel areas and office vehicle Parking areas 1 x x
Site Accessories
Fence/Boundary Wall 1 x x
H7 Shelters And Other Structures
Substructures and Superstructures 1 x x
H8 Others
Land Handover 1 x
Generator Base Foundation 1 x x
Chimney Foundation 1 x x
Lighting pole foundation 1 x x
Cable Trench 1 x x
Pipe Pedestal 1 x x
Substation 1 x x
I Engineering And Documentation
I1 Engineering
Soil investigation Job x
Conceptual engineering- Respective Job x
Basic engineering -Respective Job x
Development of power plant layout Job x
Tank farm area details engineering including tank
Job x
design, fabrication drawing (Respective Scope)
InstallationEPGL
SupplyClient
InstallationClient
Quantity
Section
Items
InstallationEPGL
SupplyClient
InstallationClient
Quantity
Section
Items
Temporary fencing 1 x
General security and site access control 1 x
Security of supplied equipment 1 x
Safety
General safety and fire protection 1 x
Safety for Engine Supplier personnel and Engine
1 x
Supplier contractors
L Commissioning
L1 Commissioning Advisory Service
Mechanical commissioning advisor, 170 man days Lot x
Electrical commissioning advisor, 160 man days Lot x
Engine automation commissioning advisor, 12 man
Lot x
days
Plant automation commissioning advisor, 6 man days Lot x
Pre-Commissioning
Pre-commissioning (respective scope) 1 x
L2 Testing Procedures
Workshop Tests
Engine test according to standard program 1 x
Third party inspectors (if required) 1 x
Customer Witness Workshop Test
Allowance 1 x
Travel 1 x
Accommodation 1 x
Local transportation 1 x
Commissioning Management For Respective Scope
L3
Of Supply
Commissioning planning 1 x x
Commissioning organization and resourcing 1 x
Health, Safety and Environment during commissioning 1 x
Commissioning coordination and meetings 1 x x
Commissioning time management, controls and
1 x
progress reporting
Commissioning and performance test documentation 1 x
L4 Initial Fillings
Erection - for Engine & Engine Equipments 1 x
Flushing consumables (except fuel) 1 x
Lubricants (Engine & Turbine) and Fuel oil 1 x
First fill of coolant conditioner 1 x
InstallationEPGL
SupplyClient
InstallationClient
Quantity
Section
Items
InstallationEPGL
SupplyClient
InstallationClient
Quantity
Section
Items