E0001-S02-GQC-IR-02106 - ITP 4.6-Duct - 72+980

This document is an inspection and testing request form submitted by the contractor to the engineer for approval. It requests inspection of post-concrete works for a package 2A MV cable internal ring. The contractor certifies it has checked the work according to quality requirements. The engineer's representative will inspect and sign off to certify the inspection. The minimum quota of inspection points required to be attended by the engineer has been exceeded so the engineer may decline the request.

Uploaded by

senthil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
146 views4 pages

E0001-S02-GQC-IR-02106 - ITP 4.6-Duct - 72+980

This document is an inspection and testing request form submitted by the contractor to the engineer for approval. It requests inspection of post-concrete works for a package 2A MV cable internal ring. The contractor certifies it has checked the work according to quality requirements. The engineer's representative will inspect and sign off to certify the inspection. The minimum quota of inspection points required to be attended by the engineer has been exceeded so the engineer may decline the request.

Uploaded by

senthil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

The Client The Contractor

E0001 – PACKAGE 2S
Railway Integration and System

56+432Inspection and Testing Request


ITR Revision
Inspection Request No.: E0001-S02-GQC-IR-02106 00
Number:
Inspection Date: 03 January 2022 Inspection Time: 09.15a.m
Reference no. Rev Status
Inspection Request Information and Receipt by the Engineer

Method Statement E0001-S02-GCX-PM-00004 00 Code 1


ITP E0001-S02-GQA-PN-00002 00 Code 1
Documents
References

E0001-FJP-GCX-DS-90017 AA Code 2
Drawing

Material Approval Choose Status


Others E0001-S02-GQC-IR-01657 00 N/A
Contact Person: Engg.Abas Ali Mobile No: 0553637148
Details of Inspection
Test/Inspection Stage Installation Testing and Commissioning (T&C)
Power Supply and
Civil Earthing and Bonding
Distribution System
Discipline/ Subsystem: MEP Signalling ICSS
APS Telecommunication Other (Specify)
Package 2A Line Section 2A GMA - Al Gharbia Mainline - Ghweifat to Ruwais Jcn
Site Name Shelter - GMA07 Chainage RUWAIS(CH:72+980,4 Way Duct)

Inspection Point Hold Point Witness Point ITP Item Number 4.6
Item to be inspected: Post Concrete Inspection (Curing, Stripping of formworks)for package 2A MV Cable Internal
Detailed description as per ITP ring (4-Way Duct), Quantity=6.01 meter
Inspection Requested By
Name Date / Time Designation Signature
Project (IR Raised By STS/
Engg.Abas Ali 02-01-2022
Engineer Subcontractor)

Inspection Requested Approved By (STS)


Section Name Date / Time Designation Signature
QC Department EDWIN SANTOS 02-01-2022 QA/QC Engineer
ITR Approval by STS

Survey Department
(If Applicable)
Rail Systems Interface
(if required)
STS Comments:
Comment reviewed & closed
(signature and date)

The Work Activity described here has been checked by the Contractor in accordance with Exhibit D, Part 1, Appendix 13.0, Section 6.0, where the contractor shall
plan, perform and record all QUALITY CONTROL activities to ensure that all work is performed in accordance with the QMS documentation reviewed by the
Engineer and in compliance with the requirements of the Contract.
This is to certify that the above referenced work/activity has been inspected and/or witnessed by the Engineer.
Inspection Conducted By (The Engineer’s Representative)
Name:
Approved
ITR Approval by The Engineer

Designation:
Approved With Comments
Date / Time:
Rejected
Signature:

Comments:
Declined
Reason to Decline:
The minimum quota of inspection/witness points required to be
attend by the Engineer has been exceeded, the ITR will be declined by
the Engineer

Others (specify): Comment reviewed & closed


(signature and date)

