METHOD STATEMENT FOR REPAIR OF BULGED
CONCRETE USING BASF’S EMACO S88C T
PROJECT : (Replace with the project’s name, at location , city name)
CLIENT : (Replace with the client’s name)
MASTER DEVELOPER : (Replace with the master developer’s name)
PMC : (Replace with the PMC’s name)
LEAD CONSULTANT : (Replace with the lead consultant’s name)
SUB-CONSULTANT : (Replace with the sub-consultant’s name)
MAIN CONTRACTOR : (Replace with the main contractor’s name)
SUB-CONTRACTOR : (Replace with the sub-contractor’s name)
TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No.
TEC-CSInnn-MET-DoR-001
Project Name) (Rev No.)
Insert Main METHOD STATEMENT Issue Date 07 September 2013
Contractors Logo
Method statement for repair of bulged concrete using Rev. Date NA
BASF’s Emaco S88C T Pages 2 of 8
TABLE OF CONTENTS
1. REVISION RECORD 3
2. OBJECTIVES 4
3. SCOPE 4
4. SEQUENCE OF RELATED ACTIVITIES 4
5. REFERENCES 4
5.1. Contract documents 4
5.2. Contractors Submittal 4
6. DEFINITIONS / ABBREVIATIONS 4
6.1. Definition 4
6.2. Abbreviations 4
7. RESPONSIBILITIES 5
8. EQUIPMENTS/ TOOLS / MANPOWER/MATERIALS 5
8.1. Manpower 5
8.2. Material 5
8.3. Plant & Equipment 5
9. PROCEDURE 6
9.1. General 6
9.2. Material 6
9.3. Substrate Preparation 6
9.4. Mixing 6
9.5. Application 7
9.6. Curing 7
9.7. HEALTH & SAFETY AND ENVIRONMENTAL MANAGEMENT 7
9.8. General 7
9.9. Health and safety precaution 7
9.10. Storage and protection 7
9.11. Environmental management 7
10. ATTACHMENTS 8
10.1. Inspection Checklists 8
10.2. Inspection Test Plan 8
10.3. Risk Assessment 8
10.4. Technical Data sheet (TDS) 8
TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No.
TEC-CSInnn-MET-DoR-001
Project Name) (Rev No.)
Insert Main METHOD STATEMENT Issue Date 07 September 2013
Contractors Logo
Method statement for repair of bulged concrete using Rev. Date NA
BASF’s Emaco S88C T Pages 3 of 8
1. REVISION RECORD
This page is a record of all revisions of the document identified below by number and title. All previous revisions are hereby
superseded and are to be destroyed.
Rev Date By Chkd. Approved Description of Revisions
0 7-Sep-13 First issue
Signature field
7-Sep-13
Revision
Revision
Number
Date
Prepared by Checked by
Reviewed
By Construction Technical QA/QC MEP Co-
Manager Manager Engineer HSE Officer ordinator Sub-contractor
Approved
By Project
Manager
2.
TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No.
TEC-CSInnn-MET-DoR-001
Project Name) (Rev No.)
Insert Main METHOD STATEMENT Issue Date 07 September 2013
Contractors Logo
Method statement for repair of bulged concrete using Rev. Date NA
BASF’s Emaco S88C T Pages 4 of 8
3. OBJECTIVES
These Method Statement details general procedures to be followed for repairing work of bulged concrete elements at
Project using BASF’s Emaco S88C T. It includes preparatory works, repairs and curing.
4. SCOPE
The scope of this method statement is for rectification of the bulges in concrete in which chipping out the concrete will
not reduce the cover below the requirements as per the structural specification.
5. SEQUENCE OF RELATED ACTIVITIES
1. Identifying bulged area
2. Decide on depth of chipping
3. Raising RFIA
4. Chipping to required depth
5. Application of concrete repair material
6. Final RFIA Inspection.
6. REFERENCES
6.1.Contract documents
1. Project Specification :- Division 3, Section 030100
2. Contract Drawings :-
6.2.Contractors Submittal
3. Project Quality Plan :-
4. Project Safety Plan :-
5. Material approvals (MAT)
Sr. No. Description MAT. No. Rev No. Date Remarks
1 EMACO S88CT-( BASF chemicals)
2
7. DEFINITIONS / ABBREVIATIONS
7.1.Definition
1. Project -(Replace with project name)
2. Client -(Replace with clients name)
3. Developer -(Replace with developers name)
4. Consultant -(Replace with consultants name)
5. PMC -(Replace with PMC name)
6. Contractor -(Replace with contractors name)
7. Sub-contractor -(Replace with sub-contractors name)
8. Supplier -(Replace with suppliers name)
7.2.Abbreviations
1. Engineer - Representative of “Name of engineering consultancy”
2. ICL - Inspection Check List
3. IR - Inspection Request
TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No.
