Construction Bill of Estimate

The document provides a bill of estimate for various construction works including earthworks, concrete works, masonry works, formworks, steel works, and painting works. It lists the quantities, dimensions, and volumes of materials needed for excavation, gravel bedding, footings, columns, walls, rebar, mortar, plaster, formworks, pipes, wire mesh, and other items. The totals at the bottom estimate the quantities of materials required including cement, sand, gravel, rebar, tie wire, blocks, plywood, lumber, nails, paint, and other supplies when a 5% excess is added to the listed quantities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
304 views6 pages

Construction Bill of Estimate

The document provides a bill of estimate for various construction works including earthworks, concrete works, masonry works, formworks, steel works, and painting works. It lists the quantities, dimensions, and volumes of materials needed for excavation, gravel bedding, footings, columns, walls, rebar, mortar, plaster, formworks, pipes, wire mesh, and other items. The totals at the bottom estimate the quantities of materials required including cement, sand, gravel, rebar, tie wire, blocks, plywood, lumber, nails, paint, and other supplies when a 5% excess is added to the listed quantities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

BILL OF ESTIMATE

EARTHWORKS:
EXCAVATION L W T Qty. Vol.
0
0.5 0.5 0.25 10 0.625
0.3 0.3 0.175 12 0.189
2 0.3 0.1 18 1.08 2.038
2.4 0.3 0.1 2 0.144

GRAVEL BEDDING L W T Qty. Vol.


0
0.5 0.5 0.25 10 0.625
0.3 0.3 0.175 12 0.189
2 0.3 0.1 18 1.08 2.038
2.4 0.3 0.1 2 0.144

CONCRETE WORKS: 0.60


FOOTING L W T Qty. Vol.
0
0.5 0.5 0.25 10 0.625
0.3 0.3 0.175 12 0.189
2 0.3 0.1 18 1.08
2.4 0.3 0.1 2 0.144 0

FOOTING RSB L W Cover Spacing Qty. Total L No.of Bar

10mm 0.5 0.5 0.05 0.1 10 40 6.7


10mm 0.3 0.3 0.05 0.1 12 28.8 4.8
10mm 2 0.3 2 0.4 18 99 16.5
2.4 0.3 2 0.4 2 13.2 2.2

COLUMN L W H Qty. Vol.

0.25 0.25 2.4 4 0.60


0 0 0 0 0.00 0.60

COLUMN RSB H L/W Cover # of Mbar Qty. Total L No.of Bar


Main Bar 0 0
10mm 2.4 0.25 0.05 4 2 19.2 3.200
10mm 0 0 0.05 4 0.0 0.000
(Stirrup) 10mm H W Cover Spacing Qty. Total L No.of Bar
1@ 2.4 0.25 0.05 0.05 2 34.7 6.0
2@ 0.10
rest @ 0.15

(Stirrup) 10mm H W Cover Spacing Qty. Total L No.of Bar


1@ 0 0 0.05 0.05 0 0.0 0.0
2@ 0.10
rest @ 0.15

TIE WIRE No.of RSB w/pc. Total w No. of Kg


39.4 3.7 145.7 2.91

MASONRY WORKS:
WALL L H # Area Qty. No. of CHB
6 0.8 7 33.6 420 420
33.6

WALL RSB L H Spacing Total L No.of Bar


V 6 0.8 0.4 12.00 4.67
H 6 0.8 0.3 16.00

TIE WIRE No.of RSB w/pc. Total w Qty.


4.67 3.7 17.27 0.35

MORTAR Area Qty. CLASS B


33.6 Cement 17.5 CFACTOR SFACTOR
Sand 1.46 0.522 0.0435

PLASTER Area Sides CLASS B 16mm thk


33.6 2 Cement 13.0 CFACTOR SFACTOR
Sand 1.08 0.192 0.016

FORMWORKS:
FORMWORKS L W H Qty. Area APLYWOOD
2.88
0.5 0.5 0.35 10 7.7
0.3 0.3 0.175 12 2.94

No. of PW No. of Bd.ft. No. of Nails 3"


3.69 109.6 2.19

STEEL WORKS:
2" G.I PIPE L H Qty. Total L No.of Pipe
40.8 1.5 12 58.80 9.8

Angle bar 1.5"x.25" L H Qty. Total length bakod


42 4 168 28
1"x1".25" 1.2 10 2016 336.00

WIRE MESH L H L of Mesh No.of Pipe Area


40.8 1.3 5 8.16 6.5

10mm RSB L H Sides Qty Total L No.of Bar


2 1.2 2 18 115.2 21.6
2.4 1.2 2 2 14.4

WELDING ROD No.of RSB w/pc. Total w Qty.


21.60 3.7 79.92 1.60

PAINTING WORKS

TOTAL AREA 70.0 sq.m

MATERIALS QTY
2.05 Gloss Latex Paint (Boysen White) 3
Epoxy Paint 2
Epoxy Reducer 1
Paint Brush 3" 5
Roller with Tray 3
1
Excavation 3 cu.m

Gravel G1 3 cu.m

CFACTOR SFACTOR GFACTOR


CLASS A 9 0.5 1
CLASS B 7.5 0.5 1

Qty plus 5%
5.4 5.67 Cement 35 bags
0.30 0.32 Sand 2 cu.m
0.60 0.63 Gravel 3/4 4 cu.m
39.4 41.34 RSB 10mm 97 pcs.
2.92 3.07 Tie Wire 8 kgs.
Qty plus 5%
420 441 4" CHB 440 pcs.
4.67 4.90 RSB 10mm 5 pcs.
0.35 0.36 Tie Wire 1 kg
30.5 32.07 Cement 32 bags
2.54 2.66 Sand 3 cu.m

Qty plus 5%
3.69 3.88 Plywood 4.0 pcs.
109.6 115.09 Lumber 116 bd.ft.
2.19 2.30 No. 2 CWN 3 kgs.
Qty plus 5%
9.80 10.29 2" G.I Pipe 11.0 pcs.
8.16 8.568 Wire Mesh 9.0 rolls
21.6 22.68 10mm RSB 23.0 pcs.
Welding R 3.0 kgs.

1gal is 4L

0
UNIT 0.25 1.8 4 10 18
gallons 42.0 0.6 2 1 50.4
gallons 68.4
liter
pcs
pcs
liter