BILL OF ESTIMATE
EARTHWORKS:
EXCAVATION L W T Qty. Vol.
0
0.5 0.5 0.25 10 0.625
0.3 0.3 0.175 12 0.189
2 0.3 0.1 18 1.08 2.038
2.4 0.3 0.1 2 0.144
GRAVEL BEDDING L W T Qty. Vol.
0
0.5 0.5 0.25 10 0.625
0.3 0.3 0.175 12 0.189
2 0.3 0.1 18 1.08 2.038
2.4 0.3 0.1 2 0.144
CONCRETE WORKS: 0.60
FOOTING L W T Qty. Vol.
0
0.5 0.5 0.25 10 0.625
0.3 0.3 0.175 12 0.189
2 0.3 0.1 18 1.08
2.4 0.3 0.1 2 0.144 0
FOOTING RSB L W Cover Spacing Qty. Total L No.of Bar
10mm 0.5 0.5 0.05 0.1 10 40 6.7
10mm 0.3 0.3 0.05 0.1 12 28.8 4.8
10mm 2 0.3 2 0.4 18 99 16.5
2.4 0.3 2 0.4 2 13.2 2.2
COLUMN L W H Qty. Vol.
0.25 0.25 2.4 4 0.60
0 0 0 0 0.00 0.60
COLUMN RSB H L/W Cover # of Mbar Qty. Total L No.of Bar
Main Bar 0 0
10mm 2.4 0.25 0.05 4 2 19.2 3.200
10mm 0 0 0.05 4 0.0 0.000
(Stirrup) 10mm H W Cover Spacing Qty. Total L No.of Bar
1@ 2.4 0.25 0.05 0.05 2 34.7 6.0
2@ 0.10
rest @ 0.15
(Stirrup) 10mm H W Cover Spacing Qty. Total L No.of Bar
1@ 0 0 0.05 0.05 0 0.0 0.0
2@ 0.10
rest @ 0.15
TIE WIRE No.of RSB w/pc. Total w No. of Kg
39.4 3.7 145.7 2.91
MASONRY WORKS:
WALL L H # Area Qty. No. of CHB
6 0.8 7 33.6 420 420
33.6
WALL RSB L H Spacing Total L No.of Bar
V 6 0.8 0.4 12.00 4.67
H 6 0.8 0.3 16.00
TIE WIRE No.of RSB w/pc. Total w Qty.
4.67 3.7 17.27 0.35
MORTAR Area Qty. CLASS B
33.6 Cement 17.5 CFACTOR SFACTOR
Sand 1.46 0.522 0.0435
PLASTER Area Sides CLASS B 16mm thk
33.6 2 Cement 13.0 CFACTOR SFACTOR
Sand 1.08 0.192 0.016
FORMWORKS:
FORMWORKS L W H Qty. Area APLYWOOD
2.88
0.5 0.5 0.35 10 7.7
0.3 0.3 0.175 12 2.94
No. of PW No. of Bd.ft. No. of Nails 3"
3.69 109.6 2.19
STEEL WORKS:
2" G.I PIPE L H Qty. Total L No.of Pipe
40.8 1.5 12 58.80 9.8
Angle bar 1.5"x.25" L H Qty. Total length bakod
42 4 168 28
1"x1".25" 1.2 10 2016 336.00
WIRE MESH L H L of Mesh No.of Pipe Area
40.8 1.3 5 8.16 6.5
10mm RSB L H Sides Qty Total L No.of Bar
2 1.2 2 18 115.2 21.6
2.4 1.2 2 2 14.4
WELDING ROD No.of RSB w/pc. Total w Qty.
21.60 3.7 79.92 1.60
PAINTING WORKS
TOTAL AREA 70.0 sq.m
MATERIALS QTY
2.05 Gloss Latex Paint (Boysen White) 3
Epoxy Paint 2
Epoxy Reducer 1
Paint Brush 3" 5
Roller with Tray 3
1
Excavation 3 cu.m
Gravel G1 3 cu.m
CFACTOR SFACTOR GFACTOR
CLASS A 9 0.5 1
CLASS B 7.5 0.5 1
Qty plus 5%
5.4 5.67 Cement 35 bags
0.30 0.32 Sand 2 cu.m
0.60 0.63 Gravel 3/4 4 cu.m
39.4 41.34 RSB 10mm 97 pcs.
2.92 3.07 Tie Wire 8 kgs.
Qty plus 5%
420 441 4" CHB 440 pcs.
4.67 4.90 RSB 10mm 5 pcs.
0.35 0.36 Tie Wire 1 kg
30.5 32.07 Cement 32 bags
2.54 2.66 Sand 3 cu.m
Qty plus 5%
3.69 3.88 Plywood 4.0 pcs.
109.6 115.09 Lumber 116 bd.ft.
2.19 2.30 No. 2 CWN 3 kgs.
Qty plus 5%
9.80 10.29 2" G.I Pipe 11.0 pcs.
8.16 8.568 Wire Mesh 9.0 rolls
21.6 22.68 10mm RSB 23.0 pcs.
Welding R 3.0 kgs.
1gal is 4L
0
UNIT 0.25 1.8 4 10 18
gallons 42.0 0.6 2 1 50.4
gallons 68.4
liter
pcs
pcs
liter