20 GENERIC IEE Checklist Form
20 GENERIC IEE Checklist Form
For
This Generic IEE Checklist Report shall be used as the interim pro-forma EIA Report
requirement for projects to be located within Environmentally Critical Areas (ECA) where a
customized IEE Checklist Report Form has not yet been developed but are required IEE
Checklist Report Form or IEE Report per existing guidelines
For ECC applications, this IEE Checklist Report shall be submitted with:
Proof of Compatibility with the existing Land Use Plan
Proof of Authority over the Project Site
Accountability Statements of Proponent (see attached form) and the Preparer (if any,
following Annexes 2-22 of Revised Procedural Manual for DAO 2003-30)
Photographs or plates/vicinity map of the project site showing impact areas and affected
areas and communities
Duly Accomplished Project Environmental Monitoring & Audit Prioritization Scheme
(PEMAPS) Questionnaire (see Annex 2-7d of Revised Procedural Manual for DAO 2003-30)
(No other documents shall be required as pre-requisite to ECC applications per DENR MC 2010-14)
Read the questions carefully and write the required information on the blank spaces provided
or otherwise check () the appropriate boxes □ or parenthesis ( ). Boxes with check marks ()
are automatically required. Use additional sheets if necessary and indicate this in the
appropriate space.
Total Project/Building
Footprint Area _______________________________________________________
(Area actually utilized)
Project Proponent: _______________________________________________________
_______________________________________________________
Office Address:
Contact Person: _______________________________________________________
Designation: _______________________________________________________
Contact Number/s
Landline : _______________________________________________________
Fax Number: _______________________________________________________
I. PROJECT DESCRIPTION
1.1 PROJECT LOCATION AND AREA: Street Name, Barangay, and Municipality/City, Province
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
See attached vicinity map/s and photographs of the project site and site development/layout plan.
Geographic coordinates of the project area (Preferably use WGS 84 datum, otherwise specify datum
used).
Perimeter/Boundary points
Longitude Latitude
(based on OCT/TCT/etc)
Specification/
Area (sq. m.) /
Facilities No. of Units Description /
Capacity
Remarks
Support Facilities (e.g. emergency
generators, boilers, etc.)
Admin support (e.g., canteen, office,
clinic, quarters, etc.)
Water source / supply
Drainage system
(Please list facilities by module/grouping. Use additional sheets if needed)
Water Source
Energy/Water Efficiency
Utilities Estimated Savings Proposed Efficiency/Conservation
Measures
Power/Electricity KWh
1.4 MANPOWER
a. Construction Phase
Manpower Requirement Expertise/Skills Total
b. Operation Phase
Manpower Requirement Expertise/Skills Total
Disturbance to wildlife Existing vegetation in the area: þ Compliance with conditions of DENR/LGU þ Annual inspection of area þ Cost integrated in the
due to vegetation Forestland SLUP, Tree Cutting Permit, ROW, PCA replanted/ revegetated construction /operation cost
clearing Marshland Permit
Grassland þ Limit land clearing as much as possible
Mangrove þ Provide temporary fencing for vegetation
Wetland that will be retained
Others, specify þ Promote restoration of damaged or
____________________ destroyed vegetation where possible (e.g.,
tree planting);
Change in surface Slope: Provide erosion control and slope Regular inspection of slope Slope/ Erosion Control
landform/ topography/ flat (0-3%) protection measures protection measures in Cost: ___________
terrain/slope gently sloping to rolling (3-18%) Designate a Spoils Storage Area, with erosion-prone areas Others, specify
steep (>18%) topsoil set aside for later use and allow Regular inspection for new ____________
Soil Erosion maximum re-use of spoils eroded areas near the site
Construction during dry season Others, specify
þ Soil/Land contamination Existing soil type in the area: þ Implementation of the Ecological Solid þ Daily inspection of þ Cost integrated in the
due to improper solid sandy Waste Management Plan (ESWMP) waste/recycling bins for construction /operation cost
waste disposal clay Set-up temporary fence around the segregation
sandy-loam construction area þ Daily inspection for presence
Others, specify þ Implement re-use and recycling of waste of mixed garbage in the
____________ materials facility
þ Implement proper segregation, collection þ Weekly inspection of waste
and disposal of domestic wastes in accumulated
designated areas Others, specify
þ Provide receptacles / bins for solid wastes _____________
Coordinate with the municipal / city waste
collectors
Engage third party company for waste
collection
Others, specify ________________
Impairment of visual Presence of visually significant Implement landscaping and other Regular inspection of þ Cost integrated in the
aesthetics landforms/landscape/structures? beautification measures landscaping and other construction/ operation cost
Devaluation of land Yes Provide adequate buffer beautification activities
values No Compensate adjacent property owners Regular monitoring of buffer
Others, specify zones
________________ þ Regularly monitor
presence/absence of
complaints from adjacent
property owners
WATER
