0% found this document useful (0 votes)
28 views63 pages

Mum2017-Italy - Large Scale Installations

Uploaded by

Scada Link
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views63 pages

Mum2017-Italy - Large Scale Installations

Uploaded by

Scada Link
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 63

LARGE SCALE INSTALLATIONS

WITH CAPSMAN
MUM 2017 in Milan, Italy
by Stavros Maragkoudakis
About me
Introduction

Stavros Maragkoudakis
Hellascom Ltd, Managing Director
MikroTik Distributor in Greece since 2001

LARGE SCALE INSTALLATIONS WITH CAPSMAN 2


Company presentation in brief
Introduction
 Hellascom is a Commercial – Technical Company which was established in 1998.
Since 2001, we distribute and support MikroTik products.
We provide professional Communication solutions, with emphasis in WiFi systems.
We sell our products to our resellers and end users through our electronic shop
www.linkshop.gr and from our offices at 12, Akti Themistokleous str.
 Hellascom acts also as system Integrators, in Hotels WiFi and in Highways Road,
Tunnels Radiocommunication large scale infrastructure Projects.

 Hellascom provides full after sales & training support to our resellers and end users.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 3


Location of our company, Zea marina at Piraeus GREECE
Introduction

LARGE SCALE INSTALLATIONS WITH CAPSMAN 4


Presentation AGEnDA
 Part 1. Introduction
 Part 2. Elounda Hotels & Resorts, a 600 AP’s WiFi Large scale Projects.
 Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”, a 200 AP’s
WiFi Project

LARGE SCALE INSTALLATIONS WITH CAPSMAN 5


key points of A large scale WiFi PROJECT
Part 1 . Introduction
Our staff very long term experience in Radiocomunication (since 1972) gave us the ability
to securely determine the critical key requirements of a large scale WiFi project.
> The most important one, is the selection of reliable equipment's.
> The second one is the use of ONLY fully tested firmware.
> The third is the careful examination of the potential existing structured cabling!
> The fourth is a careful Radio coverage live measurements and study.
> The fifth is the proper selection of central management tools and interfaces.
> The sixth, by all means avoid! expose the Antenna lobe of certain AP’s
against same channel multi AP’s signal leakages, even if these are very low signals.
(Anti noise shields, or antenna lobe direction change not be opposite leakages are workable solutions).
> And finally never feed near by AP’s from different active switches/routers, if these AP’s are on same
channel and overlapping about same areas, this is a very critical requirement in order to avoid packets
on the same channel to coexist in the same area with phase delay! If this will not achieved the users will
see very healthy RF Signals, BUT they will be unable even to login in these AP’s areas!
LARGE SCALE INSTALLATIONS WITH CAPSMAN 6
LOCATION OF Elounda resort hotel, a very large scale
600 AP’s WiFi project
Part 2. Elounda Hotels & Resorts
The company Elounda sa owns and manages three luxury resorts in the
area of Elounda in Crete, Greece.
 Elounda Peninsula
 Porto Elounda
 Elounda Mare

LARGE SCALE INSTALLATIONS WITH CAPSMAN 7


ELOUNDA PENINSULA
Part 2. Elounda Hotels & Resorts
 Elounda Peninsula is the luxury suite section of the hotel group.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 8


PORTO ELOUNDA
Part 2. Elounda Hotels & Resorts
 Porto Elounda is the spa & golf resort.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 9


ELOUNDA MARE
Part 2. Elounda Hotels & Resorts
 Elounda Mare is the classic hotel of the group.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 10


What the client requested
Part 2. Elounda Hotels & Resorts
 Inspection of the existing Ethernet and Fibre Optical Network.
 Fully indoor and outdoor coverage, with not less than -60dBm signal to the client
areas.
 A Central WiFi Management platform.
 Visitors Internet access through Hotspot, including Social Networks (Facebook,
twitter, e-mail, sms) login, with bandwidth control per visitor’s account.
 Connection with Fidelio platform, for clients that require a higher Internet
bandwidth with additional charge.
 Coexistence of secondary SSID for the Hotel Staff and POS terminals.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 11


First site visit for the project site conditions evaluation
Part 2. Elounda Hotels & Resorts
 Project Major importance subjects, include the site visit for and a live evaluation and
inspection, of the four following major importance key requirements:

> Structured Cabling visual inspection & performance measurements.


