Fields 1 to 8 to be processed by FRQ-author and/or PLM Responsible for FRQ
1 Feature Requirement FRQ-Version
No.: 1.0
FRQ No.: 90312
2 Feature Requirement Title Requested
Release/Date
Troughput weighted by volume BR7.0
Reason for Request
Customer Request / Developement Field Standardization
Sales Feature Improvement Experience
Priority High Medium Low
for response
Basic / Optional Basic Optional Feature
Feature (locking to be possible)
3a FRQ Author (Name and Department) Tel 551139083353 Date
Adriano R. S. Oliveira ICM N OP E PS Fax 5511390583360 17.11.2004
E-mail address:
[email protected]3b PLM Responsible for FRQ (Name and Department) Tel 498963675819 Date
Guenter Boshold ICM N PG R G A Fax 498963675813 17.11.2004
E-mail address:[email protected]
4a Affected GSM 2G GSM 2G+ C-GSM
Product Line: GERAN TD-SCDMA TDD
FDD Echo Canceller
4b Main Affected Call Proc O&M OTS
Function: Ext. Int. HW Voice Quality
Field 5a to be processed by FRQ-author; 5b and 5c by PLM Responsible for FRQ only
5a Source of the idea Requested Ready for Acceptance Date
Requested by customer TIM Brazil M/2005
5b Key Customers interest Requested Ready for Acceptance Date
High Medium Low
5c Expected turnover /
expected savings (e.g. Developement costs, Euro
HW costs, service costs)
explanation in field 6c required
Document: Feature Requirement Form, Date: 01.08.01 Page 1 of 4
This form-sheet has to be processed electronically only
6a Description current situation
Within our system we have implemented in the BSS only the possibility of DUALBAND,
as follows:
- GSM900 / DCS1800
- GSM900 / PCS1900
- GSM850 / PCS1900
- GSM850 / DCS1800
With this situation, it’s not possible neither to implement the dualband GSM850/900 nor
GSM 850/900/1800.
6b1 List of requirements
The BSC should support Triband(and the handovers from band to band).
Adapt the SW of BSS and OSS (RC and OTS) in a way that the 3-band operation are
recognized as permitted mode of operation and can be configured.
modify the BCCH in a way that frequencies of all 3 bands(850/900/1800) can be
broadcasted as neighbors, that we do the handover related evaluations for all 3
bands, Common BCCH with the BCCH in DCS1800(or in 900 according to the site
configuration).
6b2 Use cases (optional)
6c Compliance to standard (optional)
6d IPR (Intellectual Property Right) situation
6e Link to relevant document (internal document, concept paper ) (optional)
6f Link to other document (customer document) (optional)
6g Reasons/Customer Benefit
The customer TIM Brasil owns some bandwith in the 850 band, because of their old
TDMA network. They strongly require the development of this feature, in order to use
their frequency bands in a more efficient way.
7 Consequences, if not implemented
Siemens can lose an expected business opportunity and there is a threat to destroy the
good relations to the customer.
Document: Feature Requirement Form, Date: 01.08.01 Page 2 of 4
This form-sheet has to be processed electronically only
8 Additional remarks
Field 9 to be processed by PLM Responsible for FRQ only
8 Business figures
9a Estimated market window (in time)
9b Estimated market segment (how many customers)
9c Estimated volume (HW only)
9d Estimate price
9e Cost limit
9f Classification (common or project specific)
9g Product roadmap (HW only)
9h Competitors information
9i Target cost (HW only)
9k Business Impacts (mandatory)
9k1 Siemens proceeds
9k2 Customer proceeds
Field 10 to be processed by PLM only during Pre-check phase
10 Pre-Check Phase
10a First rough effort estimation:
< 1 MY 1-5 MY 5-10 MY 10-20 MY > 20 MY
Document: Feature Requirement Form, Date: 01.08.01 Page 3 of 4
This form-sheet has to be processed electronically only
10b Pre-Check decision:
Admissible To be Rejected
postponed for ever
10c Remarks (from PLM, Systems)
Field 11 to be processed by IPG / Product Planning, normally IPG Leader
11 FRQ-Release: Name Date Signature
(by IPG Leader)
Document: Feature Requirement Form, Date: 01.08.01 Page 4 of 4
This form-sheet has to be processed electronically only