Saudi Aramco Inspection Checklist: Depressurization & Disposal of Hydrotest Water SAIC-A-2017 15-Dec-09 Mech
Saudi Aramco Inspection Checklist: Depressurization & Disposal of Hydrotest Water SAIC-A-2017 15-Dec-09 Mech
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General Requirements
New pipelines, and pipelines in gas service do not require oil/water SAEP-327,
B1
separation prior to wastewater discharge/disposal Section 3.2.1
As far as possible locate the disposal site within the existing pipeline
corridor while ensuring adequate pipeline access and without causing SAEP-327,
B3
damage to the existing roadways, pipelines, private entities or other Section 3.2.3
structures
Disposal to Sabkhah
Discharge separated wastewater directly to the sabkhah for evaporation
provided that the wastewater remains on land, and does not flow directly
to the marine environment. An oil/water Separator Pond is required SAEP-327,
B5
before wastewater is discharged to sabkhah to ensure retention of Section 3.3
residual hydrocarbon for subsequent collection and proper handling.
Separator pond site is downwind to minimize exposure risk to nearby
facilities personnel.
Page 1 of 3
Disposal to Injection Well
Dispose wastewater into injection wells if it does not affect the well
operation. Obtain concurrence from the operators of the well prior to SAEP-327,
B8
selection of this disposal option. Injection well operators will provide water Section 3.6
quality criteria for any wastewater that will be introduced to their system
for disposal
Page 2 of 3
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) Rev 3 30-Jun-08
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Depressurization & Disposal of Hydrotest Water SAIC-A-2017 15-Dec-09 MECH.
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Disposal Offshore
Dispose wastewater offshore to the Arabian Gulf or Red Sea per SAEP-
SAEP-327,
B9 327 Table 1 (See Excel Sh # 2 Att'd). Adequate dispersal of wastewater
Section 3.7
in marine environment by diffuser or similar method or transfer
wastewater onshore for treatment/disposal.
Submit Water Disposal Approval Form and obtain approval from SAEP-327,
B15
EPD/EED before disposal of wastewater to the Red Sea Section 3.7.6
REMARKS:
REFERENCE DOCUMENTS:
1. SAES-A-007, Hydrostatic Testing Fluids and Lay-Up Procedures, (3 July 2007)
2. SAEP-327, Disposal of Wastewater from Cleaning, Flushing, and Dewatering Pipelines and Vessels (15 April, 2007)
3. SA General Instruction Manual GI-002.102 (28 October 2008) Pressure Testing Safely
Page 3 of 3