> Fibre Optical cabling visual inspection & performance measurements.
> Live Radio coverage measurements per Access point, with AP’s Location
prediction preparation, via a proper Radio coverage prediction software.
> Inspection of the indoor and outdoor wiring & Installation Restrictions regarding
the minimum visual appearance of the Access point to the Hotel Visitors.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 12


Outdoor General Radio coverage measurements sample AT PENINSULA
Part 2. Elounda Hotels & Resorts

LARGE SCALE INSTALLATIONS WITH CAPSMAN 13


Outdoor General Radio coverage measurements sample
AT PORTO
Part 2. Elounda Hotels & Resorts

LARGE SCALE INSTALLATIONS WITH CAPSMAN 14


Outdoor General Radio coverage measurements sample
AT MARE
Part 2. Elounda Hotels & Resorts

LARGE SCALE INSTALLATIONS WITH CAPSMAN 15


STRUCTURED CABLING INSPECTION
Part 2. Elounda Hotels & Resorts
 The visual inspection of the Hotel Ethernet structured cabling and connection was
done at each access point installation position.
 We came up with the usual electricians huge mistakes. Telephone line connection on the not
in use for baseT100 Ethernet cable cores as you can see in the following photos.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 16


visual and performance inspection of the fiber optic back bone’s
between the three-hotel complexes
Part 2. Elounda Hotels & Resorts
 Inspection of the hotel complex fiber optic back bone for the three-hotel
interconnection.
 Inspection of the back bone central feeding points to the Regional fiber optic
cabling concentrators to the visitors suites.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 17


KEY POINTs OF Access points installation sites selection
Part 2. Elounda Hotels & Resorts

 The key fact of a successful Project requires a very careful, Access points radio
coverage prediction and same channel overlapping avoidance, with more than 16db
signal difference, especially in visitors high concentration areas.
 Also high importance key fact, is the protection (via additional anti-noise shields or
Antenna lobe direction change), of outdoor Access points at High concentration
Visitors areas (Bars – Restaurants – Beaches etc.), if these are located opposite main
buildings with multi Access points, as even low level unwanted RF signals leakages
from these multi AP’s, will block the proper operation of the opposite located
outdoor ones.
 At the specific project indoor spaces a -60dbm radio coverage obtained, due the
main Buildings walls pass through low RF signal losses, fact that permitted us to
decrease the total number of the required access points to one (1) per Two (2)
apartments, which was a very important also key fact for the project total cost .
LARGE SCALE INSTALLATIONS WITH CAPSMAN 18
System central management equipment
Part 2. Elounda Hotels & Resorts

Product specifications
Details
Product code CCR1036-12G-4S-EM
SFP DDMI Yes
CPU nominal frequency 1.2 GHz
CPU core count 36
Size of RAM 16 GB
Architecture TILE
10/100/1000 Ethernet ports 12
Operating System RouterOS v6 (64bit)
1 License level 6
pcs
SFP ports 4

LARGE SCALE INSTALLATIONS WITH CAPSMAN 19


Switches
Part 2. Elounda Hotels & Resorts

Product specifications
Details
Product code CRS125-24G-1S-RM
SFP DDMI Yes
CPU nominal frequency 600 MHz
CPU core count 1
Size of RAM 128 MB
Architecture MIPS-BE
10/100/1000 Ethernet ports 24
Operating System RouterOS
35 License level 5
pcs
SFP ports 1

