0% found this document useful (0 votes)
155 views

Đề Thi PSM I - Đề 1

The document contains a 45 question multiple choice test about Scrum concepts and practices. The questions cover topics like the Sprint Backlog, Product Backlog, roles of the Scrum Master and Product Owner, Sprint Planning meetings, Daily Scrums, Definition of Done, and more. The test aims to assess understanding of key Scrum frameworks, processes, and terminology.

Uploaded by

Cuong Do
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
155 views

Đề Thi PSM I - Đề 1

The document contains a 45 question multiple choice test about Scrum concepts and practices. The questions cover topics like the Sprint Backlog, Product Backlog, roles of the Scrum Master and Product Owner, Sprint Planning meetings, Daily Scrums, Definition of Done, and more. The test aims to assess understanding of key Scrum frameworks, processes, and terminology.

Uploaded by

Cuong Do
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Đề thi PSM I - Đề 1

1 . Which statement is correct about the Sprint Backlog?


A . It has no detail.
B . It has all the details.
C . It has just enough detail.

2 . Which of the following best describes the way a Product Owner can order the items in the Product Backlog?
A . Based on size; larger items at the top
B . Based on value; more valuable items at the top
C . Based on risk; safer items at the top
D . Based on size; smaller items at the top

3 . True or false? The Sprint Goal and the Sprint Backlog are the outputs of the Sprint Planning meeting.
A . FALSE
B . TRUE

4 . Which TWO of the following are correct about Scrum Masters?


A . They cause the removal of impediments.
B . They run the Daily Scrums.
C . They are accountable for engaging stakeholders.
D . They participate in the Sprint Planning meetings.
E . They prioritize the work items in the Sprint Backlog.

5 . What type of test should be done during the Sprint?


A . Every type of test
B . All tests except for user acceptance tests
C . All tests except for integration tests
D . Unit tests

6 . When is the Sprint Goal created?


A . At the beginning of the project
B . In the previous Sprint Review meeting
C . During the Sprint Planning meeting
D . Toward the end of the previous Sprint

7 . What's the role of a Product Owner during Sprint Retrospectives?


A . Capturing requirements for the Product Backlog
B . Participating as a Scrum Team member
C . Summarizing and reporting the results of the meeting to stakeholders
D . Answering the questions of Developers

8 . When is the Sprint over?


A . When all Sprint Backlog items are done
B . When the Sprint Backlog tasks are done
C . When the Scrum Master announces the end of the Sprint
D . When the timeboxed duration is over

9 . True or false? The Developers can have a Team Leader to improve communications and collaboration.
A . TRUE
B . FALSE

10 . There's a Scrum project that is supposed to have two releases: one in the middle and the other at the end of the project.
Which of the following statements is correct about this project?
A . Having releasable Increments depends on the preference of the operations'.
B . Increments that are created before each release should be releasable.
C . Increments are created for investigation and adaptation; they don't have to be releasable.
D . All increments should be releasable.
11 . True or false? It's up to the self-managing team to decide which Scrum events are needed in the project.
A . FALSE
B . TRUE

12 . How is budgeting done in Scrum?


A . Usually every day
B . Budgeting is done based on the initial Product Backlog.
C . Ideally revised at each Sprint to ensure value is being delivered.
D . Scrum doesn't need a budgeting system.

13 . True or false? Daily Scrums are held at the same time and place every day.
A . TRUE
B . FALSE

14 . Which of the following is a pillar of Scrum?


A . Creativity
B . Value optimization
C . Collaboration
D . Adaptation

15 . Who is responsible for explaining the Product Backlog items?


A . Customer
B . User representative(s)
C . The Developers self-manage and talk to anyone necessary to find out what the items mean.
D . Scrum Master
E . Product Owner

16 . Which statement explains the benefit of having tests in the Definition of Done?
A . Increases transparency of the Increments.
B . It makes it easier for the Scrum Master to measure performance and report progress.
C . It makes reporting easier for the Project Manager.

17 . True or false? Scrum doesn't have a role called Project Manager.


