Name : Md.
Ratul Mia
Address : Vill: Khejur Tala, P.O.: Nilmonigonj, P.S.: Chuadanga,
District: Chuadanga, Div:Khulna
E-mail : [email protected]
Skype : ratulmollick.mollick1
Cell Phone : 01827199199
CAREER OBJECTIVE
Seeking a challenging profession in a dynamic environment that offers a noble way of leading life where innovation,
education and commitment to achieve pre-set organization goals are highly valued and encouraged.
PERSONAL COMPETENCE
Hard Worker.
Goal Oriented Person
Very good Temperament and like to take Challenges
Strong interlocution and interpersonal proficiency.
Good Communication Skill
Excellent Public relations and communication skills.
Excellent Team Leader
Have ability to work in a team environment & Experienced to lead groups.
Co-ordinate with the Team and the Managing Director.
Manage the file and other official activities.
Good adaptability with the changing environment
Responsible for ensuring healthy workplace maintaining efficient operation of
safety, hygiene, environment & security
PROFILE/Working Knowledge:
Basic Knowledge of DWDM.
Knowledge of IP Block Chain.
Implementation of 2G, 3G & 4G services (Huawei & Ericsson Device).
Radio wave Devices configuration, Traffic routing & Troubleshoot (Huawei & Ericsson Device).
3G & 4G route configuration & Troubleshoot (VLAN configuration)
BTS Device, 2G,3G,4G Device configuration & Troubleshoot (Ericsson, ZTE & Huawei Device).
Working Experience
Company Name: Taurus International Ltd
Project: GP L2100, L900 & New BTS.
Position: Project Coordinator
Responsibility: L2100 & new Implementation.
Duration: 1st Jun 2021 to till now.
Company Name: RadioCell Communication Ltd.
Position: Project Coordinator
Responsibility: My main role is to conduct the project activities by ensuring all employee safety
with operation manager (Robi-Ericsson Project). Customer support to Ericsson
operation team. Documentation for Robi Axiata, Huawei & Ericsson projects. IT related support to
the all office and field resources.
Duration: 1st Feb 2019 to till 31-May-2021
LM Ericsson Bangladesh Limited.
Address: Grand Delvista (Level 3), Plot 1A, Road-113.
Gulshan-2, Dhaka 1212.
Position: BSS Expert
Duration: January 25, 2018 to December 31, 2018
As a BSS Expert (Service provider) worked in
Robi LTE, Ultra 900 & GP Blue Speed & Modernization Project:
Installation supervision, Commissioning, Configuration, Troubleshooting of 900MHz-1800MHz GSM for Ericsson
2G RBS 6601 & 2100MHz in Ericsson 3G equipment DUW 20 01, DUW 31 01, Baseband 5212 & 5216 for LTE &
Ultra900.
On site Script upload in Baseband 5212 & 5216 for LTE & Ultra 900 project. All pre-activity done to integrate site
for LTE & Ultra 900.
Installation supervision, Commissioning, Configuration, Troubleshooting of 900MHz-1800MHz GSM for Ericsson
2G RBS 6601 & Baseband 5216 for GP Modernization Project for LTE.
Have idea about device powering.
Call test for voice, data and video and test sector-segment with SRS tools.
Ensuring Quality and OHS as per customer requirement.
Coordinate with Customer end & also Site Rectification, KPI achieve and Handover.
Starlink Engineering Limited
Address: Hazi-Tamizuddin Mension (Level-6)
Plot-GA-63, Mohakhali School Road, Mohakhali, Dhaka 1212
Duration: February 20, 2017 to January 06, 2018
As a System Engineer worked in
MINI-LINK TN 20p, 6p. 2p and HUAWEI RTN 980, 950, 905,620.
Installation, Implementation and commissioning of both ERICSSON and HUAWEI Microwave Radio Link.
Hardware (NPU, MMU, AMM) up gradation in Robi Operator in Barisal Zone.
E1 Shifting and MW MINI-LINK-E cutover to MINI-LINK TN.
Software capacity (Packet Data) up gradation for 3G under Robi Operator.
2G, 3G & 4G routing at both ERICSSON and HUAWEI device in Robi-Airtel Mergco project.