Template No: E0001-S02-GQC-WX-00002 Rev. 01 Date Issued: 02Jun-21


POST CONCRETE INSPECTION CHECKLIST
Location : RUWAIS(CH:72+980) ITR No. E0001-S02-GQC-IR-02106

Element:Buried MV Cables Date of Inspection : 03-01-2022

Inspection result
SN. Inspection phase description Remarks
Yes No N/A
POST POUR CHECKS
Concrete Curing by covering with wet hessian cloth & ✓
1 Plastic sheets over hessian cloths / water ponding method
/ Curing Compound. Curing adequate.
In case of water curing, curing is continuous for 14 days with ✓
2
the element fully covered or as agreed by the Customer
Construction joints are prepared as per specification and ✓
3
approved method statement.
Check for stripping of Formwork / Supports etc., after ✓
4 specified duration of stripping time. Refer ITP for stripping
time.

5 Top level of concrete is correct.
All critical items (Position of MEP items, Anchor bolts etc.,) ✓
6 checked by Survey wherever applicable and found as per
drawing.

7 Forms and supports are cleaned and stacked.


8 Opening size if any, as per drawing.

Surface defects if any, rectified as per approved method ✓


9
statement.
Shape, size and verticality of the structure correct as per ✓
10
drawing.
Remarks:

Subcontractor STS Construction STS QC The Engineer (optional)


Name Eng.Abas Ali

Signature
Date 03-01-2022

UNLESS SPECIFIED OTHERWISE, THIS PRINTED COPY OF THIS DOCUMENT IS UNCONTROLLED AND FOR REFERENCE PURPOSE ONLY
E0001-S02-GQC-WX-00009-00 Page 1 of 1
INSPECTION AND TEST PLAN FOR SUBSTRUCTURE
CONCRETE WORKS FOR FOUNDATION

Reference Documents Intervention Points


Test / Inspection Requirements
No Activity Description (Drawing / Spec / MS / Frequency Verification Document No.
and Criteria
Standard / Code) SC STS Engineer
As per Technical Specification X0231-UAE-
EAS-FS-10250-00 sec 3.8

As per method statement

Curing compound must be applied


Method Statement
immediately after the initial setting time
E0001-S02-GCX-PM-
and as per manufacturer’s
90004
recommendation
Post Pouring Inspection
Post Concrete Inspection Shop Drawing / Working
Curing shall be continuous and fully Checklist E0001-S02-GQC-WX-
4.6 - Curing Drawings After Concreting H W W
effective to produce concrete in 00009 + Third Party
- Stripping of formworks
compliance with the exposure Compressive Strength Report
Technical Specification
conditions but in any event shall not be
X0231-UAE-EAS-FS-10250-
for less than 14 days unless agreed
00
otherwise by the Customer

Minimum Period Before Stripping:


2 day

Free from honeycombs, cracks, holes


formed in concrete surfaces by formwork.
As per approved Material Approval Material Approval
Request Request After concreting Concrete Repair Checklist
4.7 Concrete Repair (if any) H W W
As per approve Concrete Repair Approved Concrete Repair Each defects E0001-S02-GQC-WX-00014
Methodology Methodology

Closed NCRs
5 NCR closeout (if applicable) Ensure that all the NCRs are closed. As per NCR Procedure Each NCR H H R
NCR Log

UNLESS SPECIFIED OTHERWISE, THIS PRINTED COPY OF THIS DOCUMENT IS UNCONTROLLED AND FOR REFERENCE PURPOSE ONLY
E0001-S02-GQA-PN-00002-00 PAGE 12 OF 14
1 2 3 4 5 6 7 8