A . FALSE
B . TRUE

18 . True or false? Items at the top of the Product Backlog are, on average, smaller than those at the bottom.
A . FALSE
B . TRUE

19 . The Product Owner is not collaborating with the Developers during the Sprint. What would you do as the Scrum Master?
A . Talk to the functional manager of the Product Owner.
B . Coach the Product Owner to understand why collaboration is important in Scrum and how it can affect the value of the
product.
C . Nominate someone else as the proxy Product Owner.
D . Cancel the Sprint and start training the Product Owner.

20 . True or false? The Product Owner should have a complete Product Backlog before the first Sprint can start.
A . FALSE
B . TRUE

21 . Which of the following is correct about Scrum Masters?


A . They estimate the Product Backlog items.
B . They assign work during the Sprint.
C . They participate in the Sprint Review meetings.
D . They are accountable for ordering the Product Backlog items.
22 . True or false? The Product Owner should determine how many items should be selected for the Sprint Backlog.
A . TRUE
B . FALSE

23 . True or false? The Product Owner can also be a Developer.


A . TRUE
B . FALSE

24 . True or false? Scrum is a technique for developing complex products.


A . FALSE
B . TRUE

25 . The Developers are ready to start the first Sprint, but the Product Backlog is not yet ready. What should the Product Owner
do?
A . Let the Sprint begin, but only with the goal of completing the Product Backlog.
B . Ask the Developers to help you refine the Product Backlog instead of starting the first
C . Let the team start the first Sprint, and continue refining the Product Backlog.

26 . True or false? At least one high-priority process improvement item should exist in each Sprint Backlog.
A . FALSE
B . TRUE

27 . Which of the following limits work in progress?


A . Using Product Backlogs
B . Using timeboxes
C . Having Sprint Reviews
D . Having Sprint Retrospectives

28 . Which of the following is NOT timeboxed?


A . Product Backlog refinement
B . Sprint Planning
C . Sprint
D . Daily Scrums
E . Sprint Retrospective
F . Sprint Review

29 . Which of the following may change during the Sprint?


A . Minimum level of quality
B . Product Goal
C . Product Backlog

30 . When does a Scrum Master cancel a Sprint?


A . When not enough resources are available for the project
B . The Scrum Master doesn't have the authority to cancel the Sprint.
C . When there's an unsolved technical dependency
D . When the forecast shows that we can't finish many of the items in the Sprint Backlog

31 . Which of the following is LEAST likely to be used by a Scrum team?


A . WBS, Gantt Chart
B . Digital camera, task board
C . Large screen, Planning Poker cards
D . Wiki, online forum

32 . Which of the following can be considered a real output of a Sprint?


A . A user interface layout that is designed for the whole solution
B . New features that are ready for integration
C . An Increment of working software
D . A plan for the following Sprints

33 . What does it mean for a Scrum Team to be cross-functional?


A . Every Developer has all the expertise required for creating potentially releasable Increments.
B . The team includes not only programmers, but also testers, architects, UI designers, etc.
C . The team should collaborate with all functional units.
D . The Developers work closely with business analysts, architects, and testers external to them.

34 . True or false? When multiple teams are working on a product, they should select work from the same Product Backlog.
A . TRUE
B . FALSE

35 . What happens if we forecast that some of the work defined in the Sprint Backlog won't be done by the end of the Sprint?
A . Review the work with the Product Owner to see if any adjustments are required, and keep working.
B . Extend the duration of the Sprint, to be able to deliver everything.
C . The remaining items will be moved to the next Sprint Backlog.
D . Continue to the next Sprint without a Sprint Review meeting and finish those items in the next Sprint.

36 . At the end of the Sprint, all items are Done except for one that is almost Done. What should be done with this item?
A . Consider the complete part of the item in velocity calculation and then create a new item in the Product Backlog for the
remaining work.
B . Demonstrate it in the Sprint Review meeting, if the item is presentable in its current state.
C . It can be added to the Increment if the user acceptance tests are done.
D . Move it back to the Product Backlog.

37 . True or false? The Sprint Backlog stays fixed after Sprint Planning.
A . TRUE
B . FALSE

38 . True or false? Each item in the Sprint Backlog is owned by one or a pair of Developers.
A . TRUE
B . FALSE

39 . How many hours per day should a Developer work


A . They should work at a constant pace.
B . They should work between 6 and 16 hours, depending on the situation.
C . They should work as much as needed for realizing the Sprint Backlog items by the end of the Sprint.
D . Normally, they work about 40 hours a week.