TEC-CSInnn-MET-DoR-001
Project Name) (Rev No.)
Insert Main METHOD STATEMENT Issue Date 07 September 2013
Contractors Logo
Method statement for repair of bulged concrete using Rev. Date NA
BASF’s Emaco S88C T Pages 5 of 8
4. ITL -Independent Testing Laboratory
5. ITP - Inspection and Test Plan
6. ITR -Inspection & Test Requests
7. MAT - Material Submittal
8. MEP - Mechanical Electrical Plumbing
9. MET - Method Statement
10. MIR - Material Inspection Request
11. MSDS - Material Safety Data Sheet
12. PPE -Personal Protective Equipment
13. PQP -Project Quality Plan
14. PTW -Permit To Work ( Working at Height or enclosed spaces)
15. RA -Hazard Identification and Risk Assessment
16. RFIA - Request for Inspection and Approval
17. SPD - Shop Drawing
18. TBM - Temporary Bench Mark
8. RESPONSIBILITIES
1. Project Manager has the overall responsibility for the implementation of this method statement and shall well
ensure that Sub Contractors as well other team members are aware of the requirements of the Method Statement.
2. Construction Manager will ensure that the Resources are available to carry out the works as scheduled.
3. The Project Engineer/Site Engineer is responsible for inspection records and carries out the works as per
approved Shop Drawings, Method Statements.
4. The Site Engineer/Supervisor is responsible to ensure :
4.1. That the work has been carried out as per specifications & drawings and inspections are done as per
contract.
4.2. To check material being used is approved one.
4.3. Surface preparation is as per the method statement
4.4. Mixing and application are as per the method statement.
5. The Surveyor/Site Engineer/Supervisor is responsible for Setting out the area and measuring, monitoring and
controlling the lines and levels.
6. The QA/QC Engineer/ QC inspector is responsible to ensure that the work performed is in compliance with the
approved method statement.
7. The Safety Officer is responsible to ensure that all safety precautions are in place and that the personnel on site
possess the necessary and essential PPE.
8. The Safety Officer is responsible to ensure that essential work permits are available prior to the commencement of
the work.
9. EQUIPMENTS/ TOOLS / MANPOWER/MATERIALS
9.1.Manpower
10.
1. Site Engineer 6. Helpers
2. Mason
3. Supervisor
1.1.
4. Skilled labour for chipping
5. Foreman
TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No.
TEC-CSInnn-MET-DoR-001
Project Name) (Rev No.)
Insert Main METHOD STATEMENT Issue Date 07 September 2013
Contractors Logo
Method statement for repair of bulged concrete using Rev. Date NA
BASF’s Emaco S88C T Pages 6 of 8
10.1. Material
7. EMACO S88CT
10.2. Plant & Equipment
10.3.
1. Wire brush
2. Jack hammer
3. Blender & mixing container
4. Heavy duty slow speed drill with paddle
5. Grinding machine
6. Air compressor
7. Masonry tools
8. water pump
9. Water / spirit level
10. Gloves
11. Hammer
12. Goggles
13. Chisel
14. Water Tanker
11. PROCEDURE
11.1. General
1. The works shall be performed as mentioned in this procedure and the quality assurance requirements shall be
consistent with the relevant sections of Quality System Procedure Manual of “CONTRACTOR” as well with the
Project Quality Plan.
2. Manufacturer’s recommendation to be complied with at the site.
3. Work shall not proceed without formal approval by the Engineer.
4. Before commencement of the work, ascertain the nature and location of all existing services on site by visual
survey.
5. If any protection, rerouting, termination or removals of services are required for the smooth progressing of work, it
will be discussed and written approval will be obtained from Employer as appropriate.
11.2. Material
1. EMACO S88CT: Cementations pre-bagged ready to use structure repair mortar in powder form reinforced with
acrylic polymer fibre. When mixed with the correct amount of water, it produces a thixotropic, high strength repair
mortar, reinforced with acrylic polymer fibres. It possess excellent bond characteristics to steel reinforcement and to
concrete
11.3. Substrate Preparation
1. Mark out the area requiring the area requiring the chipping.
2. The perimeter of the area should be saw cut with a grinder to a depth of 10mm and the edges cut as neatly as
possible keeping the sides square. Feather-edging is not permitted and a minimum thickness of 10mm must be
maintained over the whole repair area.