PAT service in mw radio link as Acceptance at Edotco PAT service project.
Telex Engineering Limited
Address: House#14E(Baitun Nur Jame Masjid Bhabon),
1st Floor, Road# 2, Banani, Dhaka 1212
Position: System Engineer
Duration: November 01, 2014 to February 10, 2017
As a System Engineer Worked in,
Installation & Commissioning of Ericsson Minilink TN 2P, 6P & 20P and HUAWEI RTN 950, 905 & 980.
Depending on protection and capacity, 1+0, 1+1 link and XPIC 2+0. 2+2 and SPD link.
GP Blue Chattala Project
Installation, Implementation, Commissioning & PAT done for Grameenphone Blue chattala Project.
Swapped NSN BTS to ERICSSON RBS 6110, 6601,6202.
External and Internal alarm connection in Eltek rectifier.
ROBI NSN CC Swap
Installation and implementation of RBS 6601, 6202 in Robi CC Swap.
Commissioning of RBS 6601& Deploy Multi drop function
Work with RECIFIER (Emerson, Eltek, Delta) for alarm configuration & troubleshooting
Supervise, maintain and cutover of 2G network.
Rectification and troubleshooting network after cutover.
Robi and Airtel Merger Project:
Installation, Implementation, Commissioning & PAT done for Robi-Airtel merger Project.
Installation & implementation of HUAWEI 3900 BTS.
Re-aligning all the antenna height, tilting and troubleshooting high VSWR issue.
BDCL (Banglalink Digital Communications Ltd) ZTE Swap
Good knowledge on ZTE BTS Equipment’s.
Installation, supervision, commissioning and troubleshooting of ZXSDR BS8800 BTS
Coordinate with Customer end & also Site Rectification, KPI achieve and Handover
Academic Qualification:
B.S.C in EEE (Electrical and Electronic Engineering)-2014
Dhaka International University (DIU)
Dept. of EETE (Electrical Electronics and Telecommunication Engineering)
Result: CGPA 3.82 out of 4.00
H.S.C (Higher Secondary School Certificate) – 2010
Chuadanga Technical School and College
Result: GPA 3.89 out of 5.00
Group: Automobile
Board: Dhaka
S.S.C (Secondary School Certificate)- 2007
Chuadanga Technical School and College
Result: GPA 3.73 out of 5.00
Group: Automobile
Board: Dhaka
THESIS/PROJECT
Thesis title: “Design and analysis of Transmission and Distribution 132/33 KV Sub-Station.
Supervisor: Sirajul Islam Pradhan
Professor, Dept. of Electrical Electronics and Telecommunication, DIU
Co-Supervisor: Tarek Islam
Lecturer, Dept. of Electrical Electronics and Telecommunication, DIU
COMPUTER SKILLS
Capable of using MS word, Office, operating system: Windows XP, windows 7, 10 and utility software.
Internet Browsing and E-mail, Networking including idea of LAN, MAN, WAN
Basic concept on computer & Internet utilities.
General knowledge of various engineering software.
LANGUAGE PROFIENCY
Language Reading Writing Speaking
Bengali High High High
English High High Medium
Hindi N/A N/A Medium
PERSONAL DETAILS
Father’s Name : MD. Mizanur Rahman
Mother’s Name : Mrs. Jahanara
Date of Birth : 02nd Jun, 1992
Nationality : Bangladeshi (by Birth)
Blood Group : A+
NID No : 779 229 5854
Religious : Islam (Sunni)
Sex : Male
Marital Status : Married
Present Address : H# 343/1(1st Floor), R# Kamal Sharani, Middle Pirerbag, P.S: Mirpur, Dhaka 1216
Permanent Address : Village: Khejur Tala, P.O.: Nilmonigonj, P.S.: Chuadanga, District: Chuadanga
REFERENCE
MD. Asif UL Alam Md. Rifat Hossain
Robi (CNC) Implementation Manager
Cell: 01624116923 LM Ericsson Global
[email protected] Cell: 01613444020
[email protected] I do hereby declare that all the above information is true and correct to the best of my Knowledge.
Date: 26-Aug-2021
(Md. Ratul Mia)