40 . What is the main reason for the Scrum Master to be at the Daily Scrum?
A . To tell Developers what to do
B . The Developers have asked the Scrum Master to facilitate their Daily Scrum
C . To participate as a Scrum Team member
D . To get a report on progress of the Sprint

41 . Which THREE Scrum values are demonstrated by focusing on the most valuable items first?
A . Cross-functionality
B . Trust
C . Courage
D . Focus
E . Respect

42 . Which of the following best describe the questions that are addressed in the Sprint Planning meeting? (Select multiple
choices)
A . Who will do what we have decided to do in this Sprint?
B . Why are we going to do this Sprint?
C . How are we going to do what we have decided to do in the Sprint?
D . What went wrong in the last Sprint and what can we do about it?
E . What was the feedback and how should we adapt the Product Backlog?
F . What are we going to do during the Sprint?

43 . True or false? A 2x increase in the number of Developers will double productivity.


A . FALSE
B . TRUE

44 . How is the Product Backlog impacted by changes in the environment in which the product will be used?
A . The Product Backlog should be kept high-level enough to tolerate such changes.
B . It evolves to reflect the changes.
C . The old, baselined Product Backlog would be saved, and a new one would be created for
D . There's no effect on the Product Backlog.

45 . How should the Product Owner forecast the completion date?


A . By any method they find appropriate
B . By dividing the remaining amount of work in the Product Backlog to the latest calculated velocity
C . It is the responsibility of the Scrum Master to forecast the completion date.
D . By using a trend line in the burn-down chart

46 . True or false? There are no testers in Scrum.


A . TRUE
B . FALSE

47 . True or false? When multiple teams are working on the same product, there should be one common Definition of Done that
they all follow.
A . FALSE
B . TRUE

48 . Which statement best describes the Product Backlog?


A . The customer's change requests are reflected in it.
B . Contains only small and clear items.
C . It's used to create the project plan.
D . Contains all tasks identified by the Developers.

49 . Which of the following may be done when the team becomes mature enough during the project?
A . They may not need Sprint Retrospectives anymore.
B . Their velocity may increase.
C . They can release every Sprint.
D . They won't need timeboxed events anymore.

50 . Which of the following best describes the Sprint Review meeting?


A . It's an inspection of the Increment to collect feedback and see what to do in the next Sprint.
B . It's a meeting to receive the formal approval of the customer for the Increment.
C . It's a demo at the end of the Sprint for everyone in the organization to see the Increment.
D . It's a controlling mechanism for evaluating the work of developers.

51 . When does the next Sprint begin?


A . When the Product Backlog is refined and items at the top are "ready"
B . Immediately after the previous Sprint
C . When the Product Owner authorizes it
D . When the customer approves the previous Increment

52 . When is it time to integrate the code?


A . At the end of each Sprint
B . At the end of the project
C . Before each release
D . Frequently, during the Sprint
53 . How often should the composition of the team change?
A . With every Sprint, to encourage creativity and openness
B . As needed, without the need to be concerned about changes in productivity
C . As needed, considering that it will have a short-term reduction in productivity
D . Never, because it reduces productivity

54 . True or false? It's generally better to have shorter Sprints when the project is riskier.
A . TRUE
B . FALSE

55 . Which of the following is NOT allowed in Scrum?


A . Release Planning
B . Release Sprints
C . Refactoring
D . Using Planning Poker

56 . What does a burn-down chart measure?


A . The amount of business value delivered to the customer
B . Work remaining across time
C . Work that is done based on the Definition of Done
D . The cost of the project across time

57 . Which TWO statements are correct about the number of Product Owners when there are three products being developed
using Scrum?
A . There can be a different Product Owner for each product.
B . There should be only one Product Owner.
C . Each product should have a separate Product Owner.
D . There can be a single Product Owner for all products.

58 . Which element is NOT an attribute of Product Backlog items?


A . Estimate
B . Order
C . Owner
D . Description

59 . True or false? The Product Backlog is baselined before the first Sprint
A . TRUE
B . FALSE

60 . When is an item in the Sprint Backlog considered complete?


A . When everything is done based on the Definition of Done
B . When all the Developers agree that it's complete
C . When the item has all the quality requirements defined by the Product Owner.
D . When user acceptance tests are passed

61 . True or false? The Product Owner can delegate some of their responsibilities to the Developers.
A . FALSE
B . TRUE

62 . Which TWO of the following are feedback loops in Scrum?