LARGE SCALE INSTALLATIONS WITH CAPSMAN 20


Indoor access point
Part 2. Elounda Hotels & Resorts

Product specifications
Details
Product code RB951G-2HnD
CPU nominal frequency 600 MHz
CPU core count 1
Size of RAM 128 MB
Architecture MIPS-BE
10/100/1000 Ethernet ports 5
Operating System RouterOS
License level 4
600
pcs

LARGE SCALE INSTALLATIONS WITH CAPSMAN 21


OUTDOOR access point
Part 2. Elounda Hotels & Resorts

Product specifications
Details
Product code RBSXTG-2HnD
CPU nominal frequency 600 MHz
CPU core count 1
Size of RAM 64 MB
Architecture MIPS-BE
10/100/1000 Ethernet ports 1
Operating System RouterOS
License level 4
30
pcs

LARGE SCALE INSTALLATIONS WITH CAPSMAN 22


Industrial passive poe
Part 2. Elounda Hotels & Resorts

Product specifications
Details
Ways 2
LAN Ports Gigabit Ethernet
10/100/1000
Power Supply 12 … 24V
Overvoltage Protection Up to 25kV with low
capacitive ESD Transil
Discharge Current Up to 15kA with 4 surge
arresters on each port
Operating Temperature -30°C … +65°C
Mounting Wall mounting or standard
DIN support

LARGE SCALE INSTALLATIONS WITH CAPSMAN 23


Industrial power supply
Part 2. Elounda Hotels & Resorts

Product specifications

Features
• Universal AC input / Full range
• Protections: Short circuit / Overload /
Over voltage / Over temperature
• Cooling by free air convection
• Can be installed on DIN rail TS-35/7.5 or 15
• LED indicator for power on
• 100% full load burn-in test
• Fix switching frequency at 100KHz

LARGE SCALE INSTALLATIONS WITH CAPSMAN 24


ANTI-NOISE SHIELD
Part 2. Elounda Hotels & Resorts

Product specifications

Anti-noise shield for Router BOARD SXT


Substantially reduces interference noise level generated
By nearby electronic devices, as well as, even from our own nearby access
points on the same channel.
Thus it improves the signal quality with result higher bandwidth.
The Shield is made from aluminum coated with light grey paint

LARGE SCALE INSTALLATIONS WITH CAPSMAN 25


Equipments integration acceptance test & configuration steps, at our
Technical department
Part 2. Elounda Hotels & Resorts

 The first step is the equipments acceptance,


inspection and tests at laboratory environment
before the installation.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 26


Equipments integration acceptance test & configuration steps, at our
Technical department
Part 2. Elounda Hotels & Resorts

 For the specific project, we upgraded the equipment


with the RouterOS 6.11rc, which had embedded the
CAPSMAN Beta version in it.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 27


Equipments integration acceptance test & configuration steps, at our
Technical department
Part 2. Elounda Hotels & Resorts

 Script setup preparation was done in multiple txt files


through Netinstall.
 In each interface configuration, we embed the
necessary comments, for easier future Support.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 28


Equipments integration acceptance test & configuration steps, at our
Technical department
Part 2. Elounda Hotels & Resorts

 Equipments configuration steps were


done with Netinstall and scripts use.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 29


Equipments integration acceptance test & configuration steps, at our
Technical department
Part 2. Elounda Hotels & Resorts

 In this large scale project we successfully embedded


the new RouterOS CAPsMAN Capability.

