0% found this document useful (0 votes)
499 views2 pages

BlastHole Drill Job Card

This document is a blasthole drilling job card from Kinross Chirano Gold Mines Ltd. It contains fields to record information about the drill machine, drill crew, start and finish times, pre-drilling checklists, and signatures of the operator and supervisor. The card is used to record details of blasthole drilling work and must be returned to the production office via the shift supervisor.

Uploaded by

Stephen Sogah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
499 views2 pages

BlastHole Drill Job Card

This document is a blasthole drilling job card from Kinross Chirano Gold Mines Ltd. It contains fields to record information about the drill machine, drill crew, start and finish times, pre-drilling checklists, and signatures of the operator and supervisor. The card is used to record details of blasthole drilling work and must be returned to the production office via the shift supervisor.

Uploaded by

Stephen Sogah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Blasthole Drilling Job Card

KINROSS CHIRANO GOLD MINES LTD

BLASTHOLE DRILLING JOB CARD

MACHINE ID:…………… DATE:……………………….

DRILLER'S NAME:………………………………….. START TIME:…………….

DRILLER'S ID:……………………………. CLOSE TIME:……………..

START: CREW:……………….
MACHINE ENGINE HOURS
FINISH: DRILL AREA:………………

START: SHIFT: D / N
MACHINE HAMMER HOURS
FINISH:

CHECK LIST
Engine Oil Compressor Oil

Hammer Oil Engine Water Level

Hydraulic Oil Drilling Water Level

Fuel Rod Grease

Fire Extinguisher Drifter Bolts

COMMENTS:

OPEARTOR'S SIGNATURE:……………… SUPERVISOR'S SIGNATURE:……………

NOTE:SAFETY IS EVERYONE'S RESPONSIBILITY


ALL CARDS MUST BE RETURNED TO THE PRODUCTION OFFICE VIA THE SHIFT SUPERVISOR

\\Chi-fs-02\shares_2\Minex\Engineering\Personals\TA\Drill Blast Reports- Revised Front Page Version 1.2


Blasthole Drill Job Card BLASTHOLE DRILLING REPORT

Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth
Hole Type Bench: Shot #: Pit: Pattern: Bit Size:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Production Holes

Batter
Redrill
Flushing
Toes
Ore Monitors
In-Fill
Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth
Hole Type Bench: Shot #: Pit: Pattern: Bit Size:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Production Holes

Batter
Redrill
Flushing
Toes
Ore Monitors
In-Fill
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Other Hole Types
Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth
Presplit:
Boulders
Depressurisation
\\Chi-fs-02\shares_2\Minex\Engineering\Personals\TA\Drill Blast Reports- Revised Back Page Version 1.2

You might also like