FOR CONTINUATION REFER SHEET 20 OF 21


A A

CA
OP
E LO R
BL ELTE
10M DE SH
INSI
AT
B
ED
OS E NO
OP CABL N -1
PR IO
AT
11KV IN TR
Y
RM
TE E EN
BL
CA
11kV

6.0
9m C
A
KH
E BARA
BL
CA ISS

1
m
0sq.m U/G 7 TO
kV
R#

0.5
.
x 15 . 11 TE
3C AL
PE SHEL
XL
OM m
FR
sq.m E

14
x 50 BL
3C G CA 7
ED kV U/ 6 TO
OS #
OP AL. 11 TER
PR
PE SHEL
XL

1m
OM

0m
FR

4W
0.5
D

0m
0m
1.5

B
2W B
0m
1.5

D
EGL:1.63
PROPOSED MV CABLE JOINT-20 FGL:4.45
E=625139.342 TOC:1.48
N=2648537.915 E=625629.269
N=2648774.8

EGL:1.63
FGL:4.45
SHELTER GMA-07 TOC:1.48
E=625631.788
ENLARGED VIEW 1 N=2648769.349
C C

L=24.443m-W=44.720m-S=90°
REFER TO ENLARGED

GMA_CUL_72+600
DETAIL-2
EGL:1.486 EGL:1.576 EGL:1.706
EGL:1.858 EGL:1.348 EGL:1.466 EGL:1.386 EGL:1.612 EGL:1.669
EGL:2.398 EGL:2.378 EGL:2.077 E:625296.325 E:625406.817 E:625560.973
E:625142.320 E:625187.173 E:625241.787 E:625348.528 E:625456.780 E:625506.375
E:625006.247 E:625051.480 E:625095.430 N:2648611.900 N:2648663.335 N:2648735.325
N:2648560.420 N:2648636.045 N:2648686.666 B
10M CABLE LOOP AT

14.19m
INSIDE SHELTER

N:2648586.751 N:2648709.818
PROPOSED

N:2648538.770
11KV CABLE
TERMINATION -1NO

11kV CABLE ENTRY

N:2648473.168 N:2648494.976 N:2648516.157 3C x 150 sq.mm


XLPE AL. 11kV U/G CABLE
FROM SHELTER # 7 TO ISS BARAKHA

PROPOSED 3C x 50 sq.mm
XLPE AL. 11kV U/G CABLE
FROM SHELTER # 6 TO 7
B

C C

0.50m
A

6.01m
4W
2W

0.50m
1.50m 1.50m

D
D D

EGL:1.66 EGL:1.58
FGL:1.862 FGL:1.862
72+300

72+400

72+500

72+600

72+700

72+800

72+900

73+000
TOC:1.362 TOC:1.362
E=625630.06
SEE ENLARGED
E=625617.216
N=2648761.594 N=2648767.624 VIEW 1

E E

GRADE LEVEL

GRADE LEVEL

10M CABLE LOOP AT


NATURAL SOIL FILLING INSIDE SHELTER
TO THE NORMAL LEVEL
(VARIES AS PER SITE CONDITION)

SELECTED BACK
FILL MATERIAL
SHELTER 9
GORUND LEVEL PROPOSED
PACKAGE UNIT
(VARIES AS PER SITE CONDITION)

