193201DPSGS6928 Exde02 A CRS

The document provides details about a process description document for a silica gel plant located onshore. It includes information on the project name, location, contractor, file details, transmittal dates and approval status.

Uploaded by

Mohamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views1 page

193201DPSGS6928 Exde02 A CRS

The document provides details about a process description document for a silica gel plant located onshore. It includes information on the project name, location, contractor, file details, transmittal dates and approval status.

Uploaded by

Mohamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT FILE

ZOHR ONSHORE - SILICA GEL 193201DPSGS6928_EXDE02_16.zip

PLANT LOCATION TRANSMITTAL IN DATE


OnShore 9/28/2016

CONTRACTOR PAGE
SRT 1 of 1

COMMENTS SHEET

Document Title
PROCESS DESCRIPTION
Company Document Number and Revision
193201DPSGS6928 - EX-DE - 02
Contractor Document Number and
Revision A64001-340-000-P-000A-TS-0001

Transmittal IN Number
IN-1932-SRT-EE6-00048
Transmittal OUT Number
OUT-1932-EE6-SRT-00043
Transmittal OUT Date
11/10/2016
Approval Status Code
A - APPROVED
Eni Document Approver
Enppi silica gel Focal Approver - Fathy Ahmed

Note: "COMPANY's approval of this document has to be deemed just as an authorization to proceed with the project execution.
CONTRACTOR is aware that COMPANY's approval is not relieving CONTRACTOR from any of its responsibilities in the performances required by
the CONTRACT"

(*)
A APPROVED
B APPROVED WITH COMMENTS
C NOT APPROVED