0% found this document useful (0 votes)
111 views10 pages

Sirte Oil Company Soc: Storage Tanks Tk2 & Tk7 Inspection Report

This document summarizes the inspection report of the shells of crude oil storage Tanks TK2 and TK7 located in Marsa El-Brega, Libya. The tanks were inspected between March-April 2021 and June-July 2021. The inspection found defects in both tank shells, including corrosion and pitting. Sketches and details of the defects are provided for each tank. The purpose of the report is to collect technical data on the tanks to inform the scope of work for shell rehabilitation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
111 views10 pages

Sirte Oil Company Soc: Storage Tanks Tk2 & Tk7 Inspection Report

This document summarizes the inspection report of the shells of crude oil storage Tanks TK2 and TK7 located in Marsa El-Brega, Libya. The tanks were inspected between March-April 2021 and June-July 2021. The inspection found defects in both tank shells, including corrosion and pitting. Sketches and details of the defects are provided for each tank. The purpose of the report is to collect technical data on the tanks to inform the scope of work for shell rehabilitation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

SIRTE OIL COMPANY SOC

‫شركة سرت إلنتاج وتصنيع النفط والغاز الطبيعي‬

STORAGE TANKS TK2 & TK7 INSPECTION REPORT

CONTRACT REF: MP-1356

CRUDE TANK REHABILITATION TK 2&7

Rev. Date Num Pages Done by Checked By Doc Ref


00 03-08-2021 10 ABH TDP Br-M1356-Q-003

GLOBAL ENGINEERING FOR JABEL OIL SERVICES


TECHNICAL SERVICES JOS
GETS
Revision Doc. Reference Location Page Date
00 Br-M1356-Q-003 Marsa EL-Brega-Libya 2 of 10 03-08-2021

Project Title
CRUDE TANK REHABILITATION TK 2&7 STORAGE TANKS TK2 & TK7 INSPECTION REPORT

LIST OF CONTENTS

Contents
I. INTRODUCTION............................................................................................................................................... 3
II. SCOPE OF THE DOCUMENT ........................................................................................................................ 3
III. ATTENDANCE ............................................................................................................................................... 3
IV. TANKS TK2&7 OVERVIEW ......................................................................................................................... 4
IV.1. TK2&7 TANKS DATA ............................................................................................................................ 4
IV.2. CRUDE OIL PROPRIETIES .................................................................................................................... 4
V. SHELL INSPECTION ...................................................................................................................................... 5
V.1. INSPECTION PLAN ................................................................................................................................. 5
V.2. INSPECTION RESULTS........................................................................................................................... 6
V.2.1. TANK 07 ............................................................................................................................................. 6
V.2.2. TANK 02 ............................................................................................................................................. 6
V.3. SHELL DEFECTS DETAILS .................................................................................................................... 7
V.3.1. TANK 07 ............................................................................................................................................. 7
V.3.2. TANK 02 ............................................................................................................................................. 7
V.4. SHELL SKETCHES................................................................................................................................... 8
V.4.1. TANK 07 ............................................................................................................................................. 9
V.4.2. TANK 02 ........................................................................................................................................... 10
Revision Doc. Reference Location Page Date
00 Br-M1356-Q-003 Marsa EL-Brega-Libya 3 of 10 03-08-2021

Project Title
CRUDE TANK REHABILITATION TK 2&7 STORAGE TANKS TK2 & TK7 INSPECTION REPORT

I. INTRODUCTION
Sirte Oil Company (SOC) is located in Brega Sirte LIBYA, intend to refurbish tow single deck floating roof
type crude oil Tanks TK2&7; Outside diameter 200 ft, Height 48 ft, Capacity 268,000 bbl.
Jabel Oil Services (JOS) Company (private Libyan Company) located in Seyahiya, Tripoli – LIBYA,is
selected as BIDDER to do this job, this project is required to be executed involving all required detailed
Engineering, Supply and Construction, hydrotest, Pre-commissioning Commissioning and Start-up
activities.
Tanks TK2&7 require a major re-build to bring them back to a fully serviceable condition. This work will
entail a totals replacement of the tank floor, annular ring, floating roof, firefighting system, roller stair and
associated equipment. In addition, the tanks will require a total repainting.
All equipment, material and labor required to carry out the complete scope of work will be provided by JOC
as required By SOC.