3. Depth of chipping of bulged concrete shall be decided considering the alignment, structure element’s size as per
design and approval of the Engineer.
TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No.
TEC-CSInnn-MET-DoR-001
Project Name) (Rev No.)
Insert Main METHOD STATEMENT Issue Date 07 September 2013
Contractors Logo
Method statement for repair of bulged concrete using Rev. Date NA
BASF’s Emaco S88C T Pages 7 of 8
4. Chipping shall be performed using electrically operated concrete breaker of Hilti, Bosch etc. with pointed chisel of
the appropriate capacity. Heavy duty machinery or jackhammers should not be used to avoid damage to the
structure element by excessive hammering. For removing a very thin surface a electrically operated scrabbling
hammers may be used.
5. Chipping shall continue to achieve the required decided depth.
6. The substrate shall be prepared to a rough surface.
7. The prepared surface must be sound, dense, and free of all oil, grease loose and fractured aggregate or other
contaminants that could impair adhesion.
8. Thoroughly saturate the surface of the concrete to provide a saturated surface dry condition. Any surface water
should be removed using oil free compressed air jet.
11.4. Mixing
1. Hand mixing with trowel or similar of EMACO S88CT is not permitted.
2. For mixing use a heavy duty slow speed drill with spiral mixing paddle attachment.
3. Water addition shall be between 3.5 litres of potable water per 25kg bag.
4. Pour the required amount of mixing water into the mixing drum. Start the mixer and add the EMACO S88CT
powder rapidly and continuously. Mix for 3 to 4 minutes after all the powder has been added until mortar is
homogeneous and lump free.
5. Add water, if necessary, within the limits given, until required consistency is achieved. Mix for a further 1-2
minutes.
6. Maximum mixed temperature shall not be more than 35˚C.
11.5. Application
1. After mixing EMACO S88CT is trowel applied in thickness not exceeding 50mm, forced tightly into substrate to
ensure intimate contact with the pre wetted substrate.
2. Each under lying layer shall be heavily cross hatched with a trowel and allowed to achieve its initial set prior to a
subsequent layer being applied in the same manner.
3. The levelling and initial finishing of the placed mortar surface shall be done using a wooden/plastic float. Final
finishing shall be carried out using steel trowel.
4. When the material has stiffened to the point where finger pressure lightly marks the surface, a firm troweling shall
be given using the steel float.
11.6. Curing
1. Good curing is essential. Curing can be done using properly secured wet hessian and plastic sheet.
2.
12. HEALTH & SAFETY AND ENVIRONMENTAL MANAGEMENT
12.1. General
1. The entire works will be carried out as per the guidelines established in the Project Specific HSE Plan.
2. Utmost importance shall be given to safety of personnel and protection of existing above /underground services. It
will be ensured that the personnel involved are thoroughly aware of the “Contractor”/ Employer Safety regulations.
To achieve the above the following shall also be ensured:
3. Tool Box Meetings will be conducted before starting the works.
4. All personnel will be provided with suitable Personal Protective Equipment.
5. Prior to commencement of activities ensure that all personal are safety inducted and aware of the nature of work
and the risk assessment.
TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No.
TEC-CSInnn-MET-DoR-001
Project Name) (Rev No.)
Insert Main METHOD STATEMENT Issue Date 07 September 2013
Contractors Logo
Method statement for repair of bulged concrete using Rev. Date NA
BASF’s Emaco S88C T Pages 8 of 8
6. Appropriate P.P.E. shall be provided, and the workforce shall be instructed to its use.
7. Safety officer will be available to control and monitor implementation of job specific HSSE Plan.
8. The detailed Risk assessment carried out and attached with this method statement should be followed.
12.2. Health and safety precaution
1. As with other products containing Portland cement, the cementitious material in EMACO S88C T grout may cause
irritation. In case of contact with eyes, immediately flush with plenty of water for at least 15 minutes. Call a
physician. In case of contact with skin, wash skin thoroughly
12.3. Storage and protection
1. Store out of direct sunlight, clear of the ground on pallets, protect from rainfall. Avoid excessive compaction.
2. Shelf life is 12 months when stored as above
12.4. Environmental management
1. The waste resulting from the demolition work is to be disposed of as per the requirements of the Construction
waste management Plan (CWMP).
2. The quantity being disposed or being reused in the project is to be documented, to comply with the minimum waste
management credit and the optional credit of the improved waste management credit.
13. ATTACHMENTS
13.1. Inspection Checklists
13.2. Inspection Test Plan
13.3. Risk Assessment
13.4. Technical Data sheet (TDS)