NON-CONFORMANCE REPORT
Project / Projekat Date of report / Datum izveštaja
IKEA Retail Park Belgrade 8nd December 2021
Work package / Radni paket
General Contractor Works Report No / Izveštaj br.
Contractor / Izvođač
IT Tel E 047
Non-Conformance description / Opis
grešaka Photo of defect / Fotografija greške
Objekat SM lokal SM28:
3 korugovane rebraste cevi u podnoj
betonskoj ploči (vidi crtež) u kraće cca.
30cm od projektovane dužine 160cm
Building SM tenant SM28:
3 corrugated pipes for electrical installations
(see drawing) are approx. 30 cm shorter
than length demanded by design (160cm).
Date / Datum Supervizor (nadzor) STMG Consultancy / (full name / ime i prezime & potpis /signature)
08-December-2021
_____________________________
Predrag Cvetković
Proposed corrective action / Predložene korektivne akcije
In order to bring the corrugated pipes to the projected position, it is necessary to do the following actions:
The slit in the concrete will be cut with the tool provided for cutting the concrete.
After that, the appropriate corrugated pipes will be laid, and at the end, the slit will be repaired with the appropriate
material on the recommendation of civil engineers.
Kako bi se korugovane rebraste cevi dovele na projektovanu poziciju, potrebno je uraditi sledeće:
Izvešće se šlic u betonu alatom predviđenim za sečenje betona.
Nakon toga položiće se odgovarajuće korugovane rebraste cevi i na kraju biće izvršena sanacija šlica odgovarajucim
materijalom po preporuci gradjevinskih inženjera.
Date / Datum Contractor / Izvođač (full name / ime i prezime & potpis /signature)
10.12.2021.
________________
Ivan Đorić
Proposed actions to avoid similar nonconformance for the future works / Predložene akcije za sprečavanje sličnih
pojava u nastavku radova
Date / Datum Contractor / Izvođač (full name / ime i prezime & potpis /signature)
10.12.2021. In order to prevent similar mistakes in future activities of the similar works, the project
will be considered in more detail and the performed works will be checked before
concreting the base.
Kako bi se sprečile slične pojave u nastavku radova detaljnije će se sagledavati
projekat i vršiti provera izvedenih radova pre betoniranja podloge.
Approval to proceed with corrective action / odobrenje za primenu korekcije
Date / Datum Designer / (full name / ime i prezime & potpis /signature)
Approved
Returned to be revised
_____________________________
Date / Datum Supervizor (nadzor) STMG Consultancy / (full name / ime i prezime & potpis /signature)
Approved
Returned to be revised
_____________________________
Taken corrective action / Preduzete korektivne akcije
Photos / Fotografije
During the correction / U toku During the correction / U toku
korekcije korekcije After / Posle
Corrective actions implemented / Korekcije izvršene
Date / Datum Supervisor STMG / Nadzor (full name / ime i prezime & signature / potpis)
_________________