-
Brega is located in the Sirte basin’s largest and most important oil field. field covers a large area.
MAP ADRESS: 30.397635831754926, 19.6172925596003
Site Condition; Windy in spring season.
Max air temperature in the summer: 55 °C
Min. air temperature in the winter: 5 °C
II. SCOPE OF THE DOCUMENT
The document describes the shell inspection report for the two crude oil tanks TK 2&7, located at Marsa
Elbriga in Libya, which was carried out from March 13th to April 8th 2021 and from June 23rd to July 15th
by GETS Engineers.
The purpose of this document is to collect all technical data related to TK 2&7 shells components, such as;
design, dimensions, type of material, noticed defects and estimated material quantity for shell reparation in
accordance with the SOW requirements.

III. ATTENDANCE
From March 13th to April 8th 2021 From June 23rd to July 15th 2021
- Mr. Abdelfetteh Hakim: Site - Mr. Abdelfetteh Hakim: Site Engineer
Engineer - Mr Ridha Abess: Foreman
- Mr Ramzi Elgharbi: QA/QC - Mr Mohamed Amin BenHassine: Inst & Electrical Engineer
Engineer - Mr Mohamed Seddik Rakrouki: Topographic Survey Engineer
Revision Doc. Reference Location Page Date
00 Br-M1356-Q-003 Marsa EL-Brega-Libya 4 of 10 03-08-2021

Project Title
CRUDE TANK REHABILITATION TK 2&7 STORAGE TANKS TK2 & TK7 INSPECTION REPORT

IV. TANKS TK2&7 OVERVIEW


IV.1. TK2&7 TANKS DATA

TK 2&7 Common Data


Product: Brega Crude Oil Fill Height (ft): 48 ft
City/State: Marsa Elberiga Libya Inspection Date: March 13th to April 8th 2021
June 23rd to July 15th 2021

Capacity (Gal): 268,000 Roof Design Single deck Floating Type Roof
Client: Siret Oil Company Type of Inspection: Off-Service
Construction Code: API 650 Seal Double Bag Liquid filled
Test Methods: VT, UT Plate Spec: Assume A 285 G C
Outs Diameter (ft): 200 Shell Construction: Butt Welded
Drawings: No Foundation Type: Concrete
Insulation Type: Fiber Glace Insulation Bottom and 1200 mm of
Corrosion Allow (in) No Application Shell Thick: 35mm

TK2 TK7
SN: None SN: 7880
Year Built: None Year Built: 1963
Manufacturer: None Manufacturer: Graver Tank Manufacturing
Roof Thickness (mm): 5 Union Tank Car Company
Floor Thick (mm): 8 Roof Thick (mm): 6
Course 1 Thick (mm): 35 Floor Thick (mm): 8
Course 2 Thick (mm): 30.45 Course 1 Thick 35
Course 3 Thick (mm): 26.02 Course 2 Thick 28.76
Course 4 Thick(mm): 21.63 Course 3 Thick 22.65
Course 5 Thick (mm): 16.43 Course 4 Thick 17.9
Course 6 Thick (mm): 12.37 Course 5 Thick 11.93
Course 7 Thick (mm): 8 Course 6 Thick 8.41
Course 8 Thick (mm): 8

IV.2. CRUDE OIL PROPRIETIES


Type Brega Crude
S. G. 0.82 Average
Density 51.2 lb/cf
Working Temperature 80 F°
API Gravity 40.5
Sulphur content 0.21 (by weight ).
Revision Doc. Reference Location Page Date
00 Br-M1356-Q-003 Marsa EL-Brega-Libya 5 of 10 03-08-2021

