PESCO AMI System Overview and Billing Analysis

The document provides an overview of Peshawar Electric Supply Company's (PESCO) Advanced Metering Infrastructure (AMI) system and progress. Key points include: an introduction to AMI; analysis of billing through AMI meters in April 2021, showing over 1,000 consumers billed and 43.85% of assessments; targets to convert over 41,000 non-AMI meters to AMI by December 2021; circle-wise meter reception and installation details; and an overview of the AMI installation and billing process.

Uploaded by

Imran Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
878 views37 pages

PESCO AMI System Overview and Billing Analysis

The document provides an overview of Peshawar Electric Supply Company's (PESCO) Advanced Metering Infrastructure (AMI) system and progress. Key points include: an introduction to AMI; analysis of billing through AMI meters in April 2021, showing over 1,000 consumers billed and 43.85% of assessments; targets to convert over 41,000 non-AMI meters to AMI by December 2021; circle-wise meter reception and installation details; and an overview of the AMI installation and billing process.

Uploaded by

Imran Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Presentation’s Content
  • Introduction
  • Company Overview
  • What is AMI?
  • Automated/Advance Metering Infrastructure
  • System Architecture
  • Analysis of Billing via AMR Meters in April, 2021
  • Targets and Plans of BOD PESCO
  • AMR Meters Installation Mechanism
  • Credentials
  • Layout of User Interface
  • Icons
  • Communication Reports
  • Billing Reports
  • Individual Actions
  • Daily Read
  • Instant Read
  • Load Profile
  • Monthly Billing
  • Communication History
  • Events/Alarms
  • Mute Meter Reading Updating on COSMOS
  • Contact Details of PESCO AMI Cell
  • Closing Thanks

Presentation’s Content

 Introduction to AMI System


 Analysis of billing in PESCO through AMI
 Targets and Plans of BOD PESCO
 AMR Meter Replacement Mechanism
 Introduction to COSMOS
 Mute Meter reading updating on COSMOS
 Contact details of PESCO AMI Cell
Peshawar Electric Supply
Company
What is AMI?

 Advanced Metering Infrastructure (AMI) is an integrated system of smart


meters, communication networks and data management systems that
enables two way communication and control of load management
between the utilities and the end consumers.
Automated/Advance Metering
IP Cloud
Infrastructure

SDO Operation
M&T Lab
PESCO PITC NOC
Revenue Office @ @
SE/DCM PESHAWAR WAPDA House
XEN
Commercial Directorate
- Company H/Q

VPN
Billing Interface Industrial
Industrial

Commercial
Commercial

TELCO NOC
Residential
Residential

Tube well Tube well


SYSTEM ARCHITECTURE
Analysis of Billing via AMR Meters in
April, 2021

➢ Total consumers billed via AMR meters= 12006


➢ PESCO Total Active Consumers= 3123929
➢ Percentage of Total Consumers= 0.33%
Analysis of Billing via AMR Meters in
April, 2021
.
➢ Total Assessment/billing via
AMR meters= Rs. 5914 M
(four billion, seven hundred six million, eighty-six thousand, three
hundred fifteen only)

➢ PESCO Total
Assessment/billing in all
batches= Rs. 13484 M
(eleven billion three hundred eighteen million one hundred seven
thousand seven hundred thirty-three)

➢ Percentage of Total
Assessment= 43.85 %
Analysis of Billing via AMR Meters in
April, 2021

➢ Total Units assessed via


AMR meters= 250 (M) KWH
(one hundred ninety-nine million four hundred fifty-three
thousand one hundred nineteen)

➢ PESCO Total Units in all


batches= 717 (M) KWH
(six hundred seventy-nine million one hundred thousand six
hundred twenty-six)

➢ Percentage of Total Units


billed via AMR Meters=
34.86 %
Analysis of Billing via AMR Meters
in April, 2021
BOD PESCO Targets for Non AMR meters to be converted to AMR meters up to Dec 2021
26214 3-
Load above Load 10KW Mute Meters New
phase Total
25 KW to 25 KW of C3 Project Connecetions
WC