 Every system equipment was coded and registered in


the CAPsMAN.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 30


Equipments integration acceptance test & configuration steps, at our
Technical department
Part 2. Elounda Hotels & Resorts

 In CAPsMAN configuration we added two


different SSID, one for the clients and a second
one for the Hotel POS system.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 31


Equipments integration acceptance test & configuration steps, at our
Technical department
Part 2. Elounda Hotels & Resorts
 Before the system configuration was completed, we registered the equipment details in
table files with data as location – serial Numbers – IP etc.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 32


Installation procedure at site
Part 2. Elounda Hotels & Resorts

 In the careful selected installation locations


which completed during the system radio
coverage measurements, we started the
AP’s Installations at the pre selected Hotel
Rooms, with additional care regarding
electrical safety, mechanical strength and
proper visual appearance.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 33


Installation procedure at site
Part 2. Elounda Hotels & Resorts

LARGE SCALE INSTALLATIONS WITH CAPSMAN 34


Installation procedure at site
Part 2. Elounda Hotels & Resorts

 The PoE equipments installation at the


computer rooms were made easily
accessible for support and proper
mechanical and visual cabling.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 35


Installation procedure at site
Part 2. Elounda Hotels & Resorts

LARGE SCALE INSTALLATIONS WITH CAPSMAN 36


Installation procedure at site
Part 2. Elounda Hotels & Resorts

 Outdoor equipment installation was made


with very special care regarding Radio
coverage – Electrical Installation safety – as
much as possible with Discrete Visual
Appearance, and with very special care its
Antenna Radiation Lobe to be protected from
near by multiple access points on the same
channel!

LARGE SCALE INSTALLATIONS WITH CAPSMAN 37


Hotel complex network back bone in brief
Part 2. Elounda Hotels & Resorts

LARGE SCALE INSTALLATIONS WITH CAPSMAN 38


System operation requirements
Part 2. Elounda Hotels & Resorts
 In such a large scale project environment, it is a must hotel clients to have a very
friendly login procedure, through Social networks, with controllable limited FREE
usage.

 Most large scale WiFi projects as the present one, require the WiFi system to be fully
cooperative with the Hotel Accounting Platform (in the present project Fidelio
Platform), as well as the system to provide multi end user selectable connection
profiles, and these profiles charges be charged directly on the Hotel accounting
system per end user.
This is a very demanding procedure and need careful cooperation with the Hotel
accounting Platform Vendor.
 In the present project IACBOX Software covered most of the above requirements and
the following ones:

LARGE SCALE INSTALLATIONS WITH CAPSMAN 39


System operation requirements
Part 2. Elounda Hotels & Resorts

A friendly User Login Software must


Provide, FREE access login through:
Facebook, E-Mail, or username and
password.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 40


System operation requirements
Part 2. Elounda Hotels & Resorts

Or alternative, login capability through the Fidelio


Platform, where the client’s Room will be charged
for his selected connection profile.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 41


System operation requirements
Part 2. Elounda Hotels & Resorts

LARGE SCALE INSTALLATIONS WITH CAPSMAN 42


System operation requirements
Part 2. Elounda Hotels & Resorts

These are some of the last year Statistics.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 43


System operation requirements
Part 2. Elounda Hotels & Resorts

The specific Hotel Project today operates with the latest


operational and fully tested RouterOS.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 44


OUR NEW 2016 LARGE SCALE 200 AP’s WIFI PROJECT
Part 3. At Athens Largest Hellenic General Hospital “Evaggelismos”

LARGE SCALE INSTALLATIONS WITH CAPSMAN 45


Location of it:
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”

LARGE SCALE INSTALLATIONS WITH CAPSMAN 46


Client’s basic requirements for the specific project
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”

• Study for the structured cabling installation - Routing requirements on this 11


floor hospital.

• Study for the complete WiFi radio coverage at selected Hospital Areas.

• Free login internet access for patients and visitors.

• Access to patients files from authorized doctors via mobile tablets.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 47


Our first visit at project site
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”

• We had a detailed inspection visit to all the Hospital Areas that were requested be
radio covered.

• We did a detailed Software Radio coverage study based on Hospital Plans and also live
measurements in order to obtain a full picture of the existing radio noise as well as
the penetration losses through the Hospital walls on each floor.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 48


Live Radio coverage AREAS FOR measurements at hospital
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”

LARGE SCALE INSTALLATIONS WITH CAPSMAN 49


Selection of system equipments installation locations
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”

• We selected the AP’s locations at the hospital’s corridors on each floor.