Competition in water Size of population using receiving Implement rainwater harvesting and similar þ Regularly monitor þ Cost integrated in the
use surface water: measures as an alternative source of water presence/absence of construction/ operation cost
Depletion of water ≤ 1,000 persons Observe water conservation measures; complaints
resources >1,000 and ≤ 5,000persons Careful selection of project site to avoid þ Regular coordination with
>5,000person disruption of traditional water uses concerned agencies
Obtain Water Permit from NWRB þ Regularly monitor
Available/nearest water source. Improve efficiency of water supply and occurrences of water
Deepwell distribution system shortages
Water district/LGU Others, specify Others, specify
Surface water _____________________ ____________
Others, specify
________________________
Increased occurrence Is the project site located in an area Use appropriate design for project facilities þ Regularly monitor þ Cost integrated in the
of flooding identified by MGB/PAG-ASA as Implement appropriate drainage system presence/absence of construction/ operation cost
flood prone? Regularly remove debris and other complaints
Yes materials that may obstruct water flow þ Regular coordination with
No Use appropriate technology (e.g. raised concerned agencies
hand-pumps) to protect drinking water from þ Regularly monitor increased
flood contamination frequency of flooding
Others, specify Others, specify
_____________________ _________________
AIR / NOISE
Air quality degradation Distance to nearest community: Properly operate and maintain all emission þ Regularly monitor þ Cost integrated in the
0 to less than 0.5 km sources (e.g. vehicles, pumps, generator, presence/absence of construction/ operation cost
0.5 to 1 km etc) complaints
More than 1 km Install when applicable, the appropriate air
pollution control device/s Regular (ocular) inspection of:
Strictly enforce good housekeeping Absence of white or black
practices smoke from vehicles,
Control vehicle speed to lessen heavy equipment and
suspension of road dust generator
Conduct water spraying to suppress dust Presence of truck cover
sources and minimize discomfort to nearby during deliveries
residents
Use covered vehicles to deliver materials
that may generate dust
Other, specify
___________________
Nuisance due to noise Distance to nearest community: Properly operate and maintain all noise þ Regularly monitor þ Cost integrated in the
generation 0 to less than 0.5 km sources (e.g. vehicles, pumps, generator, presence/absence of construction/ operation cost
0.5 to 1 km etc) complaints
More than 1 km Install when applicable, the appropriate Regular monitoring of buffer
noise control device/s (e.g., mufflers, zones
silencer, sound barriers, etc.)
Implement appropriate operating hours
Provide adequate buffer and/or planting of
PEOPLE
Displacement of Size of population of host barangay: Provide relocation/disturbance þ Regularly monitor þ Cost integrated in the
residents in the project ≤ 1,000 persons compensation packages presence/absence of construction/ operation cost
site and within its >1,000 and ≤ 5,000persons þ Prioritize local residents for employment complaints
vicinity >5,000person þ Promptly pay local taxes and other þ Regular coordination with
Displacement of financial obligations LGU
Indigenous People Classification of host barangay: þ Regular coordination with LGU Others, specify
Enhanced employment Urban Prior consultation & coordination to _________________
and/or livelihood Rural minimize disruption on daily domestic
opportunities activities & respect for IP rights and
Reduced employment Available services within/near the cultural practices
and/or livelihood host barangay: Ensure participation of IPs in consultations
opportunities Schools (e.g. elementary, high and dialogues
Increased revenues for school, college) Provide appropriate traffic/warning signs,
LGU Health facilities (e.g., clinics, lighting, etc
Disruption/Competition hospitals, etc.) Others, specify
in delivery of public Peace and order (e.g., police ________________
services (e.g., outpost, brgy. Tanod, etc.)
education, peace and Recreation and sports facilities
order, etc.) Others, specify
Enhanced delivery of _____________________
public services (e.g.,
education, peace and
order, etc.)
Increase in traffic
volume and worsening
of traffic flow
Impacts on community þ Regular coordination with LGU þ Presence/Absence of þ Cost integrated in the
health and safety Provide appropriate warning signs, lighting complaints construction/ operation cost
Others, specify and barricades, whenever practicable þ Regular coordination with
Provide description of the Abandonment activities, such as, dismantling and waste
disposal.
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Organization Chart:
This is to certify that all the information and commitments in this Initial
Environmental Examination (IEE) Checklist Report are accurate and complete to
the best of my knowledge.
I hereby bind myself to answer any penalty that may be imposed arising
from any misrepresentation or failure to state material information in this IEE
Checklist.
__________________________
NAME OF PROPONENT HEAD
(Position)
(Company Name)
SUBSCRIBED AND SWORN TO before me this _____ day of ____________ 201__, affiant
exhibiting his/her Community Tax Certificate No. ___________________ issued at
______________________ on __________________________.