0% found this document useful (0 votes)
81 views1 page

YB21080 Er - Arunachalam ST02-FOOTING DETAILS STRUCTURAL DRAWING

1. The document is a structural drawing showing dimensions for a building foundation in feet and inches. 2. It specifies reinforcement along the longer and shorter sides of the foundation. 3. Notes provide information on dimensions, discrepancies to bring to the structural consultant, relevant architectural drawings, and specifications for concrete grade, steel grade, and clear cover dimensions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views1 page

YB21080 Er - Arunachalam ST02-FOOTING DETAILS STRUCTURAL DRAWING

1. The document is a structural drawing showing dimensions for a building foundation in feet and inches. 2. It specifies reinforcement along the longer and shorter sides of the foundation. 3. Notes provide information on dimensions, discrepancies to bring to the structural consultant, relevant architectural drawings, and specifications for concrete grade, steel grade, and clear cover dimensions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8 9 10

W NOTES:

1. ALL DIMENSIONS ARE IN FEET & INCHES, UNLESS OTHERWISE


SPECIFIED.
29'-3"
Reinfo along Longer Reinfo along Shorter
S N 2.
3.
DRAWING SHOULD NOT BE SCALED, FOLLOW FIGURED DIMENSIONS.
ANY DISCREPANCY IN DRAWING SHALL BE BRING TO NOTICE OF
F STRUCTURAL CONSULTANT BEFORE EXECUTION OF WORK. F
11'-9" 6'-9" 10'-9" 4. THIS DRAWING SHOULD BE READ ALONG WITH THE RELEVANT
E ARCHITECTURAL DRAWING.
5. IF THERE IS ANY REVISION IN DRAWING, FURTHER CONSTRUCTION

2'-6" 2'-6"
2'-3" 2'-3" SHALL BE EXECUTED AS PER THE LATEST REVISED DRAWING, ON THE
ISSUE OF LATEST REVISION.
6 6. GRADE OF CONCRETE SHALL BE M20.GRADE OF STEEL SHALL BE Fe500
F3 2'-3" F2 2'-3" F3 7. CLEAR COVER FOR
FOOTING :2"(50mm)

6'-1012"
2'-112" 2'-412" 2'-3" 2'-9" 2'-6" 2' PLINTH BEAM 3 "(30mm)
:1 16

Longer direction
2'-9"

2'-9"
COLUMN :1 1/2"(40mm)
2'-3" 2'-3" BEAM :1"(25mm)

Column
5 A
SLAB :3/4"(20mm)

2'-9"

2'-9"
A 8. LAP LENGTH OF BARS : 50Ø, AT COLUMN LAPPING PROVIDE 4"
F3 2'-3" 2'-3" F3 SPACING OF TIES, NO LAPPING ALLOWED AT BEAM-COLUMN JOINT.
F1 F1
9. DEVELOPMENT LENGTH (Ld) FOR REINFORCEMENT BARS
2'-3" 2'-3" 2'-3" 2'-3" IN COMPRESSION : 40Ø

9'-1012"
E E
2'-9" 2'-9" 2'-9" 2'-9" IN TENSION : 50Ø
10. IN CASE OF BEAM REINFORCEMENT, NO LAPPING SHALL BE ALLOWED
2'-3" 2'-3" IN FOLLOWING PLACES
(a) TOP ROD NEAR COLUMN, L/4 ON EITHER SIDES OF COLUMN
2'-112" 2'-42"
1

(b) TOP ROD OF CANTILEVER BEAM ALONG THE LENGTH AND


4 ALSO DEVELOPMENT LENGTH, BEYOND COLUMN
(c) BOTTOM ROD AT MID SPAN OF BEAM
F3 11. REMOVAL OF SHUTTERING / FORM WORK
(a) COLUMN : 24 HOURS

6'-6"
Shorter Direction (b) BEAM SIDES : 24 HOURS

2'-3" 2'-9"
2'-112" 2'-42"

2'-9"

2'-9"
1

(c) BEAM BOTTOM : LESS THAN 6M SPAN : 14 DAYS

44'-6"
: MORE THAN 6M SPAN: 28 DAYS
3 TYPICAL PLAN OF FOOTING (d) SLAB : LESS THAN 20'SPAN : 14 DAYS
2'-9"

2'-9"
F3 : MORE THAN 20'SPAN : 28 DAYS
F1 F1 F2 HOWEVER 7 DAYS STRENGTH OF CONCRETE SHOULD BE 65% OF THE
2'-3" 2'-3" Column Reinfo TARGET STRENGTH, TO REMOVE FORM WORK.
D D
2'-1012" 2'-712" 2'-1012" 2'-712" 2'-6" 2'-6" 12. THIS BUILDING IS DESIGNED FOR GROUND FLOOR + 1.

10'-412"
GL GL
2'-6" 2'-6"

2'-3" 2'-3"
2 Lateral Ties
F3 2'-3" F2 2'-3" F3

Not Less Than 5'0"


Up to Hard Strata
2'-3" 2'-3" 2'-3" 2'-3"
2'-6" 2'-6" 10'-1012"
1 1 Reinfo along Longer
1'-1012" 2'-12" 2'-3" 2'-9" 2'-112" 1'-102" (kept in bottom)
Reinfo along Shorter
2'-6" 2'-6"

C 2' 2' C
Footing
1

'd'
To Details
F4 2' 2' F4
F2

6" 6"
LIME CONCRETE 1:3:6 REV NO Date REVISION REMARKS

Sand
A B C D SECTION - AA

CENTER LINE AND FOOTING LAYOUT Er. ARUNACHALAM


CONTRACTOR
SRI AMMAN BUILDERS

CLIENT XXX
B B
SCHEDULE OF FOOTING DETAILS

BOTTOM STEEL TOP STEEL CENTER LINE & FOOTING LAYOUT,


DEPTH DETAIL REINFORCMENT DETAILS
FOOTING
FOOTING SIZE ( 'd' ) REMARKS
TYPE
SHORTER LONGER SHORTER LONGER Er.Y.BOOPATHI M.E(Struct), M.I.S.T.E,
LICENSED STRUCTURAL ENGINEER -GRADE 1
STRUCTURAL
F1 5'6" x 5'6" 15" Y10@5"C/C Y10@5"C/C - - - CONSULTANT
PYRAMID STRUCTURAL CONSULTANT
Contact No : +91 9597691155
Mail id :[email protected]
F2 5'0" x 5'0" 15" Y10@6"C/C Y10@6"C/C - - -
Scale 1:100
DRAWN CHECKED APPROVED
F3 4'6" x 4'6" 15" Y10@6"C/C Y10@6"C/C - - - Date 15-11-2021
A A
AS KR Y.BOOPATHI Paper A3
F4 4' x 4' 15" Y10@6"C/C Y10@6"C/C - - - Size
Rev.no R0
DRAWING NO:- YB-21080-ST-02
Sheet.no (01 OF 08)