SELECTED BACK 11KV CABLE


FILL MATERIAL
MIN. 900

TERMINATION -1NO
F F

B
11kV CABLE ENTRY
MIN. 900

300
5-16mm Ø TOP & BOTTOM
STEEL REINFORCEMENT
5-16mm Ø TOP & BOTTOM
STEEL REINFORCEMENT

600
WARNING TAPES
1400

STIRRUPS Ø 8 @200
1700

B
RMU
850
STIRRUPS Ø 8 @200 50 3C x 150 sq.mm
75

XLPE AL. 11kV U/G CABLE

1000
250
150

FROM SHELTER # 7 TO ISS BARAKHA


75

CABLE COVERING TILES


150
200

200MM Ø UPVC PIPE


PROPOSED 3C x 50 sq.mm
XLPE AL. 11kV U/G CABLE EGL
200

FROM SHELTER # 6 TO 7
100

PROPOSED 3Cx50sq.mm XLPE


AL. 11kV U.G. CABLE PROPOSED 3Cx50sq.mm
XLPE AL. 11kV U.G. CABLE
150
200

PROPOSED 3C x 50 sq.mm PROPOSED 3C x 50 sq.mm


G PROPOSED 3Cx50sq.mm XLPE
AL. 11kV U.G. CABLE XLPE AL. 11kV U/G CABLE XLPE AL. 11kV U/G CABLE
50MM THICK LEAN SIEVED SAND BEDDING
CONCRETE SHELTER GMA - 6 TO 7 SHELTER GMA - 7 TO ISS BARAKAH
150

150 200 100 200 150 250 250


50MM THICK LEAN
800 500
SECTION 1-1
CONCRETE
150 200 100 200 150 SECTION D-D
SECTION A-A
800 2WAY DUCT BANK
1 NO. 11kV CABLE TRENCH DETAILS DETAIL-2
SECTION C-C SCALE 1 : 50
4WAY DUCT BANK

PROJECT
LEGEND: REFERENCE DRAWING : E0001-S02-EGE-DG-30053-AB 11KV CABLE LAYOUT Rev. Date CO Revision Description Drwn Vrfr Appr Atzr
PREPARED
ETIHAD RAIL STAGE 2 & 3 PROJECT DRAWING TITLE

HE E0001 - PACKAGE 2S LINESIDE PROPOSED MV CABLE ROUTING


LINE SIDE LEVEL REFERENCE DRAWING:C0303-GMA-ERA-DS-42530-00
GHWEIFAT

PROPOSED MV CABLE ROUTE LINESIDE ACCESS ROAD DATE 06-DEC-2021 Design & Build Contract LAYOUT FROM SHELTER GMA-06 TO GMA-07
H SHELTER LEVEL REFERENCE DRAWING:E0001-S02-EAS-DG-30051-AB AA 27-JUL-2021 -- FIRST REVSION ISSUED FOR APPROVAL (VER 00.00) HE MI DT AA
VERIFIED
(Railway Integration and Systems)
PR. REINFORCED ROAD CROSSING DUCT RIGHT OF WAY PACKAGE-2A
RUWAIS

A.ELGOHARY
PROPOSED UTILITY PROTECTION EXISTING FENCE ABBREVIATIONS: NOTE: AB 08-DEC-2021 -- ISSUED FOR APPROVAL(VER 01.00) HE MI DT AA
DATE 06-DEC-2021
CLIENT PMC SHEET No SCALE ORIGINAL SIZE

PROPOSED DUCT (BY DMD CONTRACTOR) DITCH / DRAIN 21 of 21 1:1000 A1


EGL: EXISITNG GROUND LEVEL 1. ALL DIMENSIONS ARE IN METERS UNLESS QUALITY PROCESS APPROVAL
PROPOSED DUCT (BY OTHERS) SAND MITIGATION
OTHERWISE NOTED. PACKAGE 2A C.ORTIZ
CONTRACTOR PROJECT STAGE DOCUMENT STATUS

PROPOSED MV CABLE JOINT


BOC: BOTTOM OF CABLE DATE 06-DEC-2021 DCP3 Issued for Acceptance
2. COORDINATE REFERENCE SYSTEM WG84 UTM39N. ELECTRICAL SUB CONTRACTOR ENGINEER DRAWING No REVISION
ROUTE MARKER TOC: TOP OF CONCRETE APPROVED
M. ESPOSITO
JUPITER EMC LLC.
ELECTRO MECHANICAL CONTRACTING E0001-FJP-GCX-DS-90017 AB
FGL: FINISH GRADE LEVEL P.O.Box : 128150
Abu Dhabi
Tel. : 02-6419541
Fax. : 02-6419542
DATE 06-DEC-2021 FILE NAME: E
0001F
-JPG
-CXD
-S9-0017A
-B
d.wg
1 2 3 4 5 6 7

You might also like