Project Title
CRUDE TANK REHABILITATION TK 2&7 STORAGE TANKS TK2 & TK7 INSPECTION REPORT

V. SHELL INSPECTION

V.1. INSPECTION PLAN


The following summarizes the various inspections related to Tk2&7 shell, carried out during the site visit;

- Visual inspection of shell plates, welds, and related


accessories.
- UT (Ultra-sonic Thickness) testing of shell courses.
- Identify and markup the shell side corrosion and damaged
area.
- Divide the shell defects according to required type of
repair;
 lap-welded patch plates
 Inset plates
 Build up weld
 Reparation of defect welds

- Identification of wind girder structure


dimension and material.
- Topographic survey and data collection related
to TK2&7;
 Tank perimeter;
Tank shell opening;
 Vertical seams of the first shell course;
 External stair, gauging platform
- Make of general sketch drawing included all
shell plates, accessories and openings
dimension, position and defects.
Revision Doc. Reference Location Page Date
00 Br-M1356-Q-003 Marsa EL-Brega-Libya 6 of 10 03-08-2021

Project Title
CRUDE TANK REHABILITATION TK 2&7 STORAGE TANKS TK2 & TK7 INSPECTION REPORT

V.2. INSPECTION RESULTS


V.2.1. TANK 07
- Shell plates: Approx. 20 small holes and 4 big holes.
- Severe external pitting and corrosion was noted on the shell to
wind girder welding joint,50% of wind girder is corroded.
- Stair way external pitting and corrosion was noted on all
structure.
- Shell attached piping support are in overall satisfactory
condition.
- All Shell nozzles and man-way are in satisfactory mechanical
condition.
- The tank level indicator was damaged.
- Estimated plates Qty of Shell reparation;

SHELL COURSE ESTIMATED QTY MATERIAL


N° / THK
4 / 17.9 mm 1m2 A283 Gr.C
5 / 11.93 mm 4 m2 or 1 complete plate 12000x1900 mm). A283 Gr.C
6 / 8.41 mm 45 m2 or 3 complete plates (12000x1900 A283 Gr.C
mm).

V.2.2. TANK 02
- Shell plates: Approx. 48 small holes and 10 big holes.
- Severe external pitting and corrosion was noted on the shell to
wind girder welding joint,90% of wind girder is corroded.
- Stair way external pitting and corrosion was noted on all
structure.
- Shell attached piping support are in overall satisfactory
condition.
- All Shell nozzles and man-way are in satisfactory mechanical
condition.
- The tank level indicator was damaged.
- There is no tank data nameplate attached to tank shell
- Estimated plates Qty of Shell reparation;

SHELL COURSE ESTIMATED QTY MATERIAL


N° / THK
3 / 26.02 mm 1m2 A283 Gr.C
4 / 21.63 mm 1m2 A283 Gr.C
5 / 16.43 mm 2 complete plates (12000x1900 mm) A283 Gr.C
6/ 12.37 mm 2 complete plates (12000x1900 mm) A283 Gr.C
7 / 8 mm 2 complete plates (12000x1900 mm) A283 Gr.C
8 / 8 mm 61 m2 or 3 complete plates A283 Gr.C
(12000x1900 mm)
Revision Doc. Reference Location Page Date
00 Br-M1356-Q-003 Marsa EL-Brega-Libya 7 of 10 03-08-2021

Project Title
CRUDE TANK REHABILITATION TK 2&7 STORAGE TANKS TK2 & TK7 INSPECTION REPORT

V.3. SHELL DEFECTS DETAILS


V.3.1. TANK 07

DEF-01 Hole DEF-02 Hole DEF-03 Hole DEF-04 Hole DEF-05 Bent DEF-06 Pitting First
V5/V6 in the weld V6 under wind V5 TOP SIDE V4/V5 ON THE V-5 TOP SIDE shell
between the two shell girder Plate-3 WELD Plate-3 Plate-22-23
Plate-11 Plate-11 Thk:11.40 to Plate-3 Thk: 11.51 to Thk: 18.45 to 35.14
Thk: 7.40 to11.4 Thk:7.34 to 8.02 12.02 Thk: 11.39 to 17.02 12.01
V.3.2. TANK 02