A . Daily Scrum
B . Sprint Retrospective
C . Product Backlog refinement
D . Burn-down chart

63 . Which of the following is the LEAST productive way for the Scrum Master to improve the Developers' communications
with the Product Owner?
A . Teach them how to communicate effectively.
B . Monitor their communication performance.
C . Suggest effective communication tools and techniques to the Product Owner.
D . Act as a go-between for them.

64 . Which of the following is required by Scrum?


A . Definition of Ready
B . Having timeboxed events
C . Having full-time developers
D . Answering the three standard questions during Daily Scrums

65 . Which of the following may be done in the Sprint Retrospective meeting?


A . Discuss the Product Backlog items for the next Sprint.
B . Discuss the timeboxed duration of Sprints.
C . Calculate Velocity.
D . Refine the Product Backlog.

66 . True or false? The Scrum Master shouldn't allow the Developers to start working without having the tasks identified and
assigned.
A . TRUE
B . FALSE

67 . True or false? Sprint Review is a meeting for receiving customer's formal acceptance.
A . TRUE
B . FALSE

68 . Which THREE of the following actions may a Scrum Master take in starting up a project?
A . Ask the Developers to discuss and identify the way they are going to develop the product.
B . Ask the development managers to introduce their departments and capabilities.
C . Ask the team to work together and prepare a complete Product Backlog.
D . Ensure that a bonus system is in place for the top performance of individuals.
E . Ask the Developers to introduce themselves to each other and describe their skills and background.
F . Ask the Product Owner to explain the project, its business need, history, goals, and context.

69 . What should the Developers do when they have trouble delivering an item because they don't understand it?
A . Move the item back to the Product Backlog.
B . Complete as much of the item as possible, and use it in the Sprint Review meeting to create a better understanding of what is
needed.
C . Defer the item to the next Sprint.
D . Collaborate with the Product Owner to see what's possible and desirable.

70 . Which of the following has the most to do with capturing and using lessons learned?
A . Sprint Planning
B . Sprint Retrospective
C . Product Backlog refinement
D . Sprint Review

71 . Which of the following is a valid service from a Scrum Master to a Product Owner?
A . Help the Product Owner order the Product Backlog items in order to maximize value.
B . Help the Product Owner find techniques for managing the Product Backlog.
C . Act as the middleman between the Product Owner and the Developers, as requested or required.
D . Act as a proxy when the Product Owner is not available to the team.

72 . Who determines how work is performed during the Sprint?


A . The Scrum Master
B . The Team Leader
C . The Stakeholders
D . The Developers
E . The customer
F . The whole Scrum Team

73 . Which TWO of the following are mandatory in Scrum?


A . Planning Poker
B . Product Owner
C . User Stories
D . Value Points
E . Sprint Backlog

74 . True or false? Only Product Backlog items that are "Ready" can be selected for the Sprint Backlog.
A . TRUE
B . FALSE

75 . True or false? A real self-managing team doesn't need a Scrum Master.


A . TRUE
B . FALSE

76 . What's the recommended number of Developers in a team?


A . 4 to 12
B . 3 to 11
C . 10 or less
D . 3 to 9
E . 3 to 12

77 . True or false? It's required to use User Stories in Scrum.


A . FALSE
B . TRUE

78 . Which are the THREE classical questions of Daily Scrums, if you decide to go through them?
A . What problems did I have yesterday?
B . What impediments are in my way or in the way of the team?
C . What work did I do yesterday to help the team achieve its goal?
D . How many hours did I spend on the project yesterday?
E . What is the progress of the Sprint?
F . What work am I going to do today to help the team achieve its goal?

79 . Which TWO statements are correct about Daily Scrums?


A . Only the Developers participate in the meeting.
B . It's always a 15-minute timeboxed event, no matter how many developers there are, or how long the Sprint is.
C . Developers must answer the 3 standard questions during the meeting.
D . It's facilitated by the Scrum Master.
E . It's 15 minutes only if the Sprint is one month long.

80 . What's the timeboxed duration of Sprints?


A . A couple of months
B . Between two and six weeks
C . One month
D . Maximum one month

You might also like