This document provides the results of an engineering analysis of fastening points using Hilti KWIK HUS-EZ (KH-EZ) 5/8 anchors in cracked concrete with a specified compressive strength of 6,000 psi. The analysis found: 1. The maximum utilization of an individual anchor is 87% of capacity under the applied tension load of 1,857 lbs, which meets design requirements. 2. The resulting tension force in the anchor group is 3,714 lbs, which is less than the calculated concrete breakout capacity of 4,271 lbs. 3. Warnings are provided regarding assumptions made in the analysis, such as a rigid anchor plate, and recommendations to check

Uploaded by

hisamberg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views5 pages

KWIK KH Steel Screw Anchor

This document provides the results of an engineering analysis of fastening points using Hilti KWIK HUS-EZ (KH-EZ) 5/8 anchors in cracked concrete with a specified compressive strength of 6,000 psi. The analysis found: 1. The maximum utilization of an individual anchor is 87% of capacity under the applied tension load of 1,857 lbs, which meets design requirements. 2. The resulting tension force in the anchor group is 3,714 lbs, which is less than the calculated concrete breakout capacity of 4,271 lbs. 3. Warnings are provided regarding assumptions made in the analysis, such as a rigid anchor plate, and recommendations to check

Uploaded by

hisamberg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Hilti PROFIS Engineering 3.0.

72

www.hilti.com
Company: Page: 1
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Sep 7, 2021 (2) Date: 9/7/2021
Fastening point:

Specifier's comments:

1 Input data
Anchor type and diameter: KWIK HUS-EZ (KH-EZ) 5/8 (4)
Item number: 418080 KH-EZ 5/8"x5 1/2"
Effective embedment depth: hef = 77.0 mm, hnom = 101.6 mm
Material: Carbon Steel
Evaluation Service Report: ESR-3027
Issued I Valid: 1/1/2021 | 12/1/2021
Proof: Design Method ACI 318 / AC193
Stand-off installation: eb = 0.0 mm (no stand-off); t = 10.0 mm

Anchor plate :
R lx x ly x t = 165.0 mm x 200.0 mm x 10.0 mm; (Recommended plate thickness: not calculated)

Profile: no profile
Base material: cracked concrete, 6000, fc' = 6,000 psi; h = 10,668.0 mm
Reinforcement: tension: condition B, shear: condition B; no supplemental splitting reinforcement present
edge reinforcement: none or < No. 4 bar
Seismic loads (cat. C, D, E, or F) no

R
- The anchor calculation is based on a rigid anchor plate assumption.

Geometry [mm] & Loading [lb, kNm]

Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2021 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan

1
Hilti PROFIS Engineering 3.0.72

www.hilti.com
Company: Page: 2
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Sep 7, 2021 (2) Date: 9/7/2021
Fastening point:

1.1 Design results


Case Description Forces [lb] / Moments [kNm] Seismic Max. Util. Anchor [%]
1 Combination 1 N = 1,432; Vx = 0; Vy = 0; no 87
Mx = 1.600; My = 0.000; Mz = 0.000;

2 Load case/Resulting anchor forces y

Anchor reactions [lb]


Tension force: (+Tension, -Compression) 3 4
Anchor Tension force Shear force Shear force x Shear force y Tension
1 0 0 0 0
2 0 0 0 0 x
3 1,857 0 0 0
4 1,857 0 0 0

max. concrete compressive strain: 0.10 [‰] 1 2


max. concrete compressive stress: 433 [psi]
resulting tension force in (x/y)=(0.0/40.0): 3,714 [lb]
resulting compression force in (x/y)=(0.0/-86.3): 2,282 [lb]
Compression
Anchor forces are calculated based on the assumption of a rigid anchor plate.

3 Tension load
Load Nua [lb] Capacity f Nn [lb] Utilization bN = Nua/f Nn Status
Steel Strength* 1,857 15,736 12 OK
Pullout Strength* N/A N/A N/A N/A
Concrete Breakout Failure** 3,714 4,271 87 OK

* highest loaded anchor **anchor group (anchors in tension)

3.1 Steel Strength

Nsa [lb] f f Nsa [lb] Nua [lb]


24,210 0.650 15,736 1,857

3.2 Concrete Breakout Failure

ANc [in. ]
2
ANc0 [in. ]
2
ca,min [mm] cac [mm] y c,N
91.34 82.63 60.0 116.1 1.000

ec1,N [mm] y ec1,N ec2,N [mm] y ec2,N y ed,N y cp,N kcr


0.0 1.000 0.0 1.000 0.856 1.000 17

Nb [lb] f f Ncbg [lb] Nua [lb]