DEF-01 Hole DEF-02 Bent DEF-03 Bent DEF-04 Bent DEF-05 Bent DEF-06 Bent
V-7 Plate-1 V-7 Plate 1 V-6 P3 V-6 P4 V-4 P4 V-4 P5
Thk: 7.42 to 7.8 Tkn: 4.2 to 7.4

DEF-07 Hole Bent DEF-08 Bent DEF-09 Bent DEF-10 Bent DEF-11 Bent DEF-12 Bent
V-5 P4 V-8 P5 V-3 P5 V-4 P5 V-5 P5 V-5 P5

DEF-13 Bent DEF-14 Hole DEF-15 Hole Bent DEF-16 Bent DEF-17 Bent DEF-18 Hole
V-5 P5 Bent V-6 P6 V-6 P7 V-5 P6 V-6 P6
V-5 P5

DEF-19 Hole Bent DEF-20 Hole DEF-21 Bent DEF-22 Bent DEF-23 Bent DEF-24 Hole
V-7/V-8 P6 V-7 P8 V6 P8 V-5 P7 V-6 P8 Bent
V-6 P8

DEF-25 Bent DEF-26 Bent DEF-27 Bent DEF-28 Bent DEF-29 Bent DEF-30 Bent
V-6 P8 V-8 P8 V-5 P7 V-4 P8 V-4 P8 V7 P8

DEF-31 Bent DEF-32 Hole DEF-33 Hole Bent DEF-34 Bent DEF-35 Bent DEF-36 Bent
V-6 P8 Bent v-5 P10 V-5 P14 V-7 P14 V-6 P14
V-5 P10
Revision Doc. Reference Location Page Date
00 Br-M1356-Q-003 Marsa EL-Brega-Libya 8 of 10 03-08-2021

Project Title
CRUDE TANK REHABILITATION TK 2&7 STORAGE TANKS TK2 & TK7 INSPECTION REPORT

DEF-37 Hole Bent DEF-38 Hole DEF-39 Hole Bent DEF-40 Hole Bent DEF-41 Hole DEF-42 Hole
V-7 P15 Bent V-7 P15 V-7 P16 Bent Bent
V-7 P15 V-7 P16 V-7 P16

DEF-43 Hole Bent DEF-44 Bent DEF-45 Hole Bent DEF-46 Hole Bent DEF-47 Bent DEF-48 Hole
V-6/V-7 P16 V-6 P16 V-7 P16 V-6 P17 V-5 P17 Bent
V-7 P17

DEF-49 Hole Bent DEF-50 Hole DEF-51 Hole Bent DEF-52 Hole Bent DEF-53 Hole DEF-54 Hole
V-7 P17 Bent V-7 P17 V-7 P17 Bent Bent
V-7 P17 V-7 P17 V-7 P17

DEF-55 Hole Bent DEF-56 Hole DEF-57 Hole Bent DEF-58 Hole Bent
V-6/V-7 P17 Bent V-6 P18 V-6 P18
V-7 P18

V.4. SHELL SKETCHES


Revision Doc. Reference Location Page Date
00 Br-M1356-Q-003 Marsa EL-Brega-Libya 9 of 10 03-08-2021

Project Title

CRUDE TANK REHABILITATION TK 2&7 STORAGE TANKS TK2 & TK7 INSPECTION REPORT

V.4.1. TANK 07
Revision Doc. Reference Location Page Date

00 Br-M1356-Q-003 Marsa EL-Brega-Libya 10 of 10 03-08-2021


Project Title

CRUDE TANK REHABILITATION TK 2&7 STORAGE TANKS TK2 & TK7 INSPECTION REPORT

V.4.2. TANK 02