Circle code Circle CT Opr WC CT Opr WC CT Opr WC WC WC CT Opr WC

261 Peshawar 196 107 49 2993 237 449 1425 482 4974

262 Khyber 221 173 22 3538 221 552 1476 13000 464 18739

263 Mardan 347 31 19 1486 46 70 325 412 1912

264 Hazara-I 283 383 10 1343 110 283 230 403 2239

265 Swat 685 205 125 2311 108 296 415 918 3227

266 Bannu 239 282 81 3884 112 999 950 432 6115

267 Hazara-II 83 91 4 681 28 60 1525 115 2357

268 Swabi 239 37 11 1227 47 75 680 297 2019

PESCO 2293 1309 321 17463 909 2784 7026 13000 3523 41582
Circle Wise AMR 3-Phase Whole Current Meters Received to M&T for Configuration of Sim Dated:28-07-2021

Received Data
Meters Data not
by Received
Meters to be Meters Received Sims Inserted & Received for
Circle Progressive concern for
Replaced Allocated in M&T Configured addition on
field addition
Today MDM
office on MDM

Peshawar 5642 700 6 491 491 491 233 258


Khyber 5426 650 0 634 634 634 252 382
Mardan 2193 200 0 196 196 196 138 58
Hazara-I 1879 350 0 344 344 344 237 107
Swat 3205 350 0 294 294 294 107 187
Bannu 5330 540 0 539 539 539 229 310
Hazara-II 1024 210 0 210 210 210 210 0
Swabi 1761 200 0 188 188 188 147 41
Total 26460 3200 6 2896 2896 2896 1553 1343
Circle Wise AMR CT Operated Meters Received to M&T for Configuration of Sim
Dated:28-07-2021
Data
Meters Installed Receive Data not
Sims Received by
Meters to Received Progressi / d for Received for
Circle Inserted & concern field
be Replaced in M&T ve Replace additio addition on
Configured office
Today d on site n on MDM
MDM
Peshawar 400 10 196 196 196 14 11 3
Khyber 450 53 149 114 64 12 12 0
Mardan 250 0 114 110 21 10 6 4
Hazara-I 450 2 23 23 23 23 0 23
Swat 350 0 241 241 241 52 34 18
Bannu 450 17 222 222 222 28 0 28
Hazara-II 190 0 13 13 13 13 0 13
Swabi 260 0 142 132 132 11 11 0
Total 2800 82 1100 1051 912 163 74 89
Procurement of AMR meters in PESCO

Already Procured 6000

LOI Issued 30000

WC Accurate 25000

CT Operated KBK 2500

CT Operated Creative 2500


Draw AMR meter from
AMR Meters Store through SR
Installation
Mechanism Insert the SIM from M&T

Replace/ Install the


meter at site as per SOP

Intimate the data to AMI Process the MCO/ SCO


Cell through Circle for billing as per SOP

Data is updated on MCO/SCO is processed


COSMOS on IBS for billing

Online billing is
Conducted
Vendor Prefix
Whole Current CT Operated
Accurate 2998 2999
Creative 3298 3299
KBK 3798 3799
MicroTech 3698 3699
URL
[Link]
Credentials

Type Code User Password

PESCO: 26

Circle: 26100,26200………26X00 se.26X,ddt.26X, dcm.26X 22334455

Division: 2611,2612………..26XX xen.26XX,ro.26XX 22334455

Subdivision: 26165………..26XXX sdo.26XXX 22334455


Menu Bar
LAYOUT OF USER INTERFACE Search Bar

“DISCO/
Utility
Hierarchy” Reporting

Customer & Meter Info Load Profile & Billing Data


CUSTOMER PANE – FILTERS
Icons
Communication reports
Billing reports
Individual actions
Daily read
Instant read
Load profile
Monthly Billing
Communication History
Events/Alarms
Mute Meter Reading Updating on COSMOS
Mute Meter Reading Updating on COSMOS
Mute Meter Reading Updating on COSMOS
Mute Meter Reading Updating on COSMOS
Mute Meter Reading Updating on COSMOS
Contact Details of PESCO AMI Cell
Room # 343, PESCO HQ Peshawar
Gmail address:- pescoami@[Link] Phone :- 091-9223002

 Mr. Inam Akber (Focal Person BOD PESCO)


Deputy Manager Commercial AMI Cell
Cell # 03309971641
email:- [Link]@[Link]

 Mr. Muhammad Jibreel


Deputy Manager (Metering & Testing) AMI Cell