6,945 0.650 4,271 3,714

Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2021 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan

2
Hilti PROFIS Engineering 3.0.72

www.hilti.com
Company: Page: 3
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Sep 7, 2021 (2) Date: 9/7/2021
Fastening point:

4 Shear load
Load Vua [lb] Capacity f Vn [lb] Utilization bV = Vua/f Vn Status
Steel Strength* N/A N/A N/A N/A
Steel failure (with lever arm)* N/A N/A N/A N/A
Pryout Strength* N/A N/A N/A N/A
Concrete edge failure in direction ** N/A N/A N/A N/A

* highest loaded anchor **anchor group (relevant anchors)

5 Warnings
• The anchor design methods in PROFIS Engineering require rigid anchor plates per current regulations (AS 5216:2018, ETAG 001/Annex C,
EOTA TR029 etc.). This means load re-distribution on the anchors due to elastic deformations of the anchor plate are not considered - the
anchor plate is assumed to be sufficiently stiff, in order not to be deformed when subjected to the design loading. PROFIS Engineering
calculates the minimum required anchor plate thickness with CBFEM to limit the stress of the anchor plate based on the assumptions
explained above. The proof if the rigid anchor plate assumption is valid is not carried out by PROFIS Engineering. Input data and results
must be checked for agreement with the existing conditions and for plausibility!
• Condition A applies where the potential concrete failure surfaces are crossed by supplementary reinforcement proportioned to tie the
potential concrete failure prism into the structural member. Condition B applies where such supplementary reinforcement is not provided, or
where pullout or pryout strength governs.
• Refer to the manufacturer's product literature for cleaning and installation instructions.
• For additional information about ACI 318 strength design provisions, please go to
https://submittals.us.hilti.com/PROFISAnchorDesignGuide/

Fastening meets the design criteria!

Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2021 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan

3
Hilti PROFIS Engineering 3.0.72

www.hilti.com
Company: Page: 4
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Sep 7, 2021 (2) Date: 9/7/2021
Fastening point:

6 Installation data
Anchor type and diameter: KWIK HUS-EZ (KH-EZ) 5/8 (4)
Profile: no profile Item number: 418080 KH-EZ 5/8"x5 1/2"
Hole diameter in the fixture: df = 19.1 mm Maximum installation torque: 0.115 kNm
Plate thickness (input): 10.0 mm Hole diameter in the base material: 15.9 mm
Recommended plate thickness: not calculated Hole depth in the base material: 111.1 mm
Drilling method: Hammer drilled Minimum thickness of the base material: 152.4 mm
Cleaning: Manual cleaning of the drilled hole according to instructions for use is
required.

Hilti KH-EZ screw anchor with 101.6 mm embedment, 5/8 (4), Carbon steel, installation per ESR-3027

6.1 Recommended accessories

Drilling Cleaning Setting


• Suitable Rotary Hammer • Manual blow-out pump • Torque wrench
• Properly sized drill bit • Hilti SIW 9-A22 Impact Wrench

y
82.5 82.5
60.0

100.0

3 4
10.0

100.0

x
100.0

1 2
40.0

30.0 105.0 30.0

Coordinates Anchor [mm]


Anchor x y c-x c+x c-y c+y
1 -52.5 -60.0 - - - 160.0
2 52.5 -60.0 - - - 160.0
3 -52.5 40.0 - - - 60.0
4 52.5 40.0 - - - 60.0

Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2021 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan

4
Hilti PROFIS Engineering 3.0.72

www.hilti.com
Company: Page: 5
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Sep 7, 2021 (2) Date: 9/7/2021
Fastening point:

7 Remarks; Your Cooperation Duties


• Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles, formulas
and security regulations in accordance with Hilti's technical directions and operating, mounting and assembly instructions, etc., that must be
strictly complied with by the user. All figures contained therein are average figures, and therefore use-specific tests are to be conducted
prior to using the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the
data you put in. Therefore, you bear the sole responsibility for the absence of errors, the completeness and the relevance of the data to be
put in by you. Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly
with regard to compliance with applicable norms and permits, prior to using them for your specific facility. The Software serves only as an
aid to interpret norms and permits without any guarantee as to the absence of errors, the correctness and the relevance of the results or
suitability for a specific application.
• You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular, you must arrange for
the regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilti on a regular basis. If you do
not use the AutoUpdate function of the Software, you must ensure that you are using the current and thus up-to-date version of the Software
in each case by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences, such as the recovery of lost or
damaged data or programs, arising from a culpable breach of duty by you.

Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2021 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan

You might also like