• We made the careful selection of the structured cabling Routes


via the hospital corridors ceilings, please note hospitals have a lot of restrictions about it.

• We made the careful selection of the structured cabling concentration points


Racks -Switches & PoE.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 50


System central management main hardware
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”

Product specifications
Details
Product code CCR1036-12G-4S-EM
SFP DDMI Yes
CPU nominal frequency 1.2 GHz
CPU core count 36
Size of RAM 16 GB
Architecture TILE
10/100/1000 Ethernet ports 12
Operating System RouterOS v6 (64bit)
1 License level 6
pcs
SFP ports 4

LARGE SCALE INSTALLATIONS WITH CAPSMAN 51


Switches
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”

Product specifications
Details
Product code CRS125-24G-1S-RM
SFP DDMI Yes
CPU nominal frequency 600 MHz
CPU core count 1
Size of RAM 128 MB
Architecture MIPS-BE
10/100/1000 Ethernet ports 24
Operating System RouterOS
15 License level 5
pcs
SFP ports 1

LARGE SCALE INSTALLATIONS WITH CAPSMAN 52


Indoor access point
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”

Product specifications
Details
Product code RBwAPG-5HacT2HnD-BE
Wireless standards 802.11a/b/g/n/ac
CPU nominal frequency 720 MHz
CPU core count 1
Size of RAM 64 MB
Architecture MIPS-BE
10/100/1000 Ethernet ports 1
Operating System RouterOS
200 License level 4
pcs
Chains 3

LARGE SCALE INSTALLATIONS WITH CAPSMAN 53


Industrial passive poe
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”

Product specifications
Details
Ways 2
LAN Ports Gigabit Ethernet
10/100/1000
Power Supply 12 … 24V
Overvoltage Protection Up to 25kV with low
capacitive ESD Transil
Discharge Current Up to 15kA with 4 surge
arresters on each port
Operating Temperature -30°C … +65°C
Mounting Wall mounting or standard
DIN support

LARGE SCALE INSTALLATIONS WITH CAPSMAN 54


Industrial power supply
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”

Product specifications

Features
• Universal AC input / Full range
• Protections: Short circuit / Overload /
Over voltage / Over temperature
• Cooling by free air convection
• Can be installed on DIN rail TS-35/7.5 or 15
• LED indicator for power on
• 100% full load burn-in test
• Fix switching frequency at 100KHz

LARGE SCALE INSTALLATIONS WITH CAPSMAN 55


cat6E FTP CABLE
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”

Product specifications

Features
• FTP 4x2x24AWG cat5e
• 500 Meter
• Indoor

7500
m

LARGE SCALE INSTALLATIONS WITH CAPSMAN 56


Rack 9u
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”

Product specifications

Features
• 9U Wall Mount Rack

15
pcs

LARGE SCALE INSTALLATIONS WITH CAPSMAN 57


Equipments integration acceptance test & configuration steps, at our
Technical department
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”

 We upgraded and tested all the equipment to


version 6.37.1
 All AP’s configured in order to be connected with
the central CAPsMAN.
 We created configuration backup – support files
for each equipment.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 58


Equipments integration acceptance test & configuration steps, at our
Technical department
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”

 Equipment configuration through Netinstall


and script use.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 59


Equipments integration acceptance test & configuration steps, at our
Technical department
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”
 Main Router configuration.
 CAPsMAN activation.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 60


Installation procedure at site
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”

 We had structured cabling installation and testing.


 And then we made the AP’s installation and testing too.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 61


Installation procedure at site
Part 3. Largest Hellenic General Hospital of Athens “Evaggelismos”

 We designed the proper Graphic environment where the system of every floor was
displayed at dude environment display.

The project delivered after extensive Coverage and Bandwidth tests.

LARGE SCALE INSTALLATIONS WITH CAPSMAN 62


Thank you 