Portal Ratol & Rates Premo: Sewerage RM 1707.27 2433.00 605.00 2173.33 1825.00 1500.00

This document provides sewerage rates for various precast concrete works in multiple locations, including manholes of different depths and diameters, testing works, and forming openings. The rates ranges from RM37.55 to RM3710 for different work items and locations. Contact details are provided for any questions regarding the rates.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
100 views5 pages

Portal Ratol & Rates Premo: Sewerage RM 1707.27 2433.00 605.00 2173.33 1825.00 1500.00

This document provides sewerage rates for various precast concrete works in multiple locations, including manholes of different depths and diameters, testing works, and forming openings. The rates ranges from RM37.55 to RM3710 for different work items and locations. Contact details are provided for any questions regarding the rates.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Portal RATOL & Rates PreMo

CAWANGAN KONTRAK DAN UKUR BAHAN 02.01.2022

Work Item Unit Overall Average (RM)


SEWERAGE No. Location Range (RM) Average (RM) RM 1707.27
PRECAST CONCRETE
A 2433.00 - 2433.00 2433.00
Manhole
1200m internal diameter comprising standard precast B 605.00 - 605.00 605.00
concrete panels, cutting & jointing, bedded and jointed C 1400.00 - 3500.00 2173.33
in cement & sand (1:3) lined internally to shaft and
chamber ring with 19mm thick cement fundo lining and F 1500.00 - 2150.00 1825.00
other component with coal tar epoxy all in accordance H 1500.00 - 1500.00 1500.00
to the manufacturer's specification.
1500mm deep, 1 no. 150mm thick make-up piece, 1
no. 125mm thick cover slab and 1225mm high
chamber ring with rebated top and bottom including
hoisting and fixing into position on concrete base.
SEWERAGE No. Location Range (RM) Average (RM) RM 1496.25
PRECAST CONCRETE
B 836.00 - 836.00 836.00
Manhole
1200m internal diameter comprising standard precast C 1858.00 - 2000.00 1929.00
concrete panels, cutting & jointing, bedded and jointed D 1070.00 - 1070.00 1070.00
in cement & sand (1:3) lined internally to shaft and
chamber ring with 19mm thick cement fundo lining and F 2150.00 - 2150.00 2150.00
other component with coal tar epoxy all in accordance
to the manufacturer's specification.
1720mm deep, 1 no. 150mm thick make-up piece, 1
no. 125mm thick cover slab and 1445mm high
chamber ring with rebated top and bottom including
hoisting and fixing into position on concrete base.
SEWERAGE No. Location Range (RM) Average (RM) RM 2110.00
PRECAST CONCRETE
Manhole
1200m internal diameter comprising standard precast
concrete panels, cutting & jointing, bedded and jointed
in cement & sand (1:3) lined internally to shaft and
chamber ring with 19mm thick cement fundo lining and
other component with coal tar epoxy all in accordance
to the manufacturer's specification.
2030mm deep, 1 no. 150mm thick make-up piece, 1
no. 125mm thick cover slab and 1755mm high

1/5
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 02.01.2022

Work Item Unit Overall Average (RM)


chamber ring with rebated top and bottom including C 2160.00 - 3000.00 2580.00
hoisting and fixing into position on concrete base.
F 2150.00 - 2150.00 2150.00
H 1500.00 - 1800.00 1600.00
SEWERAGE No. Location Range (RM) Average (RM) RM 2150.00
PRECAST CONCRETE
D 1500.00 - 1500.00 1500.00
Manhole
1200m internal diameter comprising standard precast F 2800.00 - 2800.00 2800.00
concrete panels, cutting & jointing, bedded and jointed
in cement & sand (1:3) lined internally to shaft and
chamber ring with 19mm thick cement fundo lining and
other component with coal tar epoxy all in accordance
to the manufacturer's specification.
2750mm deep, 1 no. 150mm thick make-up piece, 1
no. 125mm thick cover slab and 2475mm high
chamber ring with rebated top and bottom including
hoisting and fixing into position on concrete base.
SEWERAGE No. Location Range (RM) Average (RM) RM 37.55
PRECAST CONCRETE
C 40.00 - 100.00 70.00
Manhole
1200m internal diameter comprising standard precast F 5.10 - 5.10 5.10
concrete panels, cutting & jointing, bedded and jointed
in cement & sand (1:3) lined internally to shaft and
chamber ring with 19mm thick cement fundo lining and
other component with coal tar epoxy all in accordance
to the manufacturer's specification.
Form opening in precast concrete panel for 255mm
diameter pipe.
SEWERAGE Item Location Range (RM) Average (RM) RM 2237.50
SEWERAGE
TESTING
Test the whole of the sewerage system in the
presence of the S.O with water or other approved
means before trenches are filled in, make good any
defect, re-test and on completion leave the whole
system in perfect working order to the entire

2/5
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 02.01.2022

Work Item Unit Overall Average (RM)


satisfaction of the S.O. C 2000.00 - 5000.00 3500.00
Allow for 'Pipe Leakage Test' between manhole work
at the end of the installation to the satisfaction of the E 2000.00 - 5000.00 3500.00
S.O. F 1500.00 - 2000.00 1750.00
H 200.00 - 200.00 200.00
SEWERAGE Item Location Range (RM) Average (RM) RM 2000.00
SEWERAGE
C 2000.00 - 2000.00 2000.00
TESTING
Test the whole of the sewerage system in the
presence of the S.O with water or other approved
means before trenches are filled in, make good any
defect, re-test and on completion leave the whole
system in perfect working order to the entire
satisfaction of the S.O.
Allow for 'Air Leakage Test' between manhole work at
the end of the installation to the satisfaction of the S.O.
SEWERAGE Item Location Range (RM) Average (RM) RM 3583.33
SEWERAGE
C 2000.00 - 3000.00 2500.00
TESTING
Test the whole of the sewerage system in the E 3000.00 - 5000.00 4750.00
presence of the S.O with water or other approved F 2000.00 - 5000.00 3500.00
means before trenches are filled in, make good any
defect, re-test and on completion leave the whole
system in perfect working order to the entire
satisfaction of the S.O.
Allow for 'Water Leakage Test' between manhole work
at the end of the installation to the satisfaction of the
S.O.
SEWERAGE No. Location Range (RM) Average (RM) RM 2000.00
PRECAST CONCRETE
Manhole
1200m internal diameter comprising standard precast
concrete panels, cutting & jointing, bedded and jointed
in cement & sand (1:3) lined internally to shaft and
chamber ring with 19mm thick cement fundo lining and
other component with coal tar epoxy all in accordance

3/5
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 02.01.2022

Work Item Unit Overall Average (RM)


to the manufacturer's specification. E 2000.00 - 2000.00 2000.00
1200mm deep, 1 no. 150mm thick make-up piece, 1
no. 125mm thick cover slab and 1225mm high
chamber ring with rebated top and bottom including
hoisting and fixing into position on concrete base.

4/5
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 02.01.2022

Nota Catatan
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur

u.p: En Husnan Husin


Tel: 03-26161111
Email: